HomeMy WebLinkAboutNEC LAKE AND SHIELDS - PDP - PDP180012 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYDELICH Sunshine House TIS, August 2018
ASSOCIATES
TABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use ......................................................................................................................... 2
Streets ............................................................................................................................. 2
Existing Traffic ................................................................................................................. 2
Existing Operation ........................................................................................................... 2
Pedestrian Facilities ........................................................................................................ 6
Bicycle Facilities .............................................................................................................. 6
Transit Facilities .............................................................................................................. 6
III. PROPOSED DEVELOPMENT ................................................................................. 7
Trip Generation ............................................................................................................... 7
Trip Distribution ............................................................................................................... 7
Background Traffic Projections ..................................................................................... 10
Trip Assignment ............................................................................................................ 10
Signal Warrants ............................................................................................................. 10
Operation Analysis ........................................................................................................ 10
Geometry ...................................................................................................................... 15
Pedestrian Level of Service ........................................................................................... 15
Bicycle Level of Service ................................................................................................ 16
Transit Level of Service ................................................................................................. 16
IV. CONCLUSIONS .................................................................................................... 18
LIST OF TABLES
1. Current Peak Hour Operation .................................................................................... 6
2. Trip Generation ......................................................................................................... 7
3. Short Range (2023) Background Peak Hour Operation .......................................... 14
4. Short Range (2023) Total Peak Hour Operation ..................................................... 16
DELICH Sunshine House TIS, August 2018
ASSOCIATES
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Intersection Geometry.................................................................................. 4
3. Recent Peak Hour Traffic .......................................................................................... 5
4. Site Plan .................................................................................................................... 8
5. Trip Distribution ......................................................................................................... 9
6. Short Range (2023) Background Peak Hour Traffic ................................................ 11
7. Site Generated Peak Hour Traffic ........................................................................... 12
8. Short Range (2023) Total Peak Hour Traffic ........................................................... 13
9. Short Range (2023) Geometry ................................................................................ 17
APPENDICES
A. Base Assumptions Form
B. Peak Hour Traffic Counts
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins Motor
Vehicle LOS Standards (Intersections)
D. Short Range (2023) Background Peak Hour Operation
E. Short Range (2023) Total Peak Hour Operation
F. Pedestrian/Bicycle Level of Service Worksheets
DELICH Sunshine House TIS, August 2018
ASSOCIATES Page 1
I. INTRODUCTION
This Intermediate transportation impact study (TIS) addresses the capacity,
geometric, and control requirements for the proposed Sunshine House development. The
proposed Sunshine House development is located in the northeast quadrant of the
Shields/Lake intersection in Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made with the
owner/developer (CSURF) and Fort Collins Traffic Engineering. This study generally
conforms to the format set forth in the Fort Collins TIS Guidelines in the “Larimer County
Urban Area Street Standards” (LCUASS). A scoping discussion was held with the Fort
Collins Traffic Engineering staff. The Transportation Impact Study Base Assumptions form
and related documents are provided in Appendix A. The study involved the following
steps:
- Collect physical, traffic, and development data;
- Perform trip generation, trip distribution, and trip assignment;
- Determine peak hour traffic volumes;
- Conduct capacity and operational level of service analyses on key intersections;
- Analyze signal warrants;
- Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation
DELICH Sunshine House TIS, August 2018
ASSOCIATES Page 2
II. EXISTING CONDITIONS
The location of the Sunshine House is shown in Figure 1. The site is currently
vacant. It is important that a thorough understanding of the existing conditions be
presented.
Land Use
Land uses in the area are primarily institutional or residential. There are
institutional uses (CSU) to the north and east of the site. There are residential uses
surrounding the site. The center of Fort Collins lies to the east of the proposed
Sunshine House site.
Streets
The primary streets near the Sunshine House site are Shields Street and Lake
Street. Figure 2 shows a schematic of the existing geometry at the Shields/Lake
intersection.
Shields Street is west of (adjacent to) the proposed Sunshine House site. It is a
north-south street classified as a four-lane arterial street on the Fort Collins Master
Street Plan. Currently, Shields Street has a four-lane cross section with center lane. At
the Shields/Lake intersection, Shields Street has a southbound left-turn lane and two
through lanes in each direction. The Shields/Lake intersection has signal control. The
posted speed limit on Shields Street in this area is 30 mph.
Lake Street is south of (adjacent to) the proposed Sunshine House site. It is an
east-west street classified as a collector street on the Fort Collins Master Street Plan.
Currently, Lake Street has a two-lane cross section (no center median lane). At the
Shields/Lake intersection, Lake Street has a westbound left-turn lane and a westbound
right-turn lane. The posted speed limit on this segment of Lake Street is 25 mph.
Existing Traffic
Recent peak hour traffic volumes at the Shields/Lake intersection are shown in
Figure 3. The counts at the Shields/Lake intersection were obtained in September 2016
by the City of Fort Collins. Raw traffic count data is provided in Appendix B.
Existing Operation
The Shields/Lake intersection was evaluated and the peak hour operation is
displayed in Table 1. Calculation forms are provided in Appendix C. The Shields/Lake
intersection meets the Fort Collins level of service criteria with existing control,
Spring Creek Trail
Lake
Prospect
Shields
Pitkin
Whitcomb
SCALE: 1"=1000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
Sunshine House TIS, August 2018
Page 3
EXISTING INTERSECTION GEOMETRY Figure 2
DELICH
ASSOCIATES
Sunshine House TIS, August 2018
Page 4
Shields
Lake
- Denotes Lane
RECENT PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
Sunshine House TIS, August 2018
Page 5
833/1396
113/95
1345/1385
47/51
69/146
21/102
Shields
Lake
AM/PM
DELICH Sunshine House TIS, August 2018
ASSOCIATES Page 6
geometry, and signal timing in the peak hours. The intersection was evaluated using
techniques provided in the 2010 Highway Capacity Manual. A description of level of
service for signalized and unsignalized intersections from the 2010 Highway Capacity
Manual and a table showing the Fort Collins Motor Vehicle LOS Standards
(Intersections) are also provided in Appendix C. Acceptable operation at signalized
intersections during the peak hours is defined as level of service E or better for each
movement and leg, and level of service D or better overall. At arterial/collector
unsignalized intersections, acceptable operation is considered to be at level of service F
for any approach leg and level of service D overall. It is important to note that a
northbound right-turn deceleration lane is required at the Shields/Lake intersection with
the existing traffic volumes. A variance was granted to not build this right-turn lane for
The Standard development in 2017.
