HomeMy WebLinkAboutOASIS ON OLIVE - PDP - PDP180003 - DOCUMENT MARKUPS - ROUND 1 - (5)SITE
1218 W. Ash, Suite A
Windsor , Colorado 80550
Phone: (970) 674-3300
Fax: (970) 674-3303
I N T E R W E S T C O N S U L T I N G G R O U P
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
OASIS ON OLIVE
312 W. OLIVE STREET
COVER SHEET
03/14/2018
N/A
N/A
JTC
RA
1335-176-00
1 of 5
THIS OLD HOWES, LLC
561 YORK STREET
DENVER, CO 80209
PHONE: 970.484.5907
CONTACT: STEVE SLEZAK
Vicinity Map
Scale: 1" = 1000'
PROJECT DATUM: NAVD88
CITY OF FORT COLLINS BENCHMARK #1-12
SOUTHEAST CORNER OF LAPORTE AVENUE AND WHITCOMB STREET, ON A STORM INLET ON
WHITCOMB STREET
ELEV= 5004.15
CITY OF FORT COLLINS BENCHMARK #6-00
ON A CATCH BASIN AT THE NORTHWEST CORNER OF MULBERRY ST. AND COLLEGE AVENUE
ELEV= 4993.85
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM.
IF NGVD29 UNADJUSTED IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATIONS SHOULD BE USED:
NGVD UNADJUSTED = 5004.15 (NAVD88) - 3.18
NGVD UNADJUSTED = 4993.85 (NAVD88) - 3.17
UTILITY CONTACTS:
LIGHT & POWER
City of Fort Collins Light & Power
Contact: Janet McTague
Ph. 970.224.6154
STORMWATER,WATER & WASTEWATER
City of Fort Collins Utilities
700 Wood Street
Fort Collins, Colorado 80522
Contact: Shane Boyle
Ph. 970.221.6339
NATURAL GAS
Xcel Energy
1901 E. Horsetooth Road
Fort Collins, Colorado 80525
Contact: Stephanie Rich
WEST OLIVE STREET
CANYON AVENUE
PORTION LOTS 1 & 2, BLOCK 92 PORTION LOTS 1 & 2, BLOCK 92
LOT 2
LOT 1
LOT 3
312 W. OLIVE ST.
PORTION OF LOT 3, BLOCK 92
FFE = 5003.75
1218 W. Ash, Suite A
Windsor , Colorado 80550
Phone: (970) 674-3300
Fax: (970) 674-3303
I N T E R W E S T C O N S U L T I N G G R O U P
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
OASIS ON OLIVE
312 W. OLIVE STREET
GRADING, DRAINAGE & EROSION CONTROL PLAN
03/14/2018
1"=10'
N/A
JTC
RA
1335-176-00
5 of 5
THIS OLD HOWES, LLC
561 YORK STREET
DENVER, CO 80209
PHONE: 970.484.5907
CONTACT: STEVE SLEZAK
CALL BEFORE YOU DIG
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
1-800-922-1987
or 8-1-1
CALL 2-BUSINESS DAYS IN ADVANCE
BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE
MARKING OF UNDERGROUND MEMBER UTILITIES.
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
PRELIMINARY Date
NOT FOR CONSTRUCTION
0
10'
10 5 10 20
SCALE: 1" =
BMP SEQUENCE CHART
NOTES
1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY
EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT
CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT
ALL EXISTING INLETS DOWNSTREAM FROM THE
CONSTRUCTION AREA. EROSION CONTROL PROTECTION
SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE
AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED
WITH OWNER'S APPROVAL FOR REMOVAL.
2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE
OBSERVED AND ADJUSTED AS NEEDED DURING
CONSTRUCTION BASED ON SITE CONDITIONS AND THE
PERFORMANCE OF THE EROSION CONTROL CONTROL
MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION
CONTROL AND MINIMIZE DOWNSTREAM WATERWAY
POLLUTION.
3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL
BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS
NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK.
ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED &
MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION
POTENTIAL AND SOIL MIGRATION.
4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND
SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION
COMMENCEMENT.
5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND
DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND
NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND
MULCHED PER LCUASS STANDARDS.
