Loading...
HomeMy WebLinkAboutFTC EASTSIDE PARK SC, WTF (VERIZON) - FDP - FDP180009 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATIONCity of 0 ktColli� DEVELOPMENT REVIEW: APPL/CATION FORM For Office Use Only Date Submitted Current Planning File# Planner Site/Area Information Residential Area: __ Sq.Ft. Acres Project Information Project Name: Project Description (Choose type of request from the list on the back): Commercial Area: Sq.Ft. Acres Industrial Area: Sq.Ft. Acres Mixed Use Area: Sq.Ft. Acres Right of Way Area: Sq.Ft. Acres Parking and Drive Area: Sq.Ft. Acres Stormwater Detention Area: Sq.Ft. Acres Landscape Area: Sq.Ft. Acres Open/Other Areas: Sq.Ft. Acres Major Cross Streets: Gross Area: Sq.Ft. Acres Zone District: Floor Area Ratio: Gross Density: Net Density Parcel Number: . Building/Unit Information Owner Information Residential: Square Feet Name: Commercial: Square Feet Address: Industrial: Square Feet City: State: Zip: Building Floor Area Ratio: Phone: Email: Platted Area: Number of Units: A��licant Information Single Family Attached: __ Single Family Detached: Name: Two Family: Multi-Family: Organization Name: Contact: Total Number of Bedrooms Rented Separately: Address: Dates: City State: Zip: Phone: Email: Conceptual Review Meeting Date Preferred Method of Contact: Neighborhood Meeting Date Hearing Type CERTIFICATION I certify the information and exhibits submitted are true and correct to the best of my knowledge and that in filing this application, I am acting with the knowledge, consent, and authority of the owners of the real property, as those terms are defined in Section 1-2 of the City Code (including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for the purpose of inspection, and if necessary, for posting of public notice on the property. Name (Please PRINT): _____________________________ _ Address: __________________________________ _ Telephone: ____________________________ _ Signature: (and title showing authority to sign, if applicable) � CERTIFICATION MUST BE SIGNED.¢:, Community Development & Neighborhood Services- 281 N College Ave- Fort Collins, CO 80522-0580 Location Description/Project Address: Transportation Development Review Fee Date Received/ Paid _________ Total Amount Paid _________ Project Name: _________________________________________________ Project Location: _______________________________________________ Date: ______________ Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Fee structure amount due  Overall Development Plan (ODP) $500 each ______  Final Development Plan (FDP) This fee includes 2 rounds of review $1000 each ______  Additional round of review $ 500 each ______  Annexation $20 X ___ acres = ____ + $250 = ______ The maximum fee for each annexation document/ filing shall be $2,000  Minor Amendment $158 each ______  Major Amendment $2,500 each ______  Re-zone $200 each ______  Modification to Land Use Code $200 each ______  Wireless Telecommunication Equipment (WTE) $65 each ______  Road Projects ______ acres (of roadway) X $3,500 = ______  Vacation of Easement(s) *** # of vacations ___ X $400 = ______  Vacation of Right(s)-of-Way *** # of vacations ___ X $800 = ______  Dedication of Easement(s) and/or Right(s)-of-Way *** # of dedications ___ X $250 = ______  Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. Detached Single Family $160 per unit _____ # of units X $160 = ______ Multifamily or other residential units $115 per unit _____ # of units X $115 = ______ Commercial, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot ______sq ft X $0.25 = ______ Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) $250 per acre ______ acres X $ 250 = ______ Project fee $2,000 each $2,000 Total of above amounts __________ If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000 + ½ (the amount over 30,000 ________) = _________ The maximum fee for any residential ONLY project shall be $500 per residential unit. This check should be used to verify the fee amount (does not apply to mixed-use developments). PDP fee shall be the lesser of this amount or the above calculated amount. ______ # of residential units X $500 = _________ If this fee amount equals or exceeds $65,000 then the City Manager shall have the ability to reduce the fee amount. Reduction for affordable housing – a copy of the City letter certifying/ authorizing the affordable housing shall be provided with this application. Amount of reduction to be applied ______ ___________ Total owed for PDP _________ 2012 form General Information: Owners Name(s): ____________________________ ___________________________________________ Street address: _______________________________ ___________________________________________ City/State/Zip: _______________________________ Telephone: _______________ Fax: ______________ Applicants/ Consultants Firm Name: ___________ Revised November 18, 2014 2 PDP Submittal Requirements Type of Request Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Additional handouts are available explaining the submittal requirements for each of the following review processes. ‰ ‰ ‰ ‰ ‰ ‰ ‰ ‰ ‰ ‰ ‰ ‰ ‰ ‰ ‰ ‰ ‰ Annexation Petition with Initial Zoning REQUESTED ZONE: _______________________________ Fee $1,188.00 + $50.00 sign posting fee + $.75 for each APO label Rezoning Petition REQUESTED ZONE: _____________________________ Fee $977.00 + $50.00 sign posting fee Overall Development Plan (ODP) Fee: $1,599.00 + $50.00 sign posting fee + $.75 for each APO label + Poudre Fire Authority Review Fee Project Development Plan (PDP) without Subdivision Plat (also Wireless Tele-communication Facilities) Fee: $3,887.00 + $50.00 sign posting fee + $.75 for each APO label + Poudre Fire Authority Review Fee Project Development Plan (PDP) with Subdivision Plat Fee: $5,879.00 + $50.00 sign posting fee + $.75 for each APO label + Poudre Fire Authority Review Fee Final Plan without Subdivision Plat Fee: $1,000.00 Final Plan with Subdivision Plat Fee: $1,000.00 Modification of Standards/Text and Map Amendment Fee: $200.00+ ($50.00 sign posting fee + $.75 for each APO label for Modification of Standards only) Basic Development Review Fee: $200.00 + Poudre Fire Authority Review Fee Major Amendment Fee: $3,206.00 + $50.00 sign posting fee + $.75 for each APO label + Poudre Fire Authority Review Fee Non-Conforming Use Review Fee: $1,389.00 + Poudre Fire Authority Review Fee Vacation of ROW or Easement Fee: $5.00 per sheet of filing document Small Project Fees Fee: Varies-Check with the Current Planning Department + Poudre Fire Authority Review Fee Street Name Change Fee: $5.00 Extension of Final Approval Fee: $566.00 Site Plan Advisory Review NO FEE Addition of Permitted Use Fee: $500.00 + $50.00 sign posting fee + $.75 for each APO label + Poudre Fire Authority Review Fee SUBMITTAL CHECKLIST: FINAL PLAN REVIEW PROJECT DEVELOPMENT PLAN (PDP) Community Development & Neighborhood Services – 281 N College Ave – Fort Collins, CO 80522-0580 Development Review Guide – STEP 6 of 8 ‰ Application form and filing fee. Application Form.pdf ‰ Transportation Development Review Fee – please contact Engineering at 221-6605 for information. TDR Fees and Application.pdf ‰ Name and address of each owner of property within the boundaries of the development plan area. ‰ List of names of all general and/or limited partners, managers and directors and/or officers and directors of the corporation involved as either applicants or owners. ‰ Final Site Plan* (30 copies, 24” x 36” - folded) ‰ Subdivision Plat* (23 copies, 24” x 36” - folded) ‰ Architectural Elevations* (8 copies, 24” x 36” - folded) ‰ Landscape Plan* (20 copies, 24” x 36” - folded) ‰ Drainage and Erosion Control Report* (4 copies) ‰ Final Utility and Drainage Plans* (15 copies, 24” x 36” – unfolded) ‰ Requirements for utility plans checklist (1 copy). Utility Plans Checklist.pdf ‰ Transportation Impact Analysis* (TIA), updated* (7 copies). ‰ Soils Report* (2 copies). ‰ Deeds* (contingent on final approval) ‰ Mylars and PMT* (Mylars not needed until Final plans are approved) ‰ Certification of Notice to Mineral Owner(s)* (1 copy) Mineral Rights Certificate.pdf ‰ Other information Director may require: - Subsurface Hydrologic Study* (4 copies) - Easements/Agreements* (2 copies, each) - Environmental Reports* *This document is meant to be used as a checklist only. For a more detailed list and explanation of each of these items, please see the handout: “Submittal Requirements: Final Plan Review” The following information is required to be submitted with all applications, unless waived by staff. Any item waived must be dated and initialed by a planner with the City of Fort Collins Community Development and Neighborhood Services Department. Transactions Method Check Number Date Paid Amount Paid Comments Check CK # 133 03/21/2018 $1,200.00 Final Development Review Fee (small project fee) ($200.00) and Transportation Development Review Fee ($1000.00) Paid by Michael Ryan Sagar ck # 133. Receipt issued: 03/21/2018 Total Paid to Date: $1,200.00 Fee Description Account Code Fee Amount Amount Paid Date Paid Amount Due Development Review Fee 1000.444040 $200.00 $200.00 03/21/2018 $0.00 Transportation Dev Review 902010.444030 $1,000.00 $1,000.00 03/21/2018 $0.00 TOTAL FEES: $1,200.00 $1,200.00 $0.00 TOTAL BALANCE DUE AS OF 03/21/2018: $0.00 Community Development & Neighborhood Services 281 N. College Ave Fort Collins, CO 80522 970.221.6760 970.224.6134 - fax Permit/Project #: FDP180009 Applied: 03/21/2018 Type: Final Plan Site Address: Job Valuation: $0.00 Category: Fee Amounts are valid for date of this document only. Fees subject to change without notice. Form Revised May 2011 ___________________________________________ Contact: ____________________________________ Street address: _______________________________ ___________________________________________ City/State/ Zip: _______________________________ Telephone: _______________ Fax: ______________ Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection. Name (please print): __________________________ Signature: ___________________________________ Telephone: ______________________ Foot Notes: When a development project involves a change of use for a building, the charge per square foot shall apply to the portion of the overall building size for which the change of use is proposed, provided that the new use generates more traffic than the existing use, as determined by the current Institute of Transportation Engineers Trip Generation. If the new use does not generate more traffic than the existing use then the charge per square foot for shall apply only to the net additional building size (if any). These fees do not include the cost of filing fees for the recording of the Development Agreement. When a Development Agreement or Amendment Agreement is entered into the Developer shall be responsible for the cost of recording the document. Said filing fees shall be calculated and provided when the signed document is returned to the City for signatures and filing. *** This fee does not include the cost of filing fees. Filing fees shall be determined at the time of final document submittal and will be required prior to filing. cc: Christie White, Engineering Development Review Engineering