Loading...
HomeMy WebLinkAbout221 EAST MOUNTAIN AVENUE - BASIC DEVELOPMENT REVIEW - BDR180012 - SUBMITTAL DOCUMENTS - ROUND 4 - DRAINAGE RELATED DOCUMENT1218 W. ASH, STE. A, WINDSOR, COLORADO 80550 TEL. 970.674.3300 – FAX 970.674.3303 September 12, 2018 Mr. Wes Lamarque Fort Collins Utilities – Stormwater 700 Wood Street Fort Collins, CO 80522 Re: 221 East Mountain Final Storm Drainage Letter Dear Wes, Please accept the following letter describing the storm drainage intent demonstrating the proposed site improvement’s ability to comply with the City’s stormwater requirements. INTRODUCTION The 221 East Mountain is a redevelopment project proposed to construct a mixed-use condominium building with supporting utility infrastructure and site accesses (pedestrian/vehicular). The site is located at the southwest corner of the intersection of E. Mountain Ave and Mathews St. There is a 20’ public alley to the south, and 10’ public alley along the west. The roadway frontages will be improved along E. Mountain Ave and Mathews St, along with the alleys to the south and west. The legal description is as follows: Lots 1 thru 6, Block 131, Town of Fort Collins, located in part of the Northwest Quarter of Section 12, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. The property is addresses as 221 E. Mountain Ave. A vicinity map is attached for reference. EXISTING CONDITIONS The project site is located within the Udall drainage basin. The existing site consists of a vehicle maintenance shop/showroom, and a parking lot. The site is approximately 0.45 acres and is impervious except for a 40 sqft gravel area near the existing vehicle entrance off of E. Mountain Ave. The site generally slopes to the east at 1.0% grade. Approximately 4,250 sqft drains to E. Mountain Ave, and the remaining drains to Mathew St. All existing improvements will be removed from the site to accommodate the new construction. The existing southern alley is entirely paved, and the existing western alley appears to be unimproved. We are not aware of any site-specific drainage studies for this site. The project is not located within a FEMA mapped 100-yr floodplain and is not within a defined City of Fort Collins floodplain. 221 East Mountain Final Storm Drainage Letter September 12, 2018 Page 2 of 4 PROPOSED DEVELOPMENT The prosed redevelopment improvements will consist of a constructing a 4-story mixed-use multi-family condominium building, with below grade parking, and will include the supporting utility infrastructure and pedestrian/vehicle accesses. The project is planned to be constructed in a single phase. The project has zero setback requirements, encouraging zero-lot line construction. The proposed building footprint is approximately 18,330 sqft, consuming 94% of the site. The improvements will generally be 100% impervious, consistent with the existing conditions. The proposed improvements are divided into 3 onsite drainage basins and 2 offsite drainage basins: Basin D1 consists of the northwest portion of the proposed roof area and the runoff will be conveyed through storm drains to the existing inlet on E. Mountain Ave. A portion of this runoff from this basin will be treated by a roof top vegetation (green roof) and piped to a chase, discharging to the curb and gutter along Mathews street and conveyed to an existing inlet. Basin D2 consists of the northeast portion of the proposed roof area. Runoff from this basin will be piped to a chase and discharging to the curb and gutter along Mathews street and conveyed to an existing inlet. A portion of the runoff from this basin will be treated by a roof top vegetation (green roof) and piped to a chase, discharging to the curb and gutter along Mathews street and conveyed to an existing inlet. Basin D3 consists of the south portion of the proposed roof