HomeMy WebLinkAbout1032 W Prospect Road - Extra Occupancy - Basic Development Review - BDR180033 - Submittal Checklist SUBMITTAL DOCUMENTS - ROUND 1 - 10/19/2018om l t mi al Chqcklis
Final Development Plan (FDP) - Basic Development Review (B R)
FDP Major Amendments (MMJA) - Minor Amendments (MA)
Project Name: �L
Applicant Name: 1<��' (V�
Office Use Only:
Project Type: 5b9. Project Number (if assigned):
ONew Submittal O Revision -- Review Round Submittal Date:
Staff Review Meeting Date: Staff Coordinator:
This checklist is intended to be used for the final review phase for all development projects (see Step 7 of the process
flowchart). This includes final detail required for Project Development Plans (PDP). The checklist shall also be used for
Basic Development Reviews (BDR). The checklist can also be used for plan amendments including Major Amendments
(MJA) and Minor Amendments (MA). Refer to the Submittal Requirements Document for a description of these review
types. All checklist items are required unless city staff indicates an item is (W)aived, (D)eferred, (NA)Not
Applicable or already (R)eceived. If the staff code is blank (grey or blue), then the item is required. This
checklist must be reviewed, completed and accepted by staff prior to project routing. Additional information may be
requested from the applicant during the review process if necessary to address specific issues that arise. Please note
that all application materials, once submitted, become a matter of public record.
Paper Copes:
Staff
Applicant
Item Description
Submittal Requirement
Code
Validation
Resources
El
One caner cony is required (with the initial submittal only) for
Development Review
Coordination
the following: Planning Submittal Package, PUD subdivision
plat, Civil Construction Plans. Plan sets shall be provided at full
scale (24" x 36"); staple together each plan set; do not fold sets
staff
970-221-6689
One paper copy of this checklist, completed and signed by
Development Review
❑
applicant
Coordination staff 970-221-
6689— DRCoord0-)fcgov.com
❑
One signed paper copy of Development Application Form
Application Form.pdf
j
One signed paper copy of Transportation Development
TDR Fees and Application.pdf
a
Review (TDR) Application and Fee
Contact Engineering at 221-
6605 for TDR fee information
Check for the above application forms payable to the "City of
Development Review
❑
Fort Collins" (fees may be consolidated into one check)
Coordination staff
970-221-6689
Page 2 Development Application Submittal Checklist September 4, 2018
Electronic Copies:
All copies must be provided per City file naming standards and submitted on a flash drive or CD
See: Submittal Requirements Section M — File Naming Standards
1) General Information:
Staff
Code
Applicant
Validation
Item Description
Submittal Requirement
Resources
Conceptual Review (CR) or Preliminary Development
Submittal Requirements
��
❑
Review (PDR) comment response letter; or for resubmittals
include a comment response letter from the prior round of
Section C
review
Development Review
Coordination staff
❑
Project Information and Design Narrative (see Submittal
970-221-6689
Requirements, Section C)
DRCoordOfcgov.com
2) Planning Submittal Package:
Staff
Code
Applicant
Validation
Item Description
Submittal Requirement
Resources
❑
Title Block information on all plan sheets
Cover Page, including:
Section D
Section D
❑
a) Title Block
Section D
❑
b) Land Use Table
Section E
c) Sheet Index
Section D
❑
d) Signature Blocks
Section D
Standard Notes
❑
e) &t E__
(also available in Word
format at the Submittal
Requirements web page)
❑
Site Location Map
Section D
❑
Legal Description
Section D
❑
Final Site Plan Sheet(s) (and related hardscape design detail
sheets, See Section I for Requirements)
Section F
°"
❑
Final Architectural Elevation Sheet(s), Materials and other
Section G
Detail Sheets (color elevations recommended)
Page 3 Development Application Submittal Checklist September 4, 2018
Section H and I;
❑
Final Landscape Plan Sheet(s), standard city landscape
detail Section
Standard Notes
notes, and related planting sheets (See I for
(also available in Word
planting detail requirements)
format at the Submittal
Requirements web page)
,
Final Lighting Plan, Photometric Plan and Lighting Detail
Sheets
Section L
ElFinal
Trash and Recycling Enclosure Details (include these
details with the site
Section I
plan sheets or elevation sheets)
❑
Confirmation that all Sheets provided incorporate City drafting
Section D
standards
3) Final Subdivision Plat:
Staff
Code
Applicant
Validation
Item Description
Submittal Requirement
Resources
A final subdivision plat of the site. This plat must conform to
Submittal Requirements
the subdivision requirements of the City. The subdivision
Section J
plat shall contain proper designations for public streets,
easements, flood plains, floodways with base flood
LUC Division 3.3 —
elevations if applicable and all other public rights -of -way.
