Loading...
HomeMy WebLinkAboutTHE HUB ON CAMPUS - FDP - FDP180011 - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETProject Routing Sheet New: X Revision: Project Name: Project Type: Project Number: Items for New Projects & Resubmittals Redlines Date Received: Review Round: Planner: Engineer: # Label Sets Needed (1,2,3….): N/A Labels Received Y/N: Y /// RETURN ALL REDLINES 111111111 111 11 1 1111 1 1111 1 11111 111 1 1 1111 1 1 111 1 1111 1 1 11 11 1 1 11111 1 11 1 111111 1 111 11 11 1111 1 11 11 1111 1 111111 1111 1 1 1 1111 1 1 1111 1 022 21 17 146646150002131000Revised: 1-29-2016 T.I.S. Variance Letter Final Utility Plans/Erosion Planning Objectives Comment Response Letter Final Site Plan Set Final Landscape Plan New projects: APO labels & list: Holland Virata Wetland Delineation Ecological Study (ECS) Hazmat Review Final Soils Report Digital copy of all materials Offsite agreements Drainage Report Mineral Rights Certification Utility Plan Site Plan Landscape Plan Plat Building Elevations Item Waived(W); Deferred (D); or n/a File: Project Planner Building Inspection Century Link Comcast Development Review Engineering Economic Development Environmental Planner Forestry GIS Historic Preservation CFC Light & Power Neighborhood Services Park Planning Pavement Management Post Office Poudre Fire Authority Real Estate Planning Sanitation Dist: Outside Agency Water District: Street Oversizing Technical Services Traffic Operations Transfort Transportation Planning Water Conservation Received: County Assessor CDOT Ditch Co: N/A Railroad: ___________________ School District Other: Jonathon Nagel Env.Comp. Routing Format Required: (P)aper, 1 Total: Routing Format Required: Digital (E) Xcel Energy Zoning City Water Utilities Eng. (Stormwater) City Erosion Control (SWMP Review) Lighting Plan Final Plat Building Elevations Final Lighting Plan Final Drainage Report Turnaround Time: 4 weeks Comments Due: The Hub on Campus Final Plans