HomeMy WebLinkAboutGraphics - 04/09/20181 Matthew Day, Senior Landscape Architect
City of Fort Collins Park Planning and Development
11/2/2016
Streets Facility Park
Meeting Purpose
2
•Check-in with Neighborhood Advisory Committee
•Share what we heard at the Ice Cream Social
•Identify what will make a successful first phase project
•Discuss next steps and schedule
•Listen to feedback
Preliminary Outreach
3
What we heard at the Ice Cream Social
4
Active and passive use; is it the right balance?
83% yes
Is playground and access the right phasing approach?
88% yes
What playground character do you prefer?
52% nature play/informal, 31% traditional, 17% both
What are the other desired features and/or issues?
swings, climbing elements, bathrooms, water features and safe
access from the neighborhoods.
What we have learned about phasing
5
Phasing a park is not easy, certain elements need to be considered to be successful.
Streets Facility Park Analysis:
•Safe pedestrian access
Temporary asphalt connection, parking, and signalized crossing
Study intersection at Vine/Lemay
Alta Vista needs sidewalks to park
•Shade trees with irrigation
•Shade shelter / gathering space
•Play elements
•Surfacing to accommodate pedestrian traffic
•Adequate site drainage
•Safety / site lighting
•Continuity in character/identity/materials
•Restroom facilities
Streets Park Concept Plan
6
Park Character
7
Large scale custom sugar beet play structure
rough, tough / coarse character
artist and playground design integration
interpretive elements
Great Western Sugar Beet Factory Architectural Character
shelter, future restroom, and site furnishings
8
Next steps
•Site Surveying
•Engineering of water quality features and site
drainage
•Artist coordination and beet play feature custom
design
•Site design of core area
playground elements, shelter, future
restroom, and landscape
•Ongoing funding opportunities; grants and
fundraising
9
Schedule
Park Design – ongoing
Artist coordination and play feature design – ongoing
Construction bid package - winter 2016/17
Phase One Park Construction - summer 2017
Site grading and drainage
playground and art feature
sidewalks and parking
core area shade trees
shelter/gathering space
core area lights
temporary restroom