October 01, 2018
Craig Kisling
Park Planning and
Development PO Box
580
Fort Collins, CO 80522
RE: Street Park, BDR180010, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Pete Wray, at 970-221-6754 or pwray@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Morgan Uhlman, 970-416-4344,
muhlman@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 05/01/2018
07/19/2018: Please make sure that the elevations that are shown for the
sidewalk along 9th St match what was constructed.
05/01/2018: Do the elevations shown on the plans (Sheet 7) for the sidewalk
along 9th street match what was constructed?
Response – Elevations have been updated on the grading plan to reflect the as-built
condition as surveyed by City crews.
Comment Number: 4 Comment Originated: 05/04/2018
07/19/2018: The utility plans are showing a new blanket drainage and access
alignment for Tract A that excludes the building, but I do not see the documents
for the notice of alignment. The notice of alignment will need to be completed
before the project is approved. Crescent Park (Maple Hill Park) went through
this, and the notice of alignment for utilities can be found at reception number
20170041072.
Page 2 of 8
05/04/2018: From what I have learned from Real Estate Services about
the blanket easement, is that the blanket easement is null and void
because the City cannot grant an easement for itself. The project will
need to "rededicate" the easements needed through the Notice of
Alignment process. This is similar to the process that happened with
Crescent Park (Maple Hill Park) in 2017.
Response – The alignments were coordinated by CoFC Real Estate Services and
Surveying and have been recorded with the City Clerk’s Office.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290,
sblochowiak@fcgov.com
Topic: General
Comment Number: 9
07/23/2018: Clarification needed during staff review meeting regarding shading
and landscape legend on LP101 demonstrating standard buffer required and
proposed buffer provided. Ensure all data layers are activated - a layer might
be missing.
Response – Buffer zone is now shown on LP101.
Comment Number: 10 Comment Originated: 07/23/2018
07/23/2018: Add the following note on sheets LP101, LP103: "The Natural
Habitat Buffer Zone is intended to be maintained in a native landscape. Please
see Section
3.4.1 of the Land Use Code for allowable uses within the Natural Habitat
Buffer Zone."
Response – Note added to drawing.
Comment Number: 11 Comment Originated: 07/23/2018
07/23/2018: On all sheets showing the buffer zone please change wording from
proposed natural habitat buffer simply to: Natural Habitat Buffer Zone.
Response – Wording was changed on the applicable sheets.
Comment Number: 13 Comment Originated: 07/23/2018
07/23/2018: Please update LS101 with the 100' wetland buffer and Natural
Habitat Buffer Zone.
Response – Note changed on sheet LS101.
Comment Number: 15 Comment Originated: 07/23/2018
07/23/2018: Please verify that luminaire C catalog number is correct - as
currently shown is seems 4000K would be ordered however the file name refers
to 3000K.
Response – 3000K fixtures are being specified. The manufacturer only had 4000K
IES files available which is causing the confusion.
Comment Number: 16 Comment Originated: 07/23/2018
07/23/2018: What is the estimated corrected color temperature for the luminaire H
? Please select 3000K or less.
Page 3 of 8
Response – 3000K fixtures are being specified. The manufacturer only had 4000K IES files
available which is causing the confusion.
Department: Forestry
Contact: Molly Roche, 224-616-1992,
mroche@fcgov.com Topic: Landscape Plans
Comment Number: 3 Comment Originated: 05/02/2018
7/16/2018:
Continued:
Please provide the below language to the landscape plans. Only 1 mitigation
tree is required, therefore you do not need to size the trees at mitigation
caliper. The
following standard sizes are permitted:
Canopy Shade Trees: 2” caliper ball and
burlapped Ornamental Trees: 1.5” caliper ball
and burlapped Evergreen Trees: 6’ height
Response – Note added to drawing.
5/2/2018:
Please provide the total number of required mitigation trees on L100. According
to the tree inventory/mitigation table, a total of 5 mitigation trees are required.
However, since you are planning on transplanting 4 trees back on-site (with a
mitigation value totaling 4 trees), you receive a mitigation credit. Your total
mitigation, accounting for the credit, equals 1 mitigation tree.
Canopy Shade Trees: 3¿ caliper ball and
burlapped Ornamental Trees: 2.5¿ caliper ball
and burlapped Evergreen Trees: 8¿ height
Comment Number: 8 Comment Originated: 5/02/2018
7/16/2018:
Continued:
Please include the City of Fort Collins Street Tree note to all landscape sheets,
as well. Since this is City property, Forestry will need to inspect and approve all
trees at the nursery.
Response – Note added to applicable landscape drawings.
5/2/2018:
Please include the City of Fort Collins General Landscape Notes and street tree
notes on the landscape plans. These are available from City Forestry ¿ Molly
Roche (mroche@fcgov.com).
Comment Number: 10 Comment Originated: 07/18/2018
7/18/2018:
Please provide the plant legend with tree symbols on sheet LP102 for
ease of identifying species.
Response – Landscape sheet changed, and the trees are no longer shown on
LP102, so tree plant legend is not needed.
