HomeMy WebLinkAboutKYLE AVENUE SOLAR ARRAY - PDP / FDP - FDP180026 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW10/9/2018 CONCEPTUAL DESIGN REVIEW COMMENTS/RESPONSES Below are Namaste Solar’s responses (in Blue) to the comments received after the Conceptual Design Review meeting. Regards, Heath Mackay Director of Project Development Namaste Solar CDR Comment Summary: Department: Water-Wastewater Engineering Contact: Shane Boyle, 970-221-6339, sboyle@fcgov.com 1. Other service district (site specific comment): This project site is located within the Fort Collins Loveland Water District and the South Fort Collins Sanitation District for water and sewer service. Please contact them at (970) 226-3104 for development requirements. N/A – we are not bringing water or sewer to the site 2. Water conservation (standard comment): The water conservation standards for landscape and irrigation will apply. Information on these requirements can be found at: http://www.fcgov.com/standards Acknowledged – please see landscaping plan Department: Traffic Operations Contact: Tim Tuttle, 970-221-6820, TTUTTLE@fcgov.com 1. Work with the engineering department on any required adjacent street improvements, including curb, gutter and sidewalks. Acknowledged – Namaste Solar has engaged the Engineering Department Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com 1. As of January 1, 2015 all development plans are required to be on the NAVD88 vertical datum. Please make your consultants aware of this, prior to any survey and/or design work. Please contact our office for up to date Benchmark Statement format and City Vertical Control Network information. Acknowledged – we are in compliance 2. This property is not platted. If submitting a Subdivision Plat for this property/project, addresses are not acceptable in the Plat title/name. N/A – we are not submitting a Subdivision Plat Department: Stormwater Engineering Contact: Shane Boyle, 970-221-6339, sboyle@fcgov.com 1. Master plan and criteria compliance (site specific comment): The design of this site must conform to the drainage basin design of the Fossil Creek Master Drainage Plan as well the Fort Collins Stormwater Criteria Manual. Acknowledged – please see Utility Plan Set 2. Documentation requirements (site specific comment): If there is an increase in imperviousness greater than 1,000 square feet a drainage report, erosion control report and construction plans are required and they must be prepared by a Professional Engineer registered in the State of Colorado. The drainage report must address the four-step process for selecting structural BMPs. If the increase in impervious area is greater than 350 square feet and less than 1,000 square feet, a drainage letter along with a grading and erosion control plan should be sufficient to document the existing and proposed drainage patterns. A grading plan is required if the increase in imperviousness is less than 350 square feet. Acknowledged – please see Utility Plan Set 3. Stormwater outfall (site specific comment): The stormwater outfall options for this site appear to be the Natural Area to the NE. Acknowledged – please see Utility Plan Set 4. Imperviousness documentation (standard comment): It is important to document the existing impervious area since drainage requirements and fees are based on new impervious area. An exhibit showing the existing and proposed impervious areas with a table summarizing the areas is required prior to the time fees are calculated for each building permit. Acknowledged – please see Utility Plan Set. There are no existing impervious areas at the site 5. Detention requirements (standard comment): When improvements are proposed to an existing developed site and there is an increase in impervious area greater than 1000 square feet, onsite detention is required with a 2-year historic release rate for water quantity. In the Fossil Creek basin, the 2-year historic release rate is 0.2 cfs/acre. If there is less than 1000 but more than 350 square feet of new impervious area, a site grading plan is required along with the impervious area documentation. Acknowledged – please see Utility Plan Set 6. Detention drain times (standard comment): Per Colorado Revised Statute §37-92-602 (8) that became effective August 5, 2015, criteria regarding detention drain time will apply to this project. As part of the drainage design, the engineer will be required to show compliance with this statute using a standard spreadsheet (available on request) that will need to be included in the drainage report. Upon completion of the project, the engineer will also be required to upload the approved spreadsheet onto the Statewide Compliance Portal. This will apply to any volume based stormwater storage, including extended detention basins. Acknowledged – please see Utility Plan Set 7. Standard water quality requirements (standard comment): If there is an increase of more than 1000 square feet of new impervious area, fifty percent of the site runoff is required to be treated using the standard water quality treatment as described in the Fort Collins Stormwater Manual, Volume 3-Best Management Practices (BMPs). (http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-gui delines-regulations/stormwater-criteria) Extended detention is the usual method selected for water quality treatment; however the use of any of the BMPs is encouraged. Acknowledged – please see Utility Plan Set 8. LID requirements (standard comment): Low Impact Development (LID) is required on all new or redeveloping property which includes sites required to be brought into compliance with the Land Use Code. These require a higher degree of water quality treatment with one of the two following options: 1. 