HomeMy WebLinkAboutLONG POND, WIRELESS TELECOMMUNICATIONS FACILITY - FDP - FDP180016 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSPROJECT DESCRIPTION:
TITLE SHEET
T-1
PROPOSED TELE-
COMMUNICATIONS FACILITY
SITE NAME:
PROJECT
DESCRIPTION:
TOWER TYPE:
SITE ADDRESS:
60' SILO
TURNBERRY ZONING JURISDICTION:
ZONING: TBD
CITY OF FORT COLLINS
2008 TURNBERRY ROAD
FORT COLLINS, CO 80524
(LARIMER COUNTY)
POWER COMPANY:
CONTACT:
PHONE:
METER# NEAR SITE:
TELEPHONE COMPANY:
CONTACT:
PHONE:
PEDESTAL # NEAR SITE:
TOWER ENGINEERING PROFESSIONALS
5545 W. 56TH AVE., UNIT E
ARVADA, CO 80002
NICHOLAS M. CONSTANTINE
(303) 566-9914
WiBLUE, INC.
KEN BRADTKE
(303) 448-8896
SITE CONSTRUCTION MANAGER:
SITE APPLICANT:
SURVEYOR:
CIVIL ENGINEER:
PROPERTY OWNER:
NAME:
ADDRESS:
CITY, STATE, ZIP:
CONTACT:
PHONE:
NAME:
ADDRESS:
CITY, STATE, ZIP:
NAME:
ADDRESS:
CITY, STATE, ZIP:
CONTACT:
PHONE:
NAME:
ADDRESS:
CITY, STATE, ZIP:
CONTACT:
PHONE:
NAME:
CONTACT:
PHONE:
N
LCUASS GENERAL NOTES:
³ ´
³ ´
GENERAL NOTES
N-1
GENERAL NOTES
H TURNBERRY
KES NMC
ZONING
ZONING
REVIEW
ZONING
C 12-15-16
ZONING
D 12-22-16
ZONING
E 02-17-17
ZONING
F 02-24-17
ZONING
G 03-03-17
H 06-30-17
NOTES:
LEGEND
SITE COORDINATES
TURNBERRY ROAD
TURNBERRY ROAD
IMPERMEABLE AREA CALCULATIONS
SITE PLAN &
COMPOUND
DETIAL
C-1
SITE PLAN
H TURNBERRY
KES NMC
ZONING
ZONING
REVIEW
ZONING
C 12-15-16
ZONING
D 12-22-16
ZONING
E 02-17-17
ZONING
F 02-24-17
ZONING
G 03-03-17
H 06-30-17
COMPOUND DETAIL
EROSION NOTES:
PUBLIC ROAD
NOTES:
CONSTRUCTION NOTES:
³ ´
³ ´ ³ ´
EROSION &
DRIVEWAY
PLANS
C-2
SOIL & EROSION CONTROL PLAN
H TURNBERRY
KES NMC
ZONING
ZONING
REVIEW
ZONING
C 12-15-16
ZONING
D 12-22-16
ZONING
E 02-17-17
ZONING
F 02-24-17
ZONING
G 03-03-17
H 06-30-17
SILT FENCE DETAILS
STANDARD ROAD SEC. (POOR SUBGRADE)
STABILIZED CONSTRUCTION ENTRANCE
STANDARD ROAD SEC. (GOOD SUBGRADE)
FIRE ACCESS ROAD SIGNS
SOIL & EROSION CONTROL PLAN
TURNBERRY ROAD
CODES
TESTING
GUARANTEE
CO-ORDINATION:
EXAMINATION OF SITE
CUTTING, PATCHING AND EXCAVATION:
SCOPE:
ELECTRICAL NOTES:
CONDUCTORS
GROUNDING
PENETRATIONS:
EXTERIOR CONDUIT:
EQUIPMENT:
RACEWAYS
ABBREVIATIONS AND LEGEND
MATERIALS
POWER NOTES:
UTILITY PLAN SCHEDULE
H TURNBERRY
KES NMC
ZONING
ZONING
REVIEW
ZONING
C 12-15-16
ZONING
D 12-22-16
ZONING
E 02-17-17
ZONING
F 02-24-17
ZONING
G 03-03-17
H 06-30-17
E-1
ELECTRICAL
NOTES & UTILITY
COORDINATION
ELECTRICAL NOTES UTILITY COORDINATION
NOTES:
FRONT VIEW REAR VIEW
POWER PANEL SCHEDULE
NOTES:
VZW SERVICE RACK
(FRONT AND BACK)
ATLAS SERVICE RACK
(FRONT)
ATLAS SERVICE RACK
(BACK)
ONE LINE DIAGRAM NOTES: NOTES:
NOTES:
DRAWING NOTES:
H TURNBERRY
KES NMC
ZONING
ZONING
REVIEW
ZONING
C 12-15-16
ZONING
D 12-22-16
ZONING
E 02-17-17
ZONING
F 02-24-17
ZONING
G 03-03-17
