Loading...
HomeMy WebLinkAboutOASIS ON OLIVE - FDP - FDP180018 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSSITE 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME OASIS ON OLIVE 310 W. OLIVE STREET COVER SHEET 07/18/18 N/A N/A JTC RA 1335-176-00 1 of 10 THIS OLD HOWES, LLC 561 YORK STREET DENVER, CO 80209 PHONE: 970.484.5907 CONTACT: STEVE SLEZAK Vicinity Map Scale: 1" = 1000' PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK #1-12 SOUTHEAST CORNER OF LAPORTE AVENUE AND WHITCOMB STREET, ON A STORM INLET ON WHITCOMB STREET ELEV= 5004.15 CITY OF FORT COLLINS BENCHMARK #6-00 ON A CATCH BASIN AT THE NORTHWEST CORNER OF MULBERRY ST. AND COLLEGE AVENUE ELEV= 4993.85 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. IF NGVD29 UNADJUSTED IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATIONS SHOULD BE USED: NGVD UNADJUSTED = 5004.15 (NAVD88) - 3.18 NGVD UNADJUSTED = 4993.85 (NAVD88) - 3.17 UTILITY CONTACTS: LIGHT & POWER City of Fort Collins Light & Power Contact: Janet McTague Ph. 970.224.6154 STORMWATER,WATER & WASTEWATER City of Fort Collins Utilities 700 Wood Street Fort Collins, Colorado 80522 Contact: Shane Boyle Ph. 970.221.6339 NATURAL GAS Xcel Energy 1901 E. Horsetooth Road Fort Collins, Colorado 80525 Contact: Stephanie Rich 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME OASIS ON OLIVE 310 W. OLIVE STREET GENERAL NOTES 07/18/18 N/A N/A JTC RA 1335-176-00 2 of 10 THIS OLD HOWES, LLC 561 YORK STREET DENVER, CO 80209 PHONE: 970.484.5907 CONTACT: STEVE SLEZAK CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date PRELIMINARY NOT FOR CONSTRUCTION WEST OLIVE STREET CANYON AVENUE LOT 2 LOT 1 LOT 3 310 W. OLIVE ST. PORTION LOTS 1 & 2, BLOCK 92 PORTION LOTS 1 & 2, BLOCK 92 PORTION OF LOT 3, BLOCK 92 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME OASIS ON OLIVE 310 W. OLIVE STREET EXISTING CONDITIONS & DEMOLITION PLAN 07/18/18 1"=10' N/A JTC RA 1335-176-00 3 of 10 THIS OLD HOWES, LLC 561 YORK STREET DENVER, CO 80209 PHONE: 970.484.5907 CONTACT: STEVE SLEZAK CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date PRELIMINARY NOT FOR CONSTRUCTION CANYON AVENUE PORTION LOTS 1 & 2, BLOCK 92 PORTION LOTS 1 & 2, BLOCK 92 PORTION OF LOT 3, BLOCK 92 PORTION LOTS 1 & 2, BLOCK 92 PORTION LOTS 1 & 2, BLOCK 92 PORTION OF LOT 3, BLOCK 92 LOT 3 310 W. OLIVE ST. LOT 2 LOT 1 PRIVATE DRIVE PRIVATE DRIVE WEST OLIVE STREET 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME OASIS ON OLIVE 310 W. OLIVE STREET HORIZONTAL CONTROL PLAN 07/18/18 1"=10' N/A JTC RA 1335-176-00 4 of 10 THIS OLD HOWES, LLC 561 YORK STREET DENVER, CO 80209 PHONE: 970.484.5907 CONTACT: STEVE SLEZAK CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date