HomeMy WebLinkAboutALLIED BUILDING PRODUCTS - PDP - PDP180015 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLIST (3)Development Review Center – 281 N College Ave – Fort Collins, CO 80522-0580 – 970.221.6689
DRCoord@fcgov.com
Page 1
Submittal Instructions
• Appointments are required for all submittals or resubmittals – A paper copy of this checklist, all submittal
materials and fee payments are due at the time of project submittal. Please contact a Development
Review Coordinator at 970-221-6689 to schedule a submittal appointment and for assistance with this
checklist.
• Only complete submittals are accepted. The submittal may be returned to the applicant if any required
materials or application fees are missing or insufficient. Submittals received Monday morning through
Wednesday noon will be routed for review the same week and submittals received after Wednesday
noon will be held and routed the following week.
• This checklist shall be used in tandem with the Submittal Requirements Document. The applicant must
complete this checklist and acknowledgement of the Submittal Requirements Document.
• The applicant shall be the designated contact person who will receive correspondence from city staff
and referral agencies.
Additional Resources
• Development Review Guide and Flowchart:
https://www.fcgov.com/drg/
• Development Review Applications and Submittal Requirements Main Page:
https://www.fcgov.com/developmentreview/applications.php
• City Land Use Code:
https://library.municode.com/co/fort_collins/codes/land_use
• City Utilities:
Development Forms, Guidelines & Regulations
• City Engineering main page:
https://www.fcgov.com/engineering/
• The City’s Comprehensive Plans:
City Plan and Transportation Master Plan
• Online City Map Resources:
https://www.fcgov.com/gis/maps.php
Development Application
Complete Submittal Checklist
Page 2 Development Application Submittal Checklist September 4, 2018
Project Development Plan (PDP) Complete Submittal Checklist
Project Name:
Applicant Name:
Office Use Only:
Project Type: Project Number (if assigned):
New Submittal Revision -- Review Round Submittal Date:
Staff Review Meeting Date: Staff Coordinator:
In addition to PDP reviews, this checklist may be used for the pre-hearing review of the following review types:
Major Amendments (MJA) to approved PDP’s, APU and SPAR. Refer to the Submittal Requirements Document
for a description of these review types. All checklist items are required unless city staff indicates an item is:
(W)aived, (D)eferred, (N/A)Not Applicable or already (R)eceived. If the staff code is blank (grey or blue),
then the item is required. This checklist must be reviewed, completed and accepted by staff prior to project
routing. Additional information may be requested from the applicant during the review process if necessary to
address specific issues that arise. Please note that all application materials, once submitted, become a matter
of public record.
Paper Copies:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
One paper copy is required (with the initial submittal only) for
the following: Planning Submittal Package, PUD subdivision
plat, Civil Construction Plans. Plan sets shall be provided at
full scale (24” x 36”); staple together each plan set; do not
fold sets
Development Review
Coordination staff 970-221-
6689
One paper copy of this checklist, completed and signed by
applicant
Development Review
Coordination staff 970-221-
6689
DRCoord@fcgov.com
One signed paper copy of Development Application Form Application Form.pdf
One signed paper copy of Transportation Development
Review (TDR) Application and Fee
TDR Fees and Application.
pdf
Contact Engineering at 221-
6605 for TDR fee information
Check for the above application forms payable to the “City of
Fort Collins” (fees may be consolidated into one check)
Development Review
Coordination staff 970-221-
6689
Page 3 Development Application Submittal Checklist September 4, 2018
Electronic Copies:
All copies must be provided per City file naming standards and submitted on a flash drive or CD
See: Submittal Requirements Section M – File Naming Standards
1) General Information:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
Affected Property Owner (APO) Notification List (following
the notification boundary provided by city staff) Submittal Requirements
Section C
Development Review
Coordination staff 970-221-
6689
DRCoord@fcgov.com
Conceptual Review (CR) or Preliminary Development
Review (PDR) comment response letter; or for resubmittals
include a comment response letter from the prior round of
review
Project Information and Design Narrative (see Submittal
Requirements, Section C)
2) Planning Submittal Package:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
Title Block information on all plan sheets Section D
Cover Page, including: Section D
a) Title Block Section D
b) Land Use Table Section E
c) Sheet Index Section D
d) Signature Blocks Section D
e) Site Plan Notes
Standard Notes
(also available in Word
format at the Submittal
Requirements web page)
Site Location Map Section D
Legal Description Section D
Site Plan Sheet(s) (and related hardscape design detail
sheets, See Section I for Requirements) Section F
Architectural Elevation Sheet(s), Materials and other Detail
Sheets (color elevations recommended) Section G
Page 4 Development Application Submittal Checklist September 4, 2018
Landscape Plan Sheet(s), standard city landscape notes, and
related planting detail sheets (See Section I for planting detail
requirements)
Section H and I;
Standard Notes
(also available in Word
format at the Submittal
Requirements web page)
Lighting Plan, Photometric Plan and Lighting Detail Sheets Section L
Trash and Recycling Enclosure Details (include these details
with the site plan sheets or elevation sheets) Section I
Confirmation that all Sheets provided incorporate City drafting
standards Section D
3) Subdivision Plat:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
A subdivision plat of the site at an appropriate scale on one
or more sheets, with outer dimensions printable at 24" x
36" and appurtenant documents prepared according to the
requirements described in the submittal requirements. The
plat must conform to the subdivision requirements of the
City, except as waived by the approved project development
plan for the development. Final Plan review and subdivision
plat approval, and complete execution, together with all
necessary certifications, shall be required before filing of the
subdivision plat or issuance of building permits.
