Loading...
HomeMy WebLinkAboutPLATTE RIVER POWER AUTHORITY CAMPUS - FDP - FDP180004 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT1501 Academy Ct. Ste. 203 Fort Collins, Colorado 80524 (970) 530-4044 Final Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO Prepared for: Platte River Power Authority 2000 East Horsetooth Road Fort Collins, CO 80525 February 14, 2018 Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO i U16014-DrainageReport-Final.doc February 14, 2018 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Platte River Power Authority HQ Campus Fort Collins, Colorado Project Number: U16014 Dear Staff: United Civil Design Group, LLC. is pleased to submit this Final Drainage Report for the Platte River Power Authority Headquarters Campus site in Fort Collins, Colorado. In general, this report serves to document the stormwater impacts associated with the proposed redevelopment of the existing campus. We understand that review by the City of Fort Collins is to assure general compliance with standardized criteria contained in the Fort Collins Stormwater Criteria Manual (FCSCM). This report was prepared in compliance with technical criteria set forth in both the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual and the Fort Collins Stormwater Criteria Manual. If you should have any questions or comments as you review this report, please feel free to contact us at your convenience. Sincerely, United Civil Design Group Kevin Brazelton, PE Engineering Manager Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO ii U16014-DrainageReport-Final.doc TABLE OF CONTENTS PAGE I. General Location and Description ........................................................................................... 1 A. Location ............................................................................................................................ 1 B. Description of Property ................................................................................................... 1 C. Description of Development............................................................................................ 2 II. Drainage Basins and Sub-Basins .............................................................................................. 3 A. Major Basin Description .................................................................................................. 3 B. Sub-Basin Description ...................................................................................................... 3 III. Drainage Design Criteria ......................................................................................................... 3 A. Regulations ...................................................................................................................... 3 B. Directly Connected Impervious Area (DCIA) ................................................................... 3 C. Development Criteria Reference and Constraints .......................................................... 4 D. Hydrological Criteria ........................................................................................................ 5 E. Hydraulic Criteria ............................................................................................................. 6 F. Floodplain Regulations .................................................................................................... 6 G. Modifications of Criteria .................................................................................................. 6 IV. Drainage Facility Design .......................................................................................................... 6 A. General Concept .............................................................................................................. 6 B. Specific Details ................................................................................................................. 9 V. Sediment/Erosion Control ..................................................................................................... 16 VI. Conclusions ........................................................................................................................... 16 A. Compliance with Standards ........................................................................................... 16 B. Drainage Concept .......................................................................................................... 16 C. Stormwater Quality ....................................................................................................... 16 VII. References ......................................................................................................................... 17 APPENDICES APPENDIX A – Hydrology Computations APPENDIX B – Detention and Water Quality Calculations APPENDIX C – Hydraulic Computations C.1 – Storm Pipe Calculations C.2 – Inlet Sizing Calculations C.3 – Swale Calculations APPENDIX D – Referenced Materials APPENDIX E – Drainage Exhibits Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO iii U16014-DrainageReport-Final.doc VICINITY MAP Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 1 U16014-DrainageReport-Final.doc I. General Location and Description A. Location The Platte River Power Authority Headquarters Campus (referred herein as ”the site” or “the Campus”) is a parcel of land situated in the Southeast Quarter of Section 30, Township 7 North, Range 68 West of the 6th Principal Meridian to the City of Fort Collins, Larimer County, Colorado. More specifically, the site is located at the northwest corner of Horsetooth Road and Timberline Road and is bounded by East Horsetooth Road to the south, Timberline Road to the east, existing commercial property and Danfield Court to the north, and Union Pacific Railroad right-of-way to the west. B. Description of Property The campus has an existing platted area of 16.7-acres and has acted as the headquarters for Platte River Power Authority since it was first constructed in the late 1970s. The following is a summary of the existing conditions: Ground Cover - The site currently exists as commercial property and is currently covered with various buildings, pavements and open areas. Grades – The majority of the site slopes towards one of three (3) drainage outfalls. In general, the slopes within each outfall basin range between 0 to 5 percent, with some landscaped berm areas reaching near 20%. Soil Type - According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey, the site consists of Nunn clay loam (Hydrologic Soil Group C). Utilities – The campus includes an extensive network of existing utilities including mains and services for water, sanitary sewer, natural gas, electric, telephone and data lines. These mains and services are located within the property limits of the campus along with mains located within the rights-of- ways for Horsetooth Road, Timberline Road and Danfield Court. Detention Ponds and Storm Sewer – The campus currently has three (3) drainage outfalls available to accept stormwater flows from the site. These include the existing wet pond which currently acts as an irrigation and stormwater retention facility for the campus, an existing 12-inch storm sewer located at the east side of the campus along Timberline Road, and the curb and gutter at the Danfield Court cul-de-sac. There are also two (2) other internal detention areas that drain to the 12-inch storm sewer outfall. The campus also has limited internal storm drains varying in size from 4-inch Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 2 U16014-DrainageReport-Final.doc to 15-inch. Of note, there is an existing storm inlet and drain located on the north side of Horsetooth Road that collects stormwater from the roadway and conveys it into the existing wet pond on the south side of the property. This existing system will be required to be maintained and/or replaced with the construction of the proposed project. Drainageways – No known externally owned drainageways currently exist within the proposed development limits. Irrigation - City records indicate that there is an existing irrigation pipe located along the southern property boundary, running from west to east. Only portions of this irrigation system have been found or identified with utility locates or site survey but from the information available it is believed that this system consists of a 20-inch concrete pipe that is located just north of the existing curb and gutter along Horsetooth Road. The existing onsite wet Pond A1 also serves as an irrigation system and is supplied by an existing irrigation well located on the campus. Floodplains – The campus is not located within either a City or FEMA floodplain. C. Description of Development The planned campus redevelopment is planned to be constructed in phases. Ultimately, the campus redevelopment will consist of the following improvements: • The demolition of most of the existing buildings and much of the existing pavements throughout the campus. • The construction of seven (7) proposed commercial buildings including the main headquarters building and various other support buildings. • The construction of an internal roadway network with associated parking areas. • The construction of utilities in support of the campus including sanitary, water and storm drainage. • The construction of detention and water quality facilities located throughout the site with the main detention area located in the northeast portion of the site. • The reconfiguration and relining of the existing wet pond. Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 3 U16014-DrainageReport-Final.doc II. Drainage Basins and Sub-Basins A. Major Basin Description The site is located within the Foothills drainage basin within the City of Fort Collins Master Drainage Plan. Stormwater from this basin adjacent to the site is collected within streets and storm sewer systems and ultimately discharged into the Fossil Creek Reservoir Inlet Ditch. B. Sub-Basin Description Historically, the property has been utilized as the main headquarters for Platte River Power Authority. The campus has grown over the decades but is currently largely developed containing a variety of existing buildings, utility infrastructure systems and open spaces. Stormwater from the campus is collected in one of three (3) basins that either convey water after detention to public infrastructure or retain the stormwater onsite. The proposed project will maintain the historic drainage patterns to the extent feasible, but will eliminate the stormwater retention aspect of the site and reroute that stormwater to the main detention facility to be provided on the site. III. Drainage Design Criteria A. Regulations The design criteria for this study are directly from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards Manual and the Urban Storm Drainage Criteria Manuals Volumes 2, and 3 (referred to herein as USDCM). B. Directly Connected Impervious Area (DCIA) With the adoption of the USDCM, the City has also adopted the “Four Step Process” that is recommended in Volume 3 of the USDCM in selecting structural BMPs for the redeveloping urban areas. The following portions of this summary describe each step and how it has been utilized for this project: Step 1 – Employ Runoff Reduction Practices The objective of this step is to reduce runoff peaks and volumes and to employ the technique of “minimizing directly connected impervious areas” (MDCIA). This project accomplishes this by: • Routing the roof and pavement flows through bioswales, underground detention treatment/infiltration facilities and vegetated swales to increase time of concentration, promote infiltration and provide water quality. Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 4 U16014-DrainageReport-Final.doc Step 2 – Provide Water Quality Capture Volume (WQCV) The objective of providing WQCV is to reduce the sediment load and other pollutants that exit the site. For this project WQCV is provided within underground treatment facilities and a campus water quality pond. Step 3 – Stabilize Drainageways The site is not adjacent or near a major drainageway; however, this project will pay stormwater development and stormwater utility fees which the City uses, in part, to maintain the stability of the City drainageway systems. Step 4 – Consider Need for Site Specific and Source Control BMPs Site specific and source control BMPs are generally considered for large industrial and commercial sites. The redevelopment of the existing campus will include multiple site specific and source controls, including: • Covered storage areas for vehicles and materials • A warehouse for materials storage • A vehicular maintenance building with appropriate internal waste collection systems • Dedicated maintenance personnel providing landscape maintenance and snow and ice management C. Development Criteria Reference and Constraints The campus has most recently been included within the Drainage Study entitled, “Platte River Power Authority Maintenance Facility”, prepared by RBD Engineering Consultants Inc., and dated March 1984. With the proposed complete redevelopment of the site and the age of the previous studies, this report relies very little on previous drainage information and studies prepared for the site. Four (4) drainage constraints for the campus have been identified and include the following: Existing Storm Outfall The existing 12-inch storm sewer outfall for the site conveys stormwater north down Timberline Road. Utilizing invert and hydraulic grade line information provided within the construction plans entitled, “Collindale Industrial Park Storm Sewer Extension”, prepared by Meline & Irelan Consulting Engineers and dated February 1995, the existing system has been analyzed to determine the maximum allowable release rate from the campus to this existing 12-inch outfall. Refer to Appendix C for the hydraulic analysis of the existing storm drain and Appendix D for the information used to create the hydraulic model. Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 5 U16014-DrainageReport-Final.doc Utilizing the mentioned information, it was determined that the release rate from the main detention area will be limited to 3.15 cfs. Danfield Court Outfall Storm sewer does not exist at the west end of Danfield Court; therefore, any drainage outfall at the north property line will be required to tie into the curb and gutter of the street or construct offsite storm sewer. The current design does not include offsite storm sewer and the elevation of the existing curb and gutter in relation to site grades limits the feasibility of providing a significant amount of detention or water quality. To limit the impact of these constraints, the design proposes to maintain the existing parking lot with its’ current parking lot detention system. Per information provided by City personnel, maintaining the existing parking lot and detention system will be acceptable with the condition that no new impervious area is added to this existing outfall and only minor improvements are made to the existing parking area. Horsetooth Road Drainage Approximately 1-acre of Horsetooth Road drains to an existing inlet located immediately west of the south entrance to the existing site. Drainage collected via the existing inlet is conveyed to the existing wet pond and retained onsite. The proposed design will alter the design of this existing system but will be required to collect, treat, and convey the Horsetooth Road runoff through the proposed redeveloped campus. Existing Offsite Storm Sewer The existing property north of the main campus (formerly the “LSI property”) has existing storm sewer along the west and south perimeters of that property. Documentation of the design of these storm sewers is not available; therefore, it has been assumed that the offsite system has only been designed for the existing property and impervious areas that currently drain to the existing storm inlets. The proposed design will be required to limit the area draining to the offsite storm sewer system and ensure that existing flowrates to the system are not exceeded. In addition, Platte River Power Authority and the offsite property owner are preparing an agreement to allow Platte River Power Authority property that has historically flowed to this offsite storm sewer to continue to do so. D. Hydrological Criteria In accordance with the Fort Collins policy, a minor and major storm for the Fort Collins area is identified as the 2-year and 100-year storms, respectively. A major storm for the Fort Collins area has a recurrence interval of 100 years and has a peak intensity of 9.95 in/hr. Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 6 U16014-DrainageReport-Final.doc These storms have been used as a basis for planning and system design. The peak flow rates for design points have been calculated based on the Rational Method as described in the USDCM with storm duration set equal to the time of concentration for each sub-basin. This method was used to analyze the developed runoff from the 2-year (minor) and the 100-year (major) storm events. The Rational Method is widely accepted for drainage design involving small drainage areas (less than 160 acres) and short time of concentrations. The Rational Method is ideal for storm sewer sizing and small detention pond sizing (for tributary areas no larger than 90 to 160 acres). Runoff coefficients were assumed based on impervious area and soil type and are given in Appendices. E. Hydraulic Criteria The redeveloped campus will convey runoff to the proposed pond(s) via swales, gutters, concrete pans, and pipes. The FCSCM and USDCM were referenced for all hydraulic calculations. In addition, the following computer programs were utilized: • Hydraflow Storm Sewers Extension for AutoCAD Civil 3D • Hydraflow Express Extension for AutoCAD Civil3D • UD-Inlet by UDFCD F. Floodplain Regulations The campus is not located within either a City or FEMA floodplain. G. Modifications of Criteria The drive lane that extends south onto the property from Danfield Court is being regraded with this project. As such, water quality treatment is typically required. Due to the small area and the unchanging imperviousness of the area, the project has requested a variance to criteria to allow the continued drainage in its’ current configuration without water quality treatment. IV. Drainage Facility Design A. General Concept The project includes the redevelopment of a vast majority of the existing campus including the headquarters (HQ) building, support buildings and supporting roadway, parking and utility infrastructure. In general, the site is being graded to maintain existing drainage patterns, where feasible, and will collect stormwater runoff via swales, pans and storm sewer and direct them to the proposed detention and water quality pond located at the east side of the Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 7 U16014-DrainageReport-Final.doc site. The pond will discharge to the existing 12-inch storm sewer located along the west edge of Timberline Road. All referenced tables, charts, formulas, etc. are included in the Appendices. The area, time of concentration, and runoff of each proposed sub-basin is summarized in Appendix A. The project site was divided into multiple developed sub-basins as explained further below: Basin A Basin A consists of Basins A1-A13 which are designed to be collected via a series of swales, pans and storm drains that will discharge to the proposed detention Pond A1 at the east side of the property. Basin A will contain the majority of the proposed improvements and will ultimately consist of rooftop, sidewalk, roadway, and landscaped areas. Specifics to each sub- basin within Basin A include the following: Basin A1 consists of approximately 3.5 acres and includes the proposed detention Pond A1 and portions of the proposed paving improvements around the HQ building. Approximately 8,500 square feet (sf) of future building is also included within the hydrology and detention Pond A1 calculations. A pond outlet and emergency overflow are provided at the northeast end of the pond that are directed towards Timberline Road. Refer to Appendix A for additional information. Basins A2-A5 consist of approximately 2.3 acres and includes a portion of the proposed HQ and the employee parking areas for the project north of HQ. These basins are collected with proposed storm sewer and conveyed to the proposed detention pond in Basin A1. Basins A6-A11 consist of approximately 3.0 acres and includes the maintenance yard facility north of HQ and the employee parking areas. These basins are collected with proposed storm sewer and conveyed to the proposed detention pond in Basin A1. Basin A12 consists of approximately 1.5 acres and includes minimal proposed improvements with this project. The area is planned for future expansion of an unknown type. For storm sewer calculations the basin has been assumed to have a percent imperviousness of 90%. Due to the unknown nature of the future improvements, Basin A12 will be required to provide detention, water quality and LID improvements either within Basin A12 or within Basin A1 with the future improvements. Refer to Appendix A for additional information. Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 8 U16014-DrainageReport-Final.doc Basin A13 consists of approximately 0.25 acres and includes the southern portion of the HQ building. The basin will be collected with a proposed roof drain system and conveyed to the detention pond in Basin A1. Basin B Basin B includes Basins B1-B2 which consist of approximately 1.9 acres south of HQ and will include the proposed visitor parking area and landscaping. The basins are designed to be collected via a bioswale and storm drain that will discharge to the proposed detention pond in Basin A1. Approximately 10,000 (sf) of future paving is also included within the hydrology and detention Pond C1 calculations to accommodate for future visitor parking on the west end of Basin B2. Refer to Appendix A for additional information. Basin C Basin C includes Basin C1 which consists of approximately 1.2 acres south HQ and primarily includes the proposed wet Pond C1 and landscaping. Detention will be provided for Basin C1 over the permanent water surface of the proposed wet pond. A pond outlet and emergency overflow are provided at the east end of the pond that are directed towards Basin A1. Offsite Basins The site includes five (5) existing offsite basins that are being maintained with the proposed redevelopment. Specifics to each offsite basin include the following: Basin OS1 consists of approximately 0.7 acres of onsite property that drains offsite towards the north and east ultimately draining to Timberline Road. The area of this basin has increased from historic conditions but due to the removal of pavement area within the basin the percent-imperviousness has been reduced. Ultimately, the runoff generated from this basin has increased slightly with the proposed conditions (approximately 0.5 cfs in the 100-year event); however, the additional flow is not anticipated to negatively impact the street capacity of Timberline Road or downstream infrastructure. Basin OS2 consists of approximately 1.2 acres of Horsetooth Road and onsite property that drain to an existing inlet located just west of the Horsetooth Road entrance into the property. Drainage from this inlet is currently conveyed into the existing wet pond located south of HQ. The redevelopment is raising the permanent water surface of the wet pond by approximately 3-feet; therefore, Basin OS2 will be collected with a proposed storm drain system and routed around the proposed wet pond to the detention pond in Basin A1 where flows from the basin will be treated and detained prior to being released from the pond. Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 9 U16014-DrainageReport-Final.doc Basin OS3 consists of approximately 0.4 acres of onsite property that drains offsite to the adjacent commercial property east and north of the redevelopment (formerly the “LSI property”). This basin was originally owned by, and was designed to drain towards, the offsite property but has been recently purchased by Platte River Power Authority. In the existing conditions Basin OS3 includes approximately 2.2 acres or property. The proposed redevelopment alters the drainage patterns to minimize the size of Basin OS3; and therefore, the amount of drainage that flows offsite. Much of the existing basin is now included within the onsite Basins A7-A11. Refer to the Drainage Plans and Appendix A for additional information. In addition, note that Platte River Power Authority and the offsite property owner are preparing an agreement to allow Platte River Power Authority property that has historically flowed offsite to continue to do so. Basin OS4 consists of approximately 1.3 acres of onsite property that drains to Danfield Court. The basin currently exists as a parking lot that includes a small amount of parking lot detention prior to being released to Danfield Court. This existing parking lot is remaining largely unmodified with the proposed redevelopment; therefore, per communications with City personnel, no drainage improvements are being made to the basin. Basins OS5 consists of approximately 0.5 acres of landscaped area that historically drains west offsite and onto Union Pacific Railroad property. The proposed redevelopment is proposing to maintain the existing drainage patterns, size and percent imperviousness of this basin. B. Specific Details Detention The proposed redevelopment includes two (2) extended detention ponds for the proposed improvements. These ponds are located within Basins A1 and C1 and are shown within this report as Pond A1 and Pond C1. Pond A1 includes detention and water quality for all of Basins A, B and OS2. The release rate from the pond is limited by the existing 12-inch storm sewer outfall for the site which conveys stormwater north down Timberline Road. As previously mentioned, the release rate from Pond A1 was determined to be 3.15 cfs by analyzing the existing 12-inch storm sewer system. Refer to Appendices C and D for additional information. Also, note that neither detention or water quality are provided for the future conditions of basin A12. Due to the unknown nature of the future improvements, Basin A12 will be required to provide detention, water quality and LID improvements either within Basin A12 or within Basin A1 with the future improvements. Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 10 U16014-DrainageReport-Final.doc Refer to Appendix A for additional information. A pond outlet structure and emergency overflow are at the northeast end of the pond that are directed towards Timberline Road. Pond C1 includes only Basin C1 and will provide detention over the permanent water surface of the proposed wet pond. The pond is designed to require less than 6-inches of ponding from the permanent water surface to the 100-year water surface. A pond outlet and emergency overflow are provided at the east end of the pond that are directed towards Basin A1. A summary of both detention ponds are as follows: Pond Designation Detention Volume Required (ac-ft) Detention Volume Provided (ac-ft) 100-year WSEL Pond Release Rate (cfs) WQCV Required (ac-ft) WQCV Provided (ac-ft) Water Quality WSEL Top of Pond Elevation Pond A1 2.58 2.89 4952.25 3.15 0.18 0.24 4949.50 4953.25 Pond C1 0.33 0.35 4955.50 0.50 0.01 0.02 4955.03 4956.50 Stormwater Quality Several long-term stormwater quality measures have been selected for the site that will provide treatment of stormwater prior to it being discharged from the site. For this project the following measures have been included: Grass Swales - The soft bottom/overbank areas of the swales allow for infiltration to occur as well as including a flow path across a vegetated surface slowing the conveyance rate of storm water runoff while also removing sediment and other pollutants. These have been utilized to convey and treat stormwater prior to entering the storm sewer systems or Pond A1. Grass Open Areas/Buffers – Grass open areas and/or grass buffers allow for infiltration to occur as well as including a flow path across a vegetated surface slowing the conveyance rate of storm water runoff while also removing sediment and other pollutants. These have been utilized to convey and treat stormwater prior to entering the storm sewer systems or Ponds A1 and C1. Bioswales – Bioswales remove sediment and pollution from stormwater Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 11 U16014-DrainageReport-Final.doc Underground Detention – Underground detention diverts storm water runoff during the water quality event and detains the flows underground. This provides for the removal of sediment and other pollutants from the runoff while also promoting infiltration. Underground detention has been utilized to collect, detain and treat storm water runoff prior to it entering Pond A1. Wet Pond (Pond C1) – A wet pond provides water quality by acting as a permanent sedimentation basin which collects and stores the runoff prior to discharging to the pond outlet structure. This removes sediment from the flows entirely which settle to the bottom of the pond. The existing onsite wet pond is being redeveloped as part of this project and will collect and treat only those areas that drain immediately to the wet pond itself. Extended Detention Basin – Extended detention basins, in conjunction with the use of a water quality plate, collect, store and slowly release minor storm events. This allows runoff to pond, infiltrate into the grass bottom of the pond, and settle out particulates prior to being discharged from the site. An extended detention basin has been selected as a highly effective last treatment option prior to discharging runoff from the site. Low Impact Development (LID) In December of 2015, Fort Collins City Council adopted the revised Low Impact Development (LID) policy and criteria which requires developments within City limits to meet certain enhanced stormwater treatment requirements in addition to more standard treatment techniques. The proposed development will be required to meet the newly adopted LID criteria which requires the following: • Treat no less than 75% of any newly added impervious area using one or a combination of LID techniques. • Treat no less than 50% of any newly added impervious area using one or a combination of LID techniques when at least 25% of any newly added pavement is provided with permeable pavement. The following measures are being implemented with this proposed development: Underground Detention – Basins A3-A11 (with 143,260 sf of proposed impervious area) will be routed through an underground detention system located north of HQ. The underground detention system will have an overall volume of approximately 4,045 cubic feet which exceeds the minimum design requirements for the area. Refer to Appendix B for additional information. Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 12 U16014-DrainageReport-Final.doc Bioswales – Basins B1-B2 (with 27,050 sf of proposed impervious area) will be routed through a bioswale (with a surface area of 3,035 sf). Basin B-2 will include future parking area of approximately 10,000 sf. Once the future parking area is constructed, the bioswale will also require extension to provide LID treatment of the future parking lot expansion. With future construction, the bioswale within Basins B1 and B2 will treat approximately 37,050 sf of impervious area. Wet Pond – Basin C1 (with 5,730 sf of proposed impervious area) will drain directly into the wet pond within the basin. The basin is approximately 1.23 acres in size and contains largely either water or pervious surface area (approximately 90% of the basin); therefore, through communications with the City, the wet pond will be allowed to act as a permanent sedimentation basin which will remove sediment and pollution from storm water runoff prior to releasing it downstream. Note that this is an acceptable LID treatment for this project only due to the small amount of impervious area draining to the pond. Future LID Treatment – At the end of construction, Basin A12 will be left as open space but is planned for future expansion. With the future development of the basin, it is estimated that a minimum of 19,000 sf of future impervious area will require to be treated to maintain a total treatment for the campus of 75%. In total, the development is proposing to collect and treat 205,024 sf (75%) of the overall 274,263 sf of impervious area developed (including both proposed and future developments) with this project. In addition, the site is also being designed with other various open landscaped areas and vegetated swales and buffers to provide additional water quality in addition to the areas being treated with LID techniques. Standard Operating Procedures (SOPs) In order for physical stormwater Best Management Practices (BMPs) to be effective, proper maintenance is essential. Maintenance includes both routinely scheduled activities, as well as non-routine repairs that may be required after large storms, or as a result of other unforeseen problems. Standard Operating Procedures should clearly identify BMP maintenance responsibility. BMP maintenance is typically the responsibility of the entity owning the BMP. Identifying who is responsible for maintenance of BMPs and ensuring that an adequate budget is allocated for maintenance is critical to the long-term success of BMPs. Maintenance responsibility may be assigned either publicly Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 13 U16014-DrainageReport-Final.doc or privately. For this project, the privately owned BMPs including vegetative swales and bioswales, underground detention, and the extended detention ponds are to be maintained by the property owner. Storm Sewers Multiple storm sewer systems are being proposed with the redevelopment of the campus that include storm sewer mains, roof drains and underdrains. All storm sewer on the property will be private. The system that collects and conveys the public storm water from Horsetooth Road will be included within a drainage easement. Due to the complexities of the proposed site and constraints of the existing site, all storm sewer mains and roof drains are sized to accommodate the 100-year storm event. Refer to Appendix C for more information. Wet Pond As previously mentioned, the existing wet pond on the site is also being redeveloped/reconfigured with the project. As part of the reconfiguration, the following design elements are being provided: • A 12-foot depth is being provided in the pond to allow for increased water quality and to allow for the use of a geothermal mechanical system for HQ. Related to these elements, the elevation difference between the finished floor of HQ and the permanent water surface of the pond has been minimized to accommodate a deeper pond while minimizing the impacts to existing groundwater. The existing pond sits approximately 6-feet below the existing building. The design has set the proposed permanent lake water surface 3-feet below the proposed finished floor. • The amount of surface drainage conveyed to the pond is being minimized to limit the amount of storage required above the permanent water surface due to storm runoff. • The pond is being provided with an emergency overflow and outlet. Currently the pond does not have an emergency overflow or any means of draining the lake other than through irrigation. The proposed design has located both an emergency overflow and outlet structure on the east side of the lake. Phasing As mentioned previously, the redevelopment of the campus will be accomplished in phases due to the requirement that the existing Engineering/Operations (E/O) and Headquarters (HQ) buildings remain fully operational during the construction of the proposed HQ building. Only when the proposed HQ is fully operational and in use will the existing E/O and HQ buildings be demolished. Due to this, it is currently expected that two major Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 14 U16014-DrainageReport-Final.doc phases of construction will be required. The initial phase of construction will construct much of the proposed drainage infrastructure apart from the southern portion of Pond A1 as this is where the existing HQ building is located. The final phase of construction will construct the remainder of Pond A1. Through communication with City personnel, it is currently anticipated that the Stormwater Department will issue a full CO for the proposed HQ building with an escrow provision as required. Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 15 U16014-DrainageReport-Final.doc Drainage Summaries The following is a basin summary table for existing and proposed conditions: Existing Basins Basin Design Pt. Area %I Runoff Coefficients Peak Discharge acre C2 C100 Q 2 Q100 cfs cfs EX1 EX1 3.75 48.6% 0.57 0.71 6.10 26.62 EX2 EX2 2.38 32.3% 0.44 0.55 2.07 9.04 EX3 EX3 2.19 80.4% 0.82 1.00 5.10 21.75 EX4 EX4 2.33 18.9% 0.34 0.42 1.68 7.33 EX5 EX5 1.35 12.5% 0.28 0.35 0.81 3.53 OS-1 OS-1 0.31 20.5% 0.35 0.43 0.30 1.32 OS-2A OS-2A 0.33 26.6% 0.39 0.49 0.37 1.61 OS-2B OS-2B 0.93 80.2% 0.81 1.00 2.00 8.62 OS-3 OS-3 2.21 20.1% 0.34 0.43 1.45 6.33 OS-4 OS-4 1.29 73.3% 0.75 0.94 2.75 12.00 OS-5 OS-5 0.54 2.0% 0.20 0.25 0.24 1.05 Totals 22.88 99.21 Proposed Basins Basin Design Pt. Area Area Runoff Coefficients Peak Discharge acre acre C2 C100 Q 2 Q100 cfs cfs A-1 A-1 3.49 16.4% 0.32 0.40 2.16 9.43 A-2 A-2 0.91 0.82 0.83 1.00 2.15 9.10 A-3 A-3 0.37 0.90 0.95 1.00 1.01 3.71 A-4 A-4 0.57 0.87 0.86 1.00 1.39 5.64 A-5 A-5 0.40 0.85 0.84 1.00 0.95 3.96 A-6 A-6 0.41 0.41 0.53 0.67 0.62 2.72 A-7 A-7 0.32 0.53 0.63 0.79 0.54 2.37 A-8 A-8 0.21 0.62 0.71 0.89 0.42 1.84 A-9 A-9 0.64 0.90 0.95 1.00 1.74 6.41 A-10 A-10 0.68 0.87 0.92 1.00 1.78 6.74 A-11 A-11 0.97 0.27 0.41 0.51 1.06 4.63 A-12 A-12 1.15 0.06 0.23 0.29 0.68 2.95 A-12 (Future) A-12 (Future) 1.15 0.90 0.87 1.00 2.86 11.43 A-13 A-13 0.26 0.90 0.95 1.00 0.72 2.63 B-1 B-1 0.42 0.53 0.61 0.76 0.74 3.22 B-2 B-2 1.45 0.43 0.52 0.65 1.90 8.28 C-1 C-1 1.23 0.11 0.28 0.35 0.98 4.27 OS-1 OS-1 0.68 0.02 0.20 0.25 0.33 1.42 OS-2A OS-2A 0.21 0.02 0.20 0.25 0.12 0.51 Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 16 U16014-DrainageReport-Final.doc V. Sediment/Erosion Control Erosion control, both temporary and permanent, is a vital part of any development project. For this project, the site disturbance will be over 1-acre; therefore, a comprehensive Erosion Control Report has been completed under a separate cover. The Erosion Control Report will be utilized for site construction activities and will be prepared in accordance with City and Colorado Department of Public Health and Environment requirements for use as the Stormwater Management Plan for the project. VI. Conclusions A. Compliance with Standards Storm drainage designs for the Platte River Power Authority Headquarters campus have typically followed the guidelines provided by the Fort Collins Stormwater Criteria Manual and/or the Urban Storm Drainage Criteria Manual. In addition, the site drainage has been designed to meet City requirements in terms of detention, water quality and Low Impact Development standards. B. Drainage Concept The drainage system has been designed to convey the runoff to the designated design points and the existing public infrastructure in an effective, safe manner. No negative impacts are anticipated to the City of Fort Collins Master Drainage Plan or to downstream properties or infrastructure due to the proposed improvements. C. Stormwater Quality Several long-term stormwater quality measures have been selected for the site that will provide treatment of stormwater prior it to being discharged from the site. For this site this includes grass swales, grass open areas/buffers, a bioswale, underground detention and an extended detention basin. Drainage Report Platte River Power Authority HQ Campus Fort Collins, CO 17 U16014-DrainageReport-Final.doc VII. References 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, as adopted in 2011. 2. Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, Wright Water Engineers, Inc., Denver, Colorado, Revised April 2008. 3. Larimer County Urban Area Street Standards, Larimer County, Colorado, Repealed and Reenacted, Effective April 1, 2007. 4. Geotechnical Engineering Report – PRPA New Headquarters Campus, Terracon Consultants, Inc., October 30, 2017. 5. Storm Drainage Study for Platte River Power Authority Maintenance Facility, RBD Engineering Consultants, March 1984. 6. Collindale Industrial Park Storm Sewer Extension Construction Plans, Meline & Irelan, Inc., Revised May 1995. 7. Collindale Industrial Park Construction Plans, James H. Stewart & Associates, Revised October 1978. 