WEST OLIVE STREET CANYON AVENUE LOT 2 LOT 1 LOT 3 PORTION LOTS 1 & 2, BLOCK 92 PORTION LOTS 1 & 2, BLOCK 92 PORTION OF LOT 3, BLOCK 92 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME OASIS ON OLIVE 310 W. OLIVE STREET UTILITY PLAN 07/18/18 1"=10' N/A JTC RA 1335-176-00 5 of 10 THIS OLD HOWES, LLC 561 YORK STREET DENVER, CO 80209 PHONE: 970.484.5907 CONTACT: STEVE SLEZAK CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date WEST OLIVE STREET CANYON AVENUE PORTION LOTS 1 & 2, BLOCK 92 PORTION LOTS 1 & 2, BLOCK 92 LOT 2 LOT 1 LOT 3 310 W. OLIVE ST. PORTION OF LOT 3, BLOCK 92 FFE = 5003.75 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME OASIS ON OLIVE 310 W. OLIVE STREET DRAINAGE & EROSION CONTROL PLAN 07/18/18 1"=10' N/A JTC RA 1335-176-00 6 of 10 THIS OLD HOWES, LLC 561 YORK STREET DENVER, CO 80209 PHONE: 970.484.5907 CONTACT: STEVE SLEZAK CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: WEST OLIVE STREET CANYON AVENUE PORTION LOTS 1 & 2, BLOCK 92 PORTION LOTS 1 & 2, BLOCK 92 LOT 3 310 W. OLIVE ST. LOT 2 LOT 1 PORTION OF LOT 3, BLOCK 92 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME OASIS ON OLIVE 310 W. OLIVE STREET GRADING PLAN 07/18/18 1"=10' N/A JTC RA 1335-176-00 7 of 10 THIS OLD HOWES, LLC 561 YORK STREET DENVER, CO 80209 PHONE: 970.484.5907 CONTACT: STEVE SLEZAK CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME OASIS ON OLIVE 310 W. OLIVE STREET DETAILS 07/18/18 N/A N/A JTC RA 1335-176-00 8 of 10 THIS OLD HOWES, LLC 561 YORK STREET DENVER, CO 80209 PHONE: 970.484.5907 CONTACT: STEVE SLEZAK ® SANITARY SERVICE CONNECTION AT SANITARY SEWER MAIN NTS 6" CURB AND 1' CATCH GUTTER SIGN DETAIL NTS CONTRACTION JOINT DETAIL NTS EXPANSION JOINT DETAIL NTS curb and gutter detail (ON-SITE ONLY) CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME OASIS ON OLIVE 310 W. OLIVE STREET DETAILS 07/18/18 N/A N/A JTC RA 1335-176-00 9 of 10 THIS OLD HOWES, LLC 561 YORK STREET DENVER, CO 80209 PHONE: 970.484.5907 CONTACT: STEVE SLEZAK CITY OF FORT COLLINS BIORETENTION SAND MEDIA SPECIFICATION BIORETENTION PLANTER DETAIL SIDE SPILL SIDE SECTION VIEW SIDE SPILL FRONT SECTION VIEW GEOMEMBRANE LINER/CONCRETE CONNECTION DETAIL INLET SPILL FRONT SECTION VIEW CURB CUT / DRAIN CHASE DETAIL SECTION A-A PLAN ELEVATION DOWN SPOUT CONNECTION DETAIL PLAN CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME OASIS ON OLIVE 310 W. OLIVE STREET DETAILS 07/18/18 N/A N/A JTC RA 1335-176-00 10 of 10 THIS OLD HOWES, LLC 561 YORK STREET DENVER, CO 80209 PHONE: 970.484.5907 CONTACT: STEVE SLEZAK CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date Date Date Date Date Date Date Date Date Date Date Date PRELIMINARY NOT FOR CONSTRUCTION 0 10' 10 5 10 