HomeMy WebLinkAboutNEWTON SINGLE-FAMILY DETACHED - BASIC DEVELOPMENT REVIEW - BDR180019 - SUBMITTAL DOCUMENTS - ROUND 1 - RESPONSE TO STAFF REVIEW COMMENTSPage 1 of 3
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/developmentreview
August 31, 2017
Ken Merritt
JR Engineering, LLC
2900 S.
College Ave,
Ste 3D Fort
Collins, CO
80525
RE: Newton Subdivision, BDR170011, Round Number 1 – RESPONSES ARE IN RED
BELOW.
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions
about any comments, you may contact the individual commenter or direct your
questions through the Project Planner, Kai Kleer, at
970-416-4284 or kkleer@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
Comment Number: 2 Comment Originated:
08/24/2017
08/24/2017: A development agreement will be required to bind the
property as notice for obligations that will be further deferred until the
second BDR and/or building permit. In the development agreement,
the local street obligation for Vine Drive will be required for the Vine
Drive frontage on Lot 1 and the 20 feet of frontage east of Lot 1, and
will be required prior to a building permit for Lot 1. Should it be
demonstrated with a future BDR for Lot 1 that the 20 feet east of Lot
1 is truly developable, then this requirement may then be amended
through an amended development agreement (or repeal and
replacement with a new development agreement at that time.)
RESPONSE: Agreed.
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 1 Comment Originated:
06/30/2017
06/30/2017: 06/09/2017: the project owes an additional $100
more for the BDR TDRF. So between the annexation and the
project $150 is owed.
Page 2 of 3
RESPONSE: Agreed and have included fees.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: General
Comment Number: 1 Comment Originated:
08/16/2017
08/16/2017: No comments on the subdivision. Additional review and
comments will apply at the time the second BDR is submitted.
Department: Light And Power
Contact: Janet McTague, 970-224-6154, jmctague@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/23/2017
08/23/2017:
Light and Power currently has existing facilities in Vine Drive at Lyons and Lancer
Drives. The applicant may be required to provide easements to reach the property
from one of these locations.
RESPONSE: Agreed.
Comment Number: 2 Comment Originated: 08/23/2017
08/23/2017: We will need to coordinate a transformer location that is accessible to
a line truck.
RESPONSE: Agreed.
Comment Number: 3 Comment Originated: 08/23/2017
08/23/2017: Normal capacity fees will apply. In addition, the applicant may be
responsible for the extension of primary lines to reach the site.
RESPONSE: Agreed.
Department: PFA
Contact: Cal Sheesley, 970-416-2599, csheesley@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 08/23/2017
08/23/2017: PFA has no comment for the BDR of the Newton Subdivision;
however, comments provided in June, 2017 for Newton subdivision PDP170019 will
be observed and enforced at time of property development.
RESPONSE: Agreed.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 08/21/2017
08/21/2017: Repeat comments from PDP: The site disturbs more than 10,000 sq.
ft., therefore Erosion and Sediment Control Materials need to be submitted for FDP.
The erosion control requirements are in the Stormwater Design Criteria under the
Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control
Page 3 of 3
Materials Submitted do not meet requirements. Please submit; an Erosion Control
Plan, an Erosion Control Report, and an Escrow / Security Calculation. Also, based
upon the area of disturbance State permits for stormwater will be required since the
site is over an acre. If you need clarification concerning the erosion control section,
or if there are any questions please contact Jesse Schlam 970-218-2932 or email
@ jschlam@fcgov.com
RESPONSE: Agreed and an erosion control plan, report, and an estimate of $2,500 for
erosion control items are included in this submittal. New disturbance limits are under
one acre and estimated at 0.78 acres for this development.
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 08/25/2017
08/25/2017: A detailed lot grading plan can be done at time of BDR.
RESPONSE: Agreed and provided with this submittal.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Plat
Comment Number: 1 Comment Originated: 08/22/2017
08/22/2017: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections were
not made. Please provide any responses on redlined sheets and/or in response
letter.
RESPONSE: Agreed and plat has been filed and recorded.
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/25/2017
08/25/2017: An Utility Plan can be done at time of BDR.
RESPONSE: Agreed and a plan of utility services is included in this submittal.
Department: Zoning
Contact: Ryan Boehle, 970-416-2401, rboehle@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/22/2017
08/22/2017: The property would be considered U-E. Setbacks for a single family
dwelling in the UE shall be at a minimum 30ft. for the front, 25ft. for the rear, and
20ft. for the side.
RESPONSE: Agreed.