HomeMy WebLinkAboutSAINT JOHN XXIII CATHOLIC CHURCH AND LOMBARDY STUDENT HOUSING - PDP190001 - DOCUMENT MARKUPS - ROUND 2 - UTILITY PLANS (8)SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
MAY 2019
I hereby affirm that these final
construction plans were prepared
under my direct supervision, in
accordance with all applicable City
of Fort Collins and State of
Colorado standards and statutes,
respectively; and that I am fully
responsible for the accuracy of all
design. revisions, and record
conditions that I have noted on
these plans.
These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility
by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness
of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities
required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort
Collins for additional quantities of items shown that may be required during the construction phase.
DISCLAIMER STATEMENT:
CERTIFICATION STATEMENT:
VICINITY MAP
NORTH
PROJECT DATUM: NAVD88
City of Fort Collins Benchmark 20-97
At the Southwest corner of West Elizabeth and Constitution Ave. on a concrete traffic signal base.
ELEV.= 5050.15
City of Fort Collins Benchmark 19-97
At the Southeast corner of West Elizabeth and Shields St., on a concrete traffic signal base.
ELEV.= 5025.74
Please Note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used
NGVD29 Unadjusted Datum (Prior City of Fort Collins Datum) for their vertical datums.
If NGVD29 Unadjusted Datum (Prior City of Fort Collins Datum) is required for any purpose, the
following equation should be used:
NGVD29 Unadjusted Datum (Prior City of Fort Collins Datum) = NAVD88 - 3.18'
Basis of Bearings
The Basis of Bearings is the East line of the Southeast Quarter of Section 15-7-69 as bearing South 00°
29' 45" West (assumed bearing).
Flatirons, Inc.
Project No. 18-71,080
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
C002
GENERAL & CONSTRUCTION NOTES
2
A. GENERAL NOTES
1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer
County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the
specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort
Collins.
2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise.
3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer.
Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of
any work shown in these plans.
4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as
beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins
Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer
hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and
demands which may arise from any errors and omissions contained in these plans.
5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and
specifications current at the date of approval of the plans by the City of Fort Collins Engineer.
6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of
the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The
Developer shall be responsible for unknown underground utilities.
7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning
excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be
located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be
the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans.
8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any
utility crossings required.
9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer
to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction.
VAULT
F.O.
VAULT
TELE ELEC
VAULT
ELEC
VAULT
ELEC
C
VAULT
ELEC
VAULT
ELEC
ELEC
C ELEC
T T T
CC CC
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
VAULT
ELEC
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
VAULT
F.O.
CONTROL
IRR
CONTROL
IRR
AC CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
M
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
T T
T
CONTROL
IRR
FO
FO
FO FO
FO
FO FO
CONTROL
IRR
CONTROL
IRR
AC CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
M
CONTROL
IRR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
T
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC T
ELEC
FO
FO
/ / / / / / / /
G G
G
G G G
G
G
G
VAULT
F.O.
VAULT
TELE ELEC
VAULT
ELEC
VAULT
ELEC
C
VAULT
ELEC
VAULT
ELEC
ELEC
C
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
VAULT
ELEC
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
VAULT
F.O.
T T
T
ELEC
VAULT
ELEC
T
ELEC ELEC
FO
FO
FO FO
X X
X
X
X X
X
V
AULT
ELEC
UNIVERSITY AVENUE
CITY PARK AVENUE
WEST ELIZABETH STREET
NICOL CAMPUS
WEST LIMITED
1213 W.
ELIZABETH ST.
CONTROL
IRR
M
CONTROL
IRR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
T
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC T
ELEC
FO
FO
X
UNIVERSITY AVENUE
SOUTH SHIELDS STREET
WEST ELIZABETH STREET
NICOL CAMPUS WEST
1205 W. ELIZABETH ST. A
NICOL CAMPUS
WEST LIMITED
1213 W.
ELIZABETH ST.
DN
UP
DN
DN
DN
DN
X
X X X
X
X X
X
X X
X
X X
UD
UD
UD UD UD
UD
UD UD UD
UD
UD UD
UD UD
F
W
F
F
S
F
S
S
S
F
E
FDC FDC
FDC
FDC
E
E
E E E
E E
E E
E
E
E
E
S
VAULT
ELEC
VAULT
ELEC
VAULT
ELEC
FDWH
E
E
E
E
E
E
S
W
F
W
W
G G
G
G
W
V
AULT
F.O.
VAULT
ELEC
TELE
UD
UD UD
UD UD UD UD UD UD
F F
S
F
F
S
F
E E E
FDC
FDC
E
E
E
E
E
E
E E
E
E
E
VAULT
ELEC
VAULT
ELEC
E
E
E
E
E E
E
E
E
E
W
F
G
W
G
G
VAULT
F.O.
VAULT
TELE ELEC
VAULT
ELEC
VAULT
ELEC
C
VAULT
ELEC
VAULT
ELEC
ELEC
C
ELEC
BRKR
ELEC
BRKR
UD UD UD UD
UD
UD UD UD
UD
UD UD UD UD UD UD
UD
UD UD UD
UD
UD
F F
W
F
S
S
FDC
FDC
E
E
E E E E
E
E E E E
E
E
E
E
E
E
S
V
AULT
ELEC
FDWH
E
E E E
E
E
E
E
E
E
S
F
G
F
W
G
G
W
B M
FO
FO
FO
FO
FO FO
FO
CONTROL
IRR
M
CONTROL
IRR
B M
VAULT
F.O.
VAULT
ELEC
TELE
VAULT
ELEC
VAULT
ELEC
C
VAULT
ELEC
VAULT
ELEC
ELEC
C
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
VAULT
ELEC
VAULT
ELEC
VAULT
ELEC VAULT
VAULT ELEC
ELEC
VAULT
TELE
VAULT
ELEC
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
VAULT
F.O.
T T
T
ELEC
VAULT
ELEC
T
ELEC ELEC
CONTROL
IRR
M
CONTROL
IRR
ELEC
UD
VAULT
F.O.
VAULT
TELE ELEC
VAULT
ELEC
VAULT
ELEC
C
VAULT
ELEC
VAULT
ELEC
ELEC
C T T
T
ELEC
VAULT
ELEC
T
ELEC ELEC
FO
FO FO
X
X X
X
X X X X X X
V
AULT
ELEC
X
X X X
X
X X
X X
X X
X
X X
X
X
X X
X X X X
TF
UNIVERSITY AVENUE
CITY PARK AVENUE
JDH2 INVESTMENTS LLC
1305 W. ELIZABETH ST.
PHILLIPS DAVID J LIVING TRUST (.615)
1335 W. ELIZABETH ST. 160
JDH2 INVESTMENTS LLC
26' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
9' UTILITY EASEMENT
5' SIDEWALK
5' SIDEWALK
9' UTILITY EASEMENT
7' SIDEWALK
PROPOSED 18" VERTICAL
OUTFALL CURB & GUTTER
UD UD UD
UD
UD UD UD
UD
UD UD UD
UD
UD UD UD UD UD UD
UD
UD UD UD
UD
UD UD
C
ONTROL
IRR
CONTROL
IRR
CONTROL
IRR
VAULT
F.O.
X X X
X
X X
X
TF TF
X
X
X
UNIVERSITY AVENUE
NICOL CAMPUS WEST LIMITED
1213 W. ELIZABETH ST.
GLEASON/WESTSIDE
INVESTMENTS LLC
1301 W. ELIZABETH ST.
JDH2 INVESTMENTS LLC
1305 W. ELIZABETH ST.
1221 W.
ELIZABETH ST.
PROPOSED 18" VERTICAL
INFLOW CURB & GUTTER
PROPOSED 18" VERTICAL
OUTFALL CURB & GUTTER
26' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
9' UTILITY EASEMENT
5' SIDEWALK
5' SIDEWALK
10' SIDEWALK
EXISTING 30" VERTICAL DRIVEWAY
CURB & GUTTER
9' UTILITY EASEMENT
5' SIDEWALK
26' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
24' FL-FL
46' DRIVE-OVER
9' CURB CUT CURB & GUTTER
10' UTILITY
EASEMENT
EXISTING
UD UD UD UD
UD
UD UD UD
UD
UD UD UD
UD
UD UD UD UD
M
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
T
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC T
ST ST ST ELEC
ST ST
SS SS SS
SS SS
SS SS
SS SS SS
SS
SS SS SS SS SS SS
SS
SS
D
N
UP
DN
DN
DN
DN
X
X X
X
X X
X X
X
X X
ST
ST
ST
ST
ST ST
SS
SS
SS SS SS SS SS
SS SS
SS SS SS SS SS
SS SS
SS
UD UD
D
N
DN
DN
X
X
TF
DN
UNIVERSITY AVENUE
SOUTH SHIELDS STREET
WEST ELIZABETH STREET
9+50
10+00
10+50
11+00
11+50
12+00
12+50
13+00
PROPOSED
SAWCUT
15' UTILITY
EASEMENT
52' HALF-ROW
PROPOSED
STRIPING
±11' TRAVEL
LANE
11' TURN LANE
11' TRAVEL
LANE
6' BIKE LANE
6' SIDEWALK
PROPOSED
30" VERTICAL
CURB & GUTTER
EXISTING
18" VERTICAL
CURB & GUTTER
MATCH EXISTING
FLOWLINE
MATCH EXISTING
FLOWLINE
6' SIDEWALK
PROPOSED 2'
SIDEWALK CULVERT
PROPOSED 10'
B M
VAULT
F.O.
VAULT
ELEC
TELE
VAULT
ELEC
VAULT
ELEC
C
VAULT
ELEC
VAULT
ELEC
ELEC
C
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
VAULT
ELEC
VAULT
ELEC
VAULT
ELEC VAULT
VAULT ELEC
ELEC
VAULT
TELE
VAULT
ELEC
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
VAULT
F.O.
T T
T
ELEC
VAULT
ELEC
T
ELEC ELEC
CONTROL
IRR
M
CONTROL
IRR
ELEC
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C701
EROSION CONTROL DETAILS
16
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
VTC
ROCK SOCK SECTION ROCK SOCK PLAN
ROCK SOCK JOINTING
GRADATION TABLE
SIEVE SIZE
MASS PERCENT
PASSING SQUARE
MESH SIEVES
NO. 4
2" 100
1-1/2" 90-100
1" 20-55
3/4" 0-15
3/8" 0-5
MATCHES SPECIFICATIONS FOR NO. 4 COARSE AGGREGATE FOR
CONCRETE PER AASHTO M43. ALL ROCK SHALL BE FRACTURED FACE,
ALL SIDES
RS
001 CONCRETE WASHOUT AREA 002
ROCK SOCK 003 VEHICLE TRACKING PAD
004 CONSTRUCTION FENCE w/ WATTLE
TEMPORARY
CHAIN-LINK FENCE
WATTLE MATERIAL
TEMPORARY
CHAIN-LINK FENCE
WATTLE MATERIAL
UD
UD
UD UD UD
UD
UD UD UD
UD
UD UD UD UD
V
AULT
ELEC
VAULT
ELEC
VAULT
ELEC
B M
VAULT
F.O.
VAULT
ELEC
TELE
VAULT
ELEC
VAULT
ELEC
C
VAULT
ELEC
VAULT
ELEC
ELEC
C
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
VAULT
ELEC
VAULT
ELEC
VAULT
ELEC VAULT
VAULT ELEC
ELEC
VAULT
TELE
VAULT
ELEC
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
VAULT
UD UD UD
UD
UD UD UD
UD
UD UD UD UD UD UD
E
FDC FDC FDC
FDC
E E
E
E
E
E
E
E E
E
E
E
E
VAULT
ELEC
VAULT
ELEC
VAULT
ELEC
FDWH
E
E
E
E
E
E
G
G
G
G
VAULT
F.O.
VAULT
TELE ELEC
VAULT
ELEC
VAULT
ELEC
C
VAULT
ELEC
VAULT
ELEC
ELEC
C
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
VAULT
ELEC
VAULT
ELEC
VAULT
ELEC VAULT
VAULT ELEC
ELEC
VAULT
TELE
VAULT
ELEC
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
VAULT
F.O.
T T
T
ELEC
VAULT
ELEC
T
ELEC ELEC
CONTROL
IRR
M
CONTROL
IRR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
T
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC T
ELEC
T
T
T
X
T
T
T
T T
T
X
X
T
T
T
T T T
T T
T
T
ST
ST
ST
ST
ST
ST ST
ST
V
AULT
ELEC
DN
UP
DN
DN
DN
DN
X
X
X X X
X X
X
X X
X
X
X X
TF
TF
TF
TF
X
DN
X
UNIVERSITY AVENUE
UNIVERSITY AVENUE
SOUTH SHIELDS STREET
CITY PARK AVENUE
WEST ELIZABETH STREET
WEST ELIZABETH STREET
NICOL CAMPUS WEST
1205 W. ELIZABETH ST. A
NICOL CAMPUS
WEST LIMITED
1213 W.
ELIZABETH ST.
GLEASON/WESTSIDE
INVESTMENTS
LLC
1301 W.
ELIZABETH ST.
JDH2 INVESTMENTS LLC
1305 W. ELIZABETH ST.
PHILLIPS DAVID J LIVING
TRUST (.615)
1335 W. ELIZABETH ST. 160
1221 W.
ELIZABETH ST.
5035
5034
5033
5032
5031
5031
5027 5027
5028 5028
5029 5029
5030
5030
658
688
709
740
796
814
875
935
995
1036
1056
1169
1225
1316
1705
777
1409
1847
1946
2073
1536
5026.7
5026.8
5026.8
5026.9
5026.8
5026.8
5026.8
5026.9
5026.9
5027.6
5028.1
5028.6
5029.1
5029.8
5030.8
5031.8
5032.8
5034.5
5026.7
5026.5
5026.2
BLDG A
BLDG B
BLDG C
CHURCH
BLDG
FFE=39.60
FFE=33.60 FFE=33.60
FFE=30.50
FFE=32.00
FFE=30.50
FFE=32.00
FFE=30.50
FFE=37.00
APPROXIMATE
FUTURE
100-YR
FLOODPLAIN
NORTH
( IN FEET )
1 inch = ft.
60 0 60 Feet
60
120 180
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C900
FLOODPLAIN EXHIBIT
18
NORTH
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
LEGEND:
PROPOSED CONTOUR
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED CURB & GUTTER
PROPOSED STORM INLET
PROPOSED CONCRETE
CROSS PAN (TYP.)
PEDESTRIAN ACCESS RAMPS
PROPERTY BOUNDARY
CROSS-SECTION (CSU CLOMR)
NOTES:
1. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY
EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION
2. THIS PROJECT IS LOCATED WITHIN A CITY-REGULATED 100-YEAR FLOODWAY AND FLOOD FRINGE
AND MUST COMPLY WITH CHAPTER 10 OF THE CITY CODE.
3. ALL ELEVATIONS DEPICTED IN PLAN VIEW AND BENCHMARKS LISTED HEREON ARE PER THE CITY OF
FORT COLLINS VERTICAL CONTROL DATUM (NAVD 88).
4. ANY ITEMS LOCATED IN THE FLOODWAY THAT CAN FLOAT (E.G., PICNIC TABLES, BIKE RACKS, ETC.)
MUST BE ANCHORED.
5. A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH SITE CONSTRUCTION ELEMENT IN THE
FLOODPLAIN, INCLUDING BUILDING. THE FLOODPLAIN USE PERMIT FOR THE BUILDING WILL BE
APPROVED AT THE TIME OF BUILDING PERMIT APPLICATION.
6. A FLOODPLAIN USE PERMIT AND NO RISE CERTIFICATION IS REQUIRED PRIOR TO PERFORMING ANY
WORK WITHIN THE FLOODWAY (I.E., CURB CUT REMOVAL, LANDSCAPING).
7. NO STORAGE OF MATERIALS OR EQUIPMENT SHALL BE ALLOWED IN THE FLOODWAY, WHETHER
TEMPORARY (DURING CONSTRUCTION) OR PERMANENT. LANDSCAPING SHALL ALSO MEET THE
REQUIREMENTS FOR NO RISE IN THE FLOODWAY.
8. REFER TO THE PRELIMINARY DRAINAGE REPORT FOR SAINT JOHN XXIII AND LOMBARDY STUDENT
HOUSING, DATED MAY 1, 2019 FOR ADDITIONAL INFORMATION.
9. A POST-CONSTRUCTION ELEVATION CERTIFICATE MUST BE APPROVED BEFORE A CERTIFICATE OF
OCCUPANCY WILL BE ISSUED.
10. ALL HVAC EQUIPMENT IS TO BE PLACED AT OR ABOVE THE REGULATORY FLOOD PROTECTION
ELEVATION.
11. HORIZONTAL CONTROL: CITY OF FORT COLLINS GROUND MASTER CONTROL.
12. APPLICANT IS AWARE THAT THE CURRENT PLAN DOES NOT MEET REGULATORY REQUIREMENTS
AND IS CONTINUING THROUGH THE PLANNING PROCESS AT THE APPLICANT'S OWN RISK.
BUILDING PERMITS FOR STRUCTURES NOT MEETING FLOODPLAIN REQUIREMENTS BASED ON
THE CURRENT REGULATORY FLOODPLAIN MAY BE HELD UP IF THE LOMR IS NOT FINISHED
AND REGULATORY.
13. THIS PROPERTY IS LOCATED WITHIN A CITY REGULATED 100-YEAR FLOODPLAIN AND MUST COMPLY
WITH CHAPTER 10 OF THE CITY CODE.
14. RESIDENTIAL USES IN THE 100-YEAR FLOODPLAIN MUST BE ELEVATED ABOVE THE REGULATORY
FLOOD PROTECTION ELEVATION.
15. CRITICAL FACILITIES, INCLUDING FACILITIES FOR AT-RISK POPULATIONS, ARE PROHIBITED WITHIN
THE 100-YEAR FLOODPLAIN.
