HomeMy WebLinkAboutNEC LAKE AND SHIELDS - PDP - PDP180012 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESPage 1
August 22, 2018
NEC Lake & Shields
Statement of Planning Objectives
This is a request to construct a 10,920 square foot day care center on four lots that formerly
contained single family homes. The lots will be consolidated into one lot with the Plat. The
building and associated play yards will be located in the middle of the site, with a parking lot
to the south. Access to the site will be from an existing parking lot owned by CSU accessed
from Lake Street. This will be a second location for a Sunshine House facility.
Although priority is given to CSU faculty, students and staff, this facility will be open to the
Fort Collins community. Sunshine House operates several locations in Colorado, including
their existing facility on Centre Avenue, Colorado Springs, Loveland and Greeley. The
Sunshine House will operate the new facility designed and built for an enrollment of a
maximum of 188 FTE children. The new center will provide a program of play and learning
activities for children ages six weeks to 12 years. Hours of operation will be from 6:30 am to
6 pm, M-F.
The 1.5-acre site is in the HMN zoning district. Child Care Centers are subject to
Administrative Review.
The area adjacent the project contains student housing, single and multi-family and the CSU
Campus. The site is ideal for this type of use as it provides a service that is in a convenient
and centrally-located location. There is an existing transit stop on Shields directly adjacent
to the site. There are bike lanes in Shields and Lake Streets and the project will be
constructing a 10’ detached sidewalk along the Shields Street frontage.
(i) Statement of appropriate City Plan Principles and Policies achieved by
the proposed plan:
This proposal meets the applicable City Plan Principles and Policies:
Infill and Redevelopment
Principle LIV 5: The City will promote redevelopment and infill in areas
identified on the Targeted Infill and Redevelopment Areas Map.
Policy LIV 5.1 – Encourage Targeted Redevelopment and Infill
Principle LIV 6: Infill and redevelopment within residential areas will be
compatible with the established character of the neighborhood. In areas
where the desired character of the neighborhood is not established, or
is not consistent with the vision of City Plan, infill and redevelopment
projects will set an enhanced standard of quality.
Policy LIV 6.2 – Seek Compatibility with Neighborhoods
Page 2
The project is located within a targeted infill and redevelopment area and
promotes redevelopment of four underutilized lots. The majority of the
infrastructure surrounding the site already exists. The residential design of
the building will compliment the existing buildings and single family homes in
the area.
Transportation
Principle T 8: Transportation that provides opportunities for residents
to lead healthy and active lifestyles will be promoted.
Policy T 8.1 – Support Active Transportation
Policy T 8.2 – Design for Active Living
The location of the new facility will support active lifestyles by providing on-
street sidewalks, designated bike lanes and a 10’ sidewalk adjacent to the
site.
Principle T 9: Enhanced Travel Corridors will contain amenities and
designs that specifically promote walking, the use of mass transit, and
bicycling.
Policy T 9.1 – Locating Enhanced Travel Corridors
The project is located within walking distance to many Transfort stops and
MAX Bus Rapid Transit is within walking and biking distance.
Principle T10: Using transit will be a safe, affordable, easy, and
convenient mobility option for all ages and abilities.
Policy T 10.1 – Transit Stops
There is an existing transit stop on Shields Street.
Principle T11: Bicycling will be a safe, easy, and convenient mobility
option for all ages and abilities
The location of Sunshine House Early Learning Academy will promote and
support the idea of the employees and clients to utilize alternative modes of
transportation (walking/biking) or public transportation. There are bike lanes
and sidewalks on all of the public streets. In addition, this facility is in a
convenient location for faculty and staff that ride their bikes.
(ii) Description of proposed open space, wetlands, natural habitats and
features, landscaping, circulation, transition areas, and associated
buffering on site and in the general vicinity of the project.
There are no wetlands or significant natural habitats within the boundaries of
the site.
Page 3
(iii) Statement of proposed ownership and maintenance of public and
private open space areas; applicant's intentions with regard to future
ownership of all or portions of the project development plan.
The facility will be constructed and owned by CSURF and will be leased to
the Sunshine House.
(iv) Estimate of number of employees for business, commercial, and
industrial uses.
15-20
(v) Description of rationale behind the assumptions and choices made by
the applicant.
The rationale is for an 11,000 sq. ft. day care center with associated play
yards and parking.
(vi) The applicant shall submit as evidence of successful completion of the
applicable criteria, the completed documents pursuant to these
regulations for each proposed use. The planning Director may require,
or the applicant may choose to submit, evidence that is beyond what is
required in that section. Any variance from the criteria shall be
described.
At this time the project is not proposing any variance from the City of Fort
Collins criteria.
(vii) Narrative description of how conflicts between land uses or
disturbances to wetlands, natural habitats and features and or wildlife
are being avoided to the maximum extent feasible or are mitigated.
There are not existing wetlands, natural habitats or features currently located
on site. See above.
(viii) Written narrative addressing each concern/issue raised at the
neighborhood meeting(s), if a meeting has been held.
There was a neighborhood meeting held on 08.01.18 and two neighbors were
in attendance.
(ix) Name of the project as well as any previous name the project may have
had during Conceptual Review.
The project is called NEC Lake & Shields. The project was Sunshine House
at Conceptual Review.