HomeMy WebLinkAboutOASIS ON OLIVE - PDP - PDP180003 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONS (3)R I G H T S I D E E L E V A T I O N
S C A L E : 3/16" = 1' -0"
FINISHED FIRST FLOOR LEVEL
FINISHED SECOND FLOOR LEVEL
FINISHED THIRD FLOOR LEVEL
FINISHED SECOND FLOOR CEIL.
FINISHED THIRD FLOOR CEIL.
FINISHED FIRST FLOOR CEIL.
9'-0" 1'-5"
9'-0" 1'-5" 9'-0"
20'-10" PLATE HGT.
29'-10" PLATE HGT.
7'-0" HEAD HGT.
7'-0" HEAD HGT.
7'-0" HEAD HGT.
2650 2650 2650 2650 3070 2650 2650
2650 2650 2650 3070 2650 2650
2650 2650 3070 2650 2650
2650
6"
FINISH GRADE
6"
FINISH GRADE
2650 2650 2650
BASEMENT WALLS BELOW
BASEMENT FLOOR SLAB
A A
B
B
B
N
N
N
N
E
G
G
K
J
E
E
E
E
E
C E
C
A
H H H
E E
H H
B
19'-4"
O
S
S S
S 3070 S
3070
3070
3070
H
H
R
R
B
T
T
T T T
T
H H
E
EAST
4'-6"
4'-6"
2650
2650
2650
2650
2650
39' - 5 1/2" TOWER RIDGE HEIGHT
36' - 0" TOWER PLATE HEIGHT
OPEN
CORRIDOR
TO PARKING
N
SEE SHEET A-7 FOR TOWER
ELEVATION DETAILS
G
31'-9" TOP OF PARAPET WALL
G
A A A
SEE RAFTER/EAVE
DETAIL SHT. A-20
FOR CURVED EAVE
SEE RAFTER/EAVE
DETAIL SHT. A-20
FOR CURVED EAVE
SEE RAFTER/EAVE
DETAIL SHT. A-20
FOR CURVED EAVE
SEE RAFTER/EAVE
DETAIL SHT. A-20
FOR CURVED EAVE
12 4
12 4
12 4
4 12
4 12
4 12
4 12
4 12
W
FINISHED FIRST FLOOR LEVEL
FINISHED SECOND FLOOR LEVEL
FINISHED THIRD FLOOR LEVEL
FINISHED SECOND FLOOR CEIL.
FINISHED THIRD FLOOR CEIL.
FINISHED FIRST FLOOR CEIL.
9'-0" 1'-5"
9'-0" 1'-5" 9'-0"
20'-10" PLATE HGT.
29'-10" PLATE HGT.
7'-0" HEAD HGT.
7'-0" HEAD HGT.
7'-0" HEAD HGT.
L E F T S I D E E L E V A T I O N
S C A L E : 3/16" = 1' -0"
6"
FINISH GRADE
10090 O'HEAD GAR. DR.
2650 2650
2650 2650 2650 3070
2650 2650 2650 2650 2650 2650
3070
2650 2650 2650
2650 2650 2650 2650 2650 2650 2650 2650
6"
FINISH GRADE
31'-4" TOP OF PARAPET WALL
B
B
B
B
T T T T
T T T
N
N
N
N
G
G
G
J
A
D
A A A A
C
B
E E E E E
E
H
H
K K K K
K K K E
E E
H
H
S
S
E C
N
G
T T
E K
9080 O'HEAD GAR. DR.
WEST
SEE SHEET A-7 FOR TOWER
ELEVATION DETAILS
B
V B V B V B V B
2'-6"
W W
W
SEE RAFTER/EAVE
DETAIL SHT. A-20
FOR CURVED EAVE
A
X
BASEMENT
SEE RAFTER/EAVE
DETAIL SHT. A-20
FOR CURVED EAVE
12 4
12 4
12 4
12 4
4 12
4 12
4 12
CUT STONE VENEER
BRICK VENEER
SHINGLE SIDING
HARDCOAT STUCCO VENEER 7 ON
16" OSB SHEATHING
STUCCO VENEER HEADER (+1")
SHINGLED ROOFING
PAINTED S4S WOOD FASCIA WITH GUTTER & DOWNSPOUTS
ALUMINUM DECK RAILING, SEE DETAIL F / A-20
ALUMINUM DECK ROOF PERGOLA, SEE DETAIL E / A-20
ALUMINUM SLAT WINDOW AWNING, SEE DETAILS B & C / A-20
STEEL STAIR HAND RAILING
CONCRETE FILLED PAN STAIRS
"GRAND MANOR" COMPONENT SHINGLE ROOFING
NOT USED
BUILT-UP STUCCO ARCH, SEE DETAIL A/16
HORIZONTAL ROUGH SAWN WOOD SIDING
PAINTED STEEL POST
ROUGH SAWN EDGE OF DECK TRIM
STUCCO VENEER WINDOW SILL (+1")
BUILT-UP STEEL ARCH, PAINTED, SEE DETAIL A / A20
ARCHITECRURAL MESH SCREEN
6" X 6" X 18" SOFFIT BLOCKS
2" HIGH BULLNOSED STONE WALL CAP
A
B
C
D
E
F
G
H
J
K
L
M
N
O
P
Q
R
S
T
EXTERIOR FINISH NOTES
U
V
W
X
Paul L.Paget
928-846-1891
55 Lake Havasu Ave., South
Suite F, #114
Lake Havasu City, AZ 86403
ppaget77@gmail.com
CONSTRUCTION
DESIGN
SERVICES
cd
s
EXTERIOR BUILDING ELEVATIONS
312 West Olive Street
Fort Collins, Colorado 80525
REVISIONS:
A-9
REVISED:
DRAWN: PLP
PLP
DATE: 3 / 05 / 2018
DESIGNED: JD / PLP
OASIS ON OLIVE