area. Runoff from this basin will be treated by a roof top vegetation (green roof) and piped to a chase, discharging to the curb and gutter along Mathews street and conveyed to an existing inlet. Basin OS1 consists of the southern alley and several adjacent rooftops and parking areas. The basin was delineated by survey elevations of the alley visually observing the existing conditions, and buildings in the vicinity of the project site. In general, the proposed drainage patterns of this basin will not change from existing, draining along the improved alley east to Mathews Street. This offsite drainage basin can be viewed in more detail by reviewing the attached Offsite Drainage Basin Exhibit. The runoff associated with this basin was modeled at key locations along the east-west alley corridor to determine the water surface elevation of the alley flows in a 100-yr event. The 100-yr peak runoff from this basin is estimated to be 5.56 cfs. To ensure building protection, the modeled flow depths within the alley were increased by 33% to 7.40 cfs and do not enter the building openings. Basin OS2 consists of the western alley. This alley will be paved and the runoff from this alley will be collected in an area inlet and conveyed to the existing inlet on E. Mountain Ave. The proposed improvements do not create an increase in impervious area over 5,000 sq-ft which would require onsite detention. Standard water quality is provided downstream within the Udall Basin and is not required onsite. A live planted green roof is proposed to provide water quality enhancement and are designed to satisfy the Low Impact Development (LID) requirements. All calculations and exhibits are attached for reference. LOW IMPACT DEVELOPMENT TECHNIQUES In reference to the code requirements for implementation of Low Impact Development (LID) techniques, the use of a live planted green roof is proposed to satisfy these requirements. The green roof will promote 221 East Mountain Final Storm Drainage Letter September 12, 2018 Page 3 of 4 a reduction of runoff through evapotranspiration through the roof plantings. Runoff will also be filtered through the growing media prior to discharging. Due to the zero build setback and limited land available this project is required to treat a minimum of 50% of the building roof area. LiveRoof Standard System will be utilized for this project. The landscape architect and architect will be detailing this system, however a design cut sheet is attached to this report for reference. Below is a description of the 4 step process for selecting structural BMPs: Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainageways and implementing long-term source controls. The Four Step Process applies to the management of smaller, frequently occurring events. Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). Runoff from 50% of the roof will be absorbed and conveyed through the green roof system. The green roof will slow runoff, promote evapotranspiration, and filter runoff prior to being released into the adjacent storm drain system. Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release The green roof system will provide a slow release by infiltration through the growing media. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate and volume of runoff during and following development. Because the site will drain to an existing roadway and storm system, bank stabilization is unnecessary with this project. Step 4: Implement Site Specific and Other Source Control BMPs Proactively controlling pollutants at their source by preventing pollution rather than removing contaminants once they have entered the stormwater system or receiving waters is important when protecting storm systems and receiving waters. This can be accomplished through site specific needs such as construction