Loading...
HomeMy WebLinkAboutHOFFMAN MILL FUEL SITE - MINOR AMENDMENT - MA180043 / BDR180015 - SUBMITTAL DOCUMENTS - ROUND 2 - UTILITY PLANSSITE 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME HOFFMAN MILL FUELING SITE COVER SHEET 09/26/18 N/A N/A JTC JTC 1344-095-00 1 of 9 ARCHITECTURE WEST, LLC 160 PALMER DRIVE FORT COLLINS, CO 80525 PHONE: 970.207.0424 Vicinity Map Scale: 1" = 1000' PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK #17-92 300 FEET SOUTH OF THE SOUTHWEST CORNER OF EAST DRAKE RD AND TIMBERLINE RD, IN THE TOP OF AN IRRIGATION STRUCTURE ELEV= 4938.70 CITY OF FORT COLLINS BENCHMARK #8-02 ON THE SOUTHEAST CORNER OF THE INTERSECTION OF LEMAY AVE AND MULBERRY ST, IN THE CURB, ON THE SOUTHEAST SIDE OF A TRIANGULAR ISLAND THAT CONTAINS THE TRAFFIC SIGNAL. ELEV= 4939.27 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS MAY HAVE USED NGVD29 UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATIONS SHOULD BE USED: NGVD UNADJUSTED (PRIOR CITY OF FORT COLLINS DATUM) = (NAVD88) - 3.19 UTILITY CONTACTS: LIGHT & POWER City of Fort Collins Light & Power Contact: Janet McTague Ph. 970.224.6154 STORMWATER,WATER & WASTEWATER City of Fort Collins Utilities 700 Wood Street Fort Collins, Colorado 80522 Contact: Shane Boyle Ph. 970.221.6339 NATURAL GAS Xcel Energy 1901 E. Horsetooth Road Fort Collins, Colorado 80525 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME HOFFMAN MILL FUELING SITE GENERAL NOTES 09/26/18 N/A N/A JTC JTC 1344-095-00 2 of 9 ARCHITECTURE WEST, LLC 160 PALMER DRIVE FORT COLLINS, CO 80525 PHONE: 970.207.0424 CITY OF FORT COLLINS GENERAL NOTES CITY OF FORT COLLINS CONSTRUCTION NOTES CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date MATCHLINE SEE THIS SHEET HOFFMAN MILL ROAD MATCHLINE SEE THIS SHEET HOFFMAN MILL ROAD 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME HOFFMAN MILL FUELING SITE EXISTING CONDITIONS & DEMOLITION PLAN 09/26/18 1" = 30' N/A JTC JTC 1344-095-00 3 of 9 ARCHITECTURE WEST, LLC 160 PALMER DRIVE FORT COLLINS, CO 80525 PHONE: 970.207.0424 CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date HOFFMAN MILL RD 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME HOFFMAN MILL FUELING SITE HORIZONTAL CONTROL PLAN 09/26/18 1" = 10' N/A JTC JTC 1344-095-00 4 of 9 ARCHITECTURE WEST, LLC 160 PALMER DRIVE FORT COLLINS, CO 80525 PHONE: 970.207.0424 CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date 0 10' 10 5 10 20 MATCHLINE SEE THIS SHEET HOFFMAN MILL ROAD MATCHLINE SEE THIS SHEET HOFFMAN MILL ROAD 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME HOFFMAN MILL FUELING SITE DRAINAGE & EROSION CONTROL PLAN 09/26/18 1" = 30' N/A JTC JTC 1344-095-00 5 of 9 ARCHITECTURE WEST, LLC 160 PALMER DRIVE FORT COLLINS, CO 80525 PHONE: 970.207.0424 CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date