November 03, 2017
Cathy Mathis
TB Group
444 Mountain Avenue
Berthoud, CO 80513
RE: Boardwalk Office Building, PDP170032, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the
above referenced project. If you have questions about any comments, you may contact the individual commenter or
direct your questions through the Project Planner, Clay Frickey, at 970-224-6045 or cfrickey@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
Comment Number: 7 Comment Originated: 10/31/2017
10/31/2017: Previous comments addressed. OK to proceed to public hearing.
Comment Number: 8 Comment Originated: 11/03/2017
11/03/2017: Following up from staff review, please ensure the drawings reflect the extent of the existing
access, drainage, and utility easement that was established with the original plat for the project. As there
appears to have been a blanket utility easement that accommodates the equivalent 15' utility easement
from the back of walk, we may not need additional utility easement dedication, pending this information. In
addition, I would be OK with not dedicating an additional 1 foot of right-of-way under the premise that the
proposed sidewalk would still be partially covered with an existing access easement.
RESPONSE: Noted.
Comment Number: 9 Comment Originated: 11/03/2017
11/03/2017: At time of final, please have the civil drawings provide construction detail for the hardscape
median (concrete pattern and color, etc.)
RESPONSE: See note 5 Horizontal Control Plan.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 10/30/2017
10/30/2017: It appears non irrigated native seeding no longer included on landscape plan. If this is the
case please also remove native seed mix and notes (LP sheet 3 in this submittal).
RESPONSE: All references to non-irrigated seeding have been removed.
Department: Forestry
Contact: Molly Roche, mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 09/14/2017
10/30/2017:
Are there existing trees on-site?
RESPONSE: There are no existing trees on-site.
09/14/2017:
If there are any existing trees on-site, please contact City Forestry (Molly Roche - mroche@fcgov.com) to
schedule an on-site meeting to obtain tree inventory and mitigation information.
Comment Number: 7 Comment Originated: 09/14/2017
10/30/2017:
Thank you for using a shade tree in place of the Chanticleer Pears in the parking lot. Please use one of the
previously suggested species in the parking lot – Catalpa or Kentucky Coffeetree.
RESPONSE: A Kentucky Coffeetree has been used in place of the Honeylocust.
09/14/2017:
According to Land Use Code (LUC) 3.2.1 Section E.5, canopy shade trees must be used in parking lot
islands. In place of the Chanticleer Pears, please use a suitable canopy shade tree in the parking lot, such
as Catalpa or Kentucky Coffeetree.
Comment Number: 9 Comment Originated: 10/30/2017
10/30/2017:
According to Land Use Code 3.2.1 D (3) Minimum Species Diversity, 33% maximum percentage of any one
species if there are between 20 and 39 trees on-site. There are 25 trees proposed on this plan and it
appears as though Sky Rocket Juniper exceeds the 33% maximum percentage at 44%. City Forestry
suggests incorporating one or two additional evergreen species on the plan.
RESPONSE: Fastigiate Norway Spruce have taken the place of some of the Sky Rocket Junipers to
balance out the species diversity.
Comment Number: 10 Comment Originated: 10/30/2017
10/30/2017:
Typically Lindens do not survive or thrive well along roads treated with deicing salts. Please evaluate
changing the two Lindens along Boardwalk Drive for another species from the City of Fort Collins Street
Tree List, such as Bur Oak, Kentucky Coffeetree, or Catalpa.
RESPONSE: Kentucky Coffeetrees have replaced the Lindens along Boardwalk Drive.
Department: Internal Services
Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/25/2017
08/25/2017: Comment from Neighborhood Services - Can you provided the dimensions of the
trash/recycling enclosure? The community recycling ordinance which was passed last year requires all
businesses and multi-family complexes have recycling service that is equal to at least 1/3 of their service
volume (bin capacity x service frequency) by 2020. Consider building a larger enclosure that will allow for
adequate space to meet the requirements of this ordinance.
RESPONSE: The dimensions of the trash enclosure are located on the building elevation Sheet 5.
Contact: Sarah Carter, 970-416-2748, scarter@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 2 Comment Originated: 09/19/2017
09/13/2017: Construction shall comply with adopted codes as amended.
