HomeMy WebLinkAboutPLATTE RIVER POWER AUTHORITY CAMPUS - FDP - FDP180004 - SUBMITTAL DOCUMENTS - ROUND 1 - STORMWATER MANAGEMENT PLAN1501 Academy Ct. Ste. 203 Fort Collins, Colorado 80524 (970) 530-4044
Stormwater Management Plan
(Erosion Control Report)
Platte River Power Authority HQ
Campus
Fort Collins, CO
Prepared for:
Platte River Power Authority
2000 East Horsetooth Road
Fort Collins, CO 80525
February 14, 2018
1501 Academy Ct. Ste. 203 Fort Collins, Colorado 80524 (970) 530-4044
February 14, 2018
Platte River Power Authority
2000 East Horsetooth Road
Fort Collins, CO 80525
RE: Platte River Power Authority HQ Campus
Fort Collins, Colorado
Project Number: U16014
To Whom It May Concern:
United Civil Design Group, LLC. (United Civil), is pleased to submit this Stormwater
Management Plan (SWMP) for the Platte River Power Authority Headquarters Campus site
in Fort Collins, Colorado. This report outlines what control measures or Best Management
Practices (BMPs) to be implemented with the proposed construction, in order to minimize
potential pollutants in stormwater discharges.
We have prepared this report to accompany the Colorado Department of Public Health and
Environment General Permit for Stormwater Discharges Associated with Construction
Activity.
Please note that this document is intended to be a dynamic document which will be
modified and updated through the course of site construction to accurately reflect site
conditions at all times. Pollutant sources should be continuously evaluated, BMPs selected,
documented, implemented, and pollutant sources re-evaluated. As such, this version of the
SWMP was prepared to facilitate initial plan approvals and permitting, but does not
necessarily reflect the final version, or the transitions throughout the construction process.
It shall be the responsibility of the Construction Site Operator and/or the permit holder (or
applicant thereof) to ensure the plan is properly maintained and followed. The Construction
Site Operator or SWMP Administrator for this project is:
David Kelly of FCI Constructors, Inc., and can be contacted at:
Address: 4015 Coriolis Way, Frederick, CO 80504
Phone: (970) 535-4725
If you should have any questions or comments as you review this report, please feel free to
contact us at your convenience.
Sincerely,
Kevin Brazelton, PE
Engineering Manager
Stormwater Management Plan
Registry Ridge Seventh Filing
Fort Collins, CO
i U16014-SWMP.docx
TABLE OF CONTENTS
PAGE
I. Introduction ........................................................................................................................ 1
A. SWMP Objective ............................................................................................................. 1
II. Site Location and Description ............................................................................................. 1
A. Location .......................................................................................................................... 1
B. Description of Property .................................................................................................. 2
C. Description of Development .......................................................................................... 3
D. Construction Activity Description ................................................................................... 3
E.Proposed Sequence for Major Activities and BMP Staging and Implementation ........... 3
F.Area Estimates ................................................................................................................. 4
G. Runoff Coefficient and Soil Description ......................................................................... 4
H. Location and Description of Potential Pollution Sources ............................................... 6
I. Non-Stormwater Components of Discharge ................................................................... 8
J. Receiving Waters ............................................................................................................. 9
III. BMPs for Stormwater Pollution Prevention ....................................................................... 9
A. Erosion and Sediment Controls ...................................................................................... 9
B. Erosion Control Sequencing ......................................................................................... 13
C. Materials Handling and Spill Prevention ...................................................................... 15
IV. Other Controls .................................................................................................................. 15
V. Final Stabilization .............................................................................................................. 16
VI. Long-term Stormwater Quality ......................................................................................... 16
VII. Inspection and Maintenance Procedures ......................................................................... 17
VIII. References ........................................................................................................................ 19
APPENDICES
APPENDIX A - State of Colorado Forms
APPENDIX B - Erosion and Sediment Control Inspection List (ESCIL)
APPENDIX C - SWMP Maps, Plans, and Details.
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
i U16014-SWMP.docx
VICINITY MAP
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
1 U16014-SWMP.docx
I. Introduction
A. SWMP Objective
The objective of this Stormwater Management Plan (SWMP) for Platte River Power
Authority Headquarters Campus, is to identify the BMP which, when implemented, will
meet the requirements of the Colorado Department of Public Health & Environment
(CDPHE), Water Quality Control Division. According to Appendix A of the State of Colorado
General Permit Application and Stormwater Management Plan Guidance for Stormwater
Discharges Associated with Construction Activity (6/2011), the SWMP goal is to, “describe
appropriate controls and measures to improve water quality by reducing pollutants in
storm water discharges and ensure compliance with the requirements of the storm water
permit. The SWMP must be completed and implemented at the time the project breaks
ground and revised if necessary as construction proceeds to accurately reflect the
conditions and practices at the site.”
Pollutant sources should be continuously evaluated, BMPs selected, documented,
implemented, maintained and pollutant sources re-evaluated (and the process
continued). A current copy of the SWMP shall be kept onsite at all times. A person
familiar with the SWMP and on-site construction activities and clean-up procedures will
be designated as the SWMP Administrator for the site. The SWMP Administrator will be
responsible for, but not limited to, inspections and inspection reports, personnel training,
regulatory agency contact, SWMP implementation and revisions, field notebooks, and
record keeping of employee activities, contacts notifications and perform or direct the
performance of BMP maintenance as required.
References are found in the Appendix regarding some of the requirements, restrictions,
and forms related to the SWMP.
II. Site Location and Description
A. Location
The Platte River Power Authority Headquarters Campus (referred herein as ”the site” or
“the Campus”) is a parcel of land situated in the Southeast Quarter of Section 30,
Township 7 North, Range 68 West of the 6th
Principal Meridian to the City of Fort Collins,
Larimer County, Colorado. More specifically, the site is located at the northwest corner
of Horsetooth Road and Timberline Road and is bounded by East Horsetooth Road to the
south, Timberline Road to the east, existing commercial property and Danfield Court to
the north, and Union Pacific Railroad right-of-way to the west.
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
2 U16014-SWMP.docx
B. Description of Property
The campus has an existing platted area of 16.7-acres and has acted as the headquarters
for Platte River Power Authority since it was first constructed in the late 1970s.
The following is a summary of the existing conditions:
Ground Cover - The site currently exists as commercial property and is currently covered
with various buildings, pavements and open areas.
Grades – The majority of the site slopes towards one of three (3) drainage outfalls. In
general, the slopes within each outfall basin range between 0 to 5 percent, with some
landscaped berm areas reaching near 20%.
Soil Type - According to the United States Department of Agriculture (USDA) Natural
Resources Conservation Service (NRCS) Soil Survey, the site consists of Nunn clay loam
(Hydrologic Soil Group C).
Utilities – The campus includes an extensive network of existing utilities including mains
and services for water, sanitary sewer, natural gas, electric, telephone and data lines.
These mains and services are located within the property limits of the campus along
with mains located within the rights-of-ways for Horsetooth Road, Timberline Road and
Danfield Court.
Detention Ponds and Storm Sewer – The campus currently has three (3) drainage outfalls
available to accept stormwater flows from the site. These include the existing wet pond
which currently acts as an irrigation and stormwater retention facility for the campus,
an existing 12-inch storm sewer located at the east side of the campus along Timberline
Road, and the curb and gutter at the Danfield Court cul-de-sac. There are also two (2)
other internal detention areas that drain to the 12-inch storm sewer outfall. The
campus also has limited internal storm drains varying in size from 4-inch to 15-inch. Of
note, there is an existing storm inlet and drain located on the north side of Horsetooth
Road that collects stormwater from the roadway and conveys it into the existing wet
pond on the south side of the property. This existing system will require to be
maintained and/or replaced with the construction of the proposed project.
Drainageways – No known externally owned drainageways currently exist within the
proposed development limits.
Irrigation - City records indicate that there is an existing irrigation pipe located along
the southern property boundary, running from west to east. Only portions of this
irrigation system have been found or identified with utility locates or site survey but
from the information available it is believed that this system consists of a 20-inch
concrete pipe that is located just north of the existing curb and gutter along Horsetooth
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
3 U16014-SWMP.docx
Road. The existing onsite wet Pond A1 also serves as an irrigation system and is supplied
by an existing irrigation well located on the campus.
Floodplains – The campus is not located within either a City or FEMA floodplain.
C. Description of Development
The planned campus redevelopment is planned to be constructed in phases. Ultimately,
the campus redevelopment will consist of the following improvements:
• The demolition of most of the existing buildings and much of the existing
pavements throughout the campus.
• The construction of seven (7) proposed commercial buildings including the main
headquarters building and various other support buildings.
• The construction of an internal roadway network with associated parking areas.
• The construction of utilities in support of the campus including sanitary, water and
storm drainage.
• The construction of detention and water quality facilities located throughout the
site with the main detention area located in the northeast portion of the site.
• The reconfiguration and relining of the existing wet pond.
D. Construction Activity Description
Construction activity (for all phases of construction) includes installation of BMPs,
demolition, grading, utility (storm sewer, sanitary sewer, and waterline) construction,
pavement construction, drainage and water quality facility construction, and landscape
installation.
E. Proposed Sequence for Major Activities and BMP Staging and Implementation
The four (4) major Development Stages as previously defined by the State of Colorado’s
Stormwater Discharge Permit (SDP) and include the following:
Stage 1. Demolition and Grading Stage; BMPs for initial installation of perimeter and
site controls as well as overlot grading of the site
Stage 2. Infrastructure Stage; BMPs for final grading, storm and utility installation
Stage 3. Impervious Condition/Vertical Construction Stage; BMPs for curb and
pavement installation and for construction of buildings
Stage 4. Permanent BMPs and final site stabilization
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
4 U16014-SWMP.docx
The estimated sequence for major construction activities is as follows:
• Installation of erosion control (Stage 1)
• Site demolition activities (Stage 1)
• Grading of the site (Stage 1)
• Installation of utilities (storm sewer, sanitary sewer and storm sewer) (Stage 2)
• Construction of asphalt pavement, curb and gutter, sidewalk and buildings
(Stage 3)
• Landscaping and site stabilization (Stage 4)
Construction is estimated to begin April 2018 and be completed by August 2020.
Along with the stages of development previously described, the construction of the
project will also have two (2) distinct construction phases. Included within Appendix C
are the Erosion Control Plans that reflect each construction phase for the project. Also
included is a “Blank Version” of the SWMP Plan which is provided so that the Contractor
can write in BMP symbols to document the location and time BMPs are installed and
maintained during the construction process.
F. Area Estimates
The site has a platted area of 16.7 acres. The total area subject to disturbance by
construction of this project is approximately 14.6 acres.
This SWMP does not include additional offsite area (for staging, material storage,
overburden stockpiles of dirt, borrow areas, etc.) other than that mentioned above.
G. Runoff Coefficient and Soil Description
Individual basin runoff coefficients as shown in the Platte River Power Authority HQ
Campus Drainage Plan are summarized in the table on the following page:
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
5 U16014-SWMP.docx
Developed Conditions "C" Values and 2-yr and 100-yr Runoff:
Existing Basins
Basin Design
Pt.
Area %I Runoff
Coefficients
Peak
Discharge
acre C2 C100 Q
2 Q100
cfs cfs
EX1 EX1 3.75 48.6% 0.57 0.71 6.10 26.62
EX2 EX2 2.38 32.3% 0.44 0.55 2.07 9.04
EX3 EX3 2.19 80.4% 0.82 1.00 5.10 21.75
EX4 EX4 2.33 18.9% 0.34 0.42 1.68 7.33
EX5 EX5 1.35 12.5% 0.28 0.35 0.81 3.53
OS-1 OS-1 0.31 20.5% 0.35 0.43 0.30 1.32
OS-2A OS-2A 0.33 26.6% 0.39 0.49 0.37 1.61
OS-2B OS-2B 0.93 80.2% 0.81 1.00 2.00 8.62
OS-3 OS-3 2.21 20.1% 0.34 0.43 1.45 6.33
OS-4 OS-4 1.29 73.3% 0.75 0.94 2.75 12.00
OS-5 OS-5 0.54 2.0% 0.20 0.25 0.24 1.05
Totals 22.88 99.21
Proposed Basins
Basin Design
Pt.
Area Area Runoff
Coefficients
Peak
Discharge
acre acre C2 C100 Q
2 Q100
cfs cfs
A-1 A-1 3.49 16.4% 0.32 0.40 2.16 9.43
A-2 A-2 0.91 0.82 0.83 1.00 2.15 9.10
A-3 A-3 0.37 0.90 0.95 1.00 1.01 3.71
A-4 A-4 0.57 0.87 0.86 1.00 1.39 5.64
A-5 A-5 0.40 0.85 0.84 1.00 0.95 3.96
A-6 A-6 0.41 0.41 0.53 0.67 0.62 2.72
A-7 A-7 0.32 0.53 0.63 0.79 0.54 2.37
A-8 A-8 0.21 0.62 0.71 0.89 0.42 1.84
A-9 A-9 0.64 0.90 0.95 1.00 1.74 6.41
A-10 A-10 0.68 0.87 0.92 1.00 1.78 6.74
A-11 A-11 0.97 0.27 0.41 0.51 1.06 4.63
A-12 A-12 1.15 0.06 0.23 0.29 0.68 2.95
A-12
(Future)
A-12
(Future) 1.15 0.90 0.87 1.00 2.86 11.43
A-13 A-13 0.26 0.90 0.95 1.00 0.72 2.63
B-1 B-1 0.42 0.53 0.61 0.76 0.74 3.22
B-2 B-2 1.45 0.43 0.52 0.65 1.90 8.28
C-1 C-1 1.23 0.11 0.28 0.35 0.98 4.27
OS-1 OS-1 0.68 0.02 0.20 0.25 0.33 1.42
OS-2A OS-2A 0.21 0.02 0.20 0.25 0.12 0.51
OS-2B OS-2B 0.93 0.80 0.81 1.00 2.00 8.62
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
6 U16014-SWMP.docx
Terracon, completed the geotechnical and groundwater investigations for the project
site. According to the results presented in the report produced by Terracon, there are
lean clay soils with varying amounts of sand overlying claystone bedrock. Groundwater
was observed at depths of approximately 12 to 24 feet below ground surface.
According to the United States Department of Agriculture (USDA) Natural Resources
Conservation Service (NRCS) Soil Survey, the site consists of Nunn clay loam (Hydrologic
Soil Group C).
H. Location and Description of Potential Pollution Sources
This section focuses on the identification of the potential pollutant sources and briefly
discusses the Best Management Practices (BMPs) that will be used. More information on
the BMPs utilized on this site is included in the next section “III. BMPs for Stormwater
Pollution Prevention”.
1. All disturbed and stored soils;
It is expected that there will be stockpiles of dirt on the site from the utility
installations, the foundation excavations and general earthwork phasing. For this
site, stockpiles should be located in areas where Silt Fence or Straw wattles may
be placed around the individual stockpiles to contain the runoff (i.e. landscaped
or disturbed earth areas).
2. Vehicle tracking of sediments
It is anticipated that the contractor will access the property from Danfield Court
and Horsetooth Road. A vehicle tracking control pad will be required at each
access location onsite during construction to reduce tracking sediment onto the
adjacent streets.
At the end of each workday, the Contractor shall sweep or scrape Danfield Court,
Horsetooth Road and the private access drive from Danfield Court of sediment
that may have accumulated during the workday.
3. Management of contaminated soils
There are not any known contaminated soils on the site. However, if the
contractor encounters contaminated soils during the construction process they
should stop construction immediately and notify the appropriate government
authorities in accordance with good construction safety and practice.
4. Loading and Unloading operations
Loading and unloading will take place on the site. Truck access should be limited
to the extent possible to locations within the disturbed limits of the project. BMPs
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
7 U16014-SWMP.docx
such as silt fence in non-paved areas and rock socks in paved areas should be
placed to keep sediment from exiting the disturbed area limits.
5. Outdoor storage activities (building materials, fertilizers, chemicals, etc.)
Storage of onsite materials including building materials, fertilizers, waterline,
storm sewer, and sanitary sewer will be covered and placed on pallets to prevent
direct contact with the ground and potential surface runoff.
6. Vehicle and equipment maintenance
Vehicle and equipment maintenance should be performed offsite or onsite within
an area surrounded by silt fence or straw wattles. Vehicle and equipment
maintenance shall not happen along the adjacent public streets. At a minimum,
all vehicle and equipment maintenance shall be performed on the hard surface or
gravel areas at least 50’ from any stormwater feature (i.e. inlet, storm sewer,
concentrated runoff, swale, etc.)
7. Significant dust or particulate generating processes
The Contractor shall comply with applicable air pollution control requirements of
the City of Fort Collins. The Contractor shall take appropriate actions to minimize
atmospheric pollution and take reasonable precautions which shall include, but
not be limited to:
1. The use of water for control of dusts for construction processes such as
demolition, grading, or the clearing of land.
2. Covering, at all times when in motion, open-bodied trucks transporting
materials likely to give rise to airborne dusts.
3. Require lower speeds for vehicles entering, exiting, and driving within the
project limits to minimize the amount of dust disturbed by moving
vehicles.
8. Routine maintenance activities involving fertilizers, pesticides, detergents, fuels,
solvents, oils, etc;
Chemicals, fuels, lubricants, and paints stored on-site will be in water tight
containers and covered as necessary and stored in a bermed area, a storage
building, or within a vehicle to act as secondary containment.
9. On-site waste management practices (waste piles, liquid wastes, dumpsters,
etc.);
1. Waste piles should be covered or surrounded by silt fence or straw
wattles. Liquid wastes should be collected and stored in covered
containers and disposed of properly.
2. Solid waste materials, including disposable materials incidental to the
major construction activities, will be collected in on site dumpsters. The
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
8 U16014-SWMP.docx
containers will be emptied periodically and trucked away from the site.
Dumpsters should have covers.
10. Concrete truck / equipment washing, including the concrete truck chute and
associated fixtures and equipment;
A dedicated concrete washout area is necessary for this project. The contractor
shall clean out equipment within the washout area so that runoff is not allowed
to leave site and enter the public streets or neighboring properties.
11. Dedicated asphalt and concrete batch plants;
There will not be dedicated asphalt or concrete batch plants on this site.
12. Non-industrial waste sources such as worker trash and portable toilets
Worker’s trash shall be disposed of in an onsite dumpster. The site should be free
of trash at the end of each working day.
Portable toilets shall be utilized by construction personnel and serviced regularly
by a commercial operator. They shall be located a minimum of 5 feet from the
curb or 50 feet from inlets. If sanitary facilities are located on a paved surface,
toilets shall be equipped with a containment pan or a secondary containment
BMP. Regardless of location all portable toilets shall be anchored per
manufacturer recommendations.
I. Non-Stormwater Components of Discharge
In the event that groundwater is encountered during trenching or excavation operations,
a temporary sediment/retention basin should be constructed to store pumped
uncontaminated dewatering flows onsite. Note that the CDPHE may also require a
separate Construction Dewatering permit. For more information on construction
dewatering refer to the Stormwater Fact Sheet which can be found at
https://www.colorado.gov/cdphe. Refer to the blank Construction Dewatering Permit in
Appendix A for more information.
The other non-storm water components of discharge include, but are not limited to,
water line flushing, irrigation to establish seeding, washing out concrete trucks, and
watering for dust mitigation, and compaction. It is important for the contractor to
manage the runoff from these items utilizing the BMPs mentioned in this report (i.e.
sediment traps, silt fence, straw wattles, concrete washout areas, surface roughening,
etc.).
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
9 U16014-SWMP.docx
J. Receiving Waters
The site is located within the Foothills drainage basin within the City of Fort Collins Master
Drainage Plan. Stormwater from this basin adjacent to the site is collected within streets
and storm sewer systems and ultimately discharged into the Fossil Creek Reservoir Inlet
Ditch.
