Loading...
HomeMy WebLinkAboutLOAF N JUG - PDP - PDP180004 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFINAL DRAINAGE REPORT Loaf N Jug #810 – I25 & HWY392 Fort Collins, Colorado Prepared for: Loaf ‘N’ Jug c/o Jimmy Cruz 442 Keeler Parkway Pueblo, CO 81001 Phone: (719) 948-3071 Prepared by: Galloway & Company, Inc. 6162 S. Willow Drive, Suite 320 Greenwood Village, Colorado 80111 Phone: (970) 770-8884 Contact: Phil Dalrymple, PE Original Preparation: March 26th, 2018 1 TABLE OF CONTENTS TABLE OF CONTENTS.......................................................................................................................... 1 I. CERTIFICATIONS .......................................................................................................................... 2 II. GENERAL LOCATION AND DESCRIPTION .................................................................................. 3 III. DRAINAGE BASINS AND SUB-BASINS ........................................................................................ 5 IV. DRAINAGE DESIGN CRITERIA ..................................................................................................... 6 V. DRAINAGE FACILITY DESIGN .................................................................................................... 11 VI. EROSION AND SEDIMENT CONTROL MEASURES ................................................................... 13 VII. CONCLUSIONS ............................................................................................................................ 20 VIII. REFERENCES .............................................................................................................................. 23 APPENDIX A - REFERENCE MATERIALS VICINITY MAP NRCS SOILS MAP FEMA FIRMETTE APPENDIX B - HYDROLOGY CALCULATIONS PROPOSED COMPOSITE RUNOFF CALCULATIONS APPENDIX C - HYDRAULIC CALCULATIONS UDFCD SAND FILTER BMP CALCULATIONS SAND FILTER MEDIA SPECIFICATIONS MODIFIED FAA METHOD EXTENDED DETENTION CALCULATIONS UDFCD DETENTION & OUTLET STRUCTURE CALCULATIONS APPENDIX D – DRAINAGE MAPS DEVELOPED CONDITION DRAINAGE MAP APPENDIX E – EROSION CONTROL MAP EROSION CONTROL PLAN 2 I. CERTIFICATIONS CERTIFICATION OF ENGINEER “I hereby certify that this report for the final drainage design of Loaf N Jug #810 was prepared by me (or under my direct supervision) in accordance with the provisions of the Fort Collins Stormwater Criteria Manual for the owners thereof.” ______________________________________ Phil Dalrymple, PE Registered Professional Engineer State Of Colorado No. 41171 For and on behalf of Galloway & Company, Inc. CERTIFICATION OF OWNER “Loaf N Jug hereby certifies that the drainage facilities for the Loaf N Jug #810 shall be constructed according to the design presented in this report. We understand that the City of Fort Collins does not and will not assume liability for drainage facilities designed and/or certified by our engineer. We also understand that the City of Fort Collins relies on the representation of others to establish that drainage facilities are designed and constructed in compliance with City of Fort Collins guidelines, standards, or specifications. Review by the City of Fort Collins can therefore in no way limit or diminish any liability, which we or any other party may have with respect to the design or construction of such facilities.” ____________________________________ Loaf N Jug Attest: ___________________________________ (Name of Responsible Party) __________________________________ Notary Public __________________________________ Authorized Signature ` 3 II. GENERAL LOCATION AND DESCRIPTION LOCATION Loaf ‘N’ Jug Fort Collins (hereafter referred to as “the site” or “project site”) will be located northwest of the intersection of Interstate Highway I-25 and State Highway 392, also known as Carpenter Road. It is bounded on the north and west by the SW Frontage Road; on the south by State Highway 392; and on the east by the southbound off-ramp from I-25. Swede Lake, a small bay off the southeast corner of Fossil Creek Reservoir, is located northwest of the site. More specifically, the site is located in the Southwest Quarter of Section 15, Township 6 North, Range 68 West in the City of Fort Collins, County of Larimer and State of Colorado. Refer to Appendix A for a Vicinity Map. DESCRIPTION OF PROPERTY The project site consists of approximately 2.84 acres. It is currently a vacant and undeveloped lot of land. The existing grades slope down towards the site at an average of twenty five percent. The existing runoff generally flows from south to north on the site lot where it is then directed to a series of drainage swales. Swales along the East and West carry a majority of offsite runoff and the existing swale along the East side of the Frontage Road currently collects storm water from the site. These swales carry runoff north toward Fossil Creek Reservoir and the Cache la Poudre River. There are no major drainage ways passing through the project site. According to the USDA NRCS Web Soil Survey, ‘Wiley silt loam, 3 to 5 percent slopes’ covers roughly the entire project site. This soil is associated with Hydrologic Soil Group (HSG) ‘B’. HSG ‘B’ soils have a moderately slow infiltration rate when thoroughly wet, and consist chiefly of soils that allow unimpeded downward water transmission. These soils have a moderate rate of water transmission. The remainder of the site consists of similar HSG ‘B’ soils. Refer to Appendix A for additional soils information. Terracon conducted a geotechnical investigation on March 13, 2018. The results of the preliminary geotechnical investigation are summarized in Geotechnical Engineering Report, Windsor Loaf ‘N’ Jug, Windsor, Colorado (Terracon Project No. 20175104, Dated: March 13, ` 4 2018). The soils encountered across the site, “generally consisted of about 20 to 24 feet of lean clay with various amounts of sand over claystone bedrock.” The site is situated south of the Fossil Creek Reservoir and west of the Cache La Poudre River and is incorporated in both Master Drainage Plans. Currently, runoff from the site is directed to these water bodies via drainage swales which run from south to north around the project site. During the water quality storm event, excess surface runoff captured by on-site storm drainage infrastructure will flow into a Sand Filter (SF) basin located on the east side of the site. Treated discharge will flow into underdrains that outfall into the existing drainage swale north of the site. During the minor (i.e., 2-year) and major (i.e., 100-year) storm events, runoff volume in excess of the water quality event will flow out the permanent outlet structure or overtop the basin and flow into the drainage swales north and east of the basin. Once in the drainage swales, channelized flows will be conveyed into the Fossil Creek Reservoir and Cache La Poudre River. ` 5 III. DRAINAGE BASINS AND SUB-BASINS MAJOR BASIN DESCRIPTION The project site is located in the Fossil Creek/Cache La Poudre drainage basins. According to the City of Fort Collins website (http://www.fcgov.com/utilities/what-we-do/stormwater/drainage-basins/fossil-creek-basin), the Fossil Creek Drainage basin “extends along the south end of Fort Collins, from the foothills across Interstate 25 past County Road 5. It encompasses 32 square miles in the city of Fort Collins and Larimer County. Historically, the basin consisted of agricultural land, but the basin has experienced significant development in the recent past.” The Cache La Poudre River is tributary to the South Platte River and, due to floodplain restrictions, has a lower development density and more parks and open space along the river corridor,” (https://www.fcgov.com/utilities/what-we- do/stormwater/drainage-basins/poudre-river). The project site is shown on FEMA Map Numbers 08069C1201F (refer to Appendix A for FEMA Firmette). The map shows the project site outside the 0.2% annual chance floodplain. Refer to Appendix A for a copy of the Firmette. ` 6 IV. DRAINAGE DESIGN CRITERIA REGULATIONS This final drainage design presented herein is prepared in accordance with the Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual (i.e., Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manuals Volumes 1, 2 and 3 [Manual]). Together, the requirements are referred to as the Fort Collins Stormwater Criteria Manual [FCSCM]. DIRECTLY CONNECTED IMPERVIOUS AREA (DCIA) We developed a strategy for implementing ‘The Four-Step Process’ for stormwater quality management. Each step is listed below along with a brief narrative describing the implementation strategy. Refer to Appendix C for the LID sizing calculations. The following table, which is included on the LID Exhibit, summarizes basic information about each Stormwater quality strategy. The bold number preceding each strategy keys to its location on the LID Exhibit. Step 1 - Employ runoff reduction practices Several different Stormwater quality strategies were designed with Step 1 in mind. Developed runoff from the series of onsite basins will flow to a Sand Filter (SF) before entering the existing drainage swales. The UDFCD defines a Sand Filter as “A stormwater quality BMP consisting of a sand bed and underdrain system. Above the vegetated sand bed is an extended detention basin sized to capture the WQCV and EURV. A Sand Filter extended detention basin provides pollutant removal through settling and filtering and is generally suited to off-line, on-site configurations where there is no base flow and the sediment load is relatively low.” Refer to Appendix C for additional design and construction details. The existing drainage swales also help to reduce runoff as they allow infiltration along the length of the swale. Existing swale slopes and cross-section sizes will be maintained as much as possible throughout the construction process for the site, with efforts to minimize impact, especially regarding site grading, from site development. However, due to project requirements to develop the site frontage to meet LCUASS standards, a 150 ft portion of the westernmost swale will be regraded to maintain 3:1 slope criteria throughout the project site. ` 7 During storm events exceeding the water quality event, the sand filter is designed to fill to the design volume and flow out the permanent outlet structure or overtop the basin and flow into the drainage swales north and east of the basin. The incoming runoff will spill through a weir designed to pass the 100-year incoming flows at a flow depth of 0.5’. The downstream face of the spillway will be protected with North American Green (NAG) SC250 Turf Reinforcement Mat (TRM). This