20 SCALE: 1" = CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. NOTES 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL. 2. DUE TO DISCREPANCIES IN THE TOPOGRAPHIC SURVEY PROVIDED, EXISTING ELEVATIONS WERE INTERPOLATED BETWEEN POINTS SURVEY POINTS THAT APPEARED TO REPRESENT THE EXISTING CONDITIONS ON SITE. THE CONTRACTOR IS TO CONFIRM ALL EXISTING ELEVATIONS ADJACENT TO NEW WORK AND NOTIFY THE OWNER OF ANY SIGNIFICANT DEVIATIONS. 3. ALL MANHOLE RIM AND STORM DRAIN INLET GRATES SHALL BE ADJUSTED TO FINAL GRADES CONFIRMED IN THE FIELD. 4. ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 5. ALL WALKS TO HAVE 2.0% CROSS SLOPE TOWARDS PARKING AREAS, DRIVES, AND AWAY FROM STRUCTURES. CHECKED BY: Date Date Date Date Date PRELIMINARY Date NOT FOR CONSTRUCTION 0 10' 10 5 10 20 SCALE: 1" = BMP SEQUENCE CHART NOTES 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL. 2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY POLLUTION. 3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. 4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 7. AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. 8. REFERENCE SHEET 10 FOR EROSION CONTROL DETAILS. 9. DUE TO DISCREPANCIES IN THE TOPOGRAPHIC SURVEY PROVIDED, EXISTING ELEVATIONS WERE INTERPOLATED BETWEEN POINTS SURVEY POINTS THAT APPEARED TO REPRESENT THE EXISTING CONDITIONS ON SITE. THE CONTRACTOR IS TO CONFIRM ALL EXISTING ELEVATIONS ADJACENT TO NEW WORK AND NOTIFY THE OWNER OF ANY SIGNIFICANT DEVIATIONS. 10. A FLOODPLAIN USE PERMIT IS REQUIRED PRIOR TO ANY CONSTRUCTION ACTIVITY, SUCH AS DRIVEWAYS, SIDEWALKS, UTILITY INSTALLATION, ETC., IN THE FLOODPLAIN / FLOOD FRINGE. 11. STORAGE OF EQUIPMENT AND MATERIALS IS NOT ALLOWED WITHIN THE FLOODWAY. CoFC Standard erosion and sediment control notes: 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY DRAINAGE BASIN FLOW PATH INLET PROTECTION CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL SEDIMENT CONTROL LOG ROCK SOCKS CONCRETE WASHOUT AREA LEGEND 100-YR FLOOD FRINGE (CITY) 100-YR FLOODWAY (CITY) Date Date Date Date Date PRELIMINARY NOT FOR CONSTRUCTION 0 10' 10 5 10 20 SCALE: 1" = NOTES: 1. BURIED UTILITIES AND OR PIPE LINES ARE SHOWN PER VISIBLE SURFACE EVIDENCE AND AS-BUILT DRAWINGS OF THE CONSTRUCTED UTILITY LINES. THE CONTRACTOR SHALL VERIFY THE DEPTH AND LOCATION OF ALL EXISTING UTILITY CONNECTIONS AND CROSSINGS PRIOR TO ANY CONSTRUCTION. IF A CONFLICT OCCURS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR DESIGN MODIFICATION IS REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN. THE ENGINEER AND/OR THE SURVEYOR OF RECORD SHALL NOT BE LIABLE FOR THE LOCATION OF OR THE FAILURE TO NOTE THE LOCATION OF NON-VISIBLE UTILITIES. 