RE: FTC Unify SC1 - Wireless Telecommunication Equipment, PDP170022, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Kai Kleer, at
970-416-4284 or kkleer@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/03/2017
07/03/2017: Ok, provided that all facilities and items are placed on private property
and are not to be placed within public ROW. This looks to be the case as currently
shown and indicated on the plans.
All proposed elements will be on private property.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/07/2017
07/07/2017: Environmental Planning has no comments at this time.
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/18/2017
07/18/2017: Light and Power has existing electric facilities along the rear alley
adjacent to 185 N College Ave. There is an existing 3-phase 300 kVA transformer
west of the building.
Comment Number: 2 Comment Originated: 07/18/2017
07/18/2017: Will this project need a separate electrical service?
Page 2 of 4
Verizon proposes to pull electric from the building.
Comment Number: 3 Comment Originated: 07/18/2017
07/18/2017: If service is needed then electric capacity fees, development fees,
building site charges and any system modification charges necessary to feed the
site may apply. Please contact me for an estimate of charges and fees if new
electrical service is needed.
Comment Number: 4 Comment Originated: 07/18/2017
07/18/2017: Please contact Tyler Siegmund at Light & Power Engineering if you
have any questions at 970.416.2772. Please reference our policies, construction
practices, development charge processes, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers
Department: PFA
Contact: Cal Sheesley, 970-416-2599, csheesley@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 07/17/2017
07/17/2017: WAYFINDING
To aid in wayfinding, a sign indicating "ANTENNA ACCESS" shall be included on
future plans. This sign shall be located at both of the proposed ladders.
Per the FCC guidelines, Verizon is always required to post identification for the
rooftop equipment. Signage has been noted in the revised drawings at both
ladders.
Department: Planning Services
Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com
Topic: Building Elevations
Comment Number: Comment Originated: 07/06/2017
07/06/2017:
Please indicate the proposed paint-to-match color.
It’s Verizon’s intent to paint the new chimney Glidden Peach Puff (80YR72/159) or the
closest similar color available at the time of installation. As such, the chimney would
match the top level of the building.
Comment Number: Comment Originated: 07/06/2017
07/06/2017:
The Equipment Plan, North Elevation, and Line of Site drawings show two different
antenna locations. The Line of Site drawing shows a 16' east and 15' north
on-center location, the North Elevation shows 16' on-center from the east wall, and
Equipment Plan shows on-center to be 10'x10'. Please indicate correct location on
all documents and provide a measurements indicating location of equipment
setback for all drawings.
Drawings have been revised to reflect the accurate placement of the proposed chimney.
Topic: General
Comment Number: Comment Originated: 07/06/2017
07/06/2017:
Page 3 of 4
Two new ladders are proposed on the west side of the building. Can the access be
taken from the existing ladder?
The ladder to get from the ground level to the 1st floor rooftop is currently installed on the
south side of the building and is technically hovering over the adjacent property. Aside
from the inherent access issue of crossing another parcel to get to the ladder, the ladder
does not meet general safety codes. Therefore, Verizon has proposed to install a new
ladder that meets current safety standards on the west wall of the building that can be
accessed within the same property as the proposed equipment. The ladder to get from
the 1st floor rooftop to the 2nd floor rooftop also does not meet general safety codes. At
the request of the city, Verizon has explored and identified that it is possible for the 1st
floor ladder to be installed further south on the west wall of the building. As such, we
were also able to install the 2nd floor ladder in the same general location as the old 2nd
floor ladder. These changes have been reflected in the revised drawings.
Comment Number: Comment Originated: 07/06/2017
07/06/2017:
The proposed 2'x3' fiber vault is shown in the approximate location of an existing
mailbox. Can the fiber vault be located closer to the existing utility panels?
The fiber vault is actually an underground installation so the placement of the
vault will not affect any above ground items. The original drawings were
misleading in that the existing mailbox was called out as the fiber vault. These
changes have been reflected in the revised drawings.
Topic: Site Plan
Comment Number: Comment Originated: 07/06/2017
07/06/2017:
As discussed in the pre-submittal meeting, the proposed equipment is not located
as far from the edge of the roof as possible and will require a modification of
standard 3.8.13(C)(3). When resubmitting please provide modification request
explaining how your resubmittal will meet the general purpose of the standard in an
equally well or better than way that a plan which meets the standard would.