is a composite TRM of 70% straw and 30% coconut fiber matrix incorporated into permanent three-dimensional turf reinforcement matting. The spillway and downstream protection are designed for peak 100-year developed runoff entering the sand filter and passing through the weir. The downstream spillway slope is exposed because the water surface elevation in the detention pond has not reached the weir elevation. Of the total 1.52 acres of newly added impervious area, 1.18 acres are tributary to the sand filter LID feature. The LID requirement for this site is as follows: 75% of any newly developed area is required to be treated using LID. The percentage of newly developed area (i.e., added impervious area per Ordinance No. 152, 2012) treated using an LID is 77.4% (1.18/1.52 AC). Step 2 - Implement BMPs that provide a Water Quality Capture Volume (WQCV) The developed runoff from basins A1, A2, A3, R1 and R2 will drain into an Extended Detention Basin (EDB) designed on top of the sand filter. The UDFCD defines an Extended Detention Basin as “An engineered basin with an outlet structure designed to slowly release urban runoff over an extended time period to provide water quality benefits and control peak flows for frequently occurring storm events. The basins are sometimes called "dry ponds" because they are designed not to have a significant permanent pool of water remaining between storm runoff events. Outlet structures for extended detention basins are sized to control more frequently occurring storm events.” During storm events exceeding the water quality event, the Extended Detention Basin (EDB) is designed to fill to the design volume and spill excess runoff into the existing drainage swales. The permanent outlet structure is designed to collect flows greater than the water quality event and up to the 100-year event and release those flows downstream into the existing drainage swales at the historic release rate for the Fossil Creek basin (0.2 cfs/acre). The excess runoff will spill through a weir designed to pass the 100-year incoming flows at a flow depth of 0.5’. The downstream face of the spillway will be protected with North American Green (NAG) ` 8 SC250 Turf Reinforcement Mat (TRM). This is a composite TRM of 70% straw and 30% coconut fiber matrix incorporated into permanent three-dimensional turf reinforcement matting. The spillway and downstream protection are designed for peak 100-year developed runoff entering the EDB and passing through the EDB weir. The downstream spillway slope is exposed because the water surface elevation in the detention pond has not reached the weir elevation. Step 3 - Stabilize drainageways There are no formal drainage ways existing on the site. Existing swales are already stabilized with vegetation and will remain undisturbed as much as possible. Any areas disturbed during construction will be stabilized prior to project completion. Additionally, rip rap protection will be provided to protect the drainage swale receiving outflow from the onsite detention pond. Step 4 - Implement site specific and other source control BMPS Because the new development will be a gas station, one site specific source control BMP implemented for this site is the inclusion of a spill control structure. This spill control is located down grade of both the service kiosks and underground storage tanks to capture potential spills from either location and protect downstream facilities from petroleum products and other pollutants that are stored and handled at gas stations. The capacity of the spill control structure is 150 gallons. Once stormwater flows through the spill control structure, it will enter the storm sewer system and head to the proposed detention pond where it will receive further treatment through extended detention and the sand filter. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS The project site has a natural outfall to the existing drainage swales surrounding the site. In order to maintain the existing slope and capacity of these swales, site grading and drainage was constrained by the perimeter existing grades as much as possible. Where necessary, regrading to accommodate additional offsite improvements was done with efforts made to minimize impacted drainage swale length. ` 9 HYDROLOGICAL CRITERIA For urban catchments that are not complex and are generally 160 acres or less in size, it is acceptable that the design storm runoff be analyzed using the Rational Method. The Rational Method is often used when only the peak flow rate or total volume of runoff is needed (e.g., storm sewer sizing or simple detention basin sizing). The Rational Method was used to estimate the peak flow at each design point. Routing calculations (i.e., time attenuation) that aggregate the basins draining to a specific design point are include in the Rational Method calculations in Appendix B. The Rational Method is based on the Rational Formula: Q = CiA Where: Q = the maximum rate of runoff, cfs C = a runoff coefficient that is the ratio between the runoff volume from an area and the average rate of rainfall depth over a given duration for that area i = average intensity of rainfall in inches per hour for a duration equal to the Time of Concentration (Tc) A = area, acres The one-hour rainfall Intensity-Duration-Frequency tables for use with the Rational Method of runoff analysis are provided in Table RA-7 and Table RA-8 (refer to Appendix B). The 2-year and 100-year storm events serve as the basis for the drainage system design. The 2-year storm is considered the minor storm event. It has a fifty percent probability of exceedance during any given year. The 100-year storm is considered the major storm event. It has a one percent probability of exceedance during any given year. The 2-year drainage system, at a minimum, must be designed to transport runoff from the 2- year recurrence interval storm event with minimal disruption to the urban environment. The 100-year drainage system, as a minimum, must be designed to convey runoff from the 100- year recurrence interval flood to minimize life hazards and health, damage to structures, and interruption to traffic and services. ` 10 HYDRAULIC CRITERIA The on-site excess developed runoff within each tributary area begins its journey to the stormwater quality feature and, ultimately, the perimeter swales as overland flow from commercial lot areas (i.e., roof area, concrete hardscape and landscaping). Runoff then flows directly into the sand filter or drainage swales, or is intercepted by curb inlets. These inlets discharge to the on-site Sand Filter (SF). ` 11 V. DRAINAGE FACILITY DESIGN GENERAL CONCEPT This final design presents the detailed design of system for collecting and conveying developed runoff from current and future development at Loaf ‘N’ Jug #810 to the Stormwater quality feature on-site detention pond. The existing site runoff drains to an existing drainage swale surrounding the project site on the north, west, and east sides. These swales facilitate drainage toward Fossil Creek and Cache la Poudre river. The proposed design matches this existing drainage pattern and includes the development of a permanent outfall. Typically, the on-site excess developed runoff will travel overland into the storm sewer system where it is directed into the on-site water quality and detention basin. Site runoff is treated by the Sand Filter (SF) detention basin and then collected by an underdrain which flows to the northernmost drainage swale. SPECIFIC DETAILS On-Site Sand Filter Detention Basin The proposed on-site sand filter was sized using the Urban Drainage Stormwater Best Management Practice Design Workbook version 3.03, included in Appendix C. The BMP design workbook considers tributary basin geometry and imperviousness to estimate the water quality capture volume (WQCV) for the sand filter, as well as required filter surface area. Based on the workbook calculations, the required WQCV for this site is 0.031 acre-ft. In addition to the WQCV to be provided for treatment by the sand filter, the extended detention volume was designed to provide the 100-year volume plus the WQCV. Utilizing the modified FAA Method, Appendix C, the 100-year storage volume was estimated to be 0.37 acre-ft. Utilizing the Urban Drainage Detention Design Workbook, version 3.07, a stage-storage relationship was modeled to provide these required storage volumes within the site area east of the gas station and drive aisles. The preliminary design for the sand filter detention basin estimated the WQCV stage to be 0.31 ft above the sand filter media surface elevation (4878.4) and the extended detention volume (0.37 acre-ft + 0.031 acre-ft) to have a water surface elevation (4881.4). Based on site ` 12 grading surrounding the basin, the stormwater quality features and extended detention features will function as intended during the minor and major storm event. The proposed 2.5’ x 2.5’ x 3’ concrete vault will provide an outlet for storm events between the water quality event and the 100-year event. The structure will provide an outfall pipe with an orifice restrictor plate to release flows at the historic release rate, 0.2 cfs/ acre. Two 1-inch underdrains will be provided along the length of the sand filter to collect treated water and tie into the outlet structure to outfall into the existing drainage swales. The ultimate outfall, will discharge at ±0.2 cfs/ac (±0.52 cfs) thorugh a 2.8” orifice plate attached to a headwall. Beyond the headwall, is a 24” RCP outfall system. The system is designed to outfall to the existing swale system to the north, daylighting at ±4875.2 elevation. ` 13 VI. EROSION AND SEDIMENT CONTROL MEASURES The existing site condition is fully vegetated with native grasses. An existing drainage swale surrounds the project site on the north, west, and east sides, facilitating drainage north toward Fossil Creek and Cache la Poudre river. A total area of approximately 3.6 acres (2.8 onsite, 0.8 surrounding offsite) will be disturbed during the construction of the Loaf N Jug site. POTENTIAL POLLUTANT SOURCES Potential pollutant sources for this site include: · Disturbed and stored soils: The site will be grubbed and overlot graded prior to major utility and roadway construction. This will be a one time activity and should be completed relatively early in the project timeline. The areas of grading that will not require additional disturbance shall receive final landscaping within 30 days of substantial completion of site work and building construction and prior to certificate of occupancy. Otherwise temporary seeding and mulching will be required within 7 days of last disturbance