2. SITE CONTRACTOR SHALL TERMINATE UTILITY SERVICES 5-FEET FROM BUILDING UNLESS OTHERWISE NOTED. SITE CONTRACTOR SHALL COORDINATE EXACT LOCATIONS OF BUILDING UTILITIES WITH ARCHITECTURAL DRAWINGS. 3. ALL STORM SEWER, POWER AND OTHER "DRY" UTILITY INSTALLATIONS, SHALL CONFORM TO THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENGINEER. 4. ALL WATER LINE CONSTRUCTION SHALL CONFORM TO THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS CURRENT TO THE DATE OF CONSTRUCTION. 5. ALL WATER SERVICES SHALL BE TYPE K SOFT COPPER. 6. FIRE SERVICES SHALL BE RESTRAINED JOINT C900 PVC. 7. ALL SANITARY SEWER LINE CONSTRUCTION SHALL CONFORM TO THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS CURRENT TO THE DATE OF CONSTRUCTION. 8. SANITARY SEWER SERVICE LINES SHALL BE SDR 35 PVC. 9. STORM SEWER PIPE SHALL BE SDR 35 PVC WITH WATER TIGHT JOINTS AS SPECIFIED ON THE PLAN. 10. LENGTH OF PIPE IS MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE AND INCLUDES THE FLARED END SECTION. 11. SEE ARCHITECTURAL DRAWINGS FOR WALL LOCATION DETAILS OF GAS METERS, ELECTRIC METERS, AND TELEPHONE TERMINALS. 12. LIMITS OF STREET CUT SHOWN ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 13. CITY OF FORT COLLINS LIGHT & POWER (L&P) SHALL INSTALL PRIMARY LINE FROM CONNECTION POINT TO ELECTRIC VAULT, SECONDARY LINES FROM VAULT TO METER, AND BUILDING METER. CONTRACTOR SHALL COORDINATE WITH FORT COLLINS METER GROUP FOR METER LOCATION. CONTACT CITY OF FORT COLLINS LIGHT & POWER FOR THEIR CURRENT REQUIREMENTS. 14. DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER’S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 15. ALL PROPOSED UTILITIES ON-SITE ARE TO BE CONSIDERED PRIVATE OWNERSHIP, AND ARE THEREFORE TO BE MAINTAINED BY THE PRIVATE OWNER. 16. BELOW GRADE UTILITY LOCATIONS WERE NOT PROVIDED. CONTRACTOR TO CONFIRM ALL UTILITY LOCATIONS NOTIFY OWNER OF ANY CONFLICTS PRIOR TO COMMENCEMENT OF WORK. 17. A FLOODPLAIN USE PERMIT IS REQUIRED PRIOR TO ANY CONSTRUCTION ACTIVITY, SUCH AS DRIVEWAYS, SIDEWALKS, UTILITY INSTALLATION, ETC., IN THE FLOODPLAIN / FLOOD FRINGE. CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Date Date Date PRELIMINARY NOT FOR CONSTRUCTION NOTES: 1. VERIFY BUILDING PLAN DIMENSIONS PRIOR TO CONSTRUCTION 2. ALL PAVEMENTS AND EARTHWORK SHALL CONFORM TO THE GEOTECHNICAL REPORT FOR THE SITE. 3. ALL WORK SHALL CONFORM TO THE CITY OF FORT COLLINS CONSTRUCTION SPECIFICATIONS AND STANDARDS. 4. COORDINATE LOCATION, HEIGHTS, ETC. OF WALLS FENCES, AND SITE FEATURES WITH ARCH AND LANDSCAPE. 5. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKING. 6. FINAL STRIPING AND SYMBOL LOCATIONS SHALL BE FIELD COORDINATED WITH OWNER. 