Loading...
HomeMy WebLinkAboutTHE RETREAT AT FORT COLLINS (FORMERLY REDWOOD STREET MULTI-FAMILY) - PDP - PDP180002 - SUBMITTAL DOCUMENTS - ROUND 3 - DRAINAGE REPORTPRELIMINARY DRAINAGE REPORT The Retreat at Fort Collins Fort Collins, Colorado July 25, 2018 Prepared for: Landmark Properties 4455 Epps Bridge Parkway, Suite 20 Athens, GA 30606 Prepared by: 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 1290-002  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. July 25, 2018 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Final Drainage Report for The Retreat @ Fort Collins Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies the Preliminary Development Review submittal for the proposed The Retreat @ Fort Collins. This report has been prepared in accordance to the Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed The Retreat @ Fort Collins project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Stephanie Thomas, PE Project Engineer The Retreat @ Fort Collins Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ....................................................................................................................................... 1 B. Description of Property ................................................................................................................ 2 C. Floodplain .................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4 A. Major Basin Description ............................................................................................................... 4 B. Sub-Basin Description .................................................................................................................. 4 III. DRAINAGE DESIGN CRITERIA ................................................................................... 4 A. Regulations .................................................................................................................................. 4 B. Four Step Process ........................................................................................................................ 5 C. Development Criteria Reference and Constraints ......................................................................... 5 D. Hydrological Criteria .................................................................................................................... 6 E. Hydraulic Criteria ......................................................................................................................... 6 F. Floodplain Regulations Compliance .............................................................................................. 6 G. Modifications of Criteria .............................................................................................................. 6 IV. DRAINAGE FACILITY DESIGN .................................................................................... 7 A. General Concept .......................................................................................................................... 7 B. Detention Ponds and Water Quality/Low Impact Development ................................................. 10 C. Release Rate Compliance ........................................................................................................... 12 D. Low Impact Development (LID) Compliance ............................................................................... 14 V. CONCLUSIONS ...................................................................................................... 15 A. Compliance with Standards ........................................................................................................ 15 B. Drainage Concept ...................................................................................................................... 15 References ....................................................................................................................... 16 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Storm Sewers (For Future Use) B.2 – Inlets (For Future Use) B.3 – Detention Facilities (For Future Use) APPENDIX C – Water Quality Design Computations APPENDIX D – SWMM Analysis / Model APPENDIX E – FEMA Firmette APPENDIX F – Erosion Control Report The Retreat @ Fort Collins Preliminary Drainage Report LIST OF TABLES AND FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2– Proposed Site Plan ................................................................................................ 3 Figure 3 – Existing FEMA Floodplains .................................................................................... 4 Table 1 - Drainage Summary Table .................................................................................... 10 Table 2 – Detention Summary ............................................................................................ 12 Table 3 – Underground Chamber Summary .......................................................................... 12 Table 4 – Allowable Release Rate ....................................................................................... 13 Table 5 – Proposed Release Rate ........................................................................................ 14 MAP POCKET: C6.00 - Drainage Exhibit The Retreat @ Fort Collins Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. The Retreat @ Fort Collins project is located in the southeast quarter of Section 1, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is located east of Redwood Village PUD I and Redwood Street and south of Evergreen Parkway, Third Filing. The project site encompasses Redwood Village PUD Phase II. 4. The project is currently bordered to the south by Dry Creek, west by Redwood Village PUD, Phase II and Redwood Street, north by Evergreen and Park, Third Filing and to the east by Lake Canal Irrigation Ditch. The Retreat @ Fort Collins Preliminary Drainage Report 2 B. Description of Property 1. The Retreat @ Fort Collins is approximately 31.49 net acres. Approximately 1.17 acres of the site consists of the proposed extension of Suniga Road and 2.32 acres of the site consists of area proposed to remain undeveloped with this project. Figure 1 – Aerial Photograph 2. The Retreat @ Fort Collins consists of a mix of fee-simple townhomes, multi-family apartments, duplexes, clubhouse, parking garage, parking lots, private and public roadways, sidewalks and trails. 3. The existing site consists of undeveloped grasslands. 4. Historically, off-site drainage entering from the Redwood Village neighbor enters the site along the western boundary. All runoff generated from the project historically drains to the southeast and is collected in the Lake Canal Irrigation Ditch. 5. In the northwestern corner of the site is an existing detention pond. This detention pond detains a portion of the Redwood Village and the upstream developments. 6. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey, the vast majority of the site consists of variations of clay loam, which falls into Hydrologic Soil Groups C. This soil type has a slow rate of infiltration. 7. The proposed development will include a mix of above ground extended detention basins and underground detention and water quality chambers. The underground detention and water quality chambers will provide LID treatment for the site in accordance with the City of Fort Collins guidance for LID treatment. The Retreat @ Fort Collins Preliminary Drainage Report 3 Figure 2– Proposed Site Plan 8. No existing irrigation facilities or major drainageways are located within the property limits. A regional conveyance, associated with the NECCO project, has been planned on the property and will be included as a part of this project. 9. The project site is within the Low Density Mixed-Use Neighborhood District (L-M-N) Zoning District. The proposed use is permitted within the zone district. C. Floodplain 1. The subject property is located in the FEMA regulatory Dry Creek 100-year floodplain. A FEMA high-risk floodway and floodplain is located on the very southern tip of the property. This area is not proposed to be developed at this time. 2. The FEMA Panel 08069C0977G illustrates the proximity of the project site to the nearest FEMA delineated regulatory floodplain. These Firmette for this FEMA panel is provided in the Appendix. The Retreat @ Fort Collins Preliminary Drainage Report 4 Figure 3 – Existing FEMA Floodplains II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The Retreat @ Fort Collins is located within the Dry Creek Basin, which is generally located in north Fort Collins. This area is also subject to the restrictions as delineated in the North East College Corridor Outfall (NECCO) Design Report. B. Sub-Basin Description 1. The property historically drains to the southeast and is collected in the Lake Canal Irrigation Ditch. 2. Off-site drainage from the Redwood Village neighborhood is routed onto the property and entering from the western boundary. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. III. DRAINAGE DESIGN CRITERIA A. Regulations The Retreat @ Fort Collins will be subject to the regulations set forth in the FCSCM, as well as regulations associated with the Dry Creek Drainage Basin and the NECCO project. The Retreat @ Fort Collins Preliminary Drainage Report 5 B. Four Step Process The overall stormwater management strategy employed with The Retreat @ Fort Collins project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low-Impact Development (LID) strategies including: Providing vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through drain rock within the underground detention section to increase time of concentration, promote infiltration and provide initial water quality. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, this development will still generate stormwater runoff that will require additional BMPs and water quality. The majority of stormwater runoff from the site will ultimately be intercepted and treated in proposed underground Stormtech water quality chambers. Water quality for areas not routed through the Stormtech chambers will be provided within the detention pond volume. Step 3 – Stabilize Drainageways As stated in Section I.B.5, above, there are no major drainageways in or near the subject site. While this step may not seem applicable to The Retreat @ Fort Collins, the proposed project indirectly helps achieve stabilized drainageways nonetheless. Furthermore, this project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve Citywide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. This step typically applies to industrial and commercial developments and is not applicable for this project. C. Development Criteria Reference and Constraints 1. The Retreat @ Fort Collins will be subject to the regulations set forth in the FCSCM, as well as regulations associated with the Dry Creek Drainage Basin and the NECCO project. 2. This property was included in the NECCO Design Report. As this project is expected to release into the NECCO drainage system, this project will be subject to the requirements set forth with the NECCO Design Report. 3. Though this site was not included in the Redwood Village PUD Drainage design. The Redwood Village neighborhood does discharge to the project site. As such, the Redwood Village report was referenced for this project. 4. Several constraints have been identified during the course of this analysis that will impact the proposed drainage system including: The Retreat @ Fort Collins Preliminary Drainage Report 6 Tie in elevation into the NECCO Drainage system. NECCO storm drainage planned to traverse this property. This storm drain will be designed with this project. The NECCO design requires a 0.2 cfs/acres release from the developed site. This minimal release rate does not provide substantial leeway for any undetained flows. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with this development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. The EPA Storm Water Management Model (SWMM) software has been utilized for detention storage calculations. 4. Three separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2- year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. The third storm computed, for comparison purposes only, is the 10-year event. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property historically drains into the Lake Canal Irrigation Ditch. This site will be rerouted to drain to the existing NECCO storm improvements. 2. All drainage facilities proposed with The Retreat @ Fort Collins project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated in Section I.C.1, above, the subject property is located within a FEMA regulatory floodplain. As such, this project is subject to the development restrictions as provided by FEMA and the City of Fort Collins. 4. No structures are proposed within the floodplain or floodway. 5. The Retreat @ Fort Collins project does not propose to modify any natural drainageways. F. Floodplain Regulations Compliance 1. As previously mentioned, all structures are located outside of any FEMA 100-year or City floodplain, and thus are not subject to any floodplain regulations. G. Modifications of Criteria 1. The proposed The Retreat @ Fort Collins development is not requesting any modification at this time. The Retreat @ Fort Collins Preliminary Drainage Report 7 IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of The Retreat @ Fort Collins drainage design collect and treat all developed runoff from the site, direct all stormwater release from the site to the NECCO stormwater improvements adjacent to the site and minimize the amount of undetained drainage and/or provide additional detention and treatment of off-site areas to balance any undetained basins. 