III. BMPs for Stormwater Pollution Prevention
A. Erosion and Sediment Controls
Once construction activity begins, Best Management Practices (BMPs) intended to
contain sediment onsite must be constructed, inspected, and repaired as necessary. Such
controls must be functional before upslope land disturbance takes place. The BMPs will
be installed as shown on the SWMP Map shown in Appendix C. They must be
supplemented as on-site experience proves necessary in order to control sediment,
pollutant discharge, and ensure public safety.
The following temporary and permanent BMPs will be installed and maintained to control
on-site erosion and prevent sediment from traveling off-site during construction.
Temporary BMPs
• Construction Fence is a temporary BMP. The contractor is to place
construction fencing around development as needed to limit access by the
public to the construction site, as well as construction equipment and personal
vehicles to designated areas of ingress and egress.
• Inlet Protection is a temporary BMP that helps prevent soil and debris from
the site from entering the storm drain inlets and usually consists of a sediment
filter around or upstream of the storm drain inlet. Inlet protection allows
storm water to flow into the drain but only after excess sediment has been
filtered out. Inlet protection will be used and installed on existing storm inlets
prior to construction activities commencing and will be used and installed on
proposed storm inlets as construction of the storm sewer system occurs. Inlet
protection for this site will consist of:
o Inlet Filters, which are permeable barriers installed around curb or area
inlets that filter runoff and remove sediment prior to entering the inlet.
For this project Dandy products (or approved equal) will be installed per
manufacturer’s recommendations.
• Regular Meetings are a temporary and non-structural BMP. Regular meetings
with on-site workers including builders, suppliers, landscape personnel, etc.
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
10 U16014-SWMP.docx
should be conducted so that they are kept up to date with site standard
operating procedures.
• Silt Fence is a woven synthetic permeable fabric that prevents sediment from
discharging off-site. Silt fence is a temporary barrier that is installed prior to
earthmoving activities and is placed downstream of areas where runoff from
construction activities is expected to occur, especially along the site perimeter
to allow sediment to settle out from the stormwater runoff before the
stormwater leaves the construction site. Silt fences will be installed per
manufacturer’s recommendations. Silt fence encourages sheet flow and is not
intended to be used in areas of concentrated flow. If concentrated flow is
encountered during the placement of the fence, an alternative BMP shall be
used and the SWMP should be updated to reflect this change.
• Staging Areas will be provided during the construction process at least 100’
from any storm water conveyance. Staging areas include locations for vehicle
fueling, concrete truck washout, material storage and transfer, equipment
maintenance and cleaning, and other construction activities. These areas will
be maintained as isolated locations that allow for contaminants to be
concentrated and removed from the site as necessary. Concrete washout
areas shall be designed such that washout water cannot leave the location,
nor shall storm water runoff wash concrete from the locations.
• Straw Wattles are a temporary BMP that are used for a variety of purposes.
They are used for inlet protection, curbside check dams, swale protection, at
the bottom of slopes, or the limits of property boundaries. They are easy to
install and are increasingly being used for Small Site SWMP’s. The straw
wattles, which are meshed netting “tubes,” filled with straw, excelsior, or
coconut fiber. Wattles for swale protection should be installed following
rough grading of channel areas. Wattles require proper installation and
maintenance to ensure their performance.
• Rock Socks are a temporary BMP that are used for a variety of purposes. They are
used for inlet protection, curbside check dams, or at the limits of property
boundaries. Rock socks are wire meshed “tubes” filled with rocks. Rock Socks require
proper installation and maintenance to ensure their performance.
• Street Sweeping and Vacuuming removes sediment that has been tracked onto
roadways to reduce sediment transport into storm drain systems or a surface
waterway. This practice should be used on the adjacent paved road to the
construction site. Paved roads should be inspected on a daily basis and more
frequently as needed.
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
11 U16014-SWMP.docx
• Saw Cutting Pollution Prevention prevents dust and slurry from asphalt and
concrete saw cutting activities from migrating into the existing storm drain system.
Slurry and cuttings shall be vacuumed during cutting and surface operations and shall
not be allowed to remain on pavement surface overnight. Collected slurry and
cuttings shall be disposed of in a manner that does not violate groundwater or surface
water standards.
• Surface Roughening is provided following grading activities to slow the effects
of wind erosion. Roughening can be used as a temporary BMP and is a
technique used for creating unevenness on bare soil through the construction
of furrows (groove cuts) running across a slope or by utilization of construction
equipment to track the soil surface. The primary function of surface
roughening is to reduce erosion potential by decreasing runoff velocities,
reducing the length of sheet flow trapping sediment, and increasing infiltration
of water into the soil.
• Temporary Seeding is the establishment of a temporary vegetative cover on a
graded area that will be exposed for longer 30 days. Temporary seeding can
be used on areas requiring temporary protection that will eventually need
permanent vegetation at the completion of the construction or it can be used
for areas that will be re-disturbed after a period of inactivity.
• Vehicle Tracking Control is a stabilized stone pad located at points of ingress
and egress on a construction site and acts as a temporary BMP. The stone pad
is designed to reduce the amount of mud transported onto public roads by
construction traffic by removing mud and sediment from the vehicle’s wheels
when it drives over the gravel pad. These areas are limited to the minimum
number necessary to provide functional construction access and are installed
prior to grading activities. Whenever the construction entrance exists onto a
public road, the road shall be cleaned at the end of each day. Vehicle Tracking
Control will also be used on this site at any stockpile area exits.
• Wind Borne Sediment and Dust Control measures will be provided during the
construction process to control wind borne sediment. During grading
activities, water will be applied to the disturbed soils for the purpose of
maintaining cohesion with clay type soils and also to meet moisture
requirements for compaction of disturbed soils. Other measures of mitigation
for wind erosion may include the timely installation of seed and mulch
following the establishment of final grade, and the timely installation of
pavement following completion of utility trenching operations and curb
construction. Open areas should be kept in a roughened condition (see
Surface Roughening above).
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
12 U16014-SWMP.docx
Permanent BMPs
• Grass-Lined Swales (included as part of permanent seeding or other
permanently stabilized swales) are permanent landscaped channels
constructed generally below grade to convey runoff or channel water to a
desired location. The grass-lined areas allow for infiltration to occur as well as
including a flow path across a vegetated surface slowing the conveyance rate
of storm water runoff.
• Permanent Seeding and Planting is the establishment of a permanent
perennial vegetation such as trees, shrubs, vines, grasses/sod, or legumes on
exposed areas for final permanent stabilization in order to provide
stabilization of the soil by holding soil particles in place. These items should
be installed as per the approved Landscape Plan. Soil Amendments shall be
incorporated in all landscape areas to a depth of 6” at a rate of 3 cubic yards
per 1000 square feet of area unless 4” of loose topsoil have been imported
onto the site over 4” of loosened subgrade soils. Permanent Landscaping
reduces storm water runoff velocity, maintains sheet flow, protects the soil
surface from erosion, promotes infiltration of runoff, and improves wildlife
habitat.
• Bioretention is a permanent BMP that is engineered to utilize a depressed
landscape area to capture and filter or infiltrate the water quality capture
volume. BMPs that utilize bioretention are frequently referred to as rain
gardens or porous landscape detention areas.
• Preservation of Existing Vegetation should occur where no construction
activity is expected to occur. Preservation of natural vegetation is generally a
permanent BMP and is applicable to construction sites with pre-existing
vegetation. Only land needed for building activities and vehicle traffic needs
is to be cleared.
• Storm Sewer Outlet Protection devices are structurally lined aprons or other
energy dissipating devices placed at the outlets of pipes or paved channel
sections. Outlet protection devices prevent scour at storm water outlets and
minimize the potential of downstream erosion by reducing the velocity of
storm water flows. Concrete aprons connected to concrete pans will be used
downstream of storm sewer outfalls as pipe outlet protection. Outlet
Protection is installed with the storm sewer construction and serves as a
permanent structural BMP.
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
13 U16014-SWMP.docx
B. Erosion Control Sequencing
SWMP drawings are located in the Appendix that include the minimum required BMPs
found on the Sediment and Erosion Control Plans. These should be revised as needed by
the SWMP Administrator to accurately reflect site conditions. Erosion control sequencing
should generally adhere to the following:
Mobilization and Demolition
• Preserve Existing Vegetation – Before construction commencement, areas
that are not disturbed by construction activity should be preserved as needed
with construction fencing, silt fencing, signage, or other means to keep
vehicular traffic out of the area to be left undisturbed.
• Silt Fence – Before construction commencement, silt fence will be placed
downstream of areas where runoff from construction activities is expected to
occur.
• Staging Area – A concrete wash out area, fueling area, and other staging areas
will be provided during the construction process at least 100’ from any storm
water conveyance. A staging area is to be shown on the SWMP drawing when
its location is identified.
• Vehicle Tracking Control – Before commencement of construction, vehicle
tracking control shall be placed at the locations shown in the SWMP plans. Any
other points of ingress and egress planned by the contractor and approved by
the owner shall also receive suitable vehicle tracking control BMPs.
• Construction Fence – Before commencement of construction, construction
fence shall be placed at the contractor’s discretion (or as shown in the plans)
to limit access by construction equipment and personal vehicles to designated
areas of ingress and egress.
• Inlet Filters – Before commencement of construction, it may be necessary to
install inlet filters to protect existing inlets in the general vicinity of the site.
Utility Construction, Building Construction and Site Grading
The items installed during mobilization and demolition shall be in place, functional,
and maintained during and following utility construction, building construction and
site grading operations. In addition to those items, the following BMPs shall be
installed.
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
14 U16014-SWMP.docx
• Wind Borne Sediment and Dust Control – Wind borne sediment and dust
control measures should be implemented during grading activities. This will
be particularly important to consider prior to the establishment of seeding.
• Inlet Filters – Inlet filters will be placed at curb inlets and area inlets located
throughout the site immediately after the inlet is constructed / installed.
Existing inlets shall be protected prior to heavy equipment staging, demolition,
or commencement of construction activities.
• Swale Protection – Sediment control logs will be placed within the swales
immediately following rough grading. Wattles and check dams shall be placed
across the swale for every 2’ of drop in swale elevation or every 300'.
• Slope Protection – Surface roughening and contour furrows shall occur after
rough grading.
• Temporary Seeding – The majority of the landscaped areas will be
permanently seeded or planted. However, if disturbed areas are left without
permanent stabilization 30 days after grading, temporary seeding will be
required.
• Concrete Washout Area – Concrete washout areas will be placed prior to, and
maintained during, the completion of concrete work.
Final Grading, Pavement Construction, Landscaping and Final Stabilization
This erosion control sequence will likely begin prior to the establishment of
vegetation throughout the site; therefore, it is expected that majority of the BMPs
shown in the previous sequences will be in place at the beginning of this phase.
As paving is completed and seeding is established, previously placed BMPs such
as vehicle tracking control devices and some sections of silt fence may be
removed. Other erosion control measures such as inlet protection, silt fence, and
swale protection may only be removed after construction is complete and/or
upstream areas are established. In addition to previously installed measures, the
following BMPs shall be installed.
• Outlet Protection– Concrete pans/aprons will be placed immediately
downstream of storm sewer outfalls. Cobble pads will be placed immediately
downstream of curb cuts as shown on the construction documents.
• Permanent Seeding – Permanent seeding or landscaping shall be placed
immediately in areas that are final graded and where little future disturbance
is expected.
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
15 U16014-SWMP.docx
• Rock Socks – Rock socks will be placed to replace other BMP measures as
required after paving operations have been completed.
C. Materials Handling and Spill Prevention
Stormwater run-off generated from the staging areas determined by the Construction Site
Operator or SWMP Administrator will be routed to a temporary sedimentation area
where runoff will be contained and filtered before being discharged downstream. Vehicle
tracking control should be placed at the stockpile area entrance/exit and silt fence should
surround it. If relocated, the SWMP should be updated with the actual location of the
stockpile/staging area(s).
Chemicals, fuels, lubricants, and paints stored on-site will be in water tight containers and
covered as necessary and stored in a bermed area, a storage building, or within a vehicle
to act as secondary containment. Storage of onsite materials including building materials,
fertilizers, waterline, sanitary sewer, and storm sewer will be covered and placed on
pallets to prevent direct contact with the ground and potential surface runoff.
Other hazardous waste disposal (that is not typical to commercial building construction)
is not included within this SWMP. Concrete and asphalt batch plants are not anticipated
on this site and thus are not included in this SWMP.
In the event of a spill or accident, the spill shall be contained with a spill kit in order to
prevent the contaminants from flowing off-site or soaking into the soil. Site personnel
should be briefed in regular meetings of the presence of the spill kit and how the kit
should be used in the event of a spill. Once contained, the contaminated materials shall
be properly disposed of as approved by the SWMP Administrator and local, state and
federal jurisdictions. Once construction is completed, or as required during the course of
construction, concrete waste and contaminated soil will be disposed of properly. The
SWMP Administrator, City Inspector and CDPHE should be notified immediately in the
event of spills.
IV. Other Controls
The following includes other measures to control pollutants:
• Solid waste materials, including disposable materials incidental to the major
construction activities, will be collected in trash containers or dumpsters. The
containers will be emptied periodically and disposed of properly at the local landfill or
as directed by the SWMP Administrator. Dumpsters shall have covers.
• Water used to establish and maintain grass, for dust control, and for other purposes
during the construction phase must originate from a public water supply or private
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
16 U16014-SWMP.docx
well approved by the Colorado Department of Public Health and Environment unless
otherwise approved.
• Sanitary facilities shall be provided at the site throughout construction activities. They
shall be utilized by construction personnel and serviced regularly by a commercial
operator. They shall be located a minimum of 5 feet from the curb or 50 feet from
inlets and must be anchored. If sanitary facilities are located on a paved surface, a
secondary containment BMP will need to be constructed.
• Access off of paved roads should be limited.
• BMPs such as tarps and drip pans will be used for painting, stucco, dry-wall etc.
operations.
• Super-chlorinated water used for flushing water distribution systems will be de-
chlorinated prior to discharging from the site by aeration, retention, dissipation, or
chemical treatment.
V. Final Stabilization
Final stabilization is reached when all soil disturbing activities at the site have been completed
and vegetative cover has been established with a density of at least 70 percent of pre-disturbance
levels or when equivalent permanent erosion reduction methods have been utilized. Upon final
stabilization as determined by the SWMP Administrator and City inspector, temporary BMPs may
be removed, unless they are required to remain in place for future phasing.
VI. Long-term Stormwater Quality
Several long-term stormwater quality measures have been selected for the site that will provide
treatment of stormwater prior it to being discharged from the site, refer to Appendix C for
locations of the measures chosen. For this project the following measures have been selected:
Grass Swales - The soft bottom/overbank areas of the swales allow for infiltration to occur as
well as including a flow path across a vegetated surface slowing the conveyance rate of storm
water runoff. These have been chosen to convey and treat stormwater prior to being intercepted
by storm sewer infrastructure.
Grass Open Areas/Buffers – Grass open areas and/or grass buffers allow for infiltration to occur
as well as including a flow path across a vegetated surface slowing the conveyance rate of storm
water runoff. These have also been chosen to convey and treat stormwater prior to discharging
to the bioswale, storm sewer system, or detention or wet ponds.
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
17 U16014-SWMP.docx
Bioswale – Bioswales, through the use of engineered permeable materials, promote the
infiltration, slow the conveyance rate of stormwater runoff, and treat runoff by filtering sediment
from the runoff. A bioswale has been chosen to convey and treat stormwater prior to being
intercepted by storm sewer infrastructure.
Underground Detention – Underground detention, in conjunction with a water quality plate,
collects, stores, and slowly releases minor storm events allowing runoff to the pond, infiltrate,
and settle out particulates prior to being discharged downstream to storm sewer infrastructure.
Extended Detention Basin – Extended detention basins in conjunction with the use of a water
quality plate, collect, store and slowly release minor storm events allowing runoff to pond,
infiltrate into the grass bottom of the pond, and settle out particulates prior to being discharged
from the site. An extended detention basin has been selected as a highly effective last treatment
option prior to discharging runoff from the site.
VII. Inspection and Maintenance Procedures
Upon completion of each phase of construction, appropriate measures shall be taken to inspect
and maintain existing erosion control features, as described herein or per manufacturers
specifications (whichever is more stringent) and install new erosion control elements associated
with each phase of construction.
The temporary BMPs will be inspected and documented at a minimum of once every 14 days and
after each precipitation or snowmelt event. The SWMP will be kept up-to-date with inspection
records, maintenance procedures, and changes. Records should include complete inspection
reports for each inspection, maintenance, and/or repair. A record-keeping system is
recommended in managing inspection and maintenance reports and should include all
maintenance records, spill response, weather conditions, training, correspondence, etc. A blank
copy of an Erosion and Sediment Control Inspection List (ESCIL) is provided in Appendix B.
Preventative maintenance also involves the regular inspection and testing of equipment, timely
maintenance of the equipment, and complete records of the maintenance and inspections of the
equipment. The maintenance and inspection records will be kept on site and made available to
any local, state, or federal officials upon request.
Inspections must include the observation of the construction site perimeter, runoff discharge
points, disturbed areas, staging areas (including concrete washout areas and fueling areas),
erosion and sediment control measures identified in this SWMP, and any other structural BMPs
that may require maintenance. The inspection must determine if there is evidence of or potential
for pollutants to enter the drainage system and, if so, whether or not the BMPs should be
modified, replaced, or added to.
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
18 U16014-SWMP.docx
The following list includes some recommended maintenance procedures:
• Erosion and sediment control measures determined, upon inspection, to be in need
of repair shall be maintained before the next anticipated storm event or as necessary
to maintain continued effectiveness of erosion and sediment control measures. If it
is impractical to maintain erosion and sediment control measures before the next
storm event, maintenance should be accomplished as soon as practical.
• Locations where vehicles enter or exit the site shall be inspected for evidence of
sediment being tracked off-site by construction traffic. Such sediment shall be
removed at the end of each work day or before it can be conveyed to the receiving
storm drains or creeks, whichever is most imminent.
• Seeded areas will be checked to see that grass coverage is maintained. Areas will be
watered, fertilized, and reseeded as needed.
• It is the responsibility of the SWMP Administrator to maintain effective pollutant
discharge controls. Actual physical site conditions or contractor practices could make
it necessary to install one or more controls than those that are already shown on the
Erosion Control Plans. For example, localized concentrations of surface runoff or
unusually steep areas could require additional erosion control devices. Assessing the
need for and implementing additional controls will be a continuing aspect of the
SWMP Administrator until final stabilization. This plan intends to control water-borne
and liquid pollutant discharges by some combination of interception, filtration, and
containment. Parties implementing this plan must remain alert to the need to
periodically refine and update the plan to accomplish the intended goals.
Stormwater Management Plan
Platte River Power Authority HQ Campus
Fort Collins, CO
19 U16014-SWMP.docx
VIII. References
1. Final Drainage Report for Platte River Power Authority HQ Campus, United Civil Design
Group, February 14, 2018.
2. Larimer County Urban Area Street Standards, Larimer County, Colorado, Repealed and
Reenacted, Effective April 1, 2007.
3. Natural Resources Conservation Service Web Soil Survey at
www.websoilsurvey.nrcs.usda.gov/app.
4. Geotechnical Engineering Report, PRPA New Headquarters Campus, 2000 East
Horsetooth Road, Fort Collins, Colorado, Terracon, November 3, 2017.
5. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by
Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins
Municipal Code.
6. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood
Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April
2008.
7. State of Colorado, Stormwater Discharges Associated with Construction Activity,
Stormwater Management Plan Preparation Guides, www.colorado.com.
APPENDIX A
State of Colorado Forms
• State of Colorado General Permit Application
• Water Quality Control Division Colorado Discharge Permit System Application for
Construction Dewatering Wastewater Discharge
• Notice of Reassignment of Permit Coverage
• Notice of Transfer and Acceptance of Terms
• Notice of Termination
STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES APPLICATION
COLORADO DISCHARGE PERMIT SYSTEM (CDPS)
PHOTO COPIES, FAXED COPIES, PDF COPIES OR EMAILS WILL NOT BE ACCEPTED.
For Applications submitted on paper - Please print or type. Original signatures are required.
