Loading...
HomeMy WebLinkAboutSPIRIT AT THE RIVER (FORMERLY LINCOLN CORRIDOR HOTEL) - FDP - FDP180015 - SUBMITTAL DOCUMENTS - ROUND 2 - UTILITY PLANSREVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES COVER SHEET R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_TTL_70150.dwg MG MG C1.0 CONSTRUCTION DOCUMENTS MG VICINITY MAP SCALE 1"=500' CONSTRUCTION DOCUMENTS FOR SPIRIT AT THE RIVER HOTEL LOT 1&2, SPIRIT AT THE RIVER SUBDIVISION LOCATED IN THE SOUTHEAST QUARTER OF SECTION 12, TOWNSHIP 7 REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES GENERAL NOTES R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_TTL_70150.dwg MG MG C1.1 CONSTRUCTION DOCUMENTS MG 1. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE ANY CUTS ARE MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS. THE FINISHED PATCH SHALL BLEND IN SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS WHERE MORE THAN ONE CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY LOT 1 IN-SITU SUBDIVISION LOT 1 WOODWARD TECHNOLOGY CENTER E LINCOLN AVE LEGEND EXISTING DEMO BASIS OF BEARING BENCHMARKS REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES EXISTING CONDITIONS AND DEMOLITION PLAN R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM E LINCOLN AVE. LEGEND EXISTING PROPOSED PROPERTY LINE FLOWLINE BACK OF CURB EASEMENT SETBACK LINE PARKING STALL COUNT PER ROW OVERHEAD POWER CONCRETE SIDEWALK HEAVY DUTY CONCRETE PAVEMENT GRASS LANDSCAPING BUILDING FENCE STANDARD DUTY CONCRETE PAVEMENT NATURAL HABITAT BUFFER ZONE BASIS OF BEARING BENCHMARKS REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS E LINCOLN AVE. LEGEND EXISTING PROPOSED PROPERTY LINE FLOWLINE BACK OF CURB EASEMENT SETBACK LINE PARKING STALL COUNT PER ROW OVERHEAD POWER CONCRETE SIDEWALK HEAVY DUTY CONCRETE PAVEMENT GRASS LANDSCAPING BUILDING FENCE STANDARD DUTY CONCRETE PAVEMENT NATURAL HABITAT BUFFER ZONE BASIS OF BEARING BENCHMARKS REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS E LINCOLN AVE LEGEND EXISTING PROPOSED PROPERTY LINE FLOWLINE BACK OF CURB STORM SEWER CONCRETE WASHOUT AREA SEED & MULCH / LANDSCAPING SILT FENCE STOCKPILE STABILIZED STAGING AREA VEHICLE TRACKING CONTROL LIMITS OF DISTURBANCE STORM WATER FLOW DIRECTION INLET PROTECTION MAJOR CONTOUR MINOR CONTOUR STORM MANHOLE GRATE INLET WATER LINE SANITARY SEWER ROCK CHECKDAM SEDIMENT BASIN WATTLES BASIS OF BEARING BENCHMARKS REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN E LINCOLN AVE LEGEND EXISTING PROPOSED PROPERTY LINE FLOWLINE BACK OF CURB STORM SEWER CONCRETE WASHOUT AREA SEED & MULCH / LANDSCAPING SILT FENCE STOCKPILE STABILIZED STAGING AREA VEHICLE TRACKING CONTROL LIMITS OF DISTURBANCE STORM WATER FLOW DIRECTION INLET PROTECTION MAJOR CONTOUR MINOR CONTOUR STORM MANHOLE GRATE INLET WATER LINE SANITARY SEWER ROCK CHECKDAM SEDIMENT BASIN WATTLES BASIS OF BEARING BENCHMARKS REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN E LINCOLN AVE LEGEND EXISTING PROPOSED PROPERTY LINE FLOWLINE BACK OF CURB STORM SEWER CONCRETE WASHOUT AREA SEED & MULCH / LANDSCAPING SILT FENCE STOCKPILE STABILIZED STAGING AREA VEHICLE TRACKING CONTROL LIMITS OF DISTURBANCE STORM WATER FLOW DIRECTION INLET PROTECTION MAJOR CONTOUR MINOR CONTOUR STORM MANHOLE GRATE INLET WATER LINE SANITARY SEWER ROCK CHECKDAM SEDIMENT BASIN WATTLES BASIS OF BEARING BENCHMARKS REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN E LINCOLN AVE LEGEND EXISTING PROPOSED PROPERTY LINE FLOWLINE BACK OF CURB STORM SEWER CONCRETE WASHOUT AREA SEED & MULCH / LANDSCAPING SILT FENCE STOCKPILE STABILIZED STAGING AREA VEHICLE TRACKING CONTROL LIMITS OF DISTURBANCE STORM WATER FLOW DIRECTION INLET PROTECTION MAJOR CONTOUR MINOR CONTOUR STORM MANHOLE GRATE INLET WATER LINE SANITARY SEWER ROCK CHECKDAM SEDIMENT BASIN WATTLES BASIS OF BEARING BENCHMARKS REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES EROSION CONTROL DETAILS R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_ERC4_70150.dwg MG MG C4.4 CONSTRUCTION DOCUMENTS EDIT THESE IN THE SHEET PROPERTIES MG REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES EROSION CONTROL DETAILS R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_ERC4_70150.dwg MG MG C4.5 CONSTRUCTION DOCUMENTS EDIT THESE IN THE SHEET PROPERTIES MG E LINCOLN AVE (ROW VARIES) MATCHLINE SEE SHEET C6.1 LEGEND EXISTING PROPOSED PROPERTY LINE FLOWLINE BACK OF CURB EASEMENT SETBACK LINE MAJOR CONTOURS MINOR CONTOURS STORM SEWER SPOT ELEVATION FLOW ARROW FINISH FLOOR ELEVATION HIGH POINT LOW POINT GRADE BREAK FFE HP LP INVERTED CROWN SIDEWALK SW FLOWLINE FL STORM MANHOLE GRATE INLET WATER LINE SANITARY SEWER MATCH EXISTING GRADE ME BOTTOM OF WALL BOW TOP OF WALL TOW BOTTOM OF POND BOP TOP OF BERM TOB TOP OF POND TOP SPILL CURB GROUND SWALE GS BASIS OF BEARING BENCHMARKS REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON LEGEND EXISTING PROPOSED PROPERTY LINE FLOWLINE BACK OF CURB EASEMENT SETBACK LINE MAJOR CONTOURS MINOR CONTOURS STORM SEWER SPOT ELEVATION FLOW ARROW FINISH FLOOR ELEVATION HIGH POINT LOW POINT GRADE BREAK FFE HP LP INVERTED CROWN SIDEWALK SW FLOWLINE FL STORM MANHOLE GRATE INLET WATER LINE SANITARY SEWER MATCH EXISTING GRADE ME BOTTOM OF WALL BOW TOP OF WALL TOW BOTTOM OF POND BOP TOP OF BERM TOB TOP OF POND TOP SPILL CURB BASIS OF BEARING BENCHMARKS REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD LEGEND EXISTING PROPOSED PROPERTY LINE FLOWLINE BACK OF CURB EASEMENT SETBACK LINE