6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING,
INCLUDING BUT NOT LIMITED TO SLOPED AREAS.
7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP
SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING
ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON
SHALL REQUIRE RESEEDING AND EROSION CONTROL
BLANKETS TO STABILIZE THE SOIL.
8. REFERENCE SHEET XX FOR EROSION CONTROL DETAILS.
9. DUE TO DISCREPANCIES IN THE TOPOGRAPHIC SURVEY
PROVIDED, EXISTING ELEVATIONS WERE INTERPOLATED
BETWEEN POINTS SURVEY POINTS THAT APPEARED TO
REPRESENT THE EXISTING CONDITIONS ON SITE. THE
CONTRACTOR IS TO CONFIRM ALL EXISTING ELEVATIONS
ADJACENT TO NEW WORK AND NOTIFY THE OWNER OF ANY
SIGNIFICANT DEVIATIONS.
10. A FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR EACH
STRUCTURE AND EACH SITE CONSTRUCTION ELEMENT
(DETENTION PONDS, BIKE PATHS, PARKING LOTS, ETC.) IN THE
FLOODPLAIN / FLOOD FRINGE.
CoFC Standard erosion and sediment control notes:
1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL
INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO
ANY CONSTRUCTION ON THIS SITE.
2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND
DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING,
ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE
INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION
SEQUENCE AS INDICATED IN THE APPROVED PROJECT
SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL
REPORT.
3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND
RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE
OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA
REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND
FOR THE SHORTEST PRACTICAL PERIOD OF TIME.
4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY
(STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING,
FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY
RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH,
VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS
INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET
RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING
ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED
TEMPORARY OR PERMANENT EROSION CONTROL (E.G.
SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS
OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT.
5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL
TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT
WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES
SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST
IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY
ENGINEERING DEPARTMENT.
6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES
MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS
NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS
IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR
INTENDED FUNCTION. ALL RETAINED SEDIMENTS,
PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL
BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION
SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY.
7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT.
ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT
TRANSPORT BY SURFACE ROUGHENING, WATERING, AND
PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING
AFTER 30 DAYS SHALL BE SEEDED AND MULCHED.
8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR
DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY
STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT
DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE
CONTRACTOR.
BASIN COEFFICIENT (100-YR)
BASIN DESIGNATION
BASIN AREA
DESIGN POINT
DRAINAGE FLOW ARROW
DRAINAGE BASIN
BOUNDARY
DRAINAGE BASIN
FLOW PATH
INLET PROTECTION
CONSTRUCTION ENTRANCE
W/ VEHICLE TRACKING CONTROL
SEDIMENT CONTROL LOG
OUTLET STRUCTURE PROTECTION
ROCK SOCKS
CONCRETE WASHOUT AREA
LEGEND
100-YR FLOOD FRINGE (CITY) 100-YR FLOODWAY (CITY)
Line Over Text
4/11/18
Ph. 970.225.7828
TELEPHONE SERVICE
Century Link (Qwest)
3351 Eastbrook Drive
Fort Collins, Colorado 80525
Contact: Bill Johnson
Ph. 970.490.7501
CABLE SERVICE
Comcast
1201 University Dr.
Fort Collins, Colorado 80521
Contact: Don Kapperman
Ph. 970.567.0245
DEVELOPER
This Old Howes, LLC
561 York Street
Denver, CO 80209
Ph. 970.484.5907
ENGINEER
Interwest Consulting Group
1218 W. Ash, Suite A
Windsor, CO 80550
Ph. 970.674.3300
ARCHITECT
Construction Design Services
55 Lake Havasu Avenue, South
Suite F, #114
Lake Havasu City, AZ 86403
Ph. 928.846.1891
SURVEYOR
Stewart & Associates
103 South Meldrum Street
Fort Collins, CO 80521
Ph. 970.482.9331
INDEX OF SHEETS
Sheet No. Description of Sheets
1 COVER SHEET
2 GENERAL NOTES
2 EXISTING CONDITIONS & DEMOLITION PLAN
3 HORIZONTAL CONTROL PLAN
5 GRADING, DRAINAGE & EROSION CONTROL PLAN
4 UTILITY PLAN
Utility Plans For
OASIS ON OLIVE
LOCATED IN THE SOUTHEAST 1/4 SECTION 11, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M
LARIMER COUNTY, COLORADO
MARCH 2018
CALL BEFORE YOU DIG
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
1-800-922-1987
or 8-1-1
CALL 2-BUSINESS DAYS IN ADVANCE
BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE
MARKING OF UNDERGROUND MEMBER UTILITIES.