16. PER SECTION 10-103 (9), CRITICAL FACILITIES ARE PROHIBITED IN THE FLOODPLAIN. THE DEFINITION
FOR CRITICAL FACILITIES INCLUDES FACILITIES FOR AT-RISK POPULATIONS (DAYCARES, SCHOOLS,
NURSING HOMES, ETC.). THIS REGULATION DOES NOT INCLUDE SUNDAY SCHOOL TYPE SERVICES
WHERE PARENTS ARE ON-SITE WITH THEIR CHILDREN.
FIELD SURVEY BY:
BENCHMARKS:
NTS
BASE FLOOD ELEVATION (CSU CLOMR)
ELEVATION NGVD 88 5000
100-YR FLOODPLAIN
100-YR FLOODWAY
FLATIRONS, INC.
PROJECT NO. 18-71,080
DATE: APRIL 2018
ADDITIONAL SURVEY:
NORTHERN ENGINEERING SERVICES
PROJECT NO. 1560-001
DATE: OCTOBER 2018
1036
PROJECT DATUM: NAVD88
CITY OF FORT COLLINS BENCHMARK 20-97
AT THE SOUTHWEST CORNER OF WEST ELIZABETH AND CONSTITUTION AVE. ON A
CONCRETE TRAFFIC SIGNAL BASE.
ELEV.= 5050.15
CITY OF FORT COLLINS BENCHMARK 19-97
AT THE SOUTHEAST CORNER OF WEST ELIZABETH AND SHIELDS ST., ON A CONCRETE
TRAFFIC SIGNAL BASE.
ELEV.= 5025.74
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING
DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR
ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.18'
BASIS OF BEARINGS
THE BASIS OF BEARINGS IS THE EAST LINE OF THE SOUTHEAST QUARTER OF SECTION
15-7-69 AS BEARING SOUTH 00° 29' 45" WEST (ASSUMED BEARING).
F.O.
T T
T
ELEC
VAULT
ELEC
T
ELEC ELEC
CONTROL
IRR
M
CONTROL
IRR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
T
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC T
ELEC
X X X
ST
ST
ST
ST ST
ST
V
AULT
ELEC
DN
UP
DN
DN
DN
DN
X X X
X
X
X X
X X X
X
X
X X
TF
TF
TF
TF
X
DN
X
UNIVERSITY AVENUE
UNIVERSITY AVENUE
SOUTH SHIELDS STREET
CITY PARK AVENUE
WEST ELIZABETH STREET
WEST ELIZABETH STREET
NICOL CAMPUS WEST
1205 W. ELIZABETH ST. A
NICOL CAMPUS
WEST LIMITED
1213 W.
ELIZABETH ST.
GLEASON/WESTSIDE
INVESTMENTS
LLC
1301 W.
ELIZABETH ST.
JDH2 INVESTMENTS LLC
1305 W. ELIZABETH ST.
PHILLIPS DAVID J LIVING
TRUST (.615)
1335 W. ELIZABETH ST. 160
1221 W.
ELIZABETH ST.
100-YR FLOODWAY
100-YR FLOODPLAIN
CONNECT TO
EXISTING
STORM INLET
100-YR FLOODWAY
100-YR FLOODPLAIN
EXISTING
STORM DRAIN
PROPOSED
STORMTECH CHAMBERS
PROPOSED
STORM DRAIN
PROPOSED
STORM DRAIN
EXISTING
STORM DRAIN
(PRIVATE)
PROPOSED
INLET
PROPOSED
INLET
PROPOSED
INLET
PROPOSED
INLET
PROPOSED
INLET
EXISTING
INLET
PROPOSED AREA
DRAIN BASIN PROPOSED AREA
DRAIN BASIN
PROPOSED
UNDERDRAIN
PROPOSED AREA
DRAIN BASIN
2
3
OS1
OS2
OS1
OS3
OS3
1
3
OS2
2
1
BLDG A
BLDG B
BLDG C
CHURCH
BLDG
PROPOSED
STORM DRAIN
PROPOSED AREA
DRAIN BASIN
PROPOSED AREA
DRAIN BASIN
APPROXIMATE
FUTURE 100-YR
FLOODPLAIN
PROPOSED AREA
DRAIN BASIN
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
( IN FEET )
1 inch = ft.
60 0 60 Feet
60
120 180
LEGEND:
PROPOSED CONTOUR
PROPOSED STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED CURB & GUTTER
PROPERTY BOUNDARY
PROPOSED INLET
DESIGN POINT A
FLOW ARROW
DRAINAGE BASIN LABEL
DRAINAGE BASIN BOUNDARY
PROPOSED SWALE SECTION
1 1
NOTES:
1. REFER TO THE PRELIMINARY DRAINAGE REPORT FOR SAINT JOHN XXIII AND LOMBARDY STUDENT
HOUSING, DATED MAY 1, 2019 FOR ADDITIONAL INFORMATION.
2. APPLICANT IS AWARE THAT THE CURRENT PLAN DOES NOT MEET REGULATORY REQUIREMENTS
AND IS CONTINUING THROUGH THE PLANNING PROCESS AT THE APPLICANT'S OWN RISK.
BUILDING PERMITS FOR STRUCTURES NOT MEETING FLOODPLAIN REQUIREMENTS BASED ON
THE CURRENT REGULATORY FLOODPLAIN MAY BE HELD UP IF THE LOMR IS NOT FINISHED
AND REGULATORY.
3. THIS PROPERTY IS LOCATED WITHIN A CITY REGULATED 100-YEAR FLOODPLAIN AND MUST COMPLY
WITH CHAPTER 10 OF THE CITY CODE.
4. RESIDENTIAL USES IN THE 100-YEAR FLOODPLAIN MUST BE ELEVATED ABOVE THE REGULATORY
FLOOD PROTECTION ELEVATION.
5. CRITICAL FACILITIES, INCLUDING FACILITIES FOR AT-RISK POPULATIONS, ARE PROHIBITED WITHIN
THE 100-YEAR FLOODPLAIN.
BENCHMARK
FOR DRAINAGE REVIEW ONLY
NOT FOR CONSTRUCTION
C
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C800
DRAINAGE EXHIBIT
17
NORTH
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
DRAINAGE SUMMARY TABLE
DESIGN
POINT
BASIN
ID
TOTAL
AREA
(acres)
C2 C100
2-yr
Tc
(min)
100-yr
Tc
(min)
Q2
(cfs)
Q100
(cfs)
1 1 0.15 0.93 1.00 5.6 5.1 0.4 1.5
2 2 4.88 0.93 1.00 15.9 15.4 8.3 31.8
3 3 0.53 0.93 1.00 11.1 10.5 1.0 4.0
OS1 OS1 0.33 0.95 1.00 5.1 5.0 0.9 3.3
OS2 OS2 0.38 0.95 1.00 5.5 5.0 1.0 3.8
OS3 OS3 0.86 0.95 1.00 5.4 5.0 2.3 8.6
PROJECT DATUM: NAVD88
CITY OF FORT COLLINS BENCHMARK 20-97
AT THE SOUTHWEST CORNER OF WEST ELIZABETH AND CONSTITUTION AVE. ON A CONCRETE TRAFFIC
SIGNAL BASE.
ELEV.= 5050.15
CITY OF FORT COLLINS BENCHMARK 19-97
AT THE SOUTHEAST CORNER OF WEST ELIZABETH AND SHIELDS ST., ON A CONCRETE TRAFFIC SIGNAL
BASE.
ELEV.= 5025.74
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS
HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL
DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.18'
BASIS OF BEARINGS
THE BASIS OF BEARINGS IS THE EAST LINE OF THE SOUTHEAST QUARTER OF SECTION 15-7-69 AS BEARING
SOUTH 00° 29' 45" WEST (ASSUMED BEARING).
STAKE PER WATTLE
DIKE SPECIFICATIONS
SIDE VIEW
CF
CWA
005
WD
006 CURB INLET PROTECTION
IP
SWALE WATTLE DIKE
WITH NO GAPS (TYP.)
TIGHTLY ABUTTING
ENTRENCH 3"
FLOW FLOW
NOTE:
ENTRENCH WATTLE 3" INTO
NATURAL GROUND AT THE OUTSIDE
EDGE OF CONCRETE APRON
WATTLE
WATTLE
OR
NOTE:
INSTALLATION OF WATTLE STAKES
MAY VARY
(10" MIN. DIAMETER)
IP
007 DROP INLET WATTLE FILTER
OFF-SITE ON-SITE
OFF-SITE
ON-SITE
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
T
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC T
ELEC
X X X
ST
ST
ST
ST ST
ST
V
AULT
ELEC
UD
UD
UD UD UD
UD
UD UD UD
UD
UD UD UD UD
E
E
E
E E E
E E
E E
E
E
E
E
V
AULT
ELEC
VAULT
ELEC
VAULT
ELEC
E
E
E
E
E
E
G G
G
G
D
N
UP
DN
DN
DN
DN
X X X
X
X
X X
X X X
X
X
X X
TF
TF
TF
TF
X
DN
X
UNIVERSITY AVENUE
UNIVERSITY AVENUE
SOUTH SHIELDS STREET
CITY PARK AVENUE
WEST ELIZABETH STREET
WEST ELIZABETH STREET
NICOL CAMPUS WEST
1205 W. ELIZABETH ST. A
NICOL CAMPUS
WEST LIMITED
1213 W.
ELIZABETH ST.
GLEASON/WESTSIDE
INVESTMENTS
LLC
1301 W.
ELIZABETH ST.
JDH2 INVESTMENTS LLC
1305 W. ELIZABETH ST.
PHILLIPS DAVID J LIVING
TRUST (.615)
1335 W. ELIZABETH ST. 160
1221 W.
ELIZABETH ST.
100-YR FLOODWAY 100-YR FLOODPLAIN
CONNECT TO
EXISTING
STORM INLET
EXISTING
STORM DRAIN
PROPOSED
STORM DRAIN
PROPOSED
STORM DRAIN PROPOSED
INLET
PROPOSED
INLET
EXISTING
CONCRETE PAN EXISTING
PROPOSED CONCRETE PAN
INLET
PROPOSED
INLET
PROPOSED 2'
SIDEWALK CULVERT
PROPOSED 2'
PROPOSED CONCRETE PAN
STORMTECH CHAMBERS
PROPOSED
INLET
EXISTING
INLET
PROPOSED AREA
DRAIN BASIN
PROPOSED AREA
DRAIN BASIN
PROPOSED
UNDERDRAIN
PROPOSED
STORM DRAIN
PROPOSED
UNDERDRAIN
CF CF CF CF CF CF CF CF
CF CF CF CF CF CF
CF
CF CF
CF
CF CF
CF
CF
CF CF
CF
CF
CF
CF CF
CF
CF
CF CF
CF CF CF
CF
CF CF CF
CF
CF CF
CF
CF CF CF CF
100-YR FLOODPLAIN
100-YR FLOODPLAIN
PROPOSED AREA
DRAIN BASIN
PROPOSED 10'
CONCRETE PAN
VTC
CWA
CF
WD
RS
IP
IP
IP
IP
IP
IP
IP
IP
IP IP
CF CF
CF
CF
IP
RS
RS
RS
RS
BLDG A
BLDG B
BLDG C
CHURCH
BLDG
TUBULAR MARKER
(SEE DETAIL)
TUBULAR MARKER
(SEE DETAIL) TUBULAR MARKER
(SEE DETAIL)
TUBULAR MARKER
(SEE DETAIL)
TUBULAR MARKER
(SEE DETAIL)
PROPOSED AREA
DRAIN BASIN
PROPOSED AREA
DRAIN BASIN
IP
IP
IP
IP
PROPOSED AREA
DRAIN BASIN
IP
APPROXIMATE
FUTURE 100-YR
FLOODPLAIN
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C700
EROSION CONTROL PLAN
15
NORTH
( IN FEET )
1 inch = ft.
60 0 60 Feet
60
120 180
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION
Project: Saint John XXIII and Lombardy Student Housing
CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING
BEST MANAGEMENT PRACTICES (BMPS)
Structural "Installation"
Flow Barriers (Bales, Wattles, etc.) (RS)
UTILITIES
INSTALLATION
FLAT WORK
INSTALLATION
VERTICAL
INSTALLATION LANDSCAPE DEMOBILIZATION
Concrete Washout Area (CWA)
* All Temporary BMPs to be Removed once Construction is Complete
Vehicle Tracking Pad * (VTC)
Construction Fence w/ Wattle (CF)
NORTH
1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR
PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY
DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL
AUTHORITIES.
2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY
NECESSARILY SHOWN IN THEIR EXACT LOCATION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH
GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION
CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED.
4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION
SEQUENCING AND LEVEL OF SITE STABILIZATION.
5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS
UNTIL SITE IS FULLY STABILIZED.
6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN
SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT.
7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN
WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.)
8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO
MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO
ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE.
9. CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND
ENTERING THE PERMEABLE PAVER SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED.
10. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THAT EACH BUILDING PAD IS STABILIZED
THROUGHOUT CONSTRUCTION. WATTLES SHALL BE PROVIDED AROUND BUILDING PAD SIDES TO ENSURE AT NO TIME SHALL
SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS.
11. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER
PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN
SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.)
12. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL
DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT
WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR
DRAINAGE WAY.
13. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED
AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A
CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF
WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS
SHALL BE STAKED DOWN.
14. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING
OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS
HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE.
15. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS,
DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL
STAFF TO PREVENT EROSION.
16. CONTRACTOR SHALL EXERCISE CAUTION TO PROTECT RAIN GARDENS AND MODIFIED RAIN GARDEN FROM SEDIMENTATION. THIS
INCLUDES EDUCATING SUBCONTRACTORS ON-SITE.
17. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE
STABILIZATION METHODS.
18. DIRT AND DEBRIS FROM CONSTRUCTION ACTIVITIES TRACKED ON CITY STREETS SHALL BE KEPT TO A MINIMUM AND CLEANED
NIGHTLY OR AT THE SUGGESTION OF THE CITY'S EROSION CONTROL INSPECTOR.
19. CONTRACTOR SHALL KEEP CONSTRUCTION VEHICLES ENTERING AND EXITING SITE TO A MINIMUM.
20. THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS, AND DIRT FROM
ANY SOURCE FROM ENTERING THE PERMEABLE PAVEMENT SYSTEM. LOOSE MATERIALS SHALL NOT BE STORED ON THE PERMEABLE
PAVEMENT AREA. MUD AND SEDIMENT-LADEN RUNOFF SHOULD BE KEPT AWAY FROM THE PAVEMENT AREA. TEMPORARILY DIVERT
RUNOFF OR INSTALL SEDIMENT CONTROL MEASURES AS NECESSARY TO REDUCE THE AMOUNT OF SEDIMENT RUN-ON TO THE
PAVEMENT. SURFACE PROTECTION COULD INCLUDE COVERING AREAS OF THE PAVEMENT, PROVIDING ALTERNATIVE
CONSTRUCTION VEHICLE ACCESS, AND PROVIDING EDUCATION TO ALL PARTIES WORKING ONSITE.
EROSION CONTROL NOTES:
BENCHMARK
NOTE:
ALL BMPS SHOWN ON THIS PLAN ARE GRAPHIC
REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE
AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR
AND DOCUMENTED ON THE DYNAMIC SITE PLAN.
1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR
SIMILAR METHODS.
2. TOTAL DISTURBED AREA = 5.56 ACRES
3. SWMP ADMINISTRATOR:
Contact ________________________________
Company ________________________________
Address ________________________________
Phone________________________________
4. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF
ACCESS IS OFF PAVEMENT.
5. REFER TO THE PRELIMINARY DRAINAGE REPORT FOR SAINT JOHN XXIII AND LOMBARDY STUDENT
HOUSING, DATED MAY 1, 2019, BY NORTHERN ENGINEERING, FOR ADDITIONAL INFORMATION.
6. FOR ADDITIONAL INFORMATION SEE SEPARATE STORMWATER MANAGEMENT PLAN / EROSION
CONTROL REPORT FOR SAINT JOHN XXIII AND LOMBARDY STUDENT HOUSING.
7. CONTRACTOR SHALL INSTALL PAVERS AS LATE AS FEASIBLE IN THE CONSTRUCTION PROCESS AND
SHALL PROTECT IN PLACE ONCE INSTALLED TO PREVENT SEDIMENT LOADING OF THIS DRAINAGE
FACILITY DURING CONSTRUCTION.
GENERAL NOTES:
LEGEND:
PROPOSED CONTOUR
PROPOSED STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED CURB & GUTTER
PROPERTY BOUNDARY
PROPOSED INLET
VEHICLE TRACKING CONTROL PAD
CONSTRUCTION FENCE w/ WATTLE CF
CONCRETE WASHOUT
ROCK SOCK
CWA
RS
VTC
CF
WATTLE DIKE WD
INLET PROTECTION IP
PROJECT DATUM: NAVD88
CITY OF FORT COLLINS BENCHMARK 20-97
AT THE SOUTHWEST CORNER OF WEST ELIZABETH AND CONSTITUTION AVE. ON A CONCRETE TRAFFIC
SIGNAL BASE.
ELEV.= 5050.15
CITY OF FORT COLLINS BENCHMARK 19-97
AT THE SOUTHEAST CORNER OF WEST ELIZABETH AND SHIELDS ST., ON A CONCRETE TRAFFIC SIGNAL
BASE.
ELEV.= 5025.74
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING
DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.18'
BASIS OF BEARINGS
THE BASIS OF BEARINGS IS THE EAST LINE OF THE SOUTHEAST QUARTER OF SECTION 15-7-69 AS
BEARING SOUTH 00° 29' 45" WEST (ASSUMED BEARING).
