HomeMy WebLinkAboutOASIS ON OLIVE - FDP - FDP180018 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTSAugust 17, 2018
Steve Slezak
Oasis Development 213 S Howes St
Fort Collins, CO 80521
Re: Oasis on Olive, FDP180018, Round Number 1
Please see the following summary of comments from City staff and outside
reviewing agencies for your submittal of the Final Development Plan for Oasis on
Olive. If you have questions about any comments, you may contact the
individual commenter or direct your questions through your Development Review
Coordinator, Brandy Bethurem Harras 970.416.2744 or
bbethuremharras@fcgov.com
Comment Summary:
Department: Planning Services
Contact: Pete Wray, 970-221-6754, pwray@fcgov.com
Topic: General
Comment Number: 1
08/14/2018: The Planning and Zoning Board conditions 1-5 are addressed on
plans. Condition #6 needs to be finalized prior to FDP approval, including
covenant on 310 W. Olive and 231 S. Howes properties.
RESPONSE: As discussed with Planning staff, an agreement will be the
instrument to satisfy Condition #6.
Comment Number: 2
08/17/2018: Confirm site and landscape plan notes are up to date.
RESPONSE: Site and landscape notes have been updated.
Comment Number: 3
08/17/2018: Based on staff review comments, another FDP round of review is
needed. This can be a PDF review.
RESPONSE: Thank you.
Community Development and
Neighborhood Services
281 North College Avenue PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/development review
Topic: Landscape Plans
Comment Number: 4
08/14/2018: Sheet LS-2 shows tree planting details and no trees are shown on
plan. Add ornamental trees as shown on redlines or other locations for tree
stocking standard. Show ex. tree in rear yard of 231 S. Howes.
RESPONSE: Ornamental trees have been added to the landscape plan where
possible. We were unable to locate an ornamental tree near the southwest
corner of the property due to utility conflicts.
Per recommendation from Tim Buchanan the previous City Forester, the existing
tree was removed. An Autumn Blaze Maple is proposed for this area on the
landscape plan.
Comment Number: 5
08/17/2018:
Enlarge landscape legend symbols to read better. Add tree legend.
RESPONSE: Landscape legend symbols have been enlarged.
Department: Historic Preservation
Contact: Karen McWilliams, 970-224-6078, kmcwilliams@fcgov.com
Topic: General
Comment Number: 1
08/10/2018: Project was reviewed by Landmark Preservation Commission on
May 16, 2018. The Commission provided a recommendation of approval to the
Planning and Zoning Board with four conditions, which have all since been met.
P&Z added an additional condition, to record on the plat that no fence or barrier
can be built between the landmark properties on Howes street and this
development; once it has been confirmed that this condition has also been met,
then Historic Preservation has no concerns, and the project is ready for mylar.
Department: Internal Services
Contact: Jonathon Nagel, jnagel@fcgov.com
Topic: General
Comment Number: 1
08/03/2018: The Community Recycling Ordinance (No. 109 2016) requires that
all new business and multifamily complexes subscribe to recycling service that is
at minimum 1/3 of their overall service capacity(total bin capacity x number of
weekly pickups, include both trash and recycling when calculating overall service
capacity). In general recycling containers must be at least 50% the size of
proposed trash containers to meet this requirement. Please make sure proposed
containers meet this requirement and that adequate space is provided in all
enclosures.
RESPONSE: Based on conversations with Gallegos Sanitation, Two-90 gallon
poly carts for trash and Three-90 gallon poly carts for recycling are sufficient for 7
units.
Comment Number: 4
08/03/2018: With 7 units you are likely to need ~3 cubic yards of trash service
and 2 cubic yards of recycle service (cardboard does not work well in carts and
will likely take more space then this) per week. Consider adding a few additional
carts to reduce the amount of weekly pick-ups.
RESPONSE: We added one more cart.
Comment Number: 5
08/15/2018: Please provide details for the gates that will be used to access the
trash and recycling carts and show them on the site plan.
RESPONSE: The gate is shown and labeled in plan view.
Comment Number: 6
08/15/2018: Please label the proposed carts either "trash" or "recycle" and
include the capacity of each.
RESPONSE: Poly carts are now labeled and an enlargement plan has been
provided.
Department: Engineering Development Review
Contact: Katie Andrews, 970-221-6501, kandrews@fcgov.com
Topic: General
Comment Number: 1
08/13/2018: Please design the sidewalk/chase drains in accordance with the
standard sidewalk chase (D-10B) – City will be maintaining these and we require
the standard be used rather than the pipes through the ROW. Please see 619 S
College Avenue as a good example of an approved standard chase adjacent to a
driveway.