HOFFMAN MILL ROAD SEE SHEET 7 POND CROSS-SECTION PROFILE HORIZ. SCALE: 1"=10' VERT. SCALE: 1"=5' 4945 4950 4945 4950 10+00 10+50 10+70 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME HOFFMAN MILL FUELING SITE GRADING PLAN 09/26/18 1" = 10' 1" = 5' JTC JTC 1344-095-00 6 of 9 ARCHITECTURE WEST, LLC 160 PALMER DRIVE FORT COLLINS, CO 80525 PHONE: 970.207.0424 CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: HOFFMAN MILL ROAD MATCHLINE SEE THIS SHEET HOFFMAN MILL ROAD MATCHLINE SEE THIS SHEET 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME HOFFMAN MILL FUELING SITE GRADING PLAN 09/26/18 1" = 30' N/A JTC JTC 1344-095-00 7 of 9 ARCHITECTURE WEST, LLC 160 PALMER DRIVE FORT COLLINS, CO 80525 PHONE: 970.207.0424 CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME HOFFMAN MILL FUELING SITE DETAILS 09/26/18 N/A N/A JTC JTC 1344-095-00 8 of 9 ARCHITECTURE WEST, LLC 160 PALMER DRIVE FORT COLLINS, CO 80525 PHONE: 970.207.0424 CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date PLAN VIEW SECTION VIEW SPILL CONTROL STRUCTURE (MODIFIED TYPE R INLET) STORM SEWER OUTLET ISOMETRIC VIEW SECTION B-B STORM SEWER HEADWALL RIPRAP DETAIL SECTION A-A CONTRACTION JOINT DETAIL EXPANSION JOINT DETAIL 1' DRAIN CHANNEL 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME HOFFMAN MILL FUELING SITE DETAILS 09/26/18 N/A N/A JTC JTC 1344-095-00 9 of 9 ARCHITECTURE WEST, LLC 160 PALMER DRIVE FORT COLLINS, CO 80525 PHONE: 970.207.0424 CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date SMALL PIPE HEADWALL NOTES: STORM DRAIN HEADWALL CONCRETE PAN DETAIL Date Date 0 10' 10 5 10 20 SCALE: 1" = LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR NOTES: 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 2. ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. Date Date Date Date Date Date 0 10' 10 5 10 20 SCALE: 1" = LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR NOTES: 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 2. ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. WQCV SPILLWAY CROSS-SECTION Date Date 0 30' 30 15 30 60 SCALE: 1" = NOTES 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL. 2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY POLLUTION. 3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. 4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. 8. THE SAND FILTER IS TO BE INSTALLED AT THE CONCLUSION OF CONSTRUCTION ACTIVITIES ON THE SITE. 9. REFERENCE SHEET 9 FOR EROSION CONTROL DETAILS. CoFC Standard erosion and sediment control notes: 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY DRAINAGE BASIN FLOW PATH CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL SEDIMENT CONTROL LOG CONCRETE WASHOUT AREA LEGEND IMPERVIOUS AREA TREATED BY LID (6,980 SQFT) CHECK DAM (PERMANENT) NOTES: SCALE: 1" = 1. VERIFY PLAN DIMENSIONS PRIOR TO CONSTRUCTION 2. ALL PAVEMENTS AND EARTHWORK SHALL CONFORM TO THE GEOTECHNICAL REPORT FOR THE SITE. 3. ALL WORK SHALL CONFORM TO THE CITY OF FORT COLLINS CONSTRUCTION SPECIFICATIONS AND STANDARDS. 