if no further disturbance is anticipated for at least 14 days. Any soil stock piles utilized during construction will be covered with a tarpaulin when not in active use and will have silt fence installed along the base of the slope. · Vehicle tracking of sediments: There is potential for tracking of soils between the beginning of the grading process and the final stabilization of the site. Vehicle tracking control is to be installed prior to land disturbance activities and sweeping is to take place as needed. Vehicle access to the exposed and disturbed subgrade will be limited primarily to roll on/off earthmoving equipment and heavy materials delivery trucks. The SWMP Administrator is responsible for insuring that access to exposed subgrade is limited, both in quantity and in timing relative to the tracking susceptibility of the soil as it relates to moisture content. The administrator must keep the adjacent parking areas and public rights-of-way free from mud and other tracked debris from the site. · Loading and unloading operations: All loading and unloading operations of equipment shall be accomplished in areas protected by erosion and sediment controls. It is recommended that all equipment be cleaned on-site and within protected areas prior to exiting the site. ` 14 · Hazardous Material Management and Spill Reporting Plan: Any hazardous or potentially hazardous material that is brought onto the construction site will be handled properly in order to reduce the potential for storm water pollution. All materials used on this construction site will be properly stored including the use of secondary containment measures, handled, dispensed and disposed of following all applicable label directions. Flammable and combustible liquids will be stored and handled according to 29 CFR 1926.152. Only approved containers and portable tanks shall be used for storage and handling of flammable and combustible liquids. In the event of an accidental spill, immediate action will be undertaken by the General Contractor to contain and remove the spilled material. All hazardous materials will be disposed of by the Contractor in the manner specified by federal, state and local regulations and by the manufacturer of such products. As soon as possible, the spill will be reported to the appropriate agencies. As required under the provisions of the Clean Water Act, any spill or discharge entering waters of the United States will be properly reported. The General Contractor will prepare a written record of all spills and associated clean-up and will also notify the City of Fort Collins. The General Contractor will provide notice to Owner immediately upon identification of a reportable spill. Any spills of petroleum products or hazardous materials in excess of Reportable Quantities as defined by EPA or the state or local agency regulations, shall be immediately reported to the EPA National Response Center (1-800-424-8802), the Colorado Department of Public Health and Environment (CDPHE) (1-877-518-5608), and the City of Fort Collins (970-221-6700). The State reportable quantity for petroleum products is 25 gallons or more (or that cause a sheen on nearby surface waters). Spills from regulated aboveground and underground fuel storage tanks must be reported to the State Oil Inspector within 24 hours (after-hours contact CDPHE Emergency Spill Reporting Line). This includes spills from fuel pumps. Spills or releases of hazardous substances from regulated storage tanks in excess of the reportable quantity (40 CFR Part 302.6) must be ` 15 reported to the National Response Center, the local fire authority immediately, the State Oil Inspector, the City of Brighton, and Adams County within 24 hours. The reportable quantity for hazardous materials can be found in 40 CFR 302 at: http://ecfr.gpoaccess.gov/cgi/t/text/text- idx?c=ecfr&tpl=/ecfrbrowse/Title40/40cfr302_main_02.tpl In order to minimize the potential for a spill of petroleum product or hazardous materials to come in contact with storm water, the following steps will be implemented: a) All materials with hazardous properties (such as pesticides, petroleum products, fertilizers, detergents, construction chemicals, acids, paints, paint solvents, additives for soil stabilization, concrete, curing compounds and additives, etc.) will be stored including secondary containment measures in a secure location, under cover, when not in use. b) The minimum practical quantity of all such materials will be kept on the job site and scheduled for delivery as close to time of use as practical. c) A spill control and containment kit (containing for example, absorbent material such as kitty litter or sawdust, acid neutralizing agent, brooms, dust pans, mops, rags, gloves, goggles, plastic and metal trash containers, etc.) will be provided on the construction site and location(s) shown on Site Maps. The kit should be inspected for completeness as a part of weekly stormwater inspections. d) All of the product in a container will be used before the container is disposed of. All such containers will be triple rinsed, with water prior to disposal. The rinse water used in these containers will be disposed of in a manner in compliance with state and federal regulations and will not be allowed to mix with storm water discharges. ` 16 e) All products will be stored in and used from the original container with the original product label. f) All products will be used in strict compliance with instructions on the product label. The disposal of excess or used products will be in strict compliance with instructions on the products label and local regulations. The contractor is responsible for the Spill Prevention and Control Plan (SPCP). The SPCP shall clearly state measures to stop the source of a spill, contain the spill, clean up the spill, dispose of contaminated materials, and train personnel to prevent and control future spills. In addition, the SPCP must include contact and documentation requirements for each of the Minor, Significant, and Hazardous spill magnitudes. Further requirements are listed below in the equipment fueling section. · Fueling of equipment: Temporary on-site fuel tanks for construction vehicles shall meet all state and federal regulations. Tanks shall have approved spill containment with the capacity required by the applicable regulations. From NFPA 30: All tanks shall be provided with secondary containment (i.e. containment external to and separate from primary containment). Secondary containment shall be constructed of materials of sufficient thickness, density, and composition so as not to be structurally weakened as a result of contact with the fuel stored and capable of containing discharged fuel for a period of time equal to or longer than the maximum anticipated time sufficient to allow recovery of discharged fuel. It shall be capable of containing 110% of the volume of the primary tank if a single tank is used, or in the case of multiple tanks, 150% of the largest tank or 10% of the aggregate, whichever is larger. The tanks shall be in sound condition free of rust or other damage which might compromise containment. Fuel storage areas will meet all EPA, OSHA and other regulatory requirements for signage, fire extinguisher, etc. Hoses, valves, fittings, caps, filler nozzles, and associated hardware shall be maintained in proper working condition at all times. The location of fuel tanks shall be shown on the Site Maps and shall be located to minimize exposure to weather and surface water drainage features. ` 17 A Spill Prevention, Control and Countermeasure (SPCC) Plan must be developed if aboveground oil storage capacity at the construction site exceeds 1,320-gallons or as specified by state. Containers with a storage capacity of 55-gallons or less are not included when calculating site storage capacity. The General Contractor shall develop and implement a SPCC Plan in accordance with the Oil Pollution Prevention regulation at Title 40 of the Code of Federal Regulations, Part 112, (40 CFR 112). · Maintenance of equipment used for construction: If equipment is to be maintained and stored in an open area this area should not be within the drip line of trees and not be within 100 feet of a watercourse or wetland. Runoff should be diverted away from watercourses and wetlands. Maintenance should be done on impervious areas surrounded with impervious berms. Where this is not possible, use pads designed to contain the pollutants which may leak or spill during maintenance operations. Impervious pads are particularly important on sandy and other course soils where spilled materials can easily leach into the groundwater. Equipment shall be checked before and after each use and, minimally, during the weekly stormwater inspection if otherwise idle. Periodic checks of the equipment wash areas shall be performed to ensure proper operation. · Concrete washout: Concrete washout area shall be installed prior to any concrete placement on site. Signs shall be placed at the construction entrance(s), at the washout area, and elsewhere as necessary to clearly indicate the location of the concrete washout area. The washout area shall be repaired and enlarged or cleaned out as necessary to maintain capacity for wasted concrete. Concrete and concrete wash water shall be removed from the site and disposed of at an accepted waste facility. · Worker’s trash: The site shall be policed at the end of each work day to be kept free of trash and debris resulting from workers day to day activities. If necessary utilize clearly marked and protected containers for trash and debris at convenient locations throughout the site. Burying of waste on site is prohibited. Trash must be properly contained at the end of each day. ` 18 · Portable toilets: All personnel involved with construction activities must comply with state and local sanitary or septic system regulations. Temporary sanitary facilities will be provided at the site throughout the construction phase. They must be utilized by all construction personnel and must be serviced weekly by a commercial operator. The location of sanitary facilities shall be shown on the Site Maps. Portable toilets must be securely anchored a minimum of 10’ behind curbs, and are not allowed within 50’ of inlets or within 50’ of a water of the State or the municipal storm drain system. BMP’S FOR STORMWATER POLLUTION PREVENTION A General Permit for Stormwater Discharge Associated with Construction Activities issued by the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division (WQCD), will be acquired for the site. A Stormwater Management Plan (SWMP) should be prepared to identify the Best Management