8. Natural Resources Conservation Service Web Soil Survey at websoilsurvey.nrcs.usda.gov/app APPENDIX A Hydrology Computations Runoff Coefficients and % Impervious Platte River Power Authority Campus, Fort Collins, CO Basin Design Pt. Composite NRCS Soil Total Total Roof (1) Asphalt Concrete (1) Gravel (1) Lawns (1) Imperviousness Type C 2 C100 %I = 90% %I = 100% %I = 90% %I =40% %I=2% (%I) acres sf sf sf sf sf sf EX1 EX1 3.75 163,553 19,370 51,627 8,627 2,670 81,259 48.6% C/D 0.57 0.71 EX2 EX2 2.38 103,485 2,883 22,033 7,506 1,767 69,296 32.3% C/D 0.44 0.55 EX3 EX3 2.19 95,233 17,683 54,408 6,104 1,029 16,009 80.4% C/D 0.82 1.00 EX4 EX4 2.33 101,325 9,012 5,208 4,316 810 81,979 18.9% C/D 0.34 0.42 EX5 EX5 1.35 58,652 16,194 42,458 12.5% C/D 0.28 0.35 OS-1 OS-1 0.31 13,409 928 343 3,331 8,807 20.5% C/D 0.35 0.43 OS-2A OS-2A 0.33 14,302 2,539 1,177 10,586 26.6% C/D 0.39 0.49 OS-2B OS-2B 0.93 40,310 26,568 6,228 7,514 80.2% C/D 0.81 1.00 OS-3 OS-3 2.21 96,274 14,084 4,110 78,080 20.1% C/D 0.34 0.43 OS-4 OS-4 1.29 56,148 38,984 2,061 15,103 73.3% C/D 0.75 0.94 OS-5 OS-5 0.54 23,668 23,668 2.0% C/D 0.20 0.25 17.59 766,361 48,948 216,379 40,472 25,801 434,761 41.2% C/D 0.51 0.64 Notes: (1) Recommended Runoff Coefficient Values from FCSCM Table RO-11. (2) Composite Runoff Coefficient is based on FCSCM equation RO-8 and Coefficient Adjustment factors per Table RO-12. Composite Runoff Coefficients Areas (2) Existing Basins Existing Total Date: 2/7/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Runoff Coefficients and % Impervious Platte River Power Authority Campus, Fort Collins, CO Existing Basins Basin Design Pt. Composite NRCS Soil Total Total Roof (1) Asphalt Concrete (1) Gravel (1) Lawns (1) Imperviousness Type C 2 C100 acres sf %I = 90% %I = 100% %I = 90% %I =40% %I=2% (%I) sf sf sf sf sf A-1 A-1 3.49 151,910 11,029 13,397 906 126,578 16.4% C/D 0.32 0.40 A-2 A-2 0.91 39,824 - 26,691 6,604 - 6,529 82.3% C/D 0.83 1.00 A-3 A-3 0.37 16,242 16,242 - - - - 90.0% C/D 0.95 1.00 A-4 A-4 0.57 24,681 3,199 16,739 1,873 - 2,870 86.5% C/D 0.86 1.00 A-5 A-5 0.40 17,344 - 13,831 905 - 2,608 84.7% C/D 0.84 1.00 A-6 A-6 0.41 17,875 117 - 7,834 - 9,924 41.1% C/D 0.53 0.67 A-7 A-7 0.32 14,010 7,965 - 106 - 5,939 52.7% C/D 0.63 0.79 A-8 A-8 0.21 9,097 3,308 2,881 - 2,908 61.9% C/D 0.71 0.89 A-9 A-9 0.64 28,046 5,826 - 22,200 - 20 89.9% C/D 0.95 1.00 A-10 A-10 0.68 29,504 5,872 - 22,521 - 1,111 86.7% C/D 0.92 1.00 A-11 A-11 0.97 42,186 11,235 - 603 - 30,348 26.7% C/D 0.41 0.51 A-12 A-12 1.15 50,020 - - 2,240 - 47,780 5.9% C/D 0.23 0.29 A-12 (Future) A-12 (Future) 1.15 50,020 - 44,900 - - 5,120 90.0% C/D 0.87 1.00 A-13 A-13 0.26 11,517 11,517 - - - - 90.0% C/D 0.95 1.00 A-TOTAL A-TOTAL 10.38 452,256 76,311 57,261 81,164 906 236,615 45.1% C/D 0.56 0.70 B-1 B-1 0.42 18,486 - 5,907 4,218 - 8,361 53.4% C/D 0.61 0.76 B-2 B-2 1.45 62,995 - 23,640 3,277 - 36,078 43.4% C/D 0.52 0.65 B-TOTAL B-TOTAL 1.87 81,481 - 29,547 7,495 - 44,439 45.6% C/D 0.54 0.68 C-1 C-1 1.23 53,361 - - 5,726 - 47,635 11.4% C/D 0.28 0.35 C-TOTAL C-TOTAL 1.23 53,361 - - 5,726 - 47,635 11.4% C/D 0.28 0.35 OS-1 OS-1 0.68 29,533 29,533 2.0% C/D 0.20 0.25 OS-2A OS-2A 0.21 8,940 8,940 2.0% C/D 0.20 0.25 OS-2B OS-2B 0.93 40,310 26,568 6,228 7,514 80.2% C/D 0.81 1.00 OS-3 OS-3 0.42 18,209 11,803 3,921 2,485 84.5% C/D 0.85 1.00 OS-4 OS-4 1.35 58,603 35,778 6,064 16,761 70.9% C/D 0.74 0.92 OS-5 OS-5 0.54 23,668 23,668 2.0% C/D 0.20 0.25 OS-TOTAL OS-TOTAL 4.12 179,263 - 74,149 16,213 - 88,901 50.5% C/D 0.58 0.72 17.59 766,361 76,311 160,957 110,597 906 417,591 44.1% C/D 0.54 0.68 Notes: (1) Recommended Runoff Coefficient Values from FCSCM Table RO-11. (2) Composite Runoff Coefficient is based on FCSCM equation RO-8 and Coefficient Adjustment factors per Table RO-12. (3) Basin A-1 includes approximately 8,500 sf of future building. Basin B-2 includes approximately 10,000 sf of future parking area. (4) Basin A-12 (Future) is included for storm sewer sizing only and is not included within "A-TOTAL" above. Detention and LID requirements will be required for Basin A-12 with future development. Proposed Total Proposed Basins Areas Composite Runoff Coefficients (2) Date: 2/7/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm 2-Year Time of Concentration Platte River Power Authority Campus, Fort Collins, CO Basin Design Pt. Area C (1) Length Slope t i (2) Length Slope C v Velocity (3) tt (4) Check t c? Total Length t c (5) acres ft % min ft % fps min min Urban? ft min min EX1 EX1 3.75 0.57 35 3.8% 3.8 390 2.3% 20 3.0 2.1 5.9 Yes 425 12 5.9 EX2 EX2 2.38 0.44 275 0.6% 24.2 190 1.0% 7 0.7 4.5 28.7 Yes 465 13 12.6 EX3 EX3 2.19 0.82 20 1.2% 2.2 415 1.0% 20 2.0 3.5 5.7 Yes 435 12 5.7 EX4 EX4 2.33 0.34 50 1.0% 10.1 205 1.1% 7 0.7 4.7 14.7 Yes 255 11 11.4 EX5 EX5 1.35 0.28 105 1.1% 15.2 130 0.1% 7 0.2 9.3 24.5 Yes 235 11 11.3 OS-1 OS-1 0.31 0.35 70 4.4% 7.2 20 4.6% 20 4.3 0.1 7.3 Yes 90 11 7.3 OS-2A OS-2A 0.33 0.39 30 5.9% 4.0 60 1.2% 20 2.2 0.5 4.5 Yes 90 11 5.0 OS-2B OS-2B 0.93 0.81 50 2.0% 3.0 490 0.7% 20 1.6 5.1 8.1 Yes 540 13 8.1 OS-3 OS-3 2.21 0.34 30 10.0% 3.6 610 0.4% 7 0.4 23.0 26.6 Yes 640 14 13.6 OS-4 OS-4 1.29 0.75 60 5.0% 3.0 250 1.1% 20 2.1 2.0 5.0 Yes 310 12 5.0 OS-5 OS-5 0.54 0.20 30 10.0% 4.3 200 0.7% 7 0.6 5.7 10.0 Yes 230 11 10.0 Notes: (1) C=Cx*Cf (2)ti = [1.87(1.1-CxCf)L1/2]/S1/3, S= slope in %, L=length of overland flow (400' max) (3)V=CvS0.5, S=watercourse slope in ft/ft, UDFCD Equation RO-4 (4)tt=L/(V*60 sec/min) (5)tc check (for urban or developed areas only) = total length/180 + 10 (6)min tc = 5 min Existing Basins Initial Overland Flow Time (ti) Travel/Channelized Time of Flow (t t) ti +tt t c Check for Urbanized Basins Final tc (6) Date: 2/7/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm 2-Year Time of Concentration Platte River Power Authority Campus, Fort Collins, CO Existing Basins Basin Design Pt. Area C (1) Length Slope t i (2) Length Slope C v Velocity (3) tt (4) Check t c? Total Length t c (5) acres ft % min ft % fps min min Urban? ft min min A-1 A-1 3.49 0.32 235 1.5% 19.5 465 0.5% 20 1.4 5.5 25.0 Yes 700 14 13.9 A-2 A-2 0.91 0.83 10 2.0% 1.28 305 0.5% 20 1.4 3.6 4.9 Yes 315 12 5.0 A-3 A-3 0.37 0.95 50 12.5% 0.86 15 30.0% 20 11.0 0.0 0.9 Yes 65 10 5.0 A-4 A-4 0.57 0.86 36 2.0% 2.12 242 2.0% 20 2.8 1.4 3.5 Yes 278 12 5.0 A-5 A-5 0.40 0.84 50 2.0% 2.76 133 1.5% 20 2.4 0.9 3.7 Yes 183 11 5.0 A-6 A-6 0.41 0.53 17 2.0% 3.47 123 2.0% 20 2.8 0.7 4.2 Yes 140 11 5.0 A-7 A-7 0.32 0.63 64 1.5% 6.12 210 1.0% 15 1.5 2.3 8.5 Yes 274 12 8.5 A-8 A-8 0.21 0.71 15 2.0% 2.25 50 2.0% 20 2.8 0.3 2.5 Yes 65 10 5.0 A-9 A-9 0.64 0.95 25 12.5% 0.61 210 0.5% 20 1.4 2.5 3.1 Yes 235 11 5.0 A-10 A-10 0.68 0.92 63 4.0% 1.67 200 1.5% 20 2.4 1.4 3.0 Yes 263 11 5.0 A-11 A-11 0.97 0.41 20 7.0% 3.03 190 0.5% 15 1.1 3.0 6.0 Yes 210 11 6.0 A-12 A-12 1.15 0.23 20 7.0% 3.81 205 0.5% 15 1.1 3.2 7.0 Yes 225 11 7.0 A-12 (Future) A-12 (Future) 1.15 0.87 10 2.0% 1.07 205 2.0% 20 2.8 1.2 2.3 Yes 215 11 5.0 A-13 A-13 0.26 0.95 72 12.5% 1.03 15 30.0% 20 11.0 0.0 1.1 Yes 87 10 5.0 A-TOTAL A-TOTAL 10.38 0.56 51 1.5% 6.35 985 0.4% 20 1.3 13.0 19.3 Yes 1036 16 15.8 B-1 B-1 0.42 0.61 70 2.0% 6.09 40 2.0% 20 2.8 0.2 6.3 Yes 110 11 6.3 B-2 B-2 1.45 0.52 50 25.0% 2.65 290 0.5% 15 1.1 4.6 7.2 Yes 340 12 7.2 B-TOTAL B-TOTAL 1.87 0.54 50 25.0% 2.56 290 0.5% 15 1.1 4.6 7.1 Yes 340 12 7.1 C-1 C-1 1.23 0.28 16 2.0% 4.88 75 10.0% 15 4.7 0.3 5.1 Yes 91 11 5.1 C-TOTAL C-TOTAL 1.23 0.28 16 2.0% 4.88 75 10.0% 15 4.7 0.3 5.1 Yes 91 11 5.1 OS-1 OS-1 0.68 0.20 70 4.4% 8.64 20 4.6% 20 4.3 0.1 8.7 Yes 90 11 8.7 OS-2A OS-2A 0.21 0.20 30 5.9% 5.13 60 1.2% 20 2.2 0.5 5.6 Yes 90 11 5.6 OS-2B OS-2B 0.93 0.81 50 2.0% 3.05 490 0.7% 20 1.6 5.1 8.1 Yes 540 13 8.1 OS-3 OS-3 0.42 0.85 140 1.5% 4.88 165 0.7% 20 1.7 1.6 6.5 Yes 305 12 6.5 OS-4 OS-4 1.35 0.74 60 5.0% 3.10 250 1.1% 20 2.1 2.0 5.1 Yes 310 12 5.1 OS-5 OS-5 0.54 0.20 30 10.0% 4.31 200 0.7% 7 0.6 5.7 10.0 Yes 230 11 10.0 Notes: (1) C=Cx*Cf (2)ti = [1.87(1.1-CxCf)L1/2]/S1/3, S= slope in %, L=length of overland flow (400' max) (3)V=CvS0.5, S=watercourse slope in ft/ft, UDFCD Equation RO-4 (4)tt=L/(V*60 sec/min) (5)tc check (for urban or developed areas only) = total length/180 + 10 (6)min tc = 5 min Proposed Basins Initial Overland Flow Time (ti) Travel/Channelized Time of Flow (t t) ti +tt t c Check for Urbanized Basins Final tc (6) Date: 2/7/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm 100-Year Time of Concentration Platte River Power Authority Campus, Fort Collins, CO Basin Design Pt. Area C (1) Length Slope t i (2) Length Slope C v Velocity (3) tt (4) Check t c? Total Length t c (5) acres ft % min ft % fps min min Urban? ft min min EX1 EX1 3.75 0.71 35 3.8% 2.8 390 2.3% 20 3.0 2.1 4.9 Yes 425 12 5.0 EX2 EX2 2.38 0.55 275 0.6% 20.2 190 1.0% 7 0.7 4.5 24.7 Yes 465 13 12.6 EX3 EX3 2.19 1.00 20 1.2% 0.8 415 1.0% 20 2.0 3.5 4.2 Yes 435 12 5.0 EX4 EX4 2.33 0.42 50 1.0% 8.9 205 1.1% 7 0.7 4.7 13.6 Yes 255 11 11.4 EX5 EX5 1.35 0.35 105 1.1% 13.9 130 0.1% 7 0.2 9.3 23.2 Yes 235 11 11.3 OS-1 OS-1 0.31 0.43 70 4.4% 6.4 20 4.6% 20 4.3 0.1 6.5 Yes 90 11 6.5 OS-2A OS-2A 0.33 0.49 30 5.9% 3.5 60 1.2% 20 2.2 0.5 3.9 Yes 90 11 5.0 OS-2B OS-2B 0.93 1.00 50 2.0% 1.1 490 0.7% 20 1.6 5.1 6.1 Yes 540 13 6.1 OS-3 OS-3 2.21 0.43 30 10.0% 3.2 610 0.4% 7 0.4 23.0 26.2 Yes 640 14 13.6 OS-4 OS-4 1.29 0.94 60 5.0% 1.4 250 1.1% 20 2.1 2.0 3.4 Yes 310 12 5.0 OS-5 OS-5 0.54 0.25 30 10.0% 4.1 200 0.7% 7 0.6 5.7 9.8 Yes 230 11 9.8 Notes: (1) C=Cx*Cf (2)ti = [1.87(1.1-CxCf)L1/2]/S1/3, S= slope in %, L=length of overland flow (400' max) (3)V=CvS0.5, S=watercourse slope in ft/ft, UDFCD Equation RO-4 (4)tt=L/(V*60 sec/min) (5)tc check (for urban or developed areas only) = total length/180 + 10 (6)min tc = 5 min Existing Basins ti+t t Final tc (6) Initial Overland Flow Time (t tc Check for Urbanized Basins i) Travel/Channelized Time of Flow (tt ) Date: 2/7/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm 100-Year Time of Concentration Platte River Power Authority Campus, Fort Collins, CO Existing Basins Basin Design Pt. Area C (1) Length Slope t i (2) Length Slope C v Velocity (3) tt (4) Check t c? Total Length t c (5) acres ft % min ft % fps min min Urban? ft min min A-1 A-1 3.49 0.40 235 1.5% 17.5 465 0.5% 20 1.4 5.5 23.0 Yes 700 14 13.9 A-2 A-2 0.91 1.00 10 2.0% 0.47 305 0.5% 20 1.4 3.6 4.1 Yes 315 12 5.0 A-3 A-3 0.37 1.00 50 12.5% 0.57 15 30.0% 20 11.0 0.0 0.6 Yes 65 10 5.0 A-4 A-4 0.57 1.00 36 2.0% 0.89 242 2.0% 20 2.8 1.4 2.3 Yes 278 12 5.0 A-5 A-5 0.40 1.00 50 2.0% 1.05 133 1.5% 20 2.4 0.9 2.0 Yes 183 11 5.0 A-6 A-6 0.41 0.67 17 2.0% 2.66 123 2.0% 20 2.8 0.7 3.4 Yes 140 11 5.0 A-7 A-7 0.32 0.79 64 1.5% 4.06 210 1.0% 15 1.5 2.3 6.4 Yes 274 12 6.4 A-8 A-8 0.21 0.89 15 2.0% 1.22 50 2.0% 20 2.8 0.3 1.5 Yes 65 10 5.0 A-9 A-9 0.64 1.00 25 12.5% 0.41 210 0.5% 20 1.4 2.5 2.9 Yes 235 11 5.0 A-10 A-10 0.68 1.00 63 4.0% 0.94 200 1.5% 20 2.4 1.4 2.3 Yes 263 11 5.0 A-11 A-11 0.97 0.51 20 7.0% 2.58 190 0.5% 15 1.1 3.0 5.6 Yes 210 11 5.6 A-12 A-12 1.15 0.29 20 7.0% 3.56 205 0.5% 15 1.1 3.2 6.8 Yes 225 11 6.8 A-12 (Future) A-12 (Future) 1.15 1.00 10 2.0% 0.47 205 2.0% 20 2.8 1.2 1.7 Yes 215 11 5.0 A-13 A-13 0.26 1.00 72 12.5% 0.69 15 30.0% 20 11.0 0.0 0.7 Yes 87 10 5.0 A-TOTAL A-TOTAL 10.38 0.70 51 1.5% 4.72 985 0.4% 20 1.3 13.0 17.7 Yes 1036 16 15.8 B-1 B-1 0.42 0.76 70 2.0% 4.19 40 2.0% 20 2.8 0.2 4.4 Yes 110 11 5.0 B-2 B-2 1.45 0.65 50 25.0% 2.05 290 0.5% 15 1.1 4.6 6.6 Yes 340 12 6.6 B-TOTAL B-TOTAL 1.87 0.68 50 25.0% 1.94 290 0.5% 20 1.4 3.4 5.4 Yes 340 12 5.4 C-1 C-1 1.23 0.35 16 2.0% 4.46 75 10.0% 15 4.7 0.3 4.7 Yes 91 11 5.0 C-TOTAL C-TOTAL 1.23 0.35 16 2.0% 4.46 75 10.0% 15 4.7 0.3 4.7 Yes 91 11 5.0 OS-1 OS-1 0.68 0.25 70 4.4% 8.16 20 4.6% 20 4.3 0.1 8.2 Yes 90 11 8.2 OS-2A OS-2A 0.21 0.25 30 5.9% 4.85 60 1.2% 20 2.2 0.5 5.3 Yes 90 11 5.3 OS-2B OS-2B 0.93 1.00 50 2.0% 1.05 490 0.7% 20 1.6 5.1 6.1 Yes 540 13 6.1 OS-3 OS-3 0.42 1.00 140 1.5% 1.94 165 0.7% 20 1.7 1.6 3.6 Yes 305 12 5.0 OS-4 OS-4 1.35 0.92 60 5.0% 1.54 250 1.1% 20 2.1 2.0 3.5 Yes 310 12 5.0 OS-5 OS-5 0.54 0.25 30 10.0% 4.07 200 0.7% 7 0.6 5.7 9.8 Yes 230 11 9.8 Notes: (1) C=Cx*Cf (2)ti = [1.87(1.1-CxCf)L1/2]/S1/3, S= slope in %, L=length of overland flow (400' max) (3)V=CvS0.5, S=watercourse slope in ft/ft, UDFCD Equation RO-4 Rational Method Peak Runoff Platte River Power Authority Campus, Fort Collins, CO Basin Design Pt. Area 2-year 100-year acre tc t c C2 C100 I 2 I100 Q2 Q 100 min min in/hr in/hr cfs cfs EX1 EX1 3.75 6 5 0.57 0.71 2.67 9.95 5.71 26.62 EX2 EX2 2.38 13 13 0.44 0.55 1.98 6.92 2.07 9.04 EX3 EX3 2.19 6 5 0.82 1.00 2.67 9.95 4.78 21.75 EX4 EX4 2.33 11 11 0.34 0.42 2.13 7.42 1.68 7.33 EX5 EX5 1.35 11 11 0.28 0.35 2.13 7.42 0.81 3.53 OS-1 OS-1 0.31 7 6 0.35 0.43 2.52 9.95 0.27 1.32 OS-2A OS-2A 0.33 5 5 0.39 0.49 2.85 9.95 0.37 1.61 OS-2B OS-2B 0.93 8 6 0.81 1.00 2.40 9.31 1.80 8.62 OS-3 OS-3 2.21 14 14 0.34 0.43 1.92 6.71 1.45 6.33 OS-4 OS-4 1.29 5 5 0.75 0.94 2.85 9.95 2.75 12.00 OS-5 OS-5 0.54 10 10 0.20 0.25 2.21 7.72 0.24 1.05 21.94 99.21 Existing Basins Totals Runoff Coefficients Rainfall Intensity Peak Discharge Date: 2/7/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Rational Method Peak Runoff Platte River Power Authority Campus, Fort Collins, CO Existing Basins Basin Design Pt. Area 2-year 100-year acre tc t c C2 C100 I 2 I100 Q2 Q 100 min min in/hr in/hr cfs cfs A-1 A-1 3.49 14.0 14.0 0.32 0.40 1.92 6.71 2.16 9.43 A-2 A-2 0.91 5.0 5.0 0.83 1.00 2.85 9.95 2.15 9.10 A-3 A-3 0.37 5.0 5.0 0.95 1.00 2.85 9.95 1.01 3.71 A-4 A-4 0.57 5.0 5.0 0.86 1.00 2.85 9.95 1.39 5.64 A-5 A-5 0.40 5.0 5.0 0.84 1.00 2.85 9.95 0.95 3.96 A-6 A-6 0.41 5.0 5.0 0.53 0.67 2.85 9.95 0.62 2.72 A-7 A-7 0.32 8.0 6.0 0.63 0.79 2.40 9.31 0.49 2.37 A-8 A-8 0.21 5.0 5.0 0.71 0.89 2.85 9.95 0.42 1.84 A-9 A-9 0.64 5.0 5.0 0.95 1.00 2.85 9.95 1.74 6.41 A-10 A-10 0.68 5.0 5.0 0.92 1.00 2.85 9.95 1.78 6.74 A-11 A-11 0.97 6.0 6.0 0.41 0.51 2.67 9.31 1.06 4.63 A-12 A-12 1.15 7.0 7.0 0.23 0.29 2.52 8.80 0.68 2.95 A-12 (Future) A-12 (Future) 1.15 5.0 5.0 0.87 1.00 2.85 9.95 2.86 11.43 A-13 A-13 0.26 5.0 5.0 0.95 1.00 2.85 9.95 0.72 2.63 A-TOTAL A-TOTAL 10.38 16.0 16.0 0.56 0.70 1.81 6.30 10.46 45.52 B-1 B-1 0.42 6.0 5.0 0.61 0.76 2.67 9.95 0.69 3.22 B-2 B-2 1.45 7.0 7.0 0.52 0.65 2.52 8.80 1.90 8.28 B-TOTAL B-TOTAL 1.87 7.0 5.0 0.54 0.68 2.52 9.95 2.55 12.59 C-1 C-1 1.23 5.0 5.0 0.28 0.35 2.85 9.95 0.98 4.27 C-TOTAL C-TOTAL 1.23 5.0 5.0 0.28 0.35 2.85 9.95 0.98 4.27 OS-1 OS-1 0.68 9.0 8.0 0.20 0.25 2.30 8.38 0.31 1.42 OS-2A OS-2A 0.21 6.0 5.0 0.20 0.25 2.67 9.95 0.11 0.51 OS-2B OS-2B 0.93 8.0 6.0 0.81 1.00 2.40 9.31 1.80 8.62 OS-3 OS-3 0.42 7.0 5.0 0.85 1.00 2.52 9.95 0.89 4.16 OS-4 OS-4 1.35 5.0 5.0 0.74 0.92 2.85 9.95 2.82 12.31 OS-5 OS-5 0.54 10.0 10.0 0.20 0.25 2.21 7.72 0.24 1.05 Totals 24.92 105.96 Proposed Basins Runoff Coefficients Rainfall Intensity Peak Discharge Date: 2/7/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm APPENDIX B Detention and Water Quality Calculations Dention Pond Volume (FAA Method) Platte River Power Authority Campus, Fort Collins, CO POND ID: POND A1 100 Year Storm Into Detention Facility Area = 582,987 square feet Area = 13.38 acres C 100 = 0.71 Q 100 = 53.00 cfs Release Rate Out of Pond Q OUT = 3.15 cfs Unit Flow = 0.24 cfs/acre T C = 15.8 minutes Notes: 1. Release Rate limited by the existing 12" outfall capacity in Timberline Road. 2. Pond area includes all of Basins A, B and OS-2 but excludes "Basin A-12 (Future)". Detention Volume Calculations Rainfall Rainfall Inflow Rate Inflow Volume Adjustment Factor Average Outflow Volume Required Duration (T) Intensity (I) Qin= ∑C100*Area*I Vi=(Qin*T*60) Factor Outflow Rate Vo=Qav*T *60 Storage Volume m= 0.5(1 + Tc/T) Qav = m*Qout Vs=Vi-Vo min in/hr cfs ft 3 cfs ft 3 ft 3 5 9.95 94.2 28,257 1.00 3.15 945 27,312 10 7.72 73.1 43,849 1.00 3.15 1,890 41,959 15 6.52 61.7 55,549 1.00 3.15 2,835 52,714 20 5.60 53.0 63,615 0.89 2.82 3,379 60,236 25 4.98 47.1 70,715 0.82 2.57 3,851 66,863 30 4.52 42.8 77,019 0.76 2.40 4,324 72,695 35 4.08 38.6 81,109 0.73 2.28 4,796 76,312 40 3.74 35.4 84,971 0.70 2.20 5,269 79,702 45 3.46 32.8 88,436 0.68 2.13 5,741 82,694 50 3.23 30.6 91,730 0.66 2.07 6,214 85,516 55 3.03 28.7 94,655 0.64 2.03 6,686 87,969 60 2.86 27.1 97,467 0.63 1.99 7,159 90,308 70 2.59 24.5 102,976 0.61 1.93 8,104 94,872 80 2.38 22.5 108,145 0.60 1.89 9,049 99,096 90 2.21 20.9 112,973 0.59 1.85 9,994 102,979 100 2.06 19.5 117,006 0.58 1.82 10,939 106,067 110 1.94 18.4 121,209 0.57 1.80 11,884 109,325 120 1.84 17.4 125,412 0.57 1.78 12,829 112,583 Required Detention Volume V 100 = 112,583 cubic feet V 100 = 2.58 acre-ft Date: 2/1/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Dention Pond Volume (FAA Method) Platte River Power Authority Campus, Fort Collins, CO POND ID: POND C1 100 Year Storm Into Detention Facility Area = 53,361 square feet Area = 1.23 acres C 100 = 1.00 Q 100 = 4.27 cfs Release Rate Out of Pond Q OUT = 0.50 cfs Unit Flow = 0.41 cfs/acre T C = 5.0 minutes Notes: 1. Release Rate limited to maximize detention volume but keep maximum ponding to less than 6". 