All items must be completed accurately and in their entirety for the application to be deemed complete. Incomplete applications will not be processed
until all information is received which will ultimately delay the issuance of a permit. If more space is required to answer any question, please attach
additional sheets to the application form. Applications or signature pages for the application may be submitted by mail or hand delivered to:
Colorado Department of Public Health and Environment, 4300 Cherry Creek Drive South, WQCD-P-B2, Denver, CO 80246-1530
For Applications submitted electronically
Please note that you can ONLY complete the feedback form by downloading it to a PC or Mac/Apple computer and opening the Application with Adobe
Reader or a similar PDF reader. The form will NOT work with web browsers, Google preview, Mac preview software or on mobile devices using iOS or
Android operating systems.
If application is submitted electronically, processing of the application will begin at that time and not be delayed for receipt of the signed document.
Any additional information that you would like the Division to consider in developing the permit should be provided with the application. Examples
include effluent data and/or modeling and planned pollutant removal strategies.
Beginning July 1, 2016, invoices will be based on acres disturbed.
DO NOT PAY THE FEES NOW – Invoices will be sent after the receipt of the application.
Disturbed Acreage for this application (see page 4)
Less than 1 acre ($83 initial fee, $165 annual fee)
1-30 acres ($175 initial fee, $350 annual fee)
Greater than 30 acres ($270 initial fee, $540 annual fee)
Responsible Person (Title):
PERMIT INFORMATION
Reason for Application: NEW CERT RENEW CERT EXISTING CERT#
Applicant is: Property Owner Contractor/Operator
A. CONTACT INFORMATION - *indicates required
* PERMITTED ORGANIZATION FORMAL NAME:
1) * PERMIT OPERATOR - the party that has operational control over day to day activities - may be the same as owner.
Currently Held By (Person): FirstName: LastName:
Telephone: Email Address:
Organization:
Mailing Address:
City: State: Zip Code:
Per Regulation 61 : All reports required by permits, and other information requested by the Division shall be signed by the permittee or by a duly
authorized representative of that person. A person is a duly authorized representative only if:
(i) The authorization is made in writing by the permittee
(ii) The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or
activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or
an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative
may thus be either a named individual or any individual occupying a named position); and
(iii) The written authorization is submitted to the Division
SW Construction Application for: page 1 of 5
ASSIGNED PERMIT NUMBER
_____________________________
Date Received _____/_____/_____
MM DD YYYY
Revised: 10-2017
Responsible Person (Title):
2) OWNER - party has ownership or long term lease of property - may be the same as the operator.
Currently Held By (Person): FirstName: LastName:
Telephone: Email Address:
Organization:
Mailing Address:
City: State: Zip Code:
Same as 1) Permit Operator
Per Regulation 61 : All reports required by permits, and other information requested by the Division shall be signed by the permittee or by a duly
authorized representative of that person. A person is a duly authorized representative only if:
i. The authorization is made in writing by the permittee.
ii. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or
activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an
individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus
be either a named individual or any individual occupying a named position); and
iii. The written authorization is submitted to the Division.
Responsible Person (Title):
Currently Held By (Person): FirstName: LastName:
Telephone: Email Address:
Organization:
Mailing Address:
City: State: Zip Code:
Same as 1) Permit Operator
4) *BILLING CONTACT if different than the permittee.
3) *SITE CONTACT local contact for questions relating to the facility & discharge authorized by this permit for the facility
Responsible Person (Title):
Currently Held By (Person): FirstName: LastName:
Telephone: Email Address:
Organization:
Mailing Address:
City: State: Zip Code:
Same as 1) Permit Operator
SW Construction Application for: page 2 of 5
Responsible Person (Title):
5) OTHER CONTACT TYPES (check below) Add pages if necessary:
Currently Held By (Person): FirstName: LastName:
Telephone: Email Address:
Organization:
Mailing Address:
City: State: Zip Code:
Environmental Contact
Inspection Facility Contact
Consultant
Compliance Contact
Stormwater MS4 Responsible Person
Stormwater Authorized Representative
B) PERMITTED PROJECT/FACILITY INFORMATION
Latitude
Project/Facility Name
Street Address or Cross Streets
(e.g., Park St and 5 Ave; CR 21 and Hwy 10; 44 Ave and Clear Creek) ; A street name without an address, intersection, mile marker, or other
identifying information describing the location of the project is not adequate. For linear projects, the route of the project should be described as
best as possible using the starting point for the address and latitude and longitude – more clearly defined in the required map )
Facility Latitude/Longitude - List the latitude and longitude of the excavation(s) resulting in the discharge(s). If the exact soil disturbing location(s)
are not known, list the latitude and longitude of the center point of the construction project. If using the center point, be sure to specify that it is
the center point of construction activity. The preferred method is GPS and Decimal Degrees.
. Longitude
Decimal Degrees (to 5 decimal places)
.
Decimal Degrees (to 5 decimal places)
(e.g., 39.70312°, 104.93348°)
This information may be obtained from a variety of sources, including:
Surveyors or engineers for the project should have, or be able to calculate, this information.
U.S. Geological Survey topographical map(s), available at area map stores.
Using a Global Positioning System (GPS) unit to obtain a direct reading.
Google - enter address in search engine, select the map, right click on location, and select “what’s here”.
Note: the latitude/longitude required above is not the directional degrees, minutes, and seconds provided on a site legal description to define
property boundaries.
C) MAP (Attachment) If no map is submitted, the application cannot be submitted.
Map: Attach a map that indicates the site location and that CLEARLY shows the boundaries of the area that will be disturbed. A vicinity map is not
adequate for this purpose.
Legal description: If subdivided, provide the legal description below, or indicate that it is not applicable (do not supply Township/Range/Section
or metes and bounds description of site)
Subdivision(s): Lot(s):
Block(s)
OR
Not applicable (site has not been subdivided)
SW Construction Application for: page 3 of 5
City: County: Zip Code:
D) LEGAL DESCRIPTION - only for Subdivisions
Total area of project disturbance site (acres):
E) AREA OF CONSTRUCTION SITE - SEE PAGE 1 - WILL DETERMINE FEE
Note: aside from clearing, grading and excavation activities, disturbed areas also include areas receiving overburden (e.g., stockpiles), demolition areas, and areas
with heavy equipment/vehicle traffic and storage that disturb existing vegetative cover.
Part of Larger Common Plan of Development or Sale, (i.e., total, including all phases, filings, lots, and infrastructure not covered by this application)
Provide both the total area of the construction site, and the area that will undergo disturbance, in acres.
Commercial Development
Non-structural and other development (i.e. parks, trails, stream realignment, bank stabilization, demolition, etc.)
F) NATURE OF CONSTRUCTION ACTIVITY
Check the appropriate box(es) or provide a brief description that indicates the general nature of the construction activities. (The full description of activities must be
included in the Stormwater Management Plan.)
Residential Development
Highway and Transportation Development
Pipeline and Utilities (including natural gas, electricity, water, and communications)
Oil and Gas Exploration and Well Pad Development
SW Construction Application for: page 4 of 5
G) ANTICIPATED CONSTRUCTION SCHEDULE
Construction Start Date: Final Stabilization Date:
Construction Start Date - This is the day you expect to begin ground disturbing activities, including grubbing, stockpiling, excavating, demolition,
and grading activities.
Final Stabilization Date - in terms of permit coverage, this is when the site is finally stabilized. This means that all ground surface disturbing
activities at the site have been completed, and all disturbed areas have been either built on, paved, or a uniform vegetative cover has been
established with an individual plant density of at least 70 percent of pre-disturbance levels. Permit coverage must be maintained until the site is
finally stabilized. Even if you are only doing one part of the project, the estimated final stabilization date must be for the overall project.
If permit coverage is still required once your part is completed, the permit certification may be transferred or reassigned to a new responsible
entity(s).
H) RECEIVING WATERS (If discharge is to a ditch or storm sewer, include the name of the ultimate receiving waters)
Immediate Receiving Water(s):
Ultimate Receiving Water(s):
Identify the receiving water of the stormwater from your site. Receiving waters are any waters of the State of Colorado. This includes all water courses, even if they
are usually dry. If stormwater from the construction site enters a ditch or storm sewer system, identify that system and indicate the ultimate receiving water for the
ditch or storm sewer. Note: a stormwater discharge permit does not allow a discharge into a ditch or storm sewer system without the approval of the owner/
operator of that system.
I) SIGNATURE PAGE
STORMWATER MANAGEMENT PLAN CERTIFICATION
Ink Signature
For Docusign
Electronic Signature
1. You may print and sign this document and mail the hard copy to the State along with required documents (address on page one).
2. Electronic Submission Signature
You may choose to submit your application electronically, along with required attachments. To do so, click the SUBMIT button below which will direct you, via
e-mail , to sign the document electronically using the DocuSign Electronic Signature process. Once complete, you will receive via e-mail, an electronically
stamped Adobe pdf of this application. Print the signature page from the electronically stamped pdf, sign it and mail it to the WQCD Permits Section to complete
the application process (address is on page one of the application).
The Division encourages use of the electronic submission of the application and electronic signature. This method meets signature requirements as
required by the State of Colorado.
The ink signed copy of the electronically stamped pdf signature page is also required to meet Federal EPA Requirements.
Processing of the application will begin with the receipt of the valid electronic signature.
By checking this box “I certify under penalty of law that a complete Stormwater Management Plan, as described in the stormwater management plan guidance,
has been pre-pared for my activity. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering
the information, the Stormwater Management Plan is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for falsely certifying the completion of said SWMP, including the possibility of fine and imprisonment for knowing violations.”
Date:
Signature of Legally Responsible Person or Authorized Agent (submission must include original signature)
Name (printed) Title
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate and complete.
I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."
“I understand that submittal of this application is for coverage under the State of Colorado General Permit for Stormwater Discharges Associated with Construction
Activity for the entirety of the construction site/project described and applied for, until such time as the application is amended or the certification is
transferred, inactivated, or expired.” [Reg 61.4(1)(h)]
DO NOT INCLUDE A COPY OF THE STORMWATER MANAGEMENT PLAN
DO NOT INCLUDE PAYMENT—AN INVOICE WILL BE SENT AFTER THE CERTIFICATION IS ISSUED.
Signature: The applicant must be either the owner and operator of the construction site. Refer to Part B of the instructions for additional information.
The application must be signed by the applicant to be considered complete. In all cases, it shall be signed as follows:
(Regulation 61.4 (1ei)
a) In the case of corporations, by the responsible corporate officer is responsible for the overall operation of the facility from which the discharge described in
the form originates
b) In the case of a partnership, by a general partner.
c) In the case of a sole proprietorship, by the proprietor.
d) In the case of a municipal, state, or other public facility, by either a principal executive officer, ranking elected official, (a principal executive officer has
responsibility for the overall operation of the facility from which the discharge originates).
SW Construction Application for: page 5 of 5
3rd Party Preparer: If this form was prepared by an authorized agent on behalf of the Permittee, please complete the field below.
Preparer Name (printed) Email Address
Application for COLORADO DISCHARGE PERMIT SYSTEM (CDPS)
General Permits:
Page 1 of 10 revised 11-2017
For Agency Use Only:
Permit Number Assigned
COG07 - _____________________
COG315 -_____________________
COG316 -_____________________
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe/wqcd
John W. Hickenlooper, Governor | Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer
Construction Dewatering (COG070000)
Remediation Activities Discharging To Surface Water (COG315000), or
Remediation Activities Discharging To Groundwater (COG316000)
Please print or type. Original signatures are required. Photo, faxed, pdf or email copies will not be
accepted.
This combined permit application is designed to streamline the application process for the three types of discharge
permits listed in Part A below, and includes an Application Guidance Document to help applicants complete the
application and select the right permit coverage for their activity. Please note that one application is intended to
cover one project and one type of permit. Where multiple projects or types of permits are required, please submit an
appropriate number of permit applications.
The application must be submitted to the Water Quality Control Division at least 30 days (for Construction Dewatering )
or 45 days (for Remediation) prior to the anticipated date of discharge, and must be considered complete by the
division before the review and approval process begins. The division will notify the applicant if additional information
is needed to complete the application. If more space is required to answer any question, please attach additional
sheets to the application form. Applications must be submitted by mail or hand delivered to:
Colorado Department of Public Health and Environment
Water Quality Control Division, WQCD-P-B2
4300 Cherry Creek Drive South
Denver, Colorado 80246-1530
A. PERMIT INFORMATION
Reason for Application: □ NEW CERT
□ RENEW CERT EXISTING CERT #
Applicant is: □ Property Owner □ Contractor/Operator
Application is for the following discharge permit (select ONE). See Guidance.
□ Construction Dewatering (COG070000)
□ Remediation Activities Discharging to Surface Water (COG315000)
□ Remediation Activities Discharging to Groundwater (COG316000)
Note: This application is designed for processing each of the three permit types listed above. The division may
request additional characterization of the proposed discharge to ensure that the appropriate permit coverage is
requested and the appropriate permit certification is issued. The division may deny or change the requested type of
discharge permit after review of the submitted application and will notify the applicant of the changes. Coverage
under the “Subterranean Dewatering or Well Development” General Permit COG6030000 is not available using this
application form.
IMPORTANT: Please read the Application Guidance Document (Guidance) for this permit application prior to completing this
application. The Guidance provides specific and important instructions required for completing this application correctly.
Application for construction dewatering or groundwater remediation coloradowaterpermits.com
Page 2 of 10 revised 11-2017
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe/wqcd
John W. Hickenlooper, Governor | Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer
B. CONTACT INFORMATION
1. Permittee Information
Organization Formal Name: ___________________________________________________________
Permittee Name: the person authorized to sign and certify the permit application. This person receives all
permit correspondences and is responsible for ensuring compliance with the permit.
Responsible Position (Title): ______________________________________________
Currently Held By (Person): ______________________________________________
Telephone No: _________________________________
Email address: ___________________________________
Mailing Address: _______________________________________________________
City: ________________________ State: ______________ Zip: _____________
This form must be signed by the permittee to be considered complete. Per Regulation 61, in all cases, it shall
be signed as follows:
a) In the case of corporations, by a responsible corporate officer. For the purposes of this section, the
responsible corporate officer is responsible for the overall operation of the facility from which the
discharge described in the application originates.
b) In the case of a partnership, by a general partner.
c) In the case of a sole proprietorship, by the proprietor.
d) In the case of a municipal, state, or other public facility, by either a principal executive officer or ranking
elected official.
2. DMR Cognizant Official (i.e. authorized agent) the person or position authorized to sign and certify reports
required by permits including Discharge Monitoring Reports [DMR’s], Annual Reports, Compliance Schedule
submittals, and other information requested by the division. The division will transmit pre-printed DMR’s to
this person. If more than one, please add additional pages.
□ Same as 1) Permittee
Responsible Position (Title): ______________________________________________
Currently Held By (Person): ______________________________________________
Telephone No: _________________________________
Email address: ___________________________________
Organization: __________________________________________________________
Mailing Address: _______________________________________________________
City: ________________________ State: ______________ Zip: _____________
Per Regulation 61: All reports required by permits, and other information requested by the Division shall be
signed by the permittee or by a duly authorized representative of that person. A person is a duly authorized
representative only if:
a) The authorization is made in writing by the permittee
b) The authorization specifies either an individual or a position having responsibility for the overall
operation of the regulated facility or activity such as the position of plant manager, operator of a well
or a well field, superintendent, position of equivalent responsibility, or an individual or position having
overall responsibility for environmental matters for the company. (A duly authorized representative may
thus be either a named individual or any individual occupying a named position)
c) Submitted in writing to the Division
COG070000/COG315000/COG316000 Permit Application www.coloradowaterpermits.com
Page 3 of 10 revised 11-2017
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe/wqcd
John W. Hickenlooper, Governor | Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer
B. CONTACT INFORMATION (cont.)
3. Site/Local Contact (contact for questions relating to the facility & discharge authorized by this permit.)
□ Same as 1) Permittee
Responsible Position (Title): ______________________________________________
Currently Held By (Person): ______________________________________________
Telephone No: __________________________________
Email address: ___________________________________
Organization: __________________________________________________________
Mailing Address: _______________________________________________________
City: ________________________ State: ______________ Zip: _____________
4. Operator in Responsible Charge Required for Groundwater Remediation COG315000 or COG316000
□ Same as 1) Permittee □ Same as 3) Site/ Local Contact
*Note: Where the division determines that coverage under the construction dewatering permit is appropriate, an ORC is not required.
Operator Number __________________ Legal Name: _________________________________________________
Telephone No: _____________________Email address: ________________________________________________
Company: __________________________________________________________
5. Billing Contact □ Same as 1) Permittee
Responsible Position (Title): ______________________________________________
Currently Held By (Person): ______________________________________________
Telephone No: __________________________________
Email address: ___________________________________
Organization: __________________________________________________________
Mailing Address: _______________________________________________________
City: ________________________ State: ______________ Zip: _____________
6. Other Contact Types (check below) Add pages if necessary:
Responsible Position (Title): ______________________________________________
Currently Held By (Person): ______________________________________________
Telephone No: __________________________________
Email address: ___________________________________
Organization: __________________________________________________________
Mailing Address: _______________________________________________________
City: ________________________ State: ______________ Zip: _____________
□ Environmental Contact
□ Facility Inspection Contact
□ Consultant
□ Compliance Contact
□ Property Owner
□ Other ____________________________________________________________
COG070000/COG315000/COG316000 Permit Application www.coloradowaterpermits.com
Page 4 of 10 revised 11-2017
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe/wqcd
John W. Hickenlooper, Governor | Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer
C. PERMITTED FACILITY INFORMATION
Facility or Project Name ____________________________________________________________________
Street Address (or cross streets) ______________________________________________________________
City__________________________________ Colorado, Zip Code __________
County __________________________________
Type of Facility Ownership
□ City Government □ Corporation □ Private □ Municipal or Water District
□ State Government □ Mixed Ownership _________________________________
Facility or Project Latitude/Longitude — List the latitude and longitude of the excavation resulting in the
discharge(s). If the exact excavation location(s) are not known, list the latitude and longitude of the center point of
the construction project. If using the center point, be sure to specify that it is the center point of construction
activity.
Latitude _____. _________ Longitude _____. _____________
Provide coordinates in decimal degrees to 6 decimal places (e.g., 39.703345°,-104.933567°)
Horizontal Collection Method: □ GPS Unspecified □ Interpolation Map – Map Scale Number__________
Reference Point: □ Project/Facility Entrance □ Project/Facility Center/Centroid
Horizontal Reference Datum: __________________________________
Standard Industrial Classification (SIC) Code(s) for this FACILITY (include up to 4, in order of importance)
1__________________ 2________________3_________________4_________________
Receiving Water______________________________________________________________
D. PROJECT DESCRIPTION
D.1. Description of Activity:
a) Provide a brief overview of the project and dewatering activity (e.g., highway, bridge and tunnel construction,
storm drain expansion, etc.).
b) Is the dewatering and discharge in-stream? (The dewatering operation is considered in-stream where the
dewatering activity is conducted within approximately the ordinary high water mark of the stream and/or on
the bank of the stream and the discharge is back to the same water body.)
□ Yes * □ No
*If yes, you must provide a description of how your project meets this definition in the box below. If no
description is provided, the work will not be considered in-stream. Please note that in-stream work activities
may also require a separate Clean Water Act Section 404 Permit and Colorado 401 Certification.
COG070000/COG315000/COG316000 Permit Application www.coloradowaterpermits.com
Page 5 of 10 revised 11-2017
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe/wqcd
John W. Hickenlooper, Governor | Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer
c) Will the project involve a temporary stream diversion (e.g. diversion channel, pump-around, piped diversion,
coffer dam) to reroute water around the construction area?
□ Yes * □ No
*By checking yes, the applicant understands that temporary water diversions are not covered under the permit
certification and may require coverage under a Clean Water Act Section 404 Permit. Only dewatering
discharge outfalls associated with construction-related activities may be covered under the permit
certification.
d) Will dewatering be conducted in areas that involve work on (e.g. replacing, repairing, making connections to,
etc...) existing sanitary sewer lines, conveyances, or vessels, or in proximity to septic disposal systems?