CHECKED BY:
Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Parks and Recreation
Traffic Engineer
Stormwater Utility
Water & Wastewater Utility
City Engineer
CHECKED BY:
APPROVED:
Environmental Planner
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Date
Date
Date
Date
Date
Date
I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE
PREPARED UNDER MY DIRECT SUPERVISION, IN ACCORDANCE WITH
ALL APPLICABLE CITY OF FORT COLLINS AND STATE OF COLORADO
STANDARDS AND STATUTES, RESPECTIVELY, AND THAT I AM FULLY
RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS AND
RECORD CONDITIONS THAT I HAVE NOTED ON THESE PLANS.
INDEMNIFICATION STATEMENT:
THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR
CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY
THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE
LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE
CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT
QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES
REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON
AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL
ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE
REQUIRED DURING THE CONSTRUCTION PHASE.
JASON T. CLAEYS
P.E. NO. 42122
ABBREVIATION LIST
ABC AGGREGATE BASE COURSE
AD ALGEBRAIC DIFFERENCE
AE ACCESS EASEMENT
ARCH ARCHITECT
ARV AIR RELEASE VALVE
ASPH ASPHALT
BLDG BUILDING
BFE BASE FLOOD ELEVATION
BFV BUTTERFLY VALVE
BOV BLOW OFF VALVE
BOS BOTTOM OF STEP
BOW BACK OF WALK
BW BOTTOM OF WALL
C&G CURB & GUTTER
CATV CABLE TELEVISION
CDOT COLORADO DEPARTMENT OF
TRANSPORTATION
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CO CLEAN OUT
CoFC CITY OF FORT COLLINS
COMM COMMUNICATION
CON CONDENSATE
CONC CONCRETE
COORD COORDINATION
CW CHILL WATER
CWR CHILL WATER RETURN
CWS CHILL WATER SUPPLY
DE DRAINAGE EASEMENT
DEMO DEMOLITION
DIA DIAMETER
DIP DUCTILE IRON PIPE
E EAST(ING)
EAE EMERGENCY ACCESS EASEMENT
EG EXISTING GROUND
EL ELEVATION
ELCO EAST LARIMER COUNTY WATER
DISTRICT
ELEC ELECTRIC
EOA EDGE OF ASPHALT
EOC EDGE OF CONCRETE
EX EXISTING
ESMT EASEMENT
EST ESTIMATE(D)
F FIRE LINE
FDC FIRE DEPARTMENT CONNECTION
FES FLARED END SECTION
FF FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FH FIRE HYDRANT
FL FLOWLINE
FO FIBER OPTIC
FP FLOODPLAIN
G GAS
GB GRADE BREAK
GF GARAGE FLOOR
GND GROUND
GV GATE VALVE
HBP HOT BITUMINOUS PAVEMENT
HORZ HORIZONTAL
HDPE HIGH DENSITY POLYETHYLENE
HP HIGH POINT
HW HEADWALL
IE IRRIGATION EASEMENT
INV INVERT
IRR IRRIGATION
LA LANDSCAPE (PLAN/ACRH)
LF LINEAR FEET
LP LOW POINT
LT LEFT
MAX MAXIMUM
ME MATCH EXISTING
MEP MECHANICAL, ELECTRICAL,
PLUMBING ENGINEER
MH MANHOLE
MIN MINIMUM
N NORTH(ING)
NA NOT APPLICABLE
NTS NOT TO SCALE
NWCWD NORTH WELD COUNTY WATER
DISTRICT
OC ON CENTER
OHE OVERHEAD ELECTRIC
OHT OVERHEAD TELEPHONE