2. For Pond C Calculations, C100 has been assumed to be 1.00 assuming that the pond water surface is at the maximum elevation and all water that falls on the wet pond will pass through the outlet . Detention Volume Calculations Rainfall Rainfall Inflow Rate Inflow Volume Adjustment Factor Average Outflow Volume Required Duration (T) Intensity (I) Qin= ∑C100*Area*I Vi=(Qin*T*60) Factor Outflow Rate Vo=Qav*T *60 Storage Volume m= 0.5(1 + Tc/T) Qav = m*Qout Vs=Vi-Vo min in/hr cfs ft 3 cfs ft 3 ft 3 5 9.95 12.2 3,657 1.00 0.50 150 3,507 10 7.72 9.5 5,674 0.75 0.38 225 5,449 15 6.52 8.0 7,188 0.67 0.33 300 6,888 20 5.60 6.9 8,232 0.63 0.31 375 7,857 25 4.98 6.1 9,151 0.60 0.30 450 8,701 30 4.52 5.5 9,967 0.58 0.29 525 9,442 35 4.08 5.0 10,496 0.57 0.29 600 9,896 40 3.74 4.6 10,996 0.56 0.28 675 10,321 45 3.46 4.2 11,444 0.56 0.28 750 10,694 50 3.23 4.0 11,870 0.55 0.28 825 11,045 55 3.03 3.7 12,249 0.55 0.27 900 11,349 60 2.86 3.5 12,613 0.54 0.27 975 11,638 70 2.59 3.2 13,326 0.54 0.27 1,125 12,201 80 2.38 2.9 13,994 0.53 0.27 1,275 12,719 90 2.21 2.7 14,619 0.53 0.26 1,425 13,194 100 2.06 2.5 15,141 0.53 0.26 1,575 13,566 110 1.94 2.4 15,685 0.52 0.26 1,725 13,960 120 1.84 2.3 16,229 0.52 0.26 1,875 14,354 Required Detention Volume V 100 = 14,354 cubic feet V 100 = 0.33 acre-ft Date: 2/1/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm STAGE STORAGE TABLE - POND A1 NORTH ELEV AREA (sq. ft.) DEPTH (ft) AVG END INC. VOL. (cu. ft.) AVG END TOTAL VOL. (cu. ft.) CONIC INC. VOL. (cu. ft.) CONIC TOTAL VOL. (cu. ft.) 4,948.200 137.56 N/A N/A 0.00 N/A 0.00 4,948.400 1,094.72 0.200 123.23 123.23 108.02 108.02 4,948.600 3,133.91 0.200 422.86 546.09 405.39 513.41 4,948.800 6,000.79 0.200 913.47 1459.56 898.09 1411.50 4,949.000 9,570.39 0.200 1557.12 3016.68 1543.30 2954.79 4,949.200 13,193.81 0.200 2276.42 5293.10 2266.75 5221.54 4,949.400 16,829.99 0.200 3002.38 8295.48 2995.01 8216.55 4,949.600 20,811.40 0.200 3764.14 12059.62 3757.10 11973.65 4,949.800 24,256.08 0.200 4506.75 16566.36 4502.35 16476.00 4,950.000 27,457.60 0.200 5171.37 21737.73 5168.06 21644.07 4,950.200 30,539.89 0.200 5799.75 27537.48 5797.02 27441.08 4,950.400 33,087.44 0.200 6362.73 33900.21 6361.03 33802.12 4,950.600 34,901.34 0.200 6798.88 40699.09 6798.07 40600.19 4,950.800 36,320.29 0.200 7122.16 47821.26 7121.69 47721.88 4,951.000 37,391.61 0.200 7371.19 55192.45 7370.93 55092.81 4,951.200 38,356.39 0.200 7574.80 62767.25 7574.59 62667.41 4,951.400 39,341.32 0.200 7769.77 70537.02 7769.56 70436.97 4,951.600 40,353.45 0.200 7969.48 78506.49 7969.26 78406.23 4,951.800 41,397.19 0.200 8175.06 86681.56 8174.84 86581.07 4,952.000 42,572.75 0.200 8396.99 95078.55 8396.72 94977.79 4,952.200 43,891.77 0.200 8646.45 103725.00 8646.12 103623.91 4,952.400 45,220.87 0.200 8911.26 112636.27 8910.93 112534.84 STAGE STORAGE TABLE - POND A1 SOUTH ELEV AREA (sq. ft.) DEPTH (ft) AVG END INC. VOL. (cu. ft.) AVG END TOTAL VOL. (cu. ft.) CONIC INC. VOL. (cu. ft.) CONIC TOTAL VOL. (cu. ft.) 4,949.000 1.34 N/A N/A 0.00 N/A 0.00 4,949.200 237.76 0.200 23.91 23.91 17.13 17.13 Water Quality Platte River Power Authority Campus, Fort Collins, CO Required Onsite Water Quality Capture Volume Basin Area Area Imperviousness Watershed WQCV* (Extended Detention) (sf) (acres) (%) (inches) (cf) A-TOTAL 452,256 10.382 45% 0.19 8,741 B-TOTAL 81,481 1.871 46% 0.19 1,586 C-TOTAL 53,361 1.225 11% 0.08 400 OS-2 TOTAL 49,250 1.131 66% 0.26 1,271 TOTAL REQUIRED 636,348 14.609 44% 0.19 12,109 Less WQ Provided by Underground Detention 4,045 Less WQ Provided in Wet Pond 400 Total WQ Provided in Pond A 7,664 * based on 40 hr storage and additional 20% for extended detention Designed Water Quality Plate Parameters Basin WQCV WQCV Area Required Diamter of Space No. of No. of Provided Depth per WQ Plate Row WQ Hole between rows (in.) Columns Rows (cf) (ft) (in 2 ) (in) (in) Pond A1 10,409 1.50 0.922 12/16 4 2 5 Date: 2/1/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Water Quality - Low Impact Development Platte River Power Authority Campus, Fort Collins, CO Required Onsite Water Quality Capture Volume For Underground Detention Basin Area Area Imperviousness Watershed WQCV* (Extended Detention) (sf) (acres) (%) (inches) (cf) Basin A South - Underground Detention LID A-3 16,242 0.37 90% 0.321 435 A-4 24,681 0.57 87% 0.299 615 A-5 17,344 0.40 85% 0.288 417 A-12 50,020 1.15 6% 0.034 141 0.000 0 108,287 2.49 47% 0.158 1,427 Basin A North - Underground Detention LID A-6 17,875 0.41 41% 0.146 218 A-7 14,010 0.32 53% 0.171 200 A-8 9,097 0.21 62% 0.194 147 A-9 28,046 0.64 90% 0.321 750 A-10 29,504 0.68 87% 0.300 737 A-11 42,186 0.97 27% 0.113 396 140,718 3.23 59% 0.185 2,172 Total To Underground Detention 3,599 * Based on 12 hr storage forunderground detention ** Basin A-12 Future will be required to provide LID treatment at time of future development. Date: 2/1/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Dention Pond Volume (FAA Method) Platte River Power Authority Campus, Fort Collins, CO POND ID: Basin A South - Underground Detention LID WQ Basin Characateristics Area = 108,287 square feet Area = 2.49 acres C 2 = 0.51 Q in = 2.01 cfs WQ Release Rate Determined from Number of Chambers and Chamber Release Rate Q OUT = 0.52 cfs Unit Flow = 0.21 cfs/acre T C = 15.8 minutes Notes: 1. Release rate out of pond based on number of chambers multiplied by release rate per chamber. 2. Rainfall intensities approximated as one-half the 2-yr peak runoff rate. 3. C2 utilized for water quality event detention calculation. Detention Volume Calculations Rainfall Rainfall Inflow Rate Inflow Volume Adjustment Factor Average Outflow Volume Required Duration (T) Intensity (I) Qin= ∑C100*Area*I Vi=(Qin*T*60) Factor Outflow Rate Vo=Qav*T *60 Storage Volume m= 0.5(1 + Tc/T) Qav = m*Qout Vs=Vi-Vo min in/hr cfs ft 3 cfs ft 3 ft 3 5 1.425 1.8 542 1.00 0.52 156 386 10 1.105 1.4 841 1.00 0.52 311 529 15 0.935 1.2 1,067 1.00 0.52 467 600 20 0.805 1.0 1,225 0.89 0.46 557 668 25 0.715 0.9 1,360 0.82 0.42 634 725 30 0.650 0.8 1,483 0.76 0.40 712 771 35 0.585 0.7 1,558 0.73 0.38 790 767 40 0.535 0.7 1,628 0.70 0.36 868 760 45 0.495 0.6 1,694 0.68 0.35 946 749 50 0.460 0.6 1,750 0.66 0.34 1,024 726 55 0.435 0.6 1,820 0.64 0.33 1,101 719 60 0.410 0.5 1,871 0.63 0.33 1,179 692 65 0.385 0.5 1,904 0.62 0.32 1,257 647 70 0.365 0.5 1,944 0.61 0.32 1,335 609 75 0.345 0.4 1,968 0.61 0.31 1,413 556 80 0.330 0.4 2,008 0.60 0.31 1,491 518 85 0.315 0.4 2,037 0.59 0.31 1,568 468 90 0.305 0.4 2,088 0.59 0.30 1,646 442 95 0.290 0.4 2,096 0.58 0.30 1,724 372 100 0.280 0.4 2,130 0.58 0.30 1,802 328 105 0.270 0.3 2,157 0.58 0.30 1,880 277 110 0.260 0.3 2,176 0.57 0.30 1,958 218 115 0.255 0.3 2,231 0.57 0.29 2,035 195 120 0.245 0.3 2,236 0.57 0.29 2,113 123 Required Detention Volume V 100 = 771 cubic feet V 100 = 0.02 acre-ft Date: 2/1/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Dention Pond Volume (FAA Method) Platte River Power Authority Campus, Fort Collins, CO POND ID: Basin A North - Underground Detention LID WQ Basin Characateristics Area = 140,718 square feet Area = 3.23 acres C 2 = 0.68 Q in = 3.06 cfs WQ Release Rate Determined from Number of Chambers and Chamber Release Rate Q OUT = 0.71 cfs Unit Flow = 0.22 cfs/acre T C = 15.8 minutes Notes: 1. Release rate out of pond based on number of chambers multiplied by release rate per chamber. 2. Rainfall intensities approximated as one-half the 2-yr peak runoff rate. 3. C2 utilized for water quality event detention calculation. Detention Volume Calculations Rainfall Rainfall Inflow Rate Inflow Volume Adjustment Factor Average Outflow Volume Required Duration (T) Intensity (I) Qin= ∑C100*Area*I Vi=(Qin*T*60) Factor Outflow Rate Vo=Qav*T *60 Storage Volume m= 0.5(1 + Tc/T) Qav = m*Qout Vs=Vi-Vo min in/hr cfs ft 3 cfs ft 3 ft 3 5 1.425 3.1 942 1.00 0.71 212 730 10 1.105 2.4 1,461 1.00 0.71 425 1,037 15 0.935 2.1 1,854 1.00 0.71 637 1,218 20 0.805 1.8 2,129 0.89 0.63 759 1,370 25 0.715 1.6 2,364 0.82 0.58 865 1,498 30 0.650 1.4 2,578 0.76 0.54 971 1,607 35 0.585 1.3 2,707 0.73 0.51 1,077 1,630 40 0.535 1.2 2,830 0.70 0.49 1,184 1,646 45 0.495 1.1 2,945 0.68 0.48 1,290 1,656 50 0.460 1.0 3,041 0.66 0.47 1,396 1,645 55 0.435 1.0 3,163 0.64 0.46 1,502 1,662 60 0.410 0.9 3,253 0.63 0.45 1,608 1,645 65 0.385 0.8 3,309 0.62 0.44 1,714 1,595 70 0.365 0.8 3,378 0.61 0.43 1,820 1,558 75 0.345 0.8 3,421 0.61 0.43 1,926 1,495 80 0.330 0.7 3,491 0.60 0.42 2,033 1,458 85 0.315 0.7 3,540 0.59 0.42 2,139 1,402 90 0.305 0.7 3,630 0.59 0.42 2,245 1,385 95 0.290 0.6 3,643 0.58 0.41 2,351 1,292 100 0.280 0.6 3,702 0.58 0.41 2,457 1,245 105 0.270 0.6 3,749 0.58 0.41 2,563 1,185 110 0.260 0.6 3,782 0.57 0.40 2,669 1,112 115 0.255 0.6 3,877 0.57 0.40 2,776 1,102 120 0.245 0.5 3,887 0.57 0.40 2,882 1,006 Required Detention Volume V 100 = 1,662 cubic feet V 100 = 0.04 acre-ft Date: 2/1/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Underground Detention Platte River Power Authority Campus, Fort Collins, CO Required Underground Detention/WQ Volume Chamber Total Required Detention/ Chamber Chamber Unit Chamber *Installed Min. Min. Min. Req'd Design No. of Provided Provided Total ID Detention/WQ WQ Type Release Rate c Unit Chamber Unit No. of WQ Isolator Row Control i Chambers WQ Isolator Installed Volume a Inflow b Volume d Volume inc. Chambers f Release Volume by Provided Release Row System Aggregate e Rate g FAA Method h Rate j Volume k Volume l (cf) (cfs) (cfs) (cf) (cf) (sf) (cfs) (cf) (cfs) (cf) (cf) Basin A South 1427 2.01 SC-740 0.024 45.90 74.90 20.00 0.47 771 WQCV 22 0.52 1,010 1,648 Basin A North 2172 3.06 SC-740 0.024 45.90 74.90 29.00 0.68 1,662 WQCV 30 0.71 1,377 2,247 TOTAL 3599 5.07 SC-740 0.024 45.90 74.90 49.00 1.16 2,433 WQCV 54 1.23 2,479 4,045 *Volume assumes minimum aggregate depth below chamber. a. Total required WQCV calculated per 12-hr drain time. b. WQ inflow is approximated as one-half the 2-yr peak runoff rate. c. Release rate per chamber, limited by flow through geotextile with accumulated sediment. d. Volume within chamber only, not accounting for void spaces in surrounding aggregate. The Isolator Row(s) are sized per this unit volume. e. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit. The total system WQCV is sized per this unit volume. f. Number of chambers required to provide full WQCV within total installed system, including aggregate. g. Release rate per chamber times number of chambers. This is used at the 'outlet control' for the FAA calculations. h. Minimum 'chamber-only' volume to ensure dirty water is fully contained within Isolator Row. i. Determines whether the design is controlled by the Isolator Row volume or WQCV. j. Release rate per chamber times number of chambers provided. This is the approximate controlled discharge from the WQ event. k. Volume provided in chambers only (no aggregate storage). This number must meet or exceed the required FAA storage volume. l. System volume includes total number of chambers, plus surrounding aggregate. This number must meet or exceed the required 12-hr WQCV. Date: 2/1/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Low Impact Development Summary Platte River Power Authority Campus, Fort Collins, CO Basin Proposed Impervious Area LID Treatment Area Treated % of Site Treated (sf) (acres) (sf) (%) A-1 24,426 None (1) - 0% A-2 33,295 None - 0% A-3 16,242 Underground Detention 16,242 6% A-4 21,811 Underground Detention 21,811 8% A-5 14,736 Underground Detention 14,736 5% A-6 7,951 Underground Detention 7,951 3% A-7 8,071 Underground Detention 8,071 3% A-8 6,189 Underground Detention 6,189 2% A-9 28,026 Underground Detention 28,026 10% A-10 28,393 Underground Detention 28,393 10% A-11 11,838 Underground Detention 11,838 4% A-12 (Future) 19,000 Future LID Treatment (2) 19,000 7% A-13 11,517 None - 0% B-1 10,125 Bioswale 10,125 4% B-2 26,917 Bioswale (3) 26,917 10% C-1 5,726 Wet Pond 5,726 2% Total Site 274,263 205,024 75% (1) Basin A-1 includes approximately 8,500 sf of future building area not being treated (2) Minimum required future LID treatment for basin A-12 (3) Basin B-2 includes 10,000 sf of future treated area by the future extension of the proposed bioswale Low Impact Development (LID) Treated Areas Calculations by: KRB Date: 2/1/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Orifice Calculations - Pond A1 Platte River Power Authority Campus, Fort Collins, CO Detention Volume and Depth Volume Provided, ft 3 = 126,042 Water Quality Volume, ft 3 = 10,409 Total Volume Provided, ft 3 = 136,451 W.S. Elevation, ft = 4952.25 Invert Elevation, ft = 4948.00 100-year Depth D, ft = 4.25 Top of Pond Elevation, ft = 4953.25 FFE of adjacent building = 4958.00 Pond Freeboard = 1.00 Orifice Opening Orifice Flow Rate, Q (cfs) = CoAo(2gHo)0.5 Co = 0.65 Q = Qout of pond, cfs = 3.15 gravitational acceleration g, ft/sec 2 = 32.2 diam, ft = 0.622 Effective head on orifice Ho = D-1/2diam, ft = 3.94 Area of orifice Ao, ft 2 = 0.30 Area of orifice Ao, in 2 = 43.82 diam, in = 7.47 7 1/2 Date: 2/1/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Orifice Calculations - Pond C1 Platte River Power Authority Campus, Fort Collins, CO Detention Volume and Depth Volume Provided, ft 3 = 14,406 Water Quality Volume, ft 3 = 400 Total Volume Provided, ft 3 = 14,406 W.S. Elevation, ft = 4955.50 Invert Elevation, ft = 4950.58 100-year Depth D, ft = 4.92 Top of Pond Elevation, ft = 4956.50 FFE of adjacent building = 4958.00 Pond Freeboard = 1.00 