HomeMy WebLinkAboutBLOCK 23 - BASIC DEVELOPMENT REVIEW - BDR180032 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTDevelopment Review Center – 281 N College Ave – Fort Collins, CO 80522-0580 – 970.221.6689
DRCoord@fcgov.com
Page 1
Submittal Instructions
• Appointments are required for all submittals or resubmittals – A paper copy of this checklist, all submittal
materials and fee payments are due at the time of project submittal. Please contact a Development
Review Coordinator at 970-221-6689 to schedule a submittal appointment and for assistance with this
checklist.
• Only complete submittals are accepted. The submittal may be returned to the applicant if any required
materials or application fees are missing or insufficient. Submittals received Monday morning through
Wednesday noon will be routed for review the same week and submittals received after Wednesday
noon will be held and routed the following week.
• This checklist shall be used in tandem with the Submittal Requirements Document. The applicant must
complete this checklist and acknowledgement of the Submittal Requirements Document.
• The applicant shall be the designated contact person who will receive correspondence from city staff
and referral agencies.
Additional Resources
• Development Review Guide and Flowchart:
https://www.fcgov.com/drg/
• Development Review Applications and Submittal Requirements Main Page:
https://www.fcgov.com/developmentreview/applications.php
• City Land Use Code:
https://library.municode.com/co/fort_collins/codes/land_use
• City Utilities:
Development Forms, Guidelines & Regulations
• City Engineering main page:
https://www.fcgov.com/engineering/
• The City’s Comprehensive Plans:
City Plan and Transportation Master Plan
• Online City Map Resources:
https://www.fcgov.com/gis/maps.php
Development Application
Complete Submittal Checklist
Page 2 Development Application Submittal Checklist September 4, 2018
Complete Submittal Checklist:
Final Development Plan (FDP) · Basic Development Review (BDR)
FDP Major Amendments (MJA) · Minor Amendments (MA)
Project Name:
Applicant Name:
Office Use Only:
Project Type: Project Number (if assigned):
New Submittal Revision -- Review Round Submittal Date:
Staff Review Meeting Date: Staff Coordinator:
This checklist is intended to be used for the final review phase for all development projects (see Step 7 of the process
flowchart). This includes final detail required for Project Development Plans (PDP). The checklist shall also be used for
Basic Development Reviews (BDR). The checklist can also be used for plan amendments including Major Amendments
(MJA) and Minor Amendments (MA). Refer to the Submittal Requirements Document for a description of these review
types. All checklist items are required unless city staff indicates an item is (W)aived, (D)eferred, (NA)Not
Applicable or already (R)eceived. If the staff code is blank (grey or blue), then the item is required. This
checklist must be reviewed, completed and accepted by staff prior to project routing. Additional information may be
requested from the applicant during the review process if necessary to address specific issues that arise. Please note
that all application materials, once submitted, become a matter of public record.
Paper Copies:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
One paper copy is required (with the initial submittal only) for
the following: Planning Submittal Package, PUD subdivision
plat, Civil Construction Plans. Plan sets shall be provided at full
scale (24” x 36”); staple together each plan set; do not fold sets
Development Review
Coordination staff
970-221-6689
One paper copy of this checklist, completed and signed by
applicant
Development Review
Coordination staff 970-221-
6689– DRCoord@fcgov.com
One signed paper copy of Development Application Form Application Form.pdf
One signed paper copy of Transportation Development
Review (TDR) Application and Fee
TDR Fees and Application.pdf
Contact Engineering at 221-
6605 for TDR fee information
Check for the above application forms payable to the “City of
Fort Collins” (fees may be consolidated into one check)
Development Review
Coordination staff
970-221-6689
Page 3 Development Application Submittal Checklist September 4, 2018
Electronic Copies:
All copies must be provided per City file naming standards and submitted on a flash drive or CD
See: Submittal Requirements Section M – File Naming Standards
1) General Information:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
Conceptual Review (CR) or Preliminary Development
Review (PDR) comment response letter; or for resubmittals
include a comment response letter from the prior round of
review
Submittal Requirements
Section C
Development Review
Coordination staff
970-221-6689
DRCoord@fcgov.com
Project Information and Design Narrative (see Submittal
Requirements, Section C)
2) Planning Submittal Package:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
Title Block information on all plan sheets Section D
Cover Page, including: Section D
a) Title Block Section D
b) Land Use Table Section E
c) Sheet Index Section D
d) Signature Blocks Section D
e) Site Plan Notes
Standard Notes
(also available in Word
format at the Submittal
Requirements web page)
Site Location Map Section D
Legal Description Section D
Final Site Plan Sheet(s) (and related hardscape design detail
sheets, See Section I for Requirements) Section F
Final Architectural Elevation Sheet(s), Materials and other
Detail Sheets (color elevations recommended) Section G
Page 9 Development Application Submittal Checklist September 4, 2018
Other Information and Data as the Director may require for
the full and complete consideration of the development: (to
be completed by staff):
Hazardous Materials Impact Analysis (if required).
Any special wildlife, wetland, natural habitats and
features, ecological or environmental study or mapping
pursuant to Section 3.3 and 3.4 of the Land Use Code
as requested by the Director.
Other items required by the Director:
City Contact: Development
Review Coordination
970-221-6689
DRCoord@fcgov.com
Applicant Acknowledgement:
I have reviewed the Development Application Submittal Requirements, Sections A – M. All documents submitted
are complete and the Development Application Submittal Requirements have been incorporated into the plans
(See Development Application Submittal Requirements for detailed description of requirements). All documents
submitted have been compared and consistent design information is shown on all plan sheets and reports. I
understand that submittal requirements not sufficiently addressed or deferred may result in added review time.
Applicant Name Check box to confirm acknowledgement
(See Development Application Submittal Requirements for detailed description of requirements)