During a post-staff review phone call, we discussed this item in further detail. It was
determined that our proposed design was misleading due to the notes regarding
the future EME barrier to be determined and as required by the Federal
Communications Commission. I believe this possible barrier and signage that
would not be visible above the parapet walls made the proposed design seem
much larger than we are actually proposing. Verizon is proposing a new chimney
structure that will conceal an antenna inside. The chimney was proposed as the
best way to limit the impact of our facility (concealment), while also keeping in
context with other typical rooftop elements found throughout downtown. Photosims
to depict this chimney have been included in this new submittal. These changes
have been reflected in revised drawings.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/06/2017
07/06/2017: The proposed rooftop additions do not trigger any Stormwater
requirements. If future submittals include site changes that are not shown on these
Page 4 of 4
plans, please contact Dan Mogen in Water Utilities Engineering at (970)224-6192 or
dmogen@fcgov.com to coordinate and determine what requirements, if any, will
apply.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/17/2017
07/17/2017: All plan sheets must be 24"x36".
A 24”X 36” set of drawings have been included for technical services review as well as
(10) 11”X 17” drawings for the other department and review parties.
Comment Number: 2 Comment Originated: 07/17/2017
07/17/2017: A legal description of the property where this equipment is located will
need to be added to sheet T1.
These changes have been reflected in revised drawings.
Comment Number: 3 Comment Originated: 07/17/2017
07/17/2017: Some of the sheet titles in the sheet index do not match the sheet titles
on the noted sheets. See redlines.
These changes have been reflected in revised drawings.
Comment Number: 4 Comment Originated: 07/17/2017
07/17/2017: There are line over text issues. See redlines.
These changes have been reflected in revised drawings.
Comment Number: 5 Comment Originated: 07/17/2017
07/17/2017: There are cut off text issues. See redlines.
These changes have been reflected in revised drawings.
Comment Number: 6 Comment Originated: 07/17/2017
07/17/2017: Please clarify the street referenced on sheet Z-4. See redlines.
These changes have been reflected in revised drawings.
Department: Water-Wastewater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/06/2017
07/06/2017: It is assumed that no changes are proposed for water and sewer.
Please contact Dan Mogen in Water Utilities Engineering at (970)224-6192 or
dmogen@fcgov.com if changes are proposed.
Department: Zoning
Contact: Marcus Glasgow, 970-416-2338, mglasgow@fcgov.com
Page 5 of 4
Topic: General
Comment Number: 1 Comment Originated: 07/17/2017
07/17/2017: Roof- and ground-mounted wireless telecommunication equipment
shall be screened by parapet walls or screen walls in a manner compatible with the
building's design, color and material. All wireless telecommunication facilities and
equipment shall be painted to match as closely as possible the color and texture of
the wall, building or surrounding built environment. Muted colors, earth tones and
subdued colors shall be used.
There is no proposed above ground, mounted wireless telecommunication equipment in
this proposal. Proposed roof mounted equipment has either been screened by existing
parapet walls or by the new chimney. The chimney will be painted Glidden Peach Puff
(80YR72/159) or the closest similar color available at the time of installation in order to
blend into the surrounding built environment.
Comment Number: 2 Comment Originated: 07/17/2017
7/17/2017: To the extent reasonably feasible, the applicant shall employ "stealth
technology" so as to convert the wireless telecommunication facility into wireless
telecommunication equipment, as the best method by which to mitigate and/or
camouflage visual impacts. Stealth technology consists of, but is not limited to, the
use of grain bins, silos or elevators, church steeples, water towers, clock towers,
bell towers, false penthouses or other similar "mimic" structures. Such "mimic"
structures shall have a contextual relationship to the adjacent area.
By proposing a rooftop design (wireless telecommunications equipment), Verizon
has mitigated the need for a free-standing structure (wireless telecommunication
facility). Verizon knows that this particular location requires aesthetic sensitivity
due to the historic nature of main street. As such, Verizon has employed stealth
technology through the proposed new chimney to conceal the new antenna while
also utilizing existing parapet walls to screen other proposed accessory
equipment.
Comment Number: 3 Comment Originated: 07/17/2017
07/17/2017: Whenever a wireless telecommunication antenna is attached to a
building roof, the height of the antenna shall not be more than fifteen (15) feet over
the height of the building. All wireless telecommunication equipment shall be located
as far from the edge of the roof as possible. Even if the building is constructed at or
above the building height limitations contained in Section 3.8.17, the additional fifteen
(15) feet is permissible.
The top height of the existing parapet wall is 35’-8”. The top height of the proposed
chimney is 43’-9”. The proposed installation is well below the 15’ allowance.
Additionally, because of the limited height of the installation, the visibility of the chimney
from street view is also limited. This is better demonstrated in the completed photo
simulations. Verizon was able to limit the height of the proposed chimney by placing the
chimney closer to the edge of the roof. Due to the nature of wireless
telecommunications signals, the further away from the edge of the roof the equipment is
located, the higher the equipment needs to be. Verizon believes that our proposed
location is meeting the intent of the standard in an equal to or better way because since
we did not have to propose a structure that was 15’ or taller. Additionally, the proposed
chimney will essentially become a part of the building’s overall character without the
general public having direct visibility of any wireless telecommunications equipment.