July 13, 2016
Jason Messaros
BHA DESIGN INC
1603 OAKRIDGE DR
Fort Collins, CO 80528
RE: 221 E Mountain Avenue, BDR160011, Round Number 2
Comment Summary:
Department: Engineering Development Review
Contact: Katie Sexton, 970-221-6501, ksexton@fcgov.com
Topic: General
07/11/16: Pavers are still labeled on the site plan, please remove. 05/26/2016: As
indicated by Tom Knostman's comment, porous pavers within the ROW/parking
areas are not supported.
Comment Number: 2 Comment Originated: 05/24/2016
07/11/16: The project cannot show, nor will we approve plans showing, the
installation of LID improvements within the ROW unless an encroachment permit is
approved for that use. City policy prohibits the use of City ROW to accommodate
the drainage use and treatment for private property and it is unlikely that an
encroachment permit will be issued. 05/26/2016: Any rain gardens within the
right-of-way cannot be used to treat the development/ site storm runoff. Rain
gardens in the ROW are allowed to treat street flows. The ROW cannot be utilized
to accommodate LID requirements for the development site.
Comment Number: 3 Comment Originated: 05/24/2016
07/11/16: Public parking should not be shown in the parking requirements table on
the site plan because it cannot be counted toward required parking. 05/24/2016:
On-street public parking cannot count toward fulfilling parking requirements.
Comment Number: 5 Comment Originated: 05/24/2016
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Seth Lorson, at
970-224-6189 or slorson@fcgov.com.
Page 1 of 6
06/02/2016:
Define how the two Kentucky Coffeetees along Mathews will be addressed. They
have average shape and form. They could be used on the project or moved off site
to another City property. Forestry generally thinks that moving them to another City
property might be preferred and planting two new Espresso coffeetrees with a better
shape. Please define how the project wants to address these two coffeetrtees.
Comment Number: 1 Comment Originated: 06/02/2016
06/02/2016:
If it has not already been noted on the plans specify the type of tree grates to be
installed.
Comment Number: 2 Comment Originated: 06/02/2016
06/02/2016:
Is it possible to make the 6X4 foot tree grates 5 foot wide at the smallest dimension.
This facilitates possible future tree replaced.
Comment Number: 3 Comment Originated: 06/02/2016
06/02/2016:
Will there be any significant grade changes within the drip line of any exiting trees to
retain? If so contact the City Forester for an onsite meeting to evaluate.
Comment Number: 4 Comment Originated: 06/02/2016
06/02/2016:
Typically to provide trees in grates that have a high enough canopy that works better
with pedestrian movement and clearance 3 inch caliper trees are specified.
Comment Number: 5 Comment Originated: 06/02/2016
Department: Historic Preservation
Contact: Maren Bzdek, 970-221-6206, mbzdek@fcgov.com
Topic: General
As the property is adjacent to the Old Town District, Land Use Code Section 3.4.7,
Historic and Cultural Resources, will apply to the review of this project.
Comment Number: 1 Comment Originated: 05/24/2016
LUC 3.4.7(F)(6) states that the decision maker shall receive and consider a written
recommendation from the Landmark Preservation Commission. Please contact
Historic Preservation staff at mbzdek@fcgov.com or 221-6206 to schedule the
review before the Landmark Preservation Commission at your earliest convenience.
Comment Number: 2 Comment Originated: 05/24/2016
05/24/2016: At this time, staff has identified no major areas of concern based on the
submitted plans and their potential compliance with LUC 3.4.7.
Comment Number: 4 Comment Originated: 05/24/2016
05/24/2016: LUC 3.4.7 (B), General Standard, requires that "the development plan
and building design shall protect and enhance the historical and architectural value
of any historical property" on the site or on adjacent property. Staff will recommend
that the area of adjacency for this project should include the Old Town District and
the individually eligible buildings south of the parcel along Mathews, which include:
133 Mathews, 137 Mathews, and 143 Mathews.
Comment Number: 3 Comment Originated: 05/24/2016
Department: Internal Services
Contact: Sarah Carter, 970-416-2748, scarter@fcgov.com
Topic: Building Insp Plan Review
Page 2 of 6
05/26/2016: Please schedule a pre-submittal meeting for this project. Pre-Submittal
meetings assist the designer/builder by assuring, early on in the design, that the
new projects are on track to complying with all of the adopted City codes and
Standards listed below. The proposed project should be in the early to mid-design
stage for this meeting to be effective. Applicants of new projects should email
scarter@fcgov.com to schedule a pre-submittal meeting. Applicants should be
prepared to present site plans, floor plans, and elevations and be able to discuss
code issues of occupancy, square footage and type of construction being proposed.
Comment Number: 1 Comment Originated: 05/26/2016
Department: Outside Agencies
Contact: Seth Lorson, 970-224-6189, slorson@fcgov.com
Topic: General
05/12/2016: Xcel Energy
Max gas pressure is 14" WC.
Comment Number: 1 Comment Originated: 05/12/2016
07/12/2016: Comcast needs a 6' utility easement outside of alley ROW. Comcast
will need a right of entry for this building.
05/26/2016: COMCAST
Comcast has facility in the alley.
- Don Kapperman
Comment Number: 2 Comment Originated: 05/26/2016
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
07/09/2016: PRIOR COMMENTS RESOLVED
The Alternative Means of Compliance letter provided to the fire marshal has been
reviewed and approved. All prior PFA comments have been resolved.
