Loading...
HomeMy WebLinkAboutPEDERSEN TOYOTA EXPANSION - PDP - PDP140007 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCommunity Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview June 27, 2014 Angie Milewski BHA Design 1603 Oakridge Dr Fort Collins, CO 80525 Comment Summary: Department: Planning Services Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com Topic: General 06/16/2014: Land Use Code (LUC) Section 4.21(E)(2)(a) Pedestrian-oriented outdoor spaces shall be placed next to activity areas that generate users (such as shops and street corners). These spaces shall be visible from street and sidewalks and should contain amenities such as art and shelters. Because of the size of this project and its connections to three different streets there should be at least two pedestrian-oriented outdoor spaces. There should be a pedestrian oriented space along college ave located currently where the permeable pavers are located this should include pedestrian access to the public sidewalk and to the entrance of the building. The other pedestrian-oriented space on the west side should be located closer to the pedestrian entrance and not the vehicle entrance of the building. Both areas should include greater detail on the pedestrian use such as seating, tables, art, or shelters. Comment Number: 1 Comment Originated: 06/16/2014 06/17/2014: In the landscape plan on the tree mitigation sheet the tree quantities still need to be completed. Comment Number: 2 Comment Originated: 06/17/2014 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Noah Beals, at 970-416-2313 or nbeals@fcgov.com. RE: Pedersen Toyota Expansion, PDP140007, Round Number 1 Page 1 of 10 06/17/2014: LUC 3.2.2(J) Along S College Ave the 15 ft. average minimum landscape setback from the right of way is not being met. This is an average of how much of parking frontage is meeting the required landscaped area 15' setback. Please provide details of the calculations of the average landscape setback area. Comment Number: 3 Comment Originated: 06/17/2014 06/17/2014: LUC 3.2.2(C)(4) On the site plan or in an additional detail the bicycle parking needs to be shown and labeled with the number of spaces. Are all the spaces on the 1st level? Comment Number: 4 Comment Originated: 06/17/2014 06/17/2014: LUC 3.2.4 The lighting plan also needs to include the average foot-candle for only the vehicle use areas. Is there no lighting on the fourth story of the parking structure? Is there any existing lighting that is remaining that was not included on the lighting plan? Comment Number: 5 Comment Originated: 06/17/2014 06/17/2014: LUC 3.2.5 Trash and recycling enclosure shall be provided with walk-in access and at least 20ft from a public sidewalk on a concrete pad. Where is the trash and recycling enclosure? Comment Number: 6 Comment Originated: 06/17/2014 06/18/2014: LUC 3.5.1 Mechanical/Utility equipment (vents, flues, meters, boxes, transformers, conduit, RTU...) shall be screened. The plans need to identify the locations of such equipment and how they are screened. Comment Number: 7 Comment Originated: 06/18/2014 06/18/2014: LUC 3.5.3(C)(1) Shall provide connecting walkway to main entrance of the building. Comment Number: 8 Comment Originated: 06/18/2014 Page 2 of 10 06/18/2014: LUC 3.5.3(2) Buidlings have a required built-to-line. 30% of the building length shall meet the built-to-line. Along nonarterial street the build-to-line is 0-15ft. and along arterial street the build-to-line is 10-25ft. When there is more than one street along a property then a the building shall meet at least two of the built-to-line. Further there shall not be any vehicle use area between the building and the facades of the building. With this additional standard the average landscap setback standard already cited will need to be met. No vehicle use area, including inventory, should be included the landscape set back. Also pedestrian connection to college ave. The build-to-line is not being met along Kensington Dr with the new buildig it is 2' and 11" away. The new parking area on the west side of the building should not be in between the facade and the street. Comment Number: 9 Comment Originated: 06/18/2014 06/19/2014: LUC 3.5.3(E)(2)(a)1. Requires walls that face streets be subdivided every 30ft. in length to create a human scale. LUC 3.5.3(E)(3) Facades that face the street shall be broken up with architectural elements for at least 50% of the building The parking structure wall that faces S Mason Street needs to be refined to include more human scale architectural elements. The Blank walls along college both with the existing structure and Parking structure should be broken up with architectural elements to further create a human scale. Comment Number: 10 Comment