2. As previously mentioned, off-site flows from the Redwood Village neighborhood drain onto the existing property. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. The Retreat @ Fort Collins project is composed of eight major drainage basins, designated as Basins A, B, C, D, E, F, UD, and RW. The drainage patterns for each major basin are further described below. Basin A Basin A is located in the northern half of the site. This basin is subdivided into 8 sub- basins. These basins consist of buildings, parking lots, roadways and landscaping. Runoff from these basins drains via curb and gutter to curb inlets. These basins are detained and treated for LID in underground Chambers A7, and water quality is provided in Detention Pond 1. This pond releases directly to a proposed outfall pipe that connects outfalls into the proposed Detention Pond 2. 100-year detention of this basin is provided in Detention Pond 1. Basin B Basin B is located in the center and southern area of the site. This basin is subdivided into 11 sub-basins. These basins consist of buildings, parking lots, roadways and landscaping. Runoff from these basins drains via curb and gutter to curb inlets. These basins are detained and treated for LID in underground Chambers B2, B6 and B9. Water quality is also provided in Detention Pond 2. This pond releases directly to a proposed outfall pipe that connects to the NECCO stormwater improvements. This pond receives the detained release from Detention Pond 1. 100-year detention of this basin is provided in Detention Pond 2. Basin C Basin C is located along the northern boundary of the site adjacent the southern boundary of the Redwood Village. This basin consists of one sub-basin. This basin consists of buildings, parking lots, roadways and landscaping. Runoff from these basins drains via curb and gutter to curb inlets and curb cuts. These basins are detained and treated for water quality in Detention Pond 3. 100-year detention of this basin is provided by Detention Pond 3. The Retreat @ Fort Collins Preliminary Drainage Report 8 Basin D Basin D is located along the western boundary of the site adjacent the eastern boundary of the Redwood Village. This basin is subdivided into 2 sub-basins. This basin consists of buildings, parking lots, roadways and landscaping. Runoff from these basins drains via curb and gutter to curb cuts and swale. Water quality for this basin is provided in Detention Pond 4. 100-year detention of this basin is provided by a combination of Detention Pond 4 and Detention Pond 3. Once Detention Pond 4 is full it will spill to the adjacent parking lot that will convey additional flow to Detention Pond 3. Basin E Basin E is located along the southern boundary of the site. This basin consist of buildings, parking lots, roadways and landscaping. Runoff from this basin drains via curb and gutter to curb inlets. These basins are detained and treated for water quality/LID in underground Chambers E1 and Detention Pond 5. Detention Pond 5 consists of underground detention chambers. These ponds release directly to a proposed outfall pipe that connects to the NECCO stormwater improvements. Basin F Basin F is located in the northern corner of the site. This basin consists of a roadway connection to Conifer Street. Due to grading constraints this area will drain to the existing inlets at the intersection of Conifer Street and Redwood Street. These inlets discharge to Redwood Detention Pond. Based on the proposed plans to the Redwood Pond that were delineated in the NECCO report. This basin can easily be detained in the Redwood Pond without much consequence. Further discussion is provided in the Detention Pond section of this report Basin UD1 Basin UD1 is located along the western boundary of the site, adjacent Redwood Street. This basin consists of buildings, parking lots, roadways and landscaping. The runoff from this basin drains undetained via curb and gutter to existing curb inlets on Redwood Street. These inlets are connected to the NECCO stormwater improvements. Basin UD2 Basin UD2 is located along the southern boundary of the site. This basin consists of Suniga Street. The runoff from this basin drains undetained via curb and gutter to inlets designed with the NECCO stormwater improvements. Per the NECCO plan, this basin was not required to be detained by this project. This area is listed as Basin 950 and 951 in the NECCO plan. Basin UD3 Basin UD3 is located south of Suniga Street. This basin is not planned for development and will remain as its existing condition. Per the NECCO plan, this basin was not required to be detained by this project. This area is listed as Basin 413 in the NECCO plan. The Retreat @ Fort Collins Preliminary Drainage Report 9 Basin RW Basin RW consists of the existing Redwood Village neighborhood. This basin was further divided into 5 sub-basins. Basin RW1 drains via curb and gutter to the north and will be collected in proposed inlets. The runoff from Basin RW1 will bypass the Retreat site. Basin RW2 currently drains via a concrete pan and discharges onto The Retreat site. This basin’s runoff will be detained in Detention Pond 4. Basin RW3 currently drains via overland flow onto The Retreat site. This basin’s runoff will be detained in Detention Pond 4 and 3. Basin RW4 currently drains via grass swale onto The Retreat site. This basin’s runoff will be collected in an inlet and conveyed to the NECCO system by the planned NECCO extension. The runoff from Basin RW4 will bypass the Retreat site. Basin RW5 currently drains via overland flow onto The Retreat site. This basin’s runoff will be detained in Detention Pond 3. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. The Retreat @ Fort Collins Preliminary Drainage Report 10 Table 1 - Drainage Summary Table DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100- yr Tc (min) Q2 (cfs) Q100 (cfs) A1 A1 0.66 0.62 0.78 5.0 5.0 1.17 5.11 A2 A2 1.61 0.69 0.86 13.8 11.4 2.16 10.25 A3 A3 1.33 0.76 0.95 9.0 7.6 2.37 10.83 A4 A4 1.42 0.67 0.84 7.2 5.2 2.39 11.81 A5 A5 0.71 0.76 0.95 6.7 5.0 1.38 6.63 A6 A6 2.11 0.70 0.87 10.5 9.3 3.19 14.74 A7 A7 0.20 0.84 1.00 5.0 5.0 0.49 2.04 A8 A8 3.54 0.38 0.47 10.4 9.5 2.96 13.20 B1 B1 1.59 0.70 0.88 11.8 10.4 2.33 10.76 B2 B2 1.26 0.45 0.56 9.1 7.6 1.31 6.11 B3 B3 1.23 0.85 1.00 8.3 5.0 2.51 12.25 B4 B4 2.07 0.68 0.85 6.7 5.4 3.66 17.55 B5 B5 0.52 0.74 0.93 5.9 5.0 1.07 4.84 B6 B6 0.67 0.49 0.62 6.4 5.2 0.89 4.14 B7 B7 1.30 0.77 0.96 6.8 5.0 2.60 12.48 B8 B8 0.27 0.77 0.97 5.3 5.0 0.60 2.62 B9 B9 0.14 0.80 1.00 5.0 5.0 0.31 1.36 B10 B10 0.81 0.77 0.96 5.1 5.0 1.77 7.70 B11 B11 1.43 0.34 0.42 9.9 9.0 1.09 4.83 C1 C1 1.16 0.54 0.68 7.6 6.3 1.56 7.36 D1 D1 0.83 0.64 0.80 7.0 5.2 1.34 6.61 D2 D2 0.83 0.51 0.63 5.0 5.0 1.20 5.24 E1 E1 0.79 0.62 0.77 8.3 6.6 1.17 5.53 F1 F1 0.72 0.38 0.47 14.2 13.3 0.52 2.36 UD1 UD1 0.79 0.52 0.65 8.0 6.6 0.99 4.66 UD2 UD2 1.17 0.80 1.00 5.0 5.0 2.68 11.66 UD3 UD3 2.32 0.30 0.37 32.0 29.0 0.86 3.96 RW1 RW1 3.42 0.45 0.56 15.9 14.7 2.83 12.71 RW2 RW2 1.08 0.45 0.56 9.6 8.4 1.09 5.08 RW3 RW3 0.10 0.45 0.56 6.8 5.6 0.12 0.55 RW4 RW4 1.20 0.45 0.56 9.6 8.4 1.22 5.65 RW5 RW5 0.31 0.45 0.56 6.8 5.6 0.37 1.69 B. Detention Ponds and Water Quality/Low Impact Development Due to the complication of designing the underground chambers for both LID treatment and 100-year detention, the detention ponds and the LID treatments are labeled differently. The labeling of the detention ponds designed for 100-year detention are The Retreat @ Fort Collins Preliminary Drainage Report 11 Detention Pond 1 and Chambers A7 Detention Pond 1 was designed to detain the stormwater runoff during a 100-year event from the entire Basin A. Water Quality is provided for Basin A8 as extended detention within Detention Pond 1. Detention Pond 1 releases to Detention Pond 2. Chambers A7 provides LID and water quality treatment for Basin A1-A7. Detention Pond 2 and Chambers B2 and B3 Detention Pond 2 was designed to detain the stormwater runoff during a 100-year event from Basin B. Water Quality is provided for Basin B11 as extended detention within Detention Pond 2. Detention Pond 2 also takes the release from Detention Pond 1. Chambers B2 provides LID and water quality treatment for Basins B1 and B2. Chambers B6 provides LID and water quality treatment for Basins B3-B6. Chambers B9 provides LID and water quality treatment for Basins B7 and B9-B10. Detention Pond 3 Detention Pond 3 was designed to detain the stormwater runoff during a 100-year event from Basin C and Basin RW5. Water Quality is provided for Basin C1 as extended detention within Detention Pond 3. During a 100-year event Detention Pond 3 will spill to the adjacent parking lot, and be detained within the parking lot. Detention Pond 4 Detention Pond 4 was designed to detain a portion of the stormwater runoff during a 100-year event from Basin D, Basin RW2 and Basin RW3. Water Quality is provided for Basin D as extended detention within Detention Pond 4. During a 100-year event Detention Pond 4 will spill to the adjacent parking lot. This additional flow will be detained in Detention Pond 3. Detention Pond 5 and Chambers E1 Detention Pond 5 was designed to detain the stormwater runoff during a 100-year event from Basin E within underground chambers. Chambers E1 provides LID and water quality treatment for Basin E1 and Basin B8. Redwood Detention Pond As Basin F drains to the existing Redwood Pond, the Redwood Pond can be considered to detain runoff from Basin F. Basin F is a 0.72 acre basin with a 25% imperviousness. The total existing tributary area that drains to the Redwood Pond from the existing neighborhoods is 49.8 acres of 70% imperviousness. Therefore, this small additional basin area is minimal in comparison to the full tributary. The Redwood Pond is planned to be updated by the City with the NECCO project. The reconstruction of the pond will have a total 100-year volume of 9.86 ac-ft (2.12 ac-ft of that volume is water quality) and an updated outfall pipe (built by The Retreat). The 100-year depth shown in the NECCO report was shown at 4.65 feet deep. The Redwood Pond was included in the SWMM model in order to see the effect this additional area from Basin F will have on the proposed Redwood Pond. The addition of Basin F was shown to raise the 100-year water level by about 0.04 ft and the total volume by 0.13 ac-ft. This change is negligible. A summary of the detention volumes and water quality volumes for each pond are found below: The Retreat @ Fort Collins Preliminary Drainage Report 12 Table 2 – Detention Summary Open Detention Pond Summary | Proposed Condition Pond Pond Description 100-yr Volume (cf) 100-yr Volume (ac-ft) 100-yr WSEL WQCV (cf) WQCV WSEL Max Release (cfs) 1 Open Detention 116,789 2.68 4956.93 1,319 4956.93 0.70 2 Open Detention 112,201 2.58 4949.65 377 4956.52 1.60 3 Open Detention 9,363 0.21 4955.03 746 4857.14 3.80 4 Open Detention 17,091 0.39 4959.04 1,131 4956.80 2.25 Table 3 – Underground Chamber Summary Underground Chamber Summary | Proposed Condition Chamber Description 100-yr Volume (cf) 100-yr Volume (ac-ft) 100-yr WSEL WQCV (cf) WQCV WSEL Max Release (cfs) A7 Underground LID n/a n/a n/a 5,507 to be provided at final n/a B2 Underground LID n/a n/a n/a 1,619 to be provided at final n/a B6 Underground LID n/a n/a n/a 3,124 to be provided at final n/a B9 Underground LID n/a n/a n/a 1,827 to be provided at final n/a E1/Pond 5 Underground LID and Detention 7,683 0.18 to be provided at The Retreat @ Fort Collins Preliminary Drainage Report 13 Table 4 – Allowable Release Rate Allowable Stormwater Release from Combined Redwood and Retreat Site Basin Area (acres) 100-yr Release Rate (cfs) Basin A 11.57 2.31 Basin B 11.3 2.26 Basin C 1.16 0.23 Basin D 1.66 0.33 Basin E 0.79 0.16 Basin F 0.72 0.14 UD1 0.79 0.16 Total On-site Release 27.99 5.60 Off-site Basins RW1 3.42 12.71 RW2 1.08 5.08 RW3 0.1 0.55 RW4 1.2 5.65 RW5 0.31 1.69 Redwood Pond 49.8 12.00 Total Off-site Release 55.91 37.68 Total Release from Combined Redwood and Retreat Basins 83.9 43.28 The Retreat @ Fort Collins Preliminary Drainage Report 14 Table 5 – Proposed Release Rate Proposed Stormwater Release from Combined Redwood and Retreat Site Pond/ Basin 100-yr Release Rate (cfs) Pond 2 1.60 Pond 3 3.80 Pond 4 2.25 Pond 5 0.20 Redwood Pond 12.00 Total Detention Release 19.85 Undetained Basins RW1 12.71 RW4 5.65 UD1 4.66 Total Undetained Release 23.02 Total Release from Combined Redwood and Retreat Basins 42.87 Based on this, the release from the site is well within the allowable release rate for the site. D. Low Impact Development (LID) Compliance This site provides 73.5% treatment of new impervious area through a Low Impact Development treatment facility. The LID treatment is provided through underground detention and water quality chambers. These chambers will be designed as Stormtech chambers at the time of final design. The Retreat @ Fort Collins Preliminary Drainage Report 15 V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with The Retreat @ Fort Collins project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with The Retreat @ Fort Collins project complies with the City of Fort Collins’ Master Drainage Plan for the Old Town Basin. 