August 24, 2018
Rev. #1: October 3, 2018 - Applicant responses
Robert Benham
1523 Peterson St
Fort Collins, CO 80524
Re: 700 Remington St
Description of project: This is a request to add a legal accessory dwelling unit at 700
Remington St (parcel #9713218001). There is currently an illegal dwelling unit on the
property in the detached building. The property has alley access from the rear and five
off-street parking spaces are proposed between the house and rear alley. The property is
within the Neighborhood Conservation Buffer (NCB) zone district and is subject to
administrative (Type 1) review.
Please see the following summary of comments regarding the project request referenced
above. The comments offered informally by staff during the Conceptual Review will assist you
in preparing the detailed components of the project application. Modifications and additions
to these comments may be made at the time of formal review of this project. If you have any
questions regarding these comments or the next steps in the review process, you may contact
the individual commenter or direct your questions through the Project Planner, Kai Kleer, at
970-416-4284 or kkleer@fcgov.com.
Comment Summary:
Planning Services
Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com
1. The last permitted uses established at 700 Remington are Bed and Breakfast and Hair
Salon. A change of use application was submitted in 2010 (B1005292) for an Extra
Occupancy Rental House; however, the permit subsequently expired and a Certificate of
Occupancy was never issued for this use.
The extra occupancy rental nor carriage house is permitted at this time and both are
considered illegal under current code.
To bring the site into compliance the proposal will need to apply for Basic Development
Review.
Applicant response: Agreed.
2. The application should contain the site plan of the property showing the lot dimensions
and parking area dimensions, and a floor plan of all floor levels of the building. The floor
plan must indicate the use of each room and whether or not the room is finished.
Additionally, the floor plan must show the room dimensions and window locations.
Applicant response: Site plan and floor plans as described have been prepared and
included in the submittal package.
3. Updated: 4 fixed rack bike parking spaces are required (1 per bed) for the extra
occupancy rental and should be located near the primary entrance of the building. The
carriage house does not require a space by code, however it may be a nice amenity to
the renter and should be located on the west side of the building if proposed.
Applicant response: A fixed bike rack with 4 spaces as described has been indicated
on the submitted site plan for use by the main house tenants. No bike rack is being
proposed for the Carriage House.
The house will require .75 parking spaces per boarder, rounded up to the nearest whole
parking space, plus one additional space if the house is owner occupied.
Applicant response: 4 parking spaces for the tenants of the main house have been
Identified on the submitted site plan. The main house is not Owner occupied.
The carriage house will require one off street parking space.
Applicant response: One parking space for the carriage house has been identified
on the submitted site plan.
Currently 5 spaces are shown on the site plan which satisfy this requirement; however,
please indicate the dimension to ensure that they are in compliance with the minimum
stall length and widths prescribed by the land use code.
Applicant response: The parking spaces have been dimensioned as 9' wide x 19'
deep on the submitted site plan. One space has been oversized to allow for moving
van parking when needed.
4. Minimum building square footage is 350 square feet of habitable floor space per boarder
plus an additional 400 square feet if owner occupied. Make sure the land use table on the
site plan shows how this and other measured requirements are met.
Applicant response: The habitable floor space of the building exceeds the required
1,400 s.f. for 4 tenants.
5. Requirements for submittal:
Combined Site Plan/Landscape Plan
Elevations (can be current, high quality pictures of each side of the home, including
carriage house)
Floorplans for both structures.
Applicant response: Site plans, elevation photos, and floor plan drawings of the
existing site and buildings have been prepared and are included in the submittal
package.
6. The proposed development project is subject to a Type 1 review and public hearing, the
decision maker for Type 1 hearings is an Administrative Hearing Officer. The applicant
for this development request is not required to hold a neighborhood meeting for a Type 1
hearing, but if you would like to have one to notify your neighbors of the proposal, please
let me know and I can help you in setting a date, time and location for a meeting.