Engineering Standards
Approval by the Director for Type I Administrative Review,
and approval by the Planning and Zoning Board for Type II
Review by the Planning and Zoning Board, of the final plan
Subdivision Plat Digital
and subdivision plat, and complete execution, together with
Submittal Standards
all necessary certifications, shall be required before filing of
the issuance building
subdivision plat or of permits.
Mylar Submittal Checklist
Each residential lot on the subdivision plat shall identify if
the garage door(s) is recessed behind the front face of the
building, located on one of the other sides of the building,
detached from the building or located to the front of the front
face of the building.
Please note that, with the mylar submittal, the subdivision
plat is required to be provided in CAD format at time of
recordation. The CAD file for plat must be set up to be in
conformance with GIS's Subdivision Plat Digital Submittal
Standards. Refer to the Mylar Submittal Checklist.
Page 4 Development Application Submittal Checklist September 4, 2018
4) Final Civil Construction Plans:
Staff
Code
Applicant
Validation
Item Description
Submittal Requirement
Resources
Cover Sheet
Utility Plans Checklist.pdf
City Contact: Development
FjStandard
Notes Sheet
Review Coordination staff
970-221-6689
A
Existing Conditions and/or Demolition Plan (if applicable)
A
Overall Grading Plan (if applicable)
Detailed Grading Plan Sheets
Overall Utility Plan Sheet (if applicable)
Detailed Utility Plan Sheets
*
Sanitary Sewer Plan and Profile Sheets
�A
Storm Sewer Plan and Profile Sheets
Water Plan and Profile Sheets (if applicable)
Street Plan and Profile Sheets (if applicable)
Street Cross -sections (if applicable)
City of Fort Collins Standard Construction Details
Page 5 Development Application Submittal Checklist September 4, 2018
5) Final Drainage and Erosion Control Report:
staff
Code
Applicant
Validation
Item Description
Submittal Requirement
Resources
Ela.
Items a-g from the PDP Checklist:
Detention Requirements and Calculations
Stormwater Criteria Manual
Resource Page
Stormwater Criteria Manual
Appendices:
❑
b. Offsite Flows (if applicable)
A. Required Submittal
Content
c. Floodplain Zone (if applicable)
B. Stormwater Facilities
Landscape Standards
C. LID Implementation
❑
d. Hydraulic Calculations
Erosion Control
D. Guidance
E. Erosion Control
e. Detention Basin Calculations
Construction Measures
Fact Sheets
F. Erosion Control
Construction Measures
f. Standard Water Quality and LID Calculations
Standard Notes
City Utilities:
Development Forms.
❑
g. Include Drainage Plan or Exhibit in the report
_
Guidelines & Regulations
City Contact: Development
El970-221-6689
Additional Final Checklist Items:
Review Coordination staff
h. Hydraulic Calculations
❑
i. Four Step Process
j. SDI Data Spreadsheet (if applicable)
k. Erosion Control Materials
Page 6 Development Application Submittal Checklist September 4, 2018
6) Final Reports and Supporting Documents:
Staff
Applicant
Item Description
Submittal Requirement
Code
Validation
Resources
Please Note: Building
(ITEM REQUIRED WITH INITIAL SUBMITTAL ONLY)
Permits will not be reviewed
until Development Plan
Meeting
Date:
review process is completed
Building Services:
N/A
Confirmation of completed Pre -Submittal Code Review
Building Codes and
(mm/dd/yy)
Meeting with Building Services, required for all new
Standards
construction projects (except individual single family
detached residences and tenant finishes). For questions,
or to schedule this meeting call 970-416-2748.