Pedestrian Facilities
There are sidewalks along Shields Street and Lake Street within the pedestrian
influence area. Approximately 170 feet east of Shields Street, there is a gap in the
sidewalk on the north side of Lake Street for approximately 450 feet.
Bicycle Facilities
There are bicycle lanes along Shields Street and Lake Street.
Transit Facilities
Currently, this area of Fort Collins is served by Transfort Routes 19 and 32.
Routes 19 and 32 operate along Shields Street and Lake Street.
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
Shields/Lake
(signal)
WB LT E E
WB RT A D
WB APPROACH E E
NB T A A
NB T/RT A A
NB APPROACH A A
SB LT A A
SB T A A
SB APPROACH A A
OVERALL A A
DELICH Sunshine House TIS, August 2018
ASSOCIATES Page 7
III. PROPOSED DEVELOPMENT
The Sunshine House is a day care center development with approximately 156
students. Figure 4 shows a site plan of the Sunshine House. The short range analysis
(Year 2023) includes development of the Sunshine House site and an appropriate
increase in background traffic due to normal growth and other potential developments in
the area. The site plan shows that there will be an access to/from Lake Street that lines
up with the Islamic Center site access.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contain in Trip Generation, 10
th
Edition, ITE is used to estimate the trips that would be
generated by the proposed/expected uses at a site. A trip is defined as a one-way vehicle
movement from origin to destination. Table 2 shows the expected trip generation on a
daily and peak hour basis. The trip generation of the Sunshine House development
resulted in 638 daily trip ends, 122 morning peak hour trip ends, and 123 afternoon peak
hour trip ends.
TABLE 2
Trip Generation
Code Use Size
AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
565 Day Care Center 156
Students 4.09 638 0.41 64 0.37 58 0.37 58 0.42 65
Trip Distribution
Trip distribution for the Sunshine House was based on existing/future travel
patterns, land uses in the area, consideration of trip attractions in Fort Collins, and
engineering judgment. Figure 5 shows the trip distribution for the short range (2023)
analysis future. The trip distribution was agreed to by City of Fort Collins staff in the
scoping discussions.
SCALE: 1"=100'
SITE PLAN Figure 4
DELICH
ASSOCIATES
Sunshine House TIS, August 2018
Page 8
Lake
Prospect
Shields
Pitkin
James
15%
20%
20%
25% 20%
Bennett
Springfield
SCALE: 1"=200'
TRIP DISTRIBUTION Figure 5
DELICH
ASSOCIATES
Sunshine House TIS, August 2018
Page 9
DELICH Sunshine House TIS, August 2018
ASSOCIATES Page 10
Background Traffic Projections
Figure 6 shows the short range (2023) background traffic projections.
Background traffic projections for the short range future horizon were obtained by
reviewing various traffic studies prepared for this area of Fort Collins. It was determined
that the through traffic volumes on Shields Street would increase by approximately one
percent per year in the short range future. The best method to determine the short
range (2023) background traffic would be to use the forecasts in the “Standard at Fort
Collins TIS” and factor them appropriately. The background traffic growth methodology
was agreed to by City of Fort Collins staff in the scoping discussions. Normal weekday
traffic (excluding Friday) was calculated for the Islamic Center. The existing CSU
parking lot serves the student dormitories on the west side of the campus. The current
parking lot access to James Court will be gated as an emergency access. Since the
Site Access for the Sunshine House will connect to the existing CSU parking lot,
weekday peak hour volumes for the parking lot were estimated and are reflected in the
background traffic volumes on Figure 6.
Trip Assignment
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. Figure 7 shows the site generated peak hour traffic assignment. Figure 8 shows
the short range (2023) total (site plus background) peak hour traffic assignment.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices. The Shields/Lake
intersection is currently signalized. The Lake/Islamic Center-Site Access intersection will
not meet signal spacing requirements.
Operation Analysis
Operation analyses were performed at the Shields/Lake and Lake/Islamic Center-
Site Access intersections. The operation analyses were conducted for the short range
future, reflecting year 2023 conditions.
Using the traffic volumes shown in Figure 6, the Shields/Lake and Lake/Islamic
Center-Site Access intersections operate in the short range (2023) background traffic
future, as indicated in Table 3. The Shields/Lake intersection was analyzed with the
existing geometry and signal timing. Calculation forms for these analyses are provided in
Appendix D. The Shields/Lake and Lake/Islamic Center-Site Access intersections meet
the Fort Collins level of service criteria in the peak hours.
SHORT RANGE (2023) BACKGROUND
PEAK HOUR TRAFFIC Figure 6
DELICH
ASSOCIATES
Sunshine House TIS, August 2018
Page 11
806/1456
145/169
1199/1281
176/147
74/203
61/176
Shields
Lake
1/5
NOM
1/1
4/9
NOM
1/3
5/13
314/298
2/5
1/4
130/365
1/1
AM/PM
Islamic Center Site Access
SITE GENERATED
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
Sunshine House TIS, August 2018
Page 12
13/11
42/38
11/13
38/42
Shields
Lake
AM/PM
Islamic Center Site Access
49/55
9/10
9/9
55/49
SHORT RANGE (2023) TOTAL
PEAK HOUR TRAFFIC Figure 8
DELICH
ASSOCIATES
Sunshine House TIS, August 2018
Page 13
806/1456
158/180
1199/1281
218/185
85/216
99/218
Shields
Lake
1/5
NOM
1/1
53/64
NOM
10/13
60/62
314/298
2/5
10/13
130/365
1/1
AM/PM
Islamic Center Site Access
DELICH Sunshine House TIS, August 2018
ASSOCIATES Page 14
TABLE 3
Short Range (2023) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Shields/Lake
(signal)
WB LT E E
WB RT A D
WB APPROACH E E
NB T A B
NB T/RT A B
NB APPROACH A B
SB LT A B
SB T A A
SB APPROACH A A
OVERALL A B
Lake/Islamic Center-Site Access
(stop sign)
NB LT/T/RT B C
SB LT/T/RT A B
EB LT A A
WB LT A A
OVERALL A A
DELICH Sunshine House TIS, August 2018
ASSOCIATES Page 15
Using the traffic volumes shown in Figure 8, the Shields/Lake and Lake/Islamic
Center-Site Access intersections operate in the short range (2023) total traffic future, as
indicated in Table 4. Calculation forms for these analyses are provided in Appendix E. As
with the background traffic, the Shields/Lake and Lake/Islamic Center-Site Access
intersections meet the Fort Collins level of service criteria in the peak hours with existing
control, geometry, and signal timing at the Shields/Lake intersection.