Originated: 06/19/2014 06/19/2014: Is the arch element at east entrance attached to the building? This seems to be a large sign rather than portion of the building. Please provide further details Comment Number: 11 Comment Originated: 06/19/2014 06/19/2014: LUC 3.5.3(E)(6) Requires buildings to have a recognizable "base" and "top" such as a sills and cornices/stepped parapets. There needs to be more emphasis on this the base and top. These are currently not recognizable. Comment Number: 12 Comment Originated: 06/19/2014 06/19/2014: The planning set will need to provide a cover sheet with a sheet index and signature blocks. Or the site plan with the signature blocks and sheet index. Comment Number: 13 Comment Originated: 06/19/2014 06/19/2014: Signs are not approved through this development process and a note will need to indicate this or remove the signs from the plans. Comment Number: 14 Comment Originated: 06/19/2014 Page 3 of 10 06/19/2014: There will need to be a set of plans for the site, landscape, and elevations. To show the conditions of all phases. It is not clear at all what is happening during the each phase. Each phase will need to meet compliance with the LUC. Comment Number: 15 Comment Originated: 06/19/2014 Department: Engineering Development Review Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com Topic: General 06/12/2014: Per the submitted site plan there is 174,600 sq ft of new building being added to the site, therefore the TDRF for PDP is less than was shown and calculated on the TDRF applicaiton. Unless the square footage changes this project will only owe $125 for the TDRF FDP fee because of the overpayment of the PDP fee. Comment Number: 1 Comment Originated: 06/12/2014 06/25/2014: The sidewalk along College Ave should be extended as the 10 foot wide sidewalk further north and transition to a narrower sidewalk just before the property line. Comment Number: 2 Comment Originated: 06/25/2014 06/25/2014: Driveways need to be shown constructed with concrete to the property line/back of sidewalk. The radii shown seem greater than allowed – looks like just on Kensington. Comment Number: 3 Comment Originated: 06/25/2014 06/25/2014: Additional clarification will be needed on the plans to identify what improvements are a part of phase 1 and what will be done with the area that will contain the structures being built with phase 2. Comment Number: 4 Comment Originated: 06/25/2014 06/25/2014: The ramps at the two corners need to be replaced with directional ramps. Comment Number: 5 Comment Originated: 06/25/2014 06/25/2014: Are there any existing services that need to be removed? Comment Number: 6 Comment Originated: 06/25/2014 06/25/2014: No water or sewer services are shown for the car wash or the retail shop? Comment Number: 7 Comment Originated: 06/25/2014 06/25/2014: Need to look at the sight distance from the access point onto Mason Street based on the future curb location. Will a sight distance easement be needed? Comment Number: 8 Comment Originated: 06/25/2014 Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com Topic: Landscape Plans Page 4 of 10 06/25/2014: Thank you for arranging the first tree evaluation meeting. Please set up a second onsite meeting with the City Forester to complete the tree inventory and mitigation plan. As part of that meeting some further review of the north most Ash on Mason can occur to consider desirability of removal or retention. Initial discussion at the first meeting indicated the tree would remove but some further discussion could be beneficial in making a final determination. Comment Number: 1 Comment Originated: 06/25/2014 06/25/2014: Provide tree species diversity on final landscape plan and list percentages in the plant list. Comment Number: 2 Comment Originated: 06/25/2014 06/25/2014: Please add this landscape note: The Developer shall replace dead or dying street trees after planting until final maintenance inspection and acceptance by the City of Fort Collins Forestry Division. All City street trees in the project must be established, of an approved species and of acceptable condition prior to acceptance. Comment Number: 3 Comment Originated: 06/25/2014 06/25/2014: Please add the table associated with tree protection specification LUC3.2.1 G 7 Comment Number: 4 Comment Originated: 06/25/2014 Department: Internal Services Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com Topic: Building Insp Plan Review Page 5 of 10 06/23/2014: Building Permit Pre-Submittal Meeting Pre-Submittal meetings are offered to assist the designer/builder by assuring, early on in the design, that the new commercial or multi-family projects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to mid-design stage for this meeting to be effective and is typically