Practices (BMPs) which, when implemented, will meet the requirements of said General Permit. Below is a summary of SWMP requirements which may be implemented on-site as well as a sequencing chart of BMP installation (modified from Urban Drainage and Flood Control District, Urban Storm Drainage Criteria Manual Volume 3, Construction Phasing/Sequencing). Specific locations for erosion control BMPs are presented in the erosion control plan in Appendix E. The following temporary BMPs may be installed and maintained to control on-site erosion and prevent sediment from traveling off-site during construction: · Silt Fence – a woven synthetic fabric that filters runoff. The silt fence is a temporary barrier that is placed at the base of a disturbed area. · Vehicle Tracking Control – a stabilized stone pad located at points of ingress and egress on a construction site. The stone pad is designed to reduce the amount of mud transported onto public roads by construction traffic. · Inlet protection – Inlet protection will be used on all existing and proposed storm inlets to help prevent debris from entering the storm sewer system. Inlet protection generally consists of straw wattles or block and gravel filters. · Concrete washout – Concrete washout area shall be installed prior to any concrete placement on site. Signs shall be placed at the construction entrance(s), at the washout ` 19 area, and elsewhere as necessary to clearly indicate the location of the concrete washout area. The washout area shall be repaired and enlarged or cleaned out as necessary to maintain capacity for wasted concrete. Concrete and concrete wash water shall be removed from the site and disposed of at an accepted waste facility. · Stabilized Staging Area – This is a clearly designated area where construction equipment and vehicles, stockpiles, waste bins, and other construction-related materials are stored. The stabilized storage area consists of a stabilized surface, covered with 3-inch diameter aggregate or larger. Permanent stabilization of the site will include establishment of native seeded areas in the ROW and on-site disturbed area and pavement placement. Final site stabilization is achieved when perennial vegetative cover provides permanent stabilization with a density greater than 70 percent over the entire area to be stabilized by vegetative cover. CONSTRUCTION SEQUENCING CHART Project Phase BMP’s Pre-disturbance/Pre- Construction Phase · Install sediment controls downgradient of access point (including inlet protection of existing inlets and drainage facilities, see erosion control plan) · Establish vehicle tracking control at entrance to paved frontage road · Use construction fencing to define the boundaries of the project and limit access to areas of the site that are not to be disturbed · Install perimeter controls (silt fence) as needed on downgradient perimeter of site (see erosion control plan for location) Construction Phase · Create stabilization staging area · Locate portable toilets on flat surfaces away from drainage paths · Construct concrete washout area and provide signage (see erosion control plan for location) · Establish waste disposal areas ` 20 · Provide inlet protection as inlets are constructed (see erosion control plan for location) · Protect and repair BMPs, as necessary · Perform street sweeping as needed · Remove excess or waste materials Final Stabilization In addition to the above BMPs: · Seed and mulch (see landscape plan for additional detail) · Construct permanent outlet protection (rip rap) at constructed outlets · Remove all temporary BMPs when site has reached final stabilization CONSTRUCTION MATERIALS & EQUIPMENT The contractor shall store all construction materials and equipment and shall provide maintenance and fueling of equipment on confined areas on-site from which runoff will be contained and filtered. MAINTENANCE The temporary BMPs will be inspected by the contractor at a minimum of once every two weeks and after each significant storm event. The property owner will be responsible for routine and non-routine maintenance of the temporary BMPs. Routine maintenance includes: · Remove sediment from the bottom of the temporary sediment basin when accumulated sediment occupies about 20% of the design volume or when sediment accumulation results in poor drainage. · Debris and litter removal to minimize outlet clogging and improve aesthetics as necessary. · Inspection of the facility annually to ensure that it functions as initially intended. · Cleaning and repair of BMP’s is required when sediment has built up or the BMP is not working properly. ` 21 SWMP ADMINISTRATOR The SWMP Administrator is responsible for developing, implementing, maintaining, and revising the SWMP. The Contractor shall designate a SWMP Administrator which will be the contact for all SWMP related issues and the person responsible for its accuracy, completeness, and implementation. The SWMP Administrator should be a person with authority to adequately manage and direct day-to-day stormwater quality management activities at the site. The SWMP Administrator is responsible for holding a weekly storm water meeting attended by the General Contractor with all contractors and subcontractors involved in ground-disturbing activities to review the requirements of the Permit(s), the SWMP, and address any problems that have arisen in implementing the SWMP or maintaining the BMPs. Contractor shall maintain a log of all weekly meetings and document the issues addressed in the meetings. The name and contact information for the SWMP Administrator is: Name: ________________________________________ Phone: ___________________ ` 22 VII. CONCLUSIONS COMPLIANCE WITH STANDARDS The design presented in this final drainage report for Loaf N Jug #810 has been prepared in accordance with the design standards and guidelines presented in the Fort Collins Stormwater Criteria Manual. VARIANCES No variances are being requested with the proposed improvements described herein. DRAINAGE CONCEPT The proposed Loaf N Jug storm drainage improvements should provide adequate protection for the developed site. The proposed drainage design for the site should not negatively impact the existing downstream storm drainage system. ` 23 VII. REFERENCES 1. Fort Collins Stormwater Criteria Manual (Addendum to the Urban Storm Drainage Criteria Manuals Volumes 1, 2 and 3), prepared by City of Fort Collins. 2. Urban Drainage and Flood Control District, Drainage Criteria Manual Volumes 1 and 2, prepared by Wright-McLaughlin Engineers, dated June 2001 (revised April 2008), and the Volume 3, prepared by Wright-McLaughlin Engineers, dated September 1992 and revised November 2010. APPENDIX A – REFERENCE MATERIALS VICINITY MAP Loaf ‘N’ Jug #810 Vicinity Map Not to Scale Loaf ‘N’ Jug Project Site Fossil Creek Reservoir Cache La Poudre River NRCS SOILS MAP 9 Custom Soil Resource Report Soil Map 4480950 4480990 4481030 4481070 4481110 4481150 4481190 4481230 4481270 4480950 4480990 4481030 4481070 4481110 4481150 4481190 4481230 4481270 500430 500470 500510 500550 500590 500630 500670 500430 500470 500510 500550 500590 500630 500670 40° 28' 55'' N 104° 59' 41'' W 40° 28' 55'' N 104° 59' 31'' W 40° 28' 45'' N 104° 59' 41'' W 40° 28' 45'' N 104° 59' 31'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 50 100 200 300 Feet 0 20 40 80 120 Meters Map Scale: 1:1,610 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 118 Wiley silt loam, 1 to 3 percent slopes 0.1 0.7% 119 Wiley silt loam, 3 to 5 percent slopes 13.7 99.3% Totals for Area of Interest 13.8 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, Custom Soil Resource Report 11 FEMA FIRMETTE PROJECT SITE APPENDIX B – HYDROLOGY CALCULATIONS PROPOSED COMPOSITE RUNOFF CALCULATIONS Table 3.4-1. IDF Table for Rational Method Duration 2-year 10-year 100-year min in/hr in/hr in/hr 5 2.85 4.87 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.80 8 2.40 4.10 8.38 9 2.30 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.50 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.30 17 1.75 2.99 6.10 18 1.70 2.90 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.60 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.20 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.40 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.60 30 1.30 2.21 4.52 31 1.27 2.16 4.42 32 1.24 2.12 4.33 33 1.22 2.08 4.24 34 1.19 2.04 4.16 35 1.17 2.00 4.08 36 1.15 1.96 4.01 37 1.16 1.93 3.93 38 1.11 1.89 3.87 39 1.09 1.86 3.80 40 1.07 1.83 3.74 41 1.05 1.80 3.68 42 1.04 1.77 3.62 43 1.02 1.74 3.56 44 1.01 1.72 3.51 45 0.99 1.69 3.46 46 0.98 1.67 3.41 47 0.96 1.64 3.36 48 0.95 1.62 3.31 49 0.94 1.60 3.27 50 0.92 1.58 3.23 51 0.91 1.56 3.18 52 0.90 1.54 3.14 53 0.89 1.52 3.10 54 0.88 1.50 3.07 55 0.87 1.48 3.03 56 0.86 1.47 2.99 57 0.85 1.45 2.96 58 0.84 1.43 2.92 59 0.83 1.42 2.89 60 0.82 1.40 2.86 65 0.78 1.32 2.71 0.00 2.00 4.00 6.00 8.00 10.00 12.00 0 10 20 30 40 50 60 70 80 90 100 110 120 Rainfall Intensity (in/hr) Storm Duration (Minutes) Table RA-7 | City of Fort Collins Rainfall Intensity - Duration - Frequency (IDF) 2-Year 10-Year 100-Year Designer: Company: 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr Date: 1-hour rainfall depth, P1 (in) = 0.88 1.16 1.47 1.99 2.49 3.05 4.68 Project: a b c Location: Rainfall Intensity Equation Coefficients = 28.50 10.00 0.786 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr Overland Flow Length Li (ft) U/S Elevation (ft) (Optional) D/S Elevation (ft) (Optional) Overland Flow Slope Si (ft/ft) Overland Flow Time ti (min) Channelized Flow Length Lt (ft) U/S Elevation (ft) (Optional) D/S Elevation (ft) (Optional) Channelized Flow Slope St (ft/ft) NRCS Conveyance Factor K Channelized Flow Velocity Vt (ft/sec) Channelized Flow Time tt (min) Computed tc (min) Regional tc (min) Selected tc (min) 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr 0.71 0.73 0.76 0.79 0.81 0.83 0.85 11.09 APPENDIX C – HYDRAULIC CALCULATIONS UDFCD SAND FILTER BMP CALCULATIONS Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 59.0 % (100% if all paved and roofed areas upstream of sand filter) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.590 C) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 0.19 watershed inches WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including sand filter area) Area = 86,250 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 1,339 cu ft VWQCV = WQCV / 12 * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth DWQCV = 0.5 ft B) Sand Filter Side Slopes (Horizontal distance per unit vertical, Z = 4.00 ft / ft 4:1 or flatter preferred). Use "0" if sand filter has vertical walls. C) Minimum Filter Area (Flat Surface Area) AMin = 636 sq ft D) Actual Filter Area AActual = 850 sq ft E) Volume Provided VT = cu ft 3. Filter Material 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 2.