□ Yes □ No
If yes, is there the potential that sewage or septage could be in the effluent to be discharged?
□ Yes □ No *
*If no, you must provide a description of the control measures that will be implemented to prevent sewage or
septage from entering the discharge (use the box below). The division may add effluent limits for E. coli
and/or Total Coliform if the applicant does not demonstrate that adequate measures will be in place.
D.2 Description of Discharge:
a) Is the discharge to a ditch or storm sewer system? □ Yes* □ No
*If yes, the applicant must contact the owner of the ditch or storm sewer system prior to discharging to
address any local ordinances and to determine if additional requirements will be imposed by the owner.
b) Is the discharge to an impoundment? □ Yes* □ No
c) Discharge Frequency and Duration:
Estimated discharge start date: _______________
Estimated discharge duration: Years _________ Months ____________ Days _____________
Upon completion of construction phase dewatering, will there be long-term subterranean dewatering at
the site (e.g. foundation, footer, toe drains, etc...)? □ Yes* □ No
*If yes, note that construction phase dewatering and long-term subterranean dewatering cannot be
covered under the same permit certification.
d) Provide a brief description of the Best Management Practices (BMPs) to be used in the box below.
D.3 Discharge Outfalls (Limit 20 outfalls):
Total number of defined outfalls requested: _______________
Total number of undefined outfalls requested:______________ (construction dewatering only)
Complete Table 2a (for discharges to surface water) and/or 2b (for discharges to land with percolation to
groundwater) to identify your defined and undefined outfall locations. Attach additional pages as
necessary.
COG070000/COG315000/COG316000 Permit Application www.coloradowaterpermits.com
Page 6 of 10 revised 11-2017
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe/wqcd
John W. Hickenlooper, Governor | Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer
Table 2a – Requested Outfalls for Discharges to Surface Water (Discharges that may reach surface water through
direct discharge or through a conveyance such as a ditch or a storm sewer system)
OUTFALL
NUMBER1
NAME OF RECEIVING
STREAM(S)
(e.g., Cherry Creek,
Boulder Creek, Arkansas
River)
ESTIMATED
MAXIMUM
FLOW RATE2
(gpm)
DESCRIPTION OF DISCHARGE
LOCATION3
(e.g., Discharge enters storm sewer
located at the corner of Speer and
8th Ave. with flow to Cherry Creek)
LATITUDE/LONGITUDE
OF EACH DISCHARGE
OUTFALL
Defined Discharges to Surface Water
001-A
002-A
003-A
004-A
Undefined Discharges to Surface Water
(Available for construction dewatering only) (Provide estimated lat/long only for undefined outfalls)
001-AU
002-AU
003-AU
004-AU
1 Identify up to 20 defined or undefined outfalls (undefined for construction dewatering only). Use additional pages as
necessary.
2 For construction dewatering the maximum flow limit will be equal to twice the estimated maximum flow rate provided in
the permit application. For groundwater remediation the 30-day average flow limit will be based on the design capacity of
the treatment as provided in the permit application.
3 The discharge location is the point where effluent sampling will occur. This location must be at a point after treatment and
before the effluent joins or is diluted by any other waste stream, body of water, or substance. If the discharge is to a ditch or
storm sewer system, include the name of the ultimate receiving waters where the ditch or storm sewer discharges.
COG070000/COG315000/COG316000 Permit Application www.coloradowaterpermits.com
Page 7 of 10 revised 11-2017
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe/wqcd
John W. Hickenlooper, Governor | Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer
Table 2b – Requested Outfalls for Discharges to Land with the Potential to Percolate to Groundwater (These
discharges do not have the potential to reach surface water either directly or through a conveyance.)4
OUTFALL
NUMBER1
ESTIMATED
MAXIMUM
FLOW RATE2
(gpm)
DESCRIPTION OF DISCHARGE LOCATION3
(e.g., Discharge to a field south of project site and East of
I-25)
LATITUDE/LONGITUDE
OF EACH DISCHARGE
OUTFALL
Defined Discharges to Land with Potential Percolation to Groundwater
G001-A
G002-A
G003-A
G004-A
Undefined Discharges to Land with Potential Percolation to Groundwater
(Available for construction dewatering only) (Provide estimated lat/long only for undefined outfalls)
G001-AU
G002-AU
G003-AU
G004-AU
1 Identify up to 20 defined or undefined outfalls (undefined for construction dewatering only). Use additional pages as
necessary.
2 For construction dewatering the maximum flow limit will be equal to twice the estimated maximum rate flow rate provided
in the permit application. For groundwater remediation the 30-day average flow limit will be based on the design capacity of
the treatment as provided in the permit application.
3 The discharge location is the point where effluent sampling will occur. This location must be at a point after treatment and
before the effluent joins or is diluted by any other waste stream, body of water, or substance.
4 For discharges of uncontaminated groundwater to land, please review and consider the applicability of the division’s Low
Risk Discharge Guidance: Discharges of Uncontaminated Groundwater to Land before submitting a permit application to the
division. This policy is available for download at https://www.colorado.gov/pacific/cdphe/clean-water-construction-
compliance-assistance-and-guidance.
COG070000/COG315000/COG316000 Permit Application www.coloradowaterpermits.com
Page 8 of 10 revised 11-2017
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe/wqcd
John W. Hickenlooper, Governor | Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer
E. ADDITIONAL INFORMATION
E.1 Nearby Sources of Potential Groundwater Contamination:
a) Has the proposed dewatering area been reviewed for possible groundwater contamination, such as plumes from
leaking underground storage tanks (LUSTs), hazardous waste sites, or additional sources other than what is
normally encountered at excavation and construction sites? Applicants are expected to exercise due diligence
in evaluating their project sites prior to applying for a discharge permit.
□ Yes □ No
b) Is an open LUST located within one-half mile of the site?
□ Yes* □ No
*If yes, BTEX analytical data for a source water sample representative of the proposed discharge at the site
must be included with the permit application. Failure to include this data may result in delays in processing
the permit application until such data is submitted to the Division. See Guidance.
c) Is a Superfund site or National Priorities List (NLP) site located within one mile of the site?
□ Yes* □ No
*If yes, analytical data for all parameters shown in Table 1 of this application (or an alternate list of
constituents approved by the division) for a source water sample representative of the proposed discharge
must be included with the permit application. Failure to include this data may result in delays in processing
the permit application until such data is submitted to the Division. See Guidance.
d) Is any other (non-LUST, non-Superfund, non-NPL site) known source of contamination, such as a Voluntary
Cleanup (VCUP), Environmental Covenant, open RCRA Corrective Action site, or brownfields site located within
one-half mile of the site?
□ Yes* □ No
*If yes, analytical data for all parameters shown in Table 1 of this application (or an alternate list of
constituents approved by the division) for a source water sample representative of the proposed discharge
must be included with the permit application. Failure to include this data may result in delays in processing
the permit application until such data is submitted to the Division. See Guidance.
e) If known sources of contamination are located near the site, provide an overview of the source and nature of
contamination including:
The nature of the contamination of the groundwater, alluvial water, stormwater, and/or surface water
(the source water) for which treatment and/or remedial activities will occur,
The primary industrial activities which resulted in the source water contamination,
The source of the contamination (pipes, leaking underground storage tank, up gradient sources, etc.)
or state “unknown.”
COG070000/COG315000/COG316000 Permit Application www.coloradowaterpermits.com
Page 9 of 10 revised 11-2017
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe/wqcd
John W. Hickenlooper, Governor | Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer
f) For contaminated discharges (remediation), provide a narrative description of the type(s) of treatment
proposed for use at each identified outfall.
E.2 Chemical Additions
List any chemical additives or other materials to be used in the water or to treat water prior to discharge. Include
the Material Safety Data Sheet (MSDS) for each chemical with the application.
E.3 Site Maps and Schematics
Are required maps and schematics attached? □ Yes
□ No-Application cannot be processed without required maps
Location Map(s) for Outfalls – Application must include a location map(s) that shows the location of the
project/facility, the limits of the construction activity, the approximate location of the requested discharge
point(s)/outfalls, and the location of potential receiving water(s). If known, the map should also include the
approximate location(s) where dewatering is to occur and the location of proposed BMP(s) to be used. A north
arrow must be shown. Maps must be on paper that can be folded to 8 ½ x 11 inches.
E.4 Associated Permits
Does the applicant have a Stormwater Permit for Construction Activities? □ YES □ NO □ PENDING
If Yes, Stormwater Construction Permit Number: COR-___________________
Does the applicant have a Clean Water Act Section 404 Permit? □ YES □ NO □ PENDING
CHEMICAL NAME MANUFACTURER PURPOSE DOSAGE
COG070000/COG315000/COG316000 Permit Application www.coloradowaterpermits.com
Page 10 of 10 revised 11-2017
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe/wqcd
John W. Hickenlooper, Governor | Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer
E.5 Water Rights
The State Engineers Office (SEO) has indicated that any discharge that does not return water directly to
surface waters (i.e. land application, rapid infiltration basins, etc.) has the potential for material injury to a
water right. As a result, the SEO needs to determine that material injury to a water right will not occur from
such activities. To make this judgment, the SEO requests that a copy of all documentation demonstrating
that the requirements of Colorado water law have been met, be submitted to their office for review. The
submittal should be made as soon as possible to the following address:
Colorado Division of Water Resources ● 1313 Sherman Street, Room 818 ● Denver, Colorado 80203
Should there be any questions on the issue of water rights; the SEO can be contacted at (303) 866-3581. It is
important to understand that any CDPS permit issued by the division does not constitute a water right.
Issuance of a CDPS permit does not negate the need to also have the necessary water rights in place. It is
also important to understand that even if the activity has an existing CDPS permit, there is no guarantee that
the proper water rights are in place.
F. REQUIRED CERTIFICATION SIGNATURE [Reg 61.4(1)(h)]
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true,
accurate and complete. I am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations."
Signature (Legally Responsible Party (Page 2 item 1) _________________________________________
Date ______________________________
Name (printed) _____________________________________________Title______________________________
This form must be signed by the permittee to be considered complete. Per Regulation 61, in all cases, it shall be
signed as follows:
a) In the case of corporations, by a responsible corporate officer. For the purposes of this section, the responsible
corporate officer is responsible for the overall operation of the facility from which the discharge described in the
application originates.
b) In the case of a partnership, by a general partner.
c) In the case of a sole proprietorship, by the proprietor.
d) In the case of a municipal, state, or other public facility, by either a principal executive officer or ranking elected
official.
Application for construction dewatering or groundwater remediation coloradowaterpermits.com
Appendix Page 1 of 2
ATTACHMENT 1
Please Submit the Laboratory Data Package for any Required Analysis with the Permit Application
(See Important Table Notes)
Required Water Quality Data
Metals PQL (ug/l) 1 Metals PQL (ug/l) 1
Aluminum-Trec 15 Lead-PD 0.5
Antimony-Trec 2 Manganese-PD 2
Arsenic-Trec 1 Manganese-Diss 2
Arsenic-PD 1 Molybdenum-Trec 0.5
Barium-Trec 1 Nickel-Trec 1
Beryllium-Trec 2 Nickel-PD 1
Cadmium-Trec 0.5 Selenium-Trec 1
Cadmium-PD 0.5 Selenium-PD 1
Chromium III-Trec 20 Silver-Trec 0.5
Chromium III-PD 20 Silver-PD 0.5
Chromium VI-Diss 20 Thallium-Trec 0.5
Chromium-Trec 20 Thallium-PD 0.5
Copper-Trec 2 Uranium-PD 1
Copper-PD 2 Uranium-Trec 1
Iron-Trec 20 Zinc-Trec 10
Iron-Diss 20 Zinc-PD 10
Lead-Trec 0.5
Volatiles PQL (ug/l) 1 Volatiles PQL (ug/l) 1
acrolein 15 ethylbenzene 75
benzene 3 methyl bromide 5
bromoform 3 methyl chloride 4.5
carbon tetrachloride 3 1,1,2,2-tetrachloroethane 2
chlorobenzene 60 tetrachloroethylene 2.3
chlorodibromomethane 3 toluene 60
2-chloroethylvinyl ether 0.65 * 1,2-trans-dichloroethylene 0.5 *
chloroform 3 1,1,1-trichloroethane 5
1,2-dichlorethane 3 1,1,2-trichloroethane 2.0
1,1-dichlorethylene 5 trichloroethylene 2.3
1,2-dichlorpropane 2 vinyl chloride 3
1,3-dichlorpropylene 2 * 1,4-Dioxane 0.15 *
Semi-Volatile Organic Compounds PQL (ug/l) 1 Semi-Volatile Organic Compounds PQL (ug/l) 1
acenaphthene 20
1,2-diphenylhydrazine (as
azobenzene)
5 *
acenaphthylene 30 fluorene 20
anthracene 20 fluoranthene 25
benzidine 170 hexachlorobenzene 16
benzo(a)anthracene 12 hexachlorobutadiene 9
benzo(a)pyrene 20 hexachlorcyclopentadiene 50
benzo(b)fluoranthene 35 hexachloroethane 16
benzo(ghi)perylene 20 indeno(1,2,3-cd)pyrene 20
benzo(k)fluoranthene 25 isophorone 25
bis(2-chloroethyl)ether
(or Dichloroethyl ether)
15 naphthalene 20
bis(2-chloroisopropyl)ether
(or 2,2-dichloroisopropyl ether)
60 nitrobenzene 19
bis(2-ethylhexyl)phthalate 25 N-nitrosodimethylamine 30
COG070000/COG315000/COG316000 Permit Application www.coloradowaterpermits.com
Appendix Page 2 of 2
Semi-Volatile Organic Compounds PQL (ug/l) 1 Semi-Volatile Organic Compounds PQL (ug/l) 1
Butyl benzyl phthalate 25 N-nitrosodi-n-propylamine 30
2-chloronaphthalene 20 N-nitrosodiphenylamine 19
chrysene 18 pyrene 10
dibenzo(a,h)anthracene 20 1,2,4-trichlorobenzene 20
1,2-dichlorobenzene 2.5 2-chlorophenol 35
1,3-dichlorobenzene 2.5 2,4-dichlorophenol 30
1,4-dichlorobenzene 3.5 2,4,-dimethylphenol 30
3,3-dichlorobenzidine 18 4,6-dinitro-o-cresol 17
diethyl phthalate 20 2,4-dinitrophenol 100
dimethyl phthalate 20 4-nitrophenol 25
di-n-butyl phthalate 25 pentachorophenol 36
2,4-dinitrotoluene 17 phenol 15
2,6-dinitrotoluene 20 2,4,6-trichlorophenol 25
xylene 10 * 1,4-Dioxane 0.15 *
1 PQLs are as listed in the division’s Practical Quantitation Limits Policy (CW 6) unless noted otherwise.
* This is a recommended PQL based on EPA approved methods. The division’s Practical Quantitation Limits Policy (CW 6) does
not provide a 40 CFR 136 based PQL for this parameter.
Trec = Total Recoverable
PD = Potentially Dissolved
Diss = Dissolved
PQL = Practical Quantitation Limit
Important table notes:
1) Please refer to the permit application Guidance to determine whether analytical data is required with the
permit application, and if so, what specific type of data is required.
2) Parameter names match the names as they appear in the general permit or, as italicized, as they appear in the
division’s Practical Quantitation Limits Policy (CW-6).
3) The division may require analytical data for additional parameters where the project site is located in close
proximity to potential sources of contamination for parameters not included in this Attachment 1, including but
not limited to pesticide, PCB, radionuclide contamination.
4) Applicants applying under the General Permit for Remediation Activities Discharging to Groundwater
(COG316000) are encouraged to contact the division prior to sample collection to ensure that the correct metal
speciation is included in the sample analysis.
5) For the permit application, all sampling should be performed according to specified methods in 40 CFR 136,
methods approved by EPA pursuant to 40 CFR 136, or methods approved by the division, in the absence of a
method specified in or approved pursuant to 40 CFR 136. In addition, the PQLs listed in Attachment 1 should
be met unless otherwise approved by the division.
For Agency Use Only
Permit Number Assigned
COR03-______________
Date Received ____/____/____
Month Day Year
NOTICE OF REASSIGNMENT OF PERMIT COVERAGE AND GENERAL PERMIT APPLICATION
STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES
PHOTO COPIES, FAXED COPIES, PDF COPIES OR EMAILS WILL NOT BE ACCEPTED.
Please print or type. Original signatures are required. This application must be considered complete by the Division prior to initiation
of permit processing. The Division will notify the applicant if additional information is needed to complete the application. If more space is
required to answer any question, please attach additional sheets to the application form. Applications must be mailed or delivered to:
Colorado Department of Public Health and Environment
Water Quality Control Division
4300 Cherry Creek Drive South
WQCD-P-B2
Denver, Colorado 80246-1530
**Part I of the application beginning below is to be filled out by the new permit applicant that will be assuming permitting
liability for the reassigned portion of the original applicant’s site.
**Part II of the application, starting on page 3 of the form, is to be completed by the current permittee.
Both Parts I (pages 1-4) and II (page 5) must be completed.
EXISTING CERT **__________________ (from Part II)
** NOTE: THIS WILL CREATE A NEW PERMIT FOR PART 1 APPLICANT. THE EXISTING PERMIT WILL NOT BE
TERMINATED. THIS IS NOT A TRANSFER FORM.
PART I - To be completed by the New permit applicant:
I hereby accept the reassignment of permit coverage for the area described in this application. I have reviewed the terms and
conditions of this permit and the Stormwater Management Plan and accept full responsibility, coverage and liability
REASSIGNMENT WILL BE EFFECTIVE _____________________________
MONTH/ DAY/ YEAR
Applicant is : Property Owner Contractor/Operator
A. CONTACT INFORMATION - NOT ALL CONTACT TYPES MAY APPLY * indicates required
*PERMITTEE (If more than one please add additional pages)
*ORGANIZATION FORMAL NAME:
1) *PERMITTEE the person authorized to sign and certify the permit application. This person receives all
permit correspondences and is legally responsible for compliance with the permit.
Responsible Position (Title): ___________________________________________
Currently Held By Person):___________________________________________________________
Telephone No:__________________________________ email address__________________________________
Organization:
Mailing Address:
City:_ State: Zip:
This form must be signed by the Permittee to be considered complete.
Per Regulation 61 In all cases, it shall be signed as follows:
a) In the case of corporations, by a responsible corporate officer. For the purposes of this section, the responsible
corporate officer is responsible for the overall operation of the facility from which the discharge described in the
application originates.
b) In the case of a partnership, by a general partner.
c) In the case of a sole proprietorship, by the proprietor.
d) In the case of a municipal, state, or other public facility, by either a principal executive officer or ranking elected official
Application Part 1 page 1of 4 updated 4/2011
2) DMR COGNIZANT OFFICIAL (i.e. authorized agent) the person or position authorized to sign and certify reports required by the
Division including Discharge Monitoring Reports *DMR’s, Annual Reports, Compliance Schedule submittals, and other information
requested by the Division. The Division will transmit pre-printed reports (ie. DMR’s) to this person. If more than one, please add
additional pages. Same As 1) Permittee
Responsible Position (Title):____________________________________________________
Currently Held By (Person):__________________________________________________
Telephone No:_______________________________ email address____________________________________
Organization:_______________________________________________________________
Mailing Address: ____________________________________________________________
City:_ State: Zip: _______________________
Per Regulation 61 : All reports required by permits, and other information requested by the Division shall be signed by the
permittee or by a duly authorized representative of that person. A person is a duly authorized representative only if: (i) The
authorization is made in writing by the permittee
(ii) The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated
facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent
responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly
authorized representative may thus be either a named individual or any individual occupying a named position); and
(iii) The written authorization is submitted to the Division
3) *SITE CONTACT local contact for questions relating to the facility & discharge authorized by this permit for the facility.