4. COORDINATE LOCATION, HEIGHTS, ETC. OF WALLS FENCES, AND SITE FEATURES WITH ARCH AND LANDSCAPE. 5. SEE SHEET 8 FOR CONTROL AND EXPANSION JOINT DETAILS. HEAVY DUTY CONCRETE LEGEND Date Date 0 30' 30 15 30 60 SCALE: 1" = NOTES: 1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN DETERMINED FROM A COMBINATION OF RECORD DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL COORDINATE AND PROVIDE PROTECTION OF CONFLICTING UTILITIES. NOTIFY OWNER/ENGINEER IF ANY CONFLICTS ARE ENCOUNTERED. THE OWNER AND/OR ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS SHOWN. 2. COORDINATE DEMOLITION REQUIREMENTS, LIMITS OF DEMOLITION, SALVAGE ITEMS, PROTECTION OF ITEMS TO REMAIN, TREES, FENCING, ETC. WITH OWNER, ARCHITECT, AND RELEVANT CONSTRUCTION AND/OR PHASING PLANS. ADDITIONAL DEMOTION OF PAVING, TREES, UTILITIES, STRUCTURES, ETC. TO BE PERFORMED AS REQUIRED. 3. CONTRACTOR RESPONSIBLE FOR ALL SURFACE REPAIR/REPLACEMENT TO RESTORE SIDEWALKS, PAVEMENT, CURB/GUTTER AND SOD AREAS DISTURBED BY NEW WORK. REPAIR/REPLACEMENTS SHALL BE COMPLETED PER CITY OF FORT COLLINS STANDARDS AT CONTRACTOR EXPENSE. 4. EXISTING CONCRETE AND ASPHALT PAVING SHALL BE SAWCUT AND REMOVED PRIOR TO EXCAVATION. REMOVE CONCRETE TO THE NEAREST JOINT. 5. CONTRACTOR TO PROVIDE ALL NECESSARY EROSION CONTROL MEASURES DURING CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL PROPOSED AND EXISTING INLETS DOWNSTREAM FROM CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED. 6. LIMITS OF STREET CUTS, ASPHALT, AND CONCRETE REMOVALS ARE APPROXIMATE. LIMITS OF REMOVAL TO BE DETERMINED IN THE FIELD TO ADEQUATELY COMPLETE THE PROPOSED IMPROVEMENTS, WHILE MAINTAINING, IF NOT IMPROVING, EXISTING CONDITIONS. ADDITIONAL REMOVAL IDENTIFIED IN THE FIELD SHALL BE COMPLETED AT CONTRACTOR EXPENSE. ALL REPAIRS TO BE COMPLETED IN ACCORDANCE WITH CITY STREET REPAIRS STANDARDS. 7. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURS AND GUTTER, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 8. REFER TO LANDSCAPE TREE MITIGATION PLAN FOR TREE REMOVAL, RELOCATION AND PROTECTION. TREE REMOVAL INFORMATION SHOWN FOR COORDINATION PURPOSES ONLY. 9. REFERENCE LANDSCAPE AND ARCHITECTURAL PLANS FOR ADDITIONAL SITE DEMOLITION. APPROX LIMITS OF DISTURBANCE DEMO UTILITIES / FENCE / ETC DEMO STRUCTURE/UTILITY/ LIGHT/ ETC DEMO ASPHALT / CONCRETE TREE REMOVAL/RELOCATION (RE: LA) PROTECT EXISTING TREE (RE: LA) LEGEND Contact: Stephanie Rich Ph. 970.225.7828 TELEPHONE SERVICE Century Link (Qwest) 3351 Eastbrook Drive Fort Collins, Colorado 80525 Contact: Bill Johnson Ph. 