Master Submittal Checklist
Planning Services – 281 N College Ave – Fort Collins, CO 80522-0580 – 970.416.4311
Project Name: ______Spradley Barr Ford BDR – R1___________________________
Applicant Name: __Kenny Lee Architecture Group_____________________________
Office Use Only:
Project Type: __BDR_ New Submittal _X__ Revision __ Review Round _1_ Submittal Date: __________
Appointments are required for all submittals or resubmittals – please call 970-416-2740 to schedule. A
paper copy of this checklist, all submittal materials and fee payments are due at the time of project
submittal.
Only complete submittals are accepted. The submittal may be returned to the applicant if any required
materials or application fees are missing or insufficient. Submittals received Monday morning through
Wednesday noon will be routed for review the same week and submittals received after Wednesday
noon will be held and routed the following week.
This checklist shall be used in tandem with the Submittal Requirements Document. Applicant must
complete this checklist and acknowledgement of Submittal Requirements Document on page three.
This checklist applies to the following review types: BDR, PDP, FDP, ODP, APU, PUD, SPAR, CDP,
MJA. Refer to the Submittal Requirements Document for a description of these review types.
The following checklist of items are required unless city staff indicates an item is Waived,
Deferred or Not Applicable. This checklist must be reviewed, completed and accepted by staff
prior to project routing. A Notice of Acceptance shall be issued to the Applicant by Friday of the
week the project is routed. The Notice will indicate that the project contains the necessary
materials so that review can begin. If submittal is deemed incomplete, the applicant will be
required to revise and resubmit their project with the required materials.
Paper Copies:
City
Staff
1
Applicant
Checklist
X One paper copy of this checklist, completed and signed by applicant (first three pages of this
document).
X One signed paper copy of Development Application Form Application Form.pdf
X One signed paper copy of Transportation Development Review (TDR) Application and Fee –
please contact Engineering at 221-6605 for fee information TDR Fees and Application.pdf
X Check for the above applications forms payable to The City of Fort Collins (fees may be
consolidated into one check) See fee calculator here: [link]
1
Key code: (W)aived, (D)eferred to subsequent round of review, (N)ot Applicable or (R)eceived. All other items would be required if no
keycode is provided.)
x
x
x
x
Revised, date, 2018 2 Development Application Submittal Checklist
Electronic Copies:
All copies must be provided per City file naming standards: [link]
1) General Information:
City
Staff
2
Applicant
Checklist
Property Owner (APO) Notification List (following the notification boundary provided by staff)
X Conceptual Review (CR) or Preliminary Development Review (PDR) comment response letter;
or for resubmittals include a comment response letter from the prior round of review
X Project Design Narrative and General Information (see detailed Submittal Requirements)
2) Project Plans:
City
Staff
Applicant
Checklist
Cover Page
X Site Plan and Related Design Details
X Landscape Plan and Design Details
X Architectural Elevations, Materials and Details (color elevations recommended)
X Utility and Drainage Construction Plans
X Subdivision Plat
X Lighting Plans and Details
Other submittal items required (to be completed by staff): ______________________________
____________________________________________________________________________
____________________________________________________________________________
2
Key code: (W)aived, (D)eferred to subsequent round of review, (N)ot Applicable or (R)eceived. All other items would be required if no
keycode is provided.)
x
x
Included on Site Plan
x
x Included on Site Plan
x
x
x
n/a no new site lighting proposed
Revised, date, 2018 3 Development Application Submittal Checklist
3) Reports and Supporting Documents:
City
Staff
3
Applicant
Checklist
Completed Utility Plans Checklist Utility Plans Checklist.pdf
Transportation Impact Study (TIS) or waiver indicated from Traffic Operations staff
X Drainage and Erosion Control Report
Ecological Characterization Study (ECS)
Signed letters of intent (required before hearing) indicating that all required off-site easement
and off-site rights-of-way can be negotiated in time for final development plan submittal
X Engineering Variance Requests (if required)
Land Use Code Modification and Alternative Compliance Requests (if required)
Transportation Demand Management (TDM) Plan
Soils Report
Hazardous Materials Impact Analysis
Building Services Conceptual Meeting form
Other submittal items required (to be completed by staff): ______________________________
____________________________________________________________________________
4) Additional Items with Final Review:
City
Staff
Applicant
Checklist
Final Legal descriptions and exhibits for easements, other agreements or deeds of dedication
required by Engineering staff
Electric Utility C-1 Form
Erosion Control Cost Estimate
Certification of Notice to Mineral Owner(s) (if required) Mineral Rights Certificate.pdf
Subsurface Hydrologic Study
Public Improvements Cost Estimate
Development Agreement application form
Other Checklist items identified (to be completed by staff): _____________________________
____________________________________________________________________________
3
Key code: (W)aived, (D)eferred to subsequent round of review, (N)ot Applicable or (R)eceived. All other items would be required if no
keycode is provided.)
x
Revised, date, 2018 4 Development Application Submittal Checklist
Applicant Acknowledgement:
I have reviewed the Development Application Submittal Requirements [link], Sections A – M. All documents
submitted have been completed and consistent design information is shown. All documents submitted are
complete and the Development Application Submittal Requirements have been incorporated into the plans (See
Development Application Submittal Requirements for detailed description of requirements). I understand that
submittal requirements not sufficiently addressed or deferred may result in added review time.
Applicant: ________________________________________________________________________________
Signature Print Name Date
(See Development Application Submittal Requirements for detailed description of requirements)
Office Use Only:
Staff Check-in Comments: BDR process for Plat, which can be reviewed through a BDR for a Minor
Subdivision. A Minor Amendment to the existing conditions is required to expand the
building.
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_______________
Staff Checklist waivers or deferrals (include any checklist clarifications or information regarding waivers or
deferrals):
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________