3. There are no regulatory floodplains associated with The Retreat @ Fort Collins development. 4. The drainage plan and stormwater management measures proposed with The Retreat @ Fort Collins development are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit potential damage associated with its stormwater runoff. The Retreat @ Fort Collins will detain for proposed impervious area and release at a rate in conformance with the Dry Creek major drainage basin of 0.2 cfs/acre. 2. The proposed The Retreat @ Fort Collins development will not impact the Master Drainage Plan recommendations for the North East College Corridor Outfall (NECCO) within Dry Creek major drainage basin. The Retreat @ Fort Collins Preliminary Drainage Report 16 References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS Hydrologic Soil Group—Larimer County Area, Colorado (The Retreat ) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/18/2018 Page 1 of 4 4494200 4494300 4494400 4494500 4494600 4494700 4494200 4494300 4494400 4494500 4494600 4494700 494200 494300 494400 494500 494600 494700 494800 494900 495000 494200 494300 494400 494500 494600 494700 494800 494900 495000 40° 36' 12'' N 105° 4' 10'' W 40° 36' 12'' N 105° 3' 28'' W 40° 35' 52'' N 105° 4' 10'' W 40° 35' 52'' N 105° 3' 28'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 200 400 800 1200 Feet 0 50 100 200 300 Meters Map Scale: 1:4,430 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 22 Caruso clay loam, 0 to 1 percent slope D 0.6 2.4% 64 Loveland clay loam, 0 to 1 percent slopes C 6.7 24.5% 73 Nunn clay loam, 0 to 1 percent slopes C 12.8 47.1% 76 Nunn clay loam, wet, 1 to 3 percent slopes C 7.1 26.1% Totals for Area of Interest 27.2 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—Larimer County Area, Colorado The Retreat Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/18/2018 Page 3 of 4 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado The Retreat Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/18/2018 Page 4 of 4 The Retreat CHARACTER OF SURFACE 1 : Runoff Coefficient Percentage Impervious Project: The Retreat Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: S. Thomas Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 . 100% Date: July 24, 2018 Concrete …….......……………….….……….………………..….…………………………………………………….0.95 . 90% Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 . 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Single Family Lots 0.55 50% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 . 0% Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 . 0% Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBas in Area (ac) Area of Asphalt (ac) Area of Gravel (ac) Area of Concrete (ac) Area of Single-Family Lots (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff The Retreat Overland Flow, Time of Concentration: The Retreat Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf =1.00) C*Cf (10-yr Cf =1.00) C*Cf (100-yr Cf =1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S The Retreat Rational Method Equation: Project: The Retreat Calculations By: Date: Rainfall Intensity: A1 A1 0.66 5 5 5 0.62 0.62 0.78 2.85 4.87 9.95 1.17 2.00 5.11 A2 A2 1.61 14 14 11 0.69 0.69 0.86 1.95 3.34 7.42 2.16 3.69 10.25 A3 A3 1.33 9 9 8 0.76 0.76 0.95 2.35 4.02 8.59 2.37 4.05 10.83 A4 A4 1.42 7 7 5 0.67 0.67 0.84 2.52 4.31 9.95 2.39 4.09 11.81 A5 A5 0.71 7 7 5 0.76 0.76 0.95 2.60 4.44 9.95 1.38 2.37 6.63 A6 A6 2.11 11 11 9 0.70 0.70 0.87 2.17 3.71 8.03 3.19 5.44 14.74 A7 A7 0.20 5 5 5 0.84 0.84 1.00 2.85 4.87 9.95 0.49 0.83 2.04 A8 A8 3.54 10 10 10 0.38 0.38 0.47 2.21 3.78 7.88 2.96 5.07 13.20 Basin A Basin A 11.57 21 21 19 0.60 0.60 0.75 1.59 2.71 5.84 11.08 18.90 50.97 B1 B1 1.59 12 12 10 0.70 0.70 0.88 2.09 3.57 7.72 2.33 3.97 10.76 B2 B2 1.26 9 9 8 0.45 0.45 0.56 2.30 3.93 8.59 1.31 2.24 6.11 B3 B3 1.23 8 8 5 0.85 0.85 1.00 2.40 4.10 9.95 2.51 4.28 12.25 B4 B4 2.07 7 7 5 0.68 0.68 0.85 2.60 4.44 9.95 3.66 6.26 17.55 B5 B5 0.52 6 6 5 0.74 0.74 0.93 2.76 4.72 9.95 1.07 1.84 4.84 B6 B6 0.67 6 6 5 0.49 0.49 0.62 2.67 4.56 9.95 0.89 1.52 4.14 B7 B7 1.30 7 7 5 0.77 0.77 0.96 2.60 4.44 9.95 2.60 4.45 12.48 B8 B8 0.27 5 5 5 0.77 0.77 0.97 2.85 4.87 9.95 0.60 1.03 2.62 B9 B9 0.14 5 5 5 0.80 0.80 1.00 2.85 4.87 9.95 0.31 0.53 1.36 B10 B10 0.81 5 5 5 0.77 0.77 0.96 2.85 4.87 9.95 1.77 3.02 7.70 B11 B11 1.43 10 10 9 0.34 0.34 0.42 2.26 3.86 8.03 1.09 1.86 4.83 Basin B Basin B 11.30 14 14 10 0.64 0.64 0.81 1.92 3.29 7.72 13.99 23.97 70.31 C1 C1 1.16 8 8 6 0.54 0.54 0.68 2.46 4.21 9.31 1.56 2.66 7.36 Basin C Basin C 1.16 8 8 6 0.54 0.54 0.68 2.46 4.21 9.31 1.56 2.66 7.36 D1 D1 0.83 7 7 5 0.64 0.64 0.80 2.52 4.31 9.95 1.34 2.29 6.61 D2 D2 0.83 5 5 5 0.51 0.51 0.63 2.85 4.87 9.95 1.20 2.05 5.24 Basin D Basin D 1.66 11 11 9 0.57 0.57 0.72 2.17 3.71 8.03 2.07 3.53 9.56 E1 E1 0.79 8 8 7 0.62 0.62 0.77 2.40 4.10 9.06 1.17 2.00 5.53 F1 F1 0.72 14 14 13 0.38 0.38 0.47 1.92 3.29 6.92 0.52 0.90 2.36 UD1 UD1 0.79 8 8 7 0.52 0.52 0.65 2.40 4.10 9.06 0.99 1.69 4.66 UD2 UD2 1.17 5 5 5 0.80 0.80 1.00 2.85 4.87 9.95 2.68 4.59 11.66 UD3 UD3 2.32 32 32 29 0.30 0.30 0.37 1.26 2.14 4.60 0.86 1.47 3.96 RW1 RW1 3.42 16 16 15 0.45 0.45 0.56 1.84 3.14 6.62 2.83 4.82 12.71 RW2 RW2 1.08 10 10 8 0.45 0.45 0.56 2.26 3.86 8.38 1.09 1.87 5.08 RW3 RW3 0.10 7 7 6 0.45 0.45 0.56 2.60 4.44 9.63 0.12 0.20 0.55 RW4 RW4 1.20 10 10 8 0.45 0.45 0.56 2.26 3.86 8.38 1.22 2.08 5.65 RW5 RW5 0.31 7 7 6 0.45 0.45 0.56 2.60 4.44 9.63 0.37 0.62 1.69 A3, A2 Basins A1-A3 (100- year Overtopping) 3.59 14 14 11 0.70 0.70 0.88 1.95 3.34 7.42 4.92 8.43 23.41 A5 Basins A1-A5 (100- year Overtopping) 5.72 18 18 15 0.70 0.70 0.88 1.73 2.95 6.52 6.91 11.80 32.66 A7 Basins A1-A7 (Channel Calc) 8.03 18 18 15 0.70 0.70 0.88 1.73 2.95 6.52 9.74 16.63 46.02 B5 Basins B3-B5 (100- year Overtopping) 3.82 11 11 6 0.74 0.74 0.93 2.17 3.71 9.31 6.17 10.54 33.10 B6 Basins B1-B6 (Storm Sewer Calc) 7.35 APPENDIX B HYDRAULIC COMPUTATIONS B.1 – Storm Sewers B.2 – Inlets B.3 – Detention Facilities APPENDIX B.1 STORM SEWERS (FOR FUTURE USE) APPENDIX B.2 INLETS (FOR FUTURE USE) APPENDIX B.3 DETENTION FACILITIES The Retreat 1290-002 Fort Collins, Colorado S. Thomas Date: 7/24/2018 Pond No.: 1 Pond 1 100-yr 0.75 WQCV 1319 ft 3 Area (A)= 11.57 acres Quantity Detention SWMM 116789 ft 3 Max Release Rate = 0.70 cfs Total Volume 116789 ft 3 Total Volume 2.681 ac-ft *SWMM Model accounts for initial WQCV depth in pond prior to beginning of storm. Therefore, SWMM volume includes WQCV as additional. Detention Pond Calculation | SWMM Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = 7/24/2018 1:09 PM D:\Projects\1290-002\Drainage\Detention\1290-002_Detention Pond 1.xlsm\SWMM_FC The Retreat 1290-001 Fort Collins, CO S. Thomas Date: 7/24/2018 Pond No.: 1 Pond 1 WQCV 1319 ft3 4953.81 ft. Design Storm 100-yr Required Volume= 116789 ft3 4956.93 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft2 ft. ft3 ft3 ft3 ft3 4,953.20 171 0.00 0 0 0 0 4,953.40 923 0.20 109 109 99 99 4,953.60 2525 0.20 345 454 332 431 4,953.80 5861 0.20 839 1293 816 1247 4,954.00 10369 0.20 1623 2916 1602 2848 4,954.20 15731 0.20 2610 5526 2591 5440 4,954.40 21779 0.20 3751 9277 3735 9174 4,954.60 28255 0.20 5003 14280 4989 14164 4,954.80 34853 0.20 6311 20591 6299 20463 4,955.00 39212 0.20 7406 27997 7402 27865 4,955.20 41748 0.20 8096 36093 8095 35960 4,955.40 43189 0.20 8494 44587 8493 44453 4,955.60 44201 0.20 8739 53326 8739 53192 4,955.80 45225 0.20 8943 62269 8942 62134 4,956.00 46270 0.20 9149 71418 9149 71284 4,956.20 47348 0.20 9362 80780 9362 80645 4,956.40 48465 0.20 9581 90361 9581 90226 4,956.60 49588 0.20 9805 100167 9805 100031 4,956.80 50717 0.20 10030 110197 10030 110062 4,957.00 51852 0.20 10257 120454 10257 120318 4,957.20 52995 0.20 10485 130939 10485 130803 4,957.40 54145 0.20 10714 141653 10714 141517 4,957.60 55303 0.20 10945 152598 10945 152461 4,957.80 56466 0.20 11177 163774 11177 163638 Design Point Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 7/24/20181:09 PM D:\Projects\1290-002\Drainage\Detention\1290-002_Detention Pond 1.xlsm\Stage_Storage The Retreat 1290-002 Fort Collins, Colorado S. Thomas Date: 7/24/2018 Pond No.: 2 Pond 2 100-yr 0.81 WQCV 377 ft 3 Area (A)= 11.30 acres Quantity Detention SWMM 112201 ft 3 Max Release Rate = 1.60 cfs Total Volume 112201 ft 3 Total Volume 2.576 ac-ft *SWMM Model accounts for initial WQCV depth in pond prior to beginning of storm. Therefore, SWMM volume includes WQCV as additional. Detention Pond Calculation | SWMM Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = 7/24/2018 1:11 PM D:\Projects\1290-002\Drainage\Detention\1290-002_Detention Pond 2.xlsm\SWMM_FC The Retreat 1290-001 Fort Collins, CO S. Thomas Date: 7/24/2018 Pond No.: 2 Pond 2 WQCV 377 ft3 4949.65 ft. Design Storm 100-yr Required Volume= 112201 ft3 4956.52 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft2 ft. ft3 ft3 ft3 ft3 4,949.40 425 0.00 0 0 0 0 4,949.60 2054 0.20 248 248 228 228 4,949.80 4477 0.20 653 901 638 865 4,950.00 7632 0.20 1211 2112 1197 2062 4,950.20 10024 0.20 1766 3878 1760 3822 4,950.40 10786 0.20 2081 5959 2081 5903 4,950.60 11144 0.20 2193 8152 2193 8096 4,950.80 11505 0.20 2265 10417 2265 10361 4,951.00 11870 0.20 2337 12754 2337 12698 4,951.20 12238 0.20 2411 15165 2411 15109 4,951.40 12612 0.20 2485 17650 2485 17594 4,951.60 12992 0.20 2560 20210 2560 20154 4,951.80 13378 0.20 2637 22847 2637 22791 4,952.00 13770 0.20 2715 25562 2715 25506 4,952.20 14196 0.20 2797 28359 2796 28302 4,952.40 14629 0.20 2882 31241 2882 31184 4,952.60 15069 0.20 2970 34211 2970 34154 4,952.80 15517 0.20 3059 37270 3059 37213 4,953.00 15973 0.20 3149 40419 3149 40362 4,953.20 16437 0.20 3241 43660 3241 43603 4,953.40 16908 0.20 3334 46994 3334 46937 4,953.60 17388 0.20 3430 50424 3429 50366 4,953.80 17874 0.20 3526 53950 3526 53892 4,954.00 18366 0.20 3624 57574 3624 57516 4,954.20 18865 0.20 3723 61297 3723 61239 4,954.40 19372 0.20 3824 65121 3824 65063 4,954.60 19886 0.20 3926 69046 3926 68989 4,954.80 20410 0.20 4030 73076 4030 73018 4,955.00 20945 0.20 4136 77212 4135 77154 4,955.20 21491 0.20 4244 81455 4243 81397 4,955.40 22047 0.20 4354 85809 4354 85751 4,955.60 22616 0.20 4466 90275 4466 90217 4,955.80 23196 0.20 4581 94856 4581 94798 4,956.00 23790 0.20 4699 99555 4698 99496 The Retreat 1290-002 Fort Collins, Colorado S. Thomas Date: 7/24/2018 Pond No.: 3 Pond 3 100-yr 0.68 WQCV 746 ft 3 Area (A)= 1.16 acres Quantity Detention SWMM 9363 ft 3 Max Release Rate = 3.80 cfs Total Volume 9363 ft 3 Total Volume 0.215 ac-ft *SWMM Model accounts for initial WQCV depth in pond prior to beginning of storm. Therefore, SWMM volume includes WQCV as additional. Detention Pond Calculation | SWMM Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = 7/24/2018 1:11 PM D:\Projects\1290-002\Drainage\Detention\1290-002_Detention Pond 3.xlsm\SWMM_FC The Retreat 1290-001 Fort Collins, CO S. Thomas Date: 7/24/2018 Pond No.: 3 Pond 3 WQCV 746 ft3 4955.03 ft. Design Storm 100-yr Required Volume= 9363 ft3 4957.14 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft2 ft. ft3 ft3 ft3 ft3 4,953.20 0 0.00 0 0 0 0 4,953.40 13 0.20 1 1 1 1 4,953.60 52 0.20 7 8 6 7 4,953.80 119 0.20 17 25 17 24 4,954.00 213 0.20 33 58 33 56 4,954.20 347 0.20 56 114 55 112 4,954.40 524 0.20 87 201 86 198 4,954.60 726 0.20 125 326 124 323 4,954.80 952 0.20 168 494 167 490 4,955.00 1208 0.20 216 710 216 706 4,955.20 1497 0.20 271 981 270 976 4,955.40 1846 0.20 334 1315 334 1309 4,955.60 2217 0.20 406 1721 406 1715 4,955.80 2609 0.20 483 2204 482 2197 4,956.00 3020 0.20 563 2767 562 2759 4,956.20 3488 0.20 651 3417 650 3410 4,956.40 4276 0.20 776 4194 775 4185 4,956.60 5422 0.20 970 5163 968 5152 4,956.80 7025 0.20 1245 6408 1241 6393 4,957.00 8862 0.20 1589 7997 1585 7979 4,957.20 10464 0.20 1933 9930 1930 9909 Design Point Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 7/24/20181:11 PM D:\Projects\1290-002\Drainage\Detention\1290-002_Detention Pond 3.xlsm\Stage_Storage The Retreat 1290-002 Fort Collins, Colorado S. Thomas Date: 7/24/2018 Pond No.: 4 Pond 4 100-yr 0.68 WQCV 1131 ft 3 Area (A)= 1.66 acres Quantity Detention SWMM 17091 ft 3 Max Release Rate = 2.25 cfs Total Volume 17091 ft 3 Total Volume 0.392 ac-ft ft 2 *SWMM Model accounts for initial WQCV depth in pond prior to beginning of storm. Therefore, SWMM volume includes WQCV as additional. Detention Pond Calculation | SWMM Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = 7/24/2018 1:12 PM D:\Projects\1290-002\Drainage\Detention\1290-002_Detention Pond 4.xlsm\SWMM_FC The Retreat 1290-001 Fort Collins, CO S. Thomas Date: 7/24/2018 Pond No.: 4 Pond 4 WQCV 1131 2.25 1131 ft3 17091 4956.80 ft. Design Storm 100-yr Required Volume= 17091 ft3 4959.04 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft2 ft. ft3 ft3 ft3 ft3 4,955.60 1 0.00 0 0 0 0 4,955.80 45 0.20 5 5 3 3 4,956.00 161 0.20 21 25 19 23 4,956.20 541 0.20 70 95 66 89 4,956.40 1289 0.20 183 278 178 267 4,956.60 2176 0.20 347 625 343 610 4,956.80 3007 0.20 518 1143 516 1126 4,957.00 3966 0.20 697 1841 695 1821 4,957.20 4807 0.20 877 2718 876 2697 4,957.40 5557 0.20 1036 3754 1036 3732 4,957.60 6151 0.20 1171 4925 1170 4903 4,957.80 6760 0.20 1291 6216 1291 6193 4,958.00 7389 0.20 1415 7631 1414 7608 4,958.20 8037 0.20 1543 9174 1542 9150 4,958.40 8705 0.20 1674 10848 1674 10824 4,958.60 9394 