HomeMy WebLinkAboutFTC MUGS COFFEE SC, WTE (VERIZON) - FDP - FDP180014 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATIONCity of
0 ktColli� DEVELOPMENT REVIEW:
APPL/CATION FORM
For Office Use Only
Date Submitted Current Planning File# Planner
Site/Area Information
Residential Area: __ Sq.Ft. Acres
Project Information
Project Name:
Project Description (Choose type of request from the list on the back): Commercial Area: Sq.Ft. Acres
Industrial Area: Sq.Ft. Acres
Mixed Use Area: Sq.Ft. Acres
Right of Way Area: Sq.Ft. Acres
Parking and Drive Area: Sq.Ft. Acres
Stormwater Detention Area: Sq.Ft. Acres
Landscape Area: Sq.Ft. Acres
Open/Other Areas: Sq.Ft. Acres
Major Cross Streets: Gross Area: Sq.Ft. Acres
Zone District: Floor
Area Ratio:
Gross Density: Net Density
Parcel Number:
.
Building/Unit Information
Owner Information
Residential: Square Feet Name:
Commercial: Square Feet Address:
Industrial: Square Feet City:
State: Zip:
Building Floor Area Ratio: Phone: Email:
Platted Area:
Number of Units: A��licant Information
Single Family Attached: __ Single Family Detached: Name:
Two Family: Multi-Family: Organization Name:
Contact:
Total Number of Bedrooms Rented Separately:
Address:
Dates: City State: Zip:
Phone: Email:
Conceptual Review Meeting Date Preferred Method of Contact:
Neighborhood Meeting Date
Hearing Type
CERTIFICATION
I certify the information and exhibits submitted are true and correct to the best of my knowledge and that in filing this application, I am acting with
the knowledge, consent, and authority of the owners of the real property, as those terms are defined in Section 1-2 of the City Code (including
common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for the
purpose of inspection, and if necessary, for posting of public notice on the property.
Name (Please PRINT): _____________________________ _
Address: __________________________________ _
Telephone: ____________________________ _
Signature: (and title showing authority to sign, if applicable)
� CERTIFICATION MUST BE SIGNED.¢:,
Community Development & Neighborhood Services- 281 N College Ave- Fort Collins, CO 80522-0580
Location Description/Project Address:
Revised November 18, 2014 2 PDP Submittal Requirements
Type of Request
Please indicate the type of application submitted by checking the box preceding the appropriate request(s).
Additional handouts are available explaining the submittal requirements for each of the following review
processes.
Annexation Petition with Initial Zoning REQUESTED ZONE: _______________________________
Fee $1,188.00 + $50.00 sign posting fee + $.75 for each APO label
Rezoning Petition REQUESTED ZONE: _____________________________
Fee $977.00 + $50.00 sign posting fee
Overall Development Plan (ODP)
Fee: $1,599.00 + $50.00 sign posting fee + $.75 for each APO label + Poudre Fire Authority Review Fee
Project Development Plan (PDP) without Subdivision Plat (also Wireless Tele-communication Facilities)
Fee: $3,887.00 + $50.00 sign posting fee + $.75 for each APO label + Poudre Fire Authority Review Fee
Project Development Plan (PDP) with Subdivision Plat
Fee: $5,879.00 + $50.00 sign posting fee + $.75 for each APO label + Poudre Fire Authority Review Fee
Final Plan without Subdivision Plat
Fee: $1,000.00
Final Plan with Subdivision Plat
Fee: $1,000.00
Modification of Standards/Text and Map Amendment
Fee: $200.00+ ($50.00 sign posting fee + $.75 for each APO label for Modification of Standards only)
Basic Development Review
Fee: $200.00 + Poudre Fire Authority Review Fee
Major Amendment
Fee: $3,206.00 + $50.00 sign posting fee + $.75 for each APO label + Poudre Fire Authority Review Fee
Non-Conforming Use Review
Fee: $1,389.00 + Poudre Fire Authority Review Fee
Vacation of ROW or Easement
Fee: $5.00 per sheet of filing document
Small Project Fees
Fee: Varies-Check with the Current Planning Department + Poudre Fire Authority Review Fee
Street Name Change
Fee: $5.00
Extension of Final Approval
Fee: $566.00
Site Plan Advisory Review
NO FEE
Addition of Permitted Use
Fee: $500.00 + $50.00 sign posting fee + $.75 for each APO label + Poudre Fire Authority Review Fee
SUBMITTAL CHECKLIST:
FINAL PLAN REVIEW
PROJECT DEVELOPMENT PLAN (PDP)
Community Development & Neighborhood Services – 281 N College Ave – Fort Collins, CO 80522-0580
Development Review Guide – STEP 6 of 8
Application form and filing fee. Application Form.pdf
Transportation Development Review Fee – please contact Engineering at 221-6605 for information.
