Loading...
HomeMy WebLinkAboutELITE INFUSED (5724 S. COLLEGE AVE.) - BASIC DEVELOPMENT REVIEW - BDR180013 - SUBMITTAL DOCUMENTS - ROUND 1 -Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com Nicole Zdanowski November 16, 2017 Cannabis Processing Company PO Box 1013 Laporte, CO 80525 Re: 5724 S College Ave - Retail Marijuana Cultivation Facility Description of project: This is a proposal to establish a Retail Marijuana Cultivation Facility at 5724 S College Ave (parcel # 9612206028). The site plan indicates no changes to the existing one-story brick building or warehouse. However, improvements include a 50-foot firetruck turn around, handicap parking, landscaping and a garbage removal platform with fence. The site is located in the Service Commercial (CS), zone district and is subject to Basic Development Review. Please see the following summary of comments regarding the project request referenced above. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you have any questions regarding these comments or the next steps in the review process, you may contact the individual commenter or direct your questions through the Project Planner, Kai Kleer, at 970-416-4284 or kkleer@fcgov.com. Comment Summary: Contact: Marcus Glasgow, 970-416-2338, mglasgow@fcgov.com Department: Zoning 1. Must provide bicycle parking as part of LUC 3.2.2(C)(4)(b) LUC 3.5.1 (I) (6) All rooftop mechanical equipment shall be screened from public view from both above and below by integrating it into building and roof design. 2. LUC 3.2.5 Trash and recycling enclosures shall be designed with walk-in access separate from the main-service gates. Please provide details on how the trash will be handled and include on site plan with elevations. 3. Any new or replaced light sources shall be concealed and fully shielded and shall feature sharp cut-off capability so as to minimize up-light, spill-light, glare and unnecessary diffusion on adjacent property. 4. Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com Department: Water-Wastewater Engineering This property is located within the Fort Collins-Loveland Water District for water service and the South Fort Collins Sanitation District for sewer service. Please contact them for 1. Page 1 of 8 development requirements. Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Department: Technical Services As of January 1, 2015 all development plans are required to be on the NAVD88 vertical datum. Please make your consultants aware of this, prior to any surveying and/or design work. 1. If submitting a replat for this property/project, addresses are not acceptable in the Subdivision Plat title/name. 2. Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com Department: Stormwater Engineering The design of this site must conform to the drainage basin design of the Fossil Creek Master Drainage Plan as well the Fort Collins Stormwater Criteria Manual. 1. The application indicated a fairly significant increase in impervious area. However, since the site looks to be almost completely covered with pavement or building, I’m not clear on the intent here. If there is an increase in imperviousness greater than 1,000 square feet a drainage report, erosion control report and construction plans are required and they must be prepared by a Professional Engineer registered in the State of Colorado. The drainage report must address the four-step process for selecting structural BMPs. If the increase in impervious area is greater than 350 square feet and less than 1,000 square feet, a drainage letter along with a grading and erosion control plan should be sufficient to document the existing and proposed drainage patterns. A grading plan is required if the increase in imperviousness is less than 350 square feet. 2. If there is an increase in impervious area greater than 1000 square feet, onsite detention is required for the runoff volume difference between the 100-year developed flow rate and the 2-year historic release rate. In the Fossil Creek basin the two year historic release rate is 0.2 cfs/acre. 3. It is important to document the existing impervious area since drainage requirements and fees are based on new impervious area. An exhibit showing the existing and proposed impervious areas with a table summarizing the areas is required prior to the time fees are calculated for each building permit. 4. If there is an increase in impervious area that is 1000 square feet or greater or if there are portions of the site that are planned to be demolished and replaced that amount of 1000 square feet or greater, storm water quality requirements apply: Fifty percent of the site runoff is required to be treated using the standard water quality treatment as described in the Fort Collins Stormwater Manual, Volume 3-Best Management Practices (BMPs). (http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guideli nes-regulations/stormwater-criteria) Extended detention is the usual method selected for water quality treatment; however the use of any of the BMPs is encouraged. 5. If there is an increase in impervious area that is 1000 square feet or greater or if there are portions of the site that are planned to be demolished and replaced that amount of 1000 square feet or greater, LID requirements apply: LID requirements apply: Low Impact Development (LID) requirements are required on all new or redeveloping property which includes sites required to be brought into compliance with the Land Use Code. These require a higher degree of water quality treatment with one of the two following options: a. 50% of the newly added or modified impervious area must be treated by LID techniques and 25% of new paved areas must be pervious. b. 75% of all newly added or modified impervious area must be treated by LID techniques. 