site runoff control, post-construction runoff control and pollution prevention / good housekeeping. It will be the responsibility of the contractor to develop a procedural best management practice for the site. All calculations are attached for reference. EROSION CONTROL Erosion and sedimentation will be controlled on-site by use of sediment control logs, inlet protection, a gravel construction entrance, seeding, mulch, and turf. The measures are designed to limit the overall sediment yield increase due to construction as required by the City of Fort Collins. During overlot and final grading the soil will be roughened and furrowed perpendicular to the prevailing winds. 221 East Mountain Final Storm Drainage Letter September 12, 2018 Page 4 of 4 During the performance of the work required by these specifications or any operations appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall furnish all labor, equipment, materials, and means required. The Contractor shall carry out proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance that has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings, or causing naissance to persons. The Contractor will be held liable for any damage resulting from dust originating from his operations under these specifications on right-of-way or elsewhere. It is unlawful to track or cause to be tracked mud or other debris onto city streets or rights-of-way. Wherever construction vehicles access routes or intersect paved public roads, previsions must be made to minimize the transport of sediment by runoff or vehicles tracking onto the paved surface. Stabilized construction entrances are required with base material consisting of 6” coarse aggregate. The contractor will be responsible for clearing mud tracked onto city streets daily. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Silt fence and sediment control logs will require periodic replacement. Maintenance is the responsibility of the contractor. All disturbed areas must be seeded and mulched within 30 days of project start. Vegetation shall not be considered established until a ground cover is achieved which is demonstrated to be mature enough to control soil erosion to the satisfaction of the City Inspector and to survive severe weather condition. Thank you in advance for your time and if you have any questions or comments please contact me at (970) 347-8917. Sincerely, Logan Johnson, EIT Jason T. Claeys, P.E., LEED AP Interwest Consulting Group Attachments SITE MULBERRY STREET COLLEGE AVE LEMAY AVE RIVERSIDE AVENUE VINE DRIVE PROJECT VICINITY MAP N.T.S. PROJECT VERTICAL DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK 1-13: SOUTHWEST CORNER OF COLLEGE AVE. AND MAPLE ST., ON A CONCRETE TRAFFIC SIGNAL BASE. ELEVATION = 4979.75 (NAVD88) FORT COLLINS BENCHMARK 5-00: LOCATED ON THE TOP OF A CURB OF A SIGNAL POLE BASE AT THE NORTHWEST CORNER OF LINDEN ST. AND JEFFERSON ST. ELEVATION = 4978.05 (NAVD88) PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD UNADJUSTED = 4979.75 (NAVD88) - 3.17 = 4976.58 NGVD UNADJUSTED = 4978.05 (NAVD88) - 3.18 = 4974.87 Design Engineer: Design Firm: Project Number: Date: % Impervious Runoff Coefficient C Return Period Frequency Adjustment Factor (Cf ) 100% 0.95 2-year to 10-year 1.00 100% 0.95 100-year 1.25 90% 0.95 40% 0.50 0% 0.25 C2 to C10 C100 D1 6,086 0.14 294 5,792 0 0 0 100.0% 0.95 1.00 D2 6,086 0.14 376 5,709 0 0 0 100.0% 0.95 1.00 D3 7,324 0.17 497 6,826 0 0 0 100.0% 0.95 1.00 Overall 19,496 0.45 1,168 18,328 0 0 0 100.0% 0.95 1.00 OS1 24,323 0.56 11,309 8,950 0 4,064 0 90.0% 0.87 1.00 OS2 1,296 0.03 1,296 0 0 0 0 100.0% 0.95 1.00 Weighted % Impervious A COMPOSITE paved (sq feet) Aroof (sq feet) Awalk (sq feet) Agravel/pavers (sq feet) Alawn (sq feet) Gravel/Pavers Lawns (Heavy, 2-7% Slope) Sub-basin Designation Atotal (sq feet) Atotal (acres) Land Use Paved Roof Walks Runoff Coefficients and Frequency Adjustment Factors for City of Fort Collins - Storm Water Criteria Manual % Impervious values from Table RO-3 in the Urban Storm Drainage Criteria Manual L. Johnson Design Engineer: Design Firm: Project Number: Date: EQUATIONS: -Equation 6-2 -Equation 6-4 - CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins Time of Concentration (2-yr to 10-yr) Type of Travel Surface Cv D1 D1 100.0% 0.95 0.140 53 0.0100 2.05 44 0.0100 Paved Areas 20 2.00 0.36 5.00 0.0100 5.00 5.00 D2 D2 100.0% 0.95 0.140 53 0.0100 2.04 44 0.0100 Paved Areas 20 2.00 0.36 5.00 0.0100 5.00 5.00 D3 D3 100.0% 0.95 0.168 34 0.0100 1.65 126 0.0100 Paved Areas 20 2.00 1.05 5.00 0.0100 5.00 5.00 OS1 OS1 90.0% 0.87 0.558 149 0.0100 5.15 308 0.0143 Paved Areas 20 2.39 2.15 7.29 0.0129 6.50 6.50 OS2 OS2 100.0% 0.95 0.030 9 0.0180 0.71 88 0.0153 Paved Areas 20 2.47 0.59 5.00 0.0156 5.00 5.00 tt (min) OVERALL SLOPE (ft/ft) tc (min) SLOPE (ft/ft) ti (min) LENGTH (ft) SLOPE (ft/ft) Table RO-2 VELOCITY (ft/s) LENGTH (ft) DESIGN CRITERIA: Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised January 2016) Overland Flow Equations for City of Fort Collins - Storm Water Criteria Manual SUB-BASIN DATA INITIAL/OVERLAND TIME (ti) TRAVEL TIME (tt) tc=ti+tt (min) Urban Check Final tc (min) DESIGN POINT Sub-basin % Impervious C2-10 AREA (acres) -Urbanized Check Equation 6-5 Design Engineer: Design Firm: Project Number: Date: EQUATIONS: -Equation 6-2 -Equation 6-4 - CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins Time of Concentration (100-yr) Type of Travel Surface Cv D1 D1 100.0% 1.00 0.140 53 0.0100 1.36 44 0.0100 Paved Areas 20 2.00 0.36 5.00 0.0100 5.00 5.00 D2 D2 100.0% 1.00 0.140 53 0.0100 1.36 44 0.0100 Paved Areas 20 2.00 0.36 5.00 0.0100 5.00 5.00 D3 D3 100.0% 1.00 0.168 34 0.0100 1.10 126 0.0100 Paved Areas 20 2.00 1.05 5.00 0.0100 5.00 5.00 OS1 OS1 90.0% 1.00 0.558 149 0.0100 2.29 308 0.0143 Paved Areas 20 2.39 2.15 5.00 0.0129 6.50 5.00 OS2 OS2 100.0% 1.00 0.030 9 0.0180 0.47 88 0.0153 Paved Areas 20 2.47 0.59 5.00 0.0156 5.00 5.00 tt (min) OVERALL SLOPE (ft/ft) tc (min) SLOPE (ft/ft) ti (min) LENGTH (ft) SLOPE (ft/ft) Table RO-2 VELOCITY (ft/s) LENGTH (ft) DESIGN CRITERIA: Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised January 2016) Overland Flow Equations for City of Fort Collins - Storm Water Criteria Manual SUB-BASIN DATA INITIAL/OVERLAND TIME (ti) TRAVEL TIME (tt) tc=ti+tt (min) Urban Check Final tc (min) DESIGN POINT Sub-basin % Impervious C100 AREA (acres) -Urbanized Check Equation 6-5 Design Engineer: Design Firm: Project Number: Date: EQUATIONS: I = rainfall intensity (in/hr) Q n = n -yr peak discharge (cfs) P 1 = one-hour point rainfall depth (in) C n = n -yr runoff coefficient t c = time of concentration (min) I n = n -yr rainfall intensity (in/hr) P 1-2yr = 0.82 in A n = Basin drainage area (ac) P 1-10yr = 1.40 in P 1-100yr = 2.86 in BASIN SUMMARY: tc (min) Runoff Coeff (C2-10) C(A) (acres) Intensity (in/hr) Q (ft3/s) tc (min) Runoff Coeff (C2-10) C(A) (acres) Intensity (in/hr) Q (ft3/s) tc (min) Runoff Coeff. (C100) C(A) (acres) Intensity (in/hr) Q (ft3/s) D1 D1 0.140 5.00 0.95 0.13 2.78 0.37 5.00 0.95 0.13 4.87 0.65 5.00 1.00 0.14 9.95 1.39 D2 D2 0.140 5.00 0.95 0.13 2.78 0.37 5.00 0.95 0.13 4.87 0.65 5.00 1.00 0.14 9.95 1.39 D3 D3 0.168 5.00 0.95 0.16 2.78 0.44 5.00 0.95 0.16 4.87 0.78 5.00 1.00 0.17 9.95 1.67 OS1 OS1 0.558 6.50 0.87 0.49 2.58 1.26 6.50 0.87 0.49 4.40 2.15 5.00 1.00 0.56 9.95 5.56 OS2 OS2 0.030 5.00 0.95 0.03 2.78 0.08 5.00 0.95 0.03 4.87 0.14 5.00 1.00 0.03 9.95 0.30 10-yr Peak Runoff 100-yr Peak Runoff 221 East Mountain DEVELOPED PEAK RUNOFF Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised August 2006) DESIGN CRITERIA: Design Point Sub-basin Area (acres) L. Johnson Interwest Consulting Group 1324-028-00 September 12, 2018 2-yr Peak Runoff Q n = C n I n A n 0.786651) 1 ( 10 ) 28 . 