TDR Fees and Application.pdf
Name and address of each owner of property within the boundaries of the development plan area.
List of names of all general and/or limited partners, managers and directors and/or officers and directors of
the corporation involved as either applicants or owners.
Final Site Plan* (30 copies, 24” x 36” - folded)
Subdivision Plat* (23 copies, 24” x 36” - folded)
Architectural Elevations* (8 copies, 24” x 36” - folded)
Landscape Plan* (20 copies, 24” x 36” - folded)
Drainage and Erosion Control Report* (4 copies)
Final Utility and Drainage Plans* (15 copies, 24” x 36” – unfolded)
Requirements for utility plans checklist (1 copy). Utility Plans Checklist.pdf
Transportation Impact Analysis* (TIA), updated* (7 copies).
Soils Report* (2 copies).
Deeds* (contingent on final approval)
Mylars and PMT* (Mylars not needed until Final plans are approved)
Certification of Notice to Mineral Owner(s)* (1 copy) Mineral Rights Certificate.pdf
Other information Director may require:
- Subsurface Hydrologic Study* (4 copies)
- Easements/Agreements* (2 copies, each)
- Environmental Reports*
*This document is meant to be used as a checklist only. For a more detailed list and explanation of each of
these items, please see the handout: “Submittal Requirements: Final Plan Review”
The following information is required to be submitted with all applications, unless waived by staff. Any item
waived must be dated and initialed by a planner with the City of Fort Collins Community Development and
Neighborhood Services Department.
Transportation Development Review Fee Date Received/ Paid _________
Total Amount Paid _________
Project Name: _________________________________________________
Project Location: _______________________________________________ Date: ______________
Type of Submittal
Please indicate the type of application submitted by checking the box
preceding the appropriate request(s).
Fee structure amount due
Overall Development Plan (ODP) $500 each ______
Final Development Plan (FDP)
This fee includes 2 rounds of review $1000 each ______
Additional round of review $ 500 each ______
Annexation $20 X ___ acres = ____ + $250 = ______
The maximum fee for each annexation document/ filing shall be $2,000
Minor Amendment $158 each ______
Major Amendment $2,500 each ______
Re-zone $200 each ______
Modification to Land Use Code $200 each ______
Wireless Telecommunication Equipment (WTE) $65 each ______
Road Projects ______ acres (of roadway) X $3,500 = ______
Vacation of Easement(s) *** # of vacations ___ X $400 = ______
Vacation of Right(s)-of-Way *** # of vacations ___ X $800 = ______
Dedication of Easement(s) and/or Right(s)-of-Way ***
# of dedications ___ X $250 = ______
Project Development Plan (PDP) or Basic Development Review
Project requiring Transportation Services Review and/or utility plan review.
This fee includes 3 rounds of review.