7. REFERENCE ARCH AND LANDSCAPE PLANS FOR CONTROL AND EXPANSION JOINT DETAILS. LIGHT DUTY CONCRETE LEGEND HEAVY DUTY CONCRETE PAVEMENT CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. 0 10' 10 5 10 20 SCALE: 1" = HEAVY DUTY ASPHALT PAVEMENT LEGEND UTILITIES TO BE REMOVED SITE FEATURES TO BE REMOVED STRUCTURE/UTILITY/LIGHT/ETC. (TO BE REMOVED) TREE REMOVAL/RELOCATION (RE: LA) PROTECT EXISTING TREES (RE: LA) 0 10' 10 5 10 20 SCALE: 1" = NOTES: 1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN DETERMINED FROM A COMBINATION OF RECORD DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL COORDINATE AND PROVIDE PROTECTION OF CONFLICTING UTILITIES. NOTIFY OWNER IF ANY CONFLICTS ARE ENCOUNTERED. THE OWNER AND/OR ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS SHOWN. 2. CONTRACTOR RESPONSIBLE FOR ALL SURFACE REPAIR/REPLACEMENT TO RESTORE SIDEWALKS, PAVEMENT, CURB/GUTTER AND SOD AREAS DISTURBED BY NEW WORK. REPAIR/REPLACEMENTS SHALL BE COMPLETED IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS AT CONTRACTOR EXPENSE. 3. CONTRACTOR TO PROVIDE ALL NECESSARY EROSION CONTROL MEASURES DURING CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL PROPOSED AND EXISTING INLETS DOWNSTREAM FROM CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED. 4. LIMITS OF ASPHALT AND CONCRETE REMOVALS ARE APPROXIMATE. LIMITS OF REMOVAL TO BE DETERMINED IN THE FIELD TO ADEQUATELY COMPLETE THE PROPOSED IMPROVEMENTS, WHILE MAINTAINING, IF NOT IMPROVING, EXISTING CONDITIONS. ADDITIONAL REMOVAL IDENTIFIED IN THE FIELD SHALL BE COMPLETED AT CONTRACTOR EXPENSE. ALL REPAIRS TO BE COMPLETED IN ACCORDANCE WITH CITY/LCUASS STANDARDS. 5. EXISTING CONCRETE AND ASPHALT PAVING SHALL BE SAWCUT AND REMOVED PRIOR TO EXCAVATION. REMOVE CONCRETE TO THE NEAREST JOINT. 6. ALL UTILITY DISCONNECTION/REMOVAL/CONNECTION MEANS AND/OR SCHEDULE SHALL BE COORDINATED WITH THE UTILITY PROVIDER. 7. ALL FOUNDATIONS TO BE REMOVED TO BOTTOM OF FOOTERS. 8. COORDINATE ALL REMOVALS WITH THE PROPERTY OWNER TO CONFIRM LIMITS OF REMOVAL AND IF ITEMS ARE TO BE SALVAGED OR DISPOSED PRIOR TO COMMENCING WORK. 9. FOR TREE REMOVAL AND PROTECTION, REFER TO LANDSCAPE TREE MITIGATION PLAN. INFORMATION SHOWN ON THIS PLAN IS FOR COORDINATION PURPOSES ONLY. 10. REFERENCE LANDSCAPE AND ARCHITECTURAL PLANS FOR ADDITIONAL SITE REMOVAL/RELOCATIONS. 11. BELOW GRADE UTILITY LOCATIONS WERE NOT PROVIDED. CONTRACTOR TO CONFIRM ALL UTILITY LOCATIONS NOTIFY OWNER OF ANY CONFLICTS PRIOR TO COMMENCEMENT OF WORK. CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Ph. 970.225.7828 TELEPHONE SERVICE Century Link (Qwest) 3351 Eastbrook Drive Fort Collins, Colorado 80525 Contact: Bill Johnson Ph. 970.490.7501 CABLE SERVICE Comcast 1201 University Dr. Fort Collins, Colorado 