50% of the newly added or modified impervious area must be treated by LID techniques and 25% of new paved areas must be pervious. 2. 75% of all newly added or modified impervious area must be treated by LID techniques. Acknowledged – please see Utility Plan Set 9. Erosion control requirements (standard comment): The erosion control report requirements are in Section 1.3.3, Volume 3, Chapter 7 of the Fort Collins Stormwater Criteria Manual. If you need clarification concerning this section, please contact the Erosion Control Inspector, Jesse Schlam at 224-6015 or jschlam@fcgov.com. Acknowledged – please see Utility Plan Set 10. Inspection and maintenance (standard comment): There will be a final site inspection of the stormwater facilities when the project is complete and the maintenance is handed over to an HOA or another maintenance organization. Standard operating procedures (SOPs) for on-going maintenance of all onsite drainage facilities will be included as part of the Development Agreement. More information and links can be found at: http://www.fcgov.com/utilities/what-we-do/stormwater/stormwater-quality/low-impact-dev elopement Acknowledged 11. Fees (standard comment): The 2017 city wide Stormwater development fee (PIF) is $8,217/acre for new impervious area over 350 square feet and there is a $1,045/acre of site review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found at: http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-develo pment-fees or contact our Utility Fee and Rate Specialists at (970) 416-4252 for questions on fees. There is also an erosion control escrow required before the Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area, cost of the measures, or a minimum amount in accordance with the Fort Collins Stormwater Manual. Acknowledged 12. The site disturbs more than 10,000 sq. ft. and therefore Erosion and Sediment Control Materials need to be submitted. The erosion control requirements can be located in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. a copy of the erosion control requirements can be found at www.fcgov.com/eroison. The Erosion Control Materials will need to be submitted at time of the first round of FDP. Based upon the area of disturbance, State permits for stormwater will be required since the site is over an acre and should be pulled before Construction Activities begin. If you need clarification concerning the Erosion Control Material Requirements or Comments presented above please contact myself. Jesse Schlam (970) 224-6015 jschlam@fcgov.com Acknowledged – please see Utility Plan Set Department: Forestry Contact: Molly Roche, 224-616-1992, mroche@fcgov.com 1. There appears to be existing trees on-site. Will they be impacted? Please schedule an on-site meeting with City Forestry to obtain tree inventory and mitigation information. Existing significant trees should be retained to the extent reasonably feasible. This meeting should occur prior to first-round PDP. Namaste Solar met with Forestry on site. Please see Tree Removal Feasibility/Mitigation letter and Landscaping Plan 2. Please provide a landscape plan that meets the Land Use Code and 3.2.1 requirements. This should include, but is not limited to, including the City of Fort Collins General Landscape Notes, Tree Protection Notes, and Street Tree Permit Note, providing a detailed Plant List – species, quantity, size, method of transplant, and species percentage, and including current and proposed utility lines as well as proper tree separation requirements. Please contact Molly Roche (mroche@fcgov.com) if you have any questions. Required tree sizes and method of transplant: Canopy Shade Tree: 2.0” caliper balled and burlapped Evergreen tree: 6.0’ height balled and burlapped Ornamental tree: 1.5” caliper balled and burlapped If any mitigation is required, trees must be upsized to the following dimensions: Canopy Shade Trees: 3.0" caliper balled and burlap or equivalent. Evergreen Trees: 8' height balled and burlap or equivalent. Ornamental Trees: 2.5" caliper balled and burlap or equivalent. Acknowledged – please see Mitigation Letter and Landscaping Plan. Per discussions with Environmental Planning, Planning Servies, and Forestry, Namaste Solar is proposing an Alternative Compliance request for landscaping that includes native shrubs and other species in lieu of new trees that will shade the array and decrease solar electricity production. 