HomeMy WebLinkAboutCONFLUENCE - FDP - FDP170022 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS1
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/developmentreview
September 09, 2017
Jason Kersley
[au]workshop, llc.
405 Linden Street
Fort Collins, CO 80524
RE: Confluence, FDP170022, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Jason Holland, at 970-224-6126 or jholland@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/06/2017
09/06/2017: We'll look to schedule a separate follow-up meeting with Kyle
Lambrecht to go over the FDP frontage information/design shown along Willow
Street. Understanding how the curb and gutter was established both horizontally
and vertically (perhaps using information from Interwest?) and then placement of
notes on the plans to indicate what sort of external designs might be used would
be helpful.
NE Response: Per our meeting on December 4th, it was discussed that all improvements be
shown on a separate plan set title Willow Street Plaza Improvements that will be submitted at a
later date. A temporary design consisting of a concrete walk adjacent to the building and a
storm line has been provided on the plans, but will not be constructed.
Comment Number: 2 Comment Originated: 09/06/2017
09/06/2017: As part of the meeting referenced in the previous comment, the
design elements of the sidewalk/parkway streetscape between the buildings
and the curb and gutter should be further discussed with the project's proposed
establishment of pavers, sidewalks, and landscaping that is shown more
specifically on the civil plans (but is left more general on the site plan). Note on
the civil plans that there is some discrepancy between the plan sheets on
2
whether asphalt or concrete sidewalks are proposed along the building on
Willow Street.
NE Response: Please see our response for the previous comment.
Comment Number: 3 Comment Originated: 09/06/2017
09/06/2017: Additional design information/detail is needed on the proposed
Contech Filterra Biofiltration System. In checking online it appears that the unit
keeps the filtration contained within the storm drainage system and does not
allow for infiltration into the native surrounding soil, but I'd like further information
and then coordination with both Forestry and Capital Projects.
NE Response: The plaza improvements, including the Filterra Biofiltration System, were
removed from the current plan set.
Comment Number: 4 Comment Originated: 09/06/2017
09/06/2017: The design of the patching along Linden Street would need to be
expanded to ensure that it is either halfway through a vehicular travel lane or to
the lane line. Perhaps it is also possible that the patching shown in locations
can be reduced such that it is depicted to correspond to existing lane lines
shown on C500. Additional discussion with our Construction Inspection
Manager should occur to look over options and potential requirements.
NE Response: The asphalt patching and sawcut lines were adjusted to occur simultaneously
with either the halfway point of a vehicular travel lane or the lane line.
Comment Number: 5 Comment Originated: 09/06/2017
09/06/2017: I didn't make the connection that there is offsite storm drainage
pipe swale work along with construction easement that is needed from
properties to the north and not aware of letters of intent from the property
owner(s) prior to hearing. At this point, I would want to understand and
coordinate with Stormwater as to what offsite easements are being obtained
and verification on their legal descriptions, type, and format.
NE Response: A formal agreement is being pursued between the two property owners.
This agreement will be signed by both owners and recorded with Larimer County Clerk and
Recorder’s Office
Comment Number: 6 Comment Originated: 09/06/2017
09/06/2017: Discussion on construction staging should be had to understand
how this project will be built and allow existing modes of travel on the
surrounding rights-of-way to remain during the course of construction.
Response: Noted
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/05/2017
09/05/2017: No further comments. Thank you.
Noted Thanks
Department: Internal Services
Contact: Jonathon Nagel, jnagel@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/06/2017
- A minimum of 20ft clearance for overhead obstructions will be required for
3
front load type service vehicles
- Service vehicles will most likely need to back into the parking structure to
service their containers, locating the enclosure closure to the garage entrance
will make this safer and more efficient.
- What is the width of the proposed service gates? Wider gates will allow more
efficient servicing by haulers and reduce damage to the enclosure from
dumpsters impacting the narrow opening.
-Adding a door-less entry to the enclosure for pedestrians will provide safer and
more efficient access for residents.
Jonathon Nagel
Environmental Compliance Inspector
City of Fort Collins
281 N. College Ave
970-416-2701 office
jnagel@fcgov.com
Response: An enlarged waste plan has be reviewed by Jonathon Nagel and added to sheet DR01.1.
Contact: Sarah Carter, 970-416-2748, scarter@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 2 Comment Originated: 09/08/2017
09/08/2017: Construction shall comply with adopted codes as amended.
Current adopted codes are:
2015 International Building Code (IBC)
2015 International Residential Code (IRC)
2015 International Energy Conservation Code (IECC)
2015 International Mechanical Code (IMC)
2015 International Fuel Gas Code (IFGC)
2015 International Plumbing Code (IPC) as amended by the State of Colorado
2017 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com/building web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2017.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 129vult or 100mph 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code - Commercial and Multi-family 4 stories and taller: 2015 IECC
commercial chapter.
