Loading...
HomeMy WebLinkAboutNEC LAKE AND SHIELDS - PDP - PDP180012 - SUBMITTAL DOCUMENTS - ROUND 2 - EROSION CONTROL LETTER/REPORTProject Number: 232-047 Location: Fort Collins, CO Date: October 2, 2018 Total Acres: 2.17 EROSION CONTROL MEASURE Units Estimated Quantity Unit Price Total Price each 0 $100.00 $0.00 L.F. 1190 $1.10 $1,309.00 each 13 $125.00 $1,625.00 each 2 $300.00 $600.00 each 1 $200.00 $200.00 Erosion Control Matting sq. yd. 0 $3.00 $0.00 acre 1.11 $1,000.00 $1,110.00 TOTAL = $4,844.00 TOTAL = $7,266.00 TOTAL = $3,255.00 REQUIRED AMOUNT OF SECURITY = $7,266.00 NOTE: 'Total Acres' represents total disturbed area. Vegetate Landscaped Areas Inlet Protection Rock Socks Concrete Washout Area Silt Fence - OR - COST TO VEGETATE: TOTAL ACRES x ($1000/acre) x 1.5 (WHICHEVER IS GREATER) NEC Lake and Shields Erosion Control Cost Estimate Vehicle Tracking Control Pads AMOUNT OF SECURITY = 1.5 x $4,844.00 = = D:\Projects\232-047\Drainage\Erosion\232-047_Erosion-Escrow-Estimate.xls