Paver Protection (PP)
CONCRETE PAN
CHURCH
BLDG
EXISTING
STORM DRAIN
53' STORAGE
96' TAPER
5015
5020
5025
5030
5035
5040
5015
5020
5025
5030
5035
5040
8+00 9+00 10+00 11+00 12+00 13+00 14+00 14+50
5025.84
5025.96
5026.09
5026.21
5026.34
5026.46
5026.59
5026.71
5026.87
5027.12
5027.36
5027.61
0.50%
0.98%
PVI STA = 10+00.00
PVI ELEV = 5025.71
PVI STA = 12+17.57
PVI ELEV = 5026.80
PVI STA = 13+09.97
PVI ELEV = 5027.71
(0.60%)
PROPOSED
FLOWLINE GRADE
EXISTING
GROUND
PROPOSED
FLOWLINE GRADE
EXISTING
GROUND
FLOW
LINE
9+50
5020
5024
5028
5032
5020
5024
5028
5032
-60 -40 -20 0 20
FLOW
LINE
10+00
5020
5024
5028
5032
5020
5024
5028
5032
-60 -40 -20 0 20
FLOW
LINE
10+50
5020
5024
5028
5032
5020
5024
5028
5032
-60 -40 -20 0 20
FLOW
LINE
11+00
5020
5024
5028
5032
5020
5024
5028
5032
-60 -40 -20 0 20
FLOW
LINE
11+50
5020
5024
5028
5032
5020
5024
5028
5032
-60 -40 -20 0 20
FLOW
LINE
12+00
5020
5024
5028
5032
5020
5024
5028
5032
-60 -40 -20 0 20
FLOW
LINE
12+50
5020
5024
5028
5032
5020
5024
5028
5032
-60 -40 -20 0 20
FLOW
LINE
13+00
5020
5024
5028
5032
5020
5024
5028
5032
-60 -40 -20 0 20
3.42%
3.16%
2.65%
2.76%
2.44%
3.02%
5025.7
5025.71
5026.0
5025.96
5026.7
5026.21
5027.2
5026.46
5027.8
5026.71
5027.4
5027.12
5028.2
5027.61
PROPOSED
GROUND
EXISTING
GROUND
VERTICAL
CURB AND
GUTTER
PROPOSED
GROUND
EXISTING
GROUND
(4.4%)
(5.0%)
(4.2%)
(5.3%)
(5.2%)
(5.0%)
(5.1%)
PROPOSED
SAWCUT
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C500
PLAN & PROFILE, & CROSS-SECTIONS
SOUTH SHIELDS STREET-FLOWLINE
14
NORTH
( IN FEET )
1 inch = ft.
30 0 30 Feet
30
60 90
KEYMAP
VAULT
TELE
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
DN UP
UP
DN UP
DN UP
DN UP
DN
TF
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
RIGHT FLOWLINE
SOUTH SHIELDS STREET
SCALE : 1" = 30' (H) 1" = 5' (V)
EXISTING RIGHT-OF-WAY
LEGEND:
PROPOSED STORM SEWER
EXISTING STORM SEWER
PROPOSED STORM MANHOLE
PROPOSED CURB & GUTTER
PROPOSED CENTERLINE
PEDESTRIAN ACCESS RAMPS
PROPOSED CONCRETE
CROSSPAN (TYP.)
PROPOSED RIGHT-OF-WAY
NOTES:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND
UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS.
3. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE
TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR
STANDARDS.
4. EXISTING AND PROPOSED MANHOLE RIMS AND VALVE BOX LIDS TO BE ADJUSTED TO 1
4" BELOW
FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING
LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS.
PROPOSED STORM INLET
PROPERTY BOUNDARY
PROPOSED LOT LINE
EASEMENT LINE
EXISTING LOT LINE
PROPOSED LIGHT POLE
EXISTING LIGHT POLE
CROSS SECTION PROFILES
SOUTH SHIELDS STREET
SOUTH SHIELDS ST
X
X X
X
X
TF
X
X
X
D
N
X
X
X X
X
UNIVERSITY AVENUE
SOUTH SHIELDS STREET
NICOL CAMPUS WEST
1205 W. ELIZABETH ST. A
DRIVEWAY
DRIVEWAY
52' HALF ROW
10' CONCRETE PAN
±39' FL-FL
31' HALF- ROW
ACCESS EASEMENT
9' UTILITY EASEMENT
5' SIDEWALK
6' SIDEWALK
15' UTILITY EASEMENT
EXISTING MEDIAN
CURB & GUTTER
PROPOSED 30" VERTICAL
CURB & GUTTER
PROPOSED 30" VERTICAL
CURB & GUTTER
DRIVEWAY
27' FL-FL
39' FL-FL
26' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
20' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
PROPOSED 18" VERTICAL
INFLOW CURB & GUTTER
PROPOSED 18" VERTICAL
OUTFALL CURB & GUTTER
STAIRS
(RE: ARCHITECT)
STAIRS
(RE: ARCHITECT)
RAMP
(RE: ARCHITECT)
±17' FL-BACK OF BUILDING
PROPOSED 2'
CONCRETE PAN
PROPOSED 2'
SIDEWALK CULVERT
STAIRS
(RE: ARCHITECT)
STAIRS
(RE: ARCHITECT)
PROPOSED
STORMTECH CHAMBERS
PROPOSED
STORM DRAIN
PROPOSED 2'
CONCRETE PAN
PROPOSED
INLET
EXISTING
INLET
PROPOSED ROOF DRAIN
CONNECTION
PROPOSED
ROOF DRAIN
CONNECTION
PROPOSED
TRANSFORMER
PROPOSED
UNDERDRAIN
BLDG C
FFE=30.50
CHURCH BLDG
FFE=37.00
PROPOSED
STORM DRAIN
30.50
27.45
26.31
26.26
26.93
30.48
30.50
29.96
30.50
30.50
28.09
27.15
26.77
26.77
26.80
26.91
25.90
25.94
26.67
27.42
27.47
26.89
30.29
30.32
37.00
37.00
36.72
33.39
33.39
30.29
28.30
37.00
27.75
27.60
27.25
27.42
27.12
27.98
26.69
25.99
26.17
26.20
25.90
25.81
28.91
28.91
29.55
30.50
30.21
29.47
36.89
29.75
33.50
30.50
STAIRS
(RE: ARCHITECT) STAIRS
(RE: ARCHITECT)
(29.21)
(28.83)
(28.74)
(28.48)
(28.47)
46' DRIVE-OVER
CURB & GUTTER
3.0%
1.3%
100-YR FLOODPLAIN
100-YR FLOODPLAIN
(PER CSU CLOMR)
SOUTH SHIELDS STREET-FLOWLINE
SEE SHEET C500
EXISTING
STORM DRAIN
(PRIVATE)
30.50
29.50
30.13
30.13
33.13
33.67
36.04
29.59
33.00
36.09
37.00
28.97
33.00
36.09
36.42
36.42
37.00
27.68
27.85
37.00
29.16
29.65
36.74
36.09
36.09
30.37
29.25
28.50
31.20
31.20
30.52
30.51
29.47
BUILDING
OVERHANG
BUILDING
OVERHANG
29.85
STAIRS
(RE: ARCHITECT)
PROPOSED AREA
DRAIN BASIN
PROPOSED AREA
DRAIN BASIN
PROPOSED AREA
DRAIN BASIN
PROPOSED AREA
DRAIN BASIN
APPROXIMATE FUTURE
100-YR FLOODPLAIN
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C403
GRADING PLAN
13
NORTH
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
SEE SHEET C402
KEYMAP
VAULT
TELE
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
DN UP
UP
DN UP
DN UP
DN UP
DN
TF
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
C401 C402 C403
LEGEND:
PROPOSED CONTOUR
EXISTING CONTOUR
PROPERTY BOUNDARY
PROPOSED SPOT ELEVATION
33.43
PROPOSED SLOPES
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE
COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND
UTILITIES.
2. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY
EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
3. ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE
ELEVATIONS.
4. ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM NAVD88. SEE COVER SHEET
FOR BENCHMARK REFERENCES.
5. THE BOTTOM OF MASONRY SHALL GENERALLY FOLLOW FINISHED GRADES. THERE SHALL BE A
MAXIMUM OF 12" EXPOSED CONCRETE BETWEEN THE FINISHED GRADE AND ALL MASONRY.
6. THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING AND VERIFYING ELEVATIONS OF ALL
CURBS AND GUTTERS AT THE POINTS OF CONNECTION SHOWN ON THE PLANS PRIOR TO INSTALLING
ANY OF THE NEW IMPROVEMENTS. IF A CONFLICT EXISTS AND/OR A DESIGN MODIFICATION IS
REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN.
7. ADD 5000-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED.
8. CONTRACTOR SHALL CONFIRM AND COORDINATE WITH STAMPED ARCHITECTURAL AND LANDSCAPE
ARCHITECTURE DRAWINGS FOR ALL STEPS, RAMPS, LANDSCAPING WALLS, SEATWALLS, RAILINGS,
AND PLANTERS.
9. CONTRACTOR SHALL CONFIRM AND COORDINATE WITH STAMPED STRUCTURAL DRAWINGS FOR
ELEVATIONS AND GRADE CONDITIONS ALONG BUILDING PERIMETER. NOTIFY OWNER, ARCHITECT,
AND ENGINEER(S) OF ANY DISCREPANCIES PRIOR TO MOBILIZATION.
10. THE LOWEST FLOOR (INCLUDING ANY BASEMENT OR CRAWL SPACE) AND ALL HVAC EQUIPMENT
SHALL BE FLOOD PROTECTED ABOVE THE REGULATORY FLOOD PROTECTION ELEVATION.
11. A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH SITE CONSTRUCTION ELEMENT IN THE
FLOODPLAIN, INCLUDING BUILDING. THE FLOODPLAIN USE PERMIT FOR THE BUILDING WILL BE
APPROVED AT THE TIME OF BUILDING PERMIT APPLICATION.
12. SEE THE FLOODPLAIN EXHIBIT (SHEET C900) FOR ADDITIONAL INFORMATION REGARDING WORK
WITHIN THE FLOODPLAIN AND FLOODWAY.
13. APPLICANT IS AWARE THAT THE CURRENT PLAN DOES NOT MEET REGULATORY REQUIREMENTS
AND IS CONTINUING THROUGH THE PLANNING PROCESS AT THE APPLICANT'S OWN RISK.
BUILDING PERMITS FOR STRUCTURES NOT MEETING FLOODPLAIN REQUIREMENTS BASED ON
THE CURRENT REGULATORY FLOODPLAIN MAY BE HELD UP IF THE LOMR IS NOT FINISHED
AND REGULATORY.
14. THIS PROPERTY IS LOCATED WITHIN A CITY REGULATED 100-YEAR FLOODPLAIN AND MUST COMPLY
WITH CHAPTER 10 OF THE CITY CODE.
15. RESIDENTIAL USES IN THE 100-YEAR FLOODPLAIN MUST BE ELEVATED ABOVE THE REGULATORY
FLOOD PROTECTION ELEVATION.
16. CRITICAL FACILITIES, INCLUDING FACILITIES FOR AT-RISK POPULATIONS, ARE PROHIBITED WITHIN
THE 100-YEAR FLOODPLAIN.
NOTES:
2.0%
(47.45)
EXISTING SPOT ELEVATION
PROPOSED STORM
PROPOSED VERTICAL CURB AND GUTTER
PROPOSED SWALE
100-YR FLOODPLAIN
100-YR FLOODWAY
CONCRETE PAN
PROPOSED
CONCRETE PAN
EXISTING
CONCRETE PAN
PROPOSED
INLET
PROPOSED
INLET PROPOSED
INLET
PROPOSED
STORMTECH CHAMBERS
PROPOSED ROOF DRAIN
CONNECTION
PROPOSED
TRANSFORMER
PROPOSED
TRANSFORMER
100-YR FLOODPLAIN
FFE=33.60
BLDG B
FFE=33.60
BLDG B
FFE=33.60
BLDG C
FFE=32.00
BLDG C
FFE=32.00
33.60
32.40
33.60
33.60
33.60
33.59
33.60
32.60
30.01
30.50
30.50
31.01
33.60
33.60
30.84
27.53
28.41
(28.76)
32.08
31.14
29.66
29.60
28.31
28.29
28.38
28.42
28.71
27.90
28.69
28.71
28.38
28.59
28.82
28.54
28.08
28.07
27.79
27.72
30.45
30.50
30.50
28.76
27.45
26.85
26.82
30.48
28.42
29.88
29.50
29.50
30.14
31.91
32.00
31.33
31.23
31.23
30.50
30.46
29.48
29.75
29.76
29.87
31.99
32.16
BLDG B
FFE=30.50
(31.64)
(29.58)
(29.21)
3.0%
3.0%
0.5% 1.5%
1.8%
(27.94)
32.43
10' SIDEWALK
STAIRS
(RE: ARCHITECT)
31.83
31.57
31.67
29.43
100-YR FLOODPLAIN
5' UTILITY
EASEMENT
PROPOSED
UNDERDRAIN
STAIRS
(RE: ARCHITECT)
PROPOSED AREA
DRAIN BASIN
32.00
29.50
28.93
31.35
31.83
32.93
STAIRS
(RE: ARCHITECT)
STAIRS
(RE: ARCHITECT)
31.59
30.35
30.23
32.00
30.49
STAIRS
(RE: ARCHITECT)
30.17
APPROXIMATE FUTURE
100-YR FLOODPLAIN
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C402
GRADING PLAN
12
NORTH
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
SEE SHEET C401
KEYMAP
VAULT
TELE
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
DN UP
UP
DN UP
DN UP
DN UP
DN
TF
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
SEE SHEET C403
C401 C402 C403
LEGEND:
PROPOSED CONTOUR
EXISTING CONTOUR
PROPERTY BOUNDARY
PROPOSED SPOT ELEVATION
33.43
PROPOSED SLOPES
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE
COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND
UTILITIES.
2. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY
EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
3. ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE
ELEVATIONS.
4. ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM NAVD88. SEE COVER SHEET
FOR BENCHMARK REFERENCES.
5. THE BOTTOM OF MASONRY SHALL GENERALLY FOLLOW FINISHED GRADES. THERE SHALL BE A
MAXIMUM OF 12" EXPOSED CONCRETE BETWEEN THE FINISHED GRADE AND ALL MASONRY.
6. THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING AND VERIFYING ELEVATIONS OF ALL
CURBS AND GUTTERS AT THE POINTS OF CONNECTION SHOWN ON THE PLANS PRIOR TO INSTALLING
ANY OF THE NEW IMPROVEMENTS. IF A CONFLICT EXISTS AND/OR A DESIGN MODIFICATION IS
REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN.
7. ADD 5000-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED.
8. CONTRACTOR SHALL CONFIRM AND COORDINATE WITH STAMPED ARCHITECTURAL AND LANDSCAPE
ARCHITECTURE DRAWINGS FOR ALL STEPS, RAMPS, LANDSCAPING WALLS, SEATWALLS, RAILINGS,
AND PLANTERS.
9. CONTRACTOR SHALL CONFIRM AND COORDINATE WITH STAMPED STRUCTURAL DRAWINGS FOR
ELEVATIONS AND GRADE CONDITIONS ALONG BUILDING PERIMETER. NOTIFY OWNER, ARCHITECT,
AND ENGINEER(S) OF ANY DISCREPANCIES PRIOR TO MOBILIZATION.
10. THE LOWEST FLOOR (INCLUDING ANY BASEMENT OR CRAWL SPACE) AND ALL HVAC EQUIPMENT
SHALL BE FLOOD PROTECTED ABOVE THE REGULATORY FLOOD PROTECTION ELEVATION.
11. A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH SITE CONSTRUCTION ELEMENT IN THE
FLOODPLAIN, INCLUDING BUILDING. THE FLOODPLAIN USE PERMIT FOR THE BUILDING WILL BE
APPROVED AT THE TIME OF BUILDING PERMIT APPLICATION.
12. SEE THE FLOODPLAIN EXHIBIT (SHEET C900) FOR ADDITIONAL INFORMATION REGARDING WORK
WITHIN THE FLOODPLAIN AND FLOODWAY.
13. APPLICANT IS AWARE THAT THE CURRENT PLAN DOES NOT MEET REGULATORY REQUIREMENTS
AND IS CONTINUING THROUGH THE PLANNING PROCESS AT THE APPLICANT'S OWN RISK.
BUILDING PERMITS FOR STRUCTURES NOT MEETING FLOODPLAIN REQUIREMENTS BASED ON
THE CURRENT REGULATORY FLOODPLAIN MAY BE HELD UP IF THE LOMR IS NOT FINISHED
AND REGULATORY.
14. THIS PROPERTY IS LOCATED WITHIN A CITY REGULATED 100-YEAR FLOODPLAIN AND MUST COMPLY
WITH CHAPTER 10 OF THE CITY CODE.
15. RESIDENTIAL USES IN THE 100-YEAR FLOODPLAIN MUST BE ELEVATED ABOVE THE REGULATORY
FLOOD PROTECTION ELEVATION.
16. CRITICAL FACILITIES, INCLUDING FACILITIES FOR AT-RISK POPULATIONS, ARE PROHIBITED WITHIN
THE 100-YEAR FLOODPLAIN.