Page 4 of 8
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772,
tsiegmund@fcgov.com Topic: General
Comment Number: Comment Originated: 05/01/2018
05/01/2018: Light and Power has electric facilities west of the site along the
south property line of Streets facility that can be extended to feed the park. L&P
crews are checking to see if conduit is stubbed along the west edge of the park
parcel that can be utilized. If no conduit exists, a 1200ft bore is anticipated to
extend primary electric to the site.
Comment Number: 2 Comment Originated: 05/01/2018
05/01/2018: Electric capacity fees, development fees, building site charges and
any system modification charges necessary to feed the site will apply to this
development. Please contact me or visit the following website for an estimate of
charges and fees related to this project:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-
investment-development-fees
Comment Number: 3 Comment Originated: 05/01/2018
05/01/2018: Transformer location will need to be coordinated with Light &
Power. Transformers must be placed within 10 ft of a drivable surface for
installation and maintenance purposes. The transformer must also have a
front clearance of 10 ft and side/rear clearance of 3 ft minimum.
Comment Number: 4 Comment Originated: 05/01/2018
05/01/2018: A commercial service information form (C-1 form) and a one line
diagram for the commercial meter will need to be completed and submitted to
Light & Power Engineering. A link to the C-1 form is below:
http://www.fcgov.com/utilities/business/builders-and-
developers/development- forms-guidelines-regulations
Comment Number: 5 Comment Originated: 05/01/2018
05/01/2018: After discussions with Park Planning, it is anticipated that a single
phase transformer will be placed near the parking stalls. Please show and
label the proposed transformer on the utility and site/landscape plans.
Comment Number: 6 Comment Originated: 05/01/2018
05/01/2018: Please contact Tyler Siegmund at Light & Power Engineering if
you have any questions at 970.416.2772. Please reference our policies,
construction practices, development charge processes, and use our fee
estimator at http://www.fcgov.com/utilities/business/builders-and-developers
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869,
jlynxwiler@poudre-fire.org Topic: General
Comment Number: 3 Comment Originated: 07/21/2018
Page 5 of 8
07/21/2018: ADDRESS POSTING
Still need to see a plan for where & how the park address will be posted.
Response – Sheet LS101 has a note showing the location of a park name sign adjacent to
the park’s parking spaces and will have the address of 607 9th Street included on it.
Comment Number: 4 Comment Originated: 07/21/2018
07/21/2018: FIRE ACCESS
The applicant did not provide information to support the comment that the
dedication of an Emergency Access Easement was no longer applicable.
Response – our understanding is that the entire private driveway that exists is in an
access alignment and also City owned land, so adding an emergency access easement
was not needed. Our recollection is that this was discussed at the first review meeting.
Department: Planning Services
Contact: Pete Wray, 970-221-6754,
pwray@fcgov.com Topic: General
Comment Number: 1 Comment Originated: 05/01/2018
07/24/2018: The cover sheet for the site plan does not include a land use
summary table. The signature block should read "Community Development &
Neighborhood Services Director," rather than "Current Planning Director."
Please update on both the site and landscape plans.
Response – Summary table added, and signature block edited.
05/01/2018: Site Plan needs cover sheet that shows reduced plan (property
lines, setbacks easements etc.), signature title blocks, site plan notes, legal
description, and land use summary table.
Comment Number: 2 Comment Originated: 05/01/2018
07/24/2018: Please add a legend to the site plan that describes all linework,
hatching and shading. Please label all major site features, including the
restroom, parking lot, sidewalk widths, pollinator gardens, multi-purpose field,
shelter, basketball court, etc. Recommend removing the topo lines from the
site plan to make it easier to read.
Response – Labels added to drawing.
05/01/2018: Overall site plan needs to show portion of Streets Facility parking
lot and how sidewalk connection works. Details of site plan should show bold
property line, setbacks, easements, site plan legend etc.
Contact: Rebecca Everette, 970-416-2625,
reverette@fcgov.com Topic: General
Comment Number: 6 Comment Originated: 07/24/2018
07/24/2018: Please use the same project name in all title blocks and plan sets.
In some places the name is "Streets Park," "Street Facility Park," and "Streets
Facilities Park." Please ensure that all references are consistent.
Page 6 of 8
Response – All plans should now have been updated to the name “Streets Park.”
07/24/2018: Please label all major site features on the landscape plan,
including the restroom, parking lot, sidewalk widths, pollinator gardens, multi
purpose field, shelter, basketball court, etc. Recommend removing the topo
lines from the landscape plan to make it easier to read.
Response – Labels added to drawing.
Comment Number: 8 Comment Originated: 07/24/2018
07/24/2018: Due to the number of staff comments still remaining, another round
of review is needed once plans have been revised. Please contact Pete Wray or
individual commenters with any questions.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-305-5989,
dmogen@fcgov.com Topic: General
Comment Number: 2 Comment Originated: 04/27/2018
07/24/2018: Repeat comment; please see redlines.
04/27/2018: Maintaining the existing release rate of 10.5 cfs is acceptable;
however, this update does not appear to consider new impervious area that is
not being detained. Please provide analysis for these areas to show their effect.
Note that runoff from areas not being detained typically reduces the release rate
from the detention pond.