Same As 1) Permittee
Responsible Position (Title):____________________________________________________
Currently Held By (Person):__________________________________________________
Telephone No:_______________________________ email address____________________________________
Organization:_______________________________________________________________
Mailing Address: ____________________________________________________________
City:_ State: Zip: _______________________
4) * BILLING CONTACT if different than the permittee
Responsible Position (Title):____________________________________________________
Currently Held By (Person):__________________________________________________
Telephone No:_______________________________ email address____________________________________
Organization:_______________________________________________________________
Mailing Address: ____________________________________________________________
City:_ State: Zip: _______________________
5) OTHER (Please describe)_____________________________________________________
Responsible Position (Title):____________________________________________________
Currently Held By (Person):__________________________________________________
Telephone No:_______________________________ email address____________________________________
Organization:_______________________________________________________________
Mailing Address: ____________________________________________________________
City:_ State: Zip: _______________________
Application Part 1 page 2 of 4 updated 4/2011
B. Permitted Project/Facility Information
Project/Facility Name
Street Address or cross streets
City, Zip Code
County
Facility Latitude/Longitude— (approximate center of site to nearest 15 seconds using one of following formats
001A Latitude . Longitude . (e.g., 39.703°, 104.933°’)
degrees (to 3 decimal places) degrees (to 3 decimal places)
or
001A Latitude º ’ " Longitude º ’ " (e.g., 39°46'11"N, 104°53'11"W)
degrees minutes seconds degrees minutes seconds
C. MAP (Attachment)
Map: Attach a map that indicates the site location and that CLEARLY shows the boundaries of the area that will
be disturbed. Maps must be no larger than 11x17 inches.
D. LEGAL DESCRIPTION
Legal description: If subdivided, provide the legal description below, or indicate that it is not applicable (do not
supply Township/Range/Section or metes and bounds description of site)
Subdivision(s): Lot(s): Block(s):
OR
□ Not applicable (site has not been subdivided)
E. AREA OF CONSTRUCTION SITE
Total area of project site (acres):
Area of project site to undergo disturbance (acres):
Total disturbed area of Larger Common Plan of Development or Sale, if applicable:
(i.e., total, including all phases, filings, lots, and infrastructure not covered by this application)
F. NATURE OF CONSTRUCTION ACTIVITY
Check the appropriate box(s) or provide a brief description that indicates the general nature of the construction
activities. (The full description of activities must be included in the Stormwater Management Plan.)
□ Single Family Residential Development
□ Multi-Family Residential Development
□ Commercial Development
□ Oil and Gas Production and/or Exploration
(including pad sites and associated infrastructure)
□ Highway/Road Development
(not including roadways associated with commercial or residential development)
□ Other, Describe:
G. ANTICIPATED CONSTRUCTION SCHEDULE
Construction Start Date: Final Stabilization Date:
Application Part 1 page 3 of 4 updated 4/2011
NOTICE OF REASSIGNMENT OF PERMIT COVERAGE AND GENERAL PERMIT APPLICATION
STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES
Application Part 1 page 4 of 4 updated 4/2011
H. RECEIVING WATERS
(If discharge is to a ditch or storm sewer, include the name of the ultimate receiving waters)
Immediate Receiving Water(s):
Ultimate Receiving Water(s):
I. REQUIRED SIGNATURES (Both parts i. and ii. must be signed)
Signature of Applicant: The applicant must be either the owner and/or operator of the construction site.
Refer to Part B of the instructions for additional information. The application must be signed by the
applicant to be considered complete. In all cases, it shall be signed as follows:
a) In the case of corporations, by a principal executive officer of at least the level of vice-president or
his or her duly authorized representative, if such representative is responsible for the overall
operation of the facility from which the discharge described in the application originates.
b) In the case of a partnership, by a general partner.
c) In the case of a sole proprietorship, by the proprietor.
d) In the case of a municipal, state, or other public facility, by either a principal executive officer,
ranking elected official, or other duly authorized employee if such representative is responsible for
the overall operation of the facility from which the discharge described in the form originates.
STOP!:A Stormwater Management Plan must be completed prior to signing the following certifications!
i. Stormwater Management Plan Certification
“I certify under penalty of law that a complete Stormwater Management Plan, as described in Appendix A of this
application, has been prepared for my activity. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the Stormwater Management Plan is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for falsely certifying the completion of said SWMP, including the possibility of fine and imprisonment for
knowing violations.”
XX
Signature of Legally Responsible Person or Authorized Agent (submission must include original signature) Date Signed
Name (printed) Title
ii. Signature of Permit Legal Contact
“I certify under penalty of law that I have personally examined and am familiar with the information submitted in this
application and all attachments and that, based on my inquiry of those individuals immediately responsible for
obtaining the information, I believe that the information is true, accurate and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fine or imprisonment.
“I understand that submittal of this application is for coverage under the State of Colorado General Permit for
Stormwater Discharges Associated with Construction Activity for the entirety of the construction site/project
described and applied for, until such time as the application is amended or the certification is transferred,
inactivated, or expired.”
XX
Signature of Legally Responsible Person (submission must include original signature) Date Signed
Name (printed Title
DO NOT INCLUDE A COPY OF THE STORMWATER MANAGEMENT PLAN
DO NOT INCLUDE PAYMENT – AN INVOICE WILL BE SENT AFTER THE CERTIFICATION IS ISSUED.
NOTICE OF REASSIGNMENT OF PERMIT COVERAGE AND GENERAL PERMIT APPLICATION
STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES
Application Part 2 page 1 of 1 updated 4/2011
PART II - AMENDMENT TO THE CURRENT PERMIT CERTIFICATION
TO BE COMPLETED BY CURRENT PERMITTEE
CERTIFICATION NUMBER COR03________________ THIS PERMIT WILL NOT BE TERMINATED
II.A. CURRENT PERMIT LEGAL CONTACT INFORMATION Check if information has changed
Company Name:
Legally Responsible Person: First Name: Last Name:
Title:
Mailing Address:
City, State and Zip Code:
Phone:
Email Address:
2. PERMITTED FACILITY INFORMATION
Name of Plan, Project or Development:
Latitude and Longitude (approximate center of site to nearest 15 seconds using one of following formats):
Latitude: Longitude: (e.g., 39°42’11’’, 104°55’57’’)
degrees /minutes/ seconds
OR
degrees/ minutes/ seconds
Latitude: Longitude: (e.g., 39.703°, 104.933’)
degrees (to 3 decimal places) degrees (to 3 decimal places)
3. MAP (Attachment)
Map: Attach a map that indicates the site location and that CLEARLY shows the boundaries of the area that will be retained under this
current certification. Maps must be no larger than 11x17 inches.
4. NATURE OF CONSTRUCTION ACTIVITY
Check the appropriate box(s) or provide a brief description that indicates the general nature of the construction activities. (The full
description of activities must be included in the Stormwater Management Plan.)
□ Single Family Residential Development
□ Multi-Family Residential Development
□ Commercial Development
□ Other, Describe:
9. REQUIRED SIGNATURES Certification for Reassignment
“I certify under penalty of law that I have personally examined and am familiar with the information submitted in Part II of this application
and all attachments in reference to Part II and that, based on my inquiry of those individuals immediately responsible for obtaining the
information, I believe that the information is true, accurate and complete. I am aware that thereare significant penalties for submitting false
information, including the possibility of fine or imprisonment.
“As the permittee currently covered by the above-referenced certification, I hereby agree to reassign the permit coverage for the area and
activity described in Items I.b. and I.c., and all responsibilities thereof, from the above-referenced permit certification to the new permittee
listed in Part I of this form.”
Signature of Legally Responsible Person (submission must include original ink signature) Date Signed
Name (printed) Title
Page 1 of 3 Dec 2014
FOR DIVIISION USE ONLY
Effective date____________________
COLORADO WATER QUALITY CONTROL DIVISION TERMINATION APPLICATION
Print or type all information. Mail original form with ink signature to the following address. Emailed and Faxed forms
will not be accepted. All items must be filled out completely and correctly. If the form is not complete, you will be
asked to resubmit it.
Colorado Dept of Public Health and Environment
Water Quality Control Division WQCD-P-B2
4300 Cherry Creek Drive South
Denver CO 80246-1530
PART A. IDENTIFICATION OF PERMIT OR AUTHORIZATION - Please limit submission to one permit, certification,
or authorization per form. All permit termination dates are effective on the date approved by the division.
Processing times vary by type of discharge. Some discharge types require onsite inspections to verify
information in this application.
PERMIT, CERTIFICATION, OR AUTHORIZATION NUMBER (DOES NOT END IN 0000)____________________
PART B. PERMITTEE INFORMATION
Company Name______________________________________________________________________________
Legal Contact First Name____________________________Last Name_________________________________
Title________________________________
Mailing Address______________________________________________________________________________
City __________________________________State_______________Zip Code__________________________
Phone____________________________Email address______________________________________________
PART C. FACILITY OR PROJECT INFORMATION
Facility/Project name________________________________________________________________________
Location/Address ___________________________________________________________________________
City __________________________________________County_______________________________________
Local contact name________________________________________Title______________________________
Phone___________________________ Email address_______________________________________________
PART D. TERMINATION INFORMATION QUESTIONS Provide information for Part D that applies to your facility and
termination request. Not all questions need to be answered- only the part that applies to your facility.
Part D1 covers facilities no longer in operation.
Part D2 covers mining facilities no longer in operation
Part D3 covers facilities in operation but no longer discharging or needing permit coverage.
Part D4 covers Stormwater Construction facilities where construction is complete and the site is stabilized.
**Please answer questions as completely as possible to assist in timely approval of this termination request.**
D1. FACILITY IS NO LONGER IN OPERATION AT THIS LOCATION
All activities and discharges at the identified site have ceased; all potential pollutant sources have been
removed; all industrial wastes have been disposed of properly; all DMR’s, Annual Reports, and other reports
have been submitted; and all elements of a Stormwater Management Plan have been completed (if this
applies).
**FOR LAGOONS: please reference “information regarding Domestic
Treatment Works Closure at Wastewater Treatment Facilities”
COLORADO WATER QUALITY CONTROL DIVISION TERMINATION APPLICATION www.coloradowaterpermits.com
Page 2 of 3 Dec 2014
D2. MINING FACILITY IS NO LONGER IN OPERATION AT THIS LOCATION.
Sand and Gravel, Coal or Hard Rock Mining
A. Mining operation is no longer discharging process/treated water. Bond has not been released by DRMS.
A stormwater only permit is requested at this time. Attach application for Stormwater Only permit.
B. Reclamation of mining site is completed. Bond has been released by DRMS.
___ YES Attach a copy of the Bond release letter. ___NO Explain below:
C. Reclamation of mining site is complete. Is there any continued mine drainage? Eg. Adits or unreclaimed
waste piles? ___ YES , Please explain, attach additional pages as necessary.
D3. FACILITY IS STILL IN OPERATION BUT IS NO LONGER DISCHARGING OR NO LONGER NEEDS A PERMIT
A. Facility continues to operate, however the activity producing the discharge has ceased (including
changes in SIC Code resulting in change in duty to apply).
B. Termination is based on alternate disposal of discharges (discharge is being disposed of in another way)
a. Solid waste disposal unit (e.g. evaporative ponds)
b. No Exposure Exclusion (for industrial stormwater facilities only.) NOX Number_________________
c. Combined with another authorized discharge. Permit Number ____________________
d. Permit is not required (includes coverage by low risk policy, etc.) – please explain, attach
additional pages if necessary
C. PERMITTEE IS NO LONGER THE OWNER/OPERATOR OF THE SITE and all efforts have been made to
transfer the permit to appropriate parties. Please attach copies of registered mail receipts, letters,
etc.
D4. STORMWATER CONSTRUCTION FACILITIES WHERE CONSTRUCTION IS COMPLETE (Select A, B, or C)
A. SITE IS FINALLY STABILIZED OR CONSTRUCTION WAS NOT STARTED
a. The permitted activities meet the requirements for FINAL stabilization in accordance with the
permit, the Stormwater Management Plan, and as described in item b. (explanation can be
construction activities were not started).
b. Describe the methods used to meet final stabilization. (Required)
*Final Stabilization defined on page 3
COLORADO WATER QUALITY CONTROL DIVISION TERMINATION APPLICATION www.coloradowaterpermits.com
Page 3 of 3 Dec 2014
D4. STORMWATER CONSTRUCTION FACILITIES WHERE CONSTRUCTION IS COMPLETE (Continued)
B. ALTERNATIVE PERMIT COVERAGE OR FULL REASSIGNMENT
a. All ongoing construction activities including all disturbed areas, covered under the permit
certification listed in Part B have coverage under a separate CDPS Stomwater Construction
permit. The Division’s Reassignment form was used by the permittee to reassign all areas and
activities.
b. Permit certification number covering the ongoing activities (Required)_____________________
C. PERMITTEE IS NO LONGER THE OWNER OR OPERATOR OF THE FACILITY
All efforts have been made to transfer the permit to appropriate parties.
Please attach copies of registered mail receipt, letters, etc.
*Final stabilization is reached when: all ground surface disturbing activities at the site have been completed
including removal of all temporary erosion and sediment control measure, and uniform vegetative cover has been
established with an individual plant density of at least 70 percent of predisturbance levels, or equivalent
permanent, physical erosion reduction methods have been employed.
PART E. CERTIFICATION SIGNATURE REQUIRED FOR ALL TERMINATION REQUESTS
I certify under penalty of law that this document and all attachments were prepared under my direction and/or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those individuals immediately responsible for gathering the information, the information submitted is to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations. “ (See 18 USC 1001 and 33 USC 1319)
I certify that I am the legal representative of the above named company (PART B page 1).
Applies to Stormwater Construction terminations:
I understand that by submitting this notice of termination, I am no longer authorized to discharge stormwater
associated with construction activity by the general permit. I understand that discharging pollutants in
stormwater associated with construction activities to the waters of the State of Colorado, where such
discharges are not authorized by a CDPS permit, is unlawful under the Colorado Water Quality Control Act and
the Clean Water Act.
Signature of Legally Responsible Party Date Signed
Name (printed) Title
Signatory requirements: This termination request shall be signed, dated, and certified for accuracy by the permittee in
accord with the following criteria:
1. In the case of a corporation, by a principal executive officer of at least the level of vice-president, or his or her
duly authorized representative, if such representative is responsible for the overall operation of the operation
from which the discharge described herein originates;
2. In the case of a partnership, by a general partner;
3. In the case of a sole proprietorship, by the proprietor;
4. In the case of a municipal, state, or other public operation, by either a principal executive officer, ranking elected
official, or other duly authorized employee.
APPENDIX B
Erosion and Sediment Control Inspection List (ESCIL)
No.
1
2
3
4
5
6
7
Yes No Yes No Yes No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there
are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Inspector (Signature)____________________________(Printed)________________________________________
Agency: __________________________________________________________Date: _______________________
Other
Other
Check Dams/Dikes
Concrete Washout
Diversion Swale/Berm
Erosion Control Blankets
Good Housekeeping
Inlet Protection
Material/Equipment Storage
Vehicle Tracking Control Pad
Sediment Trap/Basin
Seed/Crimp/Mulch/Sod
Silt Fence
Wattles
Slope Protection/Terracing
Staging Area
Street Sweeping
Surface Roughening
Grading
Excavation
Utility Construction
Foundations
Outfall Protection
BMPs Practice Used To Be Constructed Requires Comments (If needed, use Page 2
for additional comments and notes)
Structural Work
APPENDIX C
• Permit Map
• Drainage Plan (Map Pocket)
• Sediment and Erosion Control Plans (Map Pocket)
• Erosion Control Details (Map Pocket)
• SWMP Site Plan – Blank Version (Map Pocket)
S
S
S
S
CC CC
CC
CC
CC
CC
CC
CC
CC
LIMITS OF PROJECT
(14.6 ACRES)
3405 SOUTH
TIMBERLINE ROAD
UNION PACIFIC RAILROAD
EAST HORSETOOTH ROAD
SOUTH TIMBERLINE ROAD
DANFIELD COURT
PLATTE RIVER
POWER AUTHORITY
NORTH
0' 200' 400'
SCALE: 1" = 200'
100'
PATH: P:\U16014 - PRPA CAMPUS\CADD\SWMP\01_PERMIT MAP.DWG DRAWING NAME: 01_PERMIT MAP SHEET SIZE: 8.5 x 11
PLATTE RIVER POWER AUTHORITY HQ
CDPHE DISCHARGE PERMIT MAP
JOB NUMBER: U16014
NOTE: THIS MAP WAS PREPARED FOR INFORMATION ONLY AND THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR UNAUTHORIZED USE OF THEM.
DATE: February 9, 2018 PREPARED FOR: PLATTE RIVER POWER AUTH.
1501 ACADEMY COURT, SUITE 203 FORT COLLINS, CO 80524
(970) 530-4044 WWW.UNITEDCIVIL.COM
SHEET 1 OF 1
UNITED CIVIL
Design Group LLC
SOUTHEAST CORNER
S30, T.7N., R68W
50' RIGHT-OF-WAY
R.O.W.
WIDTH
VARIES
60' RIGHT-OF-WAY
107.5' RIGHT-OF-WAY
50' RIGHT-OF-WAY
R.O.W.
WIDTH VARIES
A1
C1
OS1
OS2a
OS3
OS4
OS2b
A2
A3
A13
B1
B2
A5 A4
A6
A7
A9
A10
A11
A8
0.42
1.35
3.49
1.23
0.68
0.21
0.93
0.37 0.26
0.91
0.42
1.45
0.40 0.57
A12
0.41
0.68 0.64 0.32
0.97
0.21
0.54
OS5
DETENTION
POND A1
DETENTION
POND A1
POND OUTLET STRUCTURE
POND OUTLET STRUCTURE
EAST HORSETOOTH ROAD
SOUTH TIMBERLINE ROAD
DANFIELD COURT
UNION PACIFIC RAILROAD
OFFSITE PROPERTY OWNED BY:
107.5' RIGHT-OF-WAY
R.O.W.
WIDTH VARIES
R.O.W.
