Loading...
HomeMy WebLinkAboutApplications - Transportation Development Review (TDR) - 09/20/2018City of F6rt Collins ,.w', X] PDT '.. Transportation Development Review Fee Date Received/ Paid Total Amount Paid Project Name: aged Building Products Project Location: 2155 Midpoint Dr„ Fort Collins, CO 80525 Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Overall Development Plan (ODP) Final Development Plan (FDP) This fee includes 2 rounds of review Additional round of review Fee structure amount due S500 each S 1000 each S 500 each Annexation S20 X acres = + $250 The maximum fee for each annexation document/ filing shall be $2,000 Minor Amendment S 158 each Major Amendment S2,500 each Re -zone S200 each Modification to Land Use Code S200 each Wireless Telecommunication Equipment (WTE) S65 each Road Projects acres (of roadway) X S3,500 Vacation of Easement(s) *** # of vacations X S400 Vacation of Right(s)-of-Way *** # of vacations X S800 Dedication of Easement(s) and/or Right(s)-of-Way *"* # of dedications X S250 - X Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review This fee includes 3 rounds of review. Detached Single Family S160 per unit # of units X S160 Multifamily or other residential units S115 per unit # of units X S1 15 Commercial, Industrial, Retail, and,'or Non residential building square footage S0.25 per square foot 660, sq ft X S0.25 - $1,650 Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) S250 per acre i aye acres X S 250 $467 50 Project fee S2,000 each 52.000 Total of above amounts $4,117.50 If this fee amount exceeds S30,000 then the fee amount shall be adjusted with the following formula: S30,000 e, Vs (the amount over 30,000 „'ll .. ) Date: 9120118 General Information: Owners Name(s): Gypro Properties LLC C10 Golden Commercial Group Street address: 15400 W. 64th avenue unit gE #11 City/State/Zip: Arvada, CO 80007 Telephone:... Fax: Applicants/ Consultants Firm Name: Baseline Engineering Corp. Contact: Deanne Frederickson Street address: 4007 So. Lincoln. Suite 405 City,�Statel Zip Loveland, CO 80637 Telephone: 970.353.7600 x 323 Fax: Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code: and including common areas legally connected to or associated with the property which Nis the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, 1 hereby permit City officials to enter upon the property for purposes of inspection, Name (please p*): Todd Zueinter Signature:ZW,1LX CR.J= - // f Telephone: Todd Zuercher Foot Notes: When a development project involves a change of use for a building, the charge per square foot shall apply to the portion of the overall building size for which the change of use is proposed, provided that the new use generates more traffic than the existing use, as determined by the current Institute of Transportation Engineers Trip Generation. If the new use does not generate more traffic than the existing use then the charge per square foot for shall apply only to the net additional building size (if any). The maximum fee for any residential ONLY project shall be S500 per residential unit, This check should be used to verify the fee amount (does not apply to mixed -use These fees do not include the cost of Fling fees for the recording of developments). PDP fee shall be the lesser of this amount or the above calculated the Development Agreement. When a Development Agreement or amount, # of residential units X S500 Amendment Agreement is entered into the Developer shall be responsible for the cost of recording the document Said f ling fees If this fee amount equals or exceeds $65.000 then the City Manager shall have the ability shall be calculated and provided when the signed document is to reduce the fee amount, returned to the City for signatures and filing. Reduction for affordable housing a copy of the City letter certifying/ authorizing the 'This fee does not include the cost of filing fees. Filing affordable housing shall be provided with this application. Amount of reduction to be fees shall be determined at the time of final document applied submittal and will be required prior to filing Total owed for PDP $4,117.50 cc: Christie White, Engineering 2012 form Development Review Engineering It f Collins PDT "... Transportation Development Review Fee Date Received/ Paid Total Amount Paid Project Name: Allied Building Products Project Location: 2155 Midpoint Dr.., Fort Cofiins, CO 80525 Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Fee structure Amount due Overall Development Plan (ODP) S500 each Final Development Plan (FDP) This fee includes 2 rounds of review S1000 each .......................... Additional round of review S 500 each Annexation S20 X acres - S250 Thu; maximum fee for cinch annexa0ri dkxutncnt/ filing shall be S2,000 Minor Amendment S 158 each Major Amendment S2,500 each Re -zone S200 each Modification to Land Use Code S200 each Wireless Telecommunication Equipment (WTE) S65 each Road Projects acres (of roadway) X S3,500 Vacation of Easement(s) r"** P of vacations X S400 Vacation of Right(s)-of-Way ** # of vacations X S800 Dedication of Easement(s) and/or Right(s)-of-Way *** 0 of dedications X S250 X Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review This fee includes 3 rounds of review. Detached Single Family $ l60 per unit # of units X S160 Multifamily or other residential units S1 15 per unit # of units X S 1 15 Commercial, Industrial, Retail, and/or Non residential building square footage S0.25 per square foot rsoo sq ft X S0.25 Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) $250 per acre 1..87............ acres X S 250 Project fee S2,000 each Total of above amounts Date: 9120/18 General information: Owners Name(s): GyproPropertiesLLc CFO G(vAen Commercial Group Street address: 15400 W. 64th Avenue Unit 9E #11 City/State/Zip: Arvada, CO 80007 Telephone: Fax:........... Applicants/ Consultants Firm Name: Baseline Engineering Corp. Contact: Deanne Frederickson Street address: 4007 So. Lincoln. Suite 405 City�Statel Zip: Loveland, CO 80637 Telephone: 970.353,7600 x 323 Fax:......................................................................... Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, 1 hereby permit City officials to enter upon the property for purposes of inspection. Name (please pri Todd Zuercher Signature: e AV /g $1,650 Telephone: Todd Zuerc S467.50 S2 ! $4,117.50 If this fee amount exceeds $30,000 then the fcc amount shall be adjusted with the following formula: $30,000 + !,^,, (the amount over 30,000 ) Foot Notes: When a development project involves a change of use for a building, the charge per square foot shall apply to the portion of the overall building size for which the change of use is proposed, provided that the new use generates more traffic than the existing use, as determined by the current Institute of Transportation Engineers Trip Generation. If the new use does not generate more traffic than the existing use then the charge per square foot for shall apply only to the net additional building size (if any). The maximum fee for any residential ONLY project shall be S500 per residential unit This check should be used to verify the fee amount (does not apply to mixed -use These fees do not include the cost of filing fees for the recording of developments). PDP fee shall be the lesser of this amount or the above calculated the Development Agreement. When a Development Agreement or amount. # of residential units X S500 - Amendment Agreement is entered into the Developer shall be responsible for the cost of recording the document. Said filing fees If this fee amount equals or exceeds S65,000 then the City Manager shall have the ability shall be calculated and provided when the signed document is to reduce the fee amount, returned to the City for signatures and filing. Reduction for affordable housing a copy of the City letter certifying, authorizing the *** This fee does not include the cost of filing fees. Filing affordable housing shall be provided with this application. Amount of reduction to be fees shall be determined at the time of final document applied submittal and will be required prior to filing Total owed for PDP $4,117,50 cc: Christie White, Engineering 2012 form Development Review Engineering