6. Page 2 of 8 The erosion control report requirements are in Section 1.3.3, Volume 3, Chapter 7 of the Fort Collins Stormwater Criteria Manual. If you need clarification concerning this section, please contact the Erosion Control Inspector, Jesse Schlam at 224-6015 or jschlam@fcgov.com. 7. There will be a final site inspection of the final grading and stormwater facilities when the project is complete. Standard operating procedures (SOPs) for on-going maintenance of all onsite drainage facilities will be included as part of the Development Agreement. More information and links can be found at: http://www.fcgov.com/utilities/what-we-do/stormwater/stormwater-quality/low-impact-develo pment 8. The 2017 city wide Stormwater development fee (PIF) is $8,217/acre for new impervious area over 350 square feet and there is a $1,045/acre of site review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found at: http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-developme nt-fees or contact our Utility Fee and Rate Specialists at (970) 416-4252 for questions on fees. There is also an erosion control escrow required before the Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area, cost of the measures, or a minimum amount in accordance with the Fort Collins Stormwater Manual. 9. Contact: Cal Sheesley, 970-416-2599, csheesley@poudre-fire.org Department: Fire Authority 1: 2015 IFC CODE ADOPTION The Poudre Fire Authority and the City of Fort Collins are in the process of adopting the 2015 International Fire Code. Building plan reviews shall be subject to the adopted version of the fire code in place at the time of plan review submittal and permit application. 1. 2: FIRE LANES Fire access is required to within 150' of all exterior portions of any building, or facility as measured by an approved route around the perimeter. Any private road or private drive (the parking lot) serving as a fire lane shall be dedicated as an Emergency Access Easement (EAE) and be designed to standard fire lane specifications. While the building to the west meets access standards, the building to the east (warehouse) is considered out of fire access. An Emergency Access Easement will be required on the property or the building will require a fire sprinkler system. To meet access requirements with an EAE, it shall be dedicated within the parking lot, have adequate signage and include an appropriate turnaround. Reference to a "50' fire lane turnaround" was made but no design plan provided. Specific code language and fire lane specifications follows: FIRE LANE SPECIFICATIONS A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: > Shall be designated on the plat as an Emergency Access Easement. > Maintain the required 20 foot minimum unobstructed width & 14 foot minimum overhead clearance. > Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons. > Dead-end fire access roads in excess of 150 feet in length shall be provided with an approved area for turning around fire apparatus. > The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans. > Be visible by painting and/or signage, and maintained unobstructed at all times. Sign 2. Page 3 of 8 locations or red curbing should be labeled and detailed on final plans. > IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. 3: PREMISE IDENTIFICATION & WAYFINDING Addresses shall be posted on each structure and where otherwise needed to aid in wayfinding. Code language provided below. > IFC 505.1: New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible, visible from the street or road fronting the property, and posted with a minimum of six-inch numerals on a contrasting background. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. 3. 4: WATER SUPPLY Hydrant spacing and flow must meet minimum requirements based on type of occupancy. A hydrant is required within 300' of any Commercial Building as measured along an approved path of vehicle travel. There appears to be a hydrant at the corner of Smokey and the Frontage Road. The rear building is out of access by nearly 500' and an additional hydrant will be required. Specific code language follows: > IFC 507.5 and PFA Policy: COMMERCIAL REQUIREMENTS: Hydrants to provide 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers thereafter 4. 5: GROW FACILITIES Grow facilities for marijuana must meet minimum fire hazard and exit requirements. The applicant is responsible for obtaining and completing a "Marijuana Check Sheet". The check sheet is available from the the City of Fort Collins at such time a business permit is obtained. The completed check sheet is to be returned to the Poudre Fire Authority as directed. This document will be reviewed with the applicant at time of final inspection. For more information, contact PFA Fire Inspector/Plans Examiner, Kerry Koppes at 416-4241. 5. 6: HAZARDOUS MATERIALS - GENERAL STANDARD Based upon the extent of the cultivation process and chemicals used or stored on site, a Hazardous Materials Impact Analysis may be requested at time of building permit. For questions regarding Haz Mat, contact Assistant Fire Marshal Ron Gonzales at 970.416.2864. > FCLU 3.4.5(B): If any use on the development site may entail the use or storage of hazardous materials (including hazardous wastes) on-site, the project shall be designed to comply with all safety, fire and building codes for the use and storage of the hazardous materials involved. Adequate precautions shall be taken to protect against negative off-site impacts of a hazardous materials release, using the best available technology. 