NOTES:
2.0%
(47.45)
EXISTING SPOT ELEVATION
PROPOSED STORM
PROPOSED VERTICAL CURB AND GUTTER
PROPOSED SWALE
100-YR FLOODPLAIN
100-YR FLOODWAY
PROPOSED 18"
VERTICAL INFLOW
CURB & GUTTER
EXISTING 30" VERTICAL
CURB & GUTTER
31' HALF- ROW
MATCH EXISTING
CURB & GUTTER (TYP.) DRIVEWAY
±40' FL-FL
STAIRS
(RE: ARCHITECT)
PROPOSED
STORM DRAIN
PROPOSED
INLET
PROPOSED ROOF DRAIN
CONNECTION
PROPOSED AREA
DRAIN BASIN
PROPOSED AREA
DRAIN BASIN
PROPOSED
TRANSFORMER
PROPOSED
UNDERDRAIN
BLDG A
FFE=39.60
FFE=33.60
33.60
33.60
30.56
31.12
38.93
37.20
33.60
33.60
33.60
33.71
39.60
31.83
34.50
38.10
38.10
30.02
30.67
30.29
31.18
32.55
32.08
31.85
32.28
32.21
32.05
31.75
31.26
30.62
31.14
31.50
31.09
30.46
30.25
30.89
33.36
37.16
(32.43)
100-YR FLOODPLAIN
32.14
31.18
33.60
2.0%
1.0%
2.0%
2.0%
3.0%
10' SIDEWALK
5' UTILITY
EASEMENT
5' UTILITY
EASEMENT
PROPOSED AREA
DRAIN BASIN
38.93
STAIR
(RE: ARCHITECT)
33.19
33.60
34.98
37.13
38.21
33.60
PROPOSED
LANDSCAPE
WALL
APPROXIMATE FUTURE
100-YR FLOODPLAIN
LANDSCAPE
WALL
LANDSCAPE
WALL
LANDSCAPE
WALL
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
5028
5032
5036
5040
5028
5032
5036
5040
-20 0 20
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
5028
5032
5036
5040
5028
5032
5036
5040
-20 0 20
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
5028
5032
5036
5040
5028
5032
5036
5040
-20 0 20
5029.8
5030.7
5032.4
EXISTING
GROUND
PROPOSED
GRADE
7.58'
9.21'
EXISTING
GROUND
PROPOSED
GRADE
EXISTING 6.94'
GROUND
PROPOSED
GRADE
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C401
GRADING PLAN
11
NORTH
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
SEE SHEET C402
KEYMAP
VAULT
TELE
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
DN UP
UP
DN UP
DN UP
DN UP
DN
TF
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
C401 C402 C403
LEGEND:
PROPOSED CONTOUR
EXISTING CONTOUR
PROPERTY BOUNDARY
PROPOSED SPOT ELEVATION
33.43
PROPOSED SLOPES
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE
COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND
UTILITIES.
2. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY
EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
3. ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE
ELEVATIONS.
4. ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM NAVD88. SEE COVER SHEET
FOR BENCHMARK REFERENCES.
5. THE BOTTOM OF MASONRY SHALL GENERALLY FOLLOW FINISHED GRADES. THERE SHALL BE A
MAXIMUM OF 12" EXPOSED CONCRETE BETWEEN THE FINISHED GRADE AND ALL MASONRY.
6. THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING AND VERIFYING ELEVATIONS OF ALL
CURBS AND GUTTERS AT THE POINTS OF CONNECTION SHOWN ON THE PLANS PRIOR TO INSTALLING
ANY OF THE NEW IMPROVEMENTS. IF A CONFLICT EXISTS AND/OR A DESIGN MODIFICATION IS
REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN.
7. ADD 5000-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED.
8. CONTRACTOR SHALL CONFIRM AND COORDINATE WITH STAMPED ARCHITECTURAL AND LANDSCAPE
ARCHITECTURE DRAWINGS FOR ALL STEPS, RAMPS, LANDSCAPING WALLS, SEATWALLS, RAILINGS,
AND PLANTERS.
9. CONTRACTOR SHALL CONFIRM AND COORDINATE WITH STAMPED STRUCTURAL DRAWINGS FOR
ELEVATIONS AND GRADE CONDITIONS ALONG BUILDING PERIMETER. NOTIFY OWNER, ARCHITECT,
AND ENGINEER(S) OF ANY DISCREPANCIES PRIOR TO MOBILIZATION.
10. THE LOWEST FLOOR (INCLUDING ANY BASEMENT OR CRAWL SPACE) AND ALL HVAC EQUIPMENT
SHALL BE FLOOD PROTECTED ABOVE THE REGULATORY FLOOD PROTECTION ELEVATION.
11. A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH SITE CONSTRUCTION ELEMENT IN THE
FLOODPLAIN, INCLUDING BUILDING. THE FLOODPLAIN USE PERMIT FOR THE BUILDING WILL BE
APPROVED AT THE TIME OF BUILDING PERMIT APPLICATION.
12. SEE THE FLOODPLAIN EXHIBIT (SHEET C900) FOR ADDITIONAL INFORMATION REGARDING WORK
WITHIN THE FLOODPLAIN AND FLOODWAY.
13. APPLICANT IS AWARE THAT THE CURRENT PLAN DOES NOT MEET REGULATORY REQUIREMENTS
AND IS CONTINUING THROUGH THE PLANNING PROCESS AT THE APPLICANT'S OWN RISK.
BUILDING PERMITS FOR STRUCTURES NOT MEETING FLOODPLAIN REQUIREMENTS BASED ON
THE CURRENT REGULATORY FLOODPLAIN MAY BE HELD UP IF THE LOMR IS NOT FINISHED
AND REGULATORY.
14. THIS PROPERTY IS LOCATED WITHIN A CITY REGULATED 100-YEAR FLOODPLAIN AND MUST COMPLY
WITH CHAPTER 10 OF THE CITY CODE.
15. RESIDENTIAL USES IN THE 100-YEAR FLOODPLAIN MUST BE ELEVATED ABOVE THE REGULATORY
FLOOD PROTECTION ELEVATION.
16. CRITICAL FACILITIES, INCLUDING FACILITIES FOR AT-RISK POPULATIONS, ARE PROHIBITED WITHIN
THE 100-YEAR FLOODPLAIN.
NOTES:
2.0%
(47.45)
EXISTING SPOT ELEVATION
PROPOSED STORM
PROPOSED VERTICAL CURB AND GUTTER
PROPOSED SWALE
100-YR FLOODPLAIN
100-YR FLOODWAY
TREE CROSS SECTIONS
TREE # 24
SECTION A-A
A A
B
C
C
B
TREE # 26
SECTION B-B
TREE # 28
SECTION C-C
BUILDING
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
T
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC T
ELEC
FO
FO
FO
X X X
ST
ST
ST
ST ST
ST
V
AULT
ELEC
SS SS SS SS SS
SS SS
SS
UD
UD
UD UD UD
UD
UD UD UD
UD
UD UD UD UD
E
FDC FDC
FDC
FDC
E
E
E
E E
E E
E E
E
E
E
E
V
AULT
ELEC
VAULT
ELEC
VAULT
ELEC
FDWH
E
E
E
E
E
E
G G
G
G
D
N
UP
DN
DN
DN
DN
X X X
X
X
X X
X X X
X
X
X X
TF
TF
TF
TF
X
DN
X
UNIVERSITY AVENUE
SOUTH SHIELDS STREET
CITY PARK AVENUE
WEST ELIZABETH STREET
WEST ELIZABETH STREET
NICOL CAMPUS WEST
1205 W. ELIZABETH ST. A
NICOL CAMPUS
WEST LIMITED
1213 W.
ELIZABETH ST.
GLEASON/WESTSIDE
INVESTMENTS
LLC
1301 W.
ELIZABETH ST.
JDH2 INVESTMENTS LLC
1305 W. ELIZABETH ST.
PHILLIPS DAVID J LIVING
TRUST (.615)
1335 W. ELIZABETH ST. 160
1221 W.
ELIZABETH ST.
100-YR FLOODWAY
100-YR FLOODPLAIN
CONNECT TO
EXISTING
STORM INLET
EXISTING
STORM DRAIN
9' UTILITY EASEMENT
9' UTILITY EASEMENT
15' UTILITY EASEMENT
26' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
10' UTILITY
EASEMENT
PROPOSED
STORMTECH CHAMBERS
PROPOSED
STORM DRAIN
PROPOSED
STORM DRAIN
UNIVERSITY AVENUE
BLDG A
BLDG B
BLDG C
CHURCH
BLDG
5' UTILITY
EASEMENT
5' UTILITY
EASEMENT
5' UTILITY
EASEMENT
PROPOSED
STORM DRAIN
9' UTILITY EASEMENT
APPROXIMATE FUTURE
100-YR FLOODPLAIN
100-YR FLOODPLAIN
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C400
OVERALL GRADING PLAN
10
NORTH
( IN FEET )
1 inch = ft.
60 0 60 Feet
60
120 180
KEYMAP
VAULT
TELE
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
DN UP
UP
DN UP
DN UP
DN UP
DN
TF
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
C401 C402 C403
LEGEND:
PROPOSED CONTOUR
EXISTING CONTOUR
PROPERTY BOUNDARY
PROPOSED SPOT ELEVATION
33.43
PROPOSED SLOPES
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE
COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND
UTILITIES.
2. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY
EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
3. ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE
ELEVATIONS.
4. ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM NAVD88. SEE COVER SHEET
FOR BENCHMARK REFERENCES.
5. THE BOTTOM OF MASONRY SHALL GENERALLY FOLLOW FINISHED GRADES. THERE SHALL BE A
MAXIMUM OF 12" EXPOSED CONCRETE BETWEEN THE FINISHED GRADE AND ALL MASONRY.
6. THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING AND VERIFYING ELEVATIONS OF ALL
CURBS AND GUTTERS AT THE POINTS OF CONNECTION SHOWN ON THE PLANS PRIOR TO INSTALLING
ANY OF THE NEW IMPROVEMENTS. IF A CONFLICT EXISTS AND/OR A DESIGN MODIFICATION IS
REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN.
7. ADD 5000-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED.
8. CONTRACTOR SHALL CONFIRM AND COORDINATE WITH STAMPED ARCHITECTURAL AND LANDSCAPE
ARCHITECTURE DRAWINGS FOR ALL STEPS, RAMPS, LANDSCAPING WALLS, SEATWALLS, RAILINGS,
AND PLANTERS.
9. CONTRACTOR SHALL CONFIRM AND COORDINATE WITH STAMPED STRUCTURAL DRAWINGS FOR
ELEVATIONS AND GRADE CONDITIONS ALONG BUILDING PERIMETER. NOTIFY OWNER, ARCHITECT,
AND ENGINEER(S) OF ANY DISCREPANCIES PRIOR TO MOBILIZATION.
10. THE LOWEST FLOOR (INCLUDING ANY BASEMENT OR CRAWL SPACE) AND ALL HVAC EQUIPMENT
SHALL BE FLOOD PROTECTED ABOVE THE REGULATORY FLOOD PROTECTION ELEVATION.
11. A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH SITE CONSTRUCTION ELEMENT IN THE
FLOODPLAIN, INCLUDING BUILDING. THE FLOODPLAIN USE PERMIT FOR THE BUILDING WILL BE
APPROVED AT THE TIME OF BUILDING PERMIT APPLICATION.
12. SEE THE FLOODPLAIN EXHIBIT (SHEET C900) FOR ADDITIONAL INFORMATION REGARDING WORK
WITHIN THE FLOODPLAIN AND FLOODWAY.
13. APPLICANT IS AWARE THAT THE CURRENT PLAN DOES NOT MEET REGULATORY REQUIREMENTS
AND IS CONTINUING THROUGH THE PLANNING PROCESS AT THE APPLICANT'S OWN RISK.
BUILDING PERMITS FOR STRUCTURES NOT MEETING FLOODPLAIN REQUIREMENTS BASED ON
THE CURRENT REGULATORY FLOODPLAIN MAY BE HELD UP IF THE LOMR IS NOT FINISHED
AND REGULATORY.
14. THIS PROPERTY IS LOCATED WITHIN A CITY REGULATED 100-YEAR FLOODPLAIN AND MUST COMPLY
WITH CHAPTER 10 OF THE CITY CODE.
15. RESIDENTIAL USES IN THE 100-YEAR FLOODPLAIN MUST BE ELEVATED ABOVE THE REGULATORY
FLOOD PROTECTION ELEVATION.
16. CRITICAL FACILITIES, INCLUDING FACILITIES FOR AT-RISK POPULATIONS, ARE PROHIBITED WITHIN
THE 100-YEAR FLOODPLAIN.
NOTES:
2.0%
(47.45)
EXISTING SPOT ELEVATION
PROPOSED STORM
PROPOSED VERTICAL CURB AND GUTTER
PROPOSED SWALE
100-YR FLOODPLAIN
100-YR FLOODWAY
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
T
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC T
ELEC
FO
FO
G G
G
G G G
G
G
G
X
E
E
E E
T
T
E E
E E
T
T
T
E
E
E
E
G
ST ST
ST
ST
ST
FO
FO
FO
FO
FO
FO
FO
G
G
G G
G
G
G
G
G
G G G G
G
G
E
FO
FO FO
FO
FO
G
FO
E
E
E
E
E
E
FO
FO FO
FO
G
G G
G
G G G G
G G G G
E E E
E
E
E E
E
E
E
E
E
G G
G
G
G G
FO
FO
FO
G
G
G
G
E
FO FO
FO
E G
E
E E
E
E
E
FO
FO
FO
FO
FO
FO
FO
FO
FO
E
FO
SS
SS SS
SS SS SS
SS
G G
SS SS
W
SS
SS
SS SS
SS
SS
SS
SS
SS
SS SS
SS
SS
ST
ST
ST
W W
W W W W W W
W
W
W
W W
W
W W W W W W W W
ST ST
W W
W W
W
W W W W
W W
SS SS SS
SS SS
SS
SS SS SS SS SS
SS SS
SS
SS SS SS
W
DN
UP
DN
DN
DN
DN
X
X X X
X
X X
X
X X
X
X X
X
X
TF
TF
X X
DN
X X
X
UNIVERSITY AVENUE
UNIVERSITY AVENUE
SOUTH SHIELDS STREET
WEST ELIZABETH STREET
NICOL CAMPUS WEST
1205 W. ELIZABETH ST. A
NICOL CAMPUS
WEST LIMITED
1213 W.
ELIZABETH ST.
100-YR FLOODWAY 100-YR FLOODPLAIN
APPROXIMATE LOCATION
EXISTING 6" WATER
EXISTING 8"
SANITARY SEWER
CONNECT TO
EXISTING
STORM INLET
EXISTING
STORM DRAIN
APPROXIMATE LOCATION
EXISTING FH
APPROXIMATE LOCATION
EXISTING FH
PROPOSED 6"
SANITARY SERVICE
PROPOSED 2.5"
WATER SERVICE
PROPOSED 6"
FIRE SERVICE
PROPOSED 4"
SANITARY SERVICE
PROPOSED
STORMTECH CHAMBERS
PROPOSED
STORM DRAIN
PROPOSED FH
EXISTING
CONCRETE PAN
PROPOSED
INLET
PROPOSED
INLET PROPOSED 2'
SIDEWALK CULVERT
PROPOSED 2'
CONCRETE PAN
PROPOSED
INLET
EXISTING
INLET
PROPOSED ROOF DRAIN
CONNECTION
PROPOSED
ROOF DRAIN
CONNECTION
PROPOSED
GREASE
INTERCEPTOR
PROPOSED 6"
FIRE SERVICE
PROPOSED 2"
WATER METER
CONNECT TO
EXISTING 6" WATER
INSTALL MH
CONNECT TO
EXISTING 8"
SANITARY SEWER
CONNECT TO
EXISTING 6" WATER
PROPOSED 4"
WATER SERVICE
CONNECT TO
EXISTING 6" WATER
INSTALL MH
CONNECT TO
EXISTING 8"
SANITARY SEWER
PROPOSED 4"
WATER METER
PROPOSED ROOF DRAIN
CONNECTION
PROPOSED
STORM DRAIN
PROPOSED
TRANSFORMER
PROPOSED
TRANSFORMER
9' UTILITY EASEMENT
9' UTILITY EASEMENT
15' UTILITY EASEMENT
26' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
24' FL-FL
26' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
20' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
PROPOSED 18" VERTICAL
INFLOW CURB & GUTTER
46' DRIVE-OVER
CURB & GUTTER
10' UTILITY
EASEMENT
PROPOSED 18" VERTICAL
OUTFALL CURB & GUTTER
PROPOSED
UNDERDRAIN
PROPOSED 18" VERTICAL
INFLOW CURB & GUTTER
PROPOSED
SAWCUT (TYP.)
32.85 LF 6" PVC
N00°57'15"E
PROPOSED AREA
DRAIN BASIN
BLDG C
CHURCH
BLDG
5' UTILITY
EASEMENT
PROPOSED 8"
SANITARY SERVICES
PROPOSED AREA
PROPOSED AREA DRAIN BASIN
DRAIN BASIN
PROPOSED AREA
DRAIN BASIN
PROPOSED AREA
DRAIN BASIN
APPROXIMATE FUTURE
100-YR FLOODPLAIN
100-YR FLOODPLAIN
PROPOSED 2"
WATER SERVICE
PROPOSED 2"
WATER METER
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C302
UTILITY PLAN
9
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
( IN FEET )
1 inch = ft.
30 0 30 Feet
30
60 90
SEE SHEET C300
KEYMAP
VAULT
TELE
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
DN UP
UP
DN UP
DN UP
DN UP
DN
TF
C301 C302
NOTES:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES
AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2. ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD
CONSTRUCTION SPECIFICATIONS LATEST EDITION.
3. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE.
4. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE
REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD.
5. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER
MAINS, WATER MAINS, AND SERVICES.
6. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS,
OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
7. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE
CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR
STANDARDS.
8. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS,
SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS
PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OR FORT COLLINS STANDARDS AT THE
DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO
THE ISSUANCE OF CERTIFICATE OF OCCUPANCY.
9. REFER TO PLUMBING PLANS FOR ALL WATER SERVICE AND SANITARY SEWER SERVICE LOCATIONS. IF
CONFLICT OCCURS, BOTH THE PLUMBING ENGINEER AND CIVIL ENGINEER SHALL BE CONTACTED PRIOR TO
INSTALLATION OR ORDERING OF MATERIALS.
10. ALL EXISTING SANITARY SEWER SERVICE CONNECTION INVERTS AND LOCATIONS BASED ON BEST
AVAILABLE DATA. CONTRACTOR TO VERIFY LOCATION PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER
OF ANY DISCREPANCIES.
11. PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES.
SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF
SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS.