Neighborhood Meetings are a great way to get public feedback and avoid potential
hiccups that may occur later in the review process.
Applicant response: A neighborhood meeting is not requested a part of this
application.
7. Please see the Development Review Guide at www.fcgov.com/drg. This online guide
features a color coded flowchart with comprehensive, easy to read information on each
step in the process. This guide includes links to just about every resource you need
during development review.
Applicant response: So noted.
8. This development proposal will be subject to all applicable standards of the Fort Collins
Land Use Code (LUC), including Article 3 General Development Standards. The entire
LUC is available for your review on the web at
http://www.colocode.com/ftcollins/landuse/begin.htm.
Applicant response: So noted.
9. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a
Modification of Standard Request will need to be submitted with your formal development
proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply
for a Modification of Standard.
Applicant response: So noted. No modification of standard is requested at this time.
10. Please see the Submittal Requirements and Checklist at:
http://www.fcgov.com/developmentreview/applications.php.
Applicant response: So noted.
11. The request will be subject to the Development Review Fee Schedule that is available in
the Community Development and Neighborhood Services office. The fees are due at the
time of submittal of the required documents for the appropriate development review
process by City staff and affected outside reviewing agencies. Also, the required
Transportation Development Review Fee must be paid at time of submittal.
Applicant response: So noted.
12. When you are ready to submit your formal plans, please make an appointment with
Community Development and Neighborhood Services at (970)221-6750.
An appointment for Wednesday, October 3, 2018, at 2:00 pm was arranged.
Department: Water-Wastewater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
1. Existing Water Infrastructure (site specific comment):
There is an existing 8-inch water main in Laurel Street and an existing 6-inch water main
in Remington Street. There is an existing 3/4-inch water service to the property.
The single existing water service to this property is allowed to serve both residential
buildings on the site only if all of the conditions of City Code 26-94 are met. For
additional dwelling units, PIFs and RWRs will be due even if the single water service is
able to service both buildings.
Applicant response: So noted.
2. Existing Sewer Infrastructure (site specific comment):
There is an existing 8-inch sanitary sewer main in the alley east of the property and there
is an existing 12-inch sewer main in Laurel Street.
Applicant response: So noted.
3. Water conservation (standard comment):
The water conservation standards for landscape and irrigation will apply. Information on
these requirements can be found at: http://www.fcgov.com/standards
Applicant response: Landscaping is existing on the property with minor alterations
proposed to accommodate an additional 2 parking spaces. There is no automatic
irrigation on the property and none is proposed.
4. Fees (standard comment):
Development fees and water rights will be due at building permit. These fees are to be
paid at the time each building permit is issued. Information on fees can be found at:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-develo
pment-fees or contact our Utility Fee and Rate Specialists at (970) 416-4252 for
questions on fees.
Applicant response: So noted.
Department: Stormwater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
1. Documentation requirements (site specific comment):
If there is an increase in imperviousness greater than 1,000 square feet a drainage
report, erosion control report and construction plans are required, and they must be
prepared by a Professional Engineer registered in the State of Colorado. The drainage
report must address the four-step process for selecting structural BMPs. If the increase
in impervious area is greater than 350 square feet and less than 1,000 square feet, a
drainage letter along with a grading and erosion control plan should be sufficient to
document the existing and proposed drainage patterns. A grading plan is required if the
increase in imperviousness is less than 350 square feet.
Applicant response: The area of pervious ground cover has been increased through
the addition of gravel parking surface. The area of impervious ground cover has
been decreased by the removal of dimensional stone paving.
2. Stormwater outfall (site specific comment):
The stormwater outfall options for this site appear to be to the adjacent street or alley
way surfaces.
Applicant response: Agreed.
3. Imperviousness documentation (standard comment):
It is important to document the existing impervious area since drainage requirements
and fees are based on new impervious area. An exhibit showing the existing and
proposed impervious areas with a table summarizing the areas is required prior to the
time fees are calculated for each building permit.