3. Include locations of any water or sewer lines on the landscape plan. Please adjust street tree locations to provide for proper tree/utility separation. NA – Namaste Solar is not bringing water/sewer lines to the site or proposing street trees. Department: Fire Authority Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org 1. PFA is expecting to adopt the 2018 IFC in January 2019 Ground mounted solar arrays require a separate plan review and permit from the Poudre Fire Authority. Acknowledged 2. ACCESS Access is required to within 150ft of all points of this facility. This can be achieved by establishing a Fire Lane (please refer to specifications below) on the property and shown on the Plat as an Emergency Access Easement or dedicated by separate legal document. Namaste Solar met with PFA to discuss an appropriate access plan for this project. The site plan in the submittal package reflects the agreed upon design/location for the access road. We are not submitting a Plat for this project but will provide an Emergency Access Easement through a separate document. 3. FIRE LANE SPECIFICATIONS A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: > Shall be dedicated by plat or separate document as an Emergency Access Easement. > Maintain the required 20-foot minimum unobstructed width & 14 foot minimum overhead clearance. Where road widths exceed 20ft in width, the full width shall be dedicated unless otherwise approved by the AHJ. > Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons. > Dead-end fire access roads in excess of 150 feet in length shall be provided with an approved area for turning around fire apparatus. > The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans. > Be visible by red curb and/or signage and maintained unobstructed at all times. Sign locations or red curbing should be labeled and detailed on final plans. Refer to LCUASS detail #1418 & #1419 for sign type, placement, and spacing. Appropriate directional arrows required on all signs. > In remote rural applications, fire lane standards may be modified with the approval of the fire marshal; examples would be a reduction in road width or road surface. Acknowledged. Namaste Solar met with PFA to discuss an appropriate access plan for this project. The site plan in the submittal package reflects the agreed upon design/location for the access road. We are not submitting a Plat for this project but will provide an Emergency Access Easement through a separate document. 4. GATES The provided narrative states that the Solar facility will be fully fenced. No gates are allowed across a required Fire Lane without an approved means of emergency access gate. Code language follows: > IFC D103.5: Gates securing fire apparatus access roads shall comply with all of the following criteria: 1. The minimum gate width for vehicle access shall be 20 feet. 2. Gates shall be of the swinging or sliding type. 3. Construction of gates shall be of materials that allow manual operation by one person. 4. Gate components shall be maintained in an operative condition at all times and replaced or repaired when defective. 5. Electric gates shall be equipped with a means of opening the gate by fire department personnel for emergency access. Emergency opening devices shall be approved by the fire code official. Gates must have a Knox Gate Key Switch that fits the Knox Key system for Poudre Fire Authority. 6. Gate design and locking device specifications shall be submitted for approval by the fire code official prior to installation. 7. Electric gate operators, where provided, shall be listed in accordance with UL 325 and have a means of emergency, manual operation during power loss. 8. Gates intended for automatic operation shall be designed, constructed and installed to comply with the requirements of ASTM F 2200. Acknowledged. The proposed access gate will be 20 feet with and have a Knox Gate Key Switch that fits the Knox Key system for Poudre Fire Authority 5. ADDRESSING/WAYFINDING To assist with prompt emergency response, the Solar Facility shall be allocated its own unique address and shall be clearly visible on the gateway entrance to the facility. Acknowledged. 6. GROUND-MOUNTED PHOTOVOLTAIC ARRAYS > IFC 605.11.4: Ground-mounted photovoltaic arrays shall comply with Sections 605.11 through 605.11.2 and this section. Setback requirements shall not apply to ground-mounted, free-standing photovoltaic arrays. A clear, brush-free area of 10 feet shall be required for ground-mounted photovoltaic arrays. Vegetation height under or adjacent to arrays shall be maintained at or below 18". Acknowledged. Department: Environmental Planning Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com 1. 1. This site is surrounded by public open land: Prairie Dog Meadow Natural Area. Acknowledged. 2. 2. An Ecological Characterization Study (ECS) is required by City of Fort Collins Land Use Code (LUC) Section 3.4.1 (D)(1) as the site is within 500 feet of known natural habitat and features as defined by LUC (wetlands, wet meadow, grasslands, Prairie Dog Meadow Natural Area). Please note the buffer zone standards range from 50 to 100 ft for these features, as identified in Section 3.4.1(E) of the Land Use Code, as you proceed with your site design process. Buffers are measured from “top of bank” and/or edge of wetlands and these should be delineated as part of the ECS. Please contact me to discuss the scope and requirements of the ECS further [and to arrange an on-site meeting if necessary]. The ECS is due a minimum of 10 days prior to the PDP submittal. Acknowledged. The ECS was sent to the City on 9/17/2018 3. 3. Presence or absence of active black-tailed prairie dogs and/or burrows should be noted including estimates of number of burrows and prairie dog population size within and adjacent to the site. Acknowledged. Please see ECS 4. 