Geometry
Figure 9 shows a schematic of the short range (2023) geometry. This is the
existing geometry at the Shields/Lake intersection. As mentioned earlier, a northbound
right-turn lane on Shields Street, approaching Lake Street, is required with the existing
traffic volumes. Typically at constrained locations, when the turn lanes are shown to be
required based on volumes, the auxiliary lanes are not built unless the subject turn lane
will mitigate an operational issue. A variance request will be submitted for the
northbound right-turn deceleration lane at the Shields/Lake intersection. The Shields/
Lake intersection meets the Fort Collins operational level of service criteria in the peak
hours without the northbound right-turn lane. According to Figure 8-1 in LCUASS, left-
turn deceleration lanes will not be required at the Lake/Islamic Center-Site Access
intersection. With the existing signal timing at the Shields/Lake intersection and the
short range (2023) total traffic volumes, the westbound left-turn lane 95
th
percentile
queue length is approximately 254 feet. The existing westbound left-turn lane is
approximately 95 feet long. Adjustments in the signal timing can shorten the westbound
left-turn queue length.
Pedestrian Level of Service
Appendix F shows a map of the area that is within 1320 feet of the Sunshine
House site. There will be four pedestrian destinations within 1320 feet of the Sunshine
House site. These are: 1) the CSU Campus to the north and east of the site, 2)
residential area to the east and southeast of the site, 3) the commercial area to the
southwest of the site, and 4) the residential area to the west of the site. This site is in
an area type termed “CSU Campus,” which is the same as a “pedestrian district.” The
Pedestrian LOS Worksheet is provided in Appendix F. The minimum level of service for
“pedestrian district” is A for all areas of evaluation, except for Street Crossing which is
LOS B. Since this is an older section of the City and sidewalks were constructed under
different standards, the Continuity category cannot be achieved for any of the
destination areas. Many of the sidewalks are attached to the street and/or are too
narrow. There are two single family houses (928 & 934 Lake Street) to the east of the
Sunshine House site that have no sidewalks adjacent to their frontage. These
sidewalks will likely not be built until these two single family houses redevelop. As
elements of the “West Central Area Plan” along Lake Street are implemented, the
sidewalks will be improved.
DELICH Sunshine House TIS, August 2018
ASSOCIATES Page 16
Bicycle Level of Service
Appendix F shows a map of the area that is within 1320 feet of the Sunshine
House development. There will be one bicycle destination within 1320 feet of the
Sunshine House development: 1) the CSU Campus. The Bicycle LOS Worksheet is
provided in Appendix F. The base level of service is B for each of the bicycle
destinations. This site is connected to bicycle lanes along Shields Street and Lake
Street. Therefore, it is concluded that level of service B can be achieved.
Transit Level of Service
Currently, this area of Fort Collins is served by Transfort Routes 19 and 32.
Routes 19 and 32 operate along Shields Street and Lake Street.
TABLE 4
Short Range (2023) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Shields/Lake
(signal)
WB LT D E
WB RT A D
WB APPROACH D E
NB T A B
NB T/RT A B
NB APPROACH A B
SB LT B B
SB T A A
SB APPROACH A A
OVERALL A B
Lake/Islamic Center-Site Access
(stop sign)
NB LT/T/RT B C
SB LT/T/RT B B
EB LT A A
WB LT A A
OVERALL A A
SHORT RANGE (2023) GEOMETRY Figure 9
DELICH
ASSOCIATES
Sunshine House TIS, August 2018
Page 17
Shields
Lake
Islamic Center Site Access
- Denotes Lane
STOP
STOP
DELICH Sunshine House TIS, August 2018
ASSOCIATES Page 18
IV. CONCLUSIONS
This study assessed the impacts of the Sunshine House on the street system in the
vicinity of the proposed development in the short range (2023) future. As a result of this
analysis, the following is concluded:
- The development of the Sunshine House is feasible from a traffic engineering
standpoint. At full development, the Sunshine House will generate approximately
638 daily trip ends, 122 morning peak hour trip ends, and 123 afternoon peak hour
trip ends.
- The Shields/Lake intersection meets Fort Collins operational criteria with the
existing traffic, signal timing, and geometry.
- The Shields/Lake intersection is currently signalized. The Lake/Islamic Center-Site
Access intersection will not meet signal spacing requirements.
- In the short range (2023) future, given development of the Sunshine House and an
increase in background traffic, the Shields/Lake and Lake/Islamic Center-Site
Access intersections will meet the Fort Collins operational criteria.
- The short range (2023) geometry is shown in Figure 9. A northbound right-turn
lane is required approaching the Shields/Lake intersection. A variance request will
be submitted for this right-turn lane.
- Acceptable level of service is achieved for bicycle and transit modes based upon
the measures in the multi-modal transportation guidelines and the Fort Collins
Pedestrian Plan. Since this is an older section of the City and sidewalks were
constructed under different standards, the Continuity category cannot be
achieved for any of the destination areas. Many of the sidewalks are attached to
the street and/or are too narrow. As elements of the “West Central Area Plan”
along Lake Street are implemented, the sidewalks will be improved.