Applicant response: The area of pervious vs. impervious ground cover is
documented both graphically and numerically on the site plan included in the
submittal package.
4. LID requirements (standard comment):
For an increase in imperviousness 1000 square feet or greater, Low Impact
Development (LID) requirements are required on all new or redeveloping property which
includes sites required to be brought into compliance with the Land Use Code.
Applicant response: The area of pervious ground cover has been increased through
the addition of gravel parking surface. The area of impervious ground cover has
been decreased by the removal of dimensional stone paving.
These require a higher degree of water quality treatment with one of the two following options:
1. 50% of the newly added or modified impervious area must be treated by LID
techniques and 25% of new paved areas must be pervious.
Applicant response: Not applicable.
2. 75% of all newly added or modified impervious area must be treated by LID
techniques.
Applicant response: Not applicable.
5. Fees (standard comment):
Stormwater Development Fees include two components: Plant Investment Fees (PIFs)
and Review Fees.
Applicant response: The area of pervious ground cover has been increased through
the addition of gravel parking surface. The area of impervious ground cover has
been decreased by the removal of dimensional stone paving.
1. PIFs (2017) are $8,217/acre of new impervious area over 350 square feet ($8,217 x
% imperviousness x site acreage)
Applicant response: Not applicable.
2. Review Fees are $1,045/acre of new impervious area and based on the impervious
area rate factor (i.e. $1,045 x rate factor (based on % imperviousness) x site acreage).
Applicant response: Not applicable.
Fees are to be paid at the time of the issuance of the first building permit. There are no
fees charged for existing impervious areas. Stormwater Development Fees for parking
lots or other projects that do not require a building permit are due prior to project
approval. The fees are calculated the same as for project sites with buildings. More
information on stormwater fees can be found at:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-develo
pment-fees or contact our Utility Fee and Rate Specialists at (970) 416-4252 for
questions on fees.
6. No Comment from Erosion Control at this time. Based upon the submitted Planning
Materials it has been determined that this site; disturbs less than 10,000 sq. ft., is not in
a sensitive area, has no steep slopes (greater than 3H:1V), and is not part of a larger
common development under construction. Therefore, no submittal of Erosion Control
Materials are needed at this time (if this site substantially changes in size or design
where the above criteria are anticipated, erosion control materials should be submitted
in such a case). Though the site at this time requires no erosion control material
submittal, it still must be swept and maintained to prevent dirt, saw cuttings, concrete
wash, trash & debris, landscape materials and other pollutants from entering the storm
sewer at all times in accordance with City Code 26-498 or erosion and sediment control
measures will be required of the site. Nearby area inlets should be protected as a good
preventative practice. If at building permit issuance any issues arise please email
erosion@fcgov.com to help facilitate getting these permits signed off. If you need
clarification concerning the Erosion Control Material Requirements or Comments
presented above please contact myself. Jesse Schlam (970) 224-6015
jschlam@fcgov.com
Applicant response: So noted.
Department: Traffic Operations
Contact: Tim Tuttle, 970-221-6820, TTUTTLE@fcgov.com
1. Work with the engineering department on any required adjacent street improvements,
including curb, gutter, sidewalks.
Applicant response: Adjacent streets are already improved with concrete curb,
gutter, and sidewalks.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
1. As of January 1, 2015 all development plans are required to be on the NAVD88 vertical
datum. Please make your consultants aware of this, prior to any surveying and/or design
work. Please contact our office for up to date Benchmark Statement format and City
Vertical Control Network information.
Applicant response: No vertical modifications are proposed to the existing site
grades, elevations, or structures. Not applicable to this project.
2. If submitting a replat for this property/project, addresses are not acceptable in the
Subdivision Plat title/name.