Comment Number: 4 Comment Originated: 07/09/2016
Department: Planning Services
Contact: Seth Lorson, 970-224-6189, slorson@fcgov.com
Topic: Building Elevations
07/12/2016: I'm still measuring 58'.
05/24/2016: Maximum height in the Old City Center subdistrict is 56'. Your proposal
appears to be at 58'.
Comment Number: 5 Comment Originated: 05/24/2016
07/12/2016: Looking forward to reviewing the forthcoming analysis.
05/24/2016: Per Section 3.8.17, maximum rooftop mechanical that can exceed the
building height is 5% of the roof. It appears that the proposal has 2,314 s.f of
mechanical which exceeds the 5% maximum.
Comment Number: 6 Comment Originated: 05/24/2016
07/12/2016: The project narrative notes that the windows will be "bronze or gray
tinted". The code does not allow overly reflective widows or material. So, a light gray
may work but probably not bronze.
Comment Number: 7 Comment Originated: 07/12/2016
Topic: General
Page 3 of 6
07/12/2016: The modification request is accepted. Please note on the details on the
site plan.
05/23/2016: PARKING
Per the project narrative, the breakdown of uses and minimum parking requirements
follow:
Retail (15,738 s.f.): 32 spaces
Office (44,201 s.f.): 44 spaces
60 spaces count toward the minimum requirement of 76 spaces: 56 spaces leased
in the garage and the 4 on-site. Off-site (i.e. on-street diagonal) does not count
toward the minimum requirement.
Options to resolve this issue are:
1. Alternative Compliance which offers many different ways to meet the
requirement, or
2. Modification of Standard (variance) request to provide less retail parking than is
required.
Comment Number: 1 Comment Originated: 05/23/2016
07/12/2016: How do you recommend bike parking is provided on the sidewalk?
Request for an encroachment permit? Racks placed along the building? Request for
FC Bikes to install racks?
05/23/2016: BIKE PARKING
Bike parking must be provided on-site or request alternative compliance or a
modification of standard. The bike parking in the ROW could off-set the demand, but
it has to be permitted either as an encroachment into the ROW or for FCBikes to
install. Nevertheless, we need to formally process the request.
Also, the enclosed bike parking needs to be read "5 min" instead of "4 min".
Please consider the needs of employees when planning for on-site and enclosed
bike parking. It seems like they will need much more than 5 spaces. The spaces
designated for quasi-public use and retail should be the only ones considered for the
sidewalk. Perhaps additional bike parking can be placed in the small alley space on
the west side of the building?
Comment Number: 3 Comment Originated: 05/23/2016
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
07/12/2016: The site disturbs more than 10,000 sq. ft., therefore Erosion and
Sediment Control Materials need to be submitted. The erosion control requirements
are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter
7 Section 1.3.3. Current Erosion Control Materials Submitted do not meet
requirements. Please submit; Erosion Control Plan (based upon redlines), Erosion
Control Report (the submitted report doesn't meet City Criteria), and an Escrow /
Security Calculation (Will need to be recalculated based upon redlines). If you need
clarification concerning the erosion control section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Comment Number: 2 Comment Originated: 07/12/2016
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Page 4 of 6
07/12/2016: After discussion with Aspen Engineering, the LID treatment will be
designed on the lower roof section.
05/26/2016: The LID treatment for the site can not be in City ROW to treat storm
water on-site.
The City suggests a meeting to discuss options for this development to meet the
LID requirements.
Comment Number: 1 Comment Originated: 05/26/2016
07/12/2016: Please provide the details for the roof LID treatment system and design
layout for the storm drains to the public system.
Comment Number: 3 Comment Originated: 07/12/2016
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
07/12/2016: This has not been completely corrected. See previous comment.
05/23/2016: Please provide the following information for the Benchmark Statement
in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM.
SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE
FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88
- X.XX'.
Comment Number: 6 Comment Originated: 05/23/2016
07/12/2016: Some of the sheet titles in the sheet index do not match the sheet titles
on the noted sheets. See redlines.
Comment Number: 9 Comment Originated: 07/12/2016
07/13/2016: Please revise the sub-title as marked. See redlines.
Comment Number: 10 Comment Originated: 07/13/2016
Topic: Lighting Plan
07/12/2016: This has not been corrected.
05/23/2016: Please revise the title & sub-title as marked. See redlines.
Comment Number: 4 Comment Originated: 05/23/2016
Topic: Site Plan
07/12/2016: This has not been completely corrected.
05/23/2016: Please revise the legal description as marked. See redlines.
Comment Number: 1 Comment Originated: 05/23/2016
Department: Traffic Operation
Page 5 of 6
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
07/12/2016: Enclosed on site bike parking looks great. Please consider working
with city to add additional racks along Mountain for patrons.
05/27/2016: The bike parking is in the ROW, and while those racks will be very
useful for patrons of businesses, available bike parking on your property for
employees that is not located on the front sidewalk is important.
Comment Number: 2 Comment Originated: 05/27/2016
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
05/24/2016: Irrigation plans are required no later than at the time of building permit.
The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of
the Land Use Code. Direct questions concerning irrigation requirements to Eric
Olson, at 221-6704 or eolson@fcgov.com
Comment Number: 1 Comment Originated: 05/24/2016
Page 6 of 6