MAJOR CONTOURS MINOR CONTOURS STORM SEWER SPOT ELEVATION FLOW ARROW FINISH FLOOR ELEVATION HIGH POINT LOW POINT GRADE BREAK FFE HP LP INVERTED CROWN SIDEWALK SW FLOWLINE FL STORM MANHOLE GRATE INLET WATER LINE SANITARY SEWER MATCH EXISTING GRADE ME BOTTOM OF WALL BOW TOP OF WALL TOW BOTTOM OF POND BOP TOP OF BERM TOB TOP OF POND TOP SPILL CURB GROUND SWALE GS BASIS OF BEARING BENCHMARKS REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY LEGEND EXISTING PROPOSED PROPERTY LINE FLOWLINE BACK OF CURB EASEMENT SETBACK LINE STORM SEWER WATER LINE SANITARY SEWER WATER METER GAS LINE UNDERGROUND ELECTRIC STORM MANHOLE GRATE INLET WATER VALVE SANITARY CLEANOUT NATURAL HABITAT BUFFER ZONE BASIS OF BEARING BENCHMARKS LINCOLN AVE (ROW VARIES) REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES UTILITY DETAILS R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_DTL_70150.dwg MG MG C7.1 CONSTRUCTION DOCUMENTS EDIT THESE IN THE SHEET PROPERTIES MG REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES UTILITY DETAILS R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_DTL_70150.dwg MG MG C7.2 CONSTRUCTION DOCUMENTS EDIT THESE IN THE SHEET PROPERTIES MG STRM-100 4930 4935 4940 4945 4950 4955 4960 4930 4935 4940 4945 4950 4955 4960 100+00 101+00 102+00 103+00 104+00 105+00 STRM-200 4930 4935 4940 4945 4950 4955 4960 4930 4935 4940 4945 4950 4955 4960 200+00 201+00 202+00 202+50 STRM-310 4930 4935 4940 4945 4950 4955 4960 4930 4935 4940 4945 4950 4955 4960 310+00 311+00 311+50 REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET STRM-400 4930 4935 4940 4945 4950 4955 4960 4930 4935 4940 4945 4950 4955 4960 400+00 401+00 402+00 403+00 404+00 405+00 406+00 407+00 407+50 STRM-410 4930 4935 4940 4945 4950 4955 4960 4930 4935 4940 4945 4950 4955 4960 410+25 411+00 411+50 STRM-420 4930 4935 4940 4945 4950 4955 4960 4930 4935 4940 4945 4950 4955 4960 420+25 421+00 421+50 REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET STRM-300 4930 4935 4940 4945 4950 4955 4960 4930 4935 4940 4945 4950 4955 4960 300+00 301+00 302+00 303+00 304+00 304+50 STRM-600 4930 4935 4940 4945 4950 4955 4960 4930 4935 4940 4945 4950 4955 4960 160+00 161+00 161+48.73 STRM-700 4925 4930 4935 4940 4945 4950 4955 4925 4930 4935 4940 4945 4950 4955 100+00 101+00 101+50 REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES STORM DETAILS R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_DTL_70150.dwg MG MG C12.3 CONSTRUCTION DOCUMENTS MG REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES STORM DETAILS R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_DTL_70150.dwg MG MG C12.4 CONSTRUCTION DOCUMENTS ---- MG REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES CONSTRUCTION DETAILS R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_DTL_70150.dwg MG MG C20.0 CONSTRUCTION DOCUMENTS MG CONSTRUCTION DETAILS FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_DTL_70150.dwg MG MG C20.1 CONSTRUCTION DOCUMENTS MG REVISIONS NO. REV. DATE REVISIONS DESCRIPTION project no.: approved by: checked by: drawn by: drawing no.: QA/QC by: date: SHEET TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES R RETAINING WALL CROSS SECTION TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES STORM SEWER PLAN & PROFILES R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_STM_70150.dwg MG MG C12.2 CONSTRUCTION DOCUMENTS MG TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES STORM SEWER PLAN & PROFILES R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_STM_70150.dwg MG MG C12.1 CONSTRUCTION DOCUMENTS MG TEL 970.461.7733 www.olssonassociates.com 5285 McWhinney Boulevard, Suite 160 Loveland, CO 80538 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES STORM SEWER PLAN & PROFILES R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_STM_70150.dwg MG MG C12.0 CONSTRUCTION DOCUMENTS MG CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES UTILITY PLAN R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_UTL_70150.dwg MG MG C7.0 CONSTRUCTION DOCUMENTS MG NOTES CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: DATE DATE DATE DATE DATE DATE CITY ENGINEER WATER AND WASTEWATER UTILITY STORMWATER UTILITY PARKS AND RECREATION TRAFFIC ENGINEER ENVIRONMENTAL PLANNER OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES COURTYARD GRADING DETAIL R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_GRD_70150.dwg MG MG C6.2 CONSTRUCTION DOCUMENTS EDIT THESE IN THE SHEET PROPERTIES MG NOTES CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: DATE DATE DATE DATE DATE DATE CITY ENGINEER WATER AND WASTEWATER UTILITY STORMWATER UTILITY PARKS AND RECREATION TRAFFIC ENGINEER ENVIRONMENTAL PLANNER COURTYARD DETAIL SCALE: 1"=10' VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES POND GRADING PLAN R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_PONDGRD_70150.dwg MG MG C6.1 CONSTRUCTION DOCUMENTS MG NOTES DETENTION POND SECTION A-A AND B-B TRAIL TYPICAL SECTION NTS SECTION NOTES CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: DATE DATE DATE DATE DATE DATE CITY ENGINEER WATER AND WASTEWATER UTILITY STORMWATER UTILITY PARKS AND RECREATION TRAFFIC ENGINEER ENVIRONMENTAL PLANNER MATCHLINE SEE SHEETC6.0 RAIN GARDEN THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. NOTE THIS DOCUMENT HAS BEEN RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES GRADING PLAN R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_GRD_70150.dwg MG MG C6.0 