13. CONTRACTOR SHALL COORDINATE ANY NECESSARY TELEPHONE, CABLE, FIBER, GAS, AND ELECTRIC
LOWERINGS (OR RE-ROUTING) WITH THE RESPECTIVE UTILITY PROVIDERS.
14. CONTRACTOR TO COORDINATE FINAL LOCATION OF ALL GAS AND ELECTRIC METERS WITH ARCHITECT AND
UTILITY PROVIDERS.
15. THE PLUMBING CONTRACTOR SHALL TERMINATE UTILITY LATERALS 5' OUTSIDE OF BUILDING UNLESS
NOTED OTHERWISE. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF ALL UTILITY CONNECTIONS INTO
THE PROPOSED BUILDING SHALL BE COORDINATED WITH APPROVED MECHANICAL/PLUMBING DRAWINGS.
16. REFER TO APPROVED SITE ELECTRICAL PLANS FOR ALL CONDUITS AND POWER LINE ROUTING FOR SITE
LIGHTING.
17. THE LOCATION OF PROPOSED DRY UTILITIES AS SHOWN ON THIS DRAWING ARE SHOWN FOR HORIZONTAL
ALIGNMENTS ONLY AND ARE APPROXIMATE. FINAL DESIGNS OF DRY UTILITIES WILL BE PERFORMED BY
THE APPROPRIATE UTILITY COMPANY AND/OR ENGINEER.
18. ALL CONDUIT PLACED BY THE CONTRACTOR FOR CABLE, PHONE AND INTERNET SHALL BE EQUIPPED WITH
PULL TAPE AND LOCATE WIRE PER THE SPECIFICATIONS OF EACH UTILITY COMPANY.
19. ELECTRIC SERVICE TO BE PROVIDED BY THE CITY OF FORT COLLINS. THE CITY SHALL INSTALL THE
TRANSFORMER AND PRIMARY LINE FROM THE CONNECTION POINT AT THE EXISTING MAIN TO EACH
TRANSFORMER. THE COST OF THE PRIMARY LINE, TRANSFORMER, AND INSTALLATION OF THE
SECONDARY LINE FROM THE TRANSFORMER TO THE BUILDING SHALL BE THE RESPONSIBILITY OF THE
DEVELOPER.
20. ELECTRIC TRANSFORMER PAD SIZE IS APPROXIMATE. COORDINATE FINAL LOCATION AND SIZE OF
TRANSFORMER WITH APPROVED ELECTRICAL PLANS.
21. GAS SERVICE TO BE PROVIDED BY XCEL ENERGY. XCEL SHALL INSTALL ALL GAS SERVICES AND METERS.
THE COST OF ALL THE SERVICE INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER.
22. A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH SITE CONSTRUCTION ELEMENT IN THE
FLOODPLAIN, INCLUDING BUILDING. THE FLOODPLAIN USE PERMIT FOR THE BUILDING WILL BE APPROVED
AT THE TIME OF BUILDING PERMIT APPLICATION.
23. A FLOODPLAIN USE PERMIT AND NO RISE CERTIFICATION WILL BE REQUIRED PRIOR TO ANY WORK
OCCURRING WITHIN THE FLOODWAY.
EXISTING WATER MAIN
LEGEND:
W
G
T
CTV
EXISTING STORM SEWER
EXISTING CABLE
EXISTING TELEPHONE
EXISTING GAS
PROPOSED SEWER SERVICE S
EXISTING SANITARY SEWER SS
PROPOSED CURB & GUTTER
PROPOSED WATER SERVICE
PROPOSED FIRE HYDRANT
EXISTING FIRE HYDRANT
EASEMENT LINE
PROPERTY BOUNDARY
EXISTING LOTLINE
W
PROPOSED WATER MAIN
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
PROPOSED ELECTRIC TRANSFORMER
PROPOSED ELECTRIC E
PROPOSED FIRE DEPARTMENT CONNECTION FDC
PROPOSED FIRE SERVICE F
EXISTING ELECTRIC E
PROPOSED SUBDRAIN UD
PROPOSED CABLE CTV
PROPOSED FIBRE OPTIC FO
PROPOSED GAS G
100-YR FLOODPLAIN
STORMTECH CHAMBER ISOLATOR ROW
STORMTECH CHAMBER
100-YR FLOODWAY
PROPOSED FIRE DEPARTMENT WALL HYDRANT FDWH
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
VAULT
ELEC
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
VAULT
F.O.
T T
T
ELEC
VAULT
ELEC
T
ELEC ELEC
FO
FO
FO FO
E
T T
T
X X
T
T
T
T
T T
T
T
T T T
T
T
T
X
X
X X
X
E E E
E
E
E E
E
E E
E E
E
E
E E E
E
E
E
E E E E
E
E
E
E
G G
G
G
G
G
G
G G
G
G
G
G
T
T
T T
T
T
T T T T T T T
T
T T
T
E E
E
E
E
E E
E
G
G
G
E
E
G
G
G
G
G G
G
T
T
T
T
T
G
G
G
E
E
E
E
E E
CTV
CTV
G
G
W
W
E
E
E
E
E
E
E
E
E
E
E
G
W
W
W W
W
G
G
G
G
G
G
G
CTV
CTV
CTV
CTV
G
E
E
SS
SS SS
SS SS SS SS SS SS
SS SS SS
SS
SS
SS
SS
ST
W
W
W
W
W W W W
W
W W W W W
W
W W W W W W W
W
V
AULT
ELEC
X X
X
X X
X
X X X
X
X
X
X X X
TF
TF
UNIVERSITY AVENUE
CITY PARK AVENUE
WEST ELIZABETH STREET
NICOL CAMPUS
WEST LIMITED
1213 W.
ELIZABETH ST.
GLEASON/WESTSIDE
INVESTMENTS
LLC
1301 W.
ELIZABETH ST.
JDH2 INVESTMENTS LLC
1305 W. ELIZABETH ST.
PHILLIPS DAVID J LIVING
TRUST (.615)
1335 W. ELIZABETH ST. 160
1221 W.
ELIZABETH ST.
APPROXIMATE LOCATION
EXISTING 6" WATER
EXISTING
10" WATER
100-YR FLOODWAY
100-YR FLOODPLAIN
EXISTING FH
EXISTING FH
PROPOSED 10"
SANITARY SERVICE
PROPOSED 8"
SANITARY SERVICE
PROPOSED
STORM DRAIN
PROPOSED
INLET
PROPOSED
INLET
EXISTING
CONCRETE PAN
PROPOSED
INLET
PROPOSED
STORMTECH CHAMBERS
PROPOSED ROOF DRAIN
CONNECTION
PROPOSED ROOF DRAIN
CONNECTION
CONNECT TO
EXISTING MH
PROPOSED 6"
FIRE SERVICE
PROPOSED 4"
WATER SERVICE
PROPOSED 4"
WATER METER
PROPOSED 4"
WATER METER
PROPOSED 6"
FIRE SERVICE
PROPOSED 4"
WATER SERVICE
INSTALL MH
CONNECT TO
EXISTING 8"
SANITARY SEWER
EXISTING 8"
SANITARY SEWER
CONNECT TO
EXISTING 6" WATER
CONNECT TO
EXISTING 6" WATER
PROPOSED AREA
DRAIN BASIN
PROPOSED AREA
DRAIN BASIN
PROPOSED
TRANSFORMER
PROPOSED
UNDERDRAIN
PROPOSED
TRANSFORMER
26' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
9' UTILITY EASEMENT
9' UTILITY EASEMENT
PROPOSED 18" VERTICAL
OUTFALL CURB & GUTTER
PROPOSED 18" VERTICAL
INFLOW CURB & GUTTER
PROPOSED 18" VERTICAL
INFLOW CURB & GUTTER
PROPOSED 18" VERTICAL
OUTFALL CURB & GUTTER
26' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
9' UTILITY EASEMENT
10' UTILITY
EASEMENT
100-YR FLOODPLAIN
PROPOSED
SAWCUT (TYP.)
BLDG A
BLDG B
5' UTILITY
EASEMENT
5' UTILITY
EASEMENT
5' UTILITY
EASEMENT
PROPOSED AREA
DRAIN BASIN
APPROXIMATE FUTURE
100-YR FLOODPLAIN
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C301
UTILITY PLAN
8
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
( IN FEET )
1 inch = ft.
30 0 30 Feet
30
60 90
SEE SHEET C302
KEYMAP
VAULT
TELE
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
DN UP
UP
DN UP
DN UP
DN UP
DN
TF
C301 C302
NOTES:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES
AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2. ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD
CONSTRUCTION SPECIFICATIONS LATEST EDITION.
3. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE.
4. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE
REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD.
5. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER
MAINS, WATER MAINS, AND SERVICES.
6. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS,
OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
7. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE
CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR
STANDARDS.
8. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS,
SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS
PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OR FORT COLLINS STANDARDS AT THE
DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO
THE ISSUANCE OF CERTIFICATE OF OCCUPANCY.
9. REFER TO PLUMBING PLANS FOR ALL WATER SERVICE AND SANITARY SEWER SERVICE LOCATIONS. IF
CONFLICT OCCURS, BOTH THE PLUMBING ENGINEER AND CIVIL ENGINEER SHALL BE CONTACTED PRIOR TO
INSTALLATION OR ORDERING OF MATERIALS.
10. ALL EXISTING SANITARY SEWER SERVICE CONNECTION INVERTS AND LOCATIONS BASED ON BEST
AVAILABLE DATA. CONTRACTOR TO VERIFY LOCATION PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER
OF ANY DISCREPANCIES.
11. PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES.
SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF
SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS.
13. CONTRACTOR SHALL COORDINATE ANY NECESSARY TELEPHONE, CABLE, FIBER, GAS, AND ELECTRIC
LOWERINGS (OR RE-ROUTING) WITH THE RESPECTIVE UTILITY PROVIDERS.
14. CONTRACTOR TO COORDINATE FINAL LOCATION OF ALL GAS AND ELECTRIC METERS WITH ARCHITECT AND
UTILITY PROVIDERS.
15. THE PLUMBING CONTRACTOR SHALL TERMINATE UTILITY LATERALS 5' OUTSIDE OF BUILDING UNLESS
NOTED OTHERWISE. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF ALL UTILITY CONNECTIONS INTO
THE PROPOSED BUILDING SHALL BE COORDINATED WITH APPROVED MECHANICAL/PLUMBING DRAWINGS.
16. REFER TO APPROVED SITE ELECTRICAL PLANS FOR ALL CONDUITS AND POWER LINE ROUTING FOR SITE
LIGHTING.
17. THE LOCATION OF PROPOSED DRY UTILITIES AS SHOWN ON THIS DRAWING ARE SHOWN FOR HORIZONTAL
ALIGNMENTS ONLY AND ARE APPROXIMATE. FINAL DESIGNS OF DRY UTILITIES WILL BE PERFORMED BY
THE APPROPRIATE UTILITY COMPANY AND/OR ENGINEER.
18. ALL CONDUIT PLACED BY THE CONTRACTOR FOR CABLE, PHONE AND INTERNET SHALL BE EQUIPPED WITH
PULL TAPE AND LOCATE WIRE PER THE SPECIFICATIONS OF EACH UTILITY COMPANY.
19. ELECTRIC SERVICE TO BE PROVIDED BY THE CITY OF FORT COLLINS. THE CITY SHALL INSTALL THE
TRANSFORMER AND PRIMARY LINE FROM THE CONNECTION POINT AT THE EXISTING MAIN TO EACH
TRANSFORMER. THE COST OF THE PRIMARY LINE, TRANSFORMER, AND INSTALLATION OF THE
SECONDARY LINE FROM THE TRANSFORMER TO THE BUILDING SHALL BE THE RESPONSIBILITY OF THE
DEVELOPER.
20. ELECTRIC TRANSFORMER PAD SIZE IS APPROXIMATE. COORDINATE FINAL LOCATION AND SIZE OF
TRANSFORMER WITH APPROVED ELECTRICAL PLANS.
21. GAS SERVICE TO BE PROVIDED BY XCEL ENERGY. XCEL SHALL INSTALL ALL GAS SERVICES AND METERS.
THE COST OF ALL THE SERVICE INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER.
22. A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH SITE CONSTRUCTION ELEMENT IN THE
FLOODPLAIN, INCLUDING BUILDING. THE FLOODPLAIN USE PERMIT FOR THE BUILDING WILL BE APPROVED
AT THE TIME OF BUILDING PERMIT APPLICATION.
23. A FLOODPLAIN USE PERMIT AND NO RISE CERTIFICATION WILL BE REQUIRED PRIOR TO ANY WORK
OCCURRING WITHIN THE FLOODWAY.
EXISTING WATER MAIN
LEGEND:
W
G
T
CTV
EXISTING STORM SEWER
EXISTING CABLE
EXISTING TELEPHONE
EXISTING GAS
PROPOSED SEWER SERVICE S
EXISTING SANITARY SEWER SS
PROPOSED CURB & GUTTER
PROPOSED WATER SERVICE
PROPOSED FIRE HYDRANT
EXISTING FIRE HYDRANT
EASEMENT LINE
PROPERTY BOUNDARY
EXISTING LOTLINE
W
PROPOSED WATER MAIN
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
PROPOSED ELECTRIC TRANSFORMER
PROPOSED ELECTRIC E
PROPOSED FIRE DEPARTMENT CONNECTION FDC
PROPOSED FIRE SERVICE F
EXISTING ELECTRIC E
PROPOSED SUBDRAIN UD
PROPOSED CABLE CTV
PROPOSED FIBRE OPTIC FO
PROPOSED GAS G
100-YR FLOODPLAIN
STORMTECH CHAMBER ISOLATOR ROW
STORMTECH CHAMBER
100-YR FLOODWAY
PROPOSED FIRE DEPARTMENT WALL HYDRANT FDWH
VAULT
ELEC
VAULT
ELEC
C
VAULT
ELEC
VAULT
ELEC
FO
FO
FO
ELEC
C
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
VAULT
ELEC
VAULT
ELEC
VAULT
ELEC VAULT
VAULT ELEC
ELEC
VAULT
TELE
VAULT
ELEC
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
VAULT
F.O.
T T
T
ELEC
VAULT
ELEC
T
ELEC ELEC
CONTROL
IRR
M
CONTROL
IRR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
T
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC T
ELEC
FO
FO
FO
G
G
G G
E
E
T
T EE T
X
T
T
T
T T
T
X X
E
E
E
E E
E
E
E E E
E
E
E
E
G
G
G
G
G
G
T
T
T
T T T
T
T
E
E
E
E
G
E
W
G
G
G
T
T
G
E
E
E
CTV
EE
E
E
W
W
G
G
G
CTV
CTV
ST
ST
G
G
G
G
FO
FO
E
G
G
G G
G
E
E
G G
E
FO
SS SS SS
G
SS
SS SS SS SS SS
SS
SS SS
SS
SS
SS
SS
ST
ST ST
ST
W W W W
W
W
W
W
W W W
W
W
W W W W W
W
W W
ST
V
AULT
ELEC
W
W
W W
W
SS SS
SS SS
SS SS SS SS
D
N
UP
DN
DN
DN
DN
X X X
X
X
X
X
X X X X
X
X
X
TF
TF
TF
TF
X
DN
X
UNIVERSITY AVENUE
SOUTH SHIELDS STREET
CITY PARK AVENUE
WEST ELIZABETH STREET
WEST ELIZABETH STREET
NICOL CAMPUS WEST
1205 W. ELIZABETH ST. A
NICOL CAMPUS
WEST LIMITED
1213 W.
ELIZABETH ST.
GLEASON/WESTSIDE
INVESTMENTS
LLC
1301 W.
ELIZABETH ST.
JDH2 INVESTMENTS LLC
1305 W. ELIZABETH ST.
PHILLIPS DAVID J LIVING
TRUST (.615)
1335 W. ELIZABETH ST. 160
1221 W.
ELIZABETH ST.
100-YR FLOODWAY
100-YR FLOODPLAIN
APPROXIMATE LOCATION
EXISTING 6" WATER
APPROXIMATE LOCATION
EXISTING 6" WATER
EXISTING
10" WATER
EXISTING 8"
SANITARY SEWER
CONNECT TO
EXISTING
STORM INLET
100-YR FLOODWAY
100-YR FLOODPLAIN
EXISTING
STORM DRAIN
APPROXIMATE LOCATION
EXISTING FH
APPROXIMATE LOCATION
EXISTING FH
EXISTING FH EXISTING FH
9' UTILITY EASEMENT
9' UTILITY EASEMENT
9' UTILITY EASEMENT
15' UTILITY EASEMENT
26' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
10' UTILITY
EASEMENT
PROPOSED
SANITARY SERVICE
PROPOSED WATER
& FIRE SERVICES
PROPOSED
WATER SERVICES
PROPOSED WATER
& FIRE SERVICES
PROPOSED WATER
& FIRE SERVICES
PROPOSED
SANITARY SERVICES
PROPOSED
SANITARY SERVICE
PROPOSED
SANITARY SERVICE
PROPOSED
STORMTECH CHAMBERS
PROPOSED
STORM DRAIN
PROPOSED
STORM DRAIN PROPOSED WALL
FIRE HYDRANT
PROPOSED FH
UNIVERSITY AVENUE
EXISTING
STORM DRAIN
(PRIVATE)
BLDG A
BLDG B
BLDG C
CHURCH
BLDG
5' UTILITY
EASEMENT
5' UTILITY EASEMENT
5' UTILITY
EASEMENT
PROPOSED
FIRE SERVICE
APPROXIMATE
FUTURE 100-YR
FLOODPLAIN
INSTALL SSMH
APPROXIMATE LOCATION
EXISTING 6" WATER
APPROXIMATE LOCATION
EXISTING 15"
SANITARY SEWER
APPROXIMATE
LOCATION
EXISTING FH
INSTALL SSMH
INSTALL SSMH
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C300
OVERALL UTILITY PLAN
7
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
( IN FEET )
1 inch = ft.