Response – Redlines have been addressed. The proposed release rate has been
reduced to 9.3 cfs to account for the 1.2 cfs increase in runoff from Basin B. Analysis has
been provided in the drainage report.
Comment Number: 4 Comment Originated: 04/27/2018
07/24/2018: Variance application has been received. Discussion is needed to
update the request prior to acceptance. Please also include spillway flow depth
in the variance request.
04/27/2018: Low Impact Development requirements for water quality appear to
be met although additional information is still required to verify the playground
drain facility will be acceptable. Standard water quality is not being provided for
100% of the improvements as required; please submit a variance request for
these areas that are not being treated for water quality.
Response – The variance request has been updated. 89% of the new hardscape is
proposed to be treated. The spillway flow depth being requested is 0.6 feet.
Comment Number: 5 Comment Originated: 04/27/2018
07/24/2018: Please provide sizing calculation in the drainage report; please see
redlines.
04/27/2018: The proposed playground drain LID facility is not standard.
Additional detail is needed on this facility to understand the proposed ¿wood
fiber material¿ and cross section. Please submit additional detail or contact
me to discuss.
Response – Calculations have been provided in the drainage report.
Comment Number: 6 Comment Originated: 04/27/2018
07/24/2018: Please see redlines on rain garden cross section. The landscape
Page 7 of 8
plan now shows "raingarden seed mix (TBD)" - has it been determined how this
area will be landscaped?
04/27/2018: The proposed rain garden is not shown to use the standard cross
section. Can the cross section be updated per Stormwater Detail 53?
How will this area be landscaped? It doesn't appear to be identified on the
planting plan.
Response – The detail/cross section information has been updated on the plans. Seed
mix has been provided on the plans.
Comment Number: 8 Comment Originated: 4/27/2018
07/24/2018: It is understood that the easements are being revised to
alignments. Please provide exhibit showing the proposed alignment areas,
especially as it relates to the core area and proposed LID features within that
area.
04/27/2018: Please provide easement for the proposed LID facilities or verify
these will be in existing drainage easement.
Response – The alignments exhibits have been provided.
07/24/2018: Thank you for adding to the grading plans; please add to drainage
plan as well.
04/27/2018: Please include a note in the plans that all stormwater will be
privately maintained (not maintained by City Stormwater).
Response – The note has been provided on the requested plan sheets.
Comment Number: 12 Comment Originated: 04/27/2018
07/24/2018: Please see updated redlines (PDF).
04/27/2018: Please see redlined drainage report and plans (PDF).
Response – Redlines have been addressed on the drainage report and plans.
Department: Technical Services
Contact: Jeff County, 970-221-6588,
jcounty@fcgov.com Topic: Construction
Drawings
Comment Number: 6 Comment Originated: 05/01/2018
07/23/2018: Some of the easement descriptions shown are incorrect. If they
are going to stay on the plan, they should match what is shown on the
Subdivision Plat. 05/01/2018: Some of the easement descriptions shown are
incorrect. If they are going to stay on the plan, they should match what is
shown on the Subdivision Plat.
Response – The easement descriptions should now all be consistent with the
subdivision plat.
Number: 8 Comment Originated: 05/01/2018
07/23/2018: There are line over text issues. See
redlines. 05/01/2018: There are line over text issues.
See redlines.
Page 8 of 8
Response – The redlines have been addressed.
Comment Number: 13 Comment Originated: 07/23/2018
07/23/2018: There are cut off text issues. See redlines.
Response – The redlines have been addressed.
Topic: General
Comment Number: 2 Comment Originated: 05/01/2018
05/01/2018: Since these plans include work that is outside of the East Vine
Streets Facility P.U.D. subdivision boundary, we would like additional copies of
the sheets specific to Lots 1A & 2A, A Replat Of A Portion of Lots 1 And 2, East
Vine Streets Facility P.U.D., Major Amended Final, Phase Two Final to add to
the existing plans on file.
Response – It is believed that the requested documents are already on file.
Topic: Landscape Plans
Comment Number: 14 Comment Originated: 07/24/2018:
Some of the easement descriptions shown are incorrect. If they are going to stay
on the plan, they should match what is shown on the Subdivision Plat.
Department: Water-Wastewater Engineering
Contact: Dan Mogen, 970-305-5989,
dmogen@fcgov.com Topic: General
Comment Number: 2 Comment Originated: 04/27/2018
07/24/2018: Please see updated redlines
(PDF). 04/27/2018: Please see redlines
(PDF).
Response – The redlines have been addressed.
Department: Zoning
Contact: Missy Nelson,
mnelson@fcgov.com Topic: General
07/25/2018: Please dimension on site plan.
Response – Labels added to drawing.
05/01/2018: LUC 3.2.2(K)(5)(d) 1 handicap parking space needs to be
van-accessible with a minimum of 8' wide access aisle.
Comment Number: 7 Comment Originated: 05/01/2018
07/25/2018: 12 bicycle parking spaces were added and this is acceptable. Thank
you.
05/01/2018: Please locate and provide a note for bicycle parking on site plan for at
least 20 spaces. Please also provide bike rack details.