80521 Contact: Don Kapperman Ph. 970.567.0245 DEVELOPER This Old Howes, LLC 561 York Street Denver, CO 80209 Ph. 970.484.5907 ENGINEER Interwest Consulting Group 1218 W. Ash, Suite A Windsor, CO 80550 Ph. 970.674.3300 ARCHITECT Construction Design Services 55 Lake Havasu Avenue, South Suite F, #114 Lake Havasu City, AZ 86403 Ph. 928.846.1891 SURVEYOR Stewart & Associates 103 South Meldrum Street Fort Collins, CO 80521 Ph. 970.482.9331 INDEX OF SHEETS Sheet No. Description of Sheets 1 COVER SHEET 2 GENERAL NOTES 3 EXISTING CONDITIONS & DEMOLITION PLAN 4 HORIZONTAL CONTROL PLAN 5 UTILITY PLAN 6 DRAINAGE & EROSION CONTROL PLAN 7 GRADING PLAN 8 - 10 DETAILS Utility Plans For OASIS ON OLIVE LOT 3 OF THE OLIVE STREET APARTMENTS SUBDIVISION LOCATED IN THE SOUTHEAST 1/4 SECTION 11, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M LARIMER COUNTY, COLORADO JULY 2018 CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER MY DIRECT SUPERVISION, IN ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS AND STATE OF COLORADO STANDARDS AND STATUTES, RESPECTIVELY, AND THAT I AM FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS AND RECORD CONDITIONS THAT I HAVE NOTED ON THESE PLANS. INDEMNIFICATION STATEMENT: THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. JASON T. CLAEYS P.E. NO. 42122 ABBREVIATION LIST ABC AGGREGATE BASE COURSE AD ALGEBRAIC DIFFERENCE AE ACCESS EASEMENT ARCH ARCHITECT ARV AIR RELEASE VALVE ASPH ASPHALT BLDG BUILDING BFE BASE FLOOD ELEVATION BFV BUTTERFLY VALVE BOV BLOW OFF VALVE BOS BOTTOM OF STEP BOW BACK OF WALK BW BOTTOM OF WALL C&G CURB & GUTTER CATV CABLE TELEVISION CDOT COLORADO DEPARTMENT OF TRANSPORTATION CL CENTERLINE CMP CORRUGATED METAL PIPE CO CLEAN OUT CoFC CITY OF FORT COLLINS COMM COMMUNICATION CON CONDENSATE CONC CONCRETE COORD COORDINATION CW CHILL WATER CWR CHILL WATER RETURN CWS CHILL WATER SUPPLY DE DRAINAGE EASEMENT DEMO DEMOLITION DIA DIAMETER DIP DUCTILE IRON PIPE DS DOWNSPOUT E EAST(ING) EAE EMERGENCY ACCESS EASEMENT EG EXISTING GROUND EL ELEVATION ELCO EAST LARIMER COUNTY WATER DISTRICT ELEC ELECTRIC EOA EDGE OF ASPHALT EOC EDGE OF CONCRETE EX EXISTING ESMT EASEMENT EST ESTIMATE(D) F FIRE LINE FDC FIRE DEPARTMENT CONNECTION FES FLARED END SECTION FF FINISHED FLOOR FFE FINISHED FLOOR ELEVATION FG FINISHED GRADE FH FIRE HYDRANT FL FLOWLINE FO FIBER OPTIC FP FLOODPLAIN G GAS GB GRADE BREAK GF GARAGE FLOOR GND GROUND GV GATE VALVE HBP HOT BITUMINOUS PAVEMENT HORZ HORIZONTAL HDPE HIGH DENSITY POLYETHYLENE HP HIGH POINT HW HEADWALL IE IRRIGATION EASEMENT INV INVERT IRR IRRIGATION LA LANDSCAPE (PLAN/ACRH) LF LINEAR FEET LP LOW POINT LT LEFT MAX MAXIMUM ME MATCH EXISTING MEP MECHANICAL, ELECTRICAL, PLUMBING ENGINEER