60 0 60 Feet
60
120 180
KEYMAP
VAULT
TELE
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
DN UP
UP
DN UP
DN UP
DN UP
DN
TF
C301 C302
NOTES:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES
AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2. ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD
CONSTRUCTION SPECIFICATIONS LATEST EDITION.
3. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE.
4. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE
REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD.
5. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER
MAINS, WATER MAINS, AND SERVICES.
6. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS,
OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
7. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE
CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR
STANDARDS.
8. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS,
SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS
PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OR FORT COLLINS STANDARDS AT THE
DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO
THE ISSUANCE OF CERTIFICATE OF OCCUPANCY.
9. REFER TO PLUMBING PLANS FOR ALL WATER SERVICE AND SANITARY SEWER SERVICE LOCATIONS. IF
CONFLICT OCCURS, BOTH THE PLUMBING ENGINEER AND CIVIL ENGINEER SHALL BE CONTACTED PRIOR TO
INSTALLATION OR ORDERING OF MATERIALS.
10. ALL EXISTING SANITARY SEWER SERVICE CONNECTION INVERTS AND LOCATIONS BASED ON BEST
AVAILABLE DATA. CONTRACTOR TO VERIFY LOCATION PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER
OF ANY DISCREPANCIES.
11. PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES.
SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF
SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS.
13. CONTRACTOR SHALL COORDINATE ANY NECESSARY TELEPHONE, CABLE, FIBER, GAS, AND ELECTRIC
LOWERINGS (OR RE-ROUTING) WITH THE RESPECTIVE UTILITY PROVIDERS.
14. CONTRACTOR TO COORDINATE FINAL LOCATION OF ALL GAS AND ELECTRIC METERS WITH ARCHITECT AND
UTILITY PROVIDERS.
15. THE PLUMBING CONTRACTOR SHALL TERMINATE UTILITY LATERALS 5' OUTSIDE OF BUILDING UNLESS
NOTED OTHERWISE. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF ALL UTILITY CONNECTIONS INTO
THE PROPOSED BUILDING SHALL BE COORDINATED WITH APPROVED MECHANICAL/PLUMBING DRAWINGS.
16. REFER TO APPROVED SITE ELECTRICAL PLANS FOR ALL CONDUITS AND POWER LINE ROUTING FOR SITE
LIGHTING.
17. THE LOCATION OF PROPOSED DRY UTILITIES AS SHOWN ON THIS DRAWING ARE SHOWN FOR HORIZONTAL
ALIGNMENTS ONLY AND ARE APPROXIMATE. FINAL DESIGNS OF DRY UTILITIES WILL BE PERFORMED BY
THE APPROPRIATE UTILITY COMPANY AND/OR ENGINEER.
18. ALL CONDUIT PLACED BY THE CONTRACTOR FOR CABLE, PHONE AND INTERNET SHALL BE EQUIPPED WITH
PULL TAPE AND LOCATE WIRE PER THE SPECIFICATIONS OF EACH UTILITY COMPANY.
19. ELECTRIC SERVICE TO BE PROVIDED BY THE CITY OF FORT COLLINS. THE CITY SHALL INSTALL THE
TRANSFORMER AND PRIMARY LINE FROM THE CONNECTION POINT AT THE EXISTING MAIN TO EACH
TRANSFORMER. THE COST OF THE PRIMARY LINE, TRANSFORMER, AND INSTALLATION OF THE
SECONDARY LINE FROM THE TRANSFORMER TO THE BUILDING SHALL BE THE RESPONSIBILITY OF THE
DEVELOPER.
20. ELECTRIC TRANSFORMER PAD SIZE IS APPROXIMATE. COORDINATE FINAL LOCATION AND SIZE OF
TRANSFORMER WITH APPROVED ELECTRICAL PLANS.
21. GAS SERVICE TO BE PROVIDED BY XCEL ENERGY. XCEL SHALL INSTALL ALL GAS SERVICES AND METERS.
THE COST OF ALL THE SERVICE INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER.
22. A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH SITE CONSTRUCTION ELEMENT IN THE
FLOODPLAIN, INCLUDING BUILDING. THE FLOODPLAIN USE PERMIT FOR THE BUILDING WILL BE APPROVED
AT THE TIME OF BUILDING PERMIT APPLICATION.
23. A FLOODPLAIN USE PERMIT AND NO RISE CERTIFICATION WILL BE REQUIRED PRIOR TO ANY WORK
OCCURRING WITHIN THE FLOODWAY.
EXISTING WATER MAIN
LEGEND:
W
G
T
CTV
EXISTING STORM SEWER
EXISTING CABLE
EXISTING TELEPHONE
EXISTING GAS
PROPOSED SEWER SERVICE S
EXISTING SANITARY SEWER SS
PROPOSED CURB & GUTTER
PROPOSED WATER SERVICE
PROPOSED FIRE HYDRANT
EXISTING FIRE HYDRANT
EASEMENT LINE
PROPERTY BOUNDARY
EXISTING LOTLINE
W
PROPOSED WATER MAIN
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
PROPOSED ELECTRIC TRANSFORMER
PROPOSED ELECTRIC E
PROPOSED FIRE DEPARTMENT CONNECTION FDC
PROPOSED FIRE SERVICE F
EXISTING ELECTRIC E
PROPOSED SUBDRAIN UD
PROPOSED CABLE CTV
PROPOSED FIBRE OPTIC FO
PROPOSED GAS G
100-YR FLOODPLAIN
STORMTECH CHAMBER ISOLATOR ROW
STORMTECH CHAMBER
100-YR FLOODWAY
PROPOSED FIRE DEPARTMENT WALL HYDRANT FDWH
X
X
TF
TF
X X
DN
X X
X
DRIVEWAY
DRIVEWAY
DRIVEWAY
52' HALF ROW
10' CONCRETE PAN
EXISTING 30" VERTICAL
CURB & GUTTER
±39' FL-FL
31' HALF- ROW
ACCESS EASEMENT
PROPOSED
SAWCUT (TYP.)
PARKING
STRIPE (TYP.)
PROPOSED
SAWCUT (TYP.)
EXISTING MEDIAN
CURB & GUTTER
R25'
R15' R15' PROPOSED 30" VERTICAL
CURB & GUTTER
PROPOSED 30" VERTICAL
CURB & GUTTER
R25'
DRIVEWAY
27' FL-FL
39' FL-FL
STREET
STRIPING (TYP.)
26' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
24' FL-FL
17' 9'
17' 9'
26' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
20' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
PROPOSED 18" VERTICAL
INFLOW CURB & GUTTER
46' DRIVE-OVER
9' CURB CUT CURB & GUTTER
10' UTILITY
EASEMENT
PROPOSED 18" VERTICAL
OUTFALL CURB & GUTTER
PROPOSED
SAWCUT (TYP.)
TRASH ENCLOSURE
STAIRS
(RE: ARCHITECT)
STAIRS
(RE: ARCHITECT)
RAMP
(RE: ARCHITECT)
EXISTING
CONCRETE PAN
1
1
1
1 1
±17' FL-BACK OF BUILDING
EXISTING
STRIPING (TYP.)
PROPOSED 2'
CONCRETE PAN
PROPOSED 2'
SIDEWALK CULVERT
STAIRS
(RE: ARCHITECT)
RAMP
(RE: ARCHITECT)
STAIRS
(RE: ARCHITECT) STAIRS
(RE: ARCHITECT)
BLDG C
CHURCH
BLDG
5' UTILITY
EASEMENT
10' SIDEWALK
9' UTILITY EASEMENT
5' SIDEWALK
9' UTILITY EASEMENT
5' SIDEWALK
6' SIDEWALK
15' UTILITY EASEMENT
BUILDING
OVERHANG
BUILDING
OVERHANG
NORTH
( IN FEET )
1 inch = ft.
30 0 30 Feet
30
60 90
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C201
PAVING PLAN
6
SEE SHEET C200
KEYMAP
VAULT
TELE
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
DN UP
UP
DN UP
DN UP
DN UP
DN
TF
1. SEE DETAIL SHEETS FOR ADDITIONAL INFORMATION REGARDING CURBS AND PAVEMENT SECTIONS.
2. PAVEMENT MARKINGS SHALL BE PER CITY STANDARDS AND PROJECT SPECIFICATION MANUAL.
3. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE
CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR
STANDARDS.
4. DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS,
SIDEWALKS, CURBS AND GUTTER THAT ARE DESTROYED, DAMAGED OR REMOVED DUE TO
CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE
DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR
TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. THE LIMITS OF THE REPAIRS WILL BE
IDENTIFIED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR PRIOR TO, AND OVER THE COURSE
OF, THE PROJECT AND WILL NOT BE SHOWN ON THE PLANS.
5. ALL PUBLIC CONCRETE SIDEWALKS SHALL BE 6" THICK. DRIVEWAY/SIDEWALK CONCRETE SHALL BE 8"
(MIN.) THICK. ACTUAL DRIVEWAY CONCRETE THICKNESS SHALL BE BASED ON FINAL PAVEMENT
DESIGN.
6. CONTRACTOR SHALL REFER TO, AND COORDINATE WITH, THE APPROVED LANDSCAPE DRAWINGS FOR
DETAILED SITE LAYOUT WITHIN THE PASEO AREA. IN ADDITION, THE CONTRACTOR SHALL REFER TO,
AND COORDINATE WITH, THE APPROVED LANDSCAPE DRAWINGS FOR ALL HARDSCAPE, LANDSCAPE
AND SITE FEATURES SUCH AS BIKE RACKS, BENCHES, TRASH RECEPTACLES, LANDSCAPE ROCK AND
MULCH, LANDSCAPE WALL CONSTRUCTION DETAILS, STAIR AND HANDRAIL DETAILS AND
SPECIFICATIONS.
7. FOR BUILDING LAYOUTS REFERENCE ARCHITECTURAL PLANS. LAYOUT AND DIMENSION INFORMATION
SHOWN REPRESENTS OUTSIDE FACE OF FOUNDATION WALL (NOT STONE VENEER) AND IS SHOWN FOR
INFORMATION ONLY. BUILDING POINTS ARE AT CORNERS OF NOMINAL BUILDING FOOTPRINT.
CONTRACTOR SHALL CONFIRM ALL BUILDING CORNERS AND STRUCTURAL DIMENSIONS WITH
ARCHITECTURAL DRAWINGS PRIOR TO STAKING.
8. CONTRACTOR SHALL REFER TO, AND COORDINATE WITH, THE APPROVED LANDSCAPE &
ARCHITECTURAL DRAWINGS FOR STAIR AND HANDRAIL DETAILS AND SPECIFICATIONS.
9. SEE GEOTECHNICAL REPORT FOR SUBGRADE PREPARATION AND PAVEMENT RECOMMENDATIONS.
10. REFER TO THE EROSION CONTROL PLAN AND REPORT FOR TEMPORARY CONTROL MEASURES AND
CONSTRUCTION SEQUENCING TO PREVENT SEDIMENT LOADING OF THE DRAINAGE FACILITY DURING
CONSTRUCTION.
PROPOSED INFLOW VERTICAL CURB & GUTTER
EASEMENTS
PUBLIC CONCRETE FLATWORK
PROPERTY BOUNDARY
PROPOSED LOT LINE
PROPOSED EDGE OF PAVEMENT
PRIVATE CONCRETE FLATWORK
ASPHALT PATCH
LEGEND:
NOTES:
PROPOSED OUTFALL VERTICAL CURB & GUTTER
PAVERS
PERMEABLE PAVERS
SITE SIGN LEGEND
LANE 1
FIRE
NO
PARKING
PRIVATE CONCRETE PAVEMENT
PROPOSED ELECTRIC TRANSFORMER
TF
C200 C201
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
GLEASON/WESTSIDE
INVESTMENTS
LLC
1301 W.
ELIZABETH ST.
JDH2 INVESTMENTS LLC
1305 W. ELIZABETH ST.
PHILLIPS DAVID J LIVING
TRUST (.615)
1335 W. ELIZABETH ST. 160
1221 W.
ELIZABETH ST.
X X
X
X X
X
X X X
X
X
X
X X X
TF
TF
26' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
PROPOSED FENCE
PROPOSED 18" VERTICAL
OUTFALL CURB & GUTTER
PROPOSED 18" VERTICAL
INFLOW CURB & GUTTER
PROPOSED 18" VERTICAL
INFLOW CURB & GUTTER
PROPOSED 18" VERTICAL
OUTFALL CURB & GUTTER
26' DRAINAGE, UTILITY,
& EMERGENCY ACCESS EASEMENT
PROPOSED
SAWCUT (TYP.)
EXISTING 30" VERTICAL
CURB & GUTTER PARKING
STRIPE (TYP.)
31' HALF- ROW
MATCH EXISTING
CURB & GUTTER (TYP.) DRIVEWAY
R25' R25'
±40' FL-FL
9' CURB CUT
10' UTILITY
EASEMENT
TRASH ROOM
TRASH ROOM
STAIRS
(RE: ARCHITECT)
1
1
1 1
1
1
1
EXISTING
CONCRETE PAN
PROPOSED
CONCRETE PAN
1
STAIRS
(RE: ARCHITECT)
BLDG A
BLDG B
5' UTILITY
EASEMENT
EXISTING
CURB & GUTTER
5' UTILITY EASEMENT
5' UTILITY
EASEMENT
STAIRS
(RE: ARCHITECT)
STAIRS
(RE: ARCHITECT) STAIRS
(RE: ARCHITECT)
9' UTILITY EASEMENT
5' SIDEWALK
5' SIDEWALK
9' UTILITY EASEMENT
7' SIDEWALK
5' SIDEWALK
9' UTILITY EASEMENT
5' SIDEWALK
5' SIDEWALK
10' SIDEWALK
PROPOSED LANDSCAPE WALL
(RE: LANDSCAPE)
NORTH
( IN FEET )
1 inch = ft.
30 0 30 Feet
30
60 90
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C200
PAVING PLAN
5
SEE SHEET C201
KEYMAP
VAULT
TELE
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
DN UP
UP
DN UP
DN UP
DN UP
DN
TF
1. SEE DETAIL SHEETS FOR ADDITIONAL INFORMATION REGARDING CURBS AND PAVEMENT SECTIONS.
2. PAVEMENT MARKINGS SHALL BE PER CITY STANDARDS AND PROJECT SPECIFICATION MANUAL.
3. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE
CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR
STANDARDS.
4. DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS,
SIDEWALKS, CURBS AND GUTTER THAT ARE DESTROYED, DAMAGED OR REMOVED DUE TO
CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE
DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR
TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. THE LIMITS OF THE REPAIRS WILL BE
IDENTIFIED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR PRIOR TO, AND OVER THE COURSE
OF, THE PROJECT AND WILL NOT BE SHOWN ON THE PLANS.
5. ALL PUBLIC CONCRETE SIDEWALKS SHALL BE 6" THICK. DRIVEWAY/SIDEWALK CONCRETE SHALL BE 8"
(MIN.) THICK. ACTUAL DRIVEWAY CONCRETE THICKNESS SHALL BE BASED ON FINAL PAVEMENT
DESIGN.
6. CONTRACTOR SHALL REFER TO, AND COORDINATE WITH, THE APPROVED LANDSCAPE DRAWINGS FOR
DETAILED SITE LAYOUT WITHIN THE PASEO AREA. IN ADDITION, THE CONTRACTOR SHALL REFER TO,
AND COORDINATE WITH, THE APPROVED LANDSCAPE DRAWINGS FOR ALL HARDSCAPE, LANDSCAPE
AND SITE FEATURES SUCH AS BIKE RACKS, BENCHES, TRASH RECEPTACLES, LANDSCAPE ROCK AND
MULCH, LANDSCAPE WALL CONSTRUCTION DETAILS, STAIR AND HANDRAIL DETAILS AND
SPECIFICATIONS.
7. FOR BUILDING LAYOUTS REFERENCE ARCHITECTURAL PLANS. LAYOUT AND DIMENSION INFORMATION
SHOWN REPRESENTS OUTSIDE FACE OF FOUNDATION WALL (NOT STONE VENEER) AND IS SHOWN FOR
INFORMATION ONLY. BUILDING POINTS ARE AT CORNERS OF NOMINAL BUILDING FOOTPRINT.
CONTRACTOR SHALL CONFIRM ALL BUILDING CORNERS AND STRUCTURAL DIMENSIONS WITH
ARCHITECTURAL DRAWINGS PRIOR TO STAKING.
8. CONTRACTOR SHALL REFER TO, AND COORDINATE WITH, THE APPROVED LANDSCAPE &
ARCHITECTURAL DRAWINGS FOR STAIR AND HANDRAIL DETAILS AND SPECIFICATIONS.
9. SEE GEOTECHNICAL REPORT FOR SUBGRADE PREPARATION AND PAVEMENT RECOMMENDATIONS.
10. REFER TO THE EROSION CONTROL PLAN AND REPORT FOR TEMPORARY CONTROL MEASURES AND
CONSTRUCTION SEQUENCING TO PREVENT SEDIMENT LOADING OF THE DRAINAGE FACILITY DURING
CONSTRUCTION.