Applicant response: A replat is not part of this application. Not applicable to this project.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
1. City of Fort Collins Land Use Code [Section 3.2.1 (E)(3)], requires that to the extent
reasonably feasible, all plans be designed to incorporate water conservation materials
and techniques. This includes use of low-water-use plants and grasses in landscaping
or re-landscaping and reducing bluegrass lawns as much as possible. Native plants and
wildlife-friendly (ex: pollinators, butterflies, songbirds) landscaping and maintenance are
also encouraged. Please refer to the Fort Collins Native Plants document available
online and published by the City of Fort Collins Natural Areas Department for guidance
on native plants is: http://www.fcgov.com/naturalareas/pdf/nativeplants2013.pdf. Also
see the City of Fort Collins Plant List : https://www.fcgov.com/forestry/plant_list.pdf.
Applicant response: Landscaping is existing with only slight modification pro-
posed to accommodate an additional 2 parking spaces.
2. LUC Section 3.2.1(C) requires developments to submit a landscape and tree protection
plan, and if receiving water service from the City, an irrigation plan, that: "...(4) protects
significant trees, natural systems, and habitat, and (5) enhances the pedestrian
environment. " Note that a significant tree is defined as one having DBH (Diameter at
Breast Height) of six inches or more. If trees may be impacted then a review of trees
shall be conducted with Ralph Zentz, Senior Urban Forester (970-221-6302 or
rzentz@fcgov.com) to determine the status of existing trees and any mitigation
requirements that could result from the proposed development.
Applicant response: Landscaping is existing with only slight modification pro-
posed to accommodate an additional 2 parking spaces.
3. Please submit a site photometric plan and luminaire schedule. In regard to outdoor
lighting, especially LED light fixtures, cooler color temperatures are harsher at night and
cause more disruption to circadian (biological) rhythms for both humans and wildlife.
Warmer color temperature (warm white, 3000K or less) for any LED light fixtures is
preferred. Please also consider fixtures with motion-sensing or dimming capabilities so
that light levels can be adjusted as needed. Site light sources shall be fully shielded and
down-directional to minimize up-light, light spillage and glare [see LUC 3.2.4(D)(3)].
Thank you in advance for supporting City of Fort Collins Night Sky Objectives. For further
information regarding health effects please see:
http://darksky.org/ama-report-affirms-human-health-impacts-from-leds/
Applicant response: There is no site lighting proposed as a part of this project.
Existing outdoor lighting consists of the existing single-family residential-scale
porch lights at the front and read entry doors of the main house and carriage house.
4. Our city has an established identity as a forward-thinking community that cares about the
quality of life it offers its residents now and generations from now. Thus, the City of Fort
Collins has many sustainability programs and goals that may benefit this project. Of
particular interest may be the:
1) Green Building Program: http://www.fcgov.com/enviro/green-building.php, contact
Tony Raeker at 970-416-4238 or traeker@fcgov.com
2) Solar Energy: www.fcgov.com/solar, contact Rhonda Gatzke at 970-416-2312 or
rgatzke@fcgov.com
3) Integrated Design Assistance Program: http://fcgov.com/idap, contact Gary
Schroeder at 970-224-6003 or gschroeder@fcgov.com
Please consider City sustainability goals and ways this development can engage with
these efforts. Let me know if I can help connect you to these programs.
Applicant response: Sustainability is not contemplated as a goal for this particular
Project.
Department: Forestry
Contact: Molly Roche, , mroche@fcgov.com
1. 8/16/18:
There appear to be existing trees on-site. Please schedule an on-site meeting with City
Forestry to obtain tree inventory and mitigation information. Existing significant trees
should be retained to the extent reasonably feasible. This meeting should occur prior to
first-round PDP.
Applicant response: An onsite meeting was convened with Molly Roche. Molly
determined that the single tree scheduled for relocation was not considered a
"significant" tree. All other existing trees on the property are to be retained in their
existing location.