scheduled after the Current Planning conceptual review meeting. Applicants of new commercial or multi-family projects are advised to call 416-2341 to schedule a pre-submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage and type of construction being proposed. Construction shall comply with the following adopted codes as amended: 2012 International Building Code (IBC) 2012 International Residential Code (IRC) 2012 International Energy Conservation Code (IECC) 2012 International Mechanical Code (IMC) 2012 International Fuel Gas Code (IFGC) 2012 International Plumbing Code (IPC) as amended by the State of Colorado 2011 National Electrical Code (NEC) as amended by the State of Colorado Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009. Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost Depth: 30 inches. Wind Load: 100- MPH 3 Second Gust Exposure B. Seismic Design: Category B. Climate Zone: Zone 5 Energy Code Use 1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC. 2. Multi-family and Condominiums 3 stories max: 2012 IECC residential chapter. 3. Commercial and Multi-family 4 stories and taller: 2012 IECC commercial chapter. Fort Collins Green Code Amendments effective starting 1-1-2012. A copy of these requirements can be obtained at the Building Office or contact the above phone number. Pederson Toyota expansion – project specific concerns: 1. Fire-sprinkler systems are required for buildings more than 5k s.ft. unless fire containment is provided. 2. Building code and State statute CRS 9-5 requires project provide accessible units. 3. For an non-sprinkled parking garage that is attached to other buildings, the Building Code will limit the height to 3 stories and approx 30k per floor. 4. New Green Code requires: a. Upgraded insulation is required for buildings using electric heat or cooling. b. Exterior walls and roof must meet a STC (sound resistance) rating of 40 min. if building located within 1000ft to train tracks. c. Low-flow Watersense plumbing fixtures (toilet, faucets, shower heads) are required. d. Special combustion safety requirements for natural draft gas appliances. e. Low VOC interior finishes. Comment Number: 1 Comment Originated: 06/23/2014 Page 6 of 10 City of Fort Collins Building Services Plan Review 416-2341 Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com Topic: General 06/10/2014: The existing electric capacity to this service is 1600 amps at 120/208 volt three-phase. Additional electric capacity fee for any increase will apply. A Commercial Electric Service (C-1) form will need to be completed and supplied to Light & Power Engineering. Comment Number: 1 Comment Originated: 06/10/2014 06/10/2014: Relocation of the electric transformer will be at the owner's expense. The space shown on the utility plan for the relocated transformer may not be adequate. Based on likely electric capacity, and the resulting likely transformer size, the minimum east to west dimension required will be at least 10 feet. If the transformer is larger, additional space will be necessary. The transformer can be sized upon receipt of a completed C-1 form. Contact Light & Power Engineering at (970)221-6700 with any questions. Comment Number: 2 Comment Originated: 06/10/2014 Department: Outside Agencies Contact: Gloria Hice-Idler, , Topic: General 06/16/2014: I've reviewed the above submittal. Based upon the TIS, it appears that the intersection of Kensington and College will see an increase of traffic of more than 20%. Per the State Highway Access Code, the increase allows CDOT to re-evaluate the access and to require a new access permit. The review of the intersection indicates that no new highway improvements are necessary, but the applicant should be required to obtain a new access permit. If you have any questions, please do not hesitate to contact me. P 970.350.2148 | C 970.381.2475 | F 970.350.2198 1420 2nd Street, Greeley, CO 80631 gloria.hice-idler@state.co.us Comment Number: 1 Comment Originated: 06/16/2014 Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General Page 7 of 10 06/25/2014: STRUCTURES EXCEEDING 30' Due to the height of the parking garage, a 30' wide fire lane is required adjacent to the longest side of the structure. This requirement has not been satisfactorily met with the proposed site plan and further discussion is needed. Additionally, the 30' EAE width requirement shall be reflected on the plat. IFC Appendix D; Poudre Fire Authority Administrative Policy 85-5: In order to accommodate the access requirements for aerial fire apparatus (ladder trucks), required fire lanes shall be 30 foot wide minimum on at least one long side of the building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the building. Comment Number: 1 Comment Originated: 06/25/2014 