PROPOSED INFLOW VERTICAL CURB & GUTTER
EASEMENTS
PUBLIC CONCRETE FLATWORK
PROPERTY BOUNDARY
PROPOSED LOT LINE
PROPOSED EDGE OF PAVEMENT
PRIVATE CONCRETE FLATWORK
ASPHALT PATCH
LEGEND:
NOTES:
PROPOSED OUTFALL VERTICAL CURB & GUTTER
PAVERS
PERMEABLE PAVERS
SITE SIGN LEGEND
LANE 1
FIRE
NO
PARKING
PRIVATE CONCRETE PAVEMENT
PROPOSED ELECTRIC TRANSFORMER
TF
C200 C201
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
X
E
E
E E
T
T
E E
E E
T
T
T
E
E
E
E
G
T
T
ST ST
ST
ST
ST
/
/ / / / / / /
/ / / / / / / / / / / / / / / /
/ / / / / / / /
/ / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / / / / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
FO
FO
FO
FO
FO
FO
FO
G
G
G G
G
G
G
G
G
G G G G
G
G
E
FO
FO FO FO FO
G
FO
E
E
E
E E
E
E
FO
FO
FO
FO
G
G G
G
G G G G
G G G G
E
E
E
E
E
E
FO
FO
FO
FO
FO
FO
E E E
E
E
E E
E
E
E
E
E
FO
FO
FO
FO
FO
G
G
G
G
G G
FO
FO
FO
G
G G
G
E
FO FO
FO
E G
E
E E
E
E
E
FO
FO
FO
FO
FO
FO
FO
FO
E E
E
E
E
E
W W
W
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
FO
E
G
G
G
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
FO
SS SS
SS SS
SS SS
SS
G G
SS SS
W
SS
SS
SS SS
SS
SS
SS
SS
SS
SS SS
SS SS
ST
ST
ST
E
E
E
E E
W W W
W W W W W
W
W
W
W W
W
W W W W W W W W
ST ST
V
AULT
ELEC
W W W
W W W
W W W W
W
SS SS SS
SS
SS
SS SS
SS SS SS SS SS
SS SS
SS SS SS
W
W
W W
SS SS SS
NICOL CAMPUS WEST
1205 W. ELIZABETH ST. A
NICOL CAMPUS
WEST LIMITED
1213 W.
ELIZABETH ST.
W. ELIZABETH STREET
(ROW VARIES)
S. SHIELDS STREET
(EXISTING 70' ROW)
UNIVERSITY AVENUE
(EXISTING 60' ROW)
±40' FL-FL
±27' FL-FL
±27' FL-FL
APPROXIMATE LOCATION
EXISTING 6" CIP WATER
EXISTING 8" VCP
SANITARY SEWER
EXISTING PARKING LOT
TO BE REMOVED
EXISTING
STORM INLET
EXISTING DRIVEWAY
TO BE REMOVED
10' UTILITY
EASEMENT
(TO BE VACATED
BY THIS PLAT)
5' UTILITY
EASEMENT
(TO BE VACATED
BY THIS PLAT)
15' UTILITY
EASEMENT
(TO BE VACATED
BY THIS PLAT)
15' UTILITY
EASEMENT
(TO BE VACATED
BY THIS PLAT)
5' UTILITY
EASEMENT
(TO BE VACATED
BY THIS PLAT)
3' UTILITY
EASEMENT
(TO BE VACATED
BY THIS PLAT)
EXISTING 6' SIDEWALK
TO BE REMOVED
EXISTING CURB
TO BE REMOVED
15' STORM WATER
EASEMENT
(TO BE VACATED
BY THIS PLAT)
5' UTILITY
EASEMENT
EXISTING MONITORING WELL
TO BE REMOVED(TYP.)
100-YR FLOODWAY
100-YR FLOODPLAIN
EXISTING TREE
TO BE REMOVED
(TYP.)
PROPOSED
SAWCUT (TYP.)
PROPOSED
SAWCUT (TYP.)
EXISTING
CONCRETE PAN
EXISTING UTILITY
TO BE REMOVED
EXISTING UTILITY
TO BE REMOVED
EXISTING UTILITY
TO BE REMOVED
EXISTING UTILITY
TO BE REMOVED
EXISTING
STORM DRAIN
EXISTING DRIVEWAY
TO BE REMOVED
EXISTING DRIVEWAY
TO BE REMOVED
APPROXIMATE LOCATION
EXISTING FH
APPROXIMATE LOCATION
EXISTING FH
EXISTING
STORM DRAIN
(PRIVATE)
EXISTING SANITARY SERVICE
TO BE ABANDONED AT MAIN
EXISTING 2" & 1" COMMERCIAL
WATER SERVICES
TO BE ABANDONED AT MAIN
APPROXIMATE LOCATION
EXISTING 6" DIP WATER
APPROXIMATE LOCATION
EXISTING 8" DIP WATER
APPROXIMATE LOCATION
EXISTING 6" CIP WATER
APPROXIMATE LOCATION
EXISTING 15" PVC
SANITARY SEWER
APPROXIMATE LOCATION
EXISTING FH
APPROXIMATE LOCATION
EXISTING SANITARY SERVICE
TO BE ABANDONED AT MAIN
APPROXIMATE LOCATION
EXISTING 3
4" COPPER
COMMERCIAL WATER SERVICE
TO BE ABANDONED AT MAIN
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C101
DEMOLITION PLAN
EXISTING CONDITIONS &
4
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
( IN FEET )
1 inch = ft.
30 0 30 Feet
30
60 90
1. ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL AREA BUFFER
ZONES SHALL REMAIN AND BE PROTECTED UNLESS NOTED ON THESE PLANS FOR REMOVAL.
2. WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A
FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THE
DISTURBANCE.
3. ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY
STANDARDS. TREE PRUNING AND REMOVAL SHALL BE PERFORMED BY A BUSINESS THAT HOLDS A
CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE.
4. PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED
EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF FOUR (4) FEET IN
HEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR ONE-HALF
(½) OF THE DRIP LINE, WHICHEVER IS GREATER. THERE SHALL BE NO STORAGE OR MOVEMENT OF
EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE.
5. DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING
OF EQUIPMENT OR MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS,
OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF
A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES.
6. NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE.
7. LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR
LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS MAY BE "RIBBONED OFF,"
RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION
(G)(3) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY (50)
FEET APART AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF
SUCH AREAS BEING CLEARED
8. THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING
EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOT
SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE
AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED FROM
TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE CHART BELOW:
9. NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1-JULY 31)
WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING
SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. IF ACTIVE NESTS ARE FOUND,
THE CITY ENVIRONMENTAL PLANNER WILL DETERMINE WHETHER ADDITIONAL RESTRICTIONS ON TREE
REMOVAL AND CONSTRUCTION APPLY.
10. REFER TO LANDSCAPE AND IRRIGATION PLANS FOR ADDITIONAL TREE PROTECTION MEASURES.
TREE PROTECTION NOTES:
TREE DIAMETER AT BREAST
HEIGHT (INCHES)
AUGER DISTANCE FROM
FACE OF TREE (FEET)
0-2 1
3-4 2
5-9 5
10-14 10
15-19 12
OVER 19 15
LEGEND:
EXISTING STORM SEWER
EXISTING VALVE
EXISTING TELEPHONE PEDESTAL
EXISTING TREES (TO REMAIN)
FIELD SURVEY BY:
EXISTING SANITARY SEWER SS
EXISTING WATER W
EXISTING FENCE X
EXISTING WATER METER
EXISTING FIRE HYDRANT
EXISTING ELECTRIC VAULT
PROPERTY BOUNDARY
EXISTING RIGHT-OF-WAY
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
SUBSURFACE EXPLORATION BY:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING
NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND
UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT,
AND DISPOSAL OF ALL FACILITIES AND MATERIAL.
3. CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE,
RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN
PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF
POSSIBLE. THE CITY OF FORT COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION
THAT WILL ACCEPT CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED
AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD AND CAN BE REACHED AT
(970) 482-1249.
4. ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE.
5. CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY.
6. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE
CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR
STANDARDS.
7. ADDITIONAL TREES NOT SHOWN ON THESE PLANS MAY EXIST AND MAY REQUIRE REMOVAL.
COORDINATION OF WHICH TREES ARE TO REMAIN AND WHICH ARE TO BE REMOVED SHOULD BE
COORDINATED WITH THE CITY FORESTER. REFER TO LANDSCAPE PLANS AND TREE MITIGATION PLAN
FOR ADDITIONAL INFORMATION.
8. CONTRACTOR SHALL COORDINATE WITH FORT COLLINS UTILITY FIELD OPERATIONS DEPARTMENT AT
(970) 221-6700 FOR WATER AND SEWER SERVICE ABANDONMENT.
9. NO DEMOLITION MAY OCCUR ONSITE UNTIL THE APPROPRIATE PERMITS AND APPROVALS HAVE BEEN
ISSUED BY THE CITY. THIS INCLUDES, BUT IS NOT LIMITED, TO THE DEMOLITION OF STRUCTURES AND
THE REMOVAL OF TREES.
10. NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1-JULY 31)
WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING
SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. THE SURVEY SHALL BE
SENT TO THE CITY ENVIRONMENTAL PLANNER. IF ACTIVE NESTS ARE FOUND, THE CITY WILL
COORDINATE WITH RELEVANT STATE AND FEDERAL REPRESENTATIVES TO DETERMINE WHETHER
ADDITIONAL RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY.
11. CURB GUTTER, AND SIDEWALK SHALL BE REMOVED TO NE NEAREST JOINT.
12. CONTRACTOR SHALL COORDINATE ALL UTILITY DEMOLITION AND/OR RELOCATION ITEMS WITH THE
APPROPRIATE UTILITY PROVIDER PRIOR TO BEGINNING ANY ONSITE DEMOLITION.
13. THE REMOVAL OF UTILITY MAINS AND/OR SERVICES FOR GAS, WATER, AND SANITARY SEWER SHALL BE
REMOVED ENTIRELY TO THE ORIGINATING UTILITY MAIN PER CURRENT STANDARDS AND/OR
REQUIREMENTS OF THE APPROPRIATE UTILITY COMPANY.
14. DOMESTIC WATER SERVICES FROM THE METER PIT OR CURB STOP WERE NOT LOCATED OR SHOWN
ON THIS DRAWING. CONTRACTOR SHALL REMOVE THE ENTIRETY OF THE WATER SERVICES FROM THE
ORIGINATING MAIN TO THE EXISTING BUILDING.
15. UTILITY METERS SHOWN ON THIS DRAWING TO BE REMOVED ARE SHOWN PER THE TOPOGRAPHIC
SURVEY PERFORMED FOR THE PROJECT AND ONLY INCLUDE THOSE METERS THAT WERE CLEARLY
VISIBLE OR ACCESSIBLE AT THE TIME OF THE SURVEY. CONTRACTOR SHALL NOTE THAT ADDITIONAL
EXISTING METERS MAY BE PRESENT FROM THOSE SHOWN AND SHALL ACCOUNT FOR AND REMOVE
ALL EXISTING METERS.
16. ELECTRIC SERVICES FOR EXISTING BUILDINGS TO BE REMOVED ARE SHOWN PER BEST INFORMATION
AVAILABLE. CONTRACTOR SHALL NOTE THAT ADDITIONAL UNDERGROUND ELECTRIC SERVICES AND
CONDUITS MAY BE PRESENT ON SITE. ALL EXISTING ELECTRIC SERVICE LINES TO BUILDINGS TO BE
REMOVED SHALL ALSO BE REMOVED. ALL ELECTRIC REMOVALS OR RELOCATIONS SHALL BE
COORDINATED WITH THE CITY OF FORT COLLINS UTILITIES DEPARTMENT PRIOR TO BEGINNING ANY
UTILITY DEMOLITIONS.
17. REFER TO AND COORDINATE WITH THE SITE ELECTRICAL PLANS FOR ALL RELOCATED SITE OR STREET
LIGHTING. ALL STREET LIGHT RELOCATIONS SHALL BE COORDINATED WITH THE CITY OF FORT
COLLINS UTILITIES DEPARTMENT PRIOR TO BEGINNING ANY UTILITY DEMOLITIONS.
18. APPROVAL OF FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR ALL WORK PERFORMED IN THE
100-YR FLOODPLAIN. APPROVAL OF FLOODPLAIN USE PERMIT AND NO-RISE CERTIFICATION SHALL BE
REQUIRED FOR ALL WORK PERFORMED IN THE 100-YR FLOODWAY.
19. CONTRACTOR TO COORDINATE PROTECTION OF EXISTING STREET LIGHTS WITH CITY STAFF.
VAULT
ELEC
EXISTING CONCRETE TO BE REMOVED
T
WV
EXISTING TREES (TO BE REMOVED)
EXISTING ASPHALT TO BE REMOVED
EXISTING GASLINE G
EXISTING LOT LINE
100-YR FLOODPLAIN
100-YR FLOODWAY
NOTES:
TERRACON CONSULTANTS, INC.
GEOTECHNICAL ENGINEERING REPORT
LOMBARDY STUDENT HOUSING
FORT COLLINS, COLORADO
TERRACON PROJECT NO. 20185115
DATE: NOVEMBER 6, 2018
REVISED: DECEMBER 3, 2018
FLATIRONS, INC.
PROJECT NO. 18-71,080
DATE: APRIL 2018
ADDITIONAL SURVEY:
NORTHERN ENGINEERING SERVICES
PROJECT NO. 1560-001
DATE: OCTOBER 2018
TF
KEYMAP
VAULT
TELE
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
DN UP
UP
DN UP
DN UP
DN UP
DN
TF
C100 C101
CONTROL
IRR
CONTROL
IRR
VAULT
ELEC
ELEC
VAULT
ELEC
ELEC
AC
T
ELEC ELEC
FO
FO
FO FO
T T
T
E
E
E T E T
T
X
X
G
E
E
E
E E
E
E
E
E
X X
X
E
E
T
T
T
T
T T
T
T
T T T
T
T
T
X
X
X X
X
E
E
E E
E E
E
E
E E E
E E
E
E E E
E
E
E E
E
E E
E E
E
E
E E E E
E
E
E E
E E
E
E E
E
G G
G
G
G
G
G
G G
G
G
G
G
E
T
T
T T
T
T
T T T T T T T
T
T T
T
E E
E
E
E
E E
E
G
G
G
E
E
G
G
G
G
G
G
G
T
T
T
T
T
E
E
CTV
CTV
T
T
T
T
G
G
G
E
E
E
E
E E
CTV
CTV
G
G
W
W
E
E
E
E
E
X X
X
X
E
E
E
E
E
E
G
W
W
W W
W
G
G
G
G
G
G
G
CTV
CTV
CTV
CTV
G
E
E
W
W
W
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
SS
SS SS
SS SS SS SS SS SS
SS SS
SS
SS
SS SS
SS
ST
W
W
W
W
W W W W
W
W W W W W
W
W W W W W W W
W
W
V
AULT
ELEC
VAULT
ELEC
VAULT
ELEC
W
W W W
NICOL CAMPUS
WEST LIMITED
1213 W.
ELIZABETH ST.
GLEASON/WESTSIDE
INVESTMENTS
LLC
1301 W.
ELIZABETH ST.
JDH2 INVESTMENTS LLC
1305 W. ELIZABETH ST.
PHILLIPS DAVID J LIVING
TRUST (.615)
1335 W. ELIZABETH ST. 160
1221 W.
ELIZABETH ST.
UNIVERSITY AVENUE
(EXISTING 60' ROW)
CITY PARK AVENUE
(ROW VARIES)
W. ELIZABETH STREET
(ROW VARIES)
±40' FL-FL
±45' FL-FL
EXISTING BUILDING
TO BE REMOVED
EXISTING BUILDING
TO BE REMOVED
EXISTING BUILDINGS
TO BE REMOVED
APPROXIMATE LOCATION
EXISTING 6" DIP WATER
EXISTING 10"
CIP WATER
EXISTING 8" VCP
SANITARY SEWER
EXISTING BUILDING
TO BE REMOVED
EXISTING 4' SIDEWALK
TO BE REMOVED
EXISTING DRIVEWAY
TO BE REMOVED
EXISTING 5' SIDEWALK
TO BE REMOVED
EXISTING DRIVEWAY
TO BE REMOVED
EXISTING 3
4" RESIDENTIAL
COPPER WATER SERVICE
TO BE ABANDONED AT MAIN
EXISTING 1" COMMERCIAL
COPPER IRRIGATION SERVICES
TO BE ABANDONED AT MAIN
10' UTILITY EASEMENT
(TO BE VACATED
BY THIS PLAT)
5' UTILITY EASEMENT
EXISTING 2" & 1" COMMERCIAL
WATER SERVICES
TO BE ABANDONED AT MAIN
5' UTILITY
EASEMENT
EXISTING TREE
TO BE REMOVED
(TYP.) EXISTING TREE
(TYP.)
EXISTING UTILITIES
TO BE REMOVED
PROPOSED
SAWCUT (TYP.)
EXISTING
CONCRETE PAN
5' UTILITY
EASEMENT
100-YR FLOODWAY
100-YR FLOODPLAIN
EXISTING UTILITY
TO BE REMOVED
EXISTING UTILITY
TO BE REMOVED
EXISTING FH
EXISTING FH
EXISTING UTILITY MH
EXISTING UTILITY MH
EXISTING UTILITY MH
EXISTING SANITARY SERVICE
TO BE ABANDONED AT MAIN
APPROXIMATE LOCATION
EXISTING 6" PVC FIRE SERVICE
TO BE ABANDONED AT MAIN
EXISTING TELEPHONE
TO REMAIN
EXISTING TELEPHONE
TO REMAIN
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C100
DEMOLITION PLAN
EXISTING CONDITIONS &
3
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
1. ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL AREA BUFFER
ZONES SHALL REMAIN AND BE PROTECTED UNLESS NOTED ON THESE PLANS FOR REMOVAL.
2. WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A
FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THE
DISTURBANCE.
3. ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY
STANDARDS. TREE PRUNING AND REMOVAL SHALL BE PERFORMED BY A BUSINESS THAT HOLDS A
CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE.
4. PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED
EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF FOUR (4) FEET IN
HEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR ONE-HALF
(½) OF THE DRIP LINE, WHICHEVER IS GREATER. THERE SHALL BE NO STORAGE OR MOVEMENT OF
EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE.
5. DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING
OF EQUIPMENT OR MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS,
OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF
A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES.
6. NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE.
7. LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR
LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS MAY BE "RIBBONED OFF,"
RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION
(G)(3) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY (50)
FEET APART AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF
SUCH AREAS BEING CLEARED
8. THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING
EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOT
SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE
AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED FROM
TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE CHART BELOW:
9. NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1-JULY 31)
WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING
SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. IF ACTIVE NESTS ARE FOUND,
THE CITY ENVIRONMENTAL PLANNER WILL DETERMINE WHETHER ADDITIONAL RESTRICTIONS ON TREE
REMOVAL AND CONSTRUCTION APPLY.