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 1,339 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 13 / 16 in City of Fort Collins BSM Fort Collins, Colorado Design Procedure Form: Sand Filter (SF) Galloway & Company, Inc. March 7, 2018 UD-BMP (Version 3.06, November 2016) Choose One Choose One 18" CDOT Class B or C Filter Material Other (Explain): YES NO LNJ810_UD-BMP_v3.06.xlsm, SF 3/7/2018, 12:55 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6-7. Inlet / Outlet Works A) Describe the type of energy dissipation at inlet points and means of conveying flows in excess of the WQCV through the outlet Notes: Design Procedure Form: Sand Filter (SF) Galloway & Company, Inc. March 7, 2018 Fort Collins, Colorado Choose One YES NO LNJ810_UD-BMP_v3.06.xlsm, SF 3/7/2018, 12:55 AM SAND FILTER MEDIA SPECIFICATIONS March 19, 2011 BIORETENTION SAND MEDIA SPECIFICATION 1 CITY OF FORT COLLINS BIORETENTION SAND MEDIA SPECIFICATION PART 1 - GENERAL A. Bioretention Sand Media (BSM) shall be uniformly mixed, uncompacted, free of stones, stumps, roots, or other similar objects larger than two inches. No other materials or substances shall be mixed or dumped within the bioretention area that may be harmful to plant growth or prove a hindrance to the facility’s function and maintenance. B. BSM shall be free of plant or seed material of non-native, invasive species, or weeds. C. Fully mixed BSM shall be tested prior to installation and meet the following criteria: 1. P-Index of less than 30 2. pH of 5.5-6.5. Should pH fall outside of the acceptable range, it may be modified with lime (to raise) or iron sulfate plus sulfur (to lower). The lime or iron sulfate must be mixed uniformly into the BSM prior to use in the bioretention facility. 3. Cation Exchange Capacity (CEC) greater than 10 4. Phosphorous (Phosphate, P2O5) not to exceed 69 ppm 5. BSM that fails to meet the minimum requirements shall be replaced at the Contractor’s expense. D. BSM shall be delivered fully mixed in a drum mixer. Onsite mixing of piles will not be allowed. Mixing of the BSM to a homogeneous consistency shall be done to the satisfaction of the Owner. PART 2 - SOIL MATERIALS A. Sand 1. BSM shall consist of 60-70% sand by volume meeting ASTM C-33. B. Shredded Paper 1. BSM shall consist of 5-10% shredded paper by volume. 2. Shredded paper shall be loosely packed, approximate bulk density of 50-100 lbs/CY. 3. Shredded paper shall consist of loose leaf paper, not shredded phone books, and shall be thoroughly and mechanically mixed to prevent clumping. C. Topsoil 1. BSM shall consist of 5-10% topsoil by volume. 2. Topsoil shall be classified as sandy loam, loamy sand, or loam per USDA textural triangle with less than 5% clay material. 3. Onsite, native material shall not be used as topsoil. 4. Textural analysis shall be performed on topsoil, preferably at its source, prior to including topsoil in the mix. Topsoil shall be free of subsoil, debris, weeds, foreign matter, and any other material deleterious to plant health. 5. Topsoil shall have a pH range of 5.5 to 7.5 and moisture content between 25-55%. 6. Contractor shall certify that topsoil meets these specifications. D. Leaf Compost 1. BSM shall consist of 10-20% leaf compost by volume. 2. Leaf compost shall consist of Class 1 organic leaf compost consisting of aged leaf mulch resulting from biological degradation and transformation of plant-derived materials under controlled conditions designed to promote aerobic decomposition. March 19, 2011 BIORETENTION SAND MEDIA SPECIFICATION 2 3. The material shall be well composted, free of viable weed seeds and contain material of a generally humus nature capable of sustaining growth of vegetation, with no materials toxic to plant growth. 4. Compost shall be provided by a local US Composting Council Seal of Testing Assurance (STA) member. A copy of the provider’s most recent independent STA test report shall be submitted to and approved by the Owner prior to delivery of BSM to the project site. 5. Compost material shall also meet the following criteria: a. 100 percent of the material shall pass through a 1/2 inch screen b. PH of the material shall be between 6.0 and 8.4 c. Moisture content shall be between 35 and 50 percent d. Maturity greater than 80 percent (maturity indicator expressed as percentage of germination/vigor, 80+/80+) e. Maturity indicator expressed as Carbon to Nitrogen ration < 12 f. Maturity indicator expressed as AmmoniaN/NitrateN Ratio <4 g. Minimum organic matter shall be 40 percent dry weight basis h. Soluble salt content shall be no greater than 5500 parts per million or 0-5 mmhos/cm i. Phosphorus content shall be no greater than 325 parts per million j. Heavy metals (trace) shall not exceed 0.5 parts per million k. Chemical contaminants: meet or exceed US EPA Class A standard, 40 CFR 503.13, Tables 1 & 3 levels l. Pathogens: meet or exceed US EPA Class A standard, 40 CFR 503.32(a) levels PART 3 - EXECUTION A. General 1. Refer to project specifications for excavation requirements. B. Placement Method 1. BSM material shall be spread evenly in horizontal layers. 2. Thickness of loose material in each layer shall not exceed 9-inches. 3. Compaction of BSM material is not required. MODIFIED FAA METHOD EXTENDED DETENTION CALCULATIONS Project Number: LNJ810 Date: 3/7/2018 Project Location: Fort Collins, Colorado Calculations By: H. Feissner Pond Description: Detention Pond User Input Cell: Blue Text 100-year 16128 0.75 0.37 2 0.52 minutes seconds in/hr cubic feet cubic feet cubic feet acre-feet 5 300 9.95 4478 156 4322 0.099 10 600 7.72 6948 312 6636 0.152 15 900 6.52 8802 468 8334 0.191 20 1200 5.60 10080 624 9456 0.217 25 1500 4.98 11205 780 10425 0.239 30 1800 4.52 12204 936 11268 0.259 35 2100 4.08 12852 1092 11760 0.270 40 2400 3.74 13464 1248 12216 0.280 45 2700 3.46 14013 1404 12609 0.289 50 3000 3.23 14535 1560 12975 0.298 55 3300 3.03 14999 1716 13283 0.305 60 3600 2.86 15444 1872 13572 0.312 65 3900 2.71 15854 2028 13826 0.317 70 4200 2.59 16317 2184 14133 0.324 75 4500 2.48 16740 2340 14400 0.331 80 4800 2.38 17136 2496 14640 0.336 85 5100 2.29 17519 2652 14867 0.341 90 5400 2.21 17901 2808 15093 0.346 95 5700 2.13 18212 2964 15248 0.350 100 6000 2.06 18540 3120 15420 0.354 105 6300 2.00 18900 3276 15624 0.359 110 6600 1.94 19206 3432 15774 0.362 115 6900 1.88 19458 3588 15870 0.364 120 7200 1.84 19872 3744 16128 0.370 Storage Volume Modified FAA Method- Storage Volume Calculations Inputs | Tributary Area Output | Detention Volume Storm Duration Time Rainfall Intensity Inflow Volume Catchment 'C': Catchment Drainage Area, ac: Return Period for Detention Control: Required Storage, cubic feet: Required Storage, ac-ft: Release Rate, cfs: Average Outflow Storage Volume UDFCD DETENTION & OUTLET STRUCTURE CALCULATIONS Project: Basin ID: Depth Increment = 0.1 ft Required Volume Calculation Media Surface 0.00 125.5 31.4 3,938 0.090 Selected BMP Type = SF 0.10 126.3 32.2 4,064 0.093 400 0.009 Watershed Area = 1.98 acres 0.20 127.0 32.9 4,179 0.096 771 0.018 Watershed Length = 350 ft 0.30 127.8 33.7 4,307 0.099 1,195 0.027 Watershed Slope = 0.015 ft/ft Zone 1 (WQCV) 0.33 128.1 34.0 4,359 0.100 1,369 0.031 Watershed Imperviousness = 59.0% percent 0.40 128.6 34.5 4,437 0.102 1,633 0.037 Percentage Hydrologic Soil Group A = 0% percent 0.50 129.4 35.3 4,568 0.105 2,083 0.048 Percentage Hydrologic Soil Group B = 100% percent 0.60 130.2 36.1 4,701 0.108 2,546 0.058 Percentage Hydrologic Soil Groups C/D = 0% percent 0.70 131.0 36.9 4,834 0.111 3,023 0.069 Desired WQCV Drain Time = 12 hours 0.80 131.8 37.7 4,969 0.114 3,513 0.081 Location for 1-hr Rainfall Depths = User Input 0.90 132.6 38.5 5,106 0.117 4,017 0.092 Water Quality Capture Volume (WQCV) = 0.031 acre-feet 1.00 133.4 39.3 5,243 0.120 4,534 0.104 Excess Urban Runoff Volume (EURV) = 0.127 acre-feet 1.10 134.2 40.1 5,382 0.124 5,066 0.116 2-yr Runoff Volume (P1 = 0.88 in.) = 0.077 acre-feet 0.88 inches Zone 2 (EURV) 1.18 134.9 40.8 5,508 0.126 5,556 0.128 5-yr Runoff Volume (P1 = 1.16 in.) = 0.108 acre-feet 1.16 inches 1.20 135.0 40.9 5,522 0.127 5,611 0.129 10-yr Runoff Volume (P1 = 1.47 in.) = 0.154 acre-feet 1.47 inches 1.30 135.8 41.7 5,664 0.130 6,170 0.142 25-yr Runoff Volume (P1 = 1.99 in.) = 0.241 acre-feet 1.99 inches 1.40 136.6 42.5 5,806 0.133 6,744 0.155 50-yr Runoff Volume (P1 = 2.49 in.) = 0.315 acre-feet 2.49 inches 1.50 137.4 43.3 5,950 0.137 7,331 0.168 100-yr Runoff Volume (P1 = 3.05 in.) = 0.411 acre-feet 3.05 inches 1.60 138.2 44.1 6,095 0.140 7,934 0.182 500-yr Runoff Volume (P1 = 4.68 in.) = 0.679 acre-feet 4.68 inches 1.70 139.0 44.9 6,242 0.143 8,550 0.196 Approximate 2-yr Detention Volume = 0.072 acre-feet 1.80 139.8 45.7 6,390 0.147 9,182 0.211 Approximate 5-yr Detention Volume = 0.102 acre-feet 1.90 140.6 46.5 6,539 0.150 9,828 0.226 Approximate 10-yr Detention Volume = 0.143 acre-feet 2.00 141.4 47.3 6,689 0.154 10,490 0.241 Approximate 25-yr Detention Volume = 0.183 acre-feet 2.10 142.3 48.2 6,856 0.157 11,235 0.258 Approximate 50-yr Detention Volume = 0.212 acre-feet 2.20 143.1 49.0 7,009 0.161 11,928 0.274 Approximate 100-yr Detention Volume = 0.254 acre-feet 2.30 143.9 49.8 7,163 0.164 12,637 0.290 2.40 144.7 50.6 7,319 0.168 13,361 0.307 Stage-Storage Calculation 2.50 145.5 51.4 7,476 0.172 14,100 0.324 Zone 1 Volume (WQCV) = 0.031 acre-feet 2.60 146.3 52.2 7,634 0.175 14,856 0.341 Zone 2 Volume (EURV - Zone 1) = 0.096 acre-feet 2.70 147.1 53.0 7,793 0.179 15,627 0.359 Zone 3 Volume (User Defined - Zones 1 & 2) = 0.285 acre-feet 2.80 147.9 53.8 7,954 0.183 16,415 0.377 Total Detention Basin Volume = 0.412 acre-feet 2.90 148.7 54.6 8,116 0.186 17,218 0.395 Initial Surcharge Volume (ISV) = N/A ft^3 Zone 3 (User) 2.99 149.4 55.3 8,263 0.190 17,955 0.412 Initial Surcharge Depth (ISD) = N/A ft 3.00 149.5 55.4 8,279 0.190 18,038 0.414 Total Available Detention Depth (Htotal ) = 3.00 ft 3.10 150.3 56.2 8,444 0.194 18,874 0.433 Depth of Trickle Channel (HTC ) = N/A ft 3.20 151.1 57.0 8,610 0.198 19,727 0.453 Slope of Trickle Channel (STC ) = N/A ft/ft 3.30 151.9 57.8 8,777 0.201 20,596 0.473 Slopes of Main Basin Sides (Smain ) = 4 H:V 3.40 152.7 58.6 8,945 0.205 21,482 0.493 Basin Length-to-Width Ratio (RL/W ) = 4 3.50 153.5 59.4 9,115 0.209 22,385 0.514 3.60 154.3 60.2 9,286 0.213 23,305 0.535 Initial Surcharge Area (AISV ) = 0 ft^2 3.70 155.1 61.0 9,458 0.217 24,242 0.557 Surcharge Volume Length (LISV ) = 0.0 ft 3.80 155.9 61.8 9,631 0.221 25,197 0.578 Surcharge