CONSTRUCTION DOCUMENTS MG NOTES CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: DATE DATE DATE DATE DATE DATE CITY ENGINEER WATER AND WASTEWATER UTILITY STORMWATER UTILITY PARKS AND RECREATION TRAFFIC ENGINEER ENVIRONMENTAL PLANNER RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES EROSION CONTROL PLAN R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_ERC4_70150.dwg MG MG C4.3 CONSTRUCTION DOCUMENTS PHASE 4: FINAL STABILIZATION MG NOTES CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: DATE DATE DATE DATE DATE DATE CITY ENGINEER WATER AND WASTEWATER UTILITY STORMWATER UTILITY PARKS AND RECREATION TRAFFIC ENGINEER ENVIRONMENTAL PLANNER RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES EROSION CONTROL PLAN R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_ERC3_70150.dwg MG MG C4.2 CONSTRUCTION DOCUMENTS PHASE 3: INFRASTRUCTURE MG NOTES CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: DATE DATE DATE DATE DATE DATE CITY ENGINEER WATER AND WASTEWATER UTILITY STORMWATER UTILITY PARKS AND RECREATION TRAFFIC ENGINEER ENVIRONMENTAL PLANNER RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES EROSION CONTROL PLAN R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_ERC2_70150.dwg MG MG C4.1 CONSTRUCTION DOCUMENTS PHASE 2: OVERLOT GRADING AND VERTICAL CONSTRUCTION MG NOTES CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: DATE DATE DATE DATE DATE DATE CITY ENGINEER WATER AND WASTEWATER UTILITY STORMWATER UTILITY PARKS AND RECREATION TRAFFIC ENGINEER ENVIRONMENTAL PLANNER RELEASED BY OLSSON ASSOCIATES ONLY FOR REVIEW BY REGULATORY AGENCIES AND OTHER PROFESSIONALS, AND IS SUBJECT TO CHANGE. THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES EROSION CONTROL PLAN R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_ERC1_70150.dwg MG MG C4.0 CONSTRUCTION DOCUMENTS PHASE 1: INITIAL/PRE-OVERLOT GRADING MG NOTES CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: DATE DATE DATE DATE DATE DATE CITY ENGINEER WATER AND WASTEWATER UTILITY STORMWATER UTILITY PARKS AND RECREATION TRAFFIC ENGINEER ENVIRONMENTAL PLANNER PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES HORIZONTAL CONTROL PLAN R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_DIM_70150.dwg MG MG C3.1 CONSTRUCTION DOCUMENTS MG NOTES CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: DATE DATE DATE DATE DATE DATE CITY ENGINEER WATER AND WASTEWATER UTILITY STORMWATER UTILITY PARKS AND RECREATION TRAFFIC ENGINEER ENVIRONMENTAL PLANNER PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES SITE, SIGNAGE, AND STRIPING PLAN R FORT COLLINS, CO 2018 07-25-2018 017-0150 SPIRIT AT THE RIVER HOTEL MM C_SIT_70150.dwg MG MG C3.0 CONSTRUCTION DOCUMENTS MG NOTES KEYNOTE TABLE CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: DATE DATE DATE DATE DATE DATE CITY ENGINEER WATER AND WASTEWATER UTILITY STORMWATER UTILITY PARKS AND RECREATION TRAFFIC ENGINEER ENVIRONMENTAL PLANNER C_EXC_70150.dwg MG MG C2.0 CONSTRUCTION DOCUMENTS MG NOTES KEYNOTE TABLE EASEMENT TABLE CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: DATE DATE DATE DATE DATE DATE CITY ENGINEER WATER AND WASTEWATER UTILITY STORMWATER UTILITY PARKS AND RECREATION TRAFFIC ENGINEER ENVIRONMENTAL PLANNER ENGINEER AND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE CUTS ARE MADE. 2. UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS. 3. STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL “T” INTERSECTIONS. 4. AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE. 5. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS, INCLUDING STORM DRAINAGE STRUCTURES AND PIPES, FOR THE FOLLOWING PRIVATE STREETS: (N/A). CITY OF FORT COLLINS GENERAL NOTE 1. THE EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED PLANS. 3. ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 4. AT ALL TIMES DURING CONSTRUCTION, THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN. 5. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 6. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL BMPS ARE INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTSOF-WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE LOCAL ENTITY. 7. IN ORDER TO MINIMIZE EROSION POTENTIAL, ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES SHALL: a. BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) WEEKS AND AFTER EACH SIGNIFICANT STORM EVENT AND REPAIRED OR RECONSTRUCTED AS NECESSARY IN ORDER TO ENSURE THE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. b. REMAIN IN PLACE UNTIL SUCH TIME AS ALL THE SURROUNDING DISTURBED AREAS ARE SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR. c. BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR. 8. WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEAN UP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM ALL DRAINAGE INFRASTRUCTURE AND OTHER PUBLIC FACILITIES. 9. THE CONTRACTOR SHALL CLEAN UP ANY INADVERTENT DEPOSITED MATERIAL IMMEDIATELY AND MAKE SURE STREETS ARE FREE OF ALL MATERIALS BY THE END OF EACH WORKING DAY. 10. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY WATERS OF THE UNITED STATES. 11. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (30) DAYS SHALL BE SEEDED AND MULCHED. 12. THE STORMWATER VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM SEWER LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE OVER TO THE LOCAL ENTITY OR HOMEOWNERS ASSOCIATION (HOA). 