APPENDIX A
APPENDIX B
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 9/15/2016 Observer: City of Fort Collins
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Shields/Lake
S = straight
L = left turn
Time Northbound: Shields Southbound: Shields Total Eastbound: Westbound: Lake Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 351 20 371 29 183 212 583 0 4 15 19 19 602
7:45 409 12 421 35 209 244 665 0 8 24 32 32 697
8:00 285 6 291 24 238 262 553 0 5 19 24 24 577
8:15 300 9 309 25 203 228 537 0 4 11 15 15 552
7:30-8:30 0 1345 47 1392 113 833 0 946 2338 0 0 0 0 21 0 69 90 90 2428
PHF n/a 0.82 0.59 0.83 0.81 0.88 n/a 0.9 n/a n/a n/a n/a 0.66 n/a 0.72 0.7 0.87
4:30 337 15 352 21 333 354 706 0 15 42 57 57 763
4:45 329 10 339 33 338 371 710 0 25 39 64 64 774
5:00 353 14 367 21 382 403 770 0 31 33 64 64 834
5:15 366 12 378 20 343 363 741 0 31 32 63 63 804
4:30-5:30 0 1385 51 1436 95 1396 0 1491 2927 0 0 0 0 102 0 146 248 248 3175
PHF n/a 0.95 0.85 0.95 0.72 0.91 n/a 0.92 n/a n/a n/a n/a 0.82 n/a 0.87 0.97 0.95
APPENDIX C
HCM 2010 Signalized Intersection Summary Recent AM
3: Shields & Lake
Sunshine House 06/15/2018 Synchro 9 Light Report
Delich Associates recent am.syn
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 21 69 1345 47 113 833
Future Volume (veh/h) 21 69 1345 47 113 833
Number 3 18 6 16 5 2
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1900 1863 1863
Adj Flow Rate, veh/h 24 0 1546 53 130 957
Adj No. of Lanes 112012
Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87
Percent Heavy Veh, % 222222
Cap, veh/h 50 44 2807 96 383 3167
Arrive On Green 0.03 0.00 0.80 0.79 0.06 0.89
Sat Flow, veh/h 1774 1583 3585 119 1774 3632
Grp Volume(v), veh/h 24 0 782 817 130 957
Grp Sat Flow(s),veh/h/ln 1774 1583 1770 1842 1774 1770
Q Serve(g_s), s 1.5 0.0 17.1 17.3 1.0 4.3
Cycle Q Clear(g_c), s 1.5 0.0 17.1 17.3 1.0 4.3
Prop In Lane 1.00 1.00 0.06 1.00
Lane Grp Cap(c), veh/h 50 44 1422 1480 383 3167
V/C Ratio(X) 0.48 0.00 0.55 0.55 0.34 0.30
Avail Cap(c_a), veh/h 331 295 1422 1480 480 3167
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 52.7 0.0 3.8 3.8 3.6 0.8
Incr Delay (d2), s/veh 7.1 0.0 1.5 1.5 0.5 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.8 0.0 8.6 9.3 1.2 2.1
LnGrp Delay(d),s/veh 59.8 0.0 5.3 5.3 4.2 1.1
LnGrp LOS E AAAA
Approach Vol, veh/h 24 1599 1087
Approach Delay, s/veh 59.8 5.3 1.4
Approach LOS E A A
Timer 12345678
Assigned Phs 2 5 6 8
Phs Duration (G+Y+Rc), s 102.4 10.0 92.4 7.6
Change Period (Y+Rc), s 5.0 4.0 5.0 5.5
Max Green Setting (Gmax), s 80.0 12.0 64.0 19.5
Max Q Clear Time (g_c+I1), s 6.3 3.0 19.3 3.5
Green Ext Time (p_c), s 18.9 0.2 17.1 0.0
Intersection Summary
HCM 2010 Ctrl Delay 4.2
HCM 2010 LOS A
Timing Report, Sorted By Phase Recent AM
3: Shields & Lake
Sunshine House 06/15/2018 Synchro 9 Light Report
Delich Associates recent am.syn
Phase Number 2568
Movement SBTL SBL NBT WBL
Lead/Lag Lead Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 85 16 69 25
Maximum Split (%) 77.3% 14.5% 62.7% 22.7%
Minimum Split (s) 23 10 23 24.5
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1.5 1 1.5 2.5
Minimum Initial (s) 10 6 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7
Flash Dont Walk (s) 11 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 81 81 97 56
End Time (s) 56 97 56 81
Yield/Force Off (s) 51 93 51 75.5
Yield/Force Off 170(s) 51 93 40 63.5
Local Start Time (s) 25 25 41 0
Local Yield (s) 105 37 105 19.5
Local Yield 170(s) 105 37 94 7.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 56 (51%), Referenced to phase 2:SBTL and 6:NBT, Start of Red
Splits and Phases: 3: Shields & Lake
Queues Recent AM
3: Shields & Lake
Sunshine House 06/15/2018 Synchro 9 Light Report
Delich Associates recent am.syn
Lane Group WBL WBR NBT SBL SBT
Lane Group Flow (vph) 24 79 1600 130 957
v/c Ratio 0.12 0.32 0.63 0.44 0.32
Control Delay 41.7 12.3 11.7 8.6 3.4
Queue Delay 0.0 0.0 0.0 0.0 0.0
Total Delay 41.7 12.3 11.7 8.6 3.4
Queue Length 50th (ft) 16 0 226 9 50
Queue Length 95th (ft) 37 38 476 41 129
Internal Link Dist (ft) 1545 465 472
Turn Bay Length (ft) 150 100
Base Capacity (vph) 329 359 2534 350 2967
Starvation Cap Reductn 00000
Spillback Cap Reductn 00000
Storage Cap Reductn 00000
Reduced v/c Ratio 0.07 0.22 0.63 0.37 0.32
Intersection Summary
HCM 2010 Signalized Intersection Summary Recent PM
3: Shields & Lake
Sunshine House 06/15/2018 Synchro 9 Light Report
Delich Associates recent pm.syn
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 102 146 1385 51 95 1396
Future Volume (veh/h) 102 146 1385 51 95 1396
Number 3 18 6 16 5 2
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1900 1863 1863
Adj Flow Rate, veh/h 107 26 1458 52 100 1469
Adj No. of Lanes 112012
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222
Cap, veh/h 151 135 2681 95 356 2987
Arrive On Green 0.09 0.09 0.77 0.76 0.05 0.84
Sat Flow, veh/h 1774 1583 3579 124 1774 3632
Grp Volume(v), veh/h 107 26 739 771 100 1469
Grp Sat Flow(s),veh/h/ln 1774 1583 1770 1841 1774 1770
Q Serve(g_s), s 7.0 1.8 19.9 20.0 1.2 13.3
Cycle Q Clear(g_c), s 7.0 1.8 19.9 20.0 1.2 13.3
Prop In Lane 1.00 1.00 0.07 1.00
Lane Grp Cap(c), veh/h 151 135 1361 1415 356 2987
V/C Ratio(X) 0.71 0.19 0.54 0.54 0.28 0.49
Avail Cap(c_a), veh/h 347 310 1361 1415 386 2987
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 53.4 51.0 5.5 5.5 4.6 2.5
Incr Delay (d2), s/veh 6.0 0.7 1.6 1.5 0.4 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.7 0.8 10.2 10.7 0.9 6.6
LnGrp Delay(d),s/veh 59.4 51.7 7.1 7.0 5.0 3.1
LnGrp LOS E D AAAA
Approach Vol, veh/h 133 1510 1569