10. REFER TO LANDSCAPE AND IRRIGATION PLANS FOR ADDITIONAL TREE PROTECTION MEASURES.
TREE PROTECTION NOTES:
TREE DIAMETER AT BREAST
HEIGHT (INCHES)
AUGER DISTANCE FROM
FACE OF TREE (FEET)
0-2 1
3-4 2
5-9 5
10-14 10
15-19 12
OVER 19 15
( IN FEET )
1 inch = ft.
30 0 30 Feet
30
60 90
KEYMAP
VAULT
TELE
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
DN UP
UP
DN UP
DN UP
DN UP
DN
TF
LEGEND:
EXISTING STORM SEWER
EXISTING VALVE
EXISTING TELEPHONE PEDESTAL
EXISTING TREES (TO REMAIN)
FIELD SURVEY BY:
EXISTING SANITARY SEWER SS
EXISTING WATER W
EXISTING FENCE X
EXISTING WATER METER
EXISTING FIRE HYDRANT
EXISTING ELECTRIC VAULT
PROPERTY BOUNDARY
EXISTING RIGHT-OF-WAY
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
SUBSURFACE EXPLORATION BY:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING
NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND
UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT,
AND DISPOSAL OF ALL FACILITIES AND MATERIAL.
3. CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE,
RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN
PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF
POSSIBLE. THE CITY OF FORT COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION
THAT WILL ACCEPT CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED
AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD AND CAN BE REACHED AT
(970) 482-1249.
4. ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE.
5. CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY.
6. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE
CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR
STANDARDS.
7. ADDITIONAL TREES NOT SHOWN ON THESE PLANS MAY EXIST AND MAY REQUIRE REMOVAL.
COORDINATION OF WHICH TREES ARE TO REMAIN AND WHICH ARE TO BE REMOVED SHOULD BE
COORDINATED WITH THE CITY FORESTER. REFER TO LANDSCAPE PLANS AND TREE MITIGATION PLAN
FOR ADDITIONAL INFORMATION.
8. CONTRACTOR SHALL COORDINATE WITH FORT COLLINS UTILITY FIELD OPERATIONS DEPARTMENT AT
(970) 221-6700 FOR WATER AND SEWER SERVICE ABANDONMENT.
9. NO DEMOLITION MAY OCCUR ONSITE UNTIL THE APPROPRIATE PERMITS AND APPROVALS HAVE BEEN
ISSUED BY THE CITY. THIS INCLUDES, BUT IS NOT LIMITED, TO THE DEMOLITION OF STRUCTURES AND
THE REMOVAL OF TREES.
10. NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1-JULY 31)
WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING
SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. THE SURVEY SHALL BE
SENT TO THE CITY ENVIRONMENTAL PLANNER. IF ACTIVE NESTS ARE FOUND, THE CITY WILL
COORDINATE WITH RELEVANT STATE AND FEDERAL REPRESENTATIVES TO DETERMINE WHETHER
ADDITIONAL RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY.
11. CURB GUTTER, AND SIDEWALK SHALL BE REMOVED TO NE NEAREST JOINT.
12. CONTRACTOR SHALL COORDINATE ALL UTILITY DEMOLITION AND/OR RELOCATION ITEMS WITH THE
APPROPRIATE UTILITY PROVIDER PRIOR TO BEGINNING ANY ONSITE DEMOLITION.
13. THE REMOVAL OF UTILITY MAINS AND/OR SERVICES FOR GAS, WATER, AND SANITARY SEWER SHALL BE
REMOVED ENTIRELY TO THE ORIGINATING UTILITY MAIN PER CURRENT STANDARDS AND/OR
REQUIREMENTS OF THE APPROPRIATE UTILITY COMPANY.
14. DOMESTIC WATER SERVICES FROM THE METER PIT OR CURB STOP WERE NOT LOCATED OR SHOWN
ON THIS DRAWING. CONTRACTOR SHALL REMOVE THE ENTIRETY OF THE WATER SERVICES FROM THE
ORIGINATING MAIN TO THE EXISTING BUILDING.
15. UTILITY METERS SHOWN ON THIS DRAWING TO BE REMOVED ARE SHOWN PER THE TOPOGRAPHIC
SURVEY PERFORMED FOR THE PROJECT AND ONLY INCLUDE THOSE METERS THAT WERE CLEARLY
VISIBLE OR ACCESSIBLE AT THE TIME OF THE SURVEY. CONTRACTOR SHALL NOTE THAT ADDITIONAL
EXISTING METERS MAY BE PRESENT FROM THOSE SHOWN AND SHALL ACCOUNT FOR AND REMOVE
ALL EXISTING METERS.
16. ELECTRIC SERVICES FOR EXISTING BUILDINGS TO BE REMOVED ARE SHOWN PER BEST INFORMATION
AVAILABLE. CONTRACTOR SHALL NOTE THAT ADDITIONAL UNDERGROUND ELECTRIC SERVICES AND
CONDUITS MAY BE PRESENT ON SITE. ALL EXISTING ELECTRIC SERVICE LINES TO BUILDINGS TO BE
REMOVED SHALL ALSO BE REMOVED. ALL ELECTRIC REMOVALS OR RELOCATIONS SHALL BE
COORDINATED WITH THE CITY OF FORT COLLINS UTILITIES DEPARTMENT PRIOR TO BEGINNING ANY
UTILITY DEMOLITIONS.
17. REFER TO AND COORDINATE WITH THE SITE ELECTRICAL PLANS FOR ALL RELOCATED SITE OR STREET
LIGHTING. ALL STREET LIGHT RELOCATIONS SHALL BE COORDINATED WITH THE CITY OF FORT
COLLINS UTILITIES DEPARTMENT PRIOR TO BEGINNING ANY UTILITY DEMOLITIONS.
18. APPROVAL OF FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR ALL WORK PERFORMED IN THE
100-YR FLOODPLAIN. APPROVAL OF FLOODPLAIN USE PERMIT AND NO-RISE CERTIFICATION SHALL BE
REQUIRED FOR ALL WORK PERFORMED IN THE 100-YR FLOODWAY.
19. CONTRACTOR TO COORDINATE PROTECTION OF EXISTING STREET LIGHTS WITH CITY STAFF.
VAULT
ELEC
EXISTING CONCRETE TO BE REMOVED
T
WV
EXISTING TREES (TO BE REMOVED)
EXISTING ASPHALT TO BE REMOVED
EXISTING GASLINE G
EXISTING LOT LINE
100-YR FLOODPLAIN
100-YR FLOODWAY
NOTES:
TERRACON CONSULTANTS, INC.
GEOTECHNICAL ENGINEERING REPORT
LOMBARDY STUDENT HOUSING
FORT COLLINS, COLORADO
TERRACON PROJECT NO. 20185115
DATE: NOVEMBER 6, 2018
REVISED: DECEMBER 3, 2018
FLATIRONS, INC.
PROJECT NO. 18-71,080
DATE: APRIL 2018
ADDITIONAL SURVEY:
NORTHERN ENGINEERING SERVICES
PROJECT NO. 1560-001
DATE: OCTOBER 2018
TF
C100 C101
10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is
accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all
parties affected by any disruption of any utility service as well as the utility companies.
11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider.
Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a
pre-construction meeting may be required prior to commencement of any work.
12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary
sewer should be constructed prior to installation of the water lines and dry utilities.
13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water
Utility.
14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is
discharged into a storm sewer, channel, irrigation ditch or any waters of the United States.
15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of
Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan.
16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite
drainage facilities shall be the responsibility of the property owner(s).
17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be
submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two
weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the
Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the
Development Agreement.
18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage,
whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the
City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development.
19. All recommendations of the Preliminary Drainage Report for Saint John XXIII and Lombardy Student Housing, dated May 1, 2019 by Northern
Engineering shall be followed and implemented.
20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be
maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping.
21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must
be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by
the the City of Fort Collins street inspector.
22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit
is obtained, if applicable.
23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The
Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort
Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If
the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work
in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an
improper installation.
24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is
complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the
results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may
use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be
prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement
of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final
report.
25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at
all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to
the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then
resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets.
26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the
purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the
property lines and marked so as to reduce the excavation necessary for building connections.
27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for
roads within these districts.
28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the
Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval.
29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree
removal requiring a permit.
30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security.
Refer to OSHA Publication 2226, Excavating and Trenching.
31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The City of
Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall
be responsible for providing any and all traffic control devices as may be required by the construction activities.
32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic
Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic
sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed.
33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's
local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and
from the Development.
34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site
construction activities on Sundays or holidays, unless there is prior written approval by City of Fort Collins.
35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these
drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise.
36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for
clarification, and annotate the dimension on the as-built record drawings.
37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and
specifications, and a copy of any permits and extension agreements needed for the job.
38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications,
the Developer shall contact the Designer and the City of Fort Collins Engineer immediately.
39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the
Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins
Engineer.
40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as
the basis of bearings. The information shall be as follows:
PROJECT DATUM: NAVD88
City of Fort Collins Benchmark 20-97
At the Southwest corner of West Elizabeth and Constitution Ave. on a concrete traffic signal base.
ELEV.=5050.15
City of Fort Collins Benchmark 19-97
At the Southeast corner of West Elizabeth and Shields St., on a concrete traffic signal base.
ELEV.=5025.74
Please Note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 Unadjusted Datum (Prior
City of Fort Collins Datum) for their vertical datums.
If NGVD29 Unadjusted Datum (Prior City of Fort Collins Datum) is required for any purpose, the following equation should be used:
NGVD29 Unadjusted Datum (Prior City of Fort Collins Datum) = NAVD88 - 3.18'
Basis of Bearings
The Basis of Bearings is the East line of the Southeast Quarter of Section 15-7-69 as bearing South 00° 29' 45" West (assumed bearing).
41. All stationing is based on centerline of roadways unless otherwise noted.
42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters,
landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like
kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the
issuance of the first Certificate of Occupancy.
43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing
street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in
accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large
patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width,
including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer
and/or the City of Fort Collins Inspector at the time the cuts are made.
44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before
construction, or to the grades and condition as required by these plans.
45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections.
46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and
workmanship defects for a minimum period of two years from the date of acceptance.
47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage
structures and pipes, for the following private streets: N.A.
48. Approved Variances are listed as follows: N.A.
CONSTRUCTION NOTES
A. Grading and Erosion Control Notes
1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site.
2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans.
3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All
other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project
schedule, construction plans, and erosion control report.
4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property
sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion
control facilities shown herein.
5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the
area(s) required for immediate construction operations, and for the shortest practical period of time.
6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition
by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside
project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent
erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County.
7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall:
a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in
order to ensure the continued performance of their intended function.
b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector.
c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector.
8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and
debris from all drainage infrastructure and other public facilities.
9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of
way, and make sure streets and walkways are cleaned at the end of each working day.
10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to
cause their release into any waters of the United States.
11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering,
and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched.
12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and
before turning the maintenance over to the City/County or Homeowners Association (HOA).
13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant
or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout,
chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the
proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations.
14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and
located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout
material will be removed and properly disposed of prior to the area being restored.
15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever
measures are determined necessary, as directed by the City.
16. For additional information see separate Stormwater Management Plan / Erosion Control Report for Saint John XXIII And Lombardy Student
Housing.
B. Street Improvement Notes
1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here.
2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval,
prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall
be submitted for approval prior to placement of any asphalt.
3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to
create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can
be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins.
4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the
subgrade has been inspected and approved by the City of Fort Collins Engineer.
5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings
are not allowed.
6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing
street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter
25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay
shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not
cut the new asphalt overlay work.
7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as
per the Right-of-Way Work Permit traffic control plan.
8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt.
Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly.
9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full
depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required.
The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single
axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than
3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins
Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be
notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector.
C. Traffic Signing and Pavement Marking Construction Notes
1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction
Notes listed here.
2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic.
3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD.
4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads.
5. All lane lines for concrete pavement should be epoxy paint.
6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement
of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols.
7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards.
8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction.
9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings.
10. All sign posts shall utilize break-away assemblies and fasteners per the Standards.
11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified
during the field inspection must be corrected before the 2-year warranty period will begin.
12. The Developer installing signs shall be responsible for locating and protecting all underground utilities.
13. Special care shall be taken in sign location to ensure an unobstructed view of each sign.
14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort
Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an
unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the
requirements of the 2-year warranty period for new construction (except fair wear on traffic markings).
15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail.
D. Storm Drainage Notes
1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite
drainage facilities shall be the responsibility of the property owner(s).
2. All recommendations of the Preliminary Drainage Report for Saint John XXIII and Lombardy Student Housing, dated May 1, 2019 by Northern
Engineering shall be followed and implemented.
3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by
submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two
weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the
Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the
Development Agreement.
E. Utility Notes
1. All waterline and sanitary sewer construction shall conform to the City of Fort Collins Utility standards and specifications current to date of
construction.
2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water
utility.
3. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire.
4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The
HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be
installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal valve box and "water" lid per City
Water Detail 11A.
INFILL AND REDEVELOPMENT NOTE
A. Despite everyone's best efforts, it is impossible to fully display subsurface information prior to excavation. This is especially true in areas of infill and
redevelopment. Unknown subsurface conditions can have cost and schedule implications. Prior to finalizing contract terms, it is strongly
recommended that the Owner and General Contractor have a candid discussion to formulate a strategy for dealing with such circumstances when
they arise. The process and procures should be in place prior to excavation. Allowances and contingencies can address the cost implications, but
additional measures are required to deal with scheduling and factors impacting sequence of work. The Architect, Engineer(s), and Construction
Surveyor should be made aware of the protocol for dealing with such unknown subsurface conditions prior to starting work.
Date: April 2018
Additional Survey:
Northern Engineering Services
Project No. 1560-001
Date: October 2018
ORIGINAL FIELD SURVEY BY:
PROJECT BENCHMARKS:
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
BEING A REPLAT OF LOTS 1, 2 AND 3, PLAT OF JOHN XXIII UNIVERSITY CENTER AND LOT 1, CAMPUS WEST
TEXACO MINOR SUBDIVISION, LOCATED IN THE SOUTHEAST QUARTER OF
SECTION 15, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS,
COUNTY OF LARIMER, STATE OF COLORADO
OWNER/APPLICANT
PROJECT TEAM:
SITE ENGINEER
Northern Engineering Services, Inc.
Andy Reese
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
(970) 221-4158
SURVEYOR
ARCHITECT
CONTACT INFORMATION
PROJECT TEAM:
SHEET INDEX
ENGINEER ING
N O R T H E RN
PRELIMINARY UTILITY PLANS FOR
UTILITY CONTACT LIST: *
UTILITY COMPANY
* This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for
the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for
locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of
Colorado (UNCC) at 811 for additional information.
PHONE NUMBER
GAS----------------- Xcel Energy----------------------------- Pat Kreager (970) 225-7840
ELECTRIC-------- City of Fort Collins Light & Power-- Cody Snowdon (970) 416-2306
CABLE------------- Comcast---------------------------------- Don Kapperman (970) 567-0425
TELECOM.--------CenturyLink-------------------------------William Johnson (970) 377-6401
WATER------------ City of Fort Collins Utilities----------- Dan Mogen (970) 305-5989
WASTEWATER--City of Fort Collins Utilities----------- Dan Mogen (970) 305-5989
STORMWATER- City of Fort Collins Utilities----------- Dan Mogen (970) 305-5989
LANDSCAPE ARCHITECT
GEOTECHNICAL ENGINEER
PROJECT
LOCATION
SAINT JOHN XXIII AND LOMBARDY STUDENT HOUSING
Davis Partnership Architects
Jeff Leland, AIA
2901 Blake Street, Suite 100
Denver, Colorado 80205-2303
(303) 861-8555
BHA Design Incorporated
Jason S. Messaros, PLA
1603 Oakridge Drive, Suite 100
Fort Collins, Colorado 80525
(970) 223-7577
Northern Engineering Services, Inc.
Bob Tessely, PLS
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
(970) 221-4158
ENGINEER ING
N O R T H E RN
Terracon Consultants, Inc.
Eric Bernhardt, PE
1901 Sharp Point Drive, Suite C
Fort Collins, CO 80525
(970) 484-0359
C001 COVER SHEET
Terracon Consultants, Inc.
Geotechnical Engineering Report
Lombardy Student Housing
Fort Collins, Colorado
Terracon Project No. 20185115
Date: November 6, 2018
Revised: December 3, 2018
SUBSURFACE EXPLORATION BY:
S. SHIELDS ST.
W. MULBERRY ST.
W. ELIZABETH ST.
CSU
W. PLUM ST.
W. LAUREL ST.
CITY PARK AVE.
Blackbird Investments, LLC
Fr. Rocco Porter and Justin Doyle
130 East 3rd Street, Suite 400
Des Moines, Iowa, 50309
(515) 537-3728
C002 GENERAL & CONSTRUCTION NOTES
C001
COVER SHEET
1
UNIVERSITY AVE.
ORIGINAL SURVEY
Flatirons, Inc.
John Guyton, PLS
655 4th Avenue
Longmont, Colorado 80501
(303) 776-1733
C100-C101 EXISTING CONDITIONS & DEMOLITION PLAN
C200-C201 PAVING PLAN
C301-C302 UTILITY PLAN
C401-C403 GRADING PLAN
C500 SOUTH SHIELDS STREET - FLOWLINE
PLAN & PROFILE, & CROSS-SECTIONS
C600 RESERVED FOR DETAILS
C700 EROSION CONTROL PLAN
C701 EROSION CONTROL DETAILS
C800 DRAINAGE EXHIBIT
C900 FLOODPLAIN EXHIBIT
C300 OVERALL UTILITY PLAN
C400 OVERALL GRADING PLAN