Loading...
HomeMy WebLinkAboutAFFORDABLE SELF STORAGE - FDP - FDP180020 - SUBMITTAL DOCUMENTS - ROUND 1 - TDR APPLICATIONort Collins PDT Transportation Development Review Fee Date Received/ Paid Total Amount Paid Project Name: Affordable Self Storage Project Location: CORNER OF CONIFER AND RED CEDAR CIRCLE Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate request(s). ❑ Overall Development Plan (ODP) ❑ Final Development Plan (FDP) This fee includes 2 rounds of review ❑ Additional round of review Fee structure amount due $500 each $1000 each 1,000 $ 500 each ❑ Annexation $20 X acres = + $250 = The maximum fee for each annexation document/ filing shall be $2,000 ❑ Minor Amendment $158 each ❑ Major Amendment $2,500 each l"1 Re -zone $200 each 0 Modification to Land Use Code $200 each E Wireless Telecommunication Equipment (WTE) $65 each u] Road Projects acres (of roadway) X $3,500 = 0 Vacation of Easement(s) *** # of vacations _ X $400 = G"I Vacation of Right(s)-of-Way *** # of vacations _ X $800 = [1 Dedication of Easement(s) and/or Right(s)-of-Way *** # of dedications X $250 = 9 J Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review This fee includes 3 rounds of review. Detached Single Family $160 per unit # of units X $160 = Multifamily or other residential units $115 per unit # of units X $115 = Commercial, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot sgftX$0.25= Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) $250 per acre acres X $ 250 = Project fee $2,000 each 12M Total of above amounts If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000 + �/2 (the amount over 30,000 _ The maximum fee for any residential ONLY project shall be $500 per residential unit. This check should be used to verify the fee amount (does not apply to mixed -use developments). PDP fee shall be the lesser of this amount or the above calculated amount. # of residential units X $500 = If this fee amount equals or exceeds $65,000 then the City Manager shall have the ability to reduce the fee amount. Reduction for affordable housing — a copy of the City letter certifying/ authorizing the affordable housing shall be provided with this application. Amount of reduction to be applied Date: 08/28/2018 General Information: Owners Name(s): Randy and Deb Milan Street address: 1402 Catalpa Court City/State/Zip: Fort Collins, CO 80521 Telephone:970-566-0708 Fax: Applicants/ Consultants Firm Name: Curtis Koldeway/Hauser Architects Contact: Curtis Koldeway Street address: 3780 East 15th St., Suite 201 City/State/ Zip: Loveland, CO 80538 Telephone:970-669-8220 Fax: Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the prckerty for purposes of inspection. Name (plea a Curtis coldeway Signature: Telephone: 970-6 9-82 0 Foot Notes: When a development project involves a change of use for a building, the charge per square foot shall apply to the portion of the overall building size for which the change of use is proposed, provided that the new use generates more traffic than the existing use, as determined by the current Institute of Transportation Engineers Trip Generation. If the new use does not generate more traffic than the existing use then the charge per square foot for shall apply only to the net additional building size (if any). These fees do not include the cost of filing fees for the recording of the Development Agreement. When a Development Agreement or Amendment Agreement is entered into the Developer shall be responsible for the cost of recording the document. Said filing fees shall be calculated and provided when the signed document is returned to the City for signatures and filing. *** This fee does not include the cost of filing fees. Filing fees shall be determined at the time of final document submittal and will be required prior to filing. Total owed for PDP cc: Christie White, Engineering 2012 form Development Review Engineering