2. 8/16/2018:
If applicable to this project, please provide a landscape plan that meets the Land Use
Code and 3.2.1 requirements. This should include, but is not limited to, including the City
of Fort Collins General Landscape Notes, Tree Protection Notes, and Street Tree
Permit Note, providing a detailed Plant List – species, quantity, size, method of
transplant, and species percentage, and including current and proposed utility lines as
well as proper tree separation requirements. Please contact Molly Roche
(mroche@fcgov.com) if you have any questions.
Required tree sizes and method of transplant:
Canopy Shade Tree: 2.0” caliper balled and burlapped
Evergreen tree: 6.0’ height balled and burlapped
Ornamental tree: 1.5” caliper balled and burlapped
Applicant response: All landscaping on the subject property is existing to remain,
with only a small area to be modified as needed to accommodate an additional two
parking spaces. All existing and modified landscaping is shown graphically on the
site plan submitted with the application package.
If any mitigation is required, trees must be upsized to the following dimensions:
Canopy Shade Trees: 3.0" caliper balled and burlap or equivalent.
Evergreen Trees: 8' height balled and burlap or equivalent.
Ornamental Trees: 2.5" caliper balled and burlap or equivalent.
Applicant response: So noted.
3. 8/16/2018:
If applicable to this project: include locations of any water or sewer lines on the
landscape plan. Please adjust street tree locations to provide for proper tree/utility
separation.
Applicant response: Underground utilities and street trees are all existing, and
no relocation of either is contemplated as a part of this project.
10’ between trees and public water, sanitary, and storm sewer main lines
6’ between trees and public water, sanitary, and storm sewer service lines
4’ between trees and gas lines
Department: Fire Authority
Contact: Andrew Rosen, 970-416-2599, arosen@fcgov.com
1. OCCUPANCY GROUP USE
The building department shall determine the occupancy group use of the structures.
Should either be classified as a R-2 Group Occupancy, an automatic fire sprinkler
system shall be required.
Applicant response: It was communicated by the Development Coordinator to
the applicant that the property was not classified as a R-2 occupancy, and
therefore, no automatic fire sprinkler system is required.
2. FIRE ACCESS & WATER SUPPLY
The existing infrastructure available in the area meets current requirements and no
changes are needed.
Applicant response: So noted.
3. ADDRESS POSTING
New and existing buildings shall have approved address numbers, building numbers or
approved building identification placed in a position that is plainly legible, visible from
the street or road fronting the property, and posted with a minimum of six-inch numerals
on a contrasting background.
Applicant response: The existing house has the street address posted on the front
porch facing Remington Street. The existing detached carriage house on the rear alley has
not been addressed independently. Please advise.
4. OTHER PFA COMMENTS
Additional comments may be applicable at time of building permitting and/or inspection.
Applicant response: so noted.
Department: Engineering Development Review
Contact: Katie Andrews, 970-221-6501, kandrews@fcgov.com
1. Larimer County Road Impact Fees and Transportation Expansion Fees are due at the
time of building permit. Please contact Kyle Lambrecht at 221-6566 if you have any
questions.
Applicant response: so noted.
2. The City's Transportation Development Review Fee (TDRF) is due at the time of
submittal. For additional information on these fees, please see:
http://www.fcgov.com/engineering/dev-review.php
Applicant response: so noted.
3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of
this project, shall be replaced or restored to City of Fort Collins standards at the
Developer's expense prior to the acceptance of completed improvements and/or prior
to the issuance of the first Certificate of Occupancy.
Applicant response: so noted.
4. All public sidewalk, driveways and ramps, existing or proposed, adjacent or within the
site, need to meet ADA standards. If they currently do not, they will need to be
reconstructed so that they do meet current ADA standards as a part of this project.
Applicant response: All public sidewalks, driveways, and ramps adjacent to, and
on the private residential property, are existing, with no modifications contemplated.