0.20 1810 12658 1809 12633 4,958.80 10106 0.20 1950 14608 1950 14583 4,959.00 10843 0.20 2095 16703 2094 16677 4,959.20 10844 0.20 2169 18871 2169 18846 Design Point Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 7/24/20181:12 PM D:\Projects\1290-002\Drainage\Detention\1290-002_Detention Pond 4.xlsm\Stage_Storage 4.14 Ayres Associates outlet structure is proposed prior to discharging into the proposed storm sewer system. A 4- foot concrete trickle pan is incorporated into the pond bottom to direct low flows due to minimal slope across the pond. The overall footprint encompasses approximately 3.5 acres at an approximate depth of 6 ft. The required 100-year detention volume is 7.70 ac-ft with an additional 2.16 ac-ft of storage below the detention storage for water quality. Table 4.6 shows the major characteristics of Redwood Pond. Table 4.6. Redwood Pond. Description Elevation (ft) Pond Volume (ac-ft) Pond Depth (ft) Pond Invert 4953.10 --- --- Outlet Structure Elevation 4955.12 2.16 2.02 100-year WSEL 4957.75 9.86 4.65 Spillway into Pond 4958.39 11.94 5.29 Top of Pond 4959 14.00 5.90 WSEL = Water Surface Elevation The outlet structure for the redwood pond is a combination of two Type C inlets in series. The inlets will be separated by a steel plate with an orifice opening sized to provide a 40- hour drain time for the water quality portion of the pond. One of the frequent maintenance issues associated with water quality structures is the clogging of the orifice plates. For this reason we are proposing to install an 18F snout oil-water debris separator inside the first Type C inlet over the water quality plate. The snout should prevent the orifice plate from clogging. The second Type C inlet will be set at the water quality elevation and the outlet pipe from the inlet controls the release rate from the pond. Currently an undersized storm sewer system conveys flow from inlets along Redwood Street into Redwood Pond. The series of existing inlets surcharge during the minor events creating localized flooding at the intersection of Redwood Street and Conifer Street. The existing inlets and storm sewer do not have the capacity for the 100-year runoff from the surrounding basins. An adequate storm system would require large diameter storm pipe and deep inlets to prevent surcharging. Due to existing water and sanitary conflicts in the area, and a controlled invert into Redwood Pond, the only storm sewer system that could fit within the existing constraints would be multiple shallow 12-inch diameter storm sewer culverts. These storm sewer culverts would still not alleviate the minor and major storm flooding problem. To mitigate the flooding, the design incorporates a 90-foot overflow weir graded into the pond embankment. The 100-year storm event (approximately 85 cfs) will overtop the curb at an elevation of approximately 4958.39 and be conveyed to the pond through the weir. Minor event flows will continue to be captured by the existing inlets located north of the pond. This design can be looked at in more detail during the final design process. EPA SWMM Hydraulic Modeling The proposed weir into Redwood Pond was modeled using a weir in EPA SWMM. The transverse weir option was chosen with a discharge coefficient of 3.0. During a 100-year event the 90 foot weir will convey approximately 80 cfs at a max depth of 0.45 ft. APPENDIX C WATER QUALITY DESIGN COMPUTATIONS Project: The Retreat Calculations By: S. Thomas Date: July 24, 2018 LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) LID Treatment A1 28,709 62% 17,883 WQ Chamber A7 A2 69,932 69% 48,143 WQ Chamber A7 A3 57,726 76% 43,924 WQ Chamber A7 A4 61,860 67% 41,369 WQ Chamber A7 A5 30,720 76% 23,234 WQ Chamber A7 A6 91,912 70% 63,956 WQ Chamber A7 A7 8,912 84% 7,458 WQ Chamber A7 B1 69,286 70% 48,558 WQ Chamber B2 B2 54,867 45% 24,793 WQ Chamber B2 B3 53,646 85% 45,476 WQ Chamber B6 B4 90,005 68% 61,471 WQ Chamber B6 B5 22,787 74% 16,965 WQ Chamber B6 B6 29,364 49% 14,512 WQ Chamber B6 B7 56,825 77% 43,708 WQ Chamber B9 B8 11,887 77% 9,184 WQ Chamber E1 B9 5,943 80% 4,758 WQ Chamber B9 B10 35,151 77% 26,979 WQ Chamber B9 E1 34,607 62% 21,297 WQ Chamber E1 Total Treated 814,139 69% 563,667 LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) A8 154,227 38% 58,414 B11 62,396 34% 20,969 C1 50,565 54% 27,544 D1 36,109 64% 23,143 D2 36,306 51% 18,366 UD1 34,414 52% 17,953 UD2 51,032 80% 41,030 UD3 101,092 30% 29,972 F1 31,311 38% 11,887 Total Proposed Untreated 557,452 45% 249,277 LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) Suniga Street UD2 51,032 77% 39,522 E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E SD SD SD SD SD SD SD SD SD SD SD E E E SD SD SD SD SD SD SD SD SD E E E E E E T PLAS O NYL LITCUD E NORI PLAST O L NY CUD T LI Project Title Date: Project Number Calcs By: Client Basins 0.8 WQCV = Watershed inches of Runoff (inches) 60.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.189 in A = 8.03 ac V = 0.1264 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) 5507 cu. ft. Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event The Retreat July 21, 2018 1290-002 S. Thomas Landmark WQ Chamber A7 0.231 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV ÷ ø Pond No : A7 WQ 0.70 18.00 min 3772 ft3 8.03 acres 0.09 ac-ft Max Release Rate = 1.98 cfs Time (min) Ft Collins WQ Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustmen t Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 1.425 2403 1.00 1.98 594 1809 10 1.105 3727 1.00 1.98 1188 2539 15 0.935 4730 1.00 1.98 1782 2948 20 0.805 5430 0.95 1.88 2257 3173 25 0.715 6029 0.86 1.70 2554 3474 30 0.650 6577 0.80 1.58 2851 3725 35 0.585 6905 0.76 1.50 3148 3757 40 0.535 7217 0.73 1.44 3445 3772 45 0.495 7512 0.70 1.39 3742 3770 50 0.460 7757 0.68 1.35 4039 3718 55 0.435 8069 0.66 1.31 4336 3733 60 0.410 8297 0.65 1.29 4633 3663 65 0.385 8440 0.64 1.26 4930 3510 70 0.365 8617 0.63 1.24 5227 3390 75 0.345 8727 0.62 1.23 5524 3202 80 0.330 8904 0.61 1.21 5821 3082 85 0.315 9030 0.61 1.20 6118 2912 90 0.305 9258 0.60 1.19 6415 2843 95 0.290 9292 0.59 1.18 6712 2579 100 0.280 9443 0.59 1.17 7009 2434 105 0.270 9561 0.59 1.16 7306 2255 110 0.260 9646 0.58 1.15 7603 2042 115 0.255 9890 0.58 1.14 7900 1990 120 0.245 9915 0.58 1.14 8197 1718 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. A = Tc = Project Location : Design Point C = Design Storm DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado 1290-002 Project Title Date: Project Number Calcs By: Client Basins 0.8 WQCV = Watershed inches of Runoff (inches) 46.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.156 in A = 2.85 ac V = 0.0372 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event The Retreat July 21, 2018 1290-002 S. Thomas Landmark WQ Chamber B2 1619 cu. ft. Drain Time a = i = WQCV = 0.231 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV ÷ ø Pond No : B2 WQ 0.59 12.00 min 1661 ft3 2.85 acres 0.04 ac-ft Max Release Rate = 0.38 cfs Time (min) Ft Collins WQ Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustmen t Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 1.425 719 1.00 0.38 114 605 10 1.105 1115 1.00 0.38 228 887 15 0.935 1415 0.90 0.34 308 1107 20 0.805 1624 0.80 0.30 365 1260 25 0.715 1803 0.74 0.28 422 1382 30 0.650 1967 0.70 0.27 479 1489 35 0.585 2066 0.67 0.26 536 1530 40 0.535 2159 0.65 0.25 593 1566 45 0.495 2247 0.63 0.24 650 1598 50 0.460 2320 0.62 0.24 707 1614 55 0.435 2414 0.61 0.23 764 1650 60 0.410 2482 0.60 0.23 821 1661 65 0.385 2525 0.59 0.23 878 1647 70 0.365 2578 0.59 0.22 935 1643 75 0.345 2611 0.58 0.22 992 1619 80 0.330 2663 0.58 0.22 1049 1615 85 0.315 2701 0.57 0.22 1106 1596 90 0.305 2769 0.57 0.22 1163 1607 95 0.290 2780 0.56 0.21 1220 1560 100 0.280 2825 0.56 0.21 1277 1548 105 0.270 2860 0.56 0.21 1334 1526 110 0.260 2885 0.55 0.21 1391 1495 115 0.255 2959 0.55 0.21 1448 1511 120 0.245 2966 0.55 0.21 1505 1461 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. Project Location : Fort Collins, Colorado DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Project Number : 1290-002 Project Name : The Retreat C = Tc = A = WQ Chamber B2 Input Variables Results Design Point Design Storm Required Detention Volume Project Title Date: Project Number Calcs By: Client Basins 0.8 WQCV = Watershed inches of Runoff (inches) 61.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.192 in A = 4.49 ac V = 0.0717 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event The Retreat July 21, 2018 1290-002 S. Thomas Landmark WQ Chamber B6 3124 cu. ft. Drain Time a = i = WQCV = 0.231 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV ÷ ø Pond No : B6 WQ 0.71 8.00 min 2343 ft3 4.49 acres 0.05 ac-ft Max Release Rate = 1.22 cfs Time (min) Ft Collins WQ Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustmen t Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 1.425 1363 1.00 1.22 366 997 10 1.105 2114 1.00 1.22 732 1382 15 0.935 2683 0.77 0.94 842 1841 20 0.805 3080 0.70 0.85 1025 2055 25 0.715 3419 0.66 0.81 1208 2211 30 0.650 3730 0.63 0.77 1391 2339 35 0.585 3916 0.61 0.75 1574 2343 40 0.535 4093 0.60 0.73 1757 2336 45 0.495 4261 0.59 0.72 1940 2321 50 0.460 4399 0.58 0.71 2123 2277 55 0.435 4576 0.57 0.70 2306 2270 60 0.410 4705 0.57 0.69 2489 2217 65 0.385 4787 0.56 0.69 2672 2115 70 0.365 4887 0.56 0.68 2855 2032 75 0.345 4949 0.55 0.68 3038 1911 80 0.330 5050 0.55 0.67 3221 1829 85 0.315 5121 0.55 0.67 3404 1718 90 0.305 5250 0.54 0.66 3587 1664 95 0.290 5270 0.54 0.66 3770 1500 100 0.280 5356 0.54 0.66 3953 1403 105 0.270 5423 0.54 0.66 4136 1287 110 0.260 5470 0.54 0.65 4319 1152 115 0.255 5609 0.53 0.65 4502 1107 120 0.245 5623 0.53 0.65 4685 939 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. Project Location : Fort Collins, Colorado DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Project Number : 1290-002 Project Name : The Retreat C = Tc = A = WQ Chamber B6 Input Variables Results Design Point Design Storm Required Detention Volume Project Title Date: Project Number Calcs By: Client Basins 0.8 WQCV = Watershed inches of Runoff (inches) 71.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.224 in A = 2.25 ac V = 0.0419 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event The Retreat July 21, 2018 1290-002 S. Thomas Landmark WQ Chamber B9 1827 cu. ft. Drain Time a = i = WQCV = 0.231 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV ÷ ø Pond No : B9 WQ 0.77 7.00 min 1653 ft3 2.25 acres 0.04 ac-ft Max Release Rate = 0.45 cfs Time (min) Ft Collins WQ Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustmen t Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 1.425 741 1.00 0.45 135 606 10 1.105 1149 1.00 0.45 270 879 15 0.935 1458 0.73 0.33 297 1161 20 0.805 1674 0.68 0.30 365 1309 25 0.715 1858 0.64 0.29 432 1426 30 0.650 2027 0.62 0.28 500 1528 35 0.585 2128 0.60 0.27 567 1561 40 0.535 2225 0.59 0.26 635 1590 45 0.495 2315 0.58 0.26 702 1613 50 0.460 2391 0.57 0.26 770 1621 55 0.435 2487 0.56 0.25 837 1650 60 0.410 2557 0.56 0.25 905 1653 65 0.385 2601 0.55 0.25 972 1629 70 0.365 2656 0.55 0.25 1040 1616 75 0.345 2690 0.55 0.25 1107 1583 80 0.330 2744 0.54 0.24 1175 1570 85 0.315 2783 0.54 0.24 1242 1541 90 0.305 2853 0.54 0.24 1310 1544 95 0.290 2864 0.54 0.24 1377 1487 100 0.280 2911 0.54 0.24 1445 1466 105 0.270 2947 0.53 0.24 1512 1435 110 0.260 2973 0.53 0.24 1580 1393 115 0.255 3048 0.53 0.24 1647 1401 120 0.245 3056 0.53 0.24 1715 1342 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. Project Location : Fort Collins, Colorado DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Project Number : 1290-002 Project Name : The Retreat C = Tc = A = WQ Chamber B9 Input Variables Results Design Point Design Storm Required Detention Volume Project Title Date: Project Number Calcs By: Client Basins 0.8 WQCV = Watershed inches of Runoff (inches) 54.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.174 in A = 1.07 ac V = 0.0155 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) 676 cu. ft. Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event The Retreat July 21, 2018 1290-002 S. Thomas Landmark WQ Chamber E1 0.231 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV ÷ ø Pond No : E1 WQ 0.66 8.00 min 643 ft3 1.07 acres 0.01 ac-ft Max Release Rate = 0.20 cfs Time (min) Ft Collins WQ Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustmen t Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 1.425 302 1.00 0.20 59 243 10 1.105 468 1.00 0.20 118 351 15 0.935 594 0.77 0.15 135 459 20 0.805 682 0.70 0.14 165 518 25 0.715 757 0.66 0.13 194 563 30 0.650 826 0.63 0.12 223 603 35 0.585 868 0.61 0.12 253 615 40 0.535 907 0.60 0.12 282 625 45 0.495 944 0.59 0.12 312 632 50 0.460 975 0.58 0.11 341 634 55 0.435 1014 0.57 0.11 370 643 60 0.410 1042 0.57 0.11 400 643 65 0.385 1060 0.56 0.11 429 631 70 0.365 1083 0.56 0.11 459 624 75 0.345 1096 0.55 0.11 488 608 80 0.330 1119 0.55 0.11 517 601 85 0.315 1135 0.55 0.11 547 588 90 0.305 1163 0.54 0.11 576 587 95 0.290 1167 0.54 0.11 606 562 100 0.280 1186 0.54 0.11 635 551 105 0.270 1201 0.54 0.11 664 537 110 0.260 1212 0.54 0.11 694 518 115 0.255 1243 0.53 0.10 723 519 120 0.245 1246 0.53 0.10 753 493 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. C = Tc = A = WQ Chamber E1 Input Variables Results Design Point Design Storm Required Detention Volume Project Location : Fort Collins, Colorado DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Project Number : 1290-002 Project Name : The Retreat Vault ID Total Required WQ Volume (cf) Flow, WQ (cfs) Chamber Type Chamber Release Ratea (cfs) Chamber Volumeb (cf) Installed Chamber w/ Aggregatec (cf) Mimimum No. of Chambersd Total Release Ratee (cfs) Required Storage Volume by FAA Method (cf) Mimimum No. of Chambersf Storage Provided within the Chambersg (cf) Total Installed System Volumeh (cf) Chamber A7 5507 6.50 SC-740 0.024 45.90 74.90 74 1.75 3772 83 3810 5543 Chamber B2 1619 1.82 MC-4500 0.028 106.50 162.60 10 0.28 1661 16 1704 1626 Chamber B6 3124 4.06 SC-740 0.024 45.90 74.90 42 0.99 2343 52 2387 3146 Chamber B9 1827 2.34 MC-4500 0.028 106.50 162.60 12 0.34 1653 16 1704 1951 Chamber E1 676 0.89 MC-4500 0.028 106.50 162.60 5 0.14 643 7 746 813 a. Release rate per chamber, limited by flow through geotextile with accumulated sediment. b. Volume within chamber only, not accounting for void spaces in surrounding aggregate. c. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit. d. Number of chambers required to provide full WQCV within total installed system, including aggregate. e. Release rate per chamber times number of chambers. f. Number of chambers required to provide required FAA storage volume stored within the chamber only (no aggregate storage). g. Volume provided in chambers only (no aggregate storage). This number must meet or exceed the required FAA storage volume. h. System volume includes total number of chambers, plus surrounding aggregate. This number must meet or exceed the required WQCV. Chamber Configuration Summary D:\Projects\1290-002\Drainage\WatQual\Chambers_WQ Calcs.xlsx POND 1 (WQ FOR A8) Project: The Retreat By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 3.540 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 17.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.1700 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.103 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.030 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Adjusted WQCV (cu-ft) = 1319 <-- CALCULATED WQ Depth (ft) = 0.610 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.144 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 3/7 <-- INPUT from Figure 5 number of rows = 2 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE July 24, 2018 POND 2 (WQ FOR B11) Project: The Retreat By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 1.430 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 11.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.1100 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.073 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.009 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Adjusted WQCV (cu-ft) = 377 <-- CALCULATED WQ Depth (ft) = 0.300 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.045 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 1/4 <-- INPUT from Figure 5 number of rows = 1 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE July 24, 2018 POND 3 (WQ FOR C1) Project: The Retreat By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 1.160 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 39.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.3900 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.177 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.017 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Adjusted WQCV (cu-ft) = 746 <-- CALCULATED WQ Depth (ft) = 1.830 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.066 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 2/7 <-- INPUT from Figure 5 number of rows = 5 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE July 24, 2018 POND 4 (WQ FOR D1 AND D2) Project: The Retreat By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 1.660 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 43.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.4300 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.188 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.026 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Adjusted WQCV (cu-ft) = 1131 <-- CALCULATED WQ Depth (ft) = 1.200 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.106 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 3/8 <-- INPUT from Figure 5 number of rows = 4 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE July 24, 2018 APPENDIX D SWMM ANALYSIS / MODEL SUB-RW5 SUB-RW2-3 SUB-A SUB-B SUB-C SUB-D SUB-E SUB-F SUB-OFFSITE2REDWOOD C-1 C-2 C-3 C-4 C-5 C-6 C-7 C-8 OVERFLOWTOPOND3 O-1 O-2 O-3 O-4 O-5 OS-REDWOOD NECCO J-2 J-3 J-4 J-5 J-6 J-7 J-9 J-10 OFFLINE POND-1 POND-2 POND-3 POND-4 POND-5 POND-REDWOOD FORTCOLLINS 03/15/2016 00:15:00 SWMM 5.1 Page 1 2018-07-19_SWMM Preliminary.inp [TITLE] ;;Project Title/Notes [OPTIONS] ;;Option Value FLOW_UNITS CFS INFILTRATION HORTON FLOW_ROUTING KINWAVE LINK_OFFSETS DEPTH MIN_SLOPE 0 ALLOW_PONDING NO SKIP_STEADY_STATE NO START_DATE 03/15/2016 START_TIME 00:00:00 REPORT_START_DATE 03/15/2016 REPORT_START_TIME 00:00:00 END_DATE 03/20/2016 END_TIME 00:00:00 SWEEP_START 01/01 SWEEP_END 12/31 DRY_DAYS 0 REPORT_STEP 00:15:00 WET_STEP 00:05:00 DRY_STEP 01:00:00 ROUTING_STEP 0:00:30 INERTIAL_DAMPING PARTIAL NORMAL_FLOW_LIMITED BOTH FORCE_MAIN_EQUATION H-W VARIABLE_STEP 0.75 LENGTHENING_STEP 0 MIN_SURFAREA 12.557 MAX_TRIALS 8 HEAD_TOLERANCE 0.005 SYS_FLOW_TOL 5 LAT_FLOW_TOL 5 MINIMUM_STEP 0.5 Page 1 2018-07-19_SWMM Preliminary.inp THREADS 1 [EVAPORATION] ;;Data Source Parameters ;;-------------- ---------------- CONSTANT 0.0 DRY_ONLY NO [RAINGAGES] ;;Name Format Interval SCF Source ;;-------------- --------- ------ ------ ---------- FORTCOLLINS INTENSITY 0:05 1.0 TIMESERIES 100-YR [SUBCATCHMENTS] ;;Name Rain Gage Outlet Area %Imperv Width %Slope CurbLen SnowPack ;;-------------- ---------------- ---------------- -------- -------- -------- -------- -------- ---------------- SUB-RW5 FORTCOLLINS POND-3 0.31 35 110 0.5 0 SUB-RW2-3 FORTCOLLINS POND-4 1.18 35 160 0.5 0 SUB-A FORTCOLLINS POND-1 11.57 47 500 0.5 0 SUB-B FORTCOLLINS POND-2 11.30 53 300 0.5 0 SUB-C FORTCOLLINS POND-3 1.16 39 150 0.5 0 SUB-D FORTCOLLINS POND-4 1.66 43 131 0.5 0 SUB-E FORTCOLLINS POND-5 .79 55 170 0.5 0 SUB-F FORTCOLLINS POND-REDWOOD .72 25 100 0.5 0 SUB-OFFSITE2REDWOOD FORTCOLLINS POND-REDWOOD 49.8 70 700 .6 0 [SUBAREAS] Page 2 2018-07-19_SWMM Preliminary.inp ;;Subcatchment N-Imperv N-Perv S-Imperv S-Perv PctZero RouteTo PctRouted ;;-------------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- SUB-RW5 .016 .025 .1 .3 25 OUTLET SUB-RW2-3 .016 .025 .1 .3 25 OUTLET SUB-A .016 .025 .1 .3 25 OUTLET SUB-B .016 .025 .1 .3 25 OUTLET SUB-C .016 .025 .1 .3 25 OUTLET SUB-D .016 .025 .1 .3 25 OUTLET SUB-E .016 .025 .1 .3 25 OUTLET SUB-F .016 .025 .1 .3 25 OUTLET SUB-OFFSITE2REDWOOD .016 .025 .1 .3 25 OUTLET [INFILTRATION] ;;Subcatchment MaxRate MinRate Decay DryTime MaxInfil ;;-------------- ---------- ---------- ---------- ---------- ---------- SUB-RW5 .51 0.5 .0018 7 0 SUB-RW2-3 .51 0.5 .0018 7 0 SUB-A .51 0.5 .0018 7 0 SUB-B .51 0.5 .0018 7 0 SUB-C .51 0.5 .0018 7 0 SUB-D .51 0.5 .0018 7 0 SUB-E .51 0.5 .0018 7 0 SUB-F .51 0.5 .0018 7 0 SUB-OFFSITE2REDWOOD 3 0.5 .0018 7 0 [JUNCTIONS] ;;Name Elevation MaxDepth InitDepth SurDepth Aponded ;;-------------- ---------- ---------- ---------- ---------- ---------- NECCO 46 4.5 0 0 0 J-2 48 4.5 0 0 0 J-3 49 3 0 0 0 J-4 51 3 0 0 0 J-5 52 3 0 0 0 J-6 52 3 0 0 0 J-7 47 4.5 0 0 0 J-9 50 3 0 0 0 J-10 52.5 3 0 0 0 OFFLINE 0 0 0 0 0 Page 3 2018-07-19_SWMM Preliminary.inp [STORAGE] ;;Name Elev. MaxDepth InitDepth Shape Curve Name/Params N/A Fevap Psi Ksat IMD ;;-------------- -------- ---------- ----------- ---------- ---------------------------- -------- -------- -------- -------- POND-1 53.1 4.6 .61 TABULAR POND1 0 0 POND-2 49.4 7.4 .25 TABULAR POND2 0 0 POND-3 53.2 4 1.83 TABULAR POND3 0 0 POND-4 55.6 4.2 1.2 TABULAR POND4 0 0 POND-5 49 3 0 TABULAR POND5 0 0 POND-REDWOOD 53.1 5 2.12 TABULAR PONDREDWOOD 0 0 [CONDUITS] ;;Name From Node To Node Length Roughness InOffset OutOffset InitFlow MaxFlow ;;-------------- ---------------- ---------------- ---------- ---------- ---------- ---------- ---------- ---------- C-1 J-2 J-7 450 .012 0 0 0 0 C-2 J-7 NECCO 50 .012 0 0 0 0 C-3 J-5 J-4 160 .012 0 0 0 0 C-4 J-4 J-3 322 .012 0 0 0 0 C-5 J-3 J-7 84 .012 0 0 0 0 C-6 J-6 J-9 1574 .012 0 0 0 0 C-7 J-9 POND-2 50 .012 0 0 0 0 C-8 J-10 J-5 644 .013 0 0 0 0 [WEIRS] ;;Name From Node To Node Type CrestHt Qcoeff Gated EndCon EndCoeff Surcharge RoadWidth RoadSurf Page 4 2018-07-19_SWMM Preliminary.inp ;;-------------- ---------------- ---------------- ------------ ---------- ---------- -------- -------- ---------- ---------- ---------- ---------- OVERFLOWTOPOND3 POND-4 POND-3 TRANSVERSE 3.2 3.33 NO 0 0 YES [OUTLETS] ;;Name From Node To Node Offset Type QTable/Qcoeff Qexpon Gated ;;-------------- ---------------- ---------------- ---------- --------------- ---------------- ---------- -------- O-1 POND-1 J-6 0 TABULAR/DEPTH OS-1 NO O-2 POND-2 J-3 0 TABULAR/DEPTH OS-2 NO O-3 POND-3 J-5 0 TABULAR/DEPTH OS-3 NO O-4 POND-4 J-5 0 TABULAR/DEPTH OS-4 NO O-5 POND-5 J-2 0 TABULAR/DEPTH OS-5 NO OS-REDWOOD POND-REDWOOD J-10 0 TABULAR/DEPTH OS-REDWOOD NO [XSECTIONS] ;;Link Shape Geom1 Geom2 Geom3 Geom4 Barrels Culvert ;;-------------- ------------ ---------------- ---------- ---------- ---------- ---------- ---------- C-1 CIRCULAR 4.5 0 0 0 1 C-2 CIRCULAR 4.5 0 0 0 1 C-3 CIRCULAR 3 0 0 0 1 C-4 CIRCULAR 3 0 0 0 1 C-5 CIRCULAR 3 0 0 0 1 C-6 CIRCULAR 3 0 0 0 1 C-7 CIRCULAR 3 0 0 0 1 C-8 CIRCULAR 3 0 0 0 1 OVERFLOWTOPOND3 RECT_OPEN 1 10 4 4 [CURVES] ;;Name Type X-Value Y-Value Page 5 2018-07-19_SWMM Preliminary.inp ;;-------------- ---------- ---------- ---------- OS-1 Rating 0 0 OS-1 .61 .01 OS-1 5 .98 ; OS-2 Rating 0 0 OS-2 .25 .003 OS-2 7.4 1.67 ; OS-3 Rating 0 0 OS-3 1.83 .005 OS-3 4 3.9 ; OS-4 Rating 0 0 OS-4 1.2 .008 OS-4 4.2 3.02 ; OS-5 Rating 0 0 OS-5 3 .31 ; OS-REDWOOD Rating 0 0 OS-REDWOOD 2.02 .7 OS-REDWOOD 5 13.03 ; POND1 Storage 0 170.8 POND1 0.2 923.29 POND1 0.4 2525.22 POND1 0.6 5860.63 POND1 0.8 10368.92 POND1 1 15730.52 POND1 1.2 21779 POND1 1.4 28255.43 POND1 1.6 34853.05 POND1 1.8 39211.5 POND1 2 41748.03 POND1 2.2 43189.26 POND1 2.4 44201.36 POND1 2.6 45224.89 Page 6 2018-07-19_SWMM Preliminary.inp POND1 2.8 46269.76 POND1 3 47348.37 POND1 3.2 48464.91 POND1 3.4 49587.62 POND1 3.6 50716.56 POND1 3.8 51852.29 POND1 4 52995.08 POND1 4.2 54145.24 POND1 4.4 55302.64 POND1 4.6 56466.46 ; POND2 Storage 0 424.86 POND2 0.2 2054.07 POND2 0.4 4477.42 POND2 0.6 7632.47 POND2 0.8 10024.38 POND2 1 10786.09 POND2 1.2 11143.65 POND2 1.4 11504.81 POND2 1.6 11869.68 POND2 1.8 12238.46 POND2 2 12612.16 POND2 2.2 12992.03 POND2 2.4 13377.96 POND2 2.6 13769.77 POND2 2.8 14195.92 POND2 3 14629.04 POND2 3.2 15069.37 POND2 3.4 15517.31 POND2 3.6 15973.07 POND2 3.8 16436.65 POND2 4 16908.08 POND2 4.2 17387.54 POND2 4.4 17873.63 POND2 4.6 18366.23 POND2 4.8 18865.42 POND2 5 19371.64 POND2 5.2 19886.19 Page 7 2018-07-19_SWMM Preliminary.inp POND2 5.4 20410.49 POND2 5.6 20945.15 POND2 5.8 21490.68 POND2 6 22047.3 POND2 6.2 22615.5 POND2 6.4 23195.58 POND2 6.6 23790.35 POND2 6.8 24337.76 POND2 7 24972.48 POND2 7.2 25629.07 POND2 7.4 26305.51 ; POND3 Storage 0 0.03 POND3 0.2 12.86 POND3 0.4 52.44 POND3 0.6 118.91 POND3 0.8 212.69 POND3 1 347.07 POND3 1.2 523.87 POND3 1.4 725.7 POND3 1.6 952.44 POND3 1.8 1208.46 POND3 2 1496.75 POND3 2.2 1845.56 POND3 2.4 2216.68 POND3 2.6 2609.22 POND3 2.8 3019.8 POND3 3 3487.71 POND3 3.2 4275.86 POND3 3.4 5422.49 POND3 3.6 7025.37 POND3 3.8 8861.79 POND3 4 10463.68 ; POND4 Storage 0 0.96 POND4 0.2 44.83 POND4 0.4 160.84 POND4 0.6 540.61 Page 8 2018-07-19_SWMM Preliminary.inp POND4 0.8 1289.37 POND4 1 2176.44 POND4 1.2 3007.29 POND4 1.4 3965.73 POND4 1.6 4807.37 POND4 1.8 5557.16 POND4 2 6151 POND4 2.2 6759.62 POND4 2.4 7388.66 POND4 2.6 8036.84 POND4 2.8 8705.27 POND4 3 9394 POND4 3.2 10106.07 POND4 3.4 10842.6 ; POND5 Storage 0 4000 POND5 3 4000 ; PONDREDWOOD Storage 0 45700 PONDREDWOOD 2.02 45700 PONDREDWOOD 2.1 140000 PONDREDWOOD 5 140000 [TIMESERIES] ;;Name Date Time Value ;;-------------- ---------- ---------- ---------- 100-YR 0:05 1 100-YR 0:10 1.14 100-YR 0:15 1.33 100-YR 0:20 2.23 100-YR 0:25 2.84 100-YR 0:30 5.49 100-YR 0:35 9.95 100-YR 0:40 4.12 100-YR 0:45 2.48 100-YR 0:50 1.46 100-YR 0:55 1.22 100-YR 1:00 1.06 Page 9 2018-07-19_SWMM Preliminary.inp 100-YR 1:05 1 100-YR 1:10 .95 100-YR 1:15 .91 100-YR 1:20 .87 100-YR 1:25 .84 100-YR 1:30 .81 100-YR 1:35 .78 100-YR 1:40 .75 100-YR 1:45 .73 100-YR 1:50 .71 100-YR 1:55 .69 100-YR 2:00 .67 ; 5-YR 0:05 .4 5-YR 0:10 .45 5-YR 0:15 .53 5-YR 0:20 .89 5-YR 0:25 1.13 5-YR 0:30 2.19 5-YR 0:35 3.97 5-YR 0:40 1.64 5-YR 0:45 .99 5-YR 0:50 .58 5-YR 0:55 .49 5-YR 1:00 .42 5-YR 1:05 .28 5-YR 1:10 .27 5-YR 1:15 .25 5-YR 1:20 .24 5-YR 1:25 .23 5-YR 1:30 .22 5-YR 1:35 .21 5-YR 1:40 .20 5-YR 1:45 .19 5-YR 1:50 .19 5-YR 1:55 .18 5-YR 2:00 .18 ; Page 10 2018-07-19_SWMM Preliminary.inp 10-YR 0:05 .49 10-YR 0:10 .56 10-YR 0:15 .65 10-YR 0:20 1.09 10-YR 0:25 1.39 10-YR 0:30 2.69 10-YR 0:35 4.87 10-YR 0:40 2.02 10-YR 0:45 1.21 10-YR 0:50 .71 10-YR 0:55 .6 10-YR 1:00 .52 10-YR 1:05 .39 10-YR 1:10 .37 10-YR 1:15 .35 10-YR 1:20 .34 10-YR 1:25 .32 10-YR 1:30 .31 10-YR 1:35 .3 10-YR 1:40 .29 10-YR 1:45 .28 10-YR 1:50 .27 10-YR 1:55 .26 10-YR 2:00 .25 ; 50-YR 0:05 .79 50-YR 0:10 .9 50-YR 0:15 1.05 50-YR 0:20 1.77 50-YR 0:25 2.25 50-YR 0:30 4.36 50-YR 0:35 7.9 50-YR 0:40 3.27 50-YR 0:45 1.97 50-YR 0:50 1.16 50-YR 0:55 .97 50-YR 1:00 .84 50-YR 1:05 .79 Page 11 