HomeMy WebLinkAboutTHE HUB ON CAMPUS - FDP - FDP180011 - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETProject Routing Sheet New: X Revision:
Project Name:
Project Type:
Project Number: Items for New Projects & Resubmittals Redlines
Date Received:
Review Round:
Planner:
Engineer:
# Label Sets Needed (1,2,3….): N/A
Labels Received Y/N: Y
/// RETURN ALL REDLINES
111111111 111
11 1
1111 1
1111 1
11111 111 1 1
1111 1 1
111 1
1111 1 1
11
11 1 1
11111 1
11 1
111111 1
111 11
11
1111 1 11
11
1111 1
111111
1111 1 1 1
1111 1 1
1111 1
022 21 17 146646150002131000Revised: 1-29-2016
T.I.S. Variance Letter
Final Utility Plans/Erosion
Planning Objectives
Comment Response Letter
Final Site Plan Set
Final Landscape Plan
New projects: APO labels & list:
Holland
Virata
Wetland Delineation
Ecological Study (ECS)
Hazmat Review
Final Soils Report
Digital copy of all materials
Offsite agreements
Drainage Report
Mineral Rights Certification
Utility Plan
Site Plan
Landscape Plan
Plat
Building Elevations
Item Waived(W); Deferred (D); or n/a
File: Project Planner
Building Inspection
Century Link
Comcast
Development Review Engineering
Economic Development
Environmental Planner
Forestry
GIS
Historic Preservation
CFC Light & Power
Neighborhood Services
Park Planning
Pavement Management
Post Office
Poudre Fire Authority
Real Estate Planning
Sanitation Dist:
Outside Agency Water District:
Street Oversizing
Technical Services
Traffic Operations
Transfort
Transportation Planning
Water Conservation
Received:
County Assessor
CDOT
Ditch Co: N/A
Railroad: ___________________
School District
Other: Jonathon Nagel Env.Comp.
Routing Format Required: (P)aper,
1
Total:
Routing Format Required: Digital (E)
Xcel Energy
Zoning
City Water Utilities Eng. (Stormwater)
City Erosion Control (SWMP Review)
Lighting Plan
Final Plat
Building Elevations
Final Lighting Plan
Final Drainage Report
Turnaround Time: 4 weeks Comments Due:
The Hub on Campus
Final Plans