5. Any public improvements must be designed and built in accordance with the Larimer
County Urban Area Street Standards (LCUASS). They are available online at:
https://www.larimer.org/engineering/streets
Applicant response: All public improvements adjacent to the private residential
property are existing, with no modifications contemplated.
6. Utility plans may be required and a Development Agreement may need to be recorded
once the project is finalized.
Applicant response: so noted.
7. As of January 1, 2015 all development plans are required to be on the NAVD88 vertical
datum. Please make your consultants aware of this, prior to any surveying and/or design
work.
Applicant response: No vertical modifications are proposed to the existing site
grades, elevations, or structures as a part of this application. Not applicable to
this project.
8. A Development Construction Permit (DCP) may need to be obtained prior to starting
any work on the site.
Applicant response: so noted.
9. LCUASS parking setbacks (Figure 19-6) apply and will need to be followed depending
on parking design.
Applicant response: The modified parking design is intended to conform to the
setbacks established by the existing parking provided on the property.
10. All fences, barriers, posts or other encroachments within the public right-of-way are only
permitted upon approval of an encroachment permit. Applications for encroachment
permits shall be made to the Engineering Department for review and approval prior to
installation. Encroachment items shall not be shown on the site plan as they may not be
approved, need to be modified or moved, or if the permit is revoked then the site/
landscape plan is in non-compliance.
Applicant response: All fences, barriers, and posts on the private property and
adjacent public ROW are existing. No modifications to these existing improvements
are contemplated as a part of this application, unless directed otherwise by city staff.
11. The development/site cannot use the right-of-way for any Low Impact Development to
treat the site’s storm runoff. We can look at the use of some LID methods to treat street
flows – the design standards for these are still in development.
Applicant response: so noted.
12. Doors are not allowed to open out into the right-of-way.
Applicant response: So noted.
13. Bike parking required for the project cannot be placed within the right-of-way and if
placed just behind the right-of-way need to be placed so that when bikes are parked
they do not extend into the right-of-way.
Applicant response: So noted.
14. In regard to construction activities on this site, the public right-of-way shall not be used
for staging or storage of materials or equipment associated with the Development, nor
shall it be used for parking by any contractors, subcontractors, or other personnel
working for or hired by the Developer to construct the Development. The Developer will
need to find a location(s) on private property to accommodate any necessary staging
and/or parking needs associated with the completion of the Development. Information
on the location(s) of these areas will be required to be provided to the City as a part of
the Development Construction Permit application.
Applicant response: All staging or storage of materials or equipment or parking
associated with this project will be confined within the subject property boundary.
Department: Electric Engineering
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcgov.com
1. Light and Power currently feeds this property from the alley behind the building. Current
service is #4TCU from an existing secondary box southwest of the property.
Applicant response: So noted.
2. Any changes to the existing electric capacity will initiate electric development and
system modification charges. If power requirements are to change, please coordinate
new power requirements with Light and Power Engineering. Is an increase in capacity
anticipated with this project?
Applicant response: No modifications to the existing electrical service to this
property is contemplated as a part of this submittal.
3. Electric capacity fees, development fees, building site charges and any system
modification charges necessary to feed the site will apply to this development. Please
contact me or visit the following website for an estimate of charges and fees related to
this project:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-develo
pment-fees
Applicant response: No modifications to the existing electrical service to this
property is contemplated as a part of this submittal.
4. All residential units larger than a duplex and/or 200 amps is considered a commercial
service, therefore the owner is responsible to provide and maintain the electrical service
from the transformer to the secondary box. If an increase in power is needed then the
owner will be responsible to install the upsized secondary conductors from the meter to
the box.
Applicant response: No modifications to the existing electrical service to this
property is contemplated as a part of this submittal.
5. Please contact Tyler Siegmund at Light & Power Engineering if you have any questions
at 970.416.2772. Please reference our policies, construction practices, development
charge processes, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers
Applicant response: No modifications to the existing electrical service to this
property is contemplated as a part of this submittal.