Response: Noted
Comment Number: 3 Comment Originated: 09/08/2017
09/08/2017: Please schedule a pre-submittal meeting with Building Services
for this project. Pre-Submittal meetings assist the designer/builder by assuring,
early on in the design, that the new projects are on track to complying with all of
the adopted City codes and Standards listed below. The proposed project
should be in the early to mid-design stage for this meeting to be effective.
Applicants of new projects should email scarter@fcgov.com to schedule a
pre-submittal meeting. Applicants should be prepared to present site plans,
4
floor plans, and elevations and be able to discuss code issues of occupancy,
square footage and type of construction being proposed.
Response: Pre-submittal meeting has occurred.
Comment Number: 4 Comment Originated: 09/08/2017
09/08/2017: The fifth floor requires elevator access to those areas per IBC
section 1007.
Response: Comment has been resolved per conversation and clarification with Russ Hovland on Aug. 30,
2017, and Sarah Carter on Dec. 7, 2017.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/05/2017
09/05/2017: Any relocation or modification to existing electric facilities will be
at the expense of the owner/developer. If Light & Power’s existing electric
facilities are to remain within the limits of the project they must be located within
a utility easement.
NE Response: The dry utility notes were modified to specify that any relocation of existing
electric facilities shall be at the expense of the owner/developer. Please see Note 4 on Sheet
C300.
Comment Number: 2 Comment Originated: 09/05/2017
09/05/2017: Any proposed Light & Power electric facilities or existing electric
facilities that will remain within the limits of the project must be located within a
utility easement.
NE Response: Light and Power electric facilities will be relocated into an existing utility
easement along Poudre Street.
Comment Number: 3 Comment Originated: 09/05/2017
09/05/2017: Transformer locations need to be within 10’ of an asphalt surface
accessible by a line truck. A minimum clearance of 8’ must be maintained in
front of the transformer doors and a minimum of 3’ on the sides Transformer
and meter locations will need to be coordinated with Light & Power
Engineering. Certain building materials and or building design may require
more clearance. Please click on the following link for Electric Service
Standards.
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
NE Response: The proposed locations of transformers are located to meet the specified
setbacks from any structures.
Comment Number: 4 Comment Originated: 09/05/2017
09/05/2017: A commercial service information form (C-1 form) and a one line
diagram will need to be submitted to Light & Power Engineering for all
proposed commercial buildings and multi-family (commercial) buildings larger
than a duplex or greater than 200amps. A link to the C-1 form is below:
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Response: Noted
Comment Number: 5 Comment Originated: 09/05/2017
09/05/2017: Electric Capacity Fee, Building Site charges, and any system
5
modification charges necessary will apply to this development. Please contact
Light & Power Engineering if you have any questions at 970-221-6700. Please
reference our Electric Service Standards, development charges and fee
estimator at the following link:
http://www.fcgov.com/utilities/business/builders-and-developers
Response: Noted
Comment Number: 6 Comment Originated: 09/05/2017
09/05/2017: On the Utility Plan (North) the existing single-phase transformer
location shown to be moved to the opposite side of the alley will need to be
replaced by a drive-over secondary box to have a place to keep all of the
existing terminations from the new transformer location.
NE Response: Sheet C301 was modified as noted.
Comment Number: 7 Comment Originated: 09/05/2017
09/05/2017: On the Utility Plan (North), the new 3-phase transformer location
shown in the 8' utility easement will need to have a switch cabinet or an oval
vault located somewhere close to the new transformer to feed the new
transformer out of. THis will also have to be in the 8' utility easement.
NE Response: A switch vault was added to Sheet C301 as noted.
Comment Number: 8 Comment Originated: 09/05/2017
09/05/2017: On the Utility Plan (South), relocating the existing electric line
around the Filterra Biofiltration System will be problematic and very expensive.
This electric line is an electric duct bank with 9 runs of 750kcmil cable most
likely encased in concrete.
NE Response: The Filterra Biofiltration System was replaced with an area inlet. The area inlet was
located to avoid the electric duct bank.
Comment Number: 9 Comment Originated: 09/05/2017
09/05/2017: Light & Power will want to get some sort of loop feed to the new
3-phase transformer. This could mean placing a vault at the NW corner Poudre
St. and Linden, and bringing a primary duct line across Linden St. or breaking
into the existing duct bank at the NW corner of Linden & Willow and directional
boring adjacent to this property between Willow and Poudre St.
NE Response: The plans were modified to show that a primary duct line across Linden Street
may be required for this project. The route of this looping line will be the final decision of City
Light and Power.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 09/06/2017
09/06/2017: CATWALK CONNECTION
Catwalk connection omitted from SOUTH elevation (pg. DR02).
Response: Elevation updated to show catwalk.
Comment Number: 2 Comment Originated: 09/06/2017
09/06/2017: ROOFTOP VEGETATION
6
Rooftop gardens and landscaped roofs shall be shown to comply with IFC 317.
Response: Noted.
Comment Number: 3 Comment Originated: 09/06/2017
09/06/2017: YARD HYDRANT
The ultimate location of proposed yard hydrant in courtyard to be approved by
the fire marshal.