Volume Width (WISV ) = 0.0 ft 0 User Defined Stage-Area Boolean for Message 0 Equal Stage-Area Inputs Watershed L:W 1 CountA 0 Calc_S_TC H_FLOOR 125.5069 L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 0.33 Zone 1 (WQCV) 0.33 Zone 1 (WQCV) 1.18 Zone 2 (EURV) 1.18 Zone 2 (EURV) 2.99 Zone 3 (User) 2.99 Zone 3 (User) DETENTION BASIN STAGE-STORAGE TABLE BUILDER UD-Detention, Version 3.07 (February 2017) 0.000 0.660 1.320 1.980 2.640 0.000 0.130 0.260 0.390 0.520 0.00 2.50 5.00 7.50 10.00 Volume (ac-ft) Area (acres) Stage (ft.) Area (acres) Volume (ac-ft) 0 5500 11000 16500 22000 0 55 110 165 220 0.00 2.50 5.00 7.50 10.00 Area (sq.ft.) Length, Width (ft.) Stage (ft) Length (ft) Width (ft) Area (sq.ft.) LNJ810 Detention and SF-UD-Detention_v3.07-TEST.xlsm, Basin 3/13/2018, 1:58 PM Project: Basin ID: Stage (ft) Zone Volume (ac-ft) Outlet Type Zone 1 (WQCV) 0.33 0.031 Filtration Media Zone 2 (EURV) 1.18 0.096 Orifice Plate Zone 3 (User) 2.99 0.285 Weir&Pipe (Circular) 0.412 Total User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP) Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = 2.50 ft (distance below the filtration media surface) Underdrain Orifice Area = 0.0 ft 2 Underdrain Orifice Diameter = 0.80 inches Underdrain Orifice Centroid = 0.03 feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP) Calculated Parameters for Plate Invert of Lowest Orifice = 0.33 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = N/A ft 2 Depth at top of Zone using Orifice Plate = 1.18 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = 3.40 inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = sq. inches Elliptical Slot Area = N/A ft 2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) 0.33 0.61 0.90 Orifice Area (sq. inches) 0.00 0.00 0.00 Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) User Input: Vertical Orifice (Circular or Rectangular) Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = N/A N/A ft 2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches User Input: Overflow Weir (Dropbox) and Grate (Flat or Sloped) Calculated Parameters for Overflow Weir Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 0.53 N/A ft (relative to basin bottom at Stage = 0 ft) Height of Grate Upper Edge, Ht = 0.53 N/A feet Overflow Weir Front Edge Length = 2.50 N/A feet Over Flow Weir Slope Length = 2.50 N/A feet Overflow Weir Slope = 0.00 N/A H:V (enter zero for flat grate) Grate Open Area / 100-yr Orifice Area = 102.31 N/A should be > 4 Horiz. Length of Weir Sides = 2.50 N/A feet Overflow Grate Open Area w/o Debris = 4.38 N/A ft 2 Overflow Grate Open Area % = 70% N/A %, grate open area/total area Overflow Grate Open Area w/ Debris = 2.19 N/A ft 2 Debris Clogging % = 50% N/A % . User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice) Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Circular Not Selected Zone 3 Circular Not Selected Depth to Invert of Outlet Pipe = 2.50 N/A ft (distance below basin bottom at Stage = 0 ft) Outlet Orifice Area = 0.04 N/A ft 2 Circular Orifice Diameter = 2.80 N/A inches Outlet Orifice Centroid = 0.12 N/A feet Half-Central Angle of Restrictor Plate on Pipe = N/A N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal) Calculated Parameters for Spillway Spillway Invert Stage= 3.00 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.51 feet Spillway Crest Length = 5.00 feet Stage at Top of Freeboard = 4.51 feet Spillway End Slopes = 4.00 H:V Basin Area at Top of Freeboard = 0.25 acres Freeboard above Max Water Surface = 1.00 feet Routed Hydrograph Results Design Storm Return Period = WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) = 0.53 1.07 0.88 1.16 1.47 1.99 2.49 3.05 4.68 Calculated Runoff Volume (acre-ft) = 0.031 0.127 0.077 0.108 0.154 0.241 0.315 0.411 0.679 OPTIONAL Override Runoff Volume (acre-ft) = Inflow Hydrograph Volume (acre-ft) = 0.031 0.126 0.076 0.108 0.153 0.241 0.315 0.411 0.678 COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1 Vert Orifice 2 Count_Underdrain = 1 0.11(diameter = 3/8 inch) 2 1 1 Count_WQPlate = 0 0.14(diameter = 7/16 inch) Count_VertOrifice1 = 0 0.18(diameter = 1/2 inch) Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch) 2 1 5yr, <72hr 0 Count_Weir1 = 1 0.29(diameter = 5/8 inch) >5yr, <120hr 0 Count_Weir2 = 0 0.36 (diameter = 11/16 inch) Max Depth Row Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch) WQCV 28 Watershed Constraint Check Count_OutletPipe2 = 0 0.50 (diameter = 13/16 inch) 2 Year 60 Slope 0.015 COUNTA_2 (Standard FSD Setup)= 1 0.58(diameter = 7/8 inch) EURV 91 Shape 1.42 MaxPondDepth_Error? FALSE 0.(67 diameter = 15/16 inch) 5 Year 79 Hidden Parameters & Calculations 0.76 (diameter = 1 inch) 10 Year 110 Spillway Depth (diameter 0.86 = 1-1/16 inches) 25 Year 168 0.51 WQ Plate Flow at 100yr depth = 0.00 0.(diameter 97 = 1-1/8 inches) 50 Year 213 CLOG #1= 35% (diameter 1.08 = 1-3/16 inches) 100 Year 267 1 Z1_Boolean Cdw #1 = 1.15 1.(diameter 20 = 1-1/4 inches) 500 Year 336 0 Z2_Boolean Cdo #1 = 1.07 (diameter 1.32 = 1-5/16 inches) Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle = 0.000 1.(diameter 45 = 1-3/8 inches) 1 Opening Message CLOG #2= #VALUE! (diameter 1.59 = 1-7/16 inches) Draintime Running Cdw #2 = #VALUE! 1.(diameter 73 = 1-1/2 inches) Outlet Boolean Outlet Rank Total (1 to 4) Cdo #2 = #VALUE! (diameter 1.88 = 1-9/16 inches) Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle = #VALUE! 2.(diameter 03 = 1-5/8 inches) Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth = 0.04 (diameter 2.20 = 1-11/16 inches) Overflow Weir 1 1 1 0 Max Depth VertOrifice1 Q at 100yr depth = 0.00 2.(diameter 36 = 1-3/4 inches) Overflow Weir 2 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth = 0.00 (diameter 2.54 = 1-13/16 inches) Outlet Pipe 1 1 1 0 Freeboard EURV_draintime_user = 32 2.(diameter 72 = 1-7/8 inches) Outlet Pipe 2 0 0 1 Spillway Count_User_Hydrographs 0 (diameter 2.90 = 1-15/16 inches) 0 Spillway Length CountA_3 (EURV & 100yr) = 0 3.09(diameter = 2 inches) Button Visibility Boolean FALSE Time Interval CountA_4 (100yr Only) = 1 (use 3.29 rectangular openings) 1 Button_Trigger 1 Underdrain 0 WQCV Plate 1 EURV-WQCV Plate 0 EURV-WQCV VertOrifice 0 Outlet 90% Qpeak 1 Outlet Undetained S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound UD-Detention, Version 3.07 (February 2017) Detention Basin Outlet Structure Design 0 2 4 6 8 10 12 14 0.1 1 10 FLOW [cfs] TIME [hr] 500YR IN 500YR OUT 100YR IN 100YR OUT 50YR IN Outflow Hydrograph Workbook Filename: Storm Inflow Hydrographs The user can override the calculated inflow hydrographs from this workbook with inflow hydrographs developed in a separate program. SOURCE WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK Time Interval TIME WQCV [cfs] EURV [cfs] 2 Year [cfs] 5 Year [cfs] 10 Year [cfs] 25 Year [cfs] 50 Year [cfs] 100 Year [cfs] 500 Year [cfs] 4.70 min 0:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0:04:42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hydrograph 0:09:24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Constant 0:14:06 0.03 0.10 0.06 0.09 0.13 0.19 0.25 0.33 0.53 1.064 0:18:48 0.07 0.28 0.17 0.24 0.33 0.52 0.67 0.88 1.43 0:23:30 0.18 0.71 0.43 0.61 0.86 1.34 1.73 2.25 3.67 0:28:12 0.49 1.96 1.19 1.68 2.36 3.67 4.77 6.19 10.08 0:32:54 0.57 2.28 1.38 1.96 2.75 4.31 5.61 7.30 11.98 0:37:36 0.54 2.16 1.31 1.86 2.61 4.10 5.34 6.96 11.43 0:42:18 0.48 1.96 1.19 1.69 2.38 3.73 4.86 6.33 10.41 0:47:00 0.42 1.74 1.05 1.49 2.10 3.31 4.32 5.64 9.30 0:51:42 0.36 1.48 0.89 1.27 1.80 2.84 3.71 4.86 8.03 0:56:24 0.31 1.30 0.78 1.11 1.57 2.48 3.24 4.24 6.99 1:01:06 0.28 1.17 0.70 1.00 1.42 2.24 2.94 3.84 6.34 1:05:48 0.23 0.95 0.57 0.81 1.16 1.83 2.40 3.15 5.23 1:10:30 0.18 0.76 0.45 0.65 0.93 1.48 1.95 2.56 4.28 1:15:12 0.13 0.57 0.33 0.49 0.70 1.12 1.48 1.96 3.30 1:19:54 0.09 0.41 0.24 0.35 0.51 0.82 1.09 1.45 2.46 1:24:36 0.07 0.30 0.18 0.26 0.37 0.60 0.80 1.05 1.78 1:29:18 0.06 0.24 0.14 0.20 0.29 0.47 0.62 0.82 1.38 1:34:00 0.05 0.20 0.12 0.17 0.24 0.39 0.51 0.68 1.13 1:38:42 0.04 0.17 0.10 0.14 0.21 0.33 0.44 0.57 0.96 1:43:24 0.04 0.15 0.09 0.13 0.18 0.29 0.38 0.50 0.84 1:48:06 0.03 0.14 0.08 0.12 0.17 0.26 0.35 0.46 0.76 1:52:48 0.03 0.13 0.08 0.11 0.15 0.24 0.32 0.42 0.70 1:57:30 0.02 0.09 0.06 0.08 0.11 0.18 0.24 0.31 0.51 2:02:12 0.02 0.07 0.04 0.06 0.08 0.13 0.17 0.23 0.38 2:06:54 0.01 0.05 0.03 0.04 0.06 0.10 0.13 0.17 0.28 2:11:36 0.01 0.04 0.02 0.03 0.04 0.07 0.09 0.12 0.20 2:16:18 0.01 0.02 0.01 0.02 0.03 0.05 0.07 0.09 0.15 2:21:00 0.00 0.02 0.01 0.01 0.02 0.03 0.05 0.06 0.10 2:25:42 0.00 0.01 0.01 0.01 0.01 0.02 0.03 0.04 0.07 2:30:24 0.00 0.01 0.00 0.01 0.01 0.02 0.02 0.03 0.05 2:35:06 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.02 0.03 2:39:48 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 2:44:30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2:49:12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2:53:54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2:58:36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:03:18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:08:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:12:42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:17:24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:22:06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:26:48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:31:30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:36:12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:40:54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:45:36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:50:18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:55:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:59:42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:04:24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:09:06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Summary Stage-Area-Volume-Discharge Relationships The user can create a summary S-A-V-D by entering the desired stage increments and the remainder of the table will populate automatically. The user should graphically compare the summary S-A-V-D table to the full S-A-V-D table in the chart to confirm it captures all key transition points. Stage Area Area Volume Volume Total Outflow [ft] [ft^2] [acres] [ft^3] [ac-ft] [cfs] UD-Detention, Version 3.07 (February 2017) Detention Basin Outlet Structure Design Stage - Storage Description For best results, include the stages of all grade slope changes (e.g. ISV and Floor) from the S-A-V table on Sheet 'Basin'. Also include the inverts of all outlets (e.g. vertical orifice, overflow grate, and spillway, where applicable). APPENDIX D – DRAINAGE MAPS