4. Regarding black-tailed prairie dogs please note the following: a. The City Municipal Code and the City Land Use Code require that any prairie dogs inhabiting a project site shall be relocated or eradicated by the developer prior to any site grading or construction activities. If prairie dogs are to be eradicated, this must be done humanely using City of Fort Collins and Colorado Division of Wildlife approved methods [see LUC Section 3.4.1(N)(6)]. b. A prairie dog removal plan will need to be provided at the time of Final Plans, and documentation of the removal activities provided prior to the issuance of a Development Construction Permit. If prairie dogs are to be eradicated rather than relocated, City Staff recommend use of carbon monoxide fumigation as opposed to other eradication methods. c. Should this project gain approval and proceed to construction, a burrowing owl survey, in accordance with the Colorado Division of Parks and Wildlife standards, shall be conducted prior to construction by a professional, qualified wildlife biologist and prior to prairie dog relocation or eradication. Documentation can be in the form of a letter or memo from the wildlife biologist (in the case of the burrowing owl survey) and contractor (in the case of prairie dog removal). Please see ECS. No active prairie dog burrows were present and thus, no removal or eradication of prairie dogs is planned. 5. This project must also comply with the following standard, as it is adjacent to the Prairie Dog Meadow Natural Area: Section3.4.1(L) Compatibility with Public Natural Areas or Conserved Land. If the project contains or abuts a publicly owned natural area or conserved land, the development plan shall be designed so that it will be compatible with the management of such natural area or conserved land. In order to achieve this, the development plan shall include measures such as barriers or landscaping measures to minimize wildlife conflicts, setbacks or open space tracts to provide a transition between the development and the publicly owned natural area or conserved land, and educational signage or printed information regarding the natural values, management needs and potential conflicts associated with living in close proximity to such natural area or conserved land. The setback of array equipment should be minimum 50ft from the natural area property. Acknowledged. Please see project narrative in the submittal package. Based on the type of development proposed for this site, Environmental Planning and Natural Areas reduced the minimum setback to 35ft from the natural area property. 6. The Land Use Code requires that whenever a project abuts a Natural Area, then compatibility with and reasonable public access to that Natural Area is required. Please ensure your ECS addresses this code requirement, see Section 3.4.1(L)(M) for more information. The setback of array equipment should be minimum 50ft from the natural area property. Fencing design should be coordinated with City Natural Areas Department staff. Acknowledged. Please see the ECS. Based on the type of development proposed for this site, Environmental Planning and Natural Areas reduced the minimum setback to 35ft from the natural area property. The fencing design in the submittal package was reviewed by Natural Areas Department staff prior to the submittal of our PDF/FDF application. 7. The ECS informs design of a Natural Habitat Buffer Zone or “NHBZ”. The NHBZ can be determined through quantitative or qualitative (performance) standards. See LUC 3.4.1(E) for details. Acknowledged. Based on the type of development proposed for this site, Environmental Planning and Natural Areas reduced the minimum setback to 35ft from the natural area property. 8. Note that within any Natural Habitat Buffer Zones that may be designated on this site, the City has the ability to determine if the existing landscaping within the zone is incompatible with the purposes and intent of the buffer zone [Section 3.4.1(E)(1)(g)]. Please ensure the ECS discusses existing vegetation on-site and identifies potential restoration options. If existing vegetation is determined to be insufficient, then restoration and mitigation measures may be required. Acknowledged. Please see the ECS and Landscaping Plan. 9. There may be opportunity here to collaborate with City Natural Areas to provide enhancements through restoration and/or landscape additions in Prairie Dog Meadow Natural Area adjacent to the proposed project site. Please contact Natural Areas staff to discuss, in addition to any construction easements that may be necessary. Please be advised that if this is the case, then this project needs to be presented by City staff to City Land Conservation and Stewardship Board. Ultimately, any easements on natural area property will need to be approved by City Council. This process from start to finish generally takes MINIMUM 90 days. This would need to occur prior to scheduling a City Planning and Zoning Board Hearing for this project. Contact NAD staff for further information. Mark Sears, Senior Manager, City of Fort Collins Natural Areas Department, 970-416-2096, msears@fcgov.com No collaboration with City Natural Areas is planned at this time. 10. With respect to lighting, the City of Fort Collins Land Use Code, Section 3.2.4(D)(6), requires that "natural areas and natural features shall be protected from light spillage from off-site sources." Thus, lighting from the project shall not spill over into any natural features or natural habitat buffer areas. In addition, consider potential noise impacts to natural areas and provide noise buffering strategies perhaps through addition of evergreen trees such as southwest white pines and Rocky Mountain junipers. N/A – no lighting is proposed, nor with this development have any potential noise impacts. 