Loading...
HomeMy WebLinkAboutHUGHES STADIUM ANNEXATION & ZONING - ANX180003 - SUBMITTAL DOCUMENTS - ROUND 1 - TDR APPLICATIONFort City of CoLLins Transportation Development Review Fee Date Received! Paid ______ Proj ect Name: Hughes Stadium Annexation Project Location: South Overland Trail and Dixon Canyon Road Date: 7/16/2018 Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Fee structure ___________ Overall Development Plan (ODP) $500 each Final Development Plan (FDP) This fee includes 2 rounds of review $1000 each The maximum fee for each annexation document! filing shall be $2,000 Minor Amendment $158 each Major Amendment $2,500 each Re-zone $200 each El Modification to Land Use Code $200 each El Wireless Telecommunication Equipment (WTE) $65 each El Road Projects ______ acres (of roadway) X $3,500 = Vacation of Easement(s) *** # of vacations X $400 = Vacation of Right(s)-of-Way *** # of vacations X $800 = Dedication of Easement(s) andlor Right(s)-of-Way ** # of dedications X $250 = El Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review andlor utility plan review. This fee includes 3 rounds of review. Detached Single Family $160 per unit # ofunits X $160 = Multifamily or other residential units $115 per unit #ofunitsX$l15= Commercial, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot ______sq ft X $0.25 = Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) $250 per acre _______ acres X $ 250 = Project fee $2,000 each ______ Total of above amounts If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000 + i/2 (the amount over 30,000 ________ = The maximum fee for any residential ONLY project shall be $500 per residential unit. This check should be used to verify the fee amount (does not apply to mixed-usc developments). PDP fee shall be the lesser of this amount or the above calculated amount. # of residential units X $500 = If this fee amount equals or exceeds $65,000 then the City Manager shall have the ability to reduce the fee amount. Reduction for affordable housing — a copy of the City letter certifying! authorizing the affordable housing shall be provided with this application. Amount of reduction to be applied ____________ Total owed for PDP General Information: Owners Name(s): The Board of Governors of the Telephone: 970491-2625 Fax: _________________ Applicants! Consultants Firm Name: CSURF Real Estate Contact: Rick Callan or Nancy Hurt Street address: P.O. Box 483 (or for delivery: 2537 Research Blvd. Suite 200, Fort Collins, CO 80526) City/State! Zip: Fort Collins, CO 80522 Telephone: 970-491-2625 Fax: Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the properly which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection. Name (pIeasep,nt: Rick Callan, Sr. Real Estate Analyst Signature: ____________________________________ Telephone: 970-491-2625 Foot Notes: When a development project involves a change of use for a building, the charge per square foot shall apply to the portion of the overall building size for which the change of use is proposed, provided that the new use generates more traffic than the existing use, as determined by the current Institute of Transportation Engineers Trip Generation. If the new use does not generate more traffic than the existing use then the charge per square foot for shall apply only to the net additional building size (if any). These fees do not include the cost of filing fees for the recording of the Development Agreement. When a Development Agreement or Amendment Agreement is entered into the Developer shall be responsible for the cost of recording the document. Said filing fees shall be calculated and provided when the signed document is returned to the City for signatures and filing. *** This fee does not include the cost of filing fees. Filing fees shall be determined at the time of final document submittal and will be required prior to filing. El El Total Amount Paid _________ amount due Colorado State University System U Additional round of review Annexation El El El $ 500 each $20 X ‘‘res ° + $250 = Street address: 2011 North County Road 21 (Overland Trail) $2,000 City/State/Zip: Fort Collins, CO 80526 U El U 2012 form cc: Christie White, Engineering Development Review Engineering 7/20/18 $2,000 ANX180003