DEVELOPED CONDITION DRAINAGE MAP LOT 1 INTERSTATE LAND HOLDINGS MINOR LAND DIVISION FILE NO. 12-S3124 OWNER: INTERSTATE LAND HOLDINGS LLC SW FRONTAGE ROAD (PUBLIC RIGHT OF WAY - WIDTH VARIES) CARPENTER ROAD (CO-HWY 392) (PUBLIC RIGHT OF WAY - WIDTH VARIES) EXIT 262 NW NW I-25 OFF RAMP (PUBLIC RIGHT OF WAY - WIDTH VARIES) UE UE STM STM STM STM STM STM STM STM STM STM 4875 4875 4880 4885 4890 4895 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4880 4885 4879 4881 4882 4883 4884 4886 4887 4888 4880 4880 4885 2.49% A4 0.34 0.86 0.89 A2 0.69 0.01 0.44 APPENDIX E – EROSION CONTROL MAP EROSION CONTROL PLAN SW FRONTAGE ROAD (PUBLIC RIGHT OF WAY - WIDTH VARIES) CARPENTER ROAD (CO-HWY 392) (PUBLIC RIGHT OF WAY - WIDTH VARIES) EXIT 262 NW NW I-25 OFF RAMP (PUBLIC RIGHT OF WAY - WIDTH VARIES) 4875 4875 4880 4885 4890 4895 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4880 4885 4879 4881 4882 4883 4884 4886 4887 4888 4880 4880 4885 4885 4885 4885 83 84 84 84 86 87 88 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X LOD LOD LOD LOD LOD SF SF VTC CWA SSA SP PT IP IP SF SF IP IP IP SF SF SF LS LS LS # Date Issue / Description STAMP 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 303.770.8884 Planning. Architecture. Engineering. O www.gallowayUS.com C 2016. Galloway & Company, Inc. All Rights Reserved Init. Date: Drawn By: Project No: Checked By: H:\Loaf N Jug\CO, Fort Collins - LNJ000810 - I-25 & Hwy 392\CADD\2 Plan\LNJ810_P_11-EROS.dwg - Cayla Cappello - 2015-04-16 LOAF N JUG #810 UTILITY PLANS NWC OF I-25 AND HIGHWAY 392 FORT COLLINS, COLORADO THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT LNJ000810 442 Keeler Parkway Pueblo, Colorado 81001 719-948-3071 1 03/28/18 1ST PLANNING SUBMITTAL CAC PJD 03/14/18 OF 10 8 EROSION CONTROL PLAN SCALE: 1"=40' 0 20 40 BASIS OF BEARING BEARINGS ARE BASED ON EAST LINE OF LOT 2, INTERSTATE LAND HOLDINGS MINOR LAND DIVISION FILE NO. 12-S3124, MONUMENTED ON THE NORTH END BY A BLUE PLASTIC CAP (ILLEGIBLE) AND SOUTH END BY A REBAR WITH A BLUE PLASTIC CAP STAMPED "PLS 34174", AND IS CONSIDERED TO BEAR, S08°15'04"W. BENCHMARK ELEVATIONS FOR THE SITE WERE BASED ON THE NATIONAL GEODETIC SURVEY (NGS) MONUMENT 'PEPEK', PID "AE3938", WHICH HAS AN ELEVATION OF 4927 FEET (NAVD 88) . THE STATION IS LOCATED ABOUT 3.5 MI (5.6 KM) SOUTH-SOUTHEAST OF TIMNATH, 3.2 MI (5.1 KM) WEST OF WINDSOR AND 1 MI (1.6 KM) WEST OF THE LARIMER-WELD COUNTY LINE, IN THE SOUTHEAST 1/4 OF SECTION 14, T 6 N, R 68 W, AT STATE HIGHWAY 392 MILEPOST 1.4. OWNERSHIP--COLORADO DEPT. OF TRANSPORTATION RIGHT-OF-WAY TO REACH THE STATION FROM THE INTERSECTION OF STATE HIGHWAY 392 AND STATE HIGHWAY 257 IN WINDSOR, GO WEST ON STATE HIGHWAY 392 FOR 3.0 MI (4.8 KM) TO THE INTERSECTION OF LARIMER COUNTY ROAD 3 AND THE STATION IN THE NORTHWEST CORNER OF THE INTERSECTION ON TOP OF A SMALL HILL. TO DRIVE TO THE STATION FROM THE INTERSECTION, GO NORTH ON COUNTY ROAD 3 FOR 0.1 MI (0.2 KM) TO THE ENTRANCE TO A SUBDIVISION. TURN LEFT, WEST, FOR ABOUT 30 M (98.4 FT) TO AN INTERSECTION. TURN LEFT, SOUTH, FOR ABOUT 30 M (98.4 FT) TO THE FIRST PLACE ON THE LEFT TO DRIVE UP TO THE TOP OF A SMALL HILL AND THE STATION THE MARK IS A STANDARD DISK SET IN THE TOP OF A 0.5 M (1.6 FT) ROUND BY 1.7 M (5.6 FT) DEEP CONCRETE POST PROJECTING 5 CM ABOVE THE GROUND. IT IS 67.5 M (221.5 FT) WEST FROM THE CENTER LINE OF LARIMER COUNTY ROAD 3, 46.7 M (153.2 FT) NORTHWEST FROM THE CENTER LINE OF STATE HIGHWAY 392, 3.4 M (11.2 FT) SOUTHEAST FROM THE TOP CENTER OF A TELEPHONE PEDISTAL, 2.55 M (8.37 FT) SOUTHEAST FROM A PROPERTY CORNER LS NUMBER 22564, 0.7 M (2.3 FT) NORTHEAST FROM A WITNESS POST AND 0.7 M (2.3 FT) SOUTHWEST FROM A WITNESS POST. CAUTION - NOTICE TO CONTRACTOR 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. 2. WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY, IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF SUCH EXISTING UTILITY, EITHER THROUGH POTHOLING OR ALTERNATIVE METHOD. REPORT INFORMATION TO THE ENGINEER PRIOR TO CONSTRUCTION. CITY ENGINEER DATE DATE DATE DATE DATE STORMWATER UTILITY PARKS & RECREATION TRAFFIC ENGINEER DATE APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: WATER & WASTEWATER UTILITY CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL ENVIRONMENTAL PLANNER EROSION CONTROL LEGEND X X X SILT FENCE EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CONTOUR PROPOSED STORM SEWER (12" AND LARGER) INLET GRAVEL FILTER VEHICLE TRACKING CONTROL CONSTRUCTION ENTRANCE GRAVEL SOCK INLET PROTECTION CONCRETE WASHOUT AREA GRAVEL SOCK IN GUTTER LIMITS OF DISTURBANCE (~3.6 ACRES) FLOW ARROW VTC SF IP GS SB CWA CONTRACTOR STAGING AREA (APPROXIMATE) SCL SEDIMENT CONTROL LOG SSA PROPOSED LANDSCAPE (SEE LANDSCAPING PLANS) PT PORTABLE TOILET SP SITE POSTING (CONTACTS AND PERMITS) PROPOSED STORM SEWER (LESS THAN 12") EXISTING CONTOUR PROPOSED CONTOUR LS All changes, addendums, additions, deletions and modifications to these drawings must be approved, in writing, by the Fort Collins-Loveland Water District and the South Fort Collins Sanitation District. Mr. Terry Farrill, P.E., District Engineer Date FORT COLLINS - LOVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT LOD R1 0.12 0.76 0.84 R2 0.16 0.76 0.84 A1 0.79 0.73 0.83 A3 0.22 0.86 0.89 A5 0.33 0.01 0.44 A6 0.21 0.01 0.44 # Date Issue / Description STAMP 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 303.770.8884 Planning. Architecture. Engineering. O www.gallowayUS.com C 2016. Galloway & Company, Inc. All Rights Reserved Init. Date: Drawn By: Project No: Checked By: H:\Loaf N Jug\CO, Fort Collins - LNJ000810 - I-25 & Hwy 392\CADD\2 Plan\LNJ810_P_10-DRAN.dwg - Cayla Cappello - 2015-04-16 LOAF N JUG #810 UTILITY PLANS NWC OF I-25 AND HIGHWAY 392 FORT COLLINS, COLORADO THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT LNJ000810 442 Keeler Parkway Pueblo, Colorado 81001 719-948-3071 1 03/28/18 1ST PLANNING SUBMITTAL BASIS OF BEARING BEARINGS ARE BASED ON EAST LINE OF LOT 2, INTERSTATE LAND HOLDINGS MINOR LAND DIVISION FILE NO. 12-S3124, MONUMENTED ON THE NORTH END BY A BLUE PLASTIC CAP (ILLEGIBLE) AND SOUTH END BY A REBAR WITH A BLUE PLASTIC CAP STAMPED "PLS 34174", AND IS CONSIDERED TO BEAR, S08°15'04"W. CAC PJD 03/14/18 OF 12 7 DRAINAGE PLAN CAUTION - NOTICE TO CONTRACTOR 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. 2. WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY, IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF SUCH EXISTING UTILITY, EITHER THROUGH POTHOLING OR ALTERNATIVE METHOD. REPORT INFORMATION TO THE ENGINEER PRIOR TO CONSTRUCTION. CITY ENGINEER DATE DATE DATE DATE DATE STORMWATER UTILITY PARKS & RECREATION TRAFFIC ENGINEER DATE APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: WATER & WASTEWATER UTILITY CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL ENVIRONMENTAL PLANNER SCALE: 1"=40' 0 20 40 SITE LEGEND ADJACENT PROPERTY BOUNDARY LINE PROPERTY BOUNDARY LINE PROPOSED CURB & GUTTER EXISTING CURB & GUTTER TO REMAIN PROPOSED INLET EASEMENT BOUNDARY LINE STREET LIGHT EXISTING TO BE REMOVED GRADING LEGEND EXISTING STORM SEWER PROPOSED STORM SEWER STS 45 PROPOSED CONTOUR 5245 EXISTING CONTOUR STS STS PROPOSED STORM SEWER (LESS THAN 12") DRAINAGE LEGEND PROPOSED BASIN BOUNDARY LINE DESIGN POINT BASIN AREA IN ACRES 100-YEAR RUNOFF COEFFICIENT BASIN DESIGNATION A 5-YEAR RUNOFF COEFFICIENT 0.00 0.00 0.00 FLOW ARROW CITY OF FORT COLLINS DRAINAGE NOTES 1. ALL STREET, SANITARY SEWER, STORM SEWER AND WATER CONSTRUCTION SHALL CONFORM TO CITY STANDARDS AND SPECIFICATIONS CURRENT AT THE DATE OF EXECUTION OF THE DEVELOPMENT AGREEMENT PERTAINING TO THIS DEVELOPMENT. ANY CONSTRUCTION OCCURRING THREE YEARS AFTER THE EXECUTION OF THE DEVELOPMENT AGREEMENT SHALL REQUIRE RE-EXAMINATION OF THE PLANS BY THE DIRECTOR WHO MAY REQUIRE THAT THEY BE MADE TO CONFORM TO STANDARDS AND SPECIFICATIONS CURRENT AT THAT TIME. 2. THE TYPE, SIZE, LOCATION, AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE AS SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNKNOWN UNDERGROUND UTILITIES. 3. THESE PLANS HAVE BEEN REVIEWED BY THE CITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE CITY ENGINEER, OR THE CITY FOR ACCURACY OR CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT THE QUANTITIES OF THE ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE CITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. 4. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR MUST GIVE THE CITY ENGINEERING DEPARTMENT (970-221-6605) AND THE EROSION CONTROL INSPECTOR (970-221-6700) TWENTY-FOUR (24) HOURS ADVANCE-NOTICE. INITIAL EROSION CONTROL MEASURES MUST BE INSTALLED AND A SITE INSPECTION BY THE EROSION CONTROL INSPECTOR IS REQUIRED BEFORE COMMENCING CONSTRUCTION ACTIVITIES. 5. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNERS. 6. ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL STUDY FOR THIS DEVELOPMENT BY (ENGINEERING FIRM) MUST BE MET. 7. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE CITY, CERTIFICATION OF THE DRAINAGE FACILITIES BY A COLORADO REGISTERED PROFESSIONAL ENGINEER MUST BE SUBMITTED TO AND APPROVED BY THE CITY STORMWATER DEPARTMENT. FOR COMMERCIAL AND MULTI-FAMILY DEVELOPMENTS, CERTIFICATION OF ALL DRAINAGE FACILITIES SHALL BE SUBMITTED TO THE CITY STORMWATER DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY. INDIVIDUAL LOT CERTIFICATION, ELEVATION CERTIFICATION, OR FLOODPROOFING CERTIFICATION, AS SPECIFIED IN THE DEVELOPMENT AGREEMENT, MUST BE SUBMITTED TO THE CITY STORMWATER DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SUCH LOT. 8. IF DEWATERING IS USED TO INSTALL UTILITIES, AND DISCHARGE WILL BE INTO THE STREET, GUTTER, STORM SEWER, CHANNEL, IRRIGATION DITCH, OR ANY WATERS OF THE STATE A STATE CONSTRUCTION DEWATERING INDUSTRIAL WASTEWATER DISCHARGE PERMIT IS REQUIRED. 9. ALL LAND DISTURBING ACTIVITIES GREATER THAN OR EQUAL TO ONE ACRE MUST COMPLY WITH THE STATE OF COLORADO PERMITTING PROCESS FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. FOR MORE INFORMATION CONTACT THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT, WATER QUALITY CONTROL DIVISION, AT 303-692-3500 OR REFER TO THE WEB SITE AT HTTP://WWW.CDPHE.STATE.CO.US/WQ/PERMITSUNIT/ . 10. BENCHMARK: NATIONAL GEODETIC SURVEY BENCHMARK "C322 RESET 1959" NAVD 88 ELEVATION: 4989.40 A STANDARD 3 1/2 INCH U.S. CONSTRUCTION AND GEODETIC SURVEY BRASS BENCHMARK DISK SET IN THE TOP OF A CONCRETE WALL ON THE NORTH SIDE OF SPRING CREEK. LOCATED 47 FEET WEST OF THE CENTERLINE OF COLLEGE AVENUE (AKA U.S. HIGHWAY 287) AND 3,566 FEET NORTH OF THE CENTERLINE OF DRAKE STREET. 11. IF FILL OR DREDGED MATERIAL IS DISCHARGED INTO WATERS OF THE UNITED STATES, A USACE 404 PERMIT IS REQUIRED. 