RESPONSE: The drainage outfalls have been updated to incorporate the
sidewalk chase. It is desired to provide a sidewalk from the Olive Street parking
to the sidewalk and the eastern chase is designed to be incorporated into this
sidewalk connection and includes a cover the full length. The western chase is
directly adjacent to the driveway and separated by a 6” high curb.
Comment Number: 2
08/13/2018: Please move the riser step, that is adjacent to the sidewalk, back to
meet the sidewalk setback standards in LCUASS Figure 16-1.
RESPONSE: The step riser has been adjusted to be recessed 6” from the back
of walk as discussed.
Comment Number: 3
08/13/2018: Please label distance between encroaching fence and sidewalk.
RESPONSE: Dimensions have been added to the Horizontal Control Plan
Comment Number: 4
08/13/2018: Please add LCUASS standard details for public curb and gutter,
chase drains, and drive approaches.
RESPONSE: The chase drain detail has been added. Being an infill project the
curb adjacent to the project site does not follow the dimensions of the current
curb & gutter and the plans direct the contractor to match the existing curb
section. Similarly, the project’s driveway does not align with the standard
driveway approaches due to items such as the adjoining sidewalk chase. The
grading plan shows the 2% cross slope for the sidewalk crossing the drive.
Comment Number: 5
08/13/2018: Please clarify what is proposed for the drive approach on Canyon in
the ROW and add applicable driveway detail.
RESPONSE: The existing driveway apron is proposed to remain as is.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1
08/06/2018: The vehicle tracking pad may not be that effective at a control
measure please look into alternative in this narrow of an infill location. Please
look at the redlines for possible suggestions and some recommended additional
rock socks. If you need clarification concerning the Erosion Control Material
Requirements or Comments presented above, please contact myself. Jesse
Schlam (970) 224-6015 jschlam@fcgov.com
RESPONSE: Thank you for the recommendation and we will let the contractor
know there may be options for the vehicle tracking pad. Additional rock socks
have been provided along Olive.
Contact: Mark Taylor, 970-416-2494, mtaylor@fcgov.com
Topic: Construction Drawings
Comment Number: 5
08/08/2018: On Sheets 5 and 7, the Utility Plan and the Grading Plan, please
show and label the floodplain and floodway limits, as done on Sheet 6.
RESPONSE: The floodplain/floodway limits, along with the corresponding notes
are shown on sheets 5, 6, and 7.
Comment Number: 6
08/08/2018: On Sheets 5, 6, and 7, please add a note that a floodplain permit
and no-rise certification are required prior to beginning any work in the 100-year
floodway.
RESPONSE: The floodplain/floodway limits, along with the corresponding notes
are shown on sheets 5, 6, and 7.
Comment Number: 7
08/08/2018: On Sheet 5, please add a note stating that storage of equipment and
materials is not allowed within the floodway. The note on Sheet 6 would be
perfect.
RESPONSE: The floodplain/floodway limits, along with the corresponding notes
are shown on sheets 5, 6, and 7.
Comment Number: 8
08/08/2018: On Sheet 7, please add a note that a floodplain use permit is
required prior to beginning any work in the floodplain.
RESPONSE: The floodplain/floodway limits, along with the corresponding notes
are shown on sheets 5, 6, and 7.
Topic: Drainage Report
Comment Number: 2
08/08/2018: In the Drainage Report, please indicate that this development is
located in the City-regulated 100-year floodplain and that the master plan was
prepared by Anderson Consultant Engineers, July 15, 2003.
RESPONSE: The drainage report has been updated accordingly.
Comment Number: 3
08/08/2018: In the Drainage Report, please refer to the FEMA FIRMette located
in the Appendix to this report.
RESPONSE: The drainage report has been updated accordingly.
Topic: Site Plan
Comment Number: 4
08/08/2018: On the Site Plan, the note labeling the City-regulated 100-year
floodway boundary should point to the floodway boundary, which is along the
back of the sidewalk, rather than the floodplain boundary.
RESPONSE: Note and arrow changed.
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 9
08/13/2018: Typically, LID features are required to be in Drainage Easements.
Due to the distributed nature of the LID on this site, it may be more appropriate to
forego the easements in lieu of language in the Development Agreement that
gives the City the right to access the property for inspection purposes. The
choice regarding the easement versus the DA language is up to the Developer,
just let me know which direction you would like to go.
RESPONSE: Acknowledged.
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1
08/13/2018: No Comments.
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@fcgov.com
Topic: General
Comment Number: 1
08/14/2018: BUILDING HEIGHT
This building is shown to be 29ft 10in in height. Height greater than 30ft triggers
the requirement for Aerial Apparatus access. PFA is requiring a building height
measurement from the lowest fire access level on Olive Street.
RESPONSE: Building access was discussed with Chief Poncelow.