11. Please note LUC Section 3.2.1(C) requiring developments to submit a landscape and tree protection plan, and if receiving water service from the City, an irrigation plan, that: "...(4) protects significant trees, natural systems, and habitat, and (5) enhances the pedestrian environment.” Note that a significant tree is defined as a tree having DBH (Diameter at Breast Height) of six inches or more. Please schedule a review of the trees with Ralph Zentz, Senior Urban Forester (970-221-6302 or rzentz@fcgov.com) to determine the status of existing trees or tree groves and any mitigation requirements that could result from the proposed development. Acknowledged. Please see landscaping plan. Namaste Solar coordinated with Molly Roche with Forestry for the Tree inventory and mitigation plan. Per discussions with Environmental Planning and Forestry, Namaste Solar is proposing an Alternative Compliance request for landscaping that includes native shrubs and other species in lieu of new trees that will shade the array and decrease solar electricity production. The site will not receive water from the City. 12. City of Fort Collins Land Use Code [Section 3.2.1 (E)(3)], requires that to the extent reasonably feasible, all plans be designed to incorporate water conservation materials and techniques. This includes use of low-water-use plants and grasses in landscaping or re-landscaping and reducing bluegrass lawns as much as possible. Native plants and wildlife-friendly (ex: pollinators, butterflies, songbirds) landscaping and maintenance are also encouraged. Please refer to the Fort Collins Native Plants document available online and published by the City of Fort Collins Natural Areas Department for guidance on native plants is: http://www.fcgov.com/naturalareas/pdf/nativeplants2013.pdf. Also see the City of Fort Collins Plant List : https://www.fcgov.com/forestry/plant_list.pdf. Acknowledged. Please see landscaping plan. Namaste Solar’s landscaping plans focuses on native, low water plants and grasses, as well as a pollinator friendly seed mix for restoring areas disturbed by construction activities. 13. In regard to lighting, especially LED light fixtures, cooler color temperatures are harsher at night and cause more disruption to circadian (biological) rhythms for both humans and wildlife. Warmer color temperature (warm white, 3000K or less) for any LED light fixtures is preferred. Please also consider fixtures with motion-sensing or dimming capabilities so that light levels can be adjusted as needed. Site light sources shall be fully shielded and down-directional to minimize up-light, light spillage and glare [see LUC 3.2.4(D)(3)]. Thank you in advance for supporting City of Fort Collins Night Sky Objectives. For further information regarding health effects please see: http://darksky.org/ama-report-affirms-human-health-impacts-from-leds/ N/A – no lighting is proposed 14. City Environmental Planning staff will reach out to Natural Areas Department staff regarding process to vacate right of way and clean-up of prior approved plans shown for the Prairie Dog Meadow Natural Area. Mark Sears, Senior Manager, City of Fort Collins Natural Areas Department, 970-416-2096, msears@fcgov.com Acknowledged 15. Our city has an established identity as a forward-thinking community that cares about the quality of life it offers its citizens now and generations from now. Thus, the City of Fort Collins has many sustainability programs and goals that may benefit this project. Of particular interest may be: 1) ClimateWise program: http://fcgov.com/climatewise, contact Heidi Wagner at 970-416-2230 or climatewise@fcgov.com 2) Zero Waste Plan and the Waste Reduction and Recycling Assistance Program (WRAP): http://fcgov.com/recycling/wrap.php, contact Jonathon Nagel at 970-416-2701 or jnagel@fcgov.com 3) Green Building Program: http://fcgov.com/greenbuilding contact Tony Raeker at 970-416-4238 or traeker@fcgov.com 4) Solar Energy: www.fcgov.com/solar, contact Rhonda Gatzke at 970-416-2312 or rgatzke@fcgov.com 5) Integrated Design Assistance Program: http://fcgov.com/idap, contact Gary Schroeder at 970-224-6003 or gschroeder@fcgov.com 6) Nature in the City Program: http://fcgov.com/natureinthecity, contact Justin Scharton at 970-221-6213 or jscharton@fcgov.com Acknowledged. Namaste Solar is currently working with Rhonda Gatzke on this project and we are certainly open to working with other City programs that would provide additional value to the citizens of Fort Collins. Department: Engineering Development Review Contact: Katie Andrews, 970-221-6501, kandrews@fcgov.com 1. In accordance with Section 24-95 of the City Code, the project is responsible for the local portion of its Kyle Avenue and Cherylen Street frontage. Typically, with development, it is