Loading...
HomeMy WebLinkAboutNORTHFIELD FILING 1 - PDP - PDP170041 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPRELIMINARY DRAINAGE REPORT FOR Northfield – Filing 1 Prepared by: Interwest Consulting Group 1218 West Ash, Suite A Windsor, Colorado 80550 Phone: 970.674.3300 Fax: 970.674.3303 Prepared for: Landmark Real Estate Holdings, LLC 1170 Ash Street, Suite 100 Windsor, Colorado 80550 Office: 970.460.0567 December 13, 2017 Job Number 1282-168-03 1218 W. ASH, STE. A, WINDSOR, COLORADO 80550 TEL. 970.674.3300 – FAX 970.674.3303 December 13, 2017 Ms. Heather McDowell Fort Collins Utilities 700 Wood Street Fort Collins, CO 80522 RE: Preliminary Drainage Report for Northfield – Filing 1 Dear Heather, We are pleased to submit for your review, the Preliminary Drainage Report for the Northfield – Filing 1 subdivision. This report describes the drainage design intent to be in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Jason T. Claeys, P.E., LEED AP Interwest Consulting Group Page i TABLE OF CONTENTS Table of Contents ............................................................................................................................. i Engineer’s Certification Block ....................................................................................................... ii General Description and Location .................................................................................................. 1 Site Description and Location ..................................................................................................... 1 Site Soils ...................................................................................................................................... 2 Storm Drainage Criteria .................................................................................................................. 3 Hydrologic Criteria ...................................................................................................................... 3 Hydraulic Criteria ........................................................................................................................ 3 Drainage Basins .............................................................................................................................. 5 Drainage Facility Design ................................................................................................................ 8 Drainage Conveyance Design ..................................................................................................... 8 Detention/Water Quality Pond Design ........................................................................................ 8 Low Impact Development ............................................................................................................. 10 Stormwater Pollution Prevention .................................................................................................. 12 Conclusions ................................................................................................................................... 13 References ..................................................................................................................................... 14 Appendix ....................................................................................................................................... 15 Appendix A – Site Descriptions, Characteristics, & References ............................................... A Appendix B – Rational Calculations ........................................................................................... B Appendix C – Detention Pond Calculations ................................................................................ C Appendix D – Street Capacities ................................................................................................. D Appendix E – Low Impact Development Calculations ............................................................... E Page ii ENGINEER’S CERTIFICATION BLOCK I hereby certify that this Preliminary Drainage Report for Northfield – Filing 1 was prepared by me (or under my direct supervision) for the owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. ________________________________________ Jason T. Claeys, PE Registered Professional Engineer State of Colorado No. 42122 Page 1 GENERAL DESCRIPTION AND LOCATION SITE DESCRIPTION AND LOCATION Northfield is located in the Southeast Quarter of Section 1, Township 7 North, Range 67 West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, within the State of Colorado. More specifically, Northfield is located north of the ALTA Vista Subdivision, west of N. Lemay Avenue, and southeast of the Lake Canal irrigation ditch. The project site is approximately 55.26 acres currently and is undeveloped agricultural land. The site appears to be vegetated with grasses harvested for livestock feed. The site generally slopes from the northwest to the southeast at about 0.5% slope. There are no existing surface improvements currently on the property. The property is proposed to be subdivided into multiple single family lots and condominium tracts. Northfield – Filing 1 is the first phase of the ultimate subdivision and will consist of 112 single family attached (fee simple) units and 84 condominium units. There is an Overall Development Plan (ODP) being submitted concurrently with this Project Development Plan (PDP). This report is intended to include the preliminary drainage design for the Northfield Filing 1 PDP and conceptual design review for future phases for the Northfield ODP. Northfield is located within the City’s Dry Creek Drainage Basin. In addition to the City of Fort Collins Stormwater Design Standards, drainage requirements are also described in the “North East College Corridor Outfall (NECCO) Design Report”, prepared by Ayres Associates, dated August 2009. The improvements associated with Northfield – Filing 1 are located within basins 115, 116, 117, 414, 950, 951, 960, 961, 970, 971, 980, and 981 as delineated in the above report. A portion of Northfield – Filing 