H 06-30-17
E-2
ELECTRICAL
DETAILS
SERVICE RACK DETAILS
ONE LINE ELEVATION ONE LINE DETAIL UNDERGROUND CONDUIT(S) TRENCH DETAIL
POWER AND TELCO PLAN
TOP VIEW
SIDE VIEW
FIXED
GENERATOR
GROUNDING NOTES DRAWING NOTES:
NOTES:
SINGLE CONNECTOR AT GROUND BARS BACK TO BACK CONNECTOR AT GROUND BARS
SINGLE CONNECTOR AT STEEL OBJECTS BACK TO BACK CONNECTOR AT STEEL OBJECTS
SINGLE CONNECTOR AT METALLIC/STEEL OBJECTS BACK TO BACK CONNECTOR AT METALLIC/STEEL OBJECTS
GROUNDING
DETAILS
E-3
ELECTRICAL DETAIL
H TURNBERRY
KES NMC
ZONING
ZONING
REVIEW
ZONING
C 12-15-16
ZONING
D 12-22-16
ZONING
E 02-17-17
ZONING
F 02-24-17
ZONING
G 03-03-17
H 06-30-17
CADWELD GROUNDING DETAIL TOWER GROUNDING
ISOLATED GROUND BAR COPPER-CLAD STEEL GROUND ROD TOWER GROUNDING
MOUNTING DETAIL
COAX ISOLATED GROUND BAR
EXTERNAL CIGBE - BOTTOM
TYPE 1 GROUND BAR TYPE 2 GROUND BAR
COAX ISOLATED GROUND BAR
EXT. CIGBE - TOP & INTERMEDIATE
GROUNDING PLAN GROUNDING AT GATE POST
TRENCH DETAIL
INSPECTION WELL DETAIL
CONNECTOR AND HARDWARE DETAIL
LAT40 INC.
6250 W 10TH ST, UNIT 2
GREELEY, CO 80634
BRIAN T. BRINKMAN, P.L.S.
(970) 515-5294
PROJECT DESCRIPTION
SITE COORDINATES CODE COMPLIANCE UTILITY INFORMATION
ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN
ACCORDANCE WITH THE CURRENT EDITIONS OF THE FOLLOWING CODES AS
ADOPTED BY THE LOCAL GOVERNING AUTHORITES. NOTHING IN THESE PLANS
IS TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THE LATEST
EDITIONS OF THE FOLLOWING:
1. INTERNATIONAL BUILDING CODE
(2012 EDITION)
3. ANSI/TIA/EIA-222-G
4. NATIONAL ELECTRIC CODE (2014 EDITION)
5. LOCAL BUILDING CODE
6. CITY/COUNTY ORDINANCES
CONTACT INFORMATION
PROJECT INFORMATION
SHEET INDEX
DRIVING DIRECTIONS
LOCATION MAP
FROM DENVER, CO TAKE I-25 NORTH FOR 60.9 MILES. TAKE EXIT 271 FOR MOUNTAIN VISTA DRIVE. TURN LEFT ONTO E CO
RD 50/ MOUNTAIN VISTA DRIVE. TURN RIGHT ONTO COUNTY ROAD 11/ TURNBERRY ROAD. SITE WILL BE ON THE RIGHT.
2008 TURNBERRY ROAD
FORT COLLINS, CO 80524
(LARIMER COUNTY)
LATITUDE:
:
1
LONGITUDE:
*INFORMATION FOUND IN A SURVEY DATED MARCH 24, 2016.
KENNETH & JEANETTE FORBES
2008 TURNBERRY ROAD
FORT COLLINS, CO 80524
CENTURY LINK
CUSTOMER SERVICE
(877) 395-9493
UNKNOWN
FORT COLLINS LIGHT & POWER
CUSTOMER SERVICE
(970) 221-6700
TBD
SHEET: DESCRIPTION: REV
G TURNBERRY
KES NMC
ZONING
ZONING
REVIEW
B 07-08-16
C 12-15-16 ZONING
D 12-22-16 ZONING
E 02-17-17 ZONING
F 02-24-17 ZONING
G 03-03-17 ZONING
PARCEL NUMBER: 8832005002
GROUND ELEVATION: 5052'
ATLAS ONE, LLC.
4450 ARAPAHOE AVE, SUITE 100
BOULDER, CO 80303
CALEB CROSSLAND
(303)448-8896
LEGAL DESCRIPTION: LOT 2, FORBES MINOR SUB, FTC
(NAD '83) *
(NAD '83) *
(NAVD '88) *
AREA OF CONSTRUCTION: 64)7 /($6($5($
2. INTERNATIONAL CODE COUNCIL
SITE NAME: TURNBERRY
UTILITY PLANS