6. Contact: Spencer Branson, 970-224-6189, sbranson@fcgov.com Department: Environmental Planning City of Fort Collins Land Use Code [Section 3.2.1 (E)(3)], requires that to the extent reasonably feasible, all plans be designed to incorporate water conservation materials and 1. Page 4 of 8 techniques. This includes use of low-water-use plants and grasses in landscaping or re-landscaping and reducing bluegrass lawns as much as possible. Native plants and wildlife-friendly (ex: pollinators, butterflies, songbirds) landscaping and maintenance are also encouraged. Please refer to the Fort Collins Native Plants document available online and published by the City of Fort Collins Natural Areas Department for guidance on native plants is: http://www.fcgov.com/naturalareas/pdf/nativeplants2013.pdf. In regard to lighting, especially LED light fixtures, cooler color temperatures are harsher at night and cause more disruption to circadian (biological) rhythms for both humans and wildlife. Please consider a warmer color temperature (warm white, 3000K or less) for any LED light fixtures. Please also consider fixtures with dimming capabilities so that light levels can be adjusted as needed. Site light sources shall be fully shielded and down-directional to minimize up-light, light spillage and glare [see LUC 3.2.4(D)(3)]. For further information regarding health effects please see: http://darksky.org/ama-report-affirms-human-health-impacts-from-leds/ 2. Our city has an established identity as a forward-thinking community that cares about the quality of life it offers its citizens now and generations from now. Thus, the City of Fort Collins has many sustainability programs and goals that may benefit this project. Of particular interest may be: 1) ClimateWise program: fcgov.com/climatewise/ 2) Zero Waste Plan and the Waste Reduction and Recycling Assistance Program (WRAP): fcgov.com/recycling/pdf/_20120404_WRAP_ProgramOverview.pdf, contact Caroline Mitchell at 970-221-6288 or cmtichell@fcgov.com 3) Green Building Program: fcgov.com/enviro/green-building.php, contact Tony Raeker at 970-416-4238 or traeker@fcgov.com 4) Solar Energy: www.fcgov.com/solar 5) Integrated Design Assistance Program: http://fcgov.com/idap, contact Gary Schroeder at 970-224-6003 or gschroeder@fcgov.com 6) Nature in the City Program: http://www.fcgov.com/natureinthecity/, contact Justin Scharton at 970-221-6213 or jscharton@fcgov.com 7) Urban Agriculture: http://www.fcgov.com/urbanagriculture, contact Spencer Branson at 970-224-6086 or sbranson@fcgov.com. In addition, the Northern Colorado Food Cluster is sponsored and supported by the City of Fort Collins. The executive Director, Brad Christensen, can be reached at director@nocofoodcluster.org. Please consider City sustainability goals and ways this development can engage with these efforts. Let me know if I can help connect you to these programs. 3. Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com Department: Engineering Development Review Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit. Please contact Kyle Lambrecht at 221-6566 if you have any questions. 1. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see: http://www.fcgov.com/engineering/dev-review.php 2. All Development is responsible for the local street frontage improvements adjacent to the site, but until the frontage road goes away the parkway and sidewalk along this property cannot be built. Therefore a payment in lieu for the frontage construction will be collected for this property at time of building permit. 3. This site is adjacent to CDOT roadway and all access to the site is governed by an access control plan. The access control plan will need to be followed and implemented with any project. Access off of the frontage road is allowed for the short term. The long term plan, per the access control plan is that the frontage road will go away. Plans will be routed to 4. Page 5 of 8 CDOT for review and approval and the applicant may need to obtain access permits from CDOT. The existing parking is also subject to CDOT review, as it is in CDOT right of way. It is very likely CDOT and/ or the City will require this to be modified. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 5. All public sidewalk, driveways and ramps, existing or proposed, adjacent or within the site, need to meet ADA standards. If they currently do not, they will need to be reconstructed so that they do meet current ADA standards as a part of this project. 6. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). They are available online at: http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm 7. This project is responsible for dedicating any right-of-way and easements that are necessary or required by the City for this project. Most easements to be dedicated need to be public easements dedicated to the City. This shall include the standard utility easements that are to be provided behind the right-of-way (15 foot along an arterial, 8 foot along an alley, and 9 foot along all other street classifications). Information on the dedication process can be found at: http://www.fcgov.com/engineering/devrev.php 8. Utility plans will be required and a Development Agreement will be recorded once the project is finalized. 9. As of January 1, 2015 all development plans are required to be on the NAVD88 vertical datum. Please make your consultants aware of this, prior to any surveying and/or design work. 10. A Development Construction Permit (DCP) will need to be obtained prior to starting any work on the site. 11. A utility coordination meeting on this site is suggested. Utility coordination meetings, if requested, are typically scheduled after the preliminary submittal of the project, but can be scheduled prior to submittal upon request. Please provide a site plan with a preliminary utility layout for routing with the meeting notice. If you are interested in having a utility coordination meeting, please contact the development review engineer for scheduling. 12. LCUASS parking setbacks (Figure 19-6) apply and will need to be followed depending on parking design. 