Detached Single Family $160 per unit
_____ # of units X $160 = ______
Multifamily or other residential units $115 per unit
_____ # of units X $115 = ______
Commercial, Industrial, Retail, and/or Non residential
building square footage $0.25 per square foot
______sq ft X $0.25 = ______
Size of the development (area being platted or if not being
platted size of parcel accompanying all development
improvements) $250 per acre ______ acres X $ 250 = ______
Project fee $2,000 each $2,000
Total of above amounts __________
If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the
following formula: $30,000 + ½ (the amount over 30,000 ________) = _________
The maximum fee for any residential ONLY project shall be $500 per residential unit.
This check should be used to verify the fee amount (does not apply to mixed-use
developments). PDP fee shall be the lesser of this amount or the above calculated
amount. ______ # of residential units X $500 = _________
If this fee amount equals or exceeds $65,000 then the City Manager shall have the ability
to reduce the fee amount.
Reduction for affordable housing – a copy of the City letter certifying/ authorizing the
affordable housing shall be provided with this application. Amount of reduction to be
applied ______ ___________
Total owed for PDP _________
2012 form
General Information:
Owners Name(s): ____________________________
___________________________________________
Street address: _______________________________
___________________________________________
City/State/Zip: _______________________________
Telephone: _______________ Fax: ______________
Applicants/ Consultants Firm Name: ___________
Transactions
Method Check Number Date Paid Amount Paid Comments
Check CK # 137 04/11/2018 $1,200.00 Development Review Fee (small project fee approved by
Cameron Gloss - $200.00) and Transportation Development
Review Fee ($1000.00) paid by Michael Ryan Sagar ck #
137.
Receipt issued: 04/11/2018 Total Paid to Date: $1,200.00
Fee Description Account Code Fee Amount Amount Paid Date Paid Amount Due
Development Review Fee 1000.444040 $200.00 $200.00 04/11/2018 $0.00
Transportation Dev Review 902010.444030 $1,000.00 $1,000.00 04/11/2018 $0.00
TOTAL FEES: $1,200.00 $1,200.00 $0.00
TOTAL BALANCE DUE AS OF 04/11/2018: $0.00
Community Development & Neighborhood Services
281 N. College Ave Fort Collins, CO 80522
970.221.6760 970.224.6134 - fax
Permit/Project #: FDP180014
Routed for Review: 04/11/2018
Type: Final Plan
Site Address:
Job Valuation: $0.00 Category:
Fee Amounts are valid for date of this document only. Fees subject to change without notice.
Form Revised May 2011
___________________________________________
Contact: ____________________________________
Street address: _______________________________
___________________________________________
City/State/ Zip: _______________________________
Telephone: _______________ Fax: ______________
Certification:
By signing this permit I acknowledge that I am acting with
the knowledge, consent, and authority of the owners of the
property (including all owners having legal or equitable
interest in the real property, as defined in Section 1-2 of the
City Code; and including common areas legally connected
to or associated with the property which is the subject of
this application) without whose consent and authority the
requested action could not lawfully be accomplished.
Pursuant to said authority, I hereby permit City officials to
enter upon the property for purposes of inspection.
Name (please print): __________________________
Signature: ___________________________________
Telephone: ______________________
Foot Notes:
When a development project involves a change of use for a
building, the charge per square foot shall apply to the portion of
the overall building size for which the change of use is proposed,
provided that the new use generates more traffic than the existing
use, as determined by the current Institute of Transportation
Engineers Trip Generation. If the new use does not generate more
traffic than the existing use then the charge per square foot for
shall apply only to the net additional building size (if any).
These fees do not include the cost of filing fees for the recording of
the Development Agreement. When a Development Agreement or
Amendment Agreement is entered into the Developer shall be
responsible for the cost of recording the document. Said filing fees
shall be calculated and provided when the signed document is
returned to the City for signatures and filing.
*** This fee does not include the cost of filing fees. Filing
fees shall be determined at the time of final document
submittal and will be required prior to filing.
cc: Christie White, Engineering
Development Review Engineering