2018-07-19_SWMM Preliminary.inp 50-YR 1:10 .75 50-YR 1:15 .72 50-YR 1:20 .69 50-YR 1:25 .66 50-YR 1:30 .64 50-YR 1:35 .62 50-YR 1:40 .6 50-YR 1:45 .58 50-YR 1:50 .56 50-YR 1:55 .54 50-YR 2:00 .53 [REPORT] ;;Reporting Options INPUT NO CONTROLS NO SUBCATCHMENTS ALL NODES ALL LINKS ALL [TAGS] [MAP] DIMENSIONS 0.000 0.000 2773.000 1354.000 Units None [COORDINATES] ;;Node X-Coord Y-Coord ;;-------------- ------------------ ------------------ NECCO 878.333 78.727 J-2 621.814 349.857 J-3 860.474 241.081 J-4 1013.087 499.223 J-5 1214.405 499.223 J-6 2454.787 52.750 J-7 813.392 129.056 J-9 1079.652 119.315 J-10 1527.748 961.931 Page 12 2018-07-19_SWMM Preliminary.inp OFFLINE 1959.608 1294.756 POND-1 2461.281 198.869 POND-2 1016.334 245.951 POND-3 1086.146 429.411 POND-4 1375.135 625.859 POND-5 655.909 478.117 POND-REDWOOD 1552.101 1150.261 [VERTICES] ;;Link X-Coord Y-Coord ;;-------------- ------------------ ------------------ OVERFLOWTOPOND3 1552.101 421.293 [Polygons] ;;Subcatchment X-Coord Y-Coord ;;-------------- ------------------ ------------------ SUB-RW5 928.663 669.926 SUB-RW5 993.604 596.867 SUB-RW5 1058.546 570.890 SUB-RW5 1120.240 590.373 SUB-RW5 1121.864 523.808 SUB-RW5 982.239 531.925 SUB-RW5 886.451 635.832 SUB-RW2-3 1362.689 700.948 SUB-RW2-3 1448.736 782.124 SUB-RW2-3 1427.630 803.230 SUB-RW2-3 1380.547 785.371 SUB-RW2-3 1336.712 793.489 SUB-RW2-3 1278.265 835.701 SUB-RW2-3 1210.076 915.254 SUB-RW2-3 1124.029 863.301 SUB-RW2-3 1054.217 795.113 SUB-RW2-3 1172.735 679.842 SUB-RW2-3 1249.041 678.218 SUB-RW2-3 1307.488 650.618 SUB-A 2688.576 57.621 SUB-A 2602.529 208.610 SUB-A 2493.752 359.599 Page 13 2018-07-19_SWMM Preliminary.inp SUB-A 2367.116 525.199 SUB-A 1943.373 994.401 SUB-A 1927.138 991.154 SUB-A 1876.808 1031.743 SUB-A 1832.972 1083.696 SUB-A 1808.619 1052.849 SUB-A 1759.913 1121.037 SUB-A 1735.560 1117.790 SUB-A 1743.678 966.801 SUB-A 1724.196 890.495 SUB-A 1675.489 776.847 SUB-A 1675.489 749.247 SUB-A 1719.325 703.788 SUB-A 1821.608 541.435 SUB-A 1868.690 330.375 SUB-A 1863.820 99.833 SUB-B 1719.325 1056.096 SUB-B 1720.948 997.648 SUB-B 1681.984 996.025 SUB-B 1670.619 926.213 SUB-B 1681.984 919.719 SUB-B 1686.854 895.366 SUB-B 1664.125 828.801 SUB-B 1636.525 781.718 SUB-B 1599.183 780.095 SUB-B 1558.595 755.742 SUB-B 1519.630 710.282 SUB-B 1506.642 723.271 SUB-B 1480.665 705.412 SUB-B 1344.288 560.917 SUB-B 1284.217 453.764 SUB-B 1282.594 413.175 SUB-B 1263.111 374.210 SUB-B 1188.429 370.963 SUB-B 1084.522 406.681 SUB-B 1066.663 427.787 SUB-B 1019.581 431.034 SUB-B 1008.216 385.575 Page 14 2018-07-19_SWMM Preliminary.inp SUB-B 954.639 408.305 SUB-B 1000.098 484.611 SUB-B 948.145 512.211 SUB-B 909.180 491.105 SUB-B 828.004 582.023 SUB-B 829.627 598.258 SUB-B 876.710 646.965 SUB-B 808.521 731.388 SUB-B 746.827 679.435 SUB-B 741.956 627.482 SUB-B 699.744 583.647 SUB-B 748.450 528.446 SUB-B 737.085 510.588 SUB-B 740.333 450.517 SUB-B 782.544 445.646 SUB-B 805.274 431.034 SUB-B 806.898 357.975 SUB-B 790.662 288.163 SUB-B 756.568 254.069 SUB-B 836.121 156.657 SUB-B 1863.820 103.080 SUB-B 1870.314 330.375 SUB-B 1816.737 538.188 SUB-B 1719.325 705.412 SUB-B 1675.489 742.753 SUB-B 1673.866 783.342 SUB-B 1707.960 848.283 SUB-B 1745.302 965.178 SUB-B 1732.313 1114.543 SUB-B 1707.960 1108.049 SUB-C 829.627 603.129 SUB-C 826.380 583.647 SUB-C 905.933 492.729 SUB-C 946.522 515.458 SUB-C 996.851 482.987 SUB-C 956.263 409.928 SUB-C 1006.593 382.328 SUB-C 1017.957 431.034 Page 15 2018-07-19_SWMM Preliminary.inp SUB-C 1065.040 426.164 SUB-C 1081.275 403.434 SUB-C 1188.429 370.963 SUB-C 1264.735 377.458 SUB-C 1280.970 413.175 SUB-C 1280.970 457.011 SUB-C 1311.817 507.340 SUB-C 1261.488 536.564 SUB-C 1235.511 573.905 SUB-C 1172.193 520.329 SUB-C 982.239 531.694 SUB-C 876.710 643.718 SUB-D 1462.806 804.448 SUB-D 1495.277 896.989 SUB-D 1556.971 961.931 SUB-D 1556.971 984.660 SUB-D 1662.501 1020.378 SUB-D 1677.113 1041.484 SUB-D 1714.454 1072.331 SUB-D 1724.196 1000.895 SUB-D 1683.607 996.025 SUB-D 1670.619 926.213 SUB-D 1678.737 921.342 SUB-D 1688.478 900.236 SUB-D 1668.995 836.918 SUB-D 1639.772 780.095 SUB-D 1597.560 776.847 SUB-D 1556.971 752.494 SUB-D 1519.630 711.906 SUB-D 1508.265 724.894 SUB-D 1487.159 715.153 SUB-D 1347.535 565.788 SUB-D 1310.194 508.964 SUB-D 1259.864 538.188 SUB-D 1237.135 577.153 SUB-E 594.214 536.564 SUB-E 652.662 595.011 SUB-E 699.744 586.894 Page 16 2018-07-19_SWMM Preliminary.inp SUB-E 750.074 528.446 SUB-E 740.333 512.211 SUB-E 743.580 450.517 SUB-E 780.921 450.517 SUB-E 806.898 427.787 SUB-E 806.898 353.105 SUB-E 793.909 293.034 SUB-E 769.556 270.304 SUB-E 569.861 533.317 SUB-F 1670.619 1250.920 SUB-F 1670.619 1358.073 SUB-F 1738.807 1351.579 SUB-F 1743.678 1226.567 SUB-F 1948.244 991.154 SUB-F 1927.138 991.154 SUB-F 1875.184 1033.366 SUB-F 1831.349 1085.319 SUB-F 1808.619 1052.849 SUB-F 1758.290 1122.661 SUB-F 1707.960 1108.049 SUB-F 1714.454 1072.331 SUB-F 1665.748 1036.613 SUB-OFFSITE2REDWOOD 1436.830 1319.109 [SYMBOLS] ;;Gage X-Coord Y-Coord ;;-------------- ------------------ ------------------ FORTCOLLINS 592.591 1257.241 [BACKDROP] FILE "D:\Projects\1290-002\Drainage\Modeling\SWMM\1290-002_SJT DRNG-C6.00.jpg" DIMENSIONS 0.000 0.000 2773.000 1354.000 Page 17 THE RETREAT - 100-YR SWMM OUTPUT.rpt EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.012) -------------------------------------------------------------- ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ 03/15/2016 00:00:00 Ending Date .............. 03/20/2016 00:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:15:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 30.00 sec ************************** Volume Depth Page 1 THE RETREAT - 100-YR SWMM OUTPUT.rpt Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 23.999 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 6.118 0.935 Surface Runoff ........... 17.691 2.705 Final Storage ............ 0.305 0.047 Continuity Error (%) ..... -0.475 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 17.691 5.765 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 19.897 6.484 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 2.437 0.794 Final Stored Volume ...... 0.223 0.073 Continuity Error (%) ..... 0.037 ******************************** Highest Flow Instability Indexes ******************************** All links are stable. ************************* Routing Time Step Summary Page 2 THE RETREAT - 100-YR SWMM OUTPUT.rpt ************************* Minimum Time Step : 30.00 sec Average Time Step : 30.00 sec Maximum Time Step : 30.00 sec Percent in Steady State : 0.00 Average Iterations per Step : 1.01 Percent Not Converging : 0.00 *************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------------------------- Total Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Coeff Subcatchment in in in in in 10^6 gal CFS -------------------------------------------------------------------------------------------------------- SUB-RW5 3.67 0.00 0.00 0.89 2.79 0.02 2.94 0.761 SUB-RW2-3 3.67 0.00 0.00 0.90 2.77 0.09 10.11 0.755 SUB-A 3.67 0.00 0.00 0.77 2.89 0.91 77.20 0.786 SUB-B 3.67 0.00 0.00 0.71 2.94 0.90 62.91 0.802 SUB-C 3.67 0.00 0.00 0.85 2.82 0.09 10.01 0.770 SUB-D 3.67 0.00 0.00 0.81 2.86 0.13 13.12 0.780 SUB-E 3.67 0.00 0.00 0.61 3.05 0.07 7.48 0.830 SUB-F 3.67 0.00 0.00 1.05 2.64 0.05 5.92 0.718 SUB-OFFSITE2REDWOOD 3.67 0.00 0.00 1.04 2.59 3.51 165.55 0.707 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Page 3 THE RETREAT - 100-YR SWMM OUTPUT.rpt Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- NECCO JUNCTION 4.50 4.50 50.50 0 00:01 4.50 J-2 JUNCTION 0.03 0.15 48.15 0 02:09 0.15 J-3 JUNCTION 0.25 1.07 50.07 0 01:46 1.07 J-4 JUNCTION 0.24 1.07 52.07 0 01:45 1.07 J-5 JUNCTION 0.41 1.76 53.76 0 02:34 1.76 J-6 JUNCTION 0.20 0.34 52.34 0 02:32 0.34 J-7 JUNCTION 0.22 0.79 47.79 0 01:51 0.79 J-9 JUNCTION 0.20 0.34 50.34 0 02:45 0.34 J-10 JUNCTION 0.41 1.76 54.26 0 02:31 1.76 OFFLINE JUNCTION 0.00 0.00 0.00 0 00:00 0.00 POND-1 STORAGE 1.84 3.73 56.83 0 02:32 3.73 POND-2 STORAGE 2.64 7.12 56.52 0 02:39 7.11 POND-3 STORAGE 0.72 3.94 57.14 0 01:05 3.92 POND-4 STORAGE 0.54 3.43 59.03 0 00:55 3.41 POND-5 STORAGE 0.20 1.92 50.92 0 02:09 1.91 POND-REDWOOD STORAGE 1.29 4.75 57.85 0 02:31 4.75 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- NECCO JUNCTION 0.00 17.28 0 01:51 0 6.48 0.000 J-2 JUNCTION 0.00 0.20 0 02:09 0 0.0653 -0.000 J-3 JUNCTION 0.00 17.09 0 01:51 0 6.42 0.000 J-4 JUNCTION 0.00 15.57 0 01:45 0 4.61 0.000 Page 4 THE RETREAT - 100-YR SWMM OUTPUT.rpt J-5 JUNCTION 0.00 15.58 0 01:45 0 4.61 0.000 J-6 JUNCTION 0.00 0.70 0 02:32 0 0.907 0.000 J-7 JUNCTION 0.00 17.28 0 01:51 0 6.48 0.000 J-9 JUNCTION 0.00 0.70 0 02:45 0 0.907 0.000 J-10 JUNCTION 0.00 12.00 0 02:31 0 4.27 0.000 OFFLINE JUNCTION 0.00 0.00 0 00:00 0 0 0.000 gal POND-1 STORAGE 77.20 77.20 0 00:40 0.906 0.917 0.006 POND-2 STORAGE 62.91 62.93 0 00:40 0.903 1.81 0.009 POND-3 STORAGE 12.95 12.95 0 00:40 0.112 0.154 0.063 POND-4 STORAGE 23.23 23.23 0 00:40 0.218 0.226 0.219 POND-5 STORAGE 7.48 7.48 0 00:40 0.0654 0.0654 0.023 POND-REDWOOD STORAGE 171.47 171.47 0 00:40 3.56 4.33 0.022 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** Storage Volume Summary ********************** -------------------------------------------------------------------------------------------------- Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------------------- POND-1 36.176 22 0 0 116.789 71 0 02:32 0.70 POND-2 30.411 25 0 0 112.201 94 0 02:39 1.60 POND-3 0.258 3 0 0 9.363 94 0 01:04 3.80 POND-4 0.634 2 0 0 17.091 64 0 00:54 6.04 POND-5 0.783 7 0 0 7.683 64 0 02:09 0.20 Page 5 THE RETREAT - 100-YR SWMM OUTPUT.rpt POND-REDWOOD 79.660 16 0 0 470.988 93 0 02:30 12.00 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- C-1 CONDUIT 0.20 0 02:13 1.24 0.00 0.03 C-2 CONDUIT 17.28 0 01:51 10.31 0.06 0.16 C-3 CONDUIT 15.57 0 01:45 6.88 0.27 0.36 C-4 CONDUIT 15.57 0 01:46 6.86 0.27 0.36 C-5 CONDUIT 17.09 0 01:51 11.42 0.15 0.26 C-6 CONDUIT 0.70 0 02:45 1.58 0.03 0.11 C-7 CONDUIT 0.70 0 02:46 3.45 0.01 0.07 C-8 CONDUIT 12.00 0 02:34 2.79 0.65 0.59 OVERFLOWTOPOND3 WEIR 3.79 0 00:55 0.00 O-1 DUMMY 0.70 0 02:32 O-2 DUMMY 1.60 0 02:39 O-3 DUMMY 3.80 0 01:05 O-4 DUMMY 2.25 0 00:55 O-5 DUMMY 0.20 0 02:09 OS-REDWOOD DUMMY 12.00 0 02:31 ************************* Conduit Surcharge Summary ************************* No conduits were surcharged. Page 6 THE RETREAT - 100-YR SWMM OUTPUT.rpt Analysis begun on: Tue Jul 24 14:00:16 2018 Analysis ended on: Tue Jul 24 14:00:17 2018 Total elapsed time: 00:00:01 Page 7 THE RETREAT - 100-YR SWMM OUTPUT-SUBBASIN F NOT ROUTED TO REDWOOD POND.rpt EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.012) -------------------------------------------------------------- ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ 03/15/2016 00:00:00 Ending Date .............. 03/20/2016 00:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:15:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 30.00 sec ************************** Volume Depth Page 1 THE RETREAT - 100-YR SWMM OUTPUT-SUBBASIN F NOT ROUTED TO REDWOOD POND.rpt Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 23.999 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 6.118 0.935 Surface Runoff ........... 17.691 2.705 Final Storage ............ 0.305 0.047 Continuity Error (%) ..... -0.475 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 17.691 5.765 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 19.898 6.484 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 2.437 0.794 Final Stored Volume ...... 0.222 0.072 Continuity Error (%) ..... 