13. CITY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (CDPS) REQUIREMENTS MAKE IT UNLAWFUL TO DISCHARGE OR ALLOW THE DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER FROM CONSTRUCTION SITES. POLLUTANTS INCLUDE, BUT ARE NOT LIMITED TO DISCARDED BUILDING MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, OIL AND GAS PRODUCTS, LITTER, AND SANITARY WASTE. THE DEVELOPER SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 14. A DESIGNATED AREA SHALL BE PROVIDED ON SITE FOR CONCRETE TRUCK CHUTE WASHOUT. THE AREA SHALL BE CONSTRUCTED SO AS TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST FIFTY (50) FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION. UPON COMPLETION OF CONSTRUCTION ACTIVITIES THE CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND PROPERLY DISPOSED OF PRIOR TO THE AREA BEING RESTORED. 15. TO ENSURE THAT SEDIMENT DOES NOT MOVE OFF OF INDIVIDUAL LOTS ONE OR MORE OF THE FOLLOWING SEDIMENT/EROSION CONTROL BMPS SHALL BE INSTALLED AND MAINTAINED UNTIL THE LOTS ARE SUFFICIENTLY STABILIZED, AS DETERMINED BY THE EROSION CONTROL INSPECTOR, (WITHIN LOVELAND GMA AND CITY LIMITS ONLY). a. BELOW ALL GUTTER DOWNSPOUTS. b. OUT TO DRAINAGE SWALES. c. ALONG LOT PERIMETER. d. OTHER LOCATIONS, IF NEEDED. 16. CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AS DIRECTED BY THE CITY/COUNTY. 17. A VEHICLE TRACKING CONTROL PAD SHALL BE INSTALLED WHEN NEEDED FOR CONSTRUCTION EQUIPMENT, INCLUDING BUT NOT LIMITED TO PERSONAL VEHICLES EXITING EXISTING ROADWAYS. NO EARTHEN MATERIALS, I.E. STONE, DIRT, ETC. SHALL BE PLACED IN THE CURB & GUTTER OR ROADWAY AS A RAMP TO ACCESS TEMPORARY STOCKPILES, STAGING AREAS, CONSTRUCTION MATERIALS, CONCRETE WASHOUT AREAS, AND/OR BUILDING SITES. STANDARD GRADING AND EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES 1. ALL STREET CONSTRUCTION IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS AS WELL AS THE STREET IMPROVEMENTS NOTES LISTED HERE. 2. A PAVING SECTION DESIGN, SIGNED AND STAMPED BY A COLORADO LICENSED ENGINEER, MUST BE SUBMITTED TO THE LOCAL ENTITY ENGINEER FOR APPROVAL, PRIOR TO ANY STREET CONSTRUCTION ACTIVITY, (FULL DEPTH ASPHALT SECTIONS ARE NOT PERMITTED AT A DEPTH GREATER THAN 8 INCHES OF ASPHALT). THE JOB MIX SHALL BE SUBMITTED FOR APPROVAL PRIOR TO PLACEMENT OF ANY ASPHALT. 3. WHERE PROPOSED PAVING ADJOINS EXISTING ASPHALT, THE EXISTING ASPHALT SHALL BE SAW CUT, A MINIMUM DISTANCE OF 12 INCHES FROM THE EXISTING EDGE, TO CREATE A CLEAN CONSTRUCTION JOINT. THE DEVELOPER SHALL BE REQUIRED TO REMOVE EXISTING PAVEMENT TO A DISTANCE WHERE A CLEAN CONSTRUCTION JOINT CAN BE MADE. WHEEL CUTS SHALL NOT BE ALLOWED UNLESS APPROVED BY THE LOCAL ENTITY ENGINEER IN LOVELAND. 4. STREET SUBGRADES SHALL BE SCARIFIED THE TOP 12 INCHES AND RE-COMPACTED PRIOR TO SUBBASE INSTALLATION. NO BASE MATERIAL SHALL BE LAID UNTIL THE SUBGRADE HAS BEEN INSPECTED AND APPROVED BY THE LOCAL ENTITY ENGINEER. 5. FT. COLLINS ONLY. VALVE BOXES AND MANHOLES ARE TO BE BROUGHT UP TO GRADE AT THE TIME OF PAVEMENT PLACEMENT OR OVERLAY. VALVE BOX ADJUSTING RINGS ARE NOT ALLOWED. 6. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE INSPECTOR BEFORE ANY CUTS ARE MADE. CUTTING AND PATCHING SHALL BE DONE IN CONFORMANCE WITH CHAPTER 25, RECONSTRUCTION AND REPAIR. THE FINISHED PATCH SHALL BLEND SMOOTHLY INTO THE EXISTING SURFACE. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER. ALL OVERLAY WORK SHALL BE COORDINATED WITH ADJACENT LANDOWNERS SUCH THAT FUTURE PROJECTS DO NOT CUT THE NEW ASPHALT OVERLAY WORK. 7. ALL TRAFFIC CONTROL DEVICES SHALL BE IN CONFORMANCE WITH THESE PLANS OR AS OTHERWISE SPECIFIED IN M.U.T.C.D. (INCLUDING COLORADO SUPPLEMENT) AND AS PER THE RIGHT-OF-WAY WORK PERMIT TRAFFIC CONTROL PLAN. 8. THE DEVELOPER IS REQUIRED TO PERFORM A GUTTER WATER FLOW TEST IN THE PRESENCE OF THE LOCAL ENTITY INSPECTOR AND PRIOR TO INSTALLATION OF ASPHALT. GUTTERS THAT HOLD MORE THAN ¼ INCH DEEP OR 5 FEET LONGITUDINALLY, OF WATER, SHALL BE COMPLETELY REMOVED AND RECONSTRUCTED TO DRAIN PROPERLY. 9. PRIOR TO PLACEMENT OF H.B.P. OR CONCRETE WITHIN THE STREET AND AFTER MOISTURE/DENSITY TESTS HAVE BEEN TAKEN ON THE SUBGRADE MATERIAL (WHEN A FULL DEPTH SECTION IS PROPOSED) OR ON THE SUBGRADE AND BASE MATERIAL (WHEN A COMPOSITE SECTION IS PROPOSED), A MECHANICAL "PROOF ROLL" WILL BE REQUIRED. THE ENTIRE SUBGRADE AND/OR BASE MATERIAL SHALL BE ROLLED WITH A HEAVILY LOADED VEHICLE HAVING A TOTAL GVW OF NOT LESS THAN 50,000 LBS. AND A SINGLE AXLE WEIGHT OF AT LEAST 18,000 LBS. WITH PNEUMATIC TIRES INFLATED TO NOT LESS THAN 90 P.S.I.G. “PROOF ROLL” VEHICLES SHALL NOT TRAVEL AT SPEEDS GREATER THAN 3 M.P.H. ANY PORTION OF THE SUBGRADE OR BASE MATERIAL WHICH EXHIBITS EXCESSIVE PUMPING OR DEFORMATION, AS DETERMINED BY THE LOCAL ENTITY ENGINEER, SHALL BE REWORKED, REPLACED OR OTHERWISE MODIFIED TO FORM A SMOOTH, NON-YIELDING SURFACE. THE LOCAL ENTITY ENGINEER SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO THE “PROOF ROLL.” ALL “PROOF ROLLS” SHALL BE PERFORMED IN THE PRESENCE OF AN INSPECTOR. STREET IMPROVEMENT NOTES 1. ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE. 2. ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC. 3. ALL SIGNAGE SHALL BE PER LOCAL ENTITY STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD. 4. ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS. 5. ALL LANE LINES FOR CONCRETE PAVEMENT SHOULD BE EPOXY PAINT. 6. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE LOCAL ENTITY ENGINEER PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. 7. PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS. 8. EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. 9. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS. 10. ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS. 11. A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE LOCAL ENTITY ENGINEER. ALL DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN. 12. THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES. 13. SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN. 14. SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD, THE LOCAL ENTITY ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE LOCAL ENTITY ENGINEER DETERMINES THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS). 15. SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR ADDITIONAL DETAIL. TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES 1. THE CITY OF FORT COLLINS SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S). 2. ALL RECOMMENDATIONS OF THE SPIRIT AT THE RIVER HOTEL FINAL DRAINAGE AND EROSION CONTROL STUDY PREPARED 07-25-2018 BY OLSSON ASSOCIATES SHALL BE FOLLOWED AND IMPLEMENTED. ALL RECOMMENDATIONS OF THE MAJOR AMENDMENT TO A PORTION OF SPIRIT AT THE RIVER HOTEL FINAL DRAINAGE AND EROSION CONTROL STUDY PREPARED FOR 07-25-2018 BY OLSSON ASSOCIATES SHALL BE FOLLOWED AND IMPLEMENTED. 3. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE CITY OF FORT COLLINS, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED ENGINEER, MUST BY SUBMITTED TO AND APPROVED BY THE STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SINGLE FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BY SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER THE DEVELOPMENT AGREEMENT. 4. CERTIFYING ENGINEER SHALL BE PRESENT TO OBSERVE THE CONSTRUCTION OF THE STORM DRAINAGE IMPROVEMENTS. CONTRACTOR TO COORDINATE WITH CERTIFYING ENGINEER. 5. CONTRACTOR SHALL COMPLETE DURING CONSTRUCTION INSPECTION CHECKLIST. 6. CERTIFYING ENGINEER SHALL COMPLETE THE THE OVERALL SITE AND DRAINAGE CERTIFICATION FORM AND CHECKLIST AND CERTIFICATIONS OF LOT GRADING. 7. AS-BUILT SURVEY OF GRADING, DRAINAGE IMPROVEMENTS, AND DRAINAGE FACILITIES SHALL BE COMPLETED. SURVEY TO COORDINATE WITH CERTIFYING ENGINEER. 8. ALL STORMWATER AND UNDERDRAIN PIPE SHALL BE ADS N-12 ST IB OR EQUIVALENT. PIPE SHALL BE INSTALLED PER MANUFACTURES RECOMMENDATIONS. STORM DRAINAGE NOTES 1. THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS AND APPROVED BY THE WATER UTILITY. 2. ALL WATER MAINS TO BE INSTALLED AND TESTED PER CITY OF FORT COLLINS SPECIFICATIONS. 3. ALL WATER SERVICES SHALL BE INSTALLED PER CITY OF FORT COLLINS WATER METER INSTALLATION PROCEDURES AND SPECIFICATION 2646 "SERVICE LINES, METERS, AND APPURTENANCES." 4. CONTRACTOR TO COORDINATE WET TAPS & ABANDOMENTS WITH CITY OF FORT COLLINS (970-416-2165). 5. ABANDON WATER SERVICES SHALL BE REMOVED TO THE MAIN. REMOVE CURB STOP BOXES FROM ABANDONED WATER SERVICES. 6. ALL WATER MAINS SHALL BE PVC C900 PRESSURE CLASS 150 7. ALL WATER MAINS SHALL BE INSTALLED WITH TRACER WIRE. 8. ALL WATER MAIN VALVES SHALL HAVE VALVE BLOCKING. SEE DETAILS. 9. ALL FIRE LINES SHALL BE PVC C900 PRESSURE CLASS 150. 10. ALL SERVICES SHALL BE TYPE K COPPER. WATERLINE NOTES 1. MOISTURE DENSITY TESTS: TESTS SHALL BE CONDUCTED ON REPRESENTATIVE SAMPLES OF EACH TYPE OF MATERIAL ENCOUNTERED OR UTILIZED. 2. COMPACTION CONTROL: FIELD TESTS SHALL BE CONDUCTED TO DETERMINE COMPLIANCE WITH PROJECT REQUIREMENTS AND GEOTECHNICAL REPORT. 3. ALL MATERIAL TESTS SHALL BE MADE BY THE GEOTECHNICAL ENGINEER. QUANTITY AND LOCATIONS SHALL BE AT THE DIRECTION OF THE GEOTECHNICAL ENGINEER. 4. DENSITY TESTS SHALL BE TAKEN IN COMPACTED MATERIAL BELOW THE DISTURBED SURFACE. WHEN DENSITY TESTS INDICATE THAT THE DRY DENSITY OR MOISTURE CONTENT OF ANY LAYER OF FILL OR PORTION THEREOF IS BELOW THAT REQUIRED, THE PARTICULAR LAYER OR PORTION SHALL BE REWORKED UNTIL THE REQUIRED DRY DENSITY OR MOISTURE CONTENT HAS BEEN ACHIEVED. 5. UNLESS OTHERWISE DIRECTED BY GEOTECHNICAL ENGINEER, COMPACTION SHALL BE MINIMUM OF 95% OF OPTIMUM DENSITY, IN ACCORDANCE WITH ASTM D 698, AT A MOISTURE CONTENT OF NOT LESS THAN 2% BELOW AND NOT MORE THAN 2% ABOVE THE OPTIMUM MOISTURE CONTENT. 6. PARKING SUBGRADE SHALL BE PROOF ROLLED TO DETECT ANY AREAS OF INSUFFICIENT COMPACTION. PROOF ROLLING SHALL BE ACCOMPLISHED BY MAKING A MINIMUM OF TWO (2) COMPLETE PASSES WITH A FULLY LOADED TANDEM AXLE DUMP TRUCK, OR APPROVED EQUIVALENT, IN EACH OF THE TWO PERPENDICULAR DIRECTIONS UNDER THE SUPERVISION AND DIRECTION OF THE GEOTECHNICAL ENGINEER. AREAS OF FAILURE SHALL BE SCARIFIED, RECOMPACTED, AND RETESTED. 7. REFERENCE GEOTECHNICAL REPORT PREPARED BY XX, DATED XX XX, XXXX. QUALITY CONTROL NOTES 1. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. 2. ALL REPAIRS AND REPLACEMENT OF SIDEWALK, CURB, GUTTER AND ASPHALT SHALL BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 3. FOR LOCATIONS WHERE SERVICES ARE SHOWN UNDER SIDEWALK, SIDEWALK SHALL BE REMOVED AND REPLACED. 4. PERMIT(S) FOR ALL WORK SHOWN ON THESE PLANS SHALL BE OBTAINED PRIOR TO THE START OF ANY WORK SHOWN ON THESE PLANS. 5. CLEANOUTS LOCATED WITHIN SIDEWALK OR DRIVEWAY SHALL HAVE A TRAFFIC RATED LID. 6. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. GENERAL UTILITY NOTES 1. ALL SEWER MAINS AND SERVICES TO BE INSTALLED PER CITY OF FORT COLLINS SPECIFICATIONS. 2. CONTRACTOR TO COORDINATE WET TAPS & ABANDOMENTS WITH CITY OF FORT COLLINS (970-416-2165). 3. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE PVC SDR 35. SANITARY SEWER NOTES CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: DATE DATE DATE DATE DATE DATE CITY ENGINEER WATER AND WASTEWATER UTILITY STORMWATER UTILITY PARKS AND RECREATION TRAFFIC ENGINEER ENVIRONMENTAL PLANNER OLSSON ASSOCIATES GENERAL NOTES: 1. LOCATIONS AND ELEVATIONS OF EXISTING IMPROVEMENTS TO BE MET (OR AVOIDED) BY WORK TO BE DONE SHALL BE CONFIRMED BY THE CONTRACTOR THROUGH FIELD EXPLORATIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL REPORT TO THE ENGINEER ANY DISCREPANCIES BETWEEN HIS MEASUREMENTS AND THESE PLANS. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE APPROPRIATE FIRE DEPARTMENT OF ALL STREET CLOSURES AND EXISTING FIRE HYDRANTS TAKEN OUT OF SERVICE AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 3. PRIOR TO BEGINNING THE WORK, THE CONTRACTOR SHALL OBTAIN ANY WRITTEN AGREEMENTS FOR INGRESS AND EGRESS TO THE WORK FORM ADJACENT PRIVATE PROPERTY OWNERS. ACCESS TO ANY ADJACENT PRIVATE PROPERTY SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD. 4. EXCEPT FOR MATERIALS DESIGNED TO BE RELOCATED ON THIS PLAN, ALL OTHER CONSTRUCTION MATERIALS SHALL BE NEW. 5. SHOP DRAWINGS AND MATERIAL SPECIFICATIONS SHALL BE SUBMITTED TO CONTRACTOR FOR REVIEW AND APPROVAL PRIOR TO PLACEMENT OF MATERIAL. 6. ALL WORK SHALL CONFORM TO ALL LOCAL, STATE, AND FEDERAL APPLICABLE LAWS AND REGULATIONS. 7. ALL ESTIMATES OF QUANTITIES ARE FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR DETERMINING ALL QUANTITIES. CONTRACTOR SHALL PROVIDE ALL WORK AND MATERIALS AS SHOWN ON THESE PLANS. 8. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL SITE IMPROVEMENTS (INCLUDING BUT NOT LIMITED TO: UTILITIES, STRUCTURES, PAVING, LANDSCAPING, ETC.) SUCH THAT NO DAMAGE IS DONE TO SITE IMPROVEMENTS (I.E.: SAWCUTTING NEW PAVEMENT). SITE IMPROVEMENTS DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER. 9. THE CONTRACTOR SHALL REMOVE ALL DEBRIS RESULTING FROM WORK UNDER THIS CONTRACT TO AN APPROVED DUMP SITE. 10. DIMENSIONS SHOWN ON THE PLANS ARE TO FLOWLINE AND EXTERIOR FACE OF BUILDING, AND TO CENTERLINE OF UTILITIES, UNLESS OTHERWISE SPECIFIED. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ACCESS TO ADJACENT PARCELS DURING ALL HOURS OF OPERATION FOR THE BUSINESSES LOCATED ON THOSE PARCELS. 12. CONTRACTOR TO REFER TO DRAWINGS ISSUED BY THE ARCHITECT, TO ENSURE COORDINATION OF EXACT LOCATION AND DIMENSIONS OF BUILDING EXITS, RAMPS, TRUCK DOCKS, UTILITY ENTRANCE LOCATIONS AND GRADES AROUND THE BUILDING. IMMEDIATELY NOTIFY ENGINEER AND ARCHITECT OF ANY DISCREPANCIES. 13. REFER TO ARCHITECTURAL DRAWINGS FOR ALL IMPROVEMENTS BETWEEN THE BUILDING AND THE SIDEWALK SURROUNDING THE BUILDING. 14. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING EXISTING IRRIGATION SYSTEM IN THE AREAS OF PROPOSED IMPROVEMENTS. THE CONTRACTOR SHALL CAP THE EXISTING IRRIGATION SYSTEM TO REMAIN SUCH THAT THE REMAINING SYSTEM SHALL CONTINUE TO FUNCTION PROPERLY. IN CASES WHERE ISLAND, ROADWAYS, PARKING LOTS, AND OTHER IMPROVEMENTS NOT MENTIONED ARE MOVED OR ADJUSTED TO GRADE, CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL LANDSCAPED AREAS ARE PROPERLY IRRIGATED & THAT IRRIGATION SYSTEM FUNCTIONS PROPERLY. 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ADJACENT CITY STREETS FREE AND CLEAN OF ALL DEBRIS AND DIRT FROM THE JOB SITE. 16. SEE LANDSCAPE PLANS UNDER SEPARATE COVER FOR SITE REVEGETATION. GENERAL NOTES (CITY OF FORT COLLINS AND LARIMER COUNTY): 1. ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREA STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED AND APPROVED BY THE LOCAL ENTITY. 2. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE. 3. THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE YEARS FROM THE DATE OF APPROVAL BY THE LOCAL ENTITY ENGINEER. USE OF THESE PLANS AFTER THE EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE LOCAL ENTITY PRIOR TO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS. 4. THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOES HEREBY AFFIRM RESPONSIBILITY TO THE LOCAL ENTITY, AS BENEFICIARY OF SAID ENGINEER’S WORK, FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESE PLANS BY THE LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE PLANS OF ALL SUCH RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY THE LOCAL ENTITY, AND ITS OFFICERS AND EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS. 5. ALL SANITARY SEWER, STORM SEWER, AND WATER LINE CONSTRUCTION, AS WELL AS POWER AND OTHER “DRY” UTILITY INSTALLATIONS, SHALL CONFORM TO THE LOCAL ENTITY STANDARDS AND SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENTITY ENGINEER. 6. THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES. 7. THE ENGINEER SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1800-922-1987,AT LEAST 2 WORKING DAYS PRIOR TO BEGINNING EXCAVATION OR GRADING, TO HAVE ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY ENTITIES (I.E. DITCH / IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE REPRESENTATIVE. UTILITY SERVICE LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING EXCAVATION OR GRADING. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS. 8. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS REQUIRED. 9. IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN MODIFICATION IS REQUIRED, THE DEVELOPER SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN. DESIGN MODIFICATION(S) MUST BE APPROVED BY THE LOCAL ENTITY PRIOR TO BEGINNING CONSTRUCTION. 10. THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE LOCAL ENTITY, AND ALL UTILITY COMPANIES INVOLVED, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH A MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE FOR CONTACTING, IN ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL AS THE UTILITY COMPANIES. 11. NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE WATER SYSTEM UNTIL THE DEVELOPER NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE A MINIMUM OF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT THE DISCRETION OF THE WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO COMMENCEMENT OF ANY WORK. 12. THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. IN GENERAL, STORM SEWER AND SANITARY SEWER SHOULD BE CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES. 13. THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS AND APPROVED BY THE WATER UTILITY. 14. A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF DEWATERING IS REQUIRED IN ORDER TO INSTALL UTILITIES OR WATER IS DISCHARGED INTO A STORM SEWER, CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES. 15. THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FOR STORM WATER DISCHARGE (CONTACT COLORADO DEPARTMENT OF HEALTH, WATER QUALITY CONTROL DIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND THE EROSION CONTROL PLAN. 16. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S). 17. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE LOCAL ENTITY, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED ENGINEER, MUST BE SUBMITTED TO AND APPROVED BY THE STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SINGLE FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER THE DEVELOPMENT AGREEMENT. 18. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN THIS DEVELOPMENT AS A RESULT OF GROUNDWATER SEEPAGE, WHETHER RESULTING FROM GROUNDWATER FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS SUCH DAMAGE OR INJURIES ARE SUSTAINED AS A RESULT OF THE LOCAL ENTITY FAILURE TO PROPERLY MAINTAIN ITS WATER, WASTEWATER, AND/OR STORM DRAINAGE FACILITIES IN THE DEVELOPMENT. 19. ALL RECOMMENDATIONS OF THE DRAINAGE LETTER AND EROSION CONTROL STUDY "SPIRIT AT THE RIVER HOTEL" BY OLSSON ASSOCIATES SHALL BE FOLLOWED AND IMPLEMENTED. 20. TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE EROSION CONTROL PLAN. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS STABILIZED WITH HARD SURFACE OR LANDSCAPING. 21. THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24 HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR. 22. NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY UNTIL A RIGHT-OF-WAY PERMIT OR DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF APPLICABLE. 23. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL APPLICABLE AGENCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL NOTIFY THE LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS - 221-6605) AND THE LOCAL ENTITY EROSION CONTROL INSPECTOR (FORT COLLINS – 221-6700) AT LEAST 2 WORKING DAYS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS. IF THE LOCAL ENTITY ENGINEER IS NOT AVAILABLE AFTER PROPER NOTICE OF CONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE DEVELOPER MAY COMMENCE WORK IN THE ENGINEER ABSENCE. HOWEVER, THE LOCAL ENTITY RESERVES THE RIGHT NOT TO ACCEPT THE IMPROVEMENT IF SUBSEQUENT TESTING REVEALS AN IMPROPER INSTALLATION. 24. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHTOF-WAYAFTER RIGHT OF WAY GRADING AND ALL UTILITY TRENCH WORK IS COMPLETE AND PRIOR TO THE PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINAL SOILS/PAVEMENT DESIGN REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINAL GEOTECHNICAL REPORT, THE DEVELOPER SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECT PAVEMENT SECTION OR, THE DEVELOPER MAY USE THE LOCAL ENTITY’S DEFAULT PAVEMENT THICKNESS SECTION(S). REGARDLESS OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGN REPORTS SHALL BE PREPARED BY A LICENSED PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE SUBMITTED TO THE INSPECTOR A MINIMUM OF 10 WORKING DAYS PRIOR TO PLACEMENT OF BASE AND ASPHALT. PLACEMENT OF CURB, GUTTER, SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR UNTIL THE LOCAL ENTITY ENGINEER APPROVES THE FINAL REPORT. 25. THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THE CONSTRUCTED ELEVATIONS OF THE STREET SUBGRADE AND THE GUTTER FLOWLINE AT ALL INTERSECTIONS, INLETS, AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY INSPECTOR. THE ENGINEER OR SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL ENTITY THAT THESE ELEVATIONS CONFORM TO THE APPROVED PLANS AND SPECIFICATIONS. ANY DEVIATIONS SHALL BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE LOCAL ENTITY BEFORE INSTALLATION OF BASE COURSE OR ASPHALT WILL BE ALLOWED ON THE STREETS. 26. ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUST BE COMPLETED PRIOR TO THE FINAL STAGES OF ROAD CONSTRUCTION. FOR THE PURPOSES OF THESE STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL STAGE WORK. ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO REDUCE THE EXCAVATION NECESSARY FOR BUILDING CONNECTIONS. 27. PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY FLOODPLAIN RESOLUTION SHOULD BE REFERRED TO FOR ADDITIONAL CRITERIA FOR ROADS WITHIN THESE DISTRICTS. 28. ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE IN ACCORDANCE WITH THE CONSTRUCTION CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL. 29. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE LOCAL ENTITY FORESTER TO SCHEDULE A SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING A PERMIT. 30. THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY. REFER TO OSHA PUBLICATION 2226, EXCAVATING AND TRENCHING. 31. THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH MUTCD, TO THE APPROPRIATE RIGHT-OF-WAY AUTHORITY. (LOCAL ENTITY, COUNTY OR STATE), FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE RIGHT-OF-WAY. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THE CONSTRUCTION ACTIVITIES. 32. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANY TYPE, THE CONTRACTOR SHALL CONTACT LOCAL ENTITY TRAFFIC OPERATIONS DEPARTMENT, WHO WILL TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE CONTRACTOR; HOWEVER, IF THE CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE CHARGED FOR THE LABOR, MATERIALS AND EQUIPMENT TO REINSTALL THE SIGN AS NEEDED. 33. THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC SIGNING AND STRIPING FOR THE DEVELOPMENT RELATED TO THE DEVELOPMENT’S LOCAL STREET OPERATIONS. IN ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC SIGNING AND STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT. 34. THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY APPROVED BY THE LOCAL ENTITY ENGINEER, AND NO SITE CONSTRUCTION ACTIVITIES ON SUNDAYS OR HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE LOCAL ENTITY. 35. THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED OTHERWISE. 36. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT THE DESIGNER FOR CLARIFICATION, AND ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS. 37. THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB. 38. IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE DEVELOPER SHALL CONTACT THE DESIGNER AND THE LOCAL ENTITY ENGINEER IMMEDIATELY. 39. THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE, AND AVAILABLE TO THE LOCAL ENTITY’S INSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR(S) SHALL SUBMIT RECORD DRAWINGS TO THE LOCAL ENTITY ENGINEER. 40. THE DESIGNER SHALL PROVIDE, IN THIS LOCATION ON THE PLAN, THE LOCATION AND DESCRIPTION OF THE NEAREST SURVEY BENCHMARKS (2) FOR THE PROJECT AS WELL AS THE BASIS OF BEARINGS. 41. ALL STATIONING IS BASED ON FLOWLINE OF ROADWAYS UNLESS OTHERWISE NOTED. 42. DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER’S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 43. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE ANY CUTS ARE MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS. THE FINISHED PATCH SHALL BLEND IN SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS WHERE MORE THAN ONE CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER AND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE CUTS ARE MADE. 44. UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS. 45. STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL “T” INTERSECTIONS. 46. AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE. 47. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS, INCLUDING STORM DRAINAGE STRUCTURES AND PIPES, FOR THE FOLLOWING PRIVATE STREETS: (NA). 48. APPROVED VARIANCES ARE LISTED AS FOLLOWS: (NA). NORTH, RANGE 69 WEST OF THE 6TH P.M. CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO JULY 2018 PROJECT TEAM CONTACTS ARCHITECT PBA STUDIO 1575 GILPIN STREET DENVER, CO 80218 CONTACT: EDWIN MOCKE PHONE: (720) 376-6853 CIVIL ENGINEER OLSSON ASSOCIATES 1880 FALL RIVER DRIVE, SUITE 200 LOVELAND, CO 80538 CONTACT: MIKE MAURER PHONE: (970) 461-7733 SURVEYOR OLSSON ASSOCIATES 4690 TABLE MOUNTAIN DRIVE, SUITE 200 GOLDEN, CO 80403 CONTACT: JUSTIN SCHEITLER PHONE: (303) 237-2072 LANDSCAPE ARCHITECT RUSSELL + MILLS STUDIOS 141 SOUTH COLLEGE AVE, SUITE 104 FORT COLLINS, CO 80524 CONTACT: SHELLEY LA MASTRA PHONE: (970) 484-8855 BEARINGS ARE BASED ON THE NORTH LINE OF THE SOUTHWEST PORTION OF SUBJECT PROPERTY BEING MONUMENTED AT THE EAST END BY A FOUND BENT NUMBER 4 REBAR UPGRADED TO AN 18 INCH NUMBER 5 REBAR WITH A GREEN PLASTIC CAP STAMPED PLS 38430 FROM WHICH THE WEST END OF SAID LINE BEARS N89°57'00"W, A DISTANCE OF 170.00 FEET, MONUMENTED BY A FOUND NUMBER 4 REBAR WITH AN ILLEGIBLE YELLOW PLASTIC CAP; PROPOSED SITE BASIS OF BEARING BENCHMARKS SITE MAP SCALE 1"=100' E LINCOLN AVE. E LINCOLN AVE. RIVERSIDE AVE. CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: DATE DATE DATE DATE DATE DATE CITY ENGINEER WATER AND WASTEWATER UTILITY STORMWATER UTILITY PARKS AND RECREATION TRAFFIC ENGINEER ENVIRONMENTAL PLANNER FORT COLLINS INDEMNIFICATION STATEMENT: FORT COLLINS AFFIRMATION STATEMENT: NOTE: Sheet List Table NUMBER TITLE C1.0 COVER SHEET C1.1 GENERAL NOTES C2.0 EXISTING CONDITIONS AND DEMOLITION PLAN C3.0 SITE, SIGNAGE, AND STRIPING PLAN C3.1 HORIZONTAL CONTROL PLAN C4.0 EROSION CONTROL PLAN C4.1 EROSION CONTROL PLAN C4.2 EROSION CONTROL PLAN C4.3 EROSION CONTROL PLAN C4.4 EROSION CONTROL DETAILS C4.5 EROSION CONTROL DETAILS C6.0 GRADING PLAN C6.1 POND GRADING PLAN C6.2 COURTYARD GRADING DETAIL C7.0 UTILITY PLAN C7.1 UTILITY DETAILS C7.2 UTILITY DETAILS C12.0 STORM SEWER PLAN & PROFILES C12.1 STORM SEWER PLAN & PROFILES C12.2 STORM SEWER PLAN & PROFILES C12.3 STORM DETAILS C12.4 STORM DETAILS C20.0 CONSTRUCTION DETAILS C20.1 CONSTRUCTION DETAILS