HomeMy WebLinkAboutAFFORDABLE SELF STORAGE - FDP - FDP180020 - SUBMITTAL DOCUMENTS - ROUND 1 - TDR APPLICATIONort Collins
PDT
Transportation Development Review Fee Date Received/ Paid
Total Amount Paid
Project Name: Affordable Self Storage
Project Location: CORNER OF CONIFER AND RED CEDAR CIRCLE
Type of Submittal
Please indicate the type of application submitted by checking the box
preceding the appropriate request(s).
❑ Overall Development Plan (ODP)
❑ Final Development Plan (FDP)
This fee includes 2 rounds of review
❑ Additional round of review
Fee structure amount due
$500 each
$1000 each 1,000
$ 500 each
❑ Annexation $20 X acres = + $250 =
The maximum fee for each annexation document/ filing shall be $2,000
❑ Minor Amendment $158 each
❑ Major Amendment $2,500 each
l"1 Re -zone $200 each
0 Modification to Land Use Code $200 each
E Wireless Telecommunication Equipment (WTE) $65 each
u] Road Projects acres (of roadway) X $3,500 =
0 Vacation of Easement(s) *** # of vacations _ X $400 =
G"I Vacation of Right(s)-of-Way *** # of vacations _ X $800 =
[1 Dedication of Easement(s) and/or Right(s)-of-Way ***
# of dedications X $250 =
9 J Project Development Plan (PDP) or Basic Development Review
Project requiring Transportation Services Review and/or utility plan review
This fee includes 3 rounds of review.
Detached Single Family $160 per unit
# of units X $160 =
Multifamily or other residential units $115 per unit
# of units X $115 =
Commercial, Industrial, Retail, and/or Non residential
building square footage $0.25 per square foot
sgftX$0.25=
Size of the development (area being platted or if not being
platted size of parcel accompanying all development
improvements) $250 per acre acres X $ 250 =
Project fee $2,000 each 12M
Total of above amounts
If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the
following formula: $30,000 + �/2 (the amount over 30,000 _
The maximum fee for any residential ONLY project shall be $500 per residential unit.
This check should be used to verify the fee amount (does not apply to mixed -use
developments). PDP fee shall be the lesser of this amount or the above calculated
amount. # of residential units X $500 =
If this fee amount equals or exceeds $65,000 then the City Manager shall have the ability
to reduce the fee amount.
Reduction for affordable housing — a copy of the City letter certifying/ authorizing the
affordable housing shall be provided with this application. Amount of reduction to be
applied
Date: 08/28/2018
General Information:
Owners Name(s): Randy and Deb Milan
Street address: 1402 Catalpa Court
City/State/Zip: Fort Collins, CO 80521
Telephone:970-566-0708 Fax:
Applicants/ Consultants Firm Name:
Curtis Koldeway/Hauser Architects
Contact: Curtis Koldeway
Street address: 3780 East 15th St., Suite 201
City/State/ Zip: Loveland, CO 80538
Telephone:970-669-8220 Fax:
Certification:
By signing this permit I acknowledge that I am acting with
the knowledge, consent, and authority of the owners of the
property (including all owners having legal or equitable
interest in the real property, as defined in Section 1-2 of the
City Code; and including common areas legally connected
to or associated with the property which is the subject of
this application) without whose consent and authority the
requested action could not lawfully be accomplished.
Pursuant to said authority, I hereby permit City officials to
enter upon the prckerty for purposes of inspection.
Name (plea a Curtis coldeway
Signature:
Telephone: 970-6 9-82 0
Foot Notes:
When a development project involves a change of use for a
building, the charge per square foot shall apply to the portion of
the overall building size for which the change of use is proposed,
provided that the new use generates more traffic than the existing
use, as determined by the current Institute of Transportation
Engineers Trip Generation. If the new use does not generate more
traffic than the existing use then the charge per square foot for
shall apply only to the net additional building size (if any).
These fees do not include the cost of filing fees for the recording of
the Development Agreement. When a Development Agreement or
Amendment Agreement is entered into the Developer shall be
responsible for the cost of recording the document. Said filing fees
shall be calculated and provided when the signed document is
returned to the City for signatures and filing.
*** This fee does not include the cost of filing fees. Filing
fees shall be determined at the time of final document
submittal and will be required prior to filing.
Total owed for PDP cc: Christie White, Engineering
2012 form Development Review Engineering