970.490.7501 CABLE SERVICE Comcast 1201 University Dr. Fort Collins, Colorado 80521 Contact: Don Kapperman Ph. 970.567.0245 OWNER City of Fort Collins 300 LaPorte Avenue, Bldg B Fort Collins, CO 80521 Ph. 970.221.6610 ENGINEER Interwest Consulting Group 1218 W. Ash Street, Suite A Windsor, CO 80550 Ph. 970.674.3300 SURVEYOR King Surveyors 650 East Garden Drive Windsor, CO 80550 Ph. 970.686.5011 PLANNER Architecture West, LLC 160 Palmer Drive Fort Collins, CO 80525 Ph. 970.207.0424 LANDSCAPE ARCHITECT Centennial Design, LLC 601 S. 9th Street Berthoud, CO 80513 Ph. 970.217.4955 FUEL STATION DESIGNER CGRS 1301 Academy Court Fort Collins, CO 80524 Ph. 800.288.2657 INDEX OF SHEETS Sheet No. Description of Sheets 1 COVER SHEET 2 GENERAL NOTES 3 EXISTING CONDITIONS & DEMOLITION PLAN 4 HORIZONTAL CONTROL PLAN 5 DRAINAGE & EROSION CONTROL PLAN 6 - 7 GRADING PLAN 8 - 9 DETAILS Utility Plans For HOFFMAN MILL FUELING SITE LOCATED IN THE NORTHWEST 1/4 OF SECTION 18, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE 6TH P.M LARIMER COUNTY, COLORADO SEPTEMBER 2018 CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER MY DIRECT SUPERVISION, IN ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS AND STATE OF COLORADO STANDARDS AND STATUTES, RESPECTIVELY, AND THAT I AM FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS AND RECORD CONDITIONS THAT I HAVE NOTED ON THESE PLANS. INDEMNIFICATION STATEMENT: THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. JASON T. CLAEYS P.E. NO. 42122 ABBREVIATION LIST ABC AGGREGATE BASE COURSE AD ALGEBRAIC DIFFERENCE ADA ACCESS & DRAINAGE ALIGNMENT AE ACCESS EASEMENT ARCH ARCHITECT ARV AIR RELEASE VALVE ASPH ASPHALT BLDG BUILDING BFE BASE FLOOD ELEVATION BFV BUTTERFLY VALVE BOV BLOW OFF VALVE BOS BOTTOM OF STEP BOW BACK OF WALK BW BOTTOM OF WALL C&G CURB & GUTTER CATV CABLE TELEVISION CDOT COLORADO DEPARTMENT OF TRANSPORTATION CL CENTERLINE CMP CORRUGATED METAL PIPE CO CLEAN OUT CoFC CITY OF FORT COLLINS COMM COMMUNICATION CON CONDENSATE CONC CONCRETE COORD COORDINATION CW CHILL WATER CWR CHILL WATER RETURN CWS CHILL WATER SUPPLY DA DRAINAGE ALIGNMENT DE DRAINAGE EASEMENT DEMO DEMOLITION DIA DIAMETER DIP DUCTILE IRON PIPE E EAST(ING) EAE EMERGENCY ACCESS EASEMENT EG EXISTING GROUND EL ELEVATION ELCO EAST LARIMER COUNTY WATER DISTRICT ELEC ELECTRIC EOA EDGE OF ASPHALT EOC EDGE OF CONCRETE EX EXISTING ESMT EASEMENT EST ESTIMATE(D) F FIRE LINE FDC FIRE DEPARTMENT CONNECTION FES FLARED END SECTION FF FINISHED FLOOR FFE FINISHED FLOOR ELEVATION FG FINISHED GRADE FH FIRE HYDRANT FL FLOWLINE FO FIBER OPTIC FP FLOODPLAIN G GAS GB GRADE BREAK GF GARAGE FLOOR GND GROUND GV GATE VALVE HBP HOT BITUMINOUS PAVEMENT HORZ HORIZONTAL HDPE HIGH DENSITY POLYETHYLENE HP HIGH POINT HW HEADWALL IE IRRIGATION EASEMENT INV INVERT IRR IRRIGATION LA