Comment Number: 2
08/14/2018: FDC
The FDC shall be located in a clearly visible location on the elevation facing Olive
Street i.e. the south elevation not east elevation as indicated in the provided
documents. Code language follows:
>IFC 912.2: Fire Department Connections shall be installed in accordance with
NFPA standards. Fire department connections shall be located on the street side
of buildings, fully visible and recognizable from the street or nearest point of fire
department vehicle access. The location of the FDC shall be approved by the fire
department and the location labeled on Utility Plans.
RESPONSE: The FDC is shown on the plans.
Comment Number: 3
08/14/2018:
Please note a new contact person for sprinkler related questions Assistant Fire
Marshal, Jerry Howell 970-416-2868.
RESPONSE: Noted.
Comment Number: 4
08/14/2018: ADDRESSING
It is understood that the addressing plan will be submitted separately for PFA
approval.
RESPONSE: An addressing plan has been submitted.
Department: Light and Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcgov.com
Topic: General
Comment Number: 1
08/13/2018: Light and Power currently has single phase power extended into the
property. Modification charges will apply to modify our system to feed the new
development.
RESPONSE: Noted.
Comment Number: 2
08/13/2018: Are power requirements known? A commercial service information
form (C-1 form) will need to be completed and submitted to Light & Power
Engineering for review. A link to the C-1 form is below:
http://www.fcgov.com/utilities/business/builders-and-developers/development-
forms-guidelines-regulations
RESPONSE: Noted.
Comment Number: 3
08/13/2018: Will the building have gas service for heat?
RESPONSE: Yes.
Comment Number: 4
08/13/2018: Electric meter locations will need to be coordinated with Light and
Power. Each unit will need to be separately metered and "ganged" on one side of
the building. Please show meter locations on the plans.
RESPONSE: Meter locations are shown on the site, landscape and utility plans.
Comment Number: 5
08/13/2018: Light & Power will need AutoCAD files of the site plan, utility plans,
and landscape drawings once approved.
RESPONSE: Noted.
Comment Number: 6
08/13/2018: The Developer/owner will be responsible for installing and
maintaining the electric service from the transformer to the meter bank.
RESPONSE: Noted.
Comment Number: 7
08/13/2018: Electric capacity fees, development fees, building site charges and
any system modification charges necessary to feed the site will apply to this
development. Please contact me or visit the following website for an estimate of
charges and fees related to this project:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-
investment-development-fees
RESPONSE: Noted.
Comment Number: 8
08/13/2018: Please contact Tyler Siegmund at Light & Power Engineering if you
have any questions at 970.416.2772. Please reference our policies, construction
practices, development charge processes, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers
RESPONSE: Noted.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 1
08/11/2018: For any rock material note following:
A. Avoid using large river rock around 1 gallon or smaller plant material - this
is failing on multiple projects as the plants cannot compete with the large cobble.
RESPONSE: Comment has been acknowledged. River cobble is not proposed
to be used around 1 gallon or smaller plant material with this plan
B. Use 1.5 inch or less rock material if/when chosen as a material and/or pea
gravel especially for any 1 gallon shrubs or smaller plant material.
RESPONSE: Comment has been acknowledged.
C. Police services prefers smaller diameter rock cobble; larger material
poses a danger for ankle injuries during emergency or security operations.
RESPONSE: Comment has been acknowledged, and smaller plant material will
be used.
D. Please only use large river rock cobble for river features and/or
stormwater stabilization purposes not general landscaping.
RESPONSE: Comment has been acknowledged, and smaller plant material will
be used.
Department: Forestry
Contact: Molly Roche, mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 6
08/14/2018: Since the last round of review, there have been modifications to the
landscape notes. Please contact Molly Roche to receive the updated versions to
include on the landscape plans.
RESPONSE: Notes have been updated on the landscape plan.
Comment Number: 7
08/14/2018:
Please include the existing tree inventory and mitigation information to the
landscape plans. This is also available from Molly Roche (mroche@fcgov.com).
Tree should be labeled with corresponding numbers to match the inventory
information.
RESPONSE: Information has been added to the landscape plan.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 3
08/09/2018: Please revise the sub-title as marked. See redlines.
RESPONSE: The subtitle has been updated
Comment Number: 4
08/09/2018: The Benchmark Statement has been revised. Please provide the
following information for the Benchmark Statement in the EXACT format shown
below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR
VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM)
IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD
BE USED: NGVD29 UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM)
= NAVD88 - X.XX’.
RESPONSE: The benchmark statement has been updated
Comment Number: 5
08/09/2018: All benchmark statements must match on all sheets.
RESPONSE: The benchmark statement has been updated.
Topic: Landscape Plans
Comment Number: 1
08/09/2018: There are line over text issues. See redlines.
RESPONSE: Plans have been corrected.
Topic: Lighting Plan
Comment Number: 2
08/09/2018: The address shown on these plans does not match the other plan
sets. RESPONSE: The address has been corrected.