Approach Delay, s/veh 57.9 7.1 3.2
Approach LOS E A A
Timer 12345678
Assigned Phs 2 5 6 8
Phs Duration (G+Y+Rc), s 105.3 9.0 96.3 14.7
Change Period (Y+Rc), s 5.0 4.0 5.0 5.5
Max Green Setting (Gmax), s 87.0 7.0 76.0 22.5
Max Q Clear Time (g_c+I1), s 15.3 3.2 22.0 9.0
Green Ext Time (p_c), s 26.7 0.1 24.4 0.3
Intersection Summary
HCM 2010 Ctrl Delay 7.3
HCM 2010 LOS A
Timing Report, Sorted By Phase Recent PM
3: Shields & Lake
Sunshine House 06/15/2018 Synchro 9 Light Report
Delich Associates recent pm.syn
Phase Number 2568
Movement SBTL SBL NBT WBL
Lead/Lag Lead Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 92 11 81 28
Maximum Split (%) 76.7% 9.2% 67.5% 23.3%
Minimum Split (s) 23 9 23 24.5
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1.5 1 1.5 2.5
Minimum Initial (s) 10 5 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7
Flash Dont Walk (s) 11 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 33 33 44 5
End Time (s) 5 44 5 33
Yield/Force Off (s) 0 40 0 27.5
Yield/Force Off 170(s) 0 40 109 15.5
Local Start Time (s) 28 28 39 0
Local Yield (s) 115 35 115 22.5
Local Yield 170(s) 115 35 104 10.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 5 (4%), Referenced to phase 2:SBTL and 6:NBT, Start of Red
Splits and Phases: 3: Shields & Lake
Queues Recent PM
3: Shields & Lake
Sunshine House 06/15/2018 Synchro 9 Light Report
Delich Associates recent pm.syn
Lane Group WBL WBR NBT SBL SBT
Lane Group Flow (vph) 107 154 1512 100 1469
v/c Ratio 0.49 0.49 0.60 0.35 0.52
Control Delay 55.6 15.0 10.5 6.1 5.1
Queue Delay 0.0 0.0 0.0 0.0 0.0
Total Delay 55.6 15.0 10.5 6.1 5.1
Queue Length 50th (ft) 79 11 258 11 147
Queue Length 95th (ft) 131 70 406 28 250
Internal Link Dist (ft) 1545 465 472
Turn Bay Length (ft) 150 100
Base Capacity (vph) 346 421 2519 291 2852
Starvation Cap Reductn 00000
Spillback Cap Reductn 00000
Storage Cap Reductn 00000
Reduced v/c Ratio 0.31 0.37 0.60 0.34 0.52
Intersection Summary
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
Table 4-3
Fort Collins (GMA and City Limits)
Motor Vehicle LOS Standards (Intersections)
Overall
Any
Approach Leg
Any
Movement
Signalized D1
E E2
Unsignalized E3 F4
Arterial/Arterial
Collector/Collector
Unsignalized D3 F4
Arterial/Collector
Arterial/Local
Collector/Local
Local/Local
Roundabout E3,5 E5,4 E5
1 In mixed use district including downtown as defined by structure plan, overall LOS E is acceptable
2 Applicable with at least 5% of total entering volume
3 Use weighed average to identify overall delay
4 Mitigation may be required
5 Apply unsignalized delay value thresholds to determine LOS
APPENDIX D
HCM 2010 Signalized Intersection Summary Short Bkgrd AM
3: Shields & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates sb am.syn
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 61 74 1199 176 145 806
Future Volume (veh/h) 61 74 1199 176 145 806
Number 3 18 6 16 5 2
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1900 1863 1863
Adj Flow Rate, veh/h 70 0 1378 193 167 926
Adj No. of Lanes 112012
Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87
Percent Heavy Veh, % 222222
Cap, veh/h 107 95 2410 335 369 3053
Arrive On Green 0.06 0.00 0.77 0.76 0.06 0.86
Sat Flow, veh/h 1774 1583 3216 433 1774 3632
Grp Volume(v), veh/h 70 0 776 795 167 926
Grp Sat Flow(s),veh/h/ln 1774 1583 1770 1786 1774 1770
Q Serve(g_s), s 4.2 0.0 19.6 20.3 1.7 5.4
Cycle Q Clear(g_c), s 4.2 0.0 19.6 20.3 1.7 5.4
Prop In Lane 1.00 1.00 0.24 1.00
Lane Grp Cap(c), veh/h 107 95 1366 1378 369 3053
V/C Ratio(X) 0.66 0.00 0.57 0.58 0.45 0.30
Avail Cap(c_a), veh/h 331 295 1366 1378 466 3053
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.6 0.0 5.1 5.2 5.9 1.4
Incr Delay (d2), s/veh 6.7 0.0 1.7 1.8 0.9 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.3 0.0 10.1 10.4 2.1 2.7
LnGrp Delay(d),s/veh 57.3 0.0 6.8 7.0 6.8 1.7
LnGrp LOS E AAAA
Approach Vol, veh/h 70 1571 1093
Approach Delay, s/veh 57.3 6.9 2.4
Approach LOS E A A
Timer 12345678
Assigned Phs 2 5 6 8
Phs Duration (G+Y+Rc), s 98.9 10.0 88.9 11.1
Change Period (Y+Rc), s 5.0 4.0 5.0 5.5
Max Green Setting (Gmax), s 80.0 12.0 64.0 19.5
Max Q Clear Time (g_c+I1), s 7.4 3.7 22.3 6.2
Green Ext Time (p_c), s 18.2 0.3 16.2 0.1
Intersection Summary
HCM 2010 Ctrl Delay 6.4
HCM 2010 LOS A
Timing Report, Sorted By Phase Short Bkgrd AM
3: Shields & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates sb am.syn
Phase Number 2568
Movement SBTL SBL NBT WBL
Lead/Lag Lead Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 85 16 69 25
Maximum Split (%) 77.3% 14.5% 62.7% 22.7%
Minimum Split (s) 23 10 23 24.5
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1.5 1 1.5 2.5
Minimum Initial (s) 10 6 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7
Flash Dont Walk (s) 11 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 81 81 97 56
End Time (s) 56 97 56 81
Yield/Force Off (s) 51 93 51 75.5
Yield/Force Off 170(s) 51 93 40 63.5
Local Start Time (s) 25 25 41 0
Local Yield (s) 105 37 105 19.5
Local Yield 170(s) 105 37 94 7.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 56 (51%), Referenced to phase 2:SBTL and 6:NBT, Start of Red
Splits and Phases: 3: Shields & Lake
Queues Short Bkgrd AM
3: Shields & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates sb am.syn
Lane Group WBL WBR NBT SBL SBT
Lane Group Flow (vph) 70 85 1580 167 926
v/c Ratio 0.33 0.32 0.67 0.56 0.33
Control Delay 46.1 11.8 13.5 15.0 3.8
Queue Delay 0.0 0.0 0.0 0.0 0.0
Total Delay 46.1 11.8 13.5 15.0 3.8
Queue Length 50th (ft) 47 0 274 16 60
Queue Length 95th (ft) 82 40 466 80 123