OHU OVERHEAD UTILITY
P&UE PEDESTRIAN & UTILITY EASEMENT
PE PEDESTRIAN EASEMENT
PERF PERFORATED
PC POINT OF CURVATURE
PCC PORTLAND CEMENT CONCRETE
PCR POINT OF CURB RETURN
PH POTHOLE
PI POINT OF INTERSECTION
PL PROPERTY LINE
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
R&R REMOVAL & REPLACEMENT
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
RE REFERENCE
RFPE REGULATORY FLOODPLAIN
PROTECTION ELEVATION
RJ RESTRAINT JOINT
ROW RIGHT-OF-WAY
RT RIGHT
SCH SCHEDULE
S SOUTH
SD STORM DRAIN PIPE
SDMH STORM DRAIN MANHOLE
SRVC SERVICE
SS SANITARY SEWER
SSCO SANITARY SEWER CLEAN-OUT
SSMH SANITARY SEWER MANHOLE
SSWR SANITARY SEWER
STA STATION
STM STEAM
SWMP STORMWATER MANAGEMENT PLAN
T TELEPHONE
TB THRUST BLOCK
TBC TOP BACK OF CURB
TBV TO BE VACATED
TBR TO BE REMOVED
TELE TELEPHONE
TEMP TEMPORARY
TF TOP OF FOUNDATION
TOS TOP OF STEP
TRM TURF REINFORCEMENT MAT
TW TOP OF WALL
TYP TYPICAL
XS CROSS SECTION
UD UNDERDRAIN
UE UTILITY EASEMENT
UGE UNDERGROUND ELECTRIC
UTIL UTILITY
VCP VITRIFIED CLAY PIPE
VIF VERIFY IN FIELD
VERT VERTICAL
VPC VERTICAL POINT OF CURVATURE
VPI VERTICAL POINT OF
INTERSECTION
VPT VERTICAL POINT OF TANGENCY
W WATERLINE OR WEST
WL WATERLINE
WQCE WATER QUALITY CONTROL
ELEVATION
WSE WATER SURFACE ELEVATION
PROPOSED STREET LIGHT
PROPOSED STORM SEWER
EXISTING SANITARY SEWER MAIN
PROPOSED TELEPHONE LINE
EXISTING GAS
EXISTING STORM SEWER
EXISTING WATER MAIN
EXISTING MANHOLE
PROPOSED STORM INLET
LEGEND
PROPOSED CONCRETE
PROPOSED MINOR CONTOUR
EXISTING SPOT ELEVATION PROPOSED SPOT ELEVATION
PROPOSED MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
EXISTING UTILITY POLE
EXISTING GUY WIRE
PROPOSED GAS
EXISTING ELECTRIC LINE PROPOSED ELECTRIC LINE
EXISTING TELEPHONE LINE
EXISTING FIRE HYDRANT PROPOSED FIRE HYDRANT
EXISTING WATER VALVE
PROPOSED SANITARY SEWER MAIN
PROPOSED WATER MAIN
EXISTING CONCRETE
EXISTING FLOWLINE, CURB & GUTTER PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED FENCE
LIMITS OF CONSTRUCTION
EXISTING OVERHEAD UTILITY
EXISTING STORM SEWER INLET
PROPOSED WATER VALVE
PROPOSED MANHOLE
PROPOSED UTILITY POLE
EXISTING STREET LIGHT
PROPOSED SWALE
PROPOSED DIRECTION OF OVERLAND FLOW
EXISTING FIBER OPTIC LINE
PROPOSED HANDICAP RAMP
EXISTING OVERHEAD ELECTRIC LINE
EXISTING OVERHEAD TELEPHONE LINE
PROPOSED OVERHEAD ELECTRIC LINE
PROPOSED FIBER OPTIC LINE
PROPOSED OVERHEAD TELEPHONE LINE
EXISTING FENCE
PROPOSED OVERHEAD UTILITY
PROPOSED LIGHT POLES
EXISTING CABLE TV LINE PROPOSED CABLE TV
PROPOSED WATER SERVICE W/
CURB STOP AND METER PIT
PROPOSED SANITARY SEWER SERVICE
W/ CLEANOUT
PRELIMINARY
NOT FOR CONSTRUCTION
Line Over Text
Remove
Out Of Order
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE
USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED = NAVD88 - X.XX’ .
4/11/18
LOT, BLOCK, SUBDIVISION