13. All fences, barriers, posts or other encroachments within the public right-of-way are only permitted upon approval of an encroachment permit. Applications for encroachment permits shall be made to the Engineering Department for review and approval prior to installation. Encroachment items shall not be shown on the site plan as they may not be approved, need to be modified or moved, or if the permit is revoked then the site/ landscape plan is in non-compliance. 14. The development/site cannot use the right-of-way for any Low Impact Development to treat the site’s storm runoff. We can look at the use of some LID methods to treat street flows – the design standards for these are still in development. 15. Bike parking required for the project cannot be placed within the right-of-way and if placed just behind the right-of-way need to be placed so that when bikes are parked they do not extend into the right-of-way. 16. In regards to construction of this site, the public right-of-way shall not be used for staging or storage of materials or equipment associated with the Development, nor shall it be used for required to be provided to the City as a part of the Development Construction Permit application. Contact: Luke Unruh, 9704162724, lunruh@fcgov.com Department: Electric Engineering The only available option for three phase power would be to cut in a three phase vault on the west side of the proposed development along the frontage road. 1. Electric Capacity Fee, Building Site charges, and any necessary system modification charges will apply at owners expense. Please see the Electric Estimating Calculator and Electric Construction Policies, Practices & Procedures at the following link: http://www.fcgov.com/utilities/business/builders-and-developers 2. Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com Planning Services The project will be subject to Basic Development Review and require a site and landscape plan. 1. Adding the proposed use will require bringing the site up to current development standards found in Article 3 of the Land Use Code (LUC). 2. If parking is relocated to the middle area between the two buildings, Land Use Code requirements for a two-way drive aisle specify a 24-foot width. 3. A trash enclosure will need to be constructed on a concrete pad, built of sturdy materials (not wood), with separate walk-in access. 4. 5. The site will require one handicap parking space as outline under 3.2.2(K)(5)(d). Because this is a change of use in an existing building it will be exempt from the minimum parking requirements as defined under Section 3.2.2(K)(2)(a). 6. 7. Parking stalls must meet the the dimensions outlined under Table A of Section 3.2.2(L). In accordance with Section 3.2.1(E)(4) the site will require parking lot perimeter landscaping of one tree per twenty-five feet along a public street and one per 40 feet along a side lot line 8. In accordance with 3.2.1(E)(5) the site will require six percent landscaping of the interior space of all parking lots with less than 100 spaces. 9. In accordance with 3.2.2(C)(5), walkways shall link street sidewalks with building entries, be raised or enhanced with a paved surface not less than 6 ft in width. 10. The parking lot requires minimum average setback of 15ft from arterial street and a minimum average of 5ft along lot lines 11. If unable to meet any of the site requirements as outlined by the Land Use Code a modification to standards may be requested in accordance with modification review procedures, Section 2.8.2. 12. The project will require a minimum of four bicycle parking spaces as outlined under 3.2.2(C) (4) 13. The proposed development is subject to a Basic Development Review, please contact the Zoning Department regarding your formal submittal. 14. Page 7 of 8 Pre-Submittal Meetings for Building Permits Pre-Submittal meetings are offered to assist the designer/builder by assuring, early on in the design, that new commercial or multi-family projects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to mid-design stage for this meeting to be effective and is typically scheduled after the Current Planning conceptual review meeting. Applicants of new commercial or multi-family projects should call 970-416-2748 or email scarter@fcgov.com to schedule a pre-submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage, and type of construction being proposed. Construction shall comply with the following adopted codes as amended: 2015 International Building Code (IBC) with local amendments 2015 International Residential Code (IRC) with local amendments 2015 International Energy Conservation Code (IECC) with local amendments 2015 International Mechanical Code (IMC) with local amendments 2015 International Fuel Gas Code (IFGC) with local amendments 2015 International Plumbing Code (IPC) as amended by the State of Colorado 2017 National Electrical Code (NEC) as amended by the State of Colorado Current codes and amendments are effective as of July 17, 2017. Copies of the code amendments can be obtained at www.fcgov.com/building/codes.php or at the Building Services office. Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009. Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost Depth: 30 inches. Wind Load: 129vult or 100mph 3 Second Gust Exposure B. Seismic Design: Category B. Climate Zone: Zone 5. Energy Code Use: 1. Single Family; Duplex; Townhomes: 2015 IRC Chapter 11 or 2015 IECC Residential Provisions 2. Multi-family and Condominiums 3 stories max: 2015 IECC Chapter 4 Residential Provisions. 3. Commercial and Multi-family 4 stories and taller: 2015 IECC Chapter 4 Commercial Provisions. City of Fort Collins Building Services Plan Review 970-416-2748 scarter@fcgov.com Page 8 of 8 parking by any contractors, subcontractors, or other personnel working for or hired by the Developer to construct the Development. The Developer will need to find a location(s) on private property to accommodate any necessary staging and/or parking needs associated with the completion of the Development. Information on the location(s) of these areas will be 17. Page 6 of 8