Internal Link Dist (ft) 272 465 472
Turn Bay Length (ft) 150 100
Base Capacity (vph) 329 364 2366 340 2835
Starvation Cap Reductn 00000
Spillback Cap Reductn 00000
Storage Cap Reductn 00000
Reduced v/c Ratio 0.21 0.23 0.67 0.49 0.33
Intersection Summary
HCM 2010 Signalized Intersection Summary Short Bkgrd PM
3: Shields & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates sb pm.syn
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 176 203 1281 147 169 1456
Future Volume (veh/h) 176 203 1281 147 169 1456
Number 3 18 6 16 5 2
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1900 1863 1863
Adj Flow Rate, veh/h 185 78 1348 149 178 1533
Adj No. of Lanes 112012
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222
Cap, veh/h 232 207 2300 253 341 2826
Arrive On Green 0.13 0.13 0.72 0.71 0.06 0.80
Sat Flow, veh/h 1774 1583 3309 354 1774 3632
Grp Volume(v), veh/h 185 78 738 759 178 1533
Grp Sat Flow(s),veh/h/ln 1774 1583 1770 1800 1774 1770
Q Serve(g_s), s 12.1 5.4 24.5 25.0 2.8 18.5
Cycle Q Clear(g_c), s 12.1 5.4 24.5 25.0 2.8 18.5
Prop In Lane 1.00 1.00 0.20 1.00
Lane Grp Cap(c), veh/h 232 207 1265 1287 341 2826
V/C Ratio(X) 0.80 0.38 0.58 0.59 0.52 0.54
Avail Cap(c_a), veh/h 347 310 1265 1287 355 2826
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.6 47.7 8.4 8.5 9.1 4.3
Incr Delay (d2), s/veh 7.5 1.1 2.0 2.0 1.3 0.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.4 2.4 12.4 13.0 2.7 9.0
LnGrp Delay(d),s/veh 58.2 48.8 10.3 10.5 10.4 5.1
LnGrp LOS E D BBBA
Approach Vol, veh/h 263 1497 1711
Approach Delay, s/veh 55.4 10.4 5.6
Approach LOS E B A
Timer 12345678
Assigned Phs 2 5 6 8
Phs Duration (G+Y+Rc), s 99.8 10.0 89.8 20.2
Change Period (Y+Rc), s 5.0 4.0 5.0 5.5
Max Green Setting (Gmax), s 87.0 7.0 76.0 22.5
Max Q Clear Time (g_c+I1), s 20.5 4.8 27.0 14.1
Green Ext Time (p_c), s 27.4 0.1 24.4 0.5
Intersection Summary
HCM 2010 Ctrl Delay 11.4
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Bkgrd PM
3: Shields & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates sb pm.syn
Phase Number 2568
Movement SBTL SBL NBT WBL
Lead/Lag Lead Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 92 11 81 28
Maximum Split (%) 76.7% 9.2% 67.5% 23.3%
Minimum Split (s) 23 10 23 24.5
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1.5 1 1.5 2.5
Minimum Initial (s) 10 6 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7
Flash Dont Walk (s) 11 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 33 33 44 5
End Time (s) 5 44 5 33
Yield/Force Off (s) 0 40 0 27.5
Yield/Force Off 170(s) 0 40 109 15.5
Local Start Time (s) 28 28 39 0
Local Yield (s) 115 35 115 22.5
Local Yield 170(s) 115 35 104 10.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 5 (4%), Referenced to phase 2:SBTL and 6:NBT, Start of Red
Splits and Phases: 3: Shields & Lake
Queues Short Bkgrd PM
3: Shields & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates sb pm.syn
Lane Group WBL WBR NBT SBL SBT
Lane Group Flow (vph) 185 214 1503 178 1533
v/c Ratio 0.68 0.58 0.64 0.64 0.56
Control Delay 60.4 20.8 13.1 18.2 6.7
Queue Delay 0.0 0.0 0.0 0.0 0.0
Total Delay 60.4 20.8 13.1 18.2 6.7
Queue Length 50th (ft) 137 43 325 28 211
Queue Length 95th (ft) 207 117 426 #106 310
Internal Link Dist (ft) 272 465 472
Turn Bay Length (ft) 150 100
Base Capacity (vph) 346 432 2361 281 2744
Starvation Cap Reductn 00000
Spillback Cap Reductn 00000
Storage Cap Reductn 00000
Reduced v/c Ratio 0.53 0.50 0.64 0.63 0.56
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 2010 TWSC Short Bkgrd AM
5: Islamic Center/Site Access & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates sb am.syn
Intersection
Int Delay, s/veh 0.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 314 2 1 130 1 1 0 1 1 0 4
Future Vol, veh/h 5 314 2 1 130 1 1 0 1 1 0 4
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 87 87 87 87 87 87 87 87 87 87 87 87
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 6 361 2 1 149 1 1 0 1 1 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 151 0 0 363 0 0 529 527 362 526 527 150
Stage 1 - - - - - - 374 374 - 152 152 -
Stage 2 - - - - - - 155 153 - 374 375 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1430 - - 1196 - - 460 456 683 462 456 896
Stage 1 - - - - - - 647 618 - 850 772 -
Stage 2 - - - - - - 847 771 - 647 617 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1430 - - 1196 - - 456 453 683 459 453 896
Mov Cap-2 Maneuver - - - - - - 456 453 - 459 453 -
Stage 1 - - - - - - 644 615 - 846 771 -
Stage 2 - - - - - - 842 770 - 643 614 -
Approach EB WB NB SB
HCM Control Delay, s 0.1 0.1 11.6 9.8
HCM LOS B A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 547 1430 - - 1196 - - 753
HCM Lane V/C Ratio 0.004 0.004 - - 0.001 - - 0.008
HCM Control Delay (s) 11.6 7.5 0 - 8 0 - 9.8
HCM Lane LOS B A A - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - 0
HCM 2010 TWSC Short Bkgrd PM
5: Islamic Center/Site Access & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates sb pm.syn
Intersection
Int Delay, s/veh 0.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 13 298 5 1 365 4 5 0 1 3 0 9
Future Vol, veh/h 13 298 5 1 365 4 5 0 1 3 0 9
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 87 87 87 87 87 87 87 87 87 87 87 87
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 15 343 6 1 420 5 6 0 1 3 0 10
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 424 0 0 348 0 0 804 801 345 800 802 422
Stage 1 - - - - - - 375 375 - 424 424 -
Stage 2 - - - - - - 429 426 - 376 378 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1135 - - 1211 - - 301 318 698 303 317 632