Submittal Requirements
Section J
LUC Division 3.3 –
Engineering Standards
4) Civil Construction Plans:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
Existing Conditions and/or Demolition Plan (if applicable)
Utility Plans Checklist.pdf
City Contact: Development
Review Coordination staff
970-221-6689
Overall Grading Plan
Overall Utility Plan
Drainage Plan
Street Plan, including horizontal alignment and centerline
profiles for public streets
Page 5 Development Application Submittal Checklist September 4, 2018
5) Preliminary Drainage and Erosion Control Report:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
Detention Requirements and Calculations
Stormwater Criteria Manual
Resource Page
Stormwater Criteria Manual
Appendices:
A. Required Submittal
Content
B. Stormwater Facilities
Landscape Standards
C. LID Implementation
D. Erosion Control
Guidance
E. Erosion Control
Construction Measures
Fact Sheets
F. Erosion Control
Construction Measures
Standard Notes
City Utilities: Development
Forms, Guidelines &
Regulations
City Contact: Development
Review Coordination staff
970-221-6689
Offsite Flows (if applicable)
Floodplain Zone (if applicable)
Hydraulic Calculations
Detention Basin Calculations
Standard Water Quality and LID Calculations
Include Drainage Plan or Exhibit in the report
6) Reports and Supporting Documents:
Staff
Code
Applicant
Validation Item Description
Submittal Requirement
Resources
Meeting
Date:
(mm/dd/yy)
(ITEM REQUIRED WITH INITIAL SUBMITTAL ONLY)
Building Services:
Confirmation of completed Pre-Submittal Code Review
Meeting with Building Services, required for all new
construction projects (except individual single family
detached residences and tenant finishes). For questions,
or to schedule this meeting call 970-416-2748.
Please Note: Building Permits
will not be reviewed until
Development Plan review
process is completed
Building Codes and
Page 6 Development Application Submittal Checklist September 4, 2018
Traffic Operations:
Transportation Impact Study (TIS) or waiver indicated from
Traffic Operations staff (waiver indication to be provided with
initial submittal)
Traffic Operations Resource
Page
City Contact: Traffic
Operations 970-221-6630
Planning Services:
a) Perspective views of the Building Exterior
(incorporated into the building elevation sheets)
Submittal Requirements
Section G
b) Building Material Sample Board Submittal Requirements
Section G
c) Neighborhood Context Plan (Overall site plan
diagram indicating surrounding neighborhood
features, to be incorporated into Site Plan sheets or
cover page)
Submittal Requirements
Section C
d) Land Use Code Modification and Alternative
Compliance Requests (if required; staff review
and recommendation of approval required prior to
scheduling hearing)
LUC Division 2.8
City Contact: Planning
Services 970-416-4311
e) Parking Alternative Compliance Studies – Guidelines
for these studies are held by the Director (if required)
Parking Impact Study Guidelines
LUC Section 3.2.2(K)
City Contact: Planning
Services 970-416-4311
Development Review Engineering:
a) Soils Report – in conformance with the Larimer
County Urban Area Street Standards
Larimer County Urban Area
Street Standards
b) Subsurface Hydrologic Study
c) Signed letters of intent (required before scheduling
hearing) from impacted off-site property owner(s)
indicating generating agreement and that all required
off-site easement and off-site rights-of-way can be
finalized in conjunction with the final development
plan submittal
City Contact: Engineering
Development Review 970-
221-6605
d) Draft legal descriptions for accompanying deeds of
dedication by separate document
Easement and Right-of-Way
Dedication Process
e) Draft legal descriptions for accompanying easement
vacation request by separate document
Vacation of Easements
Process
f) Engineering or Utility Variance Requests (City review
and approval required prior to scheduling hearing)
Page 7 Development Application Submittal Checklist September 4, 2018
Environmental Planning:
a) Ecological Characterization Study (ECS). If an ECS
is required, this must be submitted at least ten days
prior to the development review application. A copy
shall also be submitted at the time of the application
with this checklist.
Submittal Requirements:
Section J, Section H
LUC Section 3.4.1
City Contact: Environmental
Planning Staff at 970-416-
4311
b) Phase 1 Environmental Site Assessment To be provided by qualified
third-party consultant
City Forestry:
Existing Tree Removal Feasibility Letter; Existing Tree
Inventory Plan; Existing Tree Mitigation Plan (if applicable).
The applicant must schedule an on-site meeting with City
Forestry to obtain tree inventory and mitigation information
for all existing trees on-site prior to review submittal.
EXISTING TREES REMOVED PRIOR TO DEVELOPMENT
APPLICATION MAY BE IN VIOLATION OF CITY CODE.
Sections H and L;
City Forestry:
forestry@fcgov.com
970.221.6660
Other Information and Data as the Director may require for
the full and complete consideration of the development: (to
be completed by staff):
Hazardous Materials Impact Analysis (if required).
Any special wildlife, wetland, natural habitats and
features, ecological or environmental study or mapping
pursuant to Section 3.3 and 3.4 of the Land Use Code
as requested by the Director.
Other items required by the Director:
City Contact: Development
Review Coordination 970-
221-6689
DRCoord@fcgov.com
Applicant Acknowledgement:
I have reviewed the Development Application Submittal Requirements, Sections A – M. All documents submitted
are complete and the Development Application Submittal Requirements have been incorporated into the plans
(See Development Application Submittal Requirements for detailed description of requirements). All documents
submitted have been compared and consistent design information is shown on all plan sheets and reports. I
understand that submittal requirements not sufficiently addressed or deferred may result in added review time.
Applicant Name Check box to confirm acknowledgement
(See Development Application Submittal Requirements for detailed description of requirements)
Larimer County Urban Area
Street Standards
Standards
Building Permit Fees