0.034 ******************************** Highest Flow Instability Indexes ******************************** All links are stable. ************************* Routing Time Step Summary Page 2 THE RETREAT - 100-YR SWMM OUTPUT-SUBBASIN F NOT ROUTED TO REDWOOD POND.rpt ************************* Minimum Time Step : 30.00 sec Average Time Step : 30.00 sec Maximum Time Step : 30.00 sec Percent in Steady State : 0.00 Average Iterations per Step : 1.01 Percent Not Converging : 0.00 *************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------------------------- Total Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Coeff Subcatchment in in in in in 10^6 gal CFS -------------------------------------------------------------------------------------------------------- SUB-RW5 3.67 0.00 0.00 0.89 2.79 0.02 2.94 0.761 SUB-RW2-3 3.67 0.00 0.00 0.90 2.77 0.09 10.11 0.755 SUB-A 3.67 0.00 0.00 0.77 2.89 0.91 77.20 0.786 SUB-B 3.67 0.00 0.00 0.71 2.94 0.90 62.91 0.802 SUB-C 3.67 0.00 0.00 0.85 2.82 0.09 10.01 0.770 SUB-D 3.67 0.00 0.00 0.81 2.86 0.13 13.12 0.780 SUB-E 3.67 0.00 0.00 0.61 3.05 0.07 7.48 0.830 SUB-F 3.67 0.00 0.00 1.05 2.64 0.05 5.92 0.718 SUB-OFFSITE2REDWOOD 3.67 0.00 0.00 1.04 2.59 3.51 165.55 0.707 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Page 3 THE RETREAT - 100-YR SWMM OUTPUT-SUBBASIN F NOT ROUTED TO REDWOOD POND.rpt Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- NECCO JUNCTION 4.50 4.50 50.50 0 00:01 4.50 J-2 JUNCTION 0.03 0.15 48.15 0 02:09 0.15 J-3 JUNCTION 0.25 1.07 50.07 0 01:46 1.07 J-4 JUNCTION 0.24 1.07 52.07 0 01:45 1.07 J-5 JUNCTION 0.41 1.74 53.74 0 02:34 1.74 J-6 JUNCTION 0.20 0.34 52.34 0 02:32 0.34 J-7 JUNCTION 0.22 0.79 47.79 0 01:50 0.79 J-9 JUNCTION 0.20 0.34 50.34 0 02:45 0.34 J-10 JUNCTION 0.41 1.74 54.24 0 02:31 1.74 OFFLINE JUNCTION 0.00 0.00 0.00 0 00:00 0.00 POND-1 STORAGE 1.84 3.73 56.83 0 02:32 3.73 POND-2 STORAGE 2.64 7.12 56.52 0 02:39 7.11 POND-3 STORAGE 0.72 3.94 57.14 0 01:05 3.92 POND-4 STORAGE 0.54 3.43 59.03 0 00:55 3.41 POND-5 STORAGE 0.20 1.92 50.92 0 02:09 1.91 POND-REDWOOD STORAGE 1.28 4.71 57.81 0 02:31 4.71 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- NECCO JUNCTION 0.00 17.11 0 01:50 0 6.43 0.000 J-2 JUNCTION 0.00 0.20 0 02:09 0 0.0653 -0.000 J-3 JUNCTION 0.00 16.92 0 01:50 0 6.37 0.000 J-4 JUNCTION 0.00 15.40 0 01:45 0 4.56 0.000 Page 4 THE RETREAT - 100-YR SWMM OUTPUT-SUBBASIN F NOT ROUTED TO REDWOOD POND.rpt J-5 JUNCTION 0.00 15.40 0 01:45 0 4.56 0.000 J-6 JUNCTION 0.00 0.70 0 02:32 0 0.907 0.000 J-7 JUNCTION 0.00 17.11 0 01:50 0 6.43 0.000 J-9 JUNCTION 0.00 0.70 0 02:45 0 0.907 0.000 J-10 JUNCTION 0.00 11.83 0 02:31 0 4.22 0.000 OFFLINE JUNCTION 5.92 5.92 0 00:40 0.0515 0.0515 0.000 POND-1 STORAGE 77.20 77.20 0 00:40 0.906 0.917 0.006 POND-2 STORAGE 62.91 62.93 0 00:40 0.903 1.81 0.009 POND-3 STORAGE 12.95 12.95 0 00:40 0.112 0.154 0.063 POND-4 STORAGE 23.23 23.23 0 00:40 0.218 0.226 0.219 POND-5 STORAGE 7.48 7.48 0 00:40 0.0654 0.0654 0.023 POND-REDWOOD STORAGE 165.55 165.55 0 00:40 3.51 4.28 0.022 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** Storage Volume Summary ********************** -------------------------------------------------------------------------------------------------- Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------------------- POND-1 36.176 22 0 0 116.789 71 0 02:32 0.70 POND-2 30.411 25 0 0 112.201 94 0 02:39 1.60 POND-3 0.258 3 0 0 9.363 94 0 01:04 3.80 POND-4 0.634 2 0 0 17.091 64 0 00:54 6.04 POND-5 0.783 7 0 0 7.683 64 0 02:09 0.20 Page 5 THE RETREAT - 100-YR SWMM OUTPUT-SUBBASIN F NOT ROUTED TO REDWOOD POND.rpt POND-REDWOOD 79.064 16 0 0 465.189 92 0 02:31 11.83 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- C-1 CONDUIT 0.20 0 02:13 1.24 0.00 0.03 C-2 CONDUIT 17.11 0 01:50 10.28 0.06 0.16 C-3 CONDUIT 15.40 0 01:45 6.86 0.27 0.35 C-4 CONDUIT 15.40 0 01:46 6.84 0.27 0.36 C-5 CONDUIT 16.92 0 01:50 11.38 0.15 0.26 C-6 CONDUIT 0.70 0 02:45 1.58 0.03 0.11 C-7 CONDUIT 0.70 0 02:46 3.45 0.01 0.07 C-8 CONDUIT 11.83 0 02:34 2.78 0.64 0.58 OVERFLOWTOPOND3 WEIR 3.79 0 00:55 0.00 O-1 DUMMY 0.70 0 02:32 O-2 DUMMY 1.60 0 02:39 O-3 DUMMY 3.80 0 01:05 O-4 DUMMY 2.25 0 00:55 O-5 DUMMY 0.20 0 02:09 OS-REDWOOD DUMMY 11.83 0 02:31 ************************* Conduit Surcharge Summary ************************* No conduits were surcharged. Page 6 THE RETREAT - 100-YR SWMM OUTPUT-SUBBASIN F NOT ROUTED TO REDWOOD POND.rpt Analysis begun on: Tue Jul 24 14:03:23 2018 Analysis ended on: Tue Jul 24 14:03:23 2018 Total elapsed time: < 1 sec Page 7 APPENDIX E FEMA FIRMETTE DS,Airbus Source: USDA, Esri, USGS, DigitalGlobe, AeroGRID, GeoEye, IGN, and Earthstar the GIS Geographics, User Community CNES/ National Flood Hazard Layer FIRMette 0 250 500 1,000 1,500 2,000 Feet Ü 105°4'8.72"W 40°36'20.86"N 105°3'29.76"W 40°35'52.45"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT HAZARD SPECIAL AREAS FLOOD Without Zone A, V, Base A99 Flood Elevation (BFE) With BFE or Depth RegulatoryAR Floodway Zone AE, AO, AH, VE, 0.of 2% 1% Annual annual Chance chance Flood flood with Hazard, average Areas depth areasdrainage of less less than than one one foot square or with mile Zone X Future ChanceAnnual Conditions Flood Hazard 1% Zone X Area Levee.to with See Reduced Notes. Flood Risk due Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood Hazard Zone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This digital map flood complies maps if with it is FEMA's not void standards as described for the below. use of The accuracy base standards map shown complies with FEMA's base map The authoritative flood hazard NFHL information web services is derived provided directly by FEMA. from This the map was reflectnot exported changes on or 3/amendments 12/2018 at subsequent 11:37:03 AM to and this does date and time. becomeor The superseded NFHL and effective by new data information over time. may change This elementsmap map image do not is appear: void if base the one map or imagery, more of the flood following zone labels, legend, FIRM panel scale number, bar, map and creation FIRM effective date, community date. Map identifiers,images for unmapped regulatoryfor purposes. and unmodernized areas cannot be used Legend OTHER FLOOD AREAS HAZARD OF OTHER AREAS STRGUECNTUERREASL FEATURES OTHER MAP PANELS 8 1:6,241.13 B 20.2 APPENDIX F EROSION CONTROL REPORT The Retreat at Fort Collins Preliminary Erosion Control Report A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Utility Plans at final design will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs MAP POCKET C6.00 – OVERALL DRAINAGE EXHIBIT V.P. V.P. D D V.P. F E S F E S F E S MH ELEC MH D MW MW MW F E S D D VAULT CABLE D D IRR D D ELEC VAULT ELEC VAULT ELEC D D D VAULT ELEC D CC C C C D 12" W 12" W 12" W 60" W 60" W 60" W 60" W 42" W 42" W 42" W X X ST ST ST ST ST ST ST ST ST u til VAULT ELEC ST ST D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD AST NY LOPL UD C ELIT I NOR ST NYL OPLA D CU T ELI I R O N S T N YLOPLA CUD T ELI I R O N ST A NYLOPL TCUD LI RIE O N LAST P O NYL D CU ELIT NORI AST L NYLOP CUD T I IEL R NO AS T L N YLOP CUD T ELI I R NO PLAST O NYL D U LITC E I NOR T S Y LOPLA N D ITCU EL NORI T OPL AS N YL D ITCU L ORIE N L AST NYLOP UD C IT EL ORI N LOP LAST Y N D TCU I L RIE NO T S YLOPL A N D ITCU L ORIE N T S YLOPLA N D ITCU EL NORI T S YLO PLA N D TCU I RIEL NO T S LOPL A Y N D ITCU L ORIE N T LOPLA S Y N D ITCU L E NORI LOPL AST Y N D ITCU L ORIE N T S YLOP LA N D TCU I RIEL NO AST L P NY LO D U C ELIT I NOR UP UP ELEVATOR UP C C C C C C C C C C C C C C C C C C (52)BIKE SPACES C C C C C C C C C POND 2 EXISTING REDWOOD DETENTION POND POND 3 POND 4 POND 1 WQ CHAMBER B6 WQ CHAMBER B9 WQ CHAMBER E1 POND 5 WQ CHAMBER A7 WQ CHAMBER B2 FUTURE NORTHFIELD SUBDIVISION 1ST FILING REPLAT OF THE MEADOWS AT REDWOOD P.U.D PHASE 1 TRACT A REPLAT OF EVERGREEN PARK 2ND FILING LAKE CANAL LAKE CANAL OWNER ROCKY MOUNTAIN RAPTOR PROGRAM EVERGREEN PARK 3RD FILING OWNER BOARD OF COUNTY COMMISSIONERS FEMA HIGH-RISK FLOODWAY FEMA HIGH-RISK FLOODPLAIN PROPOSED OUTLET STRUCTURE PROPOSED OUTLET STRUCTURE NECCO STORMLINE PROPOSED INLETS PROPOSED INLETS (2-YR) PROPOSED INLETS EXISTING INLET PROPOSED INLET PLANNED INLETS PROPOSED INLETS (2-YR) PROPOSED INLETS (2-YR) PROPOSED OUTLET STRUCTURE PROPOSED OUTLET STRUCTURE PROPOSED CURB CUTS PROPOSED INLET PROPOSED INLET (2-YR) UD1 UD2 UD3 RW5 RW4 RW2 RW1 RW3 D1 D2 E1 F1 A1 A3 A2 A4 A5 A6 PROPOSED INLETS A7 A8 B1 B2 B3 B4 PROPOSED INLETS (2-YR) B5 B6 B7 B8 B9 B10 B11 C1 RW1 RW2 RW3 RW4 RW5 UD1 UD2 UD3 F1 E1 C1 B5 B7 B9 D1 D2 B3 B1 A6 A7 A1 A3 A4 A5 A8 A2 B2 B6 B8 B10 B11 PROPOSED B4 INLET (2-YR) AJ - 4960.6 NAVD 88 AL - 4962.04 NAVD 88 AI - 4960.31 NAVD 88 AK - 4961.08 NAVD 88 ( IN FEET ) 0 1 INCH = 100 FEET 100 100 200 300 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE"Preliminary Drainage Report for The Retreat at Fort Collins dated July 25, 2018" FOR ADDITIONAL INFORMATION. NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION C6.00 DRAINAGE EXHIBIT 25 NORTH Open Detention Pond Summary | Proposed Condition Pond Pond Description 100-yr Volume (cf) 100-yr Volume (ac-ft) 100-yr WSEL WQCV (cf) WQCV WSEL Max Release (cfs) 1 Open Detention 116,789 2.68 4956.93 1,319 4956.93 0.70 2 Open Detention 112,201 2.58 4949.65 377 4956.52 1.60 3 Open Detention 9,363 0.21 4955.03 746 4857.14 3.80 4 Open Detention 17,091 0.39 4959.04 1,131 4956.80 2.25 Underground Chamber Summary | Proposed Condition Chamber Description 100-yr Volume (cf) 100-yr Volume (ac-ft) 100-yr WSEL WQCV (cf) WQCV WSEL Max Release (cfs) A7 Underground LID n/a n/a n/a 5,507 to be provided at final n/a B2 Underground LID n/a n/a n/a 1,619 to be provided at final n/a B6 Underground LID n/a n/a n/a 3,124 to be provided at final n/a B9 Underground LID n/a n/a n/a 1,827 to be provided at final n/a E1/Pond 5 Underground LID and Detention 7,683 0.18 to be provided at final 676 to be provided at final 0.20 Sheet THE RETREATE AT FORT COLLINS These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 26 DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) A1 A1 0.66 0.62 0.78 5.0 5.0 1.17 5.11 A2 A2 1.61 0.69 0.86 13.8 11.4 2.16 10.25 A3 A3 1.33 0.76 0.95 9.0 7.6 2.37 10.83 A4 A4 1.42 0.67 0.84 7.2 5.2 2.39 11.81 A5 A5 0.71 0.76 0.95 6.7 5.0 1.38 6.63 A6 A6 2.11 0.70 0.87 10.5 9.3 3.19 14.74 A7 A7 0.20 0.84 1.00 5.0 5.0 0.49 2.04 A8 A8 3.54 0.38 0.47 10.4 9.5 2.96 13.20 B1 B1 1.59 0.70 0.88 11.8 10.4 2.33 10.76 B2 B2 1.26 0.45 0.56 9.1 7.6 1.31 6.11 B3 B3 1.23 0.85 1.00 8.3 5.0 2.51 12.25 B4 B4 2.07 0.68 0.85 6.7 5.4 3.66 17.55 B5 B5 0.52 0.74 0.93 5.9 5.0 1.07 4.84 B6 B6 0.67 0.49 0.62 6.4 5.2 0.89 4.14 B7 B7 1.30 0.77 0.96 6.8 5.0 2.60 12.48 B8 B8 0.27 0.77 0.97 5.3 5.0 0.60 2.62 B9 B9 0.14 0.80 1.00 5.0 5.0 0.31 1.36 B10 B10 0.81 0.77 0.96 5.1 5.0 1.77 7.70 B11 B11 1.43 0.34 0.42 9.9 9.0 1.09 4.83 C1 C1 1.16 0.54 0.68 7.6 6.3 1.56 7.36 D1 D1 0.83 0.64 0.80 7.0 5.2 1.34 6.61 D2 D2 0.83 0.51 0.63 5.0 5.0 1.20 5.24 E1 E1 0.79 0.62 0.77 8.3 6.6 1.17 5.53 F1 F1 0.72 0.38 0.47 14.2 13.3 0.52 2.36 UD1 UD1 0.79 0.52 0.65 8.0 6.6 0.99 4.66 UD2 UD2 1.17 0.80 1.00 5.0 5.0 2.68 11.66 UD3 UD3 2.32 0.30 0.37 32.0 29.0 0.86 3.96 RW1 RW1 3.42 0.45 0.56 15.9 14.7 2.83 12.71 RW2 RW2 1.08 0.45 0.56 9.6 8.4 1.09 5.08 RW3 RW3 0.10 0.45 0.56 6.8 5.6 0.12 0.55 RW4 RW4 1.20 0.45 0.56 9.6 8.4 1.22 5.65 RW5 RW5 0.31 0.45 0.56 6.8 5.6 0.37 1.69 FLOODPLAIN NOTES: 1. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION 2. THIS PROJECT IS LOCATED WITHIN A FEMA 100-YEAR FLOODWAY AND FLOOD FRINGE AND MUST COMPLY WITH CHAPTER 10 OF THE CITY CODE. 3. ALL ELEVATIONS DEPICTED IN PLAN VIEW AND BENCHMARKS LISTED HEREON ARE PER NAVD 88 DATUM. 4. ANY ITEMS LOCATED IN THE FLOODWAY THAT CAN FLOAT (E.G., PICNIC TABLES, BIKE RACKS, ETC.) MUST BE ANCHORED. 5. THE LOWEST FLOOR AND THE FINISHED FLOOR FOR ANY BUILDING IN THE FLOODPLAIN SHALL BE FLOODPROOFED UP TO THE REGULATORY FLOOD PROTECTION ELEVATION. 6. A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH SITE CONSTRUCTION ELEMENT IN THE FLOODPLAIN. 7. A FLOODPLAIN USE PERMIT AND NO RISE CERTIFICATION IS REQUIRED PRIOR TO PERFORMING ANY WORK WITHIN THE FLOODWAY (I.E., CURB CUT REMOVAL, LANDSCAPING). 8. NO STORAGE OF MATERIALS OR EQUIPMENT SHALL BE ALLOWED IN THE FLOODWAY, WHETHER TEMPORARY (DURING CONSTRUCTION) OR PERMANENT. LANDSCAPING SHALL ALSO MEET THE REQUIREMENTS FOR NO RISE IN THE FLOODWAY. 9. REFER TO THE PRELIMINARY DRAINAGE REPORT FOR THE RETREAT AT FORT COLLINS DATED JULY 25, 2018 FOR ADDITIONAL INFORMATION. Page 10 of 11 Chambers_WQ Calcs.xlsx ö ç è = æ 12 hr Page 8 of 11 Chambers_WQ Calcs.xlsx ö ç è = æ 12 hr Page 6 of 11 Chambers_WQ Calcs.xlsx ö ç è = æ 12 hr Page 4 of 11 Chambers_WQ Calcs.xlsx ö ç è = æ 12 hr The Retreat Project Number : Project Name : WQ Chamber A7 Page 2 of 11 Chambers_WQ Calcs.xlsx ö ç è = æ 12 hr E NORI OPLAST L NY ELITCUD NORI T S NYLOPLA LIT CUD E NORI AST L P LO Y N OR IELITCUD N ST A NYLOPL IELITCUD R O N T S YLOPLA N D RIELITCU O N T S NYLOPLA D ELITCU I NOR T NYLOPLAS CUD T LI E NORI ST A NYLOPL ITCUD L RIE O N LOPLAST Y N ORIE LITCUD N YLOPLAST N D U ORIELITC N T OPLAS L NY ELITCUD NORI T S A NYLOPL D U ITC L NORIE LOPLAST Y N NORIELIT CUD YLOPLAST N CUD T ORIELI N AST L LOP Y N O RIELITCUD N NYLOPLAST UD C ELIT I NOR PLAST O L NY LITCUD E I NOR YLOPLAST N ORIEL ITCUD N UP UP ELEVATOR UP C C C C C C C C C C C C C C C C C C ( 52)BIKE SPACES C C C C C C C C C EXISTING REDWOOD DETENTION POND FEMA HIGH-RISK FLOODWAY FEMA HIGH-RISK FLOODPLAIN NECCO STORMLINE EXISTING INLET S H Y D WV S C S WV V.P. V.P. D H2O D V.P. F E S F E S F E S ELEC MH MH H Y D D MW MW H2O WV WV H2O W WV WV WV W H2O MW W h2o F E S D D VAULT CABLE D D IRR D D ELEC VAULT ELEC H2O VAULT ELEC H2O D WV WV WV WV H Y D D D VAULT ELEC D C D H Y D WV S H Y D WV WV S S S S WV WV WV S C C C W C WV WV D 12" W 60" W 60" W 42" W E E E E CTV CTV CTV E E OHU OHU OHU OHU OHU OHU CTV W CTV E E CTV CTV W W W W W CTV CTV CTV CTV W CTV X SS SS SS SS SS ST ST u til VAULT ELEC D RW1 RW2 RW3 RW4 RW5 UD1 UD2 UD3 F1 E1 C1 B5 B7 B9 D1 D2 B3 B1 A6 A7 A1 A3 A4 A5 A8 A2 B2 B6 B8 B10 B11 B4 WQ CHAMBER B6 WQ CHAMBER B9 WQ CHAMBER E1 POND 5 WQ CHAMBER A7 WQ CHAMBER B2 FUTURE NORTHFIELD SUBDIVISION 1ST FILING REPLAT OF THE MEADOWS AT REDWOOD P.U.D PHASE 1 TRACT A REPLAT OF EVERGREEN PARK 2ND FILING LAKE CANAL LAKE CANAL OWNER ROCKY MOUNTAIN RAPTOR PROGRAM EVERGREEN PARK 3RD FILING OWNER BOARD OF COUNTY COMMISSIONERS LEGEND DRAINAGE BASIN DRAINAGE BASIN LABEL AREA TREATED BY LOW IMPACT DEVELOPMENT (LID) LOW IMPACT DEVELOPMENT (LID) TREATMENT B2 LID TREATMENT EXHIBIT FORT COLLINS, CO THE RETREAT AT FORT COLLINS E NGINEER ING N O R T H E RN 07.25.2018 D:\PROJECTS\1290-002\DWG\DRNG\1290-002_LID.DWG ( IN FEET ) 0 1 INCH = 200 FEET 200 200 PROPOSED LID TREATED AREA LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) LID Treatment A1 28,709 62% 17,883 WQ Chamber A7 A2 69,932 69% 48,143 WQ Chamber A7 A3 57,726 76% 43,924 WQ Chamber A7 A4 61,860 67% 41,369 WQ Chamber A7 A5 30,720 76% 23,234 WQ Chamber A7 A6 91,912 70% 63,956 WQ Chamber A7 A7 8,912 84% 7,458 WQ Chamber A7 B1 69,286 70% 48,558 WQ Chamber B2 B2 54,867 45% 24,793 WQ Chamber B2 B3 53,646 85% 45,476 WQ Chamber B6 B4 90,005 68% 61,471 WQ Chamber B6 B5 22,787 74% 16,965 WQ Chamber B6 B6 29,364 49% 14,512 WQ Chamber B6 B7 56,825 77% 43,708 WQ Chamber B9 B8 11,887 77% 9,184 WQ Chamber E1 B9 5,943 80% 4,758 WQ Chamber B9 