Response: We have updated the exhibits that go along with the alternative compliance letter to
show the new proposed location of the yard hydrant. We have moved is to the south end of the
courtyard near the top of the stairs going from the ground to the courtyard.
Comment Number: 4 Comment Originated: 09/06/2017
09/06/2017: ALTERNATIVE MEANS & METHODS
IN PROCESS - A written plan to meet the intent of the code via alternative
means and methods will need to be submitted to Fire Marshal, Bob Poncelow
for review and approval prior to final plans approval. Applicant is waiting to hear
from FM about sprinkler fire protection under catwalk connection to Courtyard
Bldg.
Response: We have added a note calling out fire sprinkler at the catwalk in anticipation of this
being OK'd.
Department: Planning Services
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/06/2017
09/06/2017: Please see comments from Jonathon Nagel regarding the trash
enclosure details. I've also provided some redlines with suggestions
Response: Noted. We have coordinated with Jonathon Nagel.
Comment Number: 2 Comment Originated: 09/06/2017
09/06/2017: Please make sure that the mylar submittal includes all pages listed
in the sheet index. I will have minor redlines that can be addressed with a PDF
review prior to mylar, pending the review/signoff from other departments.
Response: Noted
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/05/2017
09/05/2017: Please submit a variance request form for not detaining to the
2-year historic release rate in order to provide formal documentation of the
site's drainage configuration.
NE Response: A variance request form is now provided in the appendix of the drainage
report.
Comment Number: 2 Comment Originated: 09/05/2017
09/05/2017: Please submit a disc including the final SWMM model.
NE Response: Electronic files for the final SWMM model are provided on the project submittal
disk.
7
Comment Number: 3 Comment Originated: 09/05/2017
09/05/2017: Please include details for the sand filter in the utility plans (currently
included in the drainage report). Additionally, provide building plans so it can
be verified that these plans align for construction.
NE Response: Please see the revised plan set with this detail now in place.
Comment Number: 4 Comment Originated: 09/05/2017
09/05/2017: These plans show proposed plaza improvements; however, these
improvements do not appear to be addressed in the drainage report beyond
the storm sewer sizing. The basins draining to these proposed ROW inlets are
not clearly identified or discussed. These improvements need to be addressed
to describe what is proposed and show that Stormwater requirements are
being met (it appears the water quality / LID requirements are being met with
the proposed Filterra Biofiltration System, but it must be verified).
It also needs to be identified who will be responsible for maintenance of
proposed plaza improvements.
NE Response: The plaza improvements were removed from the current plan set.
Comment Number: 5 Comment Originated: 09/05/2017
09/05/2017: Please see redlined utility plans and drainage report (PDF).
NE Response: The plans were modified per the received redlines.
Comment Number: 6 Comment Originated: 09/06/2017
09/06/2017: Please provide easement for the proposed swale on 310 and 316
Willow (area plan north of the proposed off-site inlet) as well as the proposed
inlets and storm sewer on 320 Willow.
NE Response: A formal agreement is being pursued between the two property owners.
This agreement will be signed by both owners and recorded with Larimer County Clerk and
Recorder’s Office
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 2 Comment Originated: 09/06/2017
09/06/2017: There are line over text issues. See redlines.
Response: Changes have been made to the Final Plat and are shown on the revised Subdivision Plat
Topic: Plat
Comment Number: 1 Comment Originated: 09/06/2017
09/06/2017: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections
were not made. Please provide any responses on redlined sheets and/or in
response letter.
Response: Redlines corrections have been made.
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/08/2017
8
09/08/2017: No additional comments.
Response: OK Thanks
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/22/2017
08/22/2017: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Response: Noted
Department: Water-Wastewater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/05/2017
09/05/2017: Please note that all City construction detail drawings are to be
used in their original, unaltered state. ANY modification(s) must be clearly
distinguished and all City logos/identifiers must be removed from the modified
detail. Detail drawings can be found in both .pdf and .dwg formats through the
links to “Construction Drawings” on www.fcgov.com/utility-development.
NE Response: The plans use the City’s unaltered construction detail drawings.
Comment Number: 2 Comment Originated: 09/05/2017
09/05/2017: Please note that all City of Fort Collins Utility Customers are
subject to City Code requirements for wastewater. These requirements include
Section 26-306 Wastewater Discharge Permit Requirements and Section
26-332 Prohibitive Discharge Standards. A permit may be required depending
on activities on the site; however, discharge standards apply to every customer,
both large and small, regardless of what activities take place on the site.
Please contact Industrial Pretreatment, (970)221-6900, to discuss these
requirements and how they apply to this development.
Response: Noted
Comment Number: 3 Comment Originated: 09/05/2017
09/05/2017: Please provide water meter sizing calculations in accordance with
AWWA M22 to show maximum continuous and intermittent flow rates.
Response: Noted
Comment Number: 4 Comment Originated: 09/05/2017
09/05/2017: Please see redlined utility plans (PDF).
NE Response: The plans were modified per the received redlines.