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Building Elevations 06/19/2014: No comments. Comment Number: 1 Comment Originated: 06/19/2014 Topic: Construction Drawings 06/19/2014: Please correct the sub-title as marked on sheet 1. This should match the Subdivision Plat. See redlines. Comment Number: 2 Comment Originated: 06/19/2014 06/19/2014: The City has moved to the NAVD88 vertical datum. Please state the project datum on sheets 1 & 2, and provide an equation to get from NAVD88 to NGVD29 unadjusted, i.e. NAVD88 = NGVD29 Unadjusted + _______. Comment Number: 3 Comment Originated: 06/19/2014 06/19/2014: There are line over text issues. See redlines. Comment Number: 4 Comment Originated: 06/19/2014 06/19/2014: There are text over text issues. See redlines. Comment Number: 5 Comment Originated: 06/19/2014 06/19/2014: There is text that needs to be rotated 180 degrees. See redlines. Comment Number: 6 Comment Originated: 06/19/2014 06/19/2014: Please change the right of way widths shown on sheet 5. Mason Street is platted as a 60' right of way. See redlines. Comment Number: 7 Comment Originated: 06/19/2014 Topic: Landscape Plans 06/19/2014: Please add the subdivision information for the surrounding properties as marked on sheet 1. See redlines. Comment Number: 8 Comment Originated: 06/19/2014 Topic: Plat 06/20/2014: Please make changes as marked. See redlines. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Comment Number: 15 Comment Originated: 06/20/2014 Page 8 of 10 Topic: Site Plan 06/19/2014: Please correct the legal description as marked. This should match the Subdivision Plat. See redlines. Comment Number: 9 Comment Originated: 06/19/2014 06/19/2014: Please add the subdivision information for the surrounding properties as marked. See redlines. Comment Number: 10 Comment Originated: 06/19/2014 06/19/2014: There are line over text issues. See redlines. Comment Number: 11 Comment Originated: 06/19/2014 06/19/2014: There are text over text issues. See redlines. Comment Number: 12 Comment Originated: 06/19/2014 06/19/2014: Mask text within hatching. See redlines. Comment Number: 13 Comment Originated: 06/19/2014 06/19/2014: Why is the City of Fort Collins shown as an owner in the Owner's Certification? Comment Number: 14 Comment Originated: 06/19/2014 Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com Topic: Construction Drawings 06/24/2014: Sheet 2 of 5 Section C Traffic Signing and Pavement Marking Construction Notes: Notes 6, 11, and 14 need to edited to read "Local Entity TRAFFIC Engineer" instead of Local Entity Engineer. Comment Number: 4 Comment Originated: 06/24/2014 Topic: General 06/24/2014: Transportation Planning notes that the submittal is well done, improvements are considerable, and this submittal appears to meet the intent of the Mid Town Plan. Comment Number: 2 Comment Originated: 06/24/2014 Topic: Site Plan 06/24/2014: The curb ramps at the intersection corners need to be directional. Comment Number: 3 Comment Originated: 06/24/2014 Topic: Traffic Impact Study 06/24/2014: TIS reviewed and conclusions noted. Comment Number: 1 Comment Originated: 06/24/2014 Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson@fcgov.com Topic: General 06/25/2014: Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson@fcgov.com Comment Number: 1 Comment Originated: 06/25/2014 Department: Water-Wastewater Engineering Page 9 of 10 Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com Topic: Construction Drawings 06/24/2014: Show all existing water and sewer mains and services. Comment Number: 1 Comment Originated: 06/24/2014 06/24/2014: Show/label existing curb stops and meter pit. Comment Number: 2 Comment Originated: 06/24/2014 06/24/2014: Protect the existing sewer service clean-outs in the paved/paver areas by converting to traffic-rated clean-outs. Add traffic-rated clean-out detail. Comment Number: 3 Comment Originated: 06/24/2014 06/24/2014: Will the 6" fire line be adequate for the entire building? Water pressure in that area is approximately 65 psi. Comment Number: 4 Comment Originated: 06/24/2014 Topic: General 06/24/2014: Explain the phasing shown on the site plan. Will Phase 1 include a building addition that covers the entire footprint or will the portion labeled Phase 1 Detail/Carwash be a separate building at that time? Comment Number: 5 Comment Originated: 06/24/2014 Department: Zoning Contact: Ali van Deutekom, 970-416-2743, avandeutekom@fcgov.com Topic: General 06/24/2014: I understand you would like to phase this project however, I will still need the landscape, parking, handicap parking and bicycle parking calculations of both phases with drawings in order to approve this development plan along with a phasing plan. Comment Number: 1 Comment Originated: 06/24/2014 Page 10 of 10