B10 35,151 77% 26,979 WQ Chamber B9 E1 34,607 62% 21,297 WQ Chamber E1 Total Treated 814,139 69% 563,667 PROPOSED LID UNTREATED AREA LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) A8 154,227 38% 58,414 B11 62,396 34% 20,969 C1 50,565 54% 27,544 D1 36,109 64% 23,143 D2 36,306 51% 18,366 UD1 34,414 52% 17,953 UD2 51,032 80% 41,030 UD3 101,092 30% 29,972 F1 31,311 38% 11,887 Total Proposed Untreated 557,452 45% 249,277 AREA NOT INCLUDED IN LID CALCULATIONS LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) Suniga Street UD2 51,032 77% 39,522 Undisturbed Area UD3 101,092 6% 6,042 Not Included in LID Calcs 152,124 30% 45,563 LID TREATMENT SUMMARY Total Site Area (sf) 1,371,591 Total Proposed Impervious Area (sf) 812,944 Total Impervious Area not included in LID calcs 45,563 Total Net Proposed Impervious Area (sf) 767,381 75% Required Minimum Area to be Treated by LID measures (sf) 575,536 Total Treated Impervious Area (sf) 563,667 Percent Impervious Treated by LID measures 73.5% Undisturbed Area UD3 101,092 6% 6,042 Not Included in LID Calcs 152,124 30% 45,563 1,371,591 812,944 45,563 767,381 575,536 563,667 73.5% Total Net Proposed Impervious Area (sf) AREA NOT INCLUDED IN LID CALCULATIONS Total Impervious Area not included in LID calcs Total Treated Impervious Area (sf) Percent Impervious Treated by LID 75% Required Minimum Area to be Treated by LID measures (sf) Total Proposed Impervious Area (sf) PROPOSED LID COMPUTATIONS LID TREATMENT SUMMARY PROPOSED LID UNTREATED AREA Total Site Area (sf) PROPOSED LID TREATED AREA 4,956.20 24338 0.20 4813 104368 4813 104309 4,956.40 24972 0.20 4931 109299 4931 109240 4,956.60 25629 0.20 5060 114359 5060 114300 4,956.80 26306 0.20 5193 119553 5193 119493 Design Point Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 7/24/20181:11 PM D:\Projects\1290-002\Drainage\Detention\1290-002_Detention Pond 2.xlsm\Stage_Storage 15 15 11 0.66 0.66 0.83 1.90 3.24 7.57 9.21 15.75 46.00 B7 Basins B7-B10 (Storm Sewer Calc) 2.52 8 8 5 0.77 0.77 0.96 2.46 4.21 9.95 4.78 8.17 24.16 PROPOSED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) S. Thomas Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 July 24, 2018 Intensity, i10 (in/hr) C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) Q = C f ( C )( i )( A ) 7/24/2018 12:21 PM D:\Projects\1290-002\Drainage\Hydrology\1290-002_Proposed_Rational_Calcs.xlsx\Runoff (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) A1 A1 No 0.62 0.62 0.78 50 3.18% 4.3 4.3 2.9 N/A N/A N/A N/A N/A N/A 5.0 5.0 5.0 A2 A2 No 0.69 0.69 0.86 127 3.31% 5.8 5.8 3.4 N/A N/A N/A 672 0.49% 1.40 8.0 13.8 13.8 11.4 A3 A3 No 0.76 0.76 0.95 29 2.72% 2.4 2.4 1.1 N/A N/A N/A 589 0.56% 1.50 6.5 9.0 9.0 7.6 A4 A4 No 0.67 0.67 0.84 34 0.74% 5.2 5.2 3.2 N/A N/A N/A 206 0.73% 1.71 2.0 7.2 7.2 5.2 A5 A5 No 0.76 0.76 0.95 55 1.76% 3.9 3.9 1.8 N/A N/A N/A 272 0.67% 1.64 2.8 6.7 6.7 5.0 A6 A6 No 0.70 0.70 0.87 39 5.00% 2.8 2.8 1.6 N/A N/A N/A 653 0.49% 1.40 7.8 10.5 10.5 9.3 A7 A7 No 0.84 0.84 1.00 71 3.24% 2.8 2.8 1.1 N/A N/A N/A 34 1.00% 2.00 0.3 5.0 5.0 5.0 A8 A8 No 0.38 0.38 0.47 65 4.20% 6.7 6.7 5.9 N/A N/A N/A 419 0.91% 1.90 3.7 10.4 10.4 9.5 Basin A Basin A No 0.60 0.60 0.75 127 3.31% 7.0 7.0 4.9 N/A N/A N/A 1344 0.66% 1.63 13.8 20.8 20.8 18.7 B1 B1 No 0.70 0.70 0.88 44 3.18% 3.4 3.4 1.9 N/A N/A N/A 826 0.66% 1.62 8.5 11.8 11.8 10.4 B2 B2 No 0.45 0.45 0.56 61 1.28% 8.7 8.7 7.2 62 2.61% 2.42 0.4 N/A N/A N/A 9.1 9.1 7.6 B3 B3 No 0.85 0.85 1.00 203 1.08% 6.6 6.6 2.6 N/A N/A N/A 192 0.85% 1.84 1.7 8.3 8.3 5.0 B4 B4 No 0.68 0.68 0.85 38 3.34% 3.2 3.2 1.9 N/A N/A N/A 427 1.03% 2.03 3.5 6.7 6.7 5.4 B5 B5 No 0.74 0.74 0.93 53 3.62% 3.2 3.2 1.5 N/A N/A N/A 308 0.89% 1.88 2.7 5.9 5.9 5.0 B6 B6 No 0.49 0.49 0.62 65 3.42% 6.1 6.1 4.8 N/A N/A N/A 28 0.50% 1.41 0.3 6.4 6.4 5.2 B7 B7 No 0.77 0.77 0.96 72 2.65% 3.8 3.8 1.6 N/A N/A N/A 320 0.80% 1.79 3.0 6.8 6.8 5.0 B8 B8 No 0.77 0.77 0.97 90 1.49% 5.1 5.1 2.1 N/A N/A N/A 51 2.63% 3.24 0.3 5.3 5.3 5.0 B9 B9 No 0.80 0.80 1.00 54 5.33% 2.4 2.4 0.8 N/A N/A N/A 12 1.00% 2.00 0.1 5.0 5.0 5.0 B10 B10 No 0.77 0.77 0.96 50 6.32% 2.4 2.4 1.0 N/A N/A N/A 331 1.01% 2.01 2.7 5.1 5.1 5.0 B11 B11 No 0.34 0.34 0.42 53 2.36% 7.8 7.8 7.0 58 12.36% 5.27 0.2 161 0.50% 1.42 1.9 9.9 9.9 9.0 Basin B Basin B No 0.64 0.64 0.81 203 1.08% 11.8 11.8 7.6 N/A N/A N/A 449 2.19% 2.96 2.5 14.4 14.4 10.2 C1 C1 No 0.54 0.54 0.68 61 3.28% 5.5 5.5 4.1 313 2.57% 2.40 2.2 N/A N/A N/A 7.6 7.6 6.3 Basin C Basin C No 0.54 0.54 0.68 61 3.28% 5.5 5.5 4.1 313 2.57% 2.40 2.2 N/A N/A N/A 7.6 7.6 6.3 D1 D1 No 0.64 0.64 0.80 37 1.08% 5.1 5.1 3.3 216 1.56% 1.87 1.9 N/A N/A N/A 7.0 7.0 5.2 D2 D2 No 0.51 0.51 0.63 N/A N/A N/A N/A N/A N/A N/A 368 1.08% 2.08 2.9 5.0 5.0 5.0 Basin D Basin D No 0.57 0.57 0.72 37 1.08% 5.8 5.8 4.3 216 1.56% 1.87 1.9 368 1.08% 2.08 2.9 10.7 10.7 9.1 E1 E1 No 0.62 0.62 0.77 61 2.26% 5.4 5.4 3.7 N/A N/A N/A 199 0.33% 1.14 2.9 8.3 8.3 6.6 F1 F1 No 0.38 0.38 0.47 68 4.13% 6.9 6.9 6.0 N/A N/A N/A 599 0.47% 1.38 7.2 14.2 14.2 13.3 UD1 UD1 No 0.52 0.52 0.65 87 3.68% 6.5 6.5 5.1 N/A N/A N/A 183 1.04% 2.04 1.5 8.0 8.0 6.6 UD2 UD2 No 0.80 0.80 1.00 N/A N/A N/A N/A N/A N/A N/A 493 0.91% 1.91 4.3 5.0 5.0 5.0 UD3 UD3 No 0.30 0.30 0.37 292 0.52% 32.0 32.0 29.0 N/A N/A N/A N/A N/A N/A 32.0 32.0 29.0 RW1 RW1 No 0.45 0.45 0.56 50 2.00% 6.8 6.8 5.6 N/A N/A N/A 840 0.60% 1.54 9.1 15.9 15.9 14.7 RW2 RW2 No 0.45 0.45 0.56 50 2.00% 6.8 6.8 5.6 100 1.00% 1.50 1.1 197 1.02% 2.02 1.6 9.6 9.6 8.4 RW3 RW3 No 0.45 0.45 0.56 50 2.00% 6.8 6.8 5.6 N/A N/A N/A N/A N/A N/A 6.8 6.8 5.6 RW4 RW4 No 0.45 0.45 0.56 50 2.00% 6.8 6.8 5.6 100 1.00% 1.50 1.1 197 1.02% 2.02 1.6 9.6 9.6 8.4 RW5 RW5 No 0.45 0.45 0.56 50 2.00% 6.8 6.8 5.6 N/A N/A N/A N/A N/A N/A 6.8 6.8 5.6 A3, A2 Basins A1-A3 (100- year Overtopping) No 0.70 0.70 0.88 127 3.31% 5.6 5.6 3.1 N/A N/A N/A 672 0.49% 1.40 8.0 13.6 13.6 11.2 A5 Basins A1-A5 (100- year Overtopping) No 0.70 0.70 0.88 127 3.31% 5.6 5.6 3.2 N/A N/A N/A 944 0.42% 1.29 12.2 17.8 17.8 15.4 A7 Basins A1-A7 (Channel Calc) No 0.70 0.70 0.88 127 3.31% 5.6 5.6 3.1 N/A N/A N/A 978 0.44% 1.32 12.3 17.9 17.9 15.5 B5 Basins B3-B5 (100- year Overtopping) No 0.74 0.74 0.93 203 1.08% 9.2 9.2 4.4 N/A N/A N/A 192 0.85% 1.84 1.7 11.0 11.0 6.1 B6 Basins B1-B6 (Storm Sewer Calc) No 0.66 0.66 0.83 203 1.08% 11.4 11.4 7.1 N/A N/A N/A 288 0.48% 1.38 3.5 14.8 14.8 10.5 B7 Basins B7-B10 (Storm Sewer Calc) No 0.77 0.77 0.96 90 1.49% 5.1 5.1 2.1 N/A N/A N/A 380 1.41% 2.37 2.7 7.8 7.8 5.0 * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. PROPOSED TIME OF CONCENTRATION COMPUTATIONS S. Thomas Design Point Sub-Basin Overland Flow Swale Flow Gutter/Pipe Flow Time of Concentration July 24, 2018 (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = 7/24/2018 12:20 PM D:\Projects\1290-002\Drainage\Hydrology\1290-002_Proposed_Rational_Calcs.xlsx\Tc Coefficient Composite % Imperv. A1 0.66 0.00 0.00 0.13 0.00 0.23 Clayey | Average 2% to 7% 0.308 0.62 0.62 0.78 48% A2 1.61 0.41 0.00 0.23 0.00 0.37 Clayey | Average 2% to 7% 0.600 0.69 0.69 0.86 59% A3 1.33 0.41 0.00 0.43 0.00 0.13 Clayey | Average 2% to 7% 0.358 0.76 0.76 0.95 69% A4 1.42 0.14 0.00 0.39 0.00 0.32 Clayey | Average 2% to 7% 0.571 0.67 0.67 0.84 55% A5 0.71 0.19 0.00 0.15 0.00 0.17 Clayey | Average 2% to 7% 0.195 0.76 0.76 0.95 68% A6 2.11 0.41 0.00 0.52 0.00 0.41 Clayey | Average 2% to 7% 0.766 0.70 0.70 0.87 59% A7 0.20 0.10 0.00 0.04 0.00 0.04 Clayey | Average 2% to 7% 0.033 0.84 0.84 1.00 80% A8 3.54 0.00 0.00 0.34 0.00 0.31 Clayey | Average 2% to 7% 2.889 0.38 0.38 0.47 17% Basin A 11.570 1.66 0.00 2.22 0.00 1.97 Clayey | Average 2% to 7% 5.720 0.60 0.60 0.75 47% B1 1.59 0.49 0.00 0.38 0.00 0.15 Clayey | Average 2% to 7% 0.566 0.70 0.70 0.88 61% B2 1.26 0.09 0.00 0.11 0.00 0.16 Clayey | Average 2% to 7% 0.896 0.45 0.45 0.56 27% B3 1.23 0.16 0.00 0.70 0.00 0.20 Clayey | Average 2% to 7% 0.180 0.85 0.85 1.00 78% B4 2.07 0.48 0.00 0.30 0.00 0.50 Clayey | Average 2% to 7% 0.788 0.68 0.68 0.85 58% B5 0.52 0.17 0.00 0.10 0.00 0.09 Clayey | Average 2% to 7% 0.154 0.74 0.74 0.93 67% B6 0.67 0.08 0.00 0.07 0.00 0.09 Clayey | Average 2% to 7% 0.439 0.49 0.49 0.62 33% B7 1.30 0.52 0.00 0.27 0.00 0.18 Clayey | Average 2% to 7% 0.337 0.77 0.77 0.96 71% B8 0.27 0.09 0.00 0.07 0.00 0.05 Clayey | Average 2% to 7% 0.069 0.77 0.77 0.97 70% B9 0.14 0.08 0.00 0.02 0.00 0.00 Clayey | Average 2% to 7% 0.029 0.80 0.80 1.00 77% B10 0.81 0.26 0.00 0.15 0.00 0.19 Clayey | Average 2% to 7% 0.210 0.77 0.77 0.96 70% B11 1.43 0.00 0.00 0.08 0.00 0.10 Clayey | Average 2% to 7% 1.256 0.34 0.34 0.42 11% Basin B 11.298 2.42 0.00 2.25 0.00 1.71 Clayey | Average 2% to 7% 4.925 0.64 0.64 0.81 53% C1 1.16 0.10 0.00 0.20 0.00 0.18 Clayey | Average 2% to 7% 0.672 0.54 0.54 0.68 39% Basin C 1.161 0.10 0.00 0.20 0.00 0.18 Clayey | Average 2% to 7% 0.672 0.54 0.54 0.68 39% D1 0.83 0.17 0.00 0.16 0.00 0.14 Clayey | Average 2% to 7% 0.366 0.64 0.64 0.80 52% D2 0.83 0.00 0.00 0.12 0.00 0.19 Clayey | Average 2% to 7% 0.529 0.51 0.51 0.63 33% Basin D 1.662 0.17 0.00 0.28 0.00 0.32 Clayey | Average 2% to 7% 0.895 0.57 0.57 0.72 43% E1 0.794 0.13 0.00 0.09 0.00 0.20 Clayey | Average 2% to 7% 0.380 0.62 0.62 0.77 49% F1 0.719 0.10 0.00 0.08 0.00 0.01 Clayey | Average 2% to 7% 0.371 0.38 0.38 0.47 25% UD1 0.790 0.07 0.00 0.11 0.00 0.14 Clayey | Average 2% to 7% 0.453 0.52 0.52 0.65 37% UD2 1.172 0.73 0.00 0.20 0.00 0.00 Clayey | Average 2% to 7% 0.244 0.80 0.80 1.00 77% UD3 2.321 0.00 0.00 0.15 0.00 0.00 Clayey | Average 2% to 7% 2.167 0.30 0.30 0.37 6% TOTAL ON-SITE BASINS 31.49 5.48 5.65 0.00 4.53 Clayey | Average 2% to 7% 15.827 0.60 0.60 0.75 47% RW1 3.42 0.45 0.45 0.56 35% RW2 1.08 0.45 0.45 0.56 35% RW3 0.10 0.45 0.45 0.56 35% RW4 1.20 0.45 0.45 0.56 35% RW5 0.31 0.45 0.45 0.56 35% TOTAL BASIN RW 6.11 0.45 0.45 0.56 35% ADDITIONAL COMBINED BASINS FOR CALCULATIONS Basins required to release at 0.2 cfs (A, B, C, D, E, F, UD1) 28.00 4.75 0.00 5.30 0.00 4.53 Clayey | Average 2% to 7% 13.416 0.61 0.61 0.77 49% Basins A1-A7 (WQ Chamber A7) 8.03 1.66 0.00 1.88 0.00 1.66 Clayey | Average 2% to 7% 2.831 0.70 0.70 0.88 60% Basins B1-B2 (WQ Chamber B2) 2.85 0.58 0.00 0.49 0.00 0.31 Clayey | Average 2% to 7% 1.463 0.59 0.59 0.74 46% Basins B3-B6 (WQ Chamber B6) 4.49 0.89 0.00 1.16 0.00 0.88 Clayey | Average 2% to 7% 1.561 0.71 0.71 0.88 61% Basins B7, B9-B10 (WQ Chamber B9) 2.25 0.86 0.00 0.44 0.00 0.37 Clayey | Average 2% to 7% 0.576 0.77 0.77 0.96 71% Basins B8, E1 (WQ Chamber E1) 1.07 0.21 0.00 0.16 0.00 0.25 Clayey | Average 2% to 7% 0.449 0.66 0.66 0.82 54% Basins A1-A3 (100-year Overtopping) 3.59 0.82 0.00 0.79 0.00 0.72 Clayey | Average 2% to 7% 1.266 0.70 0.70 0.88 61% Basins A1-A5 (100-year Overtopping) 5.72 1.15 0.00 1.32 0.00 1.20 Clayey | Average 2% to 7% 2.032 0.70 0.70 0.88 60% Basins A1-A7 (Channel Calc) 8.03 1.66 0.00 1.88 0.00 1.66 Clayey | Average 2% to 7% 2.831 0.70 0.70 0.88 60% Basins B3-B5 (100-year Overtopping) 3.82 0.82 0.00 1.09 0.00 0.79 Clayey | Average 2% to 7% 1.122 0.74 0.74 0.93 66% Basins B1-B6 (Storm Sewer Calc) 7.35 1.48 0.00 1.66 0.00 1.19 Clayey | Average 2% to 7% 3.023 0.66 0.66 0.83 55% Basins B7-B10 (Storm Sewer Calc) 2.52 0.95 0.00 0.51 0.00 0.42 Clayey | Average 2% to 7% 0.646 0.77 0.77 0.96 71% 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis Composite Runoff Coefficient with Adjustment PROPOSED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS UTILIZING COEFFICIENTS FROM THE REDWOOD VILLAGE PLANS 7/24/2018 2:16 PM D:\Projects\1290-002\Drainage\Hydrology\1290-002_Proposed_Rational_Calcs.xlsx\Composite C of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 12, Oct 10, 2017 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 20, 2015—Oct 15, 2016 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (The Retreat ) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/18/2018 Page 2 of 4 final 676 to be provided at final 0.20 C. Release Rate Compliance The Retreat @ Fort Collins has a total combined area of 27.99 acres that are subject to the 0.2 cfs/acre release rate as denoted per the NECCO design. As such, the total release allowed from The Retreat @ Fort Collins site is 5.60 cfs. By adding the release from the Redwood Pond (12 cfs), the total release allowable from all Ponds is 17.60 cfs. Ponds 2, 3, 4, 5 and the Redwood Pond release directly into the proposed outfall pipe connected to the NECCO Stormwater improvements. These ponds combined have a total release of 19.85 cfs. This is 2.25 cfs more than the allowable from the site. The undetained basin UD1 100-year runoff rate of 4.66 cfs combined with the additional 2.25 cfs release from the ponds shows an increase of release of 6.91 cfs. In order to balance this undetained flow, off-site basins RW2, RW3, and RW5 were detained. These off-site basins have a 100-year runoff rate of 5.08 cfs, 0.55 cfs, and 1.69 cfs (total 7.32 cfs). By subtracting the existing undetained flow of 7.32 cfs from the proposed additional developed flow of 6.91 cfs, it is shown that the development will decrease the stormwater release from the site by 0.41 cfs. The table on the next page illustrates these calculations: denoted by a number (ie. Pond 1, Pond 2, Pond 3). The labeling for the underground chambers designed for LID Treatment ONLY are labeled with the basin for which they are located (ie. Chamber A7, Chamber B2). Some chamber areas are labeled with both a Detention Pond label and a LID label. These chamber areas have both LID and detention components, and these components are calculated separately.