Orifice Opening Orifice Flow Rate, Q (cfs) = CoAo(2gHo)0.5 Co = 0.65 Q = Qout of pond, cfs = 0.50 gravitational acceleration g, ft/sec 2 = 32.2 diam, ft = 0.236 Effective head on orifice Ho = D-1/2diam, ft = 4.80 Area of orifice Ao, ft 2 = 0.04 Area of orifice Ao, in 2 = 6.30 diam, in = 2.83 2 13/16 Date: 2/1/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Orifice Calculations - Underground Detention (Structure DB1) Platte River Power Authority Campus, Fort Collins, CO Detention Volume and Depth Volume Provided, ft 3 = 4,045 Water Quality Volume, ft 3 = 4,045 Total Volume Provided, ft 3 = 4,045 W.S. Elevation, ft = 4952.72 Invert Elevation, ft = 4950.03 100-year Depth D, ft = 2.69 Spill Elevation, ft = 4952.72 FFE of adjacent building = 4958.00 Pond Freeboard = N/A Orifice Opening Orifice Flow Rate, Q (cfs) = CoAo(2gHo)0.5 Co = 0.65 Q = Qout of pond, cfs = 1.23 gravitational acceleration g, ft/sec 2 = 32.2 diam, ft = 0.437 Effective head on orifice Ho = D-1/2diam, ft = 2.47 Area of orifice Ao, ft 2 = 0.15 Area of orifice Ao, in 2 = 21.60 diam, in = 5.24 5 1/4 Date: 2/1/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Platte River Power Authority HQ Fort Collins, CO Inlet Capacity ______________________________________________________________________________________________________ INLET ID: Outlet 1-1 (Pond A1) Governing Equations: Inlet capacity equation at low flows (weir calculation): Where: P = 2(L + W) H = depth of water above the flowline Inlet capacity equation at higher flows (orifice calculation): Where: A = open area of the inlet grate H = depth of water above the centroid of the cross-sectional area (A) Input Parameters: Grate: Custom Wier Perimeter: 15.00 Open Area of Grate (ft2): 4.99 Grate Elevation (ft): 4950.00 Q100 = 3.15 cfs Allowable Capacity: 50% Depth vs. Flow: Depth Elevation Shallow Orifice Actual Above Inlet Weir Flow Flow Flow (ft) (ft) (cfs) (cfs) (cfs) 0.00 4950.00 0.00 0.00 0.00 0.05 4950.05 0.25 3.00 0.25 0.10 4950.10 0.71 4.24 0.71 0.15 4950.15 1.31 5.19 1.31 0.20 4950.20 2.01 6.00 2.01 0.25 4950.25 2.81 6.70 2.81 0.27 4950.27 3.15 6.96 3.15 <---- 100-Year Flow 0.35 4950.35 4.66 7.93 4.66 0.40 4950.40 5.69 8.48 5.69 0.45 4950.45 6.79 8.99 6.79 0.50 4950.50 7.95 9.48 7.95 0.55 4950.55 9.18 9.94 9.18 0.60 4950.60 10.46 10.39 10.39 0.65 4950.65 11.79 10.81 10.81 0.70 4950.70 13.18 11.22 11.22 0.75 4950.75 14.61 11.61 11.61 0.80 4950.80 16.10 11.99 11.99 0.85 4950.85 17.63 12.36 12.36 0.90 4950.90 19.21 12.72 12.72 0.95 4950.95 20.83 13.07 13.07 1.00 4951.00 22.50 13.41 13.41 Q = 3 . 0 P H 1 . 5 Q = 0 .67A ( 2 gH ) 0 . 5 Calculations by: NKS Date: 2/9/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Platte River Power Authority HQ Fort Collins, CO Inlet Capacity ______________________________________________________________________________________________________ INLET ID: Outlet 5-1 (W) (Pond C1) Governing Equations: Inlet capacity equation at low flows (weir calculation): Where: P = 2(L + W) H = depth of water above the flowline Inlet capacity equation at higher flows (orifice calculation): Where: A = open area of the inlet grate H = depth of water above the centroid of the cross-sectional area (A) Input Parameters: Grate: Type C Wier Perimeter: 12.29 Open Area of Grate (ft2): 4.09 Grate Elevation (ft): 4955.00 Q100 = 0.50 cfs Allowable Capacity: 50% Depth vs. Flow: Depth Elevation Shallow Orifice Actual Above Inlet Weir Flow Flow Flow (ft) (ft) (cfs) (cfs) (cfs) 0.00 4955.00 0.00 0.00 0.00 0.05 4955.05 0.21 2.46 0.21 0.09 4955.09 0.50 3.30 0.50 <---- 100-Year Flow 0.15 4955.15 1.07 4.26 1.07 0.22 4955.22 1.93 5.18 1.93 0.25 4955.25 2.30 5.50 2.30 0.30 4955.30 3.03 6.02 3.03 0.35 4955.35 3.82 6.50 3.82 0.40 4955.40 4.66 6.95 4.66 0.45 4955.45 5.56 7.37 5.56 0.50 4955.50 6.52 7.77 6.52 0.55 4955.55 7.52 8.15 7.52 0.60 4955.60 8.57 8.51 8.51 0.65 4955.65 9.66 8.86 8.86 0.70 4955.70 10.80 9.20 9.20 0.75 4955.75 11.97 9.52 9.52 0.80 4955.80 13.19 9.83 9.83 0.85 4955.85 14.45 10.13 10.13 0.90 4955.90 15.74 10.43 10.43 0.95 4955.95 17.07 10.71 10.71 1.00 4956.00 18.44 10.99 10.99 Q = 3 . 0 P H 1 . 5 Q = 0 .67A ( 2 gH ) 0 . 5 Calculations by: NKS Date: 2/9/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Feb 1 2018 Pond A1 - Emergency Overflow Weir Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 40.00 Total Depth (ft) = 1.00 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 62.13 Highlighted Depth (ft) = 0.62 Q (cfs) = 62.13 Area (sqft) = 26.34 Velocity (ft/s) = 2.36 Top Width (ft) = 44.96 0 5 10 15 20 25 30 35 40 45 50 55 60 Depth (ft) Pond A1 - Emergency Overflow Weir Depth (ft) -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 1.50 1.50 2.00 2.00 Weir W.S. Length (ft) Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Feb 1 2018 Pond C1 - Emergency Overflow Weir Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 10.00 Total Depth (ft) = 1.00 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 4.27 Highlighted Depth (ft) = 0.26 Q (cfs) = 4.270 Area (sqft) = 2.87 Velocity (ft/s) = 1.49 Top Width (ft) = 12.08 0 2 4 6 8 10 12 14 16 18 20 22 Depth (ft) Pond C1 - Emergency Overflow Weir Depth (ft) -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 1.50 1.50 2.00 2.00 Weir W.S. Length (ft) APPENDIX C Hydraulic Calculations Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Jan 18 2018 Storm Line 4 Invert Elev Dn (ft) = 4948.87 Pipe Length (ft) = 50.00 Slope (%) = 0.26 Invert Elev Up (ft) = 4949.00 Rise (in) = 24.0 Shape = Circular Span (in) = 24.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Culvert Culvert Entrance = Smooth tapered inlet throat Coeff. K,M,c,Y,k = 0.534, 0.555, 0.0196, 0.9, 0.2 Embankment Top Elevation (ft) = 4952.92 Top Width (ft) = 20.00 Crest Width (ft) = 100.00 Calculations Qmin (cfs) = 23.76 Qmax (cfs) = 23.76 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 23.76 Qpipe (cfs) = 23.76 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 7.79 Veloc Up (ft/s) = 7.56 HGL Dn (ft) = 4950.73 HGL Up (ft) = 4951.23 Hw Elev (ft) = 4951.92 Hw/D (ft) = 1.46 Flow Regime = Inlet Control Platte River Power Authority HQ Fort Collins, CO Inlet Capacity ______________________________________________________________________________________________________ INLET ID: 3-3.1 (Basin A-7) Governing Equations: Inlet capacity equation at low flows (weir calculation): Where: P = 2(L + W) H = depth of water above the flowline Inlet capacity equation at higher flows (orifice calculation): Where: A = open area of the inlet grate H = depth of water above the centroid of the cross-sectional area (A) Input Parameters: Grate: 15" Nyloplast w/ Domed Grate Wier Perimeter: 8.45 Open Area of Grate (ft2): 0.85 Q2 = 0.24 cfs Flowline Elevation (ft): 4954.61 Q100 = 1.17 cfs Allowable Capacity: 50% Depth vs. Flow: Depth Elevation Shallow Orifice Actual Above Inlet Weir Flow Flow Flow (ft) (ft) (cfs) (cfs) (cfs) 0.00 4954.61 0.00 0.00 0.00 0.05 4954.66 0.14 0.51 0.14 0.07 4954.68 0.24 0.61 0.24 <---- 2-Year Flow 0.15 4954.76 0.74 0.88 0.74 0.20 4954.81 1.13 1.02 1.02 0.26 4954.87 1.70 1.17 1.17 <---- 100-Year Flow 0.30 4954.91 2.08 1.25 1.25 0.35 4954.96 2.62 1.35 1.35 0.40 4955.01 3.21 1.44 1.44 0.46 4955.07 3.95 1.55 1.55 0.50 4955.11 4.48 1.62 1.62 0.55 4955.16 5.17 1.69 1.69 0.59 4955.20 5.74 1.75 1.75 <---- Spill Elevation 0.65 4955.26 6.64 1.84 1.84 0.70 4955.31 7.42 1.91 1.91 0.75 4955.36 8.23 1.98 1.98 0.80 4955.41 9.07 2.04 2.04 0.85 4955.46 9.93 2.11 2.11 0.90 4955.51 10.82 2.17 2.17 0.95 4955.56 11.74 2.23 2.23 1.00 4955.61 12.68 2.28 2.28 Q = 3 . 0 P H 1 . 5 Q = 0 .67A ( 2 gH ) 0 . 5 Calculations by: NKS Date: 2/9/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Platte River Power Authority HQ Fort Collins, CO Inlet Capacity ______________________________________________________________________________________________________ INLET ID: 3-3.2 (Basin A-7) Governing Equations: Inlet capacity equation at low flows (weir calculation): Where: P = 2(L + W) H = depth of water above the flowline Inlet capacity equation at higher flows (orifice calculation): Where: A = open area of the inlet grate H = depth of water above the centroid of the cross-sectional area (A) Input Parameters: Grate: 15" Nyloplast w/ Domed Grate Wier Perimeter: 8.45 Open Area of Grate (ft2): 0.85 Q2 = 0.25 cfs Flowline Elevation (ft): 4954.75 Q100 = 1.20 cfs Allowable Capacity: 50% Depth vs. Flow: Depth Elevation Shallow Orifice Actual Above Inlet Weir Flow Flow Flow (ft) (ft) (cfs) (cfs) (cfs) 0.00 4954.75 0.00 0.00 0.00 0.05 4954.80 0.14 0.51 0.14 0.07 4954.82 0.25 0.62 0.25 <---- 2-Year Flow 0.15 4954.90 0.74 0.88 0.74 0.20 4954.95 1.13 1.02 1.02 0.28 4955.03 1.83 1.20 1.20 <---- 100-Year Flow 0.30 4955.05 2.08 1.25 1.25 0.35 4955.10 2.62 1.35 1.35 <---- Spill Elevation 0.40 4955.15 3.21 1.44 1.44 0.45 4955.20 3.83 1.53 1.53 0.50 4955.25 4.48 1.62 1.62 0.55 4955.30 5.17 1.69 1.69 0.60 4955.35 5.89 1.77 1.77 0.65 4955.40 6.64 1.84 1.84 0.70 4955.45 7.42 1.91 1.91 0.75 4955.50 8.23 1.98 1.98 0.80 4955.55 9.07 2.04 2.04 0.85 4955.60 9.93 2.11 2.11 0.90 4955.65 10.82 2.17 2.17 0.95 4955.70 11.74 2.23 2.23 1.00 4955.75 12.68 2.28 2.28 Q = 3 . 0 P H 1 . 5 Q = 0 .67A ( 2 gH ) 0 . 5 Calculations by: NKS Date: 2/9/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Platte River Power Authority HQ Fort Collins, CO Inlet Capacity ______________________________________________________________________________________________________ INLET ID: 3-6 (N) (Basin A-9) Governing Equations: Inlet capacity equation at low flows (weir calculation): Where: P = 2(L + W) H = depth of water above the flowline Inlet capacity equation at higher flows (orifice calculation): Where: A = open area of the inlet grate H = depth of water above the centroid of the cross-sectional area (A) Input Parameters: Grate: Type C Wier Perimeter: 12.29 Open Area of Grate (ft2): 4.09 Q2 = 1.74 cfs Flowline Elevation (ft): 4955.14 Q100 = 6.41 cfs Allowable Capacity: 50% Depth vs. Flow: Depth Elevation Shallow Orifice Actual Above Inlet Weir Flow Flow Flow (ft) (ft) (cfs) (cfs) (cfs) 0.00 4955.14 0.00 0.00 0.00 0.05 4955.19 0.21 2.46 0.21 0.10 4955.24 0.58 3.48 0.58 0.15 4955.29 1.07 4.26 1.07 0.21 4955.35 1.74 5.00 1.74 <---- 2-Year Flow 0.25 4955.39 2.30 5.50 2.30 0.30 4955.44 3.03 6.02 3.03 0.35 4955.49 3.82 6.50 3.82 0.40 4955.54 4.66 6.95 4.66 0.45 4955.59 5.56 7.37 5.56 0.49 4955.63 6.41 7.73 6.41 <---- 100-Year Flow 0.55 4955.69 7.52 8.15 7.52 0.60 4955.74 8.57 8.51 8.51 0.65 4955.79 9.66 8.86 8.86 0.70 4955.84 10.80 9.20 9.20 0.75 4955.89 11.97 9.52 9.52 0.80 4955.94 13.19 9.83 9.83 0.85 4955.99 14.45 10.13 10.13 0.90 4956.04 15.74 10.43 10.43 0.95 4956.09 17.07 10.71 10.71 1.00 4956.14 18.44 10.99 10.99 Q = 3 . 0 P H 1 . 5 Q = 0 .67A ( 2 gH ) 0 . 5 Calculations by: NKS Date: 2/9/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Platte River Power Authority HQ Fort Collins, CO Inlet Capacity ______________________________________________________________________________________________________ INLET ID: 3-8 (Basin A-10) Governing Equations: Inlet capacity equation at low flows (weir calculation): Where: P = 2(L + W) H = depth of water above the flowline Inlet capacity equation at higher flows (orifice calculation): Where: A = open area of the inlet grate H = depth of water above the centroid of the cross-sectional area (A) Input Parameters: Grate: Type C Wier Perimeter: 12.29 Open Area of Grate (ft2): 4.09 Q2 = 1.78 cfs Flowline Elevation (ft): 4955.64 Q100 = 6.74 cfs Allowable Capacity: 50% Depth vs. Flow: Depth Elevation Shallow Orifice Actual Above Inlet Weir Flow Flow Flow (ft) (ft) (cfs) (cfs) (cfs) 0.00 4955.64 0.00 0.00 0.00 0.05 4955.69 0.21 2.46 0.21 0.10 4955.74 0.58 3.48 0.58 0.15 4955.79 1.07 4.26 1.07 0.21 4955.85 1.78 5.04 1.78 <---- 2-Year Flow 0.25 4955.89 2.30 5.50 2.30 0.30 4955.94 3.03 6.02 3.03 0.35 4955.99 3.82 6.50 3.82 0.40 4956.04 4.66 6.95 4.66 0.45 4956.09 5.56 7.37 5.56 0.51 4956.15 6.74 7.86 6.74 <---- 100-Year Flow 0.55 4956.19 7.52 8.15 7.52 0.60 4956.24 8.57 8.51 8.51 0.65 4956.29 9.66 8.86 8.86 0.70 4956.34 10.80 9.20 9.20 0.75 4956.39 11.97 9.52 9.52 0.80 4956.44 13.19 9.83 9.83 0.85 4956.49 14.45 10.13 10.13 0.90 4956.54 15.74 10.43 10.43 0.95 4956.59 17.07 10.71 10.71 1.00 4956.64 18.44 10.99 10.99 Q = 3 . 0 P H 1 . 5 Q = 0 .67A ( 2 gH ) 0 . 5 Calculations by: NKS Date: 2/9/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Platte River Power Authority HQ Fort Collins, CO Inlet Capacity ______________________________________________________________________________________________________ INLET ID: 3-7 (S) (Basin A-11) Governing Equations: Inlet capacity equation at low flows (weir calculation): Where: P = 2(L + W) H = depth of water above the flowline Inlet capacity equation at higher flows (orifice calculation): Where: A = open area of the inlet grate H = depth of water above the centroid of the cross-sectional area (A) Input Parameters: Grate: Type C Wier Perimeter: 12.29 Open Area of Grate (ft2): 4.09 Q2 = 1.06 cfs Flowline Elevation (ft): 4954.38 Q100 = 4.63 cfs Allowable Capacity: 50% Depth vs. Flow: Depth Elevation Shallow Orifice Actual Above Inlet Weir Flow Flow Flow (ft) (ft) (cfs) (cfs) (cfs) 0.00 4954.38 0.00 0.00 0.00 0.05 4954.43 0.21 2.46 0.21 0.10 4954.48 0.58 3.48 0.58 0.15 4954.53 1.06 4.24 1.06 <---- 2-Year Flow 0.20 4954.58 1.65 4.92 1.65 0.25 4954.63 2.30 5.50 2.30 0.30 4954.68 3.03 6.02 3.03 0.35 4954.73 3.82 6.50 3.82 0.40 4954.78 4.63 6.93 4.63 <---- 100-Year Flow 0.45 4954.83 5.56 7.37 5.56 0.50 4954.88 6.52 7.77 6.52 0.55 4954.93 7.52 8.15 7.52 0.60 4954.98 8.57 8.51 8.51 0.65 4955.03 9.66 8.86 8.86 0.70 4955.08 10.80 9.20 9.20 0.75 4955.13 11.97 9.52 9.52 0.80 4955.18 13.19 9.83 9.83 0.85 4955.23 14.45 10.13 10.13 0.90 4955.28 15.74 10.43 10.43 0.95 4955.33 17.07 10.71 10.71 1.00 4955.38 18.44 10.99 10.99 Q = 3 . 0 P H 1 . 5 Q = 0 .67A ( 2 gH ) 0 . 