Building Permit Fees
Traffic Operations
Traffic Operations:
Resource Page
❑
Transportation Impact Study (TIS) or waiver indicated from
Traffic Operations staff (waiver indication to be provided with
initial submittal)
City Contact: Traffic
Operations 970-221-6630
Planning Services:
❑
a) Perspective views of the Building Exterior
Submittal Requirements
Section G
(incorporated into the building elevation sheets)
❑
b) Building Material Sample Board
Submittal Requirements
Section G
c) Neighborhood Context Plan (Overall site plan
'k�►.�,
❑
diagram indicating surrounding neighborhood
features, to be incorporated into Site Plan sheets
Submittal Requirements
Section C
or cover page)
d) Land Use Code Modification and Alternative
LUC Division 2.8
❑
Compliance Requests (if required); staff review and
approval required prior to Development Review
City Contact: Planning
Completion
Services 970-416-4311
e) Parking Alternative Compliance Studies — Guidelines
LUC Section 3.2.2(I)
❑
for these studies are held by the Director (if required)
Parking Impact Study Guidelines
City Contact: Planning
Services 970-416-4311
❑
f) Certification of Notice to Mineral Owner(s)
Mineral Rights
Certificate.
(if required)
pdf
Development Review Engineering:
Larimer County Urban Area
❑
a) Soils Report — in conformance with the Larimer
Street Standards
County Urban Area Street Standards
Page 7 Development Application Submittal Checklist September 4, 2018
' IN
��b)
Subsurface Hydrologic Study2
Stormwater Criteria Manual
Resource Page
Engineering Main Page
[;,,WN,
c) Development Agreement application formCity
Contact: Engineering
Development Review 970-
221-6605
❑
d) Final legal descriptions for accompanying deeds of
Easement and Right -of -Way
Dedication Process
dedication by separate document
e) Final legal descriptions for accompanying easement
Vacation of Easements
Process
vacation request by separate document
f) Approved and Signed Engineering or Utility Variance
Requests
Larimer County Urban Area
Street Standards
Utilities — Environmental Engineering:
City Utilities: Development
Forms. Guidelines &
Erosion Control Cost Estimate
Regulations
r
Utilities — Electric Systems Engineering:
City Utilities: Develo2ment
Forms. Guidelines &
Electric Utility Service C-1 Form
Regulations
Environmental Planning:
Submittal Requirements:
a) Ecological Characterization Study (ECS). If an ECS
Section J, Section H
is required, this must be submitted at least ten days
LUC Section 3.4 1
prior to the development review application. A copy
shall also be submitted at the time of the application
City Contact:
with this checklist.
Environmental Planning
Staff at 970-416-4311
b) Phase 1 Environmental Site Assessment
To be provided b p y qualified
third -party consultant
City Forestry:
Existing Tree Removal Feasibility Letter; Existing Tree
Sections H and L;
�A
Inventory Plan; Existing Tree Mitigation Plan (if applicable).
The applicant must schedule City
an on -site meeting with
City Forestry:
Forestry to obtain tree inventory and mitigation information
forest[y0ftgov.com
for all existing trees on -site prior to review submittal.
EXISTING TREES REMOVED PRIOR TO DEVELOPMENT
970-221-6660
APPLICATION MAY BE IN VIOLATION OF CITY CODE
Page 8 Development Application Submittal Checklist September 4, 2018
Other Information and Data as the Director may require for
the full and complete consideration of the development: (to
City Contact: Development
be completed by staff):
Review Coordination
Hazardous Materials Impact Analysis (if required).
970-221-6689
Any special wildlife, wetland, natural habitats and
features, ecological or environmental study or mapping
fc
DRCoord @ gov.com
pursuant to Section 3.3 and 3.4 of the Land Use Code
�►
as requested by the Director.
Other items required by the Director:
Applicant Acknowledgement:
I have reviewed the Development Application Submittal Requirements, Sections A— M. All documents submitted
are complete and the Development Application Submittal Requirements have been incorporated into the plans
(See Development Application Submittal Requirements for detailed description of requirements). All documents
submitted have been compared and consistent design information is shown on all plan sheets and reports. I
understand that submittal requirements not sufficiently addressed or deferred may result in added review time.
cant Name
0�
Check box to confirm acknowledgement
(See Development ARalication Submittal Requirements for detailed description of requirements)
Page 9 Development Application Submittal Checklist September 4, 2018