WIDTH
VARIES
TEMPORARY STORM SEWER
WITH PHASE1 IMPROVEMENTS
PROPOSED STORM LINE 1
(SEE SHEET C4.30)
EXISTING BUILDING TO
REMAIN UNTIL PHASE 2
DEMOLITION
PROPOSED ROOF DRAIN
(SEE SHEET C4.41)
PROPOSED ROOF DRAIN
(SEE SHEET C4.41)
UNDERGROUND
DETENTION AREA
EAST HORSETOOTH ROAD
SOUTH TIMBERLINE ROAD
HQ BUILDING
MICROWAVE
BUILDING
PROPOSED
POND
EXISTING
HEADQUARTERS
COORDINATE ALL EROSION CONTROL
MEASURES TO PROTECT OFFSITE PROPERTY
WITH OFFSITE PROPERTY OWNER
PROPOSED OUTLET
STRUCTURE
PROPOSED POND OUTLET
COVER GRATE W/ PLYWOOD
UNTIL POND IS FILLED
PROPOSED STORM LINE 5
(SEE SHEET C4.36)
PROPOSED ROOF DRAIN
(SEE SHEET C4.40)
EMERGENCY OVERFLOW
SPILLWAY ELEV = 4952.25
APPROXIMATE EXISTING
IRRIGATION PIPE
TOP OF POND
ELEV = 4953.25
POND EMERGENCY OVERFLOW
SPILLWAY ELEV = 4955.5
PROPOSED STORM LINE 3
(SEE SHEET C4.32)
END CONSTRUCTION FENCE AT
EXISTING CHAIN LINK FENCE
SILT FENCE TO PROTECT POND UNTIL
COMPLETION OF LANDSCAPING
PROPOSED STORM LINE 4
(SEE SHEET C4.35)
APPROXIMATE PHASE 2 GRADING LIMITS
LIMITS OF DISTURBANCE
GRADE BREAK
PROPOSED POND
50' RIGHT-OF-WAY 107.5' RIGHT-OF-WAY
PROPOSED ROOF DRAIN
(SEE SHEET C4.41)
PROPOSED ROOF DRAIN
(SEE SHEET C4.42)
PROPOSED ROOF DRAIN
(SEE SHEET C4.41)
UNDERGROUND
DETENTION AREA
EAST HORSETOOTH ROAD
HQ BUILDING
MICROWAVE
BUILDING
POOL CAR
WAREHOUSE
EXISTING
E&O
BUILDING
SWALE
GRADE BREAK
COORDINATE ALL EROSION CONTROL
MEASURES TO PROTECT OFFSITE PROPERTY
WITH OFFSITE PROPERTY OWNER
EAST HORSETOOTH ROAD
PROPOSED ROOF DRAIN
(SEE SHEET C4.40)
PROPOSED STORM LINE 5
(SEE SHEET C4.36)
PROPOSED STORM LINE 3
(SEE SHEET C4.32)
PROPOSED STORM LINE 2
(SEE SHEET C4.31)
PROPOSED ROOF DRAIN
(SEE SHEET C4.42)
END CONSTRUCTION FENCE AT
EXISTING CHAIN LINK FENCE
SILT FENCE TO PROTECT BIOSWALE
UNTIL COMPLETION OF LANDSCAPING
APPROXIMATE PHASE 2
GRADING LIMITS
SILT FENCE TO PROTECT POND UNTIL
COMPLETION OF LANDSCAPING
EXISTING BUILDING TO
REMAIN UNTIL PHASE 2
DEMOLITION
GRADE BREAK
BIOSWALE
(SEE NOTE 5)
PLACE ROCK SOCK AT EACH
CURB CUT LOCATION TO
BIOSWALE (ALSO SEE NOTE 5)
APPROXIMATE PHASE 2
GRADING LIMITS
(SEE SHEET C5.21)
REFER TO NOTE 6 FOR
WORK WITHIN THE ROW
TEMPORARY ACCESS
PLACE COBBLE PAD AT
DOWNSTREAM END OF
EACH CURB CUT
60' RIGHT-OF-WAY
PROPOSED STORM LINE 3
(SEE SHEET C4.33)
DANFIELD COURT
OFFSITE PROPERTY OWNED BY:
2001 DANFIELD LLC
MICROWAVE
BUILDING
MAINTENANCE SHOP
/ TRUCK WASH
WAREHOUSE
SUBSTATION GARAGE
FLEET PARKING GARAGE A
FLEET PARKING GARAGE B
SWALE
COORDINATE ALL EROSION CONTROL
MEASURES TO PROTECT OFFSITE PROPERTY
WITH OFFSITE PROPERTY OWNER
GRADE BREAK
VTC TO BE PLACED WHILE DRIVE IS UNPAVED.
PUBLIC RIGHT-OF-WAY (AND PRIVATE DRIVE
ONCE PAVED) SHALL BE SWEPT DAILY OR AS
NECESSARY TO PREVENT SEDIMENT
TRANSPORTATION TO OFFSITE ROADWAYS OR
STORM SEWER.
OFFSITE STORM SEWER
EXISTING INLET
EXISTING INLET
EXISTING INLET
PLATTE RIVER POWER AUTHORITY 02/14/18
U16014
1" = 30'
1" = N/A
PLATTE RIVER POWER AUTHORITY HQ
NORTH
2/9/2018 4:38:18 PM
P:\U16014 - PRPA CAMPUS\CADD\CP\CX.XX_DETAILED EC PLANS.DWG
CX.XX_DETAILED EC PLANS
## ##
C5.12
73
EROSION CONTROL PLANS -
PHASE 1
0 30' 60'
SCALE: 1" = 30'
15'
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
107.5' RIGHT-OF-WAY
R.O.W.
WIDTH VARIES
R.O.W.
WIDTH
VARIES
PROPOSED ROOF DRAIN
(SEE SHEET C4.41)
PROPOSED ROOF DRAIN
(SEE SHEET C4.41)
UNDERGROUND
DETENTION AREA
EAST HORSETOOTH ROAD
SOUTH TIMBERLINE ROAD
HQ BUILDING
MICROWAVE
BUILDING
PROPOSED
POND
PROPOSED ROOF DRAIN
(SEE SHEET C4.40)
PROPOSED STORM LINE 3
(SEE SHEET C4.32)
PROPOSED STORM LINE 5
(SEE SHEET C4.36)
APPROXIMATE EXISTING
IRRIGATION PIPE
PROPOSED POND OUTLET
POND EMERGENCY OVERFLOW
SPILLWAY ELEV = 4955.5
LIMITS OF DISTURBANCE
PROPOSED STORM LINE 4
(SEE SHEET C4.35)
EMERGENCY OVERFLOW
SPILLWAY ELEV = 4952.25
END CONSTRUCTION FENCE AT
EXISTING CHAIN LINK FENCE
TOP OF POND
ELEV = 4953.25 PROPOSED STORM LINE 1
(SEE SHEET C4.30)
PROPOSED OUTLET
STRUCTURE
GRADE BREAK
PROPOSED POND
(SEE NOTE 4)
GRADE BREAK
EXISTING BIOSWALE
EXISTING CURB CUT
EXISTING CURB CUT
APPROXIMATE PHASE 2
GRADING LIMITS
(SEE SHEET C5.20)
COBBLE PAD 5' IN LENGTH
PLATTE RIVER POWER AUTHORITY 02/14/18
U16014
1" = 30'
1" = N/A
PLATTE RIVER POWER AUTHORITY HQ
NORTH
2/9/2018 4:38:25 PM
50' RIGHT-OF-WAY 107.5' RIGHT-OF-WAY
PROPOSED ROOF DRAIN
(SEE SHEET C4.41)
BIOSWALE (TYP.)
PROPOSED ROOF DRAIN
(SEE SHEET C4.41)
UNDERGROUND
DETENTION AREA
EAST HORSETOOTH ROAD
HQ BUILDING
MICROWAVE
BUILDING
POOL CAR
WAREHOUSE
MONUMENT SIGN/
SCREEN WALL
SWALE
GRADE BREAK
EAST HORSETOOTH ROAD
PROPOSED ROOF DRAIN
(SEE SHEET C4.40)
PROPOSED STORM LINE 5
(SEE SHEET C4.36)
PROPOSED STORM LINE 3
(SEE SHEET C4.32)
PROPOSED STORM LINE 2
(SEE SHEET C4.31)
PROPOSED ROOF DRAIN
(SEE SHEET C4.42)
END CONSTRUCTION FENCE AT
EXISTING CHAIN LINK FENCE
POTENTIAL FILL AREA
(SEE SHEET C5.21)
GRADE BREAK
GRADE BREAK
APPROXIMATE PHASE 2
GRADING LIMITS
(SEE SHEET C5.21)
COBBLE PAD 5' IN LENGTH
PLATTE RIVER POWER AUTHORITY 02/14/18
U16014
1" = 30'
1" = N/A
PLATTE RIVER POWER AUTHORITY HQ
NORTH
2/9/2018 4:38:30 PM
P:\U16014 - PRPA CAMPUS\CADD\CP\CX.XX_DETAILED EC PLANS.DWG
CX.XX_DETAILED EC PLANS
## ##
C5.31
73
EROSION CONTROL PLANS -
PHASE 2
0 30' 60'
SCALE: 1" = 30'
15'
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
PLATTE RIVER POWER AUTHORITY 02/14/18
U16014
1" = ##'
1" = N/A
PLATTE RIVER POWER AUTHORITY HQ
2/9/2018 4:40:57 PM
P:\U16014 - PRPA CAMPUS\CADD\CP\C7.00_CONSTRUCTION DETAILS.DWG
C7.00_CONSTRUCTION DETAILS
## ##
C7.40
73
EROSION CONTROL CONSTRUCTION DETAILS
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
APPROVED:
DATE:
DRAWN BY:
12/27/00
NBJ
FLOW
APPROVED:
DATE:
DRAWN BY: NBJ
11-29-2000
APPROVED:
PLATTE RIVER POWER AUTHORITY 02/14/18
U16014
1" = ##'
1" = N/A
PLATTE RIVER POWER AUTHORITY HQ
2/9/2018 4:41:01 PM
P:\U16014 - PRPA CAMPUS\CADD\CP\C7.00_CONSTRUCTION DETAILS.DWG
C7.00_CONSTRUCTION DETAILS
## ##
C7.41
73
EROSION CONTROL CONSTRUCTION DETAILS
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
CWA
VEHICLE CONTROL TRACKING PAD
NOT TO SCALE
CONCRETE WASHOUT AREA
NOT TO SCALE
1
C7.41
2
C7.42
VTC
SURFACE ROUGHENING
107.5' RIGHT-OF-WAY
R.O.W.
WIDTH VARIES
R.O.W.
WIDTH
VARIES
TEMPORARY STORM SEWER
WITH PHASE1 IMPROVEMENTS
PROPOSED STORM LINE 1
(SEE SHEET C4.30)
EXISTING BUILDING TO
REMAIN UNTIL PHASE 2
DEMOLITION
PROPOSED ROOF DRAIN
(SEE SHEET C4.41)
PROPOSED ROOF DRAIN
(SEE SHEET C4.41)
UNDERGROUND
DETENTION AREA
EAST HORSETOOTH ROAD
SOUTH TIMBERLINE ROAD
HQ BUILDING
MICROWAVE
BUILDING
PROPOSED
POND
EXISTING
HEADQUARTERS
PROPOSED OUTLET
STRUCTURE
PROPOSED POND OUTLET
COVER GRATE W/ PLYWOOD
UNTIL POND IS FILLED
PROPOSED STORM LINE 5
(SEE SHEET C4.36)
PROPOSED ROOF DRAIN
(SEE SHEET C4.40)
EMERGENCY OVERFLOW
SPILLWAY ELEV = 4952.25
APPROXIMATE EXISTING
IRRIGATION PIPE
TOP OF POND
ELEV = 4953.25
POND EMERGENCY OVERFLOW
SPILLWAY ELEV = 4955.5
PROPOSED STORM LINE 3
(SEE SHEET C4.32)
PROPOSED STORM LINE 4
(SEE SHEET C4.35)
APPROXIMATE PHASE 2 GRADING LIMITS
LIMITS OF DISTURBANCE
GRADE BREAK
GRADE BREAK
EXISTING BIOSWALE
EXISTING CURB CUT
EXISTING CURB CUT
APPROXIMATE PHASE 2
GRADING LIMITS
(SEE SHEET C5.20)
PROPOSED POND
50' RIGHT-OF-WAY 107.5' RIGHT-OF-WAY
PROPOSED ROOF DRAIN
(SEE SHEET C4.41)
PROPOSED ROOF DRAIN
(SEE SHEET C4.42)
PROPOSED ROOF DRAIN
(SEE SHEET C4.41)
UNDERGROUND
DETENTION AREA
EAST HORSETOOTH ROAD
HQ BUILDING
MICROWAVE
BUILDING
POOL CAR
WAREHOUSE
EXISTING
E&O
BUILDING
SWALE
GRADE BREAK
EAST HORSETOOTH ROAD
PROPOSED ROOF DRAIN
(SEE SHEET C4.40)
PROPOSED STORM LINE 5
(SEE SHEET C4.36)
PROPOSED STORM LINE 3
(SEE SHEET C4.32)
PROPOSED STORM LINE 2
(SEE SHEET C4.31)
PROPOSED ROOF DRAIN
(SEE SHEET C4.42)
END CONSTRUCTION FENCE AT
EXISTING CHAIN LINK FENCE
APPROXIMATE PHASE 2
GRADING LIMITS
EXISTING BUILDING TO
REMAIN UNTIL PHASE 2
DEMOLITION
GRADE BREAK
APPROXIMATE PHASE 2
GRADING LIMITS
(SEE SHEET C5.21)
TEMPORARY ACCESS
PLATTE RIVER POWER AUTHORITY 02/14/18
U16014
1" = 30'
1" = N/A
PLATTE RIVER POWER AUTHORITY HQ
NORTH
2/9/2018 4:36:01 PM
P:\U16014 - PRPA CAMPUS\CADD\SWMP\SWMP-BLANK.DWG
SWMP-BLANK
## ##
2
3
SWMP SITE PLAN
(BLANK VERSION)
0 30' 60'
SCALE: 1" = 30'
15'
60' RIGHT-OF-WAY
PROPOSED STORM LINE 3
(SEE SHEET C4.33)
DANFIELD COURT
OFFSITE PROPERTY OWNED BY:
2001 DANFIELD LLC
MICROWAVE
BUILDING
MAINTENANCE SHOP
/ TRUCK WASH
WAREHOUSE
SUBSTATION GARAGE
FLEET PARKING GARAGE A
FLEET PARKING GARAGE B
SWALE
GRADE BREAK
OFFSITE STORM SEWER
EXISTING INLET
EXISTING INLET
EXISTING INLET
PLATTE RIVER POWER AUTHORITY 02/14/18
U16014
1" = 30'
1" = N/A
PLATTE RIVER POWER AUTHORITY HQ
NORTH
2/9/2018 4:36:06 PM
P:\U16014 - PRPA CAMPUS\CADD\SWMP\SWMP-BLANK.DWG
SWMP-BLANK
## ##
3
3
SWMP SITE PLAN
(BLANK VERSION)
0 30' 60'
SCALE: 1" = 30'
15'
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
DANFIELD CT
UNION PACIFIC RAILROAD
TIMBERLINE ROAD
HORSETOOTH ROAD KEYMAP
5124
5124
PROPOSED 1' CONTOUR
EXISTING 1' CONTOUR
STORM SEWER
STORM INLET
LEGEND
EXISTING CURB & GUTTER
PROPOSED CURB & GUTTER
LIMITS OF DISTURBANCE
EXISTING PROPERTY LINE
EXISTING CHAIN LINK FENCE
SILT FENCE
VEHICLE TRACKING
CONTROL PAD
SEDIMENT CONTROL LOG
CONCRETE WASHOUT
AREA - FINAL LOCATION
TO BE DETERMINED BY
CONTRACTOR
SURFACE ROUGHENING
(SEE EROSION
CONTROL NOTE 5)
DANDY BAG INLET
PROTECTION FOR
COMBO INLET ROCK SOCK
CONSTRUCTION FENCE
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO
THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH
INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR
TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS.
2. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS.
3. REFER TO SHEETS C5.01-C5.05 FOR DETAILED GRADING PLANS.
4. THE PROPOSED POND SOUTH OF HEADQUARTERS, BEING BUILT WITH PHASE 1, SHALL BE CLEANED OF ANY SEDIMENT
THAT MAY HAVE ENTERED THE POND PRIOR TO FILLING THE POND. ONCE FILLED, THE POND SHALL BE PROTECTED FROM
SEDIMENT BY PLACING SILT FENCE AROUND THE POND AS NECESSARY UNTIL THE AREAS UPSTREAM OF THE POND HAVE
BEEN STABILIZED EITHER WITH PAVING OR VEGETATION.
5. SEDIMENT SHALL BE PREVENTED FROM ENTERING THE BIOSWALE ON ALL SIDES WITH THE USE OF SILT FENCE, STRAW
WATTLES, OR ROCK SOCKS UNTIL THE AREAS UPSTREAM OF THE BIOSWALE HAVE BEEN STABILIZED EITHER WITH PAVING
OR VEGETATION.
6. FOR WORK WITHIN STREET RIGHT-OF-WAY, CONTRACTOR SHALL:
· EXPEDITE CONSTRUCTION COMPLETION AFFECTING ROADWAYS
· NOT USE THE STREET TO STOCKPILE EARTH DURING TRENCHING ACTIVITIES
· SWEEP SEDIMENT WITHIN STREET DAILY OR PRIOR TO AND AFTER STORM EVENTS AS NECESSARY
· PLACE ROCK SOCKS ON DOWNSTREAM SIDE OF WORK AREA IN PAVED AREAS TO PREVENT SEDIMENT TRANSPORT
· SURFACE ROUGHEN LANDSCAPED AREAS UNTIL STABILIZED WITH LANDSCAPING
EXISTING CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED BUILDING
EROSION CONTROL NOTES
1. THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS.
2. REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES.
3. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS.
4. CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT
RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL
ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED.
5. ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL
MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS
MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE
WASHOUT, AND SEDIMENT TRAP.
6. SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS
PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED
SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132.
7. TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE
SITE SHALL BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION METHOD AS SPECIFIED ON THE APPROVED
LANDSACPE PLANS.
8. A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED:
INGREDIENT
%
AVAILABLE
BY
WEIGHT
APPLICATION
RATE IN
LBS/ACRE
EXISTING STORM SEWER
DANDY BAG INLET
PROTECTION FOR
TYPE R INLET
DANDY BAG INLET
PROTECTION FOR
AREA INLET COBBLE PAD
PROJECT: PLATTE RIVER POWER AUTHORITY HQ
BEST MANAGEMENT PRACTICE ITEM:
PRESERVE EXISTING VEGETATION
SILT FENCE
VEHICLE TRACKING CONTROL
STAGING AREAS
CONSTRUCTION FENCE
CONCRETE WASHOUT AREA
SWALE AND SLOPE PROTECTION
SIDEWALK CHASE/PAN FILTER (RS)
TEMPORARY SEEDING
INLET PROTECTION (EXIST. & PROP.)
1. COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF
CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS.
2. CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs.
MOBILIZATION DEMOLITION
UTILITY
INSTALLATION
BUILDING
CONSTRUCTION
SITE GRADING
& PAVING
FINAL LANDSCAPING
PHASE OF CONSTRUCTION & STABILIZATION
EROSION CONTROL SEQUENCING
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
DANFIELD CT
UNION PACIFIC RAILROAD
TIMBERLINE ROAD
HORSETOOTH ROAD KEYMAP
5124
5124
PROPOSED 1' CONTOUR
EXISTING 1' CONTOUR
STORM SEWER
STORM INLET
LEGEND
EXISTING CURB & GUTTER
PROPOSED CURB & GUTTER
LIMITS OF DISTURBANCE
EXISTING PROPERTY LINE
EXISTING CHAIN LINK FENCE
SILT FENCE
VEHICLE TRACKING
CONTROL PAD
SEDIMENT CONTROL LOG
CONCRETE WASHOUT
AREA - FINAL LOCATION
TO BE DETERMINED BY
CONTRACTOR
SURFACE ROUGHENING
(SEE EROSION
CONTROL NOTE 5)
DANDY BAG INLET
PROTECTION FOR
COMBO INLET ROCK SOCK
CONSTRUCTION FENCE
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO
THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH
INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR
TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS.
2. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS.
3. REFER TO SHEETS C5.01-C5.05 FOR DETAILED GRADING PLANS.
4. THE PROPOSED POND SOUTH OF HEADQUARTERS, BEING BUILT WITH PHASE 1, SHALL BE CLEANED OF ANY SEDIMENT
THAT MAY HAVE ENTERED THE POND PRIOR TO FILLING THE POND. ONCE FILLED, THE POND SHALL BE PROTECTED FROM
SEDIMENT BY PLACING SILT FENCE AROUND THE POND AS NECESSARY UNTIL THE AREAS UPSTREAM OF THE POND HAVE
BEEN STABILIZED EITHER WITH PAVING OR VEGETATION.
5. SEDIMENT SHALL BE PREVENTED FROM ENTERING THE BIOSWALE ON ALL SIDES WITH THE USE OF SILT FENCE, STRAW
WATTLES, OR ROCK SOCKS UNTIL THE AREAS UPSTREAM OF THE BIOSWALE HAVE BEEN STABILIZED EITHER WITH PAVING
OR VEGETATION.
6. FOR WORK WITHIN STREET RIGHT-OF-WAY, CONTRACTOR SHALL:
· EXPEDITE CONSTRUCTION COMPLETION AFFECTING ROADWAYS
· NOT USE THE STREET TO STOCKPILE EARTH DURING TRENCHING ACTIVITIES
· SWEEP SEDIMENT WITHIN STREET DAILY OR PRIOR TO AND AFTER STORM EVENTS AS NECESSARY
· PLACE ROCK SOCKS ON DOWNSTREAM SIDE OF WORK AREA IN PAVED AREAS TO PREVENT SEDIMENT TRANSPORT
· SURFACE ROUGHEN LANDSCAPED AREAS UNTIL STABILIZED WITH LANDSCAPING
EXISTING CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED BUILDING
EROSION CONTROL NOTES
1. THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS.
2. REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES.
3. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS.
4. CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT
RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL
ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED.
5. ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL
MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS
MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE
WASHOUT, AND SEDIMENT TRAP.
6. SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS
PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED
SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132.
7. TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE
SITE SHALL BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION METHOD AS SPECIFIED ON THE APPROVED
LANDSACPE PLANS.
8. A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED:
INGREDIENT
%
AVAILABLE
BY
WEIGHT
APPLICATION
RATE IN
LBS/ACRE
EXISTING STORM SEWER
DANDY BAG INLET
PROTECTION FOR
TYPE R INLET
DANDY BAG INLET
PROTECTION FOR
AREA INLET COBBLE PAD
PROJECT: PLATTE RIVER POWER AUTHORITY HQ
BEST MANAGEMENT PRACTICE ITEM:
PRESERVE EXISTING VEGETATION
SILT FENCE
VEHICLE TRACKING CONTROL
STAGING AREAS
CONSTRUCTION FENCE
CONCRETE WASHOUT AREA
SWALE AND SLOPE PROTECTION
SIDEWALK CHASE/PAN FILTER (RS)
TEMPORARY SEEDING
INLET PROTECTION (EXIST. & PROP.)
1. COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF
CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS.
2. CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs.
MOBILIZATION DEMOLITION
UTILITY
INSTALLATION
BUILDING
CONSTRUCTION
SITE GRADING
& PAVING
FINAL LANDSCAPING
PHASE OF CONSTRUCTION & STABILIZATION
EROSION CONTROL SEQUENCING
(SEE NOTE 4)
PLATTE RIVER POWER AUTHORITY 02/14/18
U16014
1" = 30'
1" = N/A
PLATTE RIVER POWER AUTHORITY HQ
NORTH
2/9/2018 4:35:55 PM
P:\U16014 - PRPA CAMPUS\CADD\SWMP\SWMP-BLANK.DWG
SWMP-BLANK
## ##
1
3
SWMP SITE PLAN
(BLANK VERSION)
0 30' 60'
SCALE: 1" = 30'
15'
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
DANFIELD CT
UNION PACIFIC RAILROAD
TIMBERLINE ROAD
HORSETOOTH ROAD KEYMAP
5124
5124
PROPOSED 1' CONTOUR
EXISTING 1' CONTOUR
STORM SEWER
STORM INLET
LEGEND
EXISTING CURB & GUTTER
PROPOSED CURB & GUTTER
LIMITS OF DISTURBANCE
EXISTING PROPERTY LINE
EXISTING CHAIN LINK FENCE
SILT FENCE
VEHICLE TRACKING
CONTROL PAD
SEDIMENT CONTROL LOG
CONCRETE WASHOUT
AREA - FINAL LOCATION
TO BE DETERMINED BY
CONTRACTOR
SURFACE ROUGHENING
(SEE EROSION
CONTROL NOTE 5)
DANDY BAG INLET
PROTECTION FOR
COMBO INLET ROCK SOCK
CONSTRUCTION FENCE
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO
THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH
INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR
TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS.
2. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS.
3. REFER TO SHEETS C5.01-C5.05 FOR DETAILED GRADING PLANS.
4. THE PROPOSED POND SOUTH OF HEADQUARTERS, BEING BUILT WITH PHASE 1, SHALL BE CLEANED OF ANY SEDIMENT
THAT MAY HAVE ENTERED THE POND PRIOR TO FILLING THE POND. ONCE FILLED, THE POND SHALL BE PROTECTED FROM
SEDIMENT BY PLACING SILT FENCE AROUND THE POND AS NECESSARY UNTIL THE AREAS UPSTREAM OF THE POND HAVE
BEEN STABILIZED EITHER WITH PAVING OR VEGETATION.
5. SEDIMENT SHALL BE PREVENTED FROM ENTERING THE BIOSWALE ON ALL SIDES WITH THE USE OF SILT FENCE, STRAW
WATTLES, OR ROCK SOCKS UNTIL THE AREAS UPSTREAM OF THE BIOSWALE HAVE BEEN STABILIZED EITHER WITH PAVING
OR VEGETATION.
6. FOR WORK WITHIN STREET RIGHT-OF-WAY, CONTRACTOR SHALL:
· EXPEDITE CONSTRUCTION COMPLETION AFFECTING ROADWAYS
· NOT USE THE STREET TO STOCKPILE EARTH DURING TRENCHING ACTIVITIES
· SWEEP SEDIMENT WITHIN STREET DAILY OR PRIOR TO AND AFTER STORM EVENTS AS NECESSARY
· PLACE ROCK SOCKS ON DOWNSTREAM SIDE OF WORK AREA IN PAVED AREAS TO PREVENT SEDIMENT TRANSPORT
· SURFACE ROUGHEN LANDSCAPED AREAS UNTIL STABILIZED WITH LANDSCAPING
EXISTING CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED BUILDING
EROSION CONTROL NOTES
1. THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS.
2. REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES.
3. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS.
4. CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT
RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL
ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED.
5. ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL
MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS
MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE
WASHOUT, AND SEDIMENT TRAP.
6. SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS
PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED
SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132.
7. TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE
SITE SHALL BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION METHOD AS SPECIFIED ON THE APPROVED
LANDSACPE PLANS.
8. A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED:
INGREDIENT
%
AVAILABLE
BY
WEIGHT
APPLICATION
RATE IN
LBS/ACRE
EXISTING STORM SEWER
DANDY BAG INLET
PROTECTION FOR
TYPE R INLET
DANDY BAG INLET
PROTECTION FOR
AREA INLET COBBLE PAD
PROJECT: PLATTE RIVER POWER AUTHORITY HQ
BEST MANAGEMENT PRACTICE ITEM:
PRESERVE EXISTING VEGETATION
SILT FENCE
VEHICLE TRACKING CONTROL
STAGING AREAS
CONSTRUCTION FENCE
CONCRETE WASHOUT AREA
SWALE AND SLOPE PROTECTION
SIDEWALK CHASE/PAN FILTER (RS)
TEMPORARY SEEDING
INLET PROTECTION (EXIST. & PROP.)
1. COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF
CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS.
2. CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs.
MOBILIZATION DEMOLITION
UTILITY
INSTALLATION
BUILDING
CONSTRUCTION
SITE GRADING
& PAVING
FINAL LANDSCAPING
PHASE OF CONSTRUCTION & STABILIZATION
EROSION CONTROL SEQUENCING
NOT TO SCALE
3
C7.41
DANDY CURB BAG TM
OVERFLOW
GAP
CURB AND
GUTTER INLET
CURB
FILTER
LOW PROFILE WITH
GUTTER FOR SAFETY
AND CURB APPEAL
LIFTING
STRAPS
STORM SEWER
GRATE COMPLETELY
COVERED BY
HI-FLOW FABRIC
DANDY BAG
VELCRO
CLOSURE
LIFT STRAPS
USED FOR EASY
MOVEMENT AND
INSPECTION OF
UNIT
STORM
SEWER
GRATE
DANDY BAGR
STORM
SEWER
GRATE
R
DANDY CURB TM
MANHOLE
CURB OPENING
WITHOUT GRATE
CURB FILTER
OVERFLOW
GAP
AGGREGATE
POUCH
INLET FILTER DETAILS
NOT TO SCALE
STABILIZED STAGING AREA DETAIL
NOT TO SCALE
COMBINATION INLET FILTER - DP1
TYPE R INLET FILTER - DP2 AREA INLET FILTER - DP3
NOTES:
1. INLET FILTERS SHALL BE DANDY PRODUCTS AS SHOWN OR APPROVED EQUAL. PLAN VIEW
REFERS TO DANDY PRODUCTS AS "DP-#" AS DESIGNATED ON THIS DETAIL.
4
C7.41
5
C7.41
DATE:
DRAWN BY:
01/03/01
NBJ
SEDIMENT CONTROL LOG INSTALLATION DETAIL
NOT TO SCALE
2
C7.40
ROCK SOCK DETAIL
NOT TO SCALE
1
C7.40
CURB AND GUTTER
BACKFILL/COMPACT
OPENINGS W/ 3
8" GRAVEL
COMPACTED
SUBGRADE
2'
3'
VARIES
(SEE NOTE 2)
9"
COBBLE PAD
2' CURB CUT
NOT TO SCALE
3 COBBLE PAD DETAIL
C7.40
PLAN
SECTION A SECTION B
TIE TO DOWNSTREAM COBBLE
CHANNEL OR BIOSWALE
A A
B
B
NOTES:
1. COBBLE TO MATCH TYPE AS SHOWN ON THE APPROVED LANDSCAPE PLANS.
2. LENGTH OF PAD SHALL BE 3' FOR ALL PADS INTO BIOSWALE. SEE PLAN FOR LENGTHS AT ALL OTHER LOCATIONS.
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
DANFIELD CT
UNION PACIFIC RAILROAD
TIMBERLINE ROAD
HORSETOOTH ROAD KEYMAP
5124
5124
PROPOSED 1' CONTOUR
EXISTING 1' CONTOUR
STORM SEWER
STORM INLET
LEGEND
EXISTING CURB & GUTTER
PROPOSED CURB & GUTTER
LIMITS OF DISTURBANCE
EXISTING PROPERTY LINE
EXISTING CHAIN LINK FENCE
SILT FENCE
VEHICLE TRACKING
CONTROL PAD
SEDIMENT CONTROL LOG
CONCRETE WASHOUT
AREA - FINAL LOCATION
TO BE DETERMINED BY
CONTRACTOR
SURFACE ROUGHENING
(SEE EROSION
CONTROL NOTE 5)
DANDY BAG INLET
PROTECTION FOR
COMBO INLET ROCK SOCK
CONSTRUCTION FENCE
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO
THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH
INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR
TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS.
2. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS.
3. REFER TO SHEETS C5.01-C5.05 FOR DETAILED GRADING PLANS.
4. THE PROPOSED POND SOUTH OF HEADQUARTERS, BEING BUILT WITH PHASE 1, SHALL BE CLEANED OF ANY SEDIMENT
THAT MAY HAVE ENTERED THE POND PRIOR TO FILLING THE POND. ONCE FILLED, THE POND SHALL BE PROTECTED FROM
SEDIMENT BY PLACING SILT FENCE AROUND THE POND AS NECESSARY UNTIL THE AREAS UPSTREAM OF THE POND HAVE
BEEN STABILIZED EITHER WITH PAVING OR VEGETATION.
5. SEDIMENT SHALL BE PREVENTED FROM ENTERING THE BIOSWALE ON ALL SIDES WITH THE USE OF SILT FENCE, STRAW
WATTLES, OR ROCK SOCKS UNTIL THE AREAS UPSTREAM OF THE BIOSWALE HAVE BEEN STABILIZED EITHER WITH PAVING
OR VEGETATION.
6. FOR WORK WITHIN STREET RIGHT-OF-WAY, CONTRACTOR SHALL:
· EXPEDITE CONSTRUCTION COMPLETION AFFECTING ROADWAYS
· NOT USE THE STREET TO STOCKPILE EARTH DURING TRENCHING ACTIVITIES
· SWEEP SEDIMENT WITHIN STREET DAILY OR PRIOR TO AND AFTER STORM EVENTS AS NECESSARY
· PLACE ROCK SOCKS ON DOWNSTREAM SIDE OF WORK AREA IN PAVED AREAS TO PREVENT SEDIMENT TRANSPORT
· SURFACE ROUGHEN LANDSCAPED AREAS UNTIL STABILIZED WITH LANDSCAPING
EXISTING CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED BUILDING
EROSION CONTROL NOTES
1. THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS.
2. REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES.
3. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS.
4. CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT
RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL
ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED.
5. ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL
MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS
MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE
WASHOUT, AND SEDIMENT TRAP.
6. SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS
PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED
SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132.
7. TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE
SITE SHALL BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION METHOD AS SPECIFIED ON THE APPROVED
LANDSACPE PLANS.
8. A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED:
INGREDIENT
%
AVAILABLE
BY
WEIGHT
APPLICATION
RATE IN
LBS/ACRE
EXISTING STORM SEWER
DANDY BAG INLET
PROTECTION FOR
TYPE R INLET
DANDY BAG INLET
PROTECTION FOR
AREA INLET COBBLE PAD
PROJECT: PLATTE RIVER POWER AUTHORITY HQ
BEST MANAGEMENT PRACTICE ITEM:
PRESERVE EXISTING VEGETATION
SILT FENCE
VEHICLE TRACKING CONTROL
STAGING AREAS
CONSTRUCTION FENCE
CONCRETE WASHOUT AREA
SWALE AND SLOPE PROTECTION
SIDEWALK CHASE/PAN FILTER (RS)
TEMPORARY SEEDING
INLET PROTECTION (EXIST. & PROP.)
1. COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF
CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS.
2. CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs.
MOBILIZATION DEMOLITION
UTILITY
INSTALLATION
BUILDING
CONSTRUCTION
SITE GRADING
& PAVING
FINAL LANDSCAPING
PHASE OF CONSTRUCTION & STABILIZATION
EROSION CONTROL SEQUENCING
P:\U16014 - PRPA CAMPUS\CADD\CP\CX.XX_DETAILED EC PLANS.DWG
CX.XX_DETAILED EC PLANS
## ##
C5.30
73
EROSION CONTROL PLANS -
PHASE 2
0 30' 60'
SCALE: 1" = 30'
15'
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
DANFIELD CT
UNION PACIFIC RAILROAD
TIMBERLINE ROAD
HORSETOOTH ROAD KEYMAP
5124
5124
PROPOSED 1' CONTOUR
EXISTING 1' CONTOUR
STORM SEWER
STORM INLET
LEGEND
EXISTING CURB & GUTTER
PROPOSED CURB & GUTTER
LIMITS OF DISTURBANCE
EXISTING PROPERTY LINE
EXISTING CHAIN LINK FENCE
SILT FENCE
VEHICLE TRACKING
CONTROL PAD
SEDIMENT CONTROL LOG
CONCRETE WASHOUT
AREA - FINAL LOCATION
TO BE DETERMINED BY
CONTRACTOR
SURFACE ROUGHENING
(SEE EROSION
CONTROL NOTE 5)
DANDY BAG INLET
PROTECTION FOR
COMBO INLET ROCK SOCK
CONSTRUCTION FENCE
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO
THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH
INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR
TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS.
2. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS.
3. REFER TO SHEETS C5.01-C5.05 FOR DETAILED GRADING PLANS.
4. THE PROPOSED POND SOUTH OF HEADQUARTERS, BEING BUILT WITH PHASE 1, SHALL BE CLEANED OF ANY SEDIMENT
THAT MAY HAVE ENTERED THE POND PRIOR TO FILLING THE POND. ONCE FILLED, THE POND SHALL BE PROTECTED FROM
SEDIMENT BY PLACING SILT FENCE AROUND THE POND AS NECESSARY UNTIL THE AREAS UPSTREAM OF THE POND HAVE
BEEN STABILIZED EITHER WITH PAVING OR VEGETATION.
5. SEDIMENT SHALL BE PREVENTED FROM ENTERING THE BIOSWALE ON ALL SIDES WITH THE USE OF SILT FENCE, STRAW
WATTLES, OR ROCK SOCKS UNTIL THE AREAS UPSTREAM OF THE BIOSWALE HAVE BEEN STABILIZED EITHER WITH PAVING
OR VEGETATION.
6. FOR WORK WITHIN STREET RIGHT-OF-WAY, CONTRACTOR SHALL:
· EXPEDITE CONSTRUCTION COMPLETION AFFECTING ROADWAYS
· NOT USE THE STREET TO STOCKPILE EARTH DURING TRENCHING ACTIVITIES
· SWEEP SEDIMENT WITHIN STREET DAILY OR PRIOR TO AND AFTER STORM EVENTS AS NECESSARY
· PLACE ROCK SOCKS ON DOWNSTREAM SIDE OF WORK AREA IN PAVED AREAS TO PREVENT SEDIMENT TRANSPORT
· SURFACE ROUGHEN LANDSCAPED AREAS UNTIL STABILIZED WITH LANDSCAPING
EXISTING CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED BUILDING
EROSION CONTROL NOTES
1. THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS.
2. REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES.
3. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS.
4. CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT
RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL
ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED.
5. ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL
MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS
MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE
WASHOUT, AND SEDIMENT TRAP.
6. SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS
PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED
SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132.
7. TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE
SITE SHALL BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION METHOD AS SPECIFIED ON THE APPROVED
LANDSACPE PLANS.
8. A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED:
INGREDIENT
%
AVAILABLE
BY
WEIGHT
APPLICATION
RATE IN
LBS/ACRE
EXISTING STORM SEWER
DANDY BAG INLET
PROTECTION FOR
TYPE R INLET
DANDY BAG INLET
PROTECTION FOR
AREA INLET COBBLE PAD
PROJECT: PLATTE RIVER POWER AUTHORITY HQ
BEST MANAGEMENT PRACTICE ITEM:
PRESERVE EXISTING VEGETATION
SILT FENCE
VEHICLE TRACKING CONTROL
STAGING AREAS
CONSTRUCTION FENCE
CONCRETE WASHOUT AREA
SWALE AND SLOPE PROTECTION
SIDEWALK CHASE/PAN FILTER (RS)
TEMPORARY SEEDING
INLET PROTECTION (EXIST. & PROP.)
1. COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF
CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS.
2. CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs.
MOBILIZATION DEMOLITION
UTILITY
INSTALLATION
BUILDING
CONSTRUCTION
SITE GRADING
& PAVING
FINAL LANDSCAPING
PHASE OF CONSTRUCTION & STABILIZATION
EROSION CONTROL SEQUENCING
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
DANFIELD CT
UNION PACIFIC RAILROAD
TIMBERLINE ROAD
HORSETOOTH ROAD KEYMAP
5124
5124
PROPOSED 1' CONTOUR
EXISTING 1' CONTOUR
STORM SEWER
STORM INLET
LEGEND
EXISTING CURB & GUTTER
PROPOSED CURB & GUTTER
LIMITS OF DISTURBANCE
EXISTING PROPERTY LINE
EXISTING CHAIN LINK FENCE
SILT FENCE
VEHICLE TRACKING
CONTROL PAD
SEDIMENT CONTROL LOG
CONCRETE WASHOUT
AREA - FINAL LOCATION
TO BE DETERMINED BY
CONTRACTOR
SURFACE ROUGHENING
(SEE EROSION
CONTROL NOTE 5)
DANDY BAG INLET
PROTECTION FOR
COMBO INLET ROCK SOCK
CONSTRUCTION FENCE
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO
THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH
INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR
TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS.
2. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS.
3. REFER TO SHEETS C5.01-C5.05 FOR DETAILED GRADING PLANS.
4. THE PROPOSED POND SOUTH OF HEADQUARTERS, BEING BUILT WITH PHASE 1, SHALL BE CLEANED OF ANY SEDIMENT
THAT MAY HAVE ENTERED THE POND PRIOR TO FILLING THE POND. ONCE FILLED, THE POND SHALL BE PROTECTED FROM
SEDIMENT BY PLACING SILT FENCE AROUND THE POND AS NECESSARY UNTIL THE AREAS UPSTREAM OF THE POND HAVE
BEEN STABILIZED EITHER WITH PAVING OR VEGETATION.
5. SEDIMENT SHALL BE PREVENTED FROM ENTERING THE BIOSWALE ON ALL SIDES WITH THE USE OF SILT FENCE, STRAW
WATTLES, OR ROCK SOCKS UNTIL THE AREAS UPSTREAM OF THE BIOSWALE HAVE BEEN STABILIZED EITHER WITH PAVING
OR VEGETATION.