MH MANHOLE MIN MINIMUM N NORTH(ING) NA NOT APPLICABLE NTS NOT TO SCALE NWCWD NORTH WELD COUNTY WATER DISTRICT OC ON CENTER OHE OVERHEAD ELECTRIC OHT OVERHEAD TELEPHONE OHU OVERHEAD UTILITY P&UE PEDESTRIAN & UTILITY EASEMENT PE PEDESTRIAN EASEMENT PERF PERFORATED PC POINT OF CURVATURE PCC PORTLAND CEMENT CONCRETE PCR POINT OF CURB RETURN PH POTHOLE PI POINT OF INTERSECTION PL PROPERTY LINE PT POINT OF TANGENCY PVC POLYVINYL CHLORIDE R&R REMOVAL & REPLACEMENT RCP REINFORCED CONCRETE PIPE RD ROOF DRAIN RE REFERENCE RFPE REGULATORY FLOODPLAIN PROTECTION ELEVATION RJ RESTRAINT JOINT ROW RIGHT-OF-WAY RT RIGHT SCH SCHEDULE S SOUTH SD STORM DRAIN PIPE SDMH STORM DRAIN MANHOLE SRVC SERVICE SS SANITARY SEWER SSCO SANITARY SEWER CLEAN-OUT SSMH SANITARY SEWER MANHOLE SSWR SANITARY SEWER STA STATION STM STEAM SWMP STORMWATER MANAGEMENT PLAN T TELEPHONE TB THRUST BLOCK TBC TOP BACK OF CURB TBV TO BE VACATED TBR TO BE REMOVED TELE TELEPHONE TEMP TEMPORARY TF TOP OF FOUNDATION TOS TOP OF STEP TRM TURF REINFORCEMENT MAT TW TOP OF WALL TYP TYPICAL XS CROSS SECTION UD UNDERDRAIN UE UTILITY EASEMENT UGE UNDERGROUND ELECTRIC UTIL UTILITY VCP VITRIFIED CLAY PIPE VIF VERIFY IN FIELD VERT VERTICAL VPC VERTICAL POINT OF CURVATURE VPI VERTICAL POINT OF INTERSECTION VPT VERTICAL POINT OF TANGENCY W WATERLINE OR WEST WL WATERLINE WQCE WATER QUALITY CONTROL ELEVATION WSE WATER SURFACE ELEVATION PROPOSED STREET LIGHT PROPOSED STORM SEWER EXISTING SANITARY SEWER MAIN PROPOSED TELEPHONE LINE EXISTING GAS EXISTING STORM SEWER EXISTING WATER MAIN EXISTING MANHOLE PROPOSED STORM INLET LEGEND PROPOSED CONCRETE PROPOSED MINOR CONTOUR EXISTING SPOT ELEVATION PROPOSED SPOT ELEVATION PROPOSED MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING UTILITY POLE EXISTING GUY WIRE PROPOSED GAS EXISTING ELECTRIC LINE PROPOSED ELECTRIC LINE EXISTING TELEPHONE LINE EXISTING FIRE HYDRANT PROPOSED FIRE HYDRANT EXISTING WATER VALVE PROPOSED SANITARY SEWER MAIN PROPOSED WATER MAIN EXISTING CONCRETE EXISTING FLOWLINE, CURB & GUTTER PROPOSED FLOWLINE, CURB & GUTTER PROPOSED FENCE LIMITS OF CONSTRUCTION EXISTING OVERHEAD UTILITY EXISTING STORM SEWER INLET PROPOSED WATER VALVE PROPOSED MANHOLE PROPOSED UTILITY POLE EXISTING STREET LIGHT PROPOSED SWALE PROPOSED DIRECTION OF OVERLAND FLOW EXISTING FIBER OPTIC LINE PROPOSED HANDICAP RAMP EXISTING OVERHEAD ELECTRIC LINE EXISTING OVERHEAD TELEPHONE LINE PROPOSED OVERHEAD ELECTRIC LINE PROPOSED FIBER OPTIC LINE PROPOSED OVERHEAD TELEPHONE LINE EXISTING FENCE PROPOSED OVERHEAD UTILITY PROPOSED LIGHT POLES EXISTING CABLE TV LINE PROPOSED CABLE TV PROPOSED WATER SERVICE W/ CURB STOP AND METER PIT PROPOSED SANITARY SEWER SERVICE W/ CLEANOUT PRELIMINARY NOT FOR CONSTRUCTION