Current adopted codes are:
2015 International Building Code (IBC)
2015 International Residential Code (IRC)
2015 International Energy Conservation Code (IECC)
2015 International Mechanical Code (IMC)
2015 International Fuel Gas Code (IFGC)
2015 International Plumbing Code (IPC) as amended by the State of Colorado
2017 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the fcgov.com/building web page to
view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2017.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 129vult or 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Commercial: 2015 IECC commercial chapter.
Department: Light And Power
Contact: Clint Reetz, 970-221-6326, creetz@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/08/2017
L&P understands that three phase power will be needed for the property. Three phase is in the area on the
west side of JFK parkway and the south side of
Boardwalk drive.
RESPONSE: Acknowledged.
Comment Number: 2 Comment Originated: 09/08/2017
Development charges, electric Capacity Fee, Building Site charges and any system modification charges
necessary will apply to this development.
RESPONSE: Acknowledged.
Comment Number: 3 Comment Originated: 09/08/2017
As your project begins to move forward please contact Light and Power Engineering to coordinate the
transformer and electric meter locations, please show the locations on the utility plans.
RESPONSE: We have shown a transformer location on the plans. The elevations show the electric meter
panels
Comment Number: 4 Comment Originated: 09/08/2017
Street trees will need to be adjusted based on the location of the streetlights.
Forty feet of clearance to the streetlight will need to be maintained by shade trees and fifteen feet by
ornamental trees.
RESPONSE: The distances have been double-checked—all trees are at least 40’ from streetlights.
Comment Number: 5 Comment Originated: 09/08/2017
Please provide a one line diagram and a C-1 form to Light and Power Engineering. The C-1 form can be
found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
RESPONSE: Acknowledged.
Comment Number: 6 Comment Originated: 09/08/2017
You may contact FCU Light & Power, project engineering if you have questions. (970) 221-6700. You
may reference Light & Power’s Electric Service Standards at
http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_FINAL_18November201
6_Amendment.pdf. You may reference our policies, development charge processes, and use our fee
estimator at
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees/electric
-development-fee-estimator
RESPONSE: Acknowledged.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 7 Comment Originated: 10/29/2017
10/29/2017: WATER SUPPLY
> The fire marshal has determined that the existing utility infrastructure available in the area supports
minimum hydrant access. The hydrant immediately east of the proposed building will be satisfactory,
assuming it meets minimum standards for pressure and volume.
> There will be no requirement to add another hydrant along JFK Parkway as previously detailed in the last
submittal round.
RESPONSE: Noted.
Comment Number: 8 Comment Originated: 10/29/2017
10/29/2017: FIRE LANE
The limits of the fire lane have not been fully defined as including all of the available drive aisle connecting
to the property line on the north and east of the site. The fire lane shall be dedicated as an EAE by
separate document.
RESPONSE: Noted and addressed.
Comment Number: 9 Comment Originated: 10/29/2017
10/29/2017: AUTOTURN
Please provide an AutoTurn exhibit to verify fire apparatus turning movements.
RESPONSE: Submitted and approved.
Comment Number: 10 Comment Originated: 10/29/2017
10/29/2017: FIRE LANE SIGNS
The limits of the fire lane shall be fully defined. Fire lane sign locations should be indicated on future plan
sets. Refer to LUCASS detail #1418 & #1419 for sign type, placement, and spacing. Appropriate directional
arrows required on all signs. Posting of additional fire lane signage may be determined at time of fire
inspection.
RESPONSE: Addressed.
Comment Number: 11 Comment Originated: 10/29/2017
10/29/2017: ADDRESS POSTING - M-F - LOCAL AMENDMENT
The building address will need to be posted on east, west, and south of the building. Depending on the
address assigned by GIS, posting of the street name on some sides of the building may be required. Code
language provided below.
> IFC 505.1.7: Buildings, either individually or part of a multi-building complex, that have fire lanes on sides
other than the addressed street side, shall have the address numbers and street name on each side that
fronts the fire lane.
RESPONSE: Acknowledged.
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com
Topic: Landscape Plans
Comment Number: 10 Comment Originated: 10/31/2017
10/31/2017: As shown, the proposed street trees along Boardwalk are not in compliance with the spacing
standards in 3.2.1(D)(2). It looks like you could slide the easternmost Linden over about 3' and place
another tree along Boardwalk while retaining at least a 40' separation from the street light and having 30'
spacing between each tree. Please add adjust the landscape plan to meet this code requirement.
