HomeMy WebLinkAboutFTC MUGS COFFEE SC, WTE (VERIZON) - PDP - PDP170031 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSPage 1 of 3
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/developmentreview
September 08, 2017
Ryan Sager
VERIZON WIRELESS/LRK CONSULTING, LLC
1196 GRANT ST UNIT 313
Denver, CO 80203
RE: FTC Mugs Coffee SC, PDP170031, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Kai Kleer, at
970-416-4284 or kkleer@fcgov.com.
Comment Summary:
Department: Light And Power
Contact: Coy Althoff, 970-224-6150, CAlthoff@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/22/2017
08/22/2017: Plans call for extending power from existing power panel in parking
structure to new power panel location. Will this extension require a new meter? If so,
contact Light and Power Engineering to coordinate the electric meter location,
please show the locations on the utility plans.
Comment Number: 2 Comment Originated: 08/22/2017
08/22/2017: Please provide a one line diagram and a C-1 form to Light and Power
Engineering. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
Comment Number: 3 Comment Originated: 08/22/2017
08/22/2017: Please contact Light & Power Engineering if you have any questions at
221-6700. Please reference our policies, development charge processes, and use
our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers.
Verizon will be utilizing the property’s existing meters with the only additions of a check meter
for the purposes of reimbursing owner for power used and a new power panel mounted next
to the equipment for adjacent connections. A new meter will not be needed at this time.
Department: PFA
Contact: Cal Sheesley, 970-416-2599, csheesley@poudre-fire.org
Topic: General
Page 2 of 3
Comment Number: 1 Comment Originated: 09/05/2017
09/05/2017: NO COMMENT
PFA has no comment regarding PDP170031. Water supply requirements are met
with the hydrant located at the southeast corner of College and Laurel. Perimeter
access is met from Laurel. While aerial apparatus access is not met, due to the
size and scope of the project, these requirements will not be enforced for this
development. The antenna shall be addressed using the same address (706 S
College) and appears to meet address posting requirements per Google Earth.
Department: Planning Services
Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/05/2017
09/01/2017:
Please provide a photo simulations looking southeast from the northwest corner of
Laurel St. and S. College Ave. Insert simulations in architectural plans immediately
after the title sheet.
Photo simulations have been completed and added after page T-1.
Comment Number: 2 Comment Originated: 09/05/2017
09/05/2017: Can you provide a note on the site plan indicating, "No wireless
telecommunication facility or equipment owner or lessee or employee thereof shall
act to exclude or attempt to exclude any other wireless telecommunication provider
from using this building, structure or location."
A special side note has been added to page Z-1.
Comment Number: 3 Comment Originated: 09/05/2017
09/05/2017: Can you provide more architectural detail of what the chimney will look
like? Instead of painting it to match the color of the building please emulate the color
and texture of brick on the facade of building.
Notes discussing the use of matching paint and texture have been added
throughout the drawings anywhere where the chimney is called out. Additionally,
photo simulations were completed to further demonstrate the implementation of
the matching brick color and texture.
Comment Number: 4 Comment Originated: 09/05/2017
09/05/2017: Can you provide dimensions of the chimney (length and width)? Please
included on site plan.
Dimension have been added to page Z-2 in the equipment plan upper level detail
diagram. Additional the height dimensions are shown on page Z-3.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/23/2017
08/23/2017: The proposed site changes shown in this submittal are not substantial
enough to trigger Stormwater requirements; therefore, no requirements apply at this
time. If future submittals include site or grading changes that are not shown on
these plans, please contact Dan Mogen at (970)224-6192 or dmogen@fcgov.com to
Page 3 of 3
coordinate and determine what requirements, if any, will apply.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/01/2017
09/01/2017: All plan sheets must be 24"x36".
Verizon will continue to submit at least (1) 24’ X 36’ set of drawings for review.
Comment Number: 2 Comment Originated: 09/01/2017
09/01/2017: A legal description of the property where this equipment is located will
need to be added to sheet T1.
Legal description has been added to page T-1.
Comment Number: 3 Comment Originated: 09/01/2017
09/01/2017: The sheet index is missing sheets that are in the plan set.
The sheet index has been updated accordingly.
Department: Water-Wastewater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/23/2017
08/23/2017: It is assumed that no water or sewer service is needed for the
proposed improvements and existing services will remain unaltered. Please contact
Dan Mogen should these assumptions be incorrect.
Department: Zoning
Contact: Ryan Boehle, 970-416-2401, rboehle@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/05/2017
09/05/2017: All equipment mounted to the exterior must be painted to match the
surrounding building surfaces.
Aside from the proposed chimney, the only other exterior equipment is the new
wall mounted conduit. This conduit is shown on page Z-2 with a note indicating it
will be painted to match the building’s exterior.