5 Calculations by: NKS Date: 2/9/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Platte River Power Authority HQ Fort Collins, CO Inlet Capacity ______________________________________________________________________________________________________ INLET ID: 2-4 (Basin A-12) Governing Equations: Inlet capacity equation at low flows (weir calculation): Where: P = 2(L + W) H = depth of water above the flowline Inlet capacity equation at higher flows (orifice calculation): Where: A = open area of the inlet grate H = depth of water above the centroid of the cross-sectional area (A) Input Parameters: Grate: Type D Wier Perimeter: 17.17 Open Area of Grate (ft2): 7.69 Q2 = 2.86 cfs Flowline Elevation (ft): 4954.11 Q100 = 11.43 cfs Allowable Capacity: 50% Depth vs. Flow: Depth Elevation Shallow Orifice Actual Above Inlet Weir Flow Flow Flow (ft) (ft) (cfs) (cfs) (cfs) 0.00 4954.11 0.00 0.00 0.00 0.05 4954.16 0.29 4.62 0.29 0.10 4954.21 0.81 6.53 0.81 0.15 4954.26 1.50 8.00 1.50 0.20 4954.31 2.30 9.24 2.30 0.23 4954.34 2.86 9.93 2.86 <---- 2-Year Flow 0.30 4954.41 4.23 11.32 4.23 0.35 4954.46 5.33 12.22 5.33 0.40 4954.51 6.52 13.07 6.52 0.45 4954.56 7.77 13.86 7.77 0.50 4954.61 9.11 14.61 9.11 0.55 4954.66 10.51 15.32 10.51 0.58 4954.69 11.43 15.76 11.43 <---- 100-Year Flow 0.65 4954.76 13.50 16.66 13.50 0.70 4954.81 15.08 17.29 15.08 0.75 4954.86 16.73 17.90 16.73 0.80 4954.91 18.43 18.48 18.43 0.85 4954.96 20.18 19.05 19.05 0.90 4955.01 21.99 19.60 19.60 0.95 4955.06 23.85 20.14 20.14 1.00 4955.11 25.76 20.66 20.66 Q = 3 . 0 P H 1 . 5 Q = 0 .67A ( 2 gH ) 0 . 5 Calculations by: NKS Date: 2/9/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Platte River Power Authority HQ Fort Collins, CO Inlet Capacity ______________________________________________________________________________________________________ INLET ID: 5-4 (N) (Basin B-1) Governing Equations: Inlet capacity equation at low flows (weir calculation): Where: P = 2(L + W) H = depth of water above the flowline Inlet capacity equation at higher flows (orifice calculation): Where: A = open area of the inlet grate H = depth of water above the centroid of the cross-sectional area (A) Input Parameters: Grate: Type C Wier Perimeter: 12.29 Open Area of Grate (ft2): 4.09 Q2 = 0.69 cfs Flowline Elevation (ft): 4954.89 Q100 = 3.22 cfs Allowable Capacity: 50% Q100 Carryover= 1.57 cfs Depth vs. Flow: Depth Elevation Shallow Orifice Actual Above Inlet Weir Flow Flow Flow (ft) (ft) (cfs) (cfs) (cfs) 0.00 4954.89 0.00 0.00 0.00 0.05 4954.94 0.21 2.46 0.21 0.11 4955.00 0.69 3.68 0.69 <---- 2-Year Flow 0.15 4955.04 1.07 4.26 1.07 0.20 4955.09 1.65 4.92 1.65 <---- Highpoint location 0.25 4955.14 2.30 5.50 2.30 0.31 4955.20 3.22 6.14 3.22 <---- 100-Year Flow 0.35 4955.24 3.82 6.50 3.82 0.40 4955.29 4.66 6.95 4.66 0.45 4955.34 5.56 7.37 5.56 0.50 4955.39 6.52 7.77 6.52 0.55 4955.44 7.52 8.15 7.52 0.60 4955.49 8.57 8.51 8.51 0.65 4955.54 9.66 8.86 8.86 0.70 4955.59 10.80 9.20 9.20 0.75 4955.64 11.97 9.52 9.52 0.80 4955.69 13.19 9.83 9.83 0.85 4955.74 14.45 10.13 10.13 0.90 4955.79 15.74 10.43 10.43 0.95 4955.84 17.07 10.71 10.71 1.00 4955.89 18.44 10.99 10.99 To Basin B2 Q = 3 . 0 P H 1 . 5 Q = 0 .67A ( 2 gH ) 0 . 5 Calculations by: NKS Date: 2/9/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Platte River Power Authority HQ Fort Collins, CO Inlet Capacity ______________________________________________________________________________________________________ INLET ID: 5-5 (Basin B-2) Governing Equations: Inlet capacity equation at low flows (weir calculation): Where: P = 2(L + W) H = depth of water above the flowline Inlet capacity equation at higher flows (orifice calculation): Where: A = open area of the inlet grate H = depth of water above the centroid of the cross-sectional area (A) Input Parameters: Grate: Type D Wier Perimeter: 17.17 Open Area of Grate (ft2): 7.69 Q2 = 1.90 cfs Flowline Elevation (ft): 4954.37 Q100 = 9.85 cfs Allowable Capacity: 50% Depth vs. Flow: Depth Elevation Shallow Orifice Actual Above Inlet Weir Flow Flow Flow (ft) (ft) (cfs) (cfs) (cfs) 0.00 4954.37 0.00 0.00 0.00 0.05 4954.42 0.29 4.62 0.29 0.10 4954.47 0.81 6.53 0.81 0.15 4954.52 1.50 8.00 1.50 0.22 4954.59 2.66 9.69 2.66 <---- 2-Year Flow 0.25 4954.62 3.22 10.33 3.22 0.30 4954.67 4.23 11.32 4.23 0.35 4954.72 5.33 12.22 5.33 0.40 4954.77 6.52 13.07 6.52 0.45 4954.82 7.77 13.86 7.77 0.50 4954.87 9.11 14.61 9.11 0.53 4954.90 9.85 15.00 9.85 <---- 100-Year Flow 0.59 4954.96 11.57 15.83 11.57 0.65 4955.02 13.50 16.66 13.50 0.70 4955.07 15.08 17.29 15.08 0.75 4955.12 16.73 17.90 16.73 0.80 4955.17 18.43 18.48 18.43 0.85 4955.22 20.18 19.05 19.05 0.90 4955.27 21.99 19.60 19.60 0.95 4955.32 23.85 20.14 20.14 1.00 4955.37 25.76 20.66 20.66 *Includes 1.57 cfs carryover from B1 Q = 3 . 0 P H 1 . 5 Q = 0 .67A ( 2 gH ) 0 . 5 Calculations by: NKS Date: 2/9/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 5.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.013 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 20.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 10.0 20.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 7.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Enter Your Project Name Here 2-1 (Basin A2) UD-Inlet_v4.05-Proposed Inlet.xlsm, 2-1 (Basin A2) 2/1/2018, 2:17 PM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above) alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 3.9 7.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 10.00 10.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = N/A N/A ft Depth for Curb Opening Weir Equation dCurb = 0.16 0.42 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.37 0.66 Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 0.78 0.99 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 2.3 12.2 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 2.2 9.1 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.05 Released March 2017 H-Vert H-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths UD-Inlet_v4.05-Proposed Inlet.xlsm, 2-1 (Basin A2) 2/1/2018, 2:17 PM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 5.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.013 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 20.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 10.0 20.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 7.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Enter Your Project Name Here 2-5 (Basin A4) UD-Inlet_v4.05-Proposed Inlet.xlsm, 2-5 (Basin A4) 2/1/2018, 2:17 PM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above) alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 3.9 7.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = N/A N/A ft Depth for Curb Opening Weir Equation dCurb = 0.16 0.42 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.50 0.90 Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 1.8 7.5 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 1.4 5.6 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.05 Released March 2017 H-Vert H-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths UD-Inlet_v4.05-Proposed Inlet.xlsm, 2-5 (Basin A4) 2/1/2018, 2:17 PM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 5.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.013 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 20.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 10.0 20.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 7.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Enter Your Project Name Here 2-6 (Basin A5) UD-Inlet_v4.05-Proposed Inlet.xlsm, 2-6 (Basin A5) 2/1/2018, 2:17 PM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above) alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 3.9 7.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = N/A N/A ft Depth for Curb Opening Weir Equation dCurb = 0.16 0.42 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.50 0.90 Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 1.8 7.5 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 1.0 4.0 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.05 Released March 2017 H-Vert H-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths UD-Inlet_v4.05-Proposed Inlet.xlsm, 2-6 (Basin A5) 2/1/2018, 2:17 PM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 5.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.021 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.013 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 20.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 10.0 20.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 5.0 5.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Enter Your Project Name Here 3-3 (E) (Basin A6) UD-Inlet_v4.05-Proposed Inlet.xlsm, 3-3 (E) (Basin A6) 2/1/2018, 2:17 PM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above) alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 5.0 5.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = N/A N/A ft Depth for Curb Opening Weir Equation dCurb = 0.25 0.25 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.64 0.64 Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 3.48 3.48 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 0.62 2.72 cfs Warning 5: The width of unit is greater than the gutter width. CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.05 Released March 2017 H-Vert H-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths UD-Inlet_v4.05-Proposed Inlet.xlsm, 3-3 (E) (Basin A6) 2/1/2018, 2:17 PM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 5.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.013 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 20.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 10.0 20.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Enter Your Project Name Here 3-5 (Basin A8) UD-Inlet_v4.05-Proposed Inlet.xlsm, 3-5 (Basin A8) 2/1/2018, 2:17 PM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above) alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 3.9 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = N/A N/A ft Depth for Curb Opening Weir Equation dCurb = 0.16 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.50 0.77 Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 1.8 5.4 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 0.4 1.8 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.05 Released March 2017 H-Vert H-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths UD-Inlet_v4.05-Proposed Inlet.xlsm, 3-5 (Basin A8) 2/1/2018, 2:17 PM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 10.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.013 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 40.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 18.5 40.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 8.3 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Enter Your Project Name Here 5-3 (Basin OS-3) UD-Inlet_v4.05-Proposed Inlet.xlsm, Existing Horsetooth Inlet 2/1/2018, 2:17 PM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above) alocal = 2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 2 2 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 8.3 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = 3.00 3.00 feet Width of a Unit Grate Wo = 1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = 0.43 0.43 Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = 0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = 3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = 0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat = 5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5) Theta = 0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.66 0.66 Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = 0.519 0.714 ft Depth for Curb Opening Weir Equation dCurb = 0.33 0.53 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.70 0.98 Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = 0.70 0.98 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 5.2 12.9 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 1.9 9.1 cfs CDOT/Denver 13 Combination INLET IN A SUMP OR SAG LOCATION Version 4.05 Released March 2017 H-Vert H-Curb W Lo (C) Lo (G) Wo WP CDOT/Denver 13 Combination Override Depths UD-Inlet_v4.05-Proposed Inlet.xlsm, Existing Horsetooth Inlet 2/1/2018, 2:17 PM Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Feb 8 2018 Basin A7 Swale - Downstream at SE corner of Substation Garage User-defined Invert Elev (ft) = 4954.60 Slope (%) = 0.50 N-Value = 0.029 Calculations Compute by: Known Q Known Q (cfs) = 1.60 (Sta, El, n)-(Sta, El, n)... ( 0.00, 4955.60)-(4.50, 4954.68, 0.035)-(5.50, 4954.60, 0.013)-(6.50, 4954.68, 0.013)-(12.00, 4955.20, 0.035) Highlighted Depth (ft) = 0.37 Q (cfs) = 1.600 Area (sqft) = 1.31 Velocity (ft/s) = 1.22 Wetted Perim (ft) = 6.54 Crit Depth, Yc (ft) = 0.27 Top Width (ft) = 6.49 EGL (ft) = 0.39 -2 0 2 4 6 8 10 12 14 Elev (ft) Section Depth (ft) 4954.00 -0.60 4954.50 -0.10 4955.00 0.40 4955.50 0.90 4956.00 1.40 Sta (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Feb 1 2018 Basin A11 Swale - Downstream at SW corner of Fleet Parking A User-defined Invert Elev (ft) = 4954.63 Slope (%) = 0.50 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 5.12 (Sta, El, n)-(Sta, El, n)... ( 0.00, 4955.97)-(4.50, 4955.21, 0.013)-(4.55, 4954.71, 0.013)-(5.55, 4954.63, 0.013)-(6.55, 4954.71, 0.013)-(6.60, 4955.21, 0.013)-(8.60, 4955.64, 0.013) Highlighted Depth (ft) = 0.66 Q (cfs) = 5.120 Area (sqft) = 1.31 Velocity (ft/s) = 3.92 Wetted Perim (ft) = 3.87 Crit Depth, Yc (ft) = 0.69 Top Width (ft) = 2.95 EGL (ft) = 0.90 -1 0 1 2 3 4 5 6 7 8 9 10 Elev (ft) Section Depth (ft) 4954.00 -0.63 4954.50 -0.13 4955.00 0.37 4955.50 0.87 4956.00 1.37 Sta (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Feb 1 2018 Basin B2 Swale - Downstream at Bioswale User-defined Invert Elev (ft) = 4954.30 Slope (%) = 0.50 N-Value = 0.024 Calculations Compute by: Known Q Known Q (cfs) = 11.01 (Sta, El, n)-(Sta, El, n)... ( 0.00, 4954.82)-(17.00, 4954.43, 0.013)-(18.50, 4954.40, 0.013)-(23.50, 4954.30, 0.035)-(28.50, 4954.40, 0.035)-(33.50, 4955.40, 0.035) Highlighted Depth (ft) = 0.43 Q (cfs) = 11.01 Area (sqft) = 6.51 Velocity (ft/s) = 1.69 Wetted Perim (ft) = 26.27 Crit Depth, Yc (ft) = 0.35 Top Width (ft) = 26.23 EGL (ft) = 0.47 -5 0 5 10 15 20 25 30 35 40 Elev (ft) Section Depth (ft) 4953.50 -0.80 4954.00 -0.30 4954.50 0.20 4955.00 0.70 4955.50 1.20 4956.00 1.70 Sta (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, Feb 7 2018 2' CURB CUT (MAXIMUM CAPACITY) Rectangular Bottom Width (ft) = 2.