6. FOR WORK WITHIN STREET RIGHT-OF-WAY, CONTRACTOR SHALL:
· EXPEDITE CONSTRUCTION COMPLETION AFFECTING ROADWAYS
· NOT USE THE STREET TO STOCKPILE EARTH DURING TRENCHING ACTIVITIES
· SWEEP SEDIMENT WITHIN STREET DAILY OR PRIOR TO AND AFTER STORM EVENTS AS NECESSARY
· PLACE ROCK SOCKS ON DOWNSTREAM SIDE OF WORK AREA IN PAVED AREAS TO PREVENT SEDIMENT TRANSPORT
· SURFACE ROUGHEN LANDSCAPED AREAS UNTIL STABILIZED WITH LANDSCAPING
EXISTING CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED BUILDING
EROSION CONTROL NOTES
1. THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS.
2. REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES.
3. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS.
4. CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT
RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL
ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED.
5. ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL
MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS
MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE
WASHOUT, AND SEDIMENT TRAP.
6. SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS
PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED
SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132.
7. TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE
SITE SHALL BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION METHOD AS SPECIFIED ON THE APPROVED
LANDSACPE PLANS.
8. A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED:
INGREDIENT
%
AVAILABLE
BY
WEIGHT
APPLICATION
RATE IN
LBS/ACRE
EXISTING STORM SEWER
DANDY BAG INLET
PROTECTION FOR
TYPE R INLET
DANDY BAG INLET
PROTECTION FOR
AREA INLET COBBLE PAD
PROJECT: PLATTE RIVER POWER AUTHORITY HQ
BEST MANAGEMENT PRACTICE ITEM:
PRESERVE EXISTING VEGETATION
SILT FENCE
VEHICLE TRACKING CONTROL
STAGING AREAS
CONSTRUCTION FENCE
CONCRETE WASHOUT AREA
SWALE AND SLOPE PROTECTION
SIDEWALK CHASE/PAN FILTER (RS)
TEMPORARY SEEDING
INLET PROTECTION (EXIST. & PROP.)
1. COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF
CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS.
2. CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs.
MOBILIZATION DEMOLITION
UTILITY
INSTALLATION
BUILDING
CONSTRUCTION
SITE GRADING
& PAVING
FINAL LANDSCAPING
PHASE OF CONSTRUCTION & STABILIZATION
EROSION CONTROL SEQUENCING
(SEE DETAILS)
COBBLE PAD 5' IN LENGTH
PLATTE RIVER POWER AUTHORITY 02/14/18
U16014
1" = 30'
1" = N/A
PLATTE RIVER POWER AUTHORITY HQ
NORTH
2/9/2018 4:38:14 PM
P:\U16014 - PRPA CAMPUS\CADD\CP\CX.XX_DETAILED EC PLANS.DWG
CX.XX_DETAILED EC PLANS
## ##
C5.11
73
EROSION CONTROL PLANS -
PHASE 1
0 30' 60'
SCALE: 1" = 30'
15'
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
DANFIELD CT
UNION PACIFIC RAILROAD
TIMBERLINE ROAD
HORSETOOTH ROAD KEYMAP
5124
5124
PROPOSED 1' CONTOUR
EXISTING 1' CONTOUR
STORM SEWER
STORM INLET
LEGEND
EXISTING CURB & GUTTER
PROPOSED CURB & GUTTER
LIMITS OF DISTURBANCE
EXISTING PROPERTY LINE
EXISTING CHAIN LINK FENCE
SILT FENCE
VEHICLE TRACKING
CONTROL PAD
SEDIMENT CONTROL LOG
CONCRETE WASHOUT
AREA - FINAL LOCATION
TO BE DETERMINED BY
CONTRACTOR
SURFACE ROUGHENING
(SEE EROSION
CONTROL NOTE 5)
DANDY BAG INLET
PROTECTION FOR
COMBO INLET ROCK SOCK
CONSTRUCTION FENCE
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO
THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH
INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR
TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS.
2. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS.
3. REFER TO SHEETS C5.01-C5.05 FOR DETAILED GRADING PLANS.
4. THE PROPOSED POND SOUTH OF HEADQUARTERS, BEING BUILT WITH PHASE 1, SHALL BE CLEANED OF ANY SEDIMENT
THAT MAY HAVE ENTERED THE POND PRIOR TO FILLING THE POND. ONCE FILLED, THE POND SHALL BE PROTECTED FROM
SEDIMENT BY PLACING SILT FENCE AROUND THE POND AS NECESSARY UNTIL THE AREAS UPSTREAM OF THE POND HAVE
BEEN STABILIZED EITHER WITH PAVING OR VEGETATION.
5. SEDIMENT SHALL BE PREVENTED FROM ENTERING THE BIOSWALE ON ALL SIDES WITH THE USE OF SILT FENCE, STRAW
WATTLES, OR ROCK SOCKS UNTIL THE AREAS UPSTREAM OF THE BIOSWALE HAVE BEEN STABILIZED EITHER WITH PAVING
OR VEGETATION.
6. FOR WORK WITHIN STREET RIGHT-OF-WAY, CONTRACTOR SHALL:
· EXPEDITE CONSTRUCTION COMPLETION AFFECTING ROADWAYS
· NOT USE THE STREET TO STOCKPILE EARTH DURING TRENCHING ACTIVITIES
· SWEEP SEDIMENT WITHIN STREET DAILY OR PRIOR TO AND AFTER STORM EVENTS AS NECESSARY
· PLACE ROCK SOCKS ON DOWNSTREAM SIDE OF WORK AREA IN PAVED AREAS TO PREVENT SEDIMENT TRANSPORT
· SURFACE ROUGHEN LANDSCAPED AREAS UNTIL STABILIZED WITH LANDSCAPING
EXISTING CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED BUILDING
EROSION CONTROL NOTES
1. THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS.
2. REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES.
3. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS.
4. CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT
RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL
ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED.
5. ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL
MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS
MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE
WASHOUT, AND SEDIMENT TRAP.
6. SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS
PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED
SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132.
7. TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE
SITE SHALL BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION METHOD AS SPECIFIED ON THE APPROVED
LANDSACPE PLANS.
8. A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED:
INGREDIENT
%
AVAILABLE
BY
WEIGHT
APPLICATION
RATE IN
LBS/ACRE
EXISTING STORM SEWER
DANDY BAG INLET
PROTECTION FOR
TYPE R INLET
DANDY BAG INLET
PROTECTION FOR
AREA INLET COBBLE PAD
PROJECT: PLATTE RIVER POWER AUTHORITY HQ
BEST MANAGEMENT PRACTICE ITEM:
PRESERVE EXISTING VEGETATION
SILT FENCE
VEHICLE TRACKING CONTROL
STAGING AREAS
CONSTRUCTION FENCE
CONCRETE WASHOUT AREA
SWALE AND SLOPE PROTECTION
SIDEWALK CHASE/PAN FILTER (RS)
TEMPORARY SEEDING
INLET PROTECTION (EXIST. & PROP.)
1. COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF
CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS.
2. CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs.
MOBILIZATION DEMOLITION
UTILITY
INSTALLATION
BUILDING
CONSTRUCTION
SITE GRADING
& PAVING
FINAL LANDSCAPING
PHASE OF CONSTRUCTION & STABILIZATION
EROSION CONTROL SEQUENCING
(SEE NOTE 4)
BIOSWALE
(SEE NOTE 5)
PLACE ROCK SOCK AT EACH
CURB CUT LOCATION TO
BIOSWALE (ALSO SEE NOTE 5)
REFER TO NOTE 6 FOR
WORK WITHIN THE ROW
REFER TO NOTE 6 FOR
WORK WITHIN THE ROW
GRADE BREAK
EXISTING BIOSWALE
EXISTING CURB CUT
EXISTING CURB CUT
APPROXIMATE PHASE 2
GRADING LIMITS
(SEE SHEET C5.20)
PLACE COBBLE PAD AT D/S
END OF EACH CURB CUT
(SEE DETAILS)
COBBLE PAD 5' IN LENGTH
REFER TO NOTE 6 FOR
WORK WITHIN THE ROW
PLATTE RIVER POWER AUTHORITY 02/14/18
U16014
1" = 30'
1" = N/A
PLATTE RIVER POWER AUTHORITY HQ
NORTH
2/9/2018 4:38:07 PM
P:\U16014 - PRPA CAMPUS\CADD\CP\CX.XX_DETAILED EC PLANS.DWG
CX.XX_DETAILED EC PLANS
## ##
C5.10
73
EROSION CONTROL PLANS -
PHASE 1
0 30' 60'
SCALE: 1" = 30'
15'
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
DANFIELD CT
UNION PACIFIC RAILROAD
TIMBERLINE ROAD
HORSETOOTH ROAD KEYMAP
5124
5124
PROPOSED 1' CONTOUR
EXISTING 1' CONTOUR
STORM SEWER
STORM INLET
LEGEND
EXISTING CURB & GUTTER
PROPOSED CURB & GUTTER
LIMITS OF DISTURBANCE
EXISTING PROPERTY LINE
EXISTING CHAIN LINK FENCE
SILT FENCE
VEHICLE TRACKING
CONTROL PAD
SEDIMENT CONTROL LOG
CONCRETE WASHOUT
AREA - FINAL LOCATION
TO BE DETERMINED BY
CONTRACTOR
SURFACE ROUGHENING
(SEE EROSION
CONTROL NOTE 5)
DANDY BAG INLET
PROTECTION FOR
COMBO INLET ROCK SOCK
CONSTRUCTION FENCE
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO
THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH
INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR
TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS.
2. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS.
3. REFER TO SHEETS C5.01-C5.05 FOR DETAILED GRADING PLANS.
4. THE PROPOSED POND SOUTH OF HEADQUARTERS, BEING BUILT WITH PHASE 1, SHALL BE CLEANED OF ANY SEDIMENT
THAT MAY HAVE ENTERED THE POND PRIOR TO FILLING THE POND. ONCE FILLED, THE POND SHALL BE PROTECTED FROM
SEDIMENT BY PLACING SILT FENCE AROUND THE POND AS NECESSARY UNTIL THE AREAS UPSTREAM OF THE POND HAVE
BEEN STABILIZED EITHER WITH PAVING OR VEGETATION.
5. SEDIMENT SHALL BE PREVENTED FROM ENTERING THE BIOSWALE ON ALL SIDES WITH THE USE OF SILT FENCE, STRAW
WATTLES, OR ROCK SOCKS UNTIL THE AREAS UPSTREAM OF THE BIOSWALE HAVE BEEN STABILIZED EITHER WITH PAVING
OR VEGETATION.
6. FOR WORK WITHIN STREET RIGHT-OF-WAY, CONTRACTOR SHALL:
· EXPEDITE CONSTRUCTION COMPLETION AFFECTING ROADWAYS
· NOT USE THE STREET TO STOCKPILE EARTH DURING TRENCHING ACTIVITIES
· SWEEP SEDIMENT WITHIN STREET DAILY OR PRIOR TO AND AFTER STORM EVENTS AS NECESSARY
· PLACE ROCK SOCKS ON DOWNSTREAM SIDE OF WORK AREA IN PAVED AREAS TO PREVENT SEDIMENT TRANSPORT
· SURFACE ROUGHEN LANDSCAPED AREAS UNTIL STABILIZED WITH LANDSCAPING
EXISTING CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED BUILDING
EROSION CONTROL NOTES
1. THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS.
2. REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES.
3. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS.
4. CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT
RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL
ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED.
5. ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL
MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS
MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE
WASHOUT, AND SEDIMENT TRAP.
6. SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS
PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED
SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132.
7. TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE
SITE SHALL BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION METHOD AS SPECIFIED ON THE APPROVED
LANDSACPE PLANS.
8. A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED:
INGREDIENT
%
AVAILABLE
BY
WEIGHT
APPLICATION
RATE IN
LBS/ACRE
EXISTING STORM SEWER
DANDY BAG INLET
PROTECTION FOR
TYPE R INLET
DANDY BAG INLET
PROTECTION FOR
AREA INLET COBBLE PAD
PROJECT: PLATTE RIVER POWER AUTHORITY HQ
BEST MANAGEMENT PRACTICE ITEM:
PRESERVE EXISTING VEGETATION
SILT FENCE
VEHICLE TRACKING CONTROL
STAGING AREAS
CONSTRUCTION FENCE
CONCRETE WASHOUT AREA
SWALE AND SLOPE PROTECTION
SIDEWALK CHASE/PAN FILTER (RS)
TEMPORARY SEEDING
INLET PROTECTION (EXIST. & PROP.)
1. COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF
CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS.
2. CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs.
MOBILIZATION DEMOLITION
UTILITY
INSTALLATION
BUILDING
CONSTRUCTION
SITE GRADING
& PAVING
FINAL LANDSCAPING
PHASE OF CONSTRUCTION & STABILIZATION
EROSION CONTROL SEQUENCING
2001 DANFIELD LLC
HQ BUILDING
MICROWAVE
BUILDING
MAINTENANCE SHOP
/ TRUCK WASH
POOL CAR
WAREHOUSE
SUBSTATION GARAGE
FLEET PARKING GARAGE A
PROPOSED
POND
FLEET PARKING
GARAGE B
BIOSWALE W/
UNDERDRAIN
POTENTIAL FUTURE
PARKING AREA
POTENTIAL FUTURE BIOSWALE
UNDERGROUND
DETENTION
EXISTING STORM
DRAINING BASIN OS3
DANFIELD COURT
PROPOSED
POND C1
1.15
PLATTE RIVER POWER AUTHORITY 02/14/18
U16014
1" = 60'
1" = N/A
PLATTE RIVER POWER AUTHORITY HQ
NORTH
2/9/2018 5:32:19 AM
P:\U16014 - PRPA CAMPUS\CADD\CP\C6.00_PROPOSED DRAINAGE PLAN.DWG
C6.00_PROPOSED DRAINAGE PLAN
KRB NKS
C6.00
73
DRAINAGE PLAN
0 60' 120'
SCALE: 1" = 60'
30'
PREPARED FOR:
JOB NUMBER
SHEET NUMBER
OF SHEETS
DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
NO. BY DATE
CAUTION
REVISIONS:
VERTICAL:
HORIZONTAL:
SCALE
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
PROJ. MGR:
DRAWING NAME:
PATH:
DATE: TIME: DESIGNER:
UNITED CIVIL
Design Group LLC
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED
ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.
2. VEGETATIVE SWALES, BIOSWALES, UNDERGROUND DETENTION AND THE WATERQUALITY AND DETENTION POND
SHALL BE MAINTAINED BY THE PROPERTY OWNER AND FOLLOW APPLICABLE STANDARD OPERATING
PROCEDURES AS SHOWN IN DEVELOPMENT AGREEMENT.
3. FUTURE DETENTION AND LID IMPROVEMENTS WILL BE REQUIRED WITHIN BASIN A-12 WITH FUTURE
DEVELOPMENTS.
5124
5124
PROPOSED 1' CONTOUR
EXISTING 1' CONTOUR
STORM SEWER
STORM INLET
LEGEND
EXISTING CURB & GUTTER
PROPOSED CURB & GUTTER
PROPOSED FLOWLINE
LIMITS OF DISTURBANCE
EXISTING PROPERTY LINE
EXISTING R.O.W LINE
EXISTING EASEMENT
BASIN BOUNDARY
SWALE SECTION
D-101
XXXX
BASIN DESIGNATION
BASIN AREA (ACRE)
2 - YR RUNOFF COEFF.
100 - YR RUNOFF COEFF.
DESIGN POINT
FLOW DIRECTION
5125
5125
PROPOSED 5' CONTOUR
EXISTING 5' CONTOUR
A A
DRAINAGE SUMMARY
POND SUMMARY
LOW IMPACT DEVELOPMENT TREATMENT SUMMARY
Basin
Proposed
Impervious
Area
LID Treatment Area Treated % of Site
Treated
(sf) (acres) (sf) (%)
A-1 24,426 None 0 0%
A-2 33,295 None 0 0%
A-3 16,242 Underground Detention 16,242 6%
A-4 21,811 Underground Detention 21,811 8%
A-5 14,736 Underground Detention 14,736 5%
A-6 7,951 Underground Detention 7,951 3%
A-7 8,071 Underground Detention 8,071 3%
A-8 6,189 Underground Detention 6,189 2%
A-9 28,026 Underground Detention 28,026 10%
A-10 28,393 Underground Detention 28,393 10%
A-11 11,838 Underground Detention 11,838 4%
A-12 (Future) 19,000 Future LID Treatment 19,000 7%
A-13 11,517 None 0 0%
B-1 10,125 Bioswale 10,125 4%
B-2 26,917 Bioswale 26,917 10%
C-1 5,726 Wet Pond 5,726 2%
Total Site 274,263 205,024 75%
Pond A1 Pond C1
WQCV REQUIRED 0.18 AC-FT 0.01 AC-FT
WQCV PROVIDED 0.24 AC-FT 0.02 AC-FT
DETENTION VOLUME REQUIRED 2.58 AC-FT 0.33 AC-FT
DETENTION VOLUME PROVIDED 2.89 AC-FT 0.35 AC-FT
WQCV WATER SURFACE ELEVATION 4949.50 4955.03
100-YEAR WATER SURFACE ELEVATION 4,952.25 4,955.50
TOP OF POND ELEVATION 4,953.25 4,956.50
Proposed Basins
Basin Area %I C2
C100 Q
2 Q100
(acre) (cfs) (cfs)
A-1 3.49 16% 0.32 0.40 2.16 9.43
A-2 0.91 82% 0.83 1.00 2.15 9.10
A-3 0.37 90% 0.95 1.00 1.01 3.71
A-4 0.57 87% 0.86 1.00 1.39 5.64
A-5 0.40 85% 0.84 1.00 0.95 3.96
A-6 0.41 41% 0.53 0.67 0.62 2.72
A-7 0.32 53% 0.63 0.79 0.49 2.37
A-8 0.21 62% 0.71 0.89 0.42 1.84
A-9 0.64 90% 0.95 1.00 1.74 6.41
A-10 0.68 87% 0.92 1.00 1.78 6.74
A-11 0.97 27% 0.41 0.51 1.06 4.63
A-12 1.15 6% 0.23 0.29 0.68 2.95
A-13 0.26 90% 0.95 1.00 0.72 2.63
A-TOTAL 10.38 45% 0.56 0.70 10.46 45.52
B-1 0.42 53% 0.61 0.76 0.69 3.22
B-2 1.45 43% 0.52 0.65 1.90 8.28
B-TOTAL 1.87 46% 0.54 0.68 2.55 12.59
C-1 1.23 11% 0.28 0.35 0.98 4.27
C-TOTAL 1.23 11% 0.28 0.35 0.98 4.27
OS-1 0.68 2% 0.20 0.25 0.31 1.42
OS-2A 0.21 2% 0.20 0.25 0.11 0.51
OS-2B 0.93 80% 0.81 1.00 1.80 8.62
OS-3 0.42 84% 0.85 1.00 0.89 4.16
OS-4 1.35 71% 0.74 0.92 2.82 12.31
OS-5 0.54 2% 0.20 0.25 0.24 1.05
Asphalt Paving
Landscaping
Construction Activities Construction Sequence
Today Planned for this Week Planned for Next Week
Erosion & Sediment Control Measures
Inspection Date: ______________ Time: ___________ __ a.m. __ p.m.
Temp: ____° F. Weather Conditions (rain, snow, cloudy, windy, etc.):
______________________________________________________________________
Type of Activity
____ Other (describe below)
_____________________________
_____________________________
_____________________________
Reason for Inspection (check one):
____ Water Running Across Site
No.
____ Complaint
____ High Winds
____ Routine
Permit No.:
Needs Replacement (Not
Functional)
EROSION AND SEDIMENT CONTROL INSPECTION FORM
The Contractor or Agent shall inspect all BMPs at a minimum once every two (2) weeks and after each Significant Storm Event.
Subdivision, Project or Site Name:
OS-3 OS-3 0.42 0.84 0.85 1.00 1.01 4.16
S-4 OS-4 1.35 0.71 0.74 0.92 2.82 12.31
OS-5 OS-5 0.54 0.02 0.20 0.25 0.24 1.05
Totals 70.49 105.96