required that the frontage improvements be designed and constructed to LCUASS standards before the first building permit ¿ this includes the installation of asphalt, curb, gutter, parkway, and sidewalk. However, we understand that some of these roads may never be built now that City Natural Areas owns the property. It is possible that the City collect a payment in lieu of construction for a portion of the frontage or defer the entire obligation to subsequent development via development agreement. To give you an estimate of the value of this obligation, the local street portion estimate for 2018 is $225/linear feet of frontage. Staff realizes this will not be a small sum, please contact me so we can discuss the options for payment in lieu or potential deferment and with any questions you have about the frontage obligation. Acknowledged. Per discussions with Engineering any and all road/curb/gutter/sidewalk upgrades will be deferred to a future development for this site. Namaste Solar is working with Engineering on the Development Agreement that codifies this deferment. 2. Larimer County Road Impact Fees and Transportation Expansion Fees are due at the time of building permit. Please contact Kyle Lambrecht at 221-6566 if you have any questions. Namaste Solar spoke with Kyle Lambrecht. Based on the type of development proposed, no Larimer County Road Impact Fees and Transportation Expansion Fees will be assessed. 3. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see: http://www.fcgov.com/engineering/dev-review.php Per City Staff, this project is exempt from the TDRF 4. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). They are available online at: https://www.larimer.org/engineering/streets N/A. Per discussions with Engineering any and all road/curb/gutter/sidewalk upgrades will be deferred to a future development for this site. Namaste Solar is working with Engineering on the Development Agreement that codifies this deferment. 5. This project is responsible for dedicating any right-of-way and easements that are necessary or required by the City for this project. Most easements to be dedicated need to be public easements dedicated to the City. This shall include the standard utility easements that are to be provided behind the right-of-way (15 foot along an arterial, 8 foot along an alley, and 9 foot along all other street classifications). Information on the dedication process can be found at: http://www.fcgov.com/engineering/devrev.php Acknowledged. Namaste Solar will work engineering to document the Emergency Access Easement and Utility Easement for Fort Collins Light and Power. 6. Utility plans will be required and a Development Agreement will be recorded once the project is finalized. Acknowledged 7. As of January 1, 2015 all development plans are required to be on the NAVD88 vertical datum. Please make consultants aware of this, prior to any surveying and/or design work. Acknowledged 8. A Development Construction Permit (DCP) may need to be obtained prior to starting any work on the site. Acknowledged 9. Regarding construction of this site, the public right-of-way shall not be used for staging or storage of materials or equipment associated with the Development, nor shall it be used for parking by any contractors, subcontractors, or other personnel working for or hired by the Developer to construct the Development. The Developer will need to find a location(s) on private property to accommodate any necessary staging and/or parking needs associated with the completion of the Development. Information on the location(s) of these areas will be required to be provided to the City as a part of the Development Construction Permit application. Acknowledged. Staging/parking for the project will take plan on the project site. Department: Electric Engineering Contact: Rob Irish, 970-224-6167, rirish@fcgov.com 1. Light & Power has existing single-phase overhead electric facilities running adjacent to this site along Kyle Ave. The nearest 3-phase facilities are located at the SE corner of Kyle Ave. & Trilby Rd. If the applicant anticipates needing 3-phase they would be responsible for any system modification charges to get it to the site. Acknowledged. Namaste Solar has received an estimate for this modification from Power and Light. 2. Any relocation or modification to existing electric facilities will be at the expense of the owner/developer. If there are no existing, usable, easements or room in the ROW for Light & Power facilities, the owner/developer may be responsible for providing off-site easements to the proposed site. Acknowledged. There is an existing utility ROW/Easement along Kyle Avenue. 3. Any proposed Light & Power electric facilities or existing electric facilities that will remain within the limits of the project must be located within a utility easement. Acknowledged. Namaste Solar will work Engineering to document the utility Easement for Fort Collins Light and Power facilities within the limits of the project. Per Austin Kreager, Electric Utility Project Manager, the Light and Power easement to be 10’ wide for the entirety of the proposed primary line and transformer location. 