Stage 1 - - - - - - 646 617 - 608 587 -
Stage 2 - - - - - - 604 586 - 645 615 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1135 - - 1211 - - 292 313 698 299 312 632
Mov Cap-2 Maneuver - - - - - - 292 313 - 299 312 -
Stage 1 - - - - - - 636 607 - 598 586 -
Stage 2 - - - - - - 594 585 - 634 605 -
Approach EB WB NB SB
HCM Control Delay, s 0.3 0 16.4 12.5
HCM LOS C B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 323 1135 - - 1211 - - 494
HCM Lane V/C Ratio 0.021 0.013 - - 0.001 - - 0.028
HCM Control Delay (s) 16.4 8.2 0 - 8 0 - 12.5
HCM Lane LOS C A A - A A - B
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0.1
APPENDIX E
HCM 2010 Signalized Intersection Summary Short Total AM
3: Shields & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates st am.syn
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 99 85 1199 218 158 806
Future Volume (veh/h) 99 85 1199 218 158 806
Number 3 18 6 16 5 2
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1900 1863 1863
Adj Flow Rate, veh/h 114 0 1378 238 182 926
Adj No. of Lanes 112012
Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87
Percent Heavy Veh, % 222222
Cap, veh/h 158 141 2247 383 341 2950
Arrive On Green 0.09 0.00 0.74 0.73 0.06 0.83
Sat Flow, veh/h 1774 1583 3118 516 1774 3632
Grp Volume(v), veh/h 114 0 799 817 182 926
Grp Sat Flow(s),veh/h/ln 1774 1583 1770 1772 1774 1770
Q Serve(g_s), s 6.9 0.0 23.3 24.4 2.2 6.5
Cycle Q Clear(g_c), s 6.9 0.0 23.3 24.4 2.2 6.5
Prop In Lane 1.00 1.00 0.29 1.00
Lane Grp Cap(c), veh/h 158 141 1314 1316 341 2950
V/C Ratio(X) 0.72 0.00 0.61 0.62 0.53 0.31
Avail Cap(c_a), veh/h 331 295 1314 1316 437 2950
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 48.8 0.0 6.6 6.9 9.5 2.1
Incr Delay (d2), s/veh 6.1 0.0 2.1 2.2 1.3 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.7 0.0 11.9 12.7 3.3 3.2
LnGrp Delay(d),s/veh 54.8 0.0 8.7 9.1 10.8 2.3
LnGrp LOS D AABA
Approach Vol, veh/h 114 1616 1108
Approach Delay, s/veh 54.8 8.9 3.7
Approach LOS D A A
Timer 12345678
Assigned Phs 2 5 6 8
Phs Duration (G+Y+Rc), s 95.7 10.0 85.7 14.3
Change Period (Y+Rc), s 5.0 4.0 5.0 5.5
Max Green Setting (Gmax), s 80.0 12.0 64.0 19.5
Max Q Clear Time (g_c+I1), s 8.5 4.2 26.4 8.9
Green Ext Time (p_c), s 19.1 0.3 16.3 0.2
Intersection Summary
HCM 2010 Ctrl Delay 8.7
HCM 2010 LOS A
Timing Report, Sorted By Phase Short Total AM
3: Shields & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates st am.syn
Phase Number 2568
Movement SBTL SBL NBT WBL
Lead/Lag Lead Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 85 16 69 25
Maximum Split (%) 77.3% 14.5% 62.7% 22.7%
Minimum Split (s) 23 10 23 24.5
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1.5 1 1.5 2.5
Minimum Initial (s) 10 6 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7
Flash Dont Walk (s) 11 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 81 81 97 56
End Time (s) 56 97 56 81
Yield/Force Off (s) 51 93 51 75.5
Yield/Force Off 170(s) 51 93 40 63.5
Local Start Time (s) 25 25 41 0
Local Yield (s) 105 37 105 19.5
Local Yield 170(s) 105 37 94 7.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 56 (51%), Referenced to phase 2:SBTL and 6:NBT, Start of Red
Splits and Phases: 3: Shields & Lake
Queues Short Total AM
3: Shields & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates st am.syn
Lane Group WBL WBR NBT SBL SBT
Lane Group Flow (vph) 114 98 1629 182 926
v/c Ratio 0.48 0.33 0.71 0.63 0.33
Control Delay 49.9 11.0 15.2 22.8 4.1
Queue Delay 0.0 0.0 0.0 0.0 0.0
Total Delay 49.9 11.0 15.2 22.8 4.1
Queue Length 50th (ft) 77 0 340 34 73
Queue Length 95th (ft) 121 42 493 109 123
Internal Link Dist (ft) 272 465 472
Turn Bay Length (ft) 150 100
Base Capacity (vph) 329 374 2296 320 2793
Starvation Cap Reductn 00000
Spillback Cap Reductn 00000
Storage Cap Reductn 00000
Reduced v/c Ratio 0.35 0.26 0.71 0.57 0.33
Intersection Summary
HCM 2010 Signalized Intersection Summary Short Total PM
3: Shields & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates st pm.syn
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 218 216 1281 185 180 1456
Future Volume (veh/h) 218 216 1281 185 180 1456
Number 3 18 6 16 5 2
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1900 1863 1863
Adj Flow Rate, veh/h 229 94 1348 186 189 1533
Adj No. of Lanes 112012
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222
Cap, veh/h 275 245 2162 296 316 2741
Arrive On Green 0.15 0.15 0.69 0.68 0.06 0.77
Sat Flow, veh/h 1774 1583 3222 428 1774 3632
Grp Volume(v), veh/h 229 94 758 776 189 1533
Grp Sat Flow(s),veh/h/ln 1774 1583 1770 1787 1774 1770
Q Serve(g_s), s 15.0 6.4 27.8 28.6 3.3 20.7
Cycle Q Clear(g_c), s 15.0 6.4 27.8 28.6 3.3 20.7
Prop In Lane 1.00 1.00 0.24 1.00
Lane Grp Cap(c), veh/h 275 245 1223 1235 316 2741
V/C Ratio(X) 0.83 0.38 0.62 0.63 0.60 0.56
Avail Cap(c_a), veh/h 347 310 1223 1235 331 2741
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 49.2 45.6 10.0 10.2 12.5 5.4
Incr Delay (d2), s/veh 13.1 1.0 2.4 2.4 2.7 0.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 8.4 2.9 14.3 14.7 3.8 10.3
LnGrp Delay(d),s/veh 62.3 46.6 12.4 12.6 15.3 6.2
LnGrp LOS E D BBBA
Approach Vol, veh/h 323 1534 1722
Approach Delay, s/veh 57.7 12.5 7.2
Approach LOS E B A
Timer 12345678
Assigned Phs 2 5 6 8
Phs Duration (G+Y+Rc), s 96.9 10.0 86.9 23.1
Change Period (Y+Rc), s 5.0 4.0 5.0 5.5
Max Green Setting (Gmax), s 87.0 7.0 76.0 22.5
Max Q Clear Time (g_c+I1), s 22.7 5.3 30.6 17.0
Green Ext Time (p_c), s 27.9 0.1 24.2 0.5
Intersection Summary
HCM 2010 Ctrl Delay 14.0
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Total PM