5 t c P I + = 1324-028-00 Rational Calcs (FC).xlsx Page 4 of 4 Interwest Consulting Group Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Tuesday, Sep 11 2018 221 E Mountain - Southern Alley Flow Depth User-defined Invert Elev (ft) = 4977.54 Slope (%) = 0.40 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 7.40 (Sta, El, n)-(Sta, El, n)... ( -10.00, 4979.12)-(1.00, 4977.59, 0.013)-(10.00, 4977.92, 0.013)-(14.00, 4978.00, 0.013) Highlighted Depth (ft) = 0.36 Q (cfs) = 7.400 Area (sqft) = 3.29 Velocity (ft/s) = 2.25 Wetted Perim (ft) = 18.92 Crit Depth, Yc (ft) = 0.36 Top Width (ft) = 18.91 EGL (ft) = 0.44 -5 0 5 10 15 20 Elev (ft) Depth (ft) Section 4977.00 -0.54 4977.50 -0.04 4978.00 0.46 4978.50 0.96 4979.00 1.46 4979.50 1.96 4980.00 2.46 Sta (ft) Low Impact Development Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Low Impact Development Summary Developed Area Summary 18,090 sqft Total Roof Area required for Treatment (50%): 9,045 sqft 8,880 sqft 49.1% Depth of Average Runoff Producing Storm: 0.43 inches Volume Treated by Green Roof: 318 cu ft 221 East Mountain Total Roof Area: L. Johnson Interwest Consulting Group 1324-028-00 September 12, 2018 Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, January 2010 City of Fort Collins - Ordinance No. 007, 2016 - Treat at least 75% of any newly developed or redeveloped impervious area using one or a combination of LID techniques, or - Treat at least 50% of any newly developed or redeveloped impervious area using one or a combination of LID techniques when 25% of private driveable surfaces are permeable. - Due to zero setback requirements within Old Town Fort Collins, This project is required to treat 50% of any newly developed or redeveloped impervious area using one or a combination of LID techniques. Old Town Fort Collins Total Area Treated by Green Roof: Percent Area Treated by LID*: LiveRoof, LLC P.O. Box 533 Spring Lake, MI 49456 (800) 875-1392 www.liveroof.com LiveRoof Standard Module LiveRoof Engineered Soil LiveRoof Green Roof Plants (Minimum 95% Soil Coverage at Installation) Minimum 40-mil Polypropylene or EPDM Slip Sheet, Edges Overlapped & Seamed EPDM, TPO or PVC Waterproofing Membrane Bonding Adhesive Insulation Insulation Adhesive Moisture Portals™ TOP VIEW SIDE VIEW NOT TO SCALE LiveRoof STANDARD SYSTEM ILLUSTRATIONS ARE TO CONCEPTUALLY ASSIST PROFESSIONALS IN DESIGNING LIVEROOF STANDARD A INSTALLATIONS. LIVEROOF DOES NOT ACCEPT RESPONSIBILTY FOR ENGINEERING BASED ON ILLUSTRATIONS. A QUALIFIED ROOFING SPECIALIST SHOULD BE CONSULTED TO DETERMINE APPROPRIATE WATERPROOFING AND ROOF DECK MATERIALS AND SUITABLE DESIGN. LiveRoof System Saturated Weight: 27-29 lbs / sf Drainage Holes Ergonomic Handles 1' . 2' . 3 1/4" . 4 1/4" . 1" . 1/2" . Over Conventional Roofing Assembly Provided by others September 12, 2018 221 East Mountain DEVELOPED TIME OF CONCENTRATION L. Johnson Interwest Consulting Group 1324-028-00 t c = t i + t t 0 . 5 V = C v S w V L tt 60 = �� = 18 − 15� + � 60 24� + 12 � �� = 1.87(1.1 − �� �� ) � � � 1324-028-00 Rational Calcs (FC).xlsx Page 3 of 4 Interwest Consulting Group September 12, 2018 221 East Mountain DEVELOPED TIME OF CONCENTRATION L. Johnson Interwest Consulting Group 1324-028-00 t c = t i + t t 0 . 5 V = C v S w V L tt 60 = �� = 18 − 15� + � 60 24� + 12 � �� = 1.87(1.1 − �� �� ) � � � 1324-028-00 Rational Calcs (FC).xlsx Page 2 of 4 Interwest Consulting Group Interwest Consulting Group 1324-028-00 September 12, 2018 221 East Mountain DEVELOPED IMPERVIOUS AREA CALCULATION DESIGN CRITERIA: Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised January 2016) BASINS: 1324-028-00 Rational Calcs (FC).xlsx Page 1 of 4 Interwest Consulting Group