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 100.00 Slope (%) = 2.00 N-Value = 0.025 Calculations Compute by: Known Depth Known Depth (ft) = 0.50 Highlighted Depth (ft) = 0.50 Q (cfs) = 4.040 Area (sqft) = 1.00 Velocity (ft/s) = 4.04 Wetted Perim (ft) = 3.00 Crit Depth, Yc (ft) = 0.50 Top Width (ft) = 2.00 EGL (ft) = 0.75 0 .5 1 1.5 2 2.5 3 Elev (ft) Section Depth (ft) 99.75 -0.25 100.00 0.00 100.25 0.25 100.50 0.50 100.75 0.75 101.00 1.00 Reach (ft) APPENDIX D Referenced Materials United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Larimer County Area, Colorado Platte River Power Authority Natural Resources Conservation Service February 23, 2017 9 Custom Soil Resource Report Soil Map 4486900 4487100 4487300 4487500 4487700 4487900 4488100 4488300 4488500 4486900 4487100 4487300 4487500 4487700 4487900 4488100 4488300 4488500 495900 496100 496300 496500 496700 496900 497100 495900 496100 496300 496500 496700 496900 497100 40° 32' 50'' N 105° 2' 55'' W 40° 32' 50'' N 105° 1' 59'' W 40° 31' 54'' N 105° 2' 55'' W 40° 31' 54'' N 105° 1' 59'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 400 800 1600 2400 Feet 0 100 200 400 600 Meters Map Scale: 1:8,480 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. Map Unit Legend Larimer County Area, Colorado (CO644) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 6 Aquepts, ponded 3.5 1.0% 34 Fort Collins loam, 0 to 1 percent slopes 8.6 2.4% 35 Fort Collins loam, 0 to 3 percent slopes 4.2 1.2% 36 Fort Collins loam, 3 to 5 percent slopes 5.7 1.6% 73 Nunn clay loam, 0 to 1 percent slopes 180.2 50.8% 74 Nunn clay loam, 1 to 3 percent slopes 131.4 37.1% 75 Nunn clay loam, 3 to 5 percent slopes 13.3 3.8% 76 Nunn clay loam, wet, 1 to 3 percent slopes 7.6 2.2% Totals for Area of Interest 354.6 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a Custom Soil Resource Report 11 73—Nunn clay loam, 0 to 1 percent slopes Map Unit Setting National map unit symbol: 2tlng Elevation: 4,100 to 5,700 feet Mean annual precipitation: 14 to 15 inches Mean annual air temperature: 48 to 52 degrees F Frost-free period: 135 to 152 days Farmland classification: Prime farmland if irrigated Map Unit Composition Nunn and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Nunn Setting Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Pleistocene aged alluvium and/or eolian deposits Typical profile Ap - 0 to 6 inches: clay loam Bt1 - 6 to 10 inches: clay loam Bt2 - 10 to 26 inches: clay loam Btk - 26 to 31 inches: clay loam Bk1 - 31 to 47 inches: loam Bk2 - 47 to 80 inches: loam Properties and qualities Slope: 0 to 1 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 7 percent Salinity, maximum in profile: Nonsaline (0.1 to 1.0 mmhos/cm) Sodium adsorption ratio, maximum in profile: 0.5 Available water storage in profile: High (about 9.1 inches) Interpretive groups Land capability classification (irrigated): 3e Land capability classification (nonirrigated): 4e Custom Soil Resource Report 18 Hydrologic Soil Group: C Ecological site: Clayey Plains (R067BY042CO) Hydric soil rating: No Minor Components Heldt Percent of map unit: 10 percent Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Ecological site: Clayey Plains (R067BY042CO) Hydric soil rating: No Wages Percent of map unit: 5 percent Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Ecological site: Loamy Plains (R067BY002CO) Hydric soil rating: No 74—Nunn clay loam, 1 to 3 percent slopes Map Unit Setting National map unit symbol: 2tlpl Elevation: 3,900 to 5,840 feet Mean annual precipitation: 13 to 17 inches Mean annual air temperature: 50 to 54 degrees F Frost-free period: 135 to 160 days Farmland classification: Prime farmland if irrigated Map Unit Composition Nunn and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Nunn Setting Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Pleistocene aged alluvium and/or eolian deposits Typical profile Ap - 0 to 9 inches: clay loam Bt - 9 to 13 inches: clay loam Custom Soil Resource Report 19 Btk - 13 to 25 inches: clay loam Bk1 - 25 to 38 inches: clay loam Bk2 - 38 to 80 inches: clay loam Properties and qualities Slope: 1 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 7 percent Salinity, maximum in profile: Nonsaline to very slightly saline (0.1 to 2.0 mmhos/cm) Sodium adsorption ratio, maximum in profile: 0.5 Available water storage in profile: High (about 9.9 inches) Interpretive groups Land capability classification (irrigated): 2e Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: Clayey Plains (R067BY042CO) Hydric soil rating: No Minor Components Heldt Percent of map unit: 10 percent Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Ecological site: Clayey Plains (R067BY042CO) Hydric soil rating: No Satanta Percent of map unit: 5 percent Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Ecological site: Loamy Plains (R067BY002CO) Hydric soil rating: No 75—Nunn clay loam, 3 to 5 percent slopes Map Unit Setting National map unit symbol: 2tlpm Custom Soil Resource Report 20 Table—Hydrologic Soil Group (Platte River Power Authority) Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 6 Aquepts, ponded A/D 3.5 1.0% 34 Fort Collins loam, 0 to 1 percent slopes B 8.6 2.4% 35 Fort Collins loam, 0 to 3 percent slopes C 4.2 1.2% 36 Fort Collins loam, 3 to 5 percent slopes B 5.7 1.6% 73 Nunn clay loam, 0 to 1 percent slopes C 180.2 50.8% 74 Nunn clay loam, 1 to 3 percent slopes C 131.4 37.1% 75 Nunn clay loam, 3 to 5 percent slopes C 13.3 3.8% 76 Nunn clay loam, wet, 1 to 3 percent slopes C 7.6 2.2% Totals for Area of Interest 354.6 100.0% Rating Options—Hydrologic Soil Group (Platte River Power Authority) Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Custom Soil Resource Report 28 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 29 United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 30 This unofficial copy was downloaded on Nov-02-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA This unofficial copy was downloaded on Nov-02-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA This unofficial copy was downloaded on Nov-02-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA APPENDIX E Drainage Exhibits SOUTHEAST CORNER S30, T.7N., R68W 50' RIGHT-OF-WAY R.O.W. WIDTH VARIES 60' RIGHT-OF-WAY 107.5' RIGHT-OF-WAY 50' RIGHT-OF-WAY R.O.W. WIDTH VARIES 2.21 1.29 2.38 3.75 2.33 1.35 2.19 0.31 0.33 0.93 0.54 EX1 EX4 OS1 EX2 EX3 EX5 OS2a OS3 OS4 OS2b OS5 EAST HORSETOOTH ROAD SOUTH TIMBERLINE ROAD DANFIELD COURT UNION PACIFIC RAILROAD OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC EXISTING E/O BUILDING EXISTING FITNESS/ EXISTING HQ POOL CAR GARAGE EXISTING MICROWAVE BUILDING EXISTING WAREHOUSE/ SUBSTATION GARAGE EXISTING CARPENTER SHOP EXISTING POND EXISTING DETENTION EXISTING DETENTION EXISTING DETENTION EXISTING STORM DRAINING HORSETOOTH ROAD EXISTING STORM DRAINING BASIN OS3 PLATTE RIVER POWER AUTHORITY 2/14/18 SOUTHEAST CORNER S30, T.7N., R68W 50' RIGHT-OF-WAY R.O.W. WIDTH VARIES 60' RIGHT-OF-WAY 107.5' RIGHT-OF-WAY 50' RIGHT-OF-WAY R.O.W. WIDTH VARIES A1 C1 OS1 OS2a OS3 OS4 OS2b A2 A3 A13 B1 B2 A5 A4 A6 A7 A9 A10 A11 A8 0.42 1.35 3.49 1.23 0.68 0.21 0.93 0.37 0.26 0.91 0.42 1.45 0.40 0.57 A12 0.41 0.68 0.64 0.32 0.97 0.21 0.54 OS5 DETENTION POND A1 DETENTION POND A1 POND OUTLET STRUCTURE POND OUTLET STRUCTURE EAST HORSETOOTH ROAD SOUTH TIMBERLINE ROAD DANFIELD COURT UNION PACIFIC RAILROAD OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC HQ BUILDING MICROWAVE BUILDING MAINTENANCE SHOP / TRUCK WASH POOL CAR WAREHOUSE SUBSTATION GARAGE FLEET PARKING GARAGE A PROPOSED POND FLEET PARKING GARAGE B BIOSWALE W/ UNDERDRAIN POTENTIAL FUTURE PARKING AREA POTENTIAL FUTURE BIOSWALE UNDERGROUND DETENTION EXISTING STORM DRAINING BASIN OS3 DANFIELD COURT PROPOSED POND C1 1.15 PLATTE RIVER POWER AUTHORITY 02/14/18 U16014 1" = 60' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 2/9/2018 5:32:19 AM P:\U16014 - PRPA CAMPUS\CADD\CP\C6.00_PROPOSED DRAINAGE PLAN.DWG C6.00_PROPOSED DRAINAGE PLAN KRB NKS C6.00 73 DRAINAGE PLAN 0 60' 120' SCALE: 1" = 60' 30' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: APPROVED: NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. 2. VEGETATIVE SWALES, BIOSWALES, UNDERGROUND DETENTION AND THE WATERQUALITY AND DETENTION POND SHALL BE MAINTAINED BY THE PROPERTY OWNER AND FOLLOW APPLICABLE STANDARD OPERATING PROCEDURES AS SHOWN IN DEVELOPMENT AGREEMENT. 3. FUTURE DETENTION AND LID IMPROVEMENTS WILL BE REQUIRED WITHIN BASIN A-12 WITH FUTURE DEVELOPMENTS. 5124 5124 PROPOSED 1' CONTOUR EXISTING 1' CONTOUR STORM SEWER STORM INLET LEGEND EXISTING CURB & GUTTER PROPOSED CURB & GUTTER PROPOSED FLOWLINE LIMITS OF DISTURBANCE EXISTING PROPERTY LINE EXISTING R.O.W LINE EXISTING EASEMENT BASIN BOUNDARY SWALE SECTION D-101 XXXX BASIN DESIGNATION BASIN AREA (ACRE) 2 - YR RUNOFF COEFF. 100 - YR RUNOFF COEFF. DESIGN POINT FLOW DIRECTION 5125 5125 PROPOSED 5' CONTOUR EXISTING 5' CONTOUR A A DRAINAGE SUMMARY POND SUMMARY LOW IMPACT DEVELOPMENT TREATMENT SUMMARY Basin Proposed Impervious Area LID Treatment Area Treated % of Site Treated (sf) (acres) (sf) (%) A-1 24,426 None 0 0% A-2 33,295 None 0 0% A-3 16,242 Underground Detention 16,242 6% A-4 21,811 Underground Detention 21,811 8% A-5 14,736 Underground Detention 14,736 5% A-6 7,951 Underground Detention 7,951 3% A-7 8,071 Underground Detention 8,071 3% A-8 6,189 Underground Detention 6,189 2% A-9 28,026 Underground Detention 28,026 10% A-10 28,393 Underground Detention 28,393 10% A-11 11,838 Underground Detention 11,838 4% A-12 (Future) 19,000 Future LID Treatment 19,000 7% A-13 11,517 None 0 0% B-1 10,125 Bioswale 10,125 4% B-2 26,917 Bioswale 26,917 10% C-1 5,726 Wet Pond 5,726 2% Total Site 274,263 205,024 75% Pond A1 Pond C1 WQCV REQUIRED 0.18 AC-FT 0.01 AC-FT WQCV PROVIDED 0.24 AC-FT 0.02 AC-FT DETENTION VOLUME REQUIRED 2.58 AC-FT 0.33 AC-FT DETENTION VOLUME PROVIDED 2.89 AC-FT 0.35 AC-FT WQCV WATER SURFACE ELEVATION 4949.50 4955.03 100-YEAR WATER SURFACE ELEVATION 4,952.25 4,955.50 TOP OF POND ELEVATION 4,953.25 4,956.50 Proposed Basins Basin Area %I C2 C100 Q 2 Q100 (acre) (cfs) (cfs) A-1 3.49 16% 0.32 0.40 2.16 9.43 A-2 0.91 82% 0.83 1.00 2.15 9.10 A-3 0.37 90% 0.95 1.00 1.01 3.71 A-4 0.57 87% 0.86 1.00 1.39 5.64 A-5 0.40 85% 0.84 1.00 0.95 3.96 A-6 0.41 41% 0.53 0.67 0.62 2.72 A-7 0.32 53% 0.63 0.79 0.49 2.37 A-8 0.21 62% 0.71 0.89 0.42 1.84 A-9 0.64 90% 0.95 1.00 1.74 6.41 A-10 0.68 87% 0.92 1.00 1.78 6.74 A-11 0.97 27% 0.41 0.51 1.06 4.63 A-12 1.15 6% 0.23 0.29 0.68 2.95 A-13 0.26 90% 0.95 1.00 0.72 2.63 A-TOTAL 10.38 45% 0.56 0.70 10.46 45.52 B-1 0.42 53% 0.61 0.76 0.69 3.22 B-2 1.45 43% 0.52 0.65 1.90 8.28 B-TOTAL 1.87 46% 0.54 0.68 2.55 12.59 C-1 1.23 11% 0.28 0.35 0.98 4.27 C-TOTAL 1.23 11% 0.28 0.35 0.98 4.27 OS-1 0.68 2% 0.20 0.25 0.31 1.42 OS-2A 0.21 2% 0.20 0.25 0.11 0.51 OS-2B 0.93 80% 0.81 1.00 1.80 8.62 OS-3 0.42 84% 0.85 1.00 0.89 4.16 OS-4 1.35 71% 0.74 0.92 2.82 12.31 OS-5 0.54 2% 0.20 0.25 0.24 1.05 U16014 1" = 60' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 2/2/2018 7:22:16 AM P:\U16014 - PRPA CAMPUS\CADD\CP\CX.XX_EXISTING DRAINAGE PLAN.DWG CX.XX_EXISTING DRAINAGE PLAN KRB NKS EX-DR 1 EXISTING DRAINAGE PLAN 0 60' 120' SCALE: 1" = 60' 30' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. 2. VEGETATIVE SWALES, BIOSWALES, UNDERGROUND DETENTION AND THE WATERQUALITY AND DETENTION POND SHALL BE MAINTAINED BY THE PROPERTY OWNER AND FOLLOW APPLICABLE STANDARD OPERATING PROCEDURES AS SHOWN IN DEVELOPMENT AGREEMENT. 3. FUTURE DETENTION AND LID IMPROVEMENTS WILL BE REQUIRED WITHIN BASIN A-12 WITH FUTURE DEVELOPMENTS. 5124 5124 PROPOSED 1' CONTOUR EXISTING 1' CONTOUR STORM SEWER STORM INLET LEGEND EXISTING CURB & GUTTER PROPOSED CURB & GUTTER PROPOSED FLOWLINE LIMITS OF DISTURBANCE EXISTING PROPERTY LINE EXISTING R.O.W LINE EXISTING EASEMENT BASIN BOUNDARY SWALE SECTION D-101 XXXX BASIN DESIGNATION BASIN AREA (ACRE) 2 - YR RUNOFF COEFF. 100 - YR RUNOFF COEFF. DESIGN POINT FLOW DIRECTION 5125 5125 PROPOSED 5' CONTOUR EXISTING 5' CONTOUR A A DRAINAGE SUMMARY Existing Basins Basin Area %I C2 C 100 Q2 Q100 (acre) (cfs) (cfs) EX1 3.75 49% 0.57 0.71 5.71 26.62 EX2 2.38 32% 0.44 0.55 2.07 9.04 EX3 2.19 80% 0.82 1.00 4.78 21.75 EX4 2.33 19% 0.34 0.42 1.68 7.33 EX5 1.35 12% 0.28 0.35 0.81 3.53 OS-1 0.31 20% 0.35 0.43 0.27 1.32 OS-2A 0.33 27% 0.39 0.49 0.37 1.61 OS-2B 0.93 80% 0.81 1.00 1.80 8.62 OS-3 2.21 20% 0.34 0.43 1.45 6.33 OS-4 1.29 73% 0.75 0.94 2.75 12.00 OS-5 0.54 2% 0.20 0.25 0.24 1.05 4,949.400 1,075.80 0.200 131.36 155.27 121.29 138.41 4,949.600 2,508.89 0.200 358.47 513.74 348.51 486.92 4,949.800 4,404.37 0.200 691.33 1205.06 682.50 1169.42 4,950.000 6,253.35 0.200 1065.77 2270.83 1060.38 2229.80 4,950.200 7,637.64 0.200 1389.10 3659.93 1386.79 3616.59 4,950.400 8,940.94 0.200 1657.86 5317.79 1656.15 5272.74 4,950.600 10,218.98 0.200 1915.99 7233.78 1914.57 7187.31 4,950.800 11,462.58 0.200 2168.16 9401.94 2166.97 9354.28 4,951.000 12,663.01 0.200 2412.56 11814.50 2411.56 11765.84 4,951.200 13,750.96 0.200 2641.40 14455.89 2640.65 14406.49 4,951.400 14,634.78 0.200 2838.57 17294.47 2838.12 17244.60 4,951.600 15,276.37 0.200 2991.12 20285.58 2990.89 20235.49 4,951.800 15,698.81 0.200 3097.52 23383.10 3097.42 23332.91 4,952.000 16,080.80 0.200 3177.96 26561.06 3177.89 26510.80 4,952.200 16,467.22 0.200 3254.80 29815.86 3254.73 29765.52 4,952.400 16,858.99 0.200 3332.62 33148.49 3332.54 33098.07 4,952.600 17,256.19 0.200 3411.52 36560.00 3411.44 36509.51 4,952.800 17,658.48 0.200 3491.47 40051.47 3491.39 40000.90 105,852 cf @ 4952.25 30,599 cf @ 4952.25 · 136,451 cf total volume (3.13 ac-ft) · 2.58 ac-ft required for detention (2.89 ac-ft provided) · 0.18 ac-ft required for water quality (0.24 ac-ft provided) (4)tt=L/(V*60 sec/min) (5)tc check (for urban or developed areas only) = total length/180 + 10 (6)min tc = 5 min Proposed Basins Initial Overland Flow Time (ti) Travel/Channelized Time of Flow (t t) ti +tt t c Check for Urbanized Basins Final tc (6) Date: 2/7/2018 P:\U16014 - PRPA Campus\Reports\Drainage\Calculations\U16014-Drain Calcs.xlsm OS-2B OS-2B 0.93 0.80 0.81 1.00 2.00 8.62 OS-3 OS-3 0.42 0.84 0.85 1.00 1.01 4.16 OS-4 OS-4 1.35 0.71 0.74 0.92 2.82 12.31 OS-5 OS-5 0.54 0.02 0.20 0.25 0.24 1.05 Totals 70.49 105.96 runoff via infiltration through an engineered sand media. This slows the conveyance rate of storm water runoff, reduces runoff and provides a flow path across a vegetated surface. These have been utilized to convey and treat stormwater prior to entering the storm sewer system and Pond A1.