3: Shields & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates st pm.syn
Phase Number 2568
Movement SBTL SBL NBT WBL
Lead/Lag Lead Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 92 11 81 28
Maximum Split (%) 76.7% 9.2% 67.5% 23.3%
Minimum Split (s) 23 10 23 24.5
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1.5 1 1.5 2.5
Minimum Initial (s) 10 6 10 4
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7 7
Flash Dont Walk (s) 11 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 33 33 44 5
End Time (s) 5 44 5 33
Yield/Force Off (s) 0 40 0 27.5
Yield/Force Off 170(s) 0 40 109 15.5
Local Start Time (s) 28 28 39 0
Local Yield (s) 115 35 115 22.5
Local Yield 170(s) 115 35 104 10.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 5 (4%), Referenced to phase 2:SBTL and 6:NBT, Start of Red
Splits and Phases: 3: Shields & Lake
Queues Short Total PM
3: Shields & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates st pm.syn
Lane Group WBL WBR NBT SBL SBT
Lane Group Flow (vph) 229 227 1543 189 1533
v/c Ratio 0.76 0.57 0.67 0.73 0.57
Control Delay 63.9 21.5 14.4 28.6 7.5
Queue Delay 0.0 0.0 0.0 0.0 0.0
Total Delay 63.9 21.5 14.4 28.6 7.5
Queue Length 50th (ft) 169 51 368 36 238
Queue Length 95th (ft) 254 131 446 #89 310
Internal Link Dist (ft) 272 465 472
Turn Bay Length (ft) 150 100
Base Capacity (vph) 346 432 2301 259 2686
Starvation Cap Reductn 00000
Spillback Cap Reductn 00000
Storage Cap Reductn 00000
Reduced v/c Ratio 0.66 0.53 0.67 0.73 0.57
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 2010 TWSC Short Total AM
5: Islamic Center/Site Access & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates st am.syn
Intersection
Int Delay, s/veh 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 60 314 2 1 130 10 1 0 1 10 0 53
Future Vol, veh/h 60 314 2 1 130 10 1 0 1 10 0 53
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 87 87 87 87 87 87 87 87 87 87 87 87
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 69 361 2 1 149 11 1 0 1 11 0 61
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 161 0 0 363 0 0 688 663 362 658 658 155
Stage 1 - - - - - - 500 500 - 157 157 -
Stage 2 - - - - - - 188 163 - 501 501 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1418 - - 1196 - - 360 382 683 378 384 891
Stage 1 - - - - - - 553 543 - 845 768 -
Stage 2 - - - - - - 814 763 - 552 543 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1418 - - 1196 - - 320 358 683 359 360 891
Mov Cap-2 Maneuver - - - - - - 320 358 - 359 360 -
Stage 1 - - - - - - 519 510 - 793 767 -
Stage 2 - - - - - - 758 762 - 517 510 -
Approach EB WB NB SB
HCM Control Delay, s 1.2 0.1 13.3 10.6
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 436 1418 - - 1196 - - 721
HCM Lane V/C Ratio 0.005 0.049 - - 0.001 - - 0.1
HCM Control Delay (s) 13.3 7.7 0 - 8 0 - 10.6
HCM Lane LOS B A A - A A - B
HCM 95th %tile Q(veh) 0 0.2 - - 0 - - 0.3
HCM 2010 TWSC Short Total PM
5: Islamic Center/Site Access & Lake
Sunshine House 07/11/2018 Synchro 9 Light Report
Delich Associates st pm.syn
Intersection
Int Delay, s/veh 2.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 62 271 2 1 323 13 3 0 1 13 0 64
Future Vol, veh/h 62 271 2 1 323 13 3 0 1 13 0 64
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 87 87 87 87 87 87 87 87 87 87 87 87
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 71 311 2 1 371 15 3 0 1 15 0 74
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 386 0 0 314 0 0 873 844 313 837 837 379
Stage 1 - - - - - - 455 455 - 381 381 -
Stage 2 - - - - - - 418 389 - 456 456 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1172 - - 1246 - - 271 300 727 286 303 668
Stage 1 - - - - - - 585 569 - 641 613 -
Stage 2 - - - - - - 612 608 - 584 568 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1172 - - 1246 - - 228 278 727 269 281 668
Mov Cap-2 Maneuver - - - - - - 228 278 - 269 281 -
Stage 1 - - - - - - 542 527 - 594 612 -
Stage 2 - - - - - - 544 607 - 541 527 -
Approach EB WB NB SB
HCM Control Delay, s 1.5 0 18.3 13.1
HCM LOS C B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 275 1172 - - 1246 - - 534
HCM Lane V/C Ratio 0.017 0.061 - - 0.001 - - 0.166
HCM Control Delay (s) 18.3 8.3 0 - 7.9 0 - 13.1
HCM Lane LOS C A A - A A - B
HCM 95th %tile Q(veh) 0.1 0.2 - - 0 - - 0.6
APPENDIX F
Lake
Prospect
Shields
Pitkin
James
Bennett
Springfield
SCALE: 1"=500'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
Sunshine House TIS, June 2018
Pedestrian LOS Worksheet
Project Location Classification: Mixed-Use District
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Level of Service (minimum based on project location classification)
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
CSU Campus Institutional
Minimum A A B A A
1 Actual A C A A A
Proposed A B A A A
Residential uses to the
east & southeast of the
site
Residential
Minimum A A B A A
2 Actual A D A A A
Proposed A D A A A
Commercial uses to the
southwest of the site Commercial
Minimum A A B A A
3 Actual A C B A A
Proposed A C B A A
Residential uses to the
west of the site Residential
Minimum A A B A A
4 Actual A C B A A
Proposed A C B A A
Minimum
5 Actual
Proposed
Minimum
6 Actual
Proposed
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed
Lake
Prospect
Shields
Pitkin
James
Bennett
Springfield
SCALE: 1"=500'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES
Sunshine House TIS, June 2018
Bicycle LOS Worksheet
Level of Service – Connectivity
Minimum Actual Proposed
Base Connectivity: C B B
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
1 CSU Campus Institutional C B B
2
3
4
5
6
7
8