Loading...
HomeMy WebLinkAboutSTREETS PARK - BASIC DEVELOPMENT REVIEW - BDR180010 - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT SUBMITTAL AND RESUBMITTALMatthew Day, Senior Landscape Architect 1 City of Fort Collins Park Planning and Development 11/2/2016 Streets Facility Park Meeting Purpose 2 • Check-in with Neighborhood Advisory Committee • Share what we heard at the Ice Cream Social • Identify what will make a successful first phase project • Discuss next steps and schedule • Listen to feedback Preliminary Outreach 3 What we heard at the Ice Cream Social 4 Active and passive use; is it the right balance? 83% yes Is playground and access the right phasing approach? 88% yes What playground character do you prefer? 52% nature play/informal, 31% traditional, 17% both What are the other desired features and/or issues? swings, climbing elements, bathrooms, water features and safe access from the neighborhoods. What we have learned about phasing 5 Phasing a park is not easy, certain elements need to be considered to be successful. Streets Facility Park Analysis: • Safe pedestrian access Temporary asphalt connection, parking, and signalized crossing Study intersection at Vine/Lemay Alta Vista needs sidewalks to park • Shade trees with irrigation • Shade shelter / gathering space • Play elements • Surfacing to accommodate pedestrian traffic • Adequate site drainage • Safety / site lighting • Continuity in character/identity/materials • Restroom facilities Streets Park Concept Plan 6 Park Character 7 Large scale custom sugar beet play structure rough, tough / coarse character artist and playground design integration interpretive elements Great Western Sugar Beet Factory Architectural Character shelter, future restroom, and site furnishings 8 Next steps • Site Surveying • Engineering of water quality features and site drainage • Artist coordination and beet play feature custom design • Site design of core area playground elements, shelter, future restroom, and landscape • Ongoing funding opportunities; grants and fundraising 9 Schedule Park Design – ongoing Artist coordination and play feature design – ongoing Construction bid package - winter 2016/17 Phase One Park Construction - summer 2017 Site grading and drainage playground and art feature sidewalks and parking core area shade trees shelter/gathering space core area lights temporary restroom