LANDSCAPE (PLAN/ACRH) LF LINEAR FEET LP LOW POINT LT LEFT MAX MAXIMUM ME MATCH EXISTING MEP MECHANICAL, ELECTRICAL, PLUMBING ENGINEER MH MANHOLE MIN MINIMUM N NORTH(ING) NA NOT APPLICABLE NTS NOT TO SCALE NWCWD NORTH WELD COUNTY WATER DISTRICT OC ON CENTER OHE OVERHEAD ELECTRIC OHT OVERHEAD TELEPHONE OHU OVERHEAD UTILITY P&UE PEDESTRIAN & UTILITY EASEMENT PE PEDESTRIAN EASEMENT PERF PERFORATED PC POINT OF CURVATURE PCC PORTLAND CEMENT CONCRETE PCR POINT OF CURB RETURN PH POTHOLE PI POINT OF INTERSECTION PL PROPERTY LINE PT POINT OF TANGENCY PVC POLYVINYL CHLORIDE R&R REMOVAL & REPLACEMENT RCP REINFORCED CONCRETE PIPE RD ROOF DRAIN RE REFERENCE RFPE REGULATORY FLOODPLAIN PROTECTION ELEVATION RJ RESTRAINT JOINT ROW RIGHT-OF-WAY RT RIGHT SCH SCHEDULE S SOUTH SD STORM DRAIN PIPE SDMH STORM DRAIN MANHOLE SRVC SERVICE SS SANITARY SEWER SSCO SANITARY SEWER CLEAN-OUT SSMH SANITARY SEWER MANHOLE SSWR SANITARY SEWER STA STATION STM STEAM SWMP STORMWATER MANAGEMENT PLAN T TELEPHONE TB THRUST BLOCK TBC TOP BACK OF CURB TBV TO BE VACATED TBR TO BE REMOVED TELE TELEPHONE TEMP TEMPORARY TF TOP OF FOUNDATION TOS TOP OF STEP TRM TURF REINFORCEMENT MAT TW TOP OF WALL TYP TYPICAL XS CROSS SECTION UD UNDERDRAIN UE UTILITY EASEMENT UGE UNDERGROUND ELECTRIC UTIL UTILITY VCP VITRIFIED CLAY PIPE VIF VERIFY IN FIELD VERT VERTICAL VPC VERTICAL POINT OF CURVATURE VPI VERTICAL POINT OF INTERSECTION VPT VERTICAL POINT OF TANGENCY W WATERLINE OR WEST WL WATERLINE WQCE WATER QUALITY CONTROL ELEVATION WSE WATER SURFACE ELEVATION PROPOSED STREET LIGHT PROPOSED STORM SEWER EXISTING SANITARY SEWER MAIN PROPOSED TELEPHONE LINE EXISTING GAS EXISTING STORM SEWER EXISTING WATER MAIN EXISTING MANHOLE PROPOSED STORM INLET LEGEND PROPOSED CONCRETE PROPOSED MINOR CONTOUR EXISTING SPOT ELEVATION PROPOSED SPOT ELEVATION PROPOSED MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING UTILITY POLE EXISTING GUY WIRE PROPOSED GAS EXISTING ELECTRIC LINE PROPOSED ELECTRIC LINE EXISTING TELEPHONE LINE EXISTING FIRE HYDRANT PROPOSED FIRE HYDRANT EXISTING WATER VALVE PROPOSED SANITARY SEWER MAIN PROPOSED WATER MAIN EXISTING CONCRETE EXISTING FLOWLINE, CURB & GUTTER PROPOSED FLOWLINE, CURB & GUTTER PROPOSED FENCE LIMITS OF CONSTRUCTION EXISTING OVERHEAD UTILITY EXISTING STORM SEWER INLET PROPOSED WATER VALVE PROPOSED MANHOLE PROPOSED UTILITY POLE EXISTING STREET LIGHT PROPOSED SWALE PROPOSED DIRECTION OF OVERLAND FLOW EXISTING FIBER OPTIC LINE PROPOSED HANDICAP RAMP EXISTING OVERHEAD ELECTRIC LINE EXISTING OVERHEAD TELEPHONE LINE PROPOSED OVERHEAD ELECTRIC LINE PROPOSED FIBER OPTIC LINE PROPOSED OVERHEAD TELEPHONE LINE EXISTING FENCE PROPOSED OVERHEAD UTILITY PROPOSED LIGHT POLES EXISTING CABLE TV LINE PROPOSED CABLE TV PROPOSED WATER SERVICE W/ CURB STOP AND METER PIT PROPOSED SANITARY SEWER SERVICE W/ CLEANOUT