RESPONSE: The street trees have now been moved to be 30’ apart, with 40’ between the streetlight and
the easternmost tree. An additional street tree has also been added with the extra space made.
Topic: Site Plan
Comment Number: 5 Comment Originated: 09/11/2017
10/25/2017: Thanks for adding the bike rack detail to the site plan. To clarify, will you be using the same
bike rack for both the enclosed spaces and the fixed rack spaces?
09/11/2017: Please provide a detail of the proposed bike racks to be used.
RESPONSE: Detail shown on elevation sheet.
Department: Stormwater Engineering
Contact: Basil Hamdan, 970-224-6035, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 09/12/2017
10/27/2017: OK for FDP submittal of Erosion Control materials, previous comments will apply at that
stage.
09/12/2017: The site disturbs more than 10,000 sq. ft., therefore Erosion and
Sediment Control Materials need to be submitted. The erosion control requirements are in the Stormwater
Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control
Materials Submitted do not meet requirements. Please submit; an Erosion Control Plan, an Erosion Control
Report, and an Escrow / Security Calculation. If you need clarification concerning the erosion control
section, or if there are any questions please contact Basil Hamdan 970-224-6035 or email @
bhamdan@fcgov.com
RESPONSE: Erosion Control Plan included with submittal.
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Topic: General
Comment Number: 6 Comment Originated: 10/30/2017
10/30/2017: Ready for hearing.
Comment Number: 7 Comment Originated: 10/30/2017
10/30/2017: The storm pipe outfall is called out as an 18-inch size on the Utility
Plan and a 12-inch on the Drainage Plan. Please make consistent. (final)
RESPONSE: Corrected.
Comment Number: 8 Comment Originated: 10/30/2017
10/30/2017: Please provide a cross-section detail of the retaining wall and roof drain piping. (final)
RESPONSE: Provided on Grading Plan
Comment Number: 9 Comment Originated: 10/30/2017
10/30/2017: Please tuck the FES into the bank more – it looks like it might be sticking out too far. (final)
RESPONSE: Addressed.
Comment Number: 10 Comment Originated: 10/30/2017
10/30/2017: Please note that since your proposed basin D basically matches the previously approved
basin (from Landings Office Park PUD) that drains directly to JFK and Boardwalk, I won’t require a variance
for this. Please remove any references to requesting a variance to our criteria for this. Just make sure that
it’s clear in the report that you are matching a previously approved condition. (final)
RESPONSE: Noted and addressed.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Lighting Plan
Comment Number: 8 Comment Originated: 10/30/2017
10/30/2017: There are line over text issues. See redlines.
RESPONSE: Line over text fixed.
Topic: Site Plan
Comment Number: 1 Comment Originated: 09/12/2017
10/30/2017: There are line over text issues. See redlines.
09/12/2017: There are line over text issues. See redlines.
RESPONSE: Bike rack detail removed and is now shown on the building elevations.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 10/30/2017
10/30/2017: I believe you'll need truncated domes in the sidewalk in the porkchop, much like a refuge
island for a roundabout? This could be added at final.
RESPONSE: Added.
Comment Number: 3 Comment Originated: 10/30/2017
10/30/2017: We'll need signing and striping plans at final. - mostly signage in the porkchop.
RESPONSE: Added.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/13/2017
09/13/2017: Irrigation plans are required no later than at the time of building permit. The irrigation plans
must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions
concerning irrigation requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
RESPONSE: Acknowledged.
Department: Water-Wastewater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 10/30/2017
10/30/2017: Ready for hearing.
Department: Zoning
Contact: Missy Nelson, mnelson@fcgov.com
Topic: Site Plan
Comment Number: 2 Comment Originated: 09/13/2017
10/31/17: Still missing pedestrian access for trash enclosure. LUC 3.2.4(C)(4)
Include pedestrian access area of trash enclosure on elevation.
RESPONSE: The pedestrian door has been labeled on the site plan to make it clearer.
Comment Number: 4 Comment Originated: 09/13/2017
10/31/17: The units located on the south side of the building may still be too exposed.
Please locate mechanical equipment (RTUs, meter, vents, conduits, vents, boxes, etc.) on site plan and
elevations and provide information on screening.
RESPONSE: We moved the air conditioning units to the east side of the building and they are screened
with grasses. Electrical panels, gas and electric meters are shown on the building elevations. And are
screened in the landscape plan.