12. IF CONSTRUCTION AFFECTS ANY COLORADO HIGHWAY, A COLORADO DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY PERMIT IS REQUIRED. GENERAL DRAINAGE NOTES 1. NO BUILDING, STRUCTURE, OR FILL WILL BE PLACED IN THE DETENTION AREAS AND CHANGES OR ALTERATIONS AFFECTING THE HYDRAULIC CHARACTERISTICS OF THE DETENTION AREAS WILL BE MADE WITHOUT THE APPROVAL OF THE CITY ENGINEER. 2. MAINTENANCE AND OPERATION OF THE DETENTION AND WATER QUALITY AREAS IS THE RESPONSIBILITY OF PROPERTY OWNER. IF OWNER FAILS IN THIS RESPONSIBILITY, THE CITY HAS THE RIGHT TO ENTER THE PROPERTY, MAINTAIN THE DETENTION AREAS, AND BE REIMBURSED FOR COSTS INCURRED. 3. DETENTION POND VOLUMES, ALL DRAINAGE APPURTENANCES, AND BASIN BOUNDARIES SHALL BE VERIFIED. AS-BUILT DRAWINGS SHALL BE PREPARED BY A REGISTERED PROFESSIONAL ENGINEER PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY. 4. PERMISSION TO REPRODUCE THESE PLANS IS HEREBY GIVEN TO THE CITY OF LITTLETON FOR CITY PURPOSES ASSOCIATED WITH PLAN REVIEW, APPROVAL, PERMITTING, INSPECTION AND CONSTRUCTION OF THE WORK. 5. ALL PROPOSED CURB AND GUTTER FOR THE SITE SHALL BE 6" VERTICAL CURB AND GUTTER W/ A 1' PAN. VICINITY MAP NOT TO SCALE SITE RUNOFF SUMMARY TABLE DESIGN POINT BASIN AREA (AC) PERCENT IMPERVIOUS Q5 (CFS) Q100 (CFS) 1 A1 0.79 86.7 2.27 6.75 2 A2 0.69 2 0.03 3.12 3 A3 0.22 100 0.73 1.99 4 A4 0.34 100 1.16 3.17 5 A5 0.33 2 0.02 1.48 6 A6 0.21 2 0.01 0.93 1 R1 0.12 90 0.37 1.09 1 R2 0.16 90 0.47 1.38 All changes, addendums, additions, deletions and modifications to these drawings must be approved, in writing, by the Fort Collins-Loveland Water District and the South Fort Collins Sanitation District. Mr. Terry Farrill, P.E., District Engineer Date FORT COLLINS - LOVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT OF 10 4:13:48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:18:30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:23:12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:27:54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:32:36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:37:18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:42:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:46:42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:51:24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:56:06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:00:48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:05:30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:10:12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:14:54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:19:36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:24:18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:29:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:33:42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:38:24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 UD-Detention, Version 3.07 (February 2017) Detention Basin Outlet Structure Design 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT EURV IN EURV OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 3.5 4 0.1 1 10 100 PONDING DEPTH [ft] DRAIN TIME [hr] 500YR 100YR 50YR 25YR 10YR 5YR 2YR EURV WQCV 0.00 1,000.00 2,000.00 3,000.00 4,000.00 5,000.00 6,000.00 0 50,000 100,000 150,000 200,000 250,000 300,000 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 OUTFLOW [cfs] AREA [ft^2], VOLUME [ft^3] PONDING DEPTH [ft] User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] Predevelopment Unit Peak Flow, q (cfs/acre) = 0.00 0.00 0.01 0.02 0.19 0.71 1.10 1.61 2.93 Predevelopment Peak Q (cfs) = 0.0 0.0 0.0 0.0 0.4 1.4 2.2 3.2 5.8 Peak Inflow Q (cfs) = 0.6 2.3 1.4 2.0 2.8 4.3 5.6 7.3 12.0 Peak Outflow Q (cfs) = 0.0 0.4 0.4 0.4 0.4 0.4 0.4 0.46 4.4 Ratio Peak Outflow to Predevelopment Q = N/A N/A N/A 10.6 1.0 0.3 0.2 0.1 0.8 Structure Controlling Flow = Filtration Media Outlet Plate 1 Outlet Plate 1 Outlet Plate 1 Outlet Plate 1 Outlet Plate 1 Outlet Plate 1 Outlet Plate 1 Spillway Max Velocity through Grate 1 (fps) = N/A 0.08 0.07 0.1 0.1 0.1 0.1 0.1 0.1 Max Velocity through Grate 2 (fps) = N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) = 14 25 24 24 25 26 27 29 27 Time to Drain 99% of Inflow Volume (hours) = 14 26 25 25 26 29 30 32 33 Maximum Ponding Depth (ft) = 0.28 0.91 0.60 0.79 1.10 1.68 2.12 2.66 3.35 Area at Maximum Ponding Depth (acres) = 0.10 0.12 0.11 0.11 0.12 0.14 0.16 0.18 0.20 Maximum Volume Stored (acre-ft) = 0.026 0.095 0.058 0.080 0.116 0.195 0.261 0.352 0.483 Detention Basin Outlet Structure Design UD-Detention, Version 3.07 (February 2017) Example Zone Configuration (Retention Pond) 3.90 156.7 62.6 9,806 0.225 26,168 0.601 Depth of Basin Floor (HFLOOR ) = 0.00 ft 4.00 157.5 63.4 9,982 0.229 27,158 0.623 Length of Basin Floor (LFLOOR ) = 125.5 ft 4.10 158.3 64.2 10,160 0.233 28,165 0.647 Width of Basin Floor (WFLOOR ) = 31.4 ft 4.20 159.1 65.0 10,338 0.237 29,190 0.670 Area of Basin Floor (AFLOOR ) = 3,938 ft^2 4.30 159.9 65.8 10,518 0.241 30,233 0.694 Volume of Basin Floor (VFLOOR ) = 0 ft^3 4.40 160.7 66.6 10,699 0.246 31,294 0.718 Depth of Main Basin (HMAIN ) = 3.00 ft 4.50 161.5 67.4 10,882 0.250 32,373 0.743 Length of Main Basin (LMAIN ) = 149.5 ft 4.60 162.3 68.2 11,066 0.254 33,470 0.768 Width of Main Basin (WMAIN ) = 55.4 ft 4.70 163.1 69.0 11,251 0.258 34,586 0.794 Area of Main Basin (AMAIN ) = 8,279 ft^2 4.80 163.9 69.8 11,437 0.263 35,720 0.820 Volume of Main Basin (VMAIN ) = 17,927 ft^3 4.90 164.7 70.6 11,624 0.267 36,873 0.846 Calculated Total Basin Volume (Vtotal ) = 0.412 acre-feet 5.00 165.5 71.4 11,813 0.271 38,045 0.873 5.10 166.3 72.2 12,003 0.276 39,236 0.901 5.20 167.1 73.0 12,195 0.280 40,446 0.929 5.30 167.9 73.8 12,388 0.284 41,675 0.957 5.40 168.7 74.6 12,582 0.289 42,923 0.985 5.50 169.5 75.4 12,777 0.293 44,191 1.014 5.60 170.3 76.2 12,973 0.298 45,479 1.044 5.70 171.1 77.0 13,171 0.302 46,786 1.074 5.80 171.9 77.8 13,370 0.307 48,113 1.105 5.90 172.7 78.6 13,571 0.312 49,460 1.135 6.00 173.5 79.4 13,772 0.316 50,827 1.167 6.10 174.3 80.2 13,975 0.321 52,215 1.199 6.20 175.1 81.0 14,180 0.326 53,622 1.231 6.30 175.9 81.8 14,385 0.330 55,051 1.264 6.40 176.7 82.6 14,592 0.335 56,499 1.297 6.50 177.5 83.4 14,800 0.340 57,969 1.331 6.60 178.3 84.2 15,009 0.345 59,459 1.365 6.70 179.1 85.0 15,220 0.349 60,971 1.400 6.80 179.9 85.8 15,432 0.354 62,503 1.435 6.90 180.7 86.6 15,645 0.359 64,057 1.471 7.00 181.5 87.4 15,859 0.364 65,632 1.507 7.10 182.3 88.2 16,075 0.369 67,229 1.543 7.20 183.1 89.0 16,292 0.374 68,848 1.581 7.30 183.9 89.8 16,511 0.379 70,488 1.618 7.40 184.7 90.6 16,730 0.384 72,150 1.656 7.50 185.5 91.4 16,951 0.389 73,834 1.695 7.60 186.3 92.2 17,173 0.394 75,540 1.734 7.70 187.1 93.0 17,397 0.399 77,268 1.774 7.80 187.9 93.8 17,621 0.405 79,019 1.814 7.90 188.7 94.6 17,847 0.410 80,793 1.855 8.00 189.5 95.4 18,075 0.415 82,589 1.896 8.10 190.3 96.2 18,303 0.420 84,408 1.938 8.20 191.1 97.0 18,533 0.425 86,249 1.980 8.30 191.9 97.8 18,764 0.431 88,114 2.023 8.40 192.7 98.6 18,996 0.436 90,002 2.066 8.50 193.5 99.4 19,230 0.441 91,914 2.110 8.60 194.3 100.2 19,465 0.447 93,848 2.154 8.70 195.1 101.0 19,701 0.452 95,807 2.199 8.80 195.9 101.8 19,939 0.458 97,789 2.245 8.90 196.7 102.6 20,178 0.463 99,795 2.291 9.00 197.5 103.4 20,418 0.469 101,824 2.338 9.10 198.3 104.2 20,659 0.474 103,878 2.385 9.20 199.1 105.0 20,902 0.480 105,956 2.432 9.30 199.9 105.8 21,145 0.485 108,058 2.481 9.40 200.7 106.6 21,391 0.491 110,185 2.530 9.50 201.5 107.4 21,637 0.497 112,337 2.579 DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft^2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft^2) Width (ft) UD-Detention, Version 3.07 (February 2017) Volume (ft^3) Volume (ac-ft) Area (acre) Optional User Override 1-hr Precipitation Example Zone Configuration (Retention Pond) LNJ810 Detention and SF-UD-Detention_v3.07-TEST.xlsm, Basin 3/13/2018, 1:58 PM 5.00 2.98 3.93 4.99 6.75 8.45 10.35 15.87 1.66 2.27 2.97 4.22 5.40 6.75 10.66 0.01 0.01 0.07 0.26 0.34 0.44 0.54 20.54 5.00 2.98 3.93 4.99 6.75 8.45 10.35 15.87 0.02 0.03 0.25 1.22 1.98 3.12 5.97 0.84 0.86 0.86 0.88 0.89 0.89 0.90 3.80 5.00 2.98 3.93 4.99 6.75 8.45 10.35 15.87 0.54 0.73 0.93 1.28 1.62 1.99 3.10 0.84 0.86 0.86 0.88 0.89 0.89 0.90 4.23 5.00 2.98 3.93 4.99 6.75 8.45 10.35 15.87 0.86 1.16 1.48 2.04 2.58 3.17 4.93 0.01 0.01 0.07 0.26 0.34 0.44 0.54 4.02 5.00 2.98 3.93 4.99 6.75 8.45 10.35 15.87 0.01 0.02 0.12 0.58 0.94 1.48 2.84 0.01 0.01 0.07 0.26 0.34 0.44 0.54 14.38 5.00 2.98 3.93 4.99 6.75 8.45 10.35 15.87 0.01 0.01 0.08 0.37 0.59 0.93 1.79 0.74 0.76 0.78 0.81 0.83 0.84 0.87 12.63 5.00 2.98 3.93 4.99 6.75 8.45 10.35 15.87 0.27 0.37 0.49 0.68 0.87 1.09 1.71 0.74 0.76 0.78 0.81 0.83 0.84 0.87 5.80 5.00 2.98 3.93 4.99 6.75 8.45 10.35 15.87 0.35 0.47 0.62 0.87 1.11 1.38 2.17 0.40 0.43 0.49 0.58 0.63 0.67 0.73 5.00 2.98 3.93 4.99 6.75 8.45 10.35 15.87 3.41 4.85 6.94 11.26 15.09 19.92 33.17 0.45 0.48 0.53 0.62 0.66 0.70 0.75 5.00 2.98 3.93 4.99 6.75 8.45 10.35 15.87 2.66 3.76 5.26 8.27 10.98 14.33 23.61 B 2.0 300.00 0.011 Rainfall Intensity, I (in/hr) 75.00 0.011 11.82 Peak Flow, Q (cfs) Calculation of Peak Runoff using Rational Method Runoff Coefficient, C Overland (Initial) Flow Time Channelized (Travel) Flow Time Time of Concentration Subcatchment Name Area (ac) NRCS Hydrologic Soil Group Percent Imperviousness A1 0.79 B 86.7 Select UDFCD location for NOAA Atlas 14 Rainfall Depths from the pulldown list OR enter your own depths obtained from the NOAA website (click this link) Cells of this color are for required user-input Cells of this color are for optional override values Cells of this color are for calculated results based on overrides CAC Galloway 3/7/2018 LNJ000810.20 Fort Collins, CO Version 2.00 released May 2017 A3 0.22 B 100.0 30.00 0.003 165.00 0.020 A2 0.69 250.00 0.035 9.21 A5 0.33 B 2.0 35.00 0.250 9.85 A4 0.34 B 100.0 170.00 0.025 45.00 0.025 R1 0.12 B 90.0 95.00 0.001 A6 0.21 B 2.0 155.00 0.050 12.34 TOTAL 2.86 B 53.2 R2 0.16 B 90.0 20.00 0.001 150.00 0.005 SF Tributary 1.98 B 59.0 I ��/�� = a ∗ P� b + t� � t� = 0.395 1.1 − C� L� S� �.�� t� = L� 60K S� = L� 60V� Computed t� = t� + t� Regional t� = 26 − 17i + L� 60 14i + 9 S� Selected t� = max t������� ,min Computed t� ,Regional t� t������� = 5 (urban) t������� = 10 (non-urban) Q ��� = CIA 70 0.73 1.25 2.59 75 0.70 1.19 2.48 80 0.66 1.14 2.38 85 0.64 1.09 2.29 90 0.61 1.05 2.21 95 0.58 1.01 2.13 100 0.56 0.97 2.06 105 0.54 0.94 2.00 110 0.52 0.91 1.94 115 0.51 0.88 1.88 120 0.49 0.86 1.84 Frequency and Intensity accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 12, Oct 10, 2017 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 20, 2015—Oct 15, 2016 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 10