4. A commercial service information form (C-1 form) and a one line diagram will need to be submitted to Light & Power Engineering for all proposed commercial buildings and multi-family (commercial) buildings larger than a duplex or greater than 200amps. A link to the C-1 form is below: http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-gui delines-regulations Acknowledged. The C-1 and one-line diagram have already been submitted to Light & Power Engineering 5. Transformer locations need to be within 10’ of an asphalt surface accessible by a line truck. A minimum clearance of 8’ must be maintained in front of the transformer doors and a minimum of 3’ on the sides Transformer and meter locations will need to be coordinated with Light & Power Engineering. Certain building materials and or building design may require more clearance. Please adhere to all clearance requirements in the Electric Service Standards at the following link. http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-gui delines-regulations Per discussions with Rob Irish, the requirement for the asphalt surface has been waived so long as there is a gravel access road capable of supporting a 40-ton vehicle. All other minimum clearances will be provided. 6. Electric Capacity Fee, Building Site charges, and any system modification charges necessary will apply to this development. Please contact Light & Power Engineering if you have any questions at 970-221-6700 or ElectricProjectEngineering@fcgov.com. Please reference our Electric Service Standards, development charges and fee estimator at the following link: http://www.fcgov.com/utilities/business/builders-and-developers Acknowledged. Namaste Solar has coordinated with Light &Power regarding anticipated capacity fee and system modifications charges. Additionally, Namaste Solar engaged Exponential Engineering for a System Impact Study (SIS), a copy of which was forward to Kent Coldsnow at Light & Power. Planning Services Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com 1. Project decision maker is the Planning and Zoning Board. A neighborhood meeting will need to be scheduled prior to the project submittal. 2-week mailed notice prior to meeting is required, please plan submittal accordingly. Acknowledged. The neighborhood meeting has occurred. 2. Please provide a glare analysis upon submittal of the project. Analysis can be in a memo format and should elaborate on the panel design, angles and potential for glare into adjacent properties. Please see Glare Study included with submittal package. 3. Perimeter fence with a minimum height of five (5) feet and a maximum height of seven (7) feet. Please choose an appropriate fence design that is sensitive to the existing natural areas and residential character of the area. Please see fencing detail in the submittal package, which was previously reviewed and deemed appropriate by the City. 4. If any lighting is proposed with the installation please provide photometric plans. Ensure that light fixtures are down directional and full cut off with 3,000K or less temperature. N/A – no light proposed. 5. Landscape plan will be required. This project will require street trees, screening/landscaping along the perimeter of the site. Acknowledged – please see Landscaping Plan. Per discussions with Environmental Planning and Forestry, Namaste Solar is proposing an Alternative Compliance request for landscaping that includes native shrubs and other species in lieu of new trees that will shade the array and decrease solar electricity production. 6. The following setbacks are required in the Urban Estate zone district 30 ft. front yard (from Kyle Ave.) 25 ft. rear yard (from east property line) 20 ft. side yard (from north property line) Acknowledged. The proposed setbacks for this project exceed the setbacks listed above. 7. The proposed development project is subject to a Type 2 (Planning and Zoning Board) review and public hearing. The applicant for this development request is required to hold a neighborhood information meeting prior to formal submittal of the proposal. Neighborhood meetings offer an informal way to get feedback from your surrounding neighbors and discover any potential hiccups prior to the formal hearing. Please contact me, at 221-6750, to assist you in setting a date, time, and location. I and possibly other City staff, would be present to facilitate the meeting. The neighborhood meeting took place on August 30, 2018 8. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. Acknowledged and reviewed. 9. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code (LUC), including Article 3 General Development Standards. The entire LUC is available for your review on the web at http://www.colocode.com/ftcollins/landuse/begin.htm. Acknowledged and reviewed. 10. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of Standard. Acknowledged and reviewed. 11. Please see the Submittal Requirements and Checklist at: http://www.fcgov.com/developmentreview/applications.php. Acknowledged and reviewed. 12. The request will be subject to the Development Review Fee Schedule that is available in the Community Development and Neighborhood Services office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal. Per City staff, this project is exempt from the Development Review and TDR Fees. 13. When you are ready to submit your formal plans, please make an appointment with Community Development and Neighborhood Services at (970)221-6750. Acknowledged