1 improvements are located within the 100-yr FEMA Flood Hazard Area as shown on FEMA FIRM map numbers 08069C0977G (revised June 17, 2008), and 08069C0981G (revised June 17, 2008). All improvements are outside of the 100-yr floodway, but are within the 100-yr floodplain. The first phase of the NECCO improvements were completed early in 2017 with the remaining improvements to be completed in the spring of 2018. It is anticipated that the LOMR associated with these improvements will be completed by the end of year in 2018. Once the LOMR is complete, the 100-yr floodplain is anticipated to be removed from the site. If circumstances occur that the LOMR is not complete at the time of construction for Northfield – Filing 1 improvements, a floodplain development permit will be required. No residential units are proposed within the 100-yr floodplain limits with Northfield – Filing 1. It is anticipated that the floodplain limits will be adjusted prior to future development submittals and/or buildings will be elevated above the Regulatory Base Floodplain Elevation and adhering to LUC Chapter 10 requirements. A large portion of the site is located within the Page 2 Cache la Poudre River 500-yr floodplain limiting any critical facilities being constructed on the site. SITE SOILS The Northfield site consists of Loveland clay loam and Nunn clay loam and are classified as Type C hydrologic group. According to USDA/Natural Resource Conservation Group, this soil has a slow infiltration rate when thoroughly wet. These soils consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Per the “Preliminary Subsurface Exploration and Ground water Report – Schlagel Property”, prepared be Earth Engineering Consultants (EEC), dated August 16, 2017: Vegetation growth and topsoil was encountered at the surface of each boring. Underlying the topsoil/vegetation layer was a zone of cohesive subsoils classified lean to fat clay with varying amounts of sand and clayey sand to approximate depths of 2 to 5-1/2 feet. Underlying the cohesive subsoils was a granular layer of poorly to well graded sand with silt and gravel extending to the depths explored at approximately 14 to 21-1/2 feet or to underlying bedrock. It appears that below the lean to fat clay, there is a granular materials that would inhibit more moderate infiltration rates then the surface materials. Further investigation of the percolation rates of the deeper soils are anticipated with the final design and drainage report. Groundwater was also observed during the subsurface soil exploration: Groundwater and/or the presence of a piezometric water surface, was generally observed at depths ranging from approximately 3 to 7 feet below ground surface as indicated on the enclosed boring logs. EEC is continuing to monitor the groundwater level depths over the 12 month period after the original borings. Based on the couple observations to date, there has not been a significant change in groundwater elevations. Groundwater elevations are taken into consideration for the pond bottoms and building foundations. Supporting figures can be found in the Appendix A. Page 3 STORM DRAINAGE CRITERIA This preliminary report was prepared to meet or exceed the City of Fort Collins storm water criteria. The City of Fort Collin’s Storm Drainage Design Criteria and amendments to the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. HYDROLOGIC CRITERIA The rational method was performed to calculate the peak runoff rates for each basin. Percent impervious were estimated based on land use and the associated runoff coefficients were calculated. The time of concentration was calculated using USDCM Equation 6-5 and the intensity was calculated using the corresponding storm rainfall depth and USDCM Equation 4-3. To account for the City of Fort Collins’ IDF Curve, Coefficient 3 of the UDFCD’s intensity formula was adjusted to 0.7867. The City of Fort Collins area has 2-yr 1-hr rainfall depth of 0.82 inches and a 100-yr 1 hr rainfall depth of 2.86 inches. These depths do account for the 1997 adjusted rainfall depths. HYDRAULIC CRITERIA The hydraulic calculations provided for in this report are limited to maximum street capacities based on the minimum street slopes. The Street Sections and Allowable Half-Street spreadsheets for 0.5% longitudinal slope are provided in the Appendix. The final Northfield – Filing 1 storm drainage system will be designed to convey the minor and major storm events through the combination of streets, inlets, storm sewer pipes, and swales. Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria, all inlets and storm pipes will be designed such that, during the minor initial storm event, the 2-yr storm, the flows for the Local Street will not top the curb and may only rise to the street crown elevation, and for a Major Arterial will not top the curb and the flow spread will leave at least one lane width free of water in each direction. During the major storm event, the 100-yr storm, the water depth for the Local Street will be held to a maximum depth that will not inundate the ground line of structures and shall not exceed 6” depth at the roadway centerline, and for the Major Arterial will be held to a maximum depth that will not inundate the ground line of structures and shall not exceed 6” depth at the roadway centerline or 18” depth at the gutter flowline. Within the Final Drainage Report, peak basin runoff flows from the rational calculations will then be used to determine the street capacities, and on-grade inlet locations. The on-grade and sump inlet capacities will be calculated using UDFCD’s spreadsheet UD-Inlet_v4.05.xlsm. The inlet capacities will be analyzed and the necessary adjustments will be applied to the street Page 4 runoff flows based on the amount of runoff collected by on-grade inlets. The sump inlets will be sized using the previous mentioned street capacity allowances with overtopping if needed. The captured flows will then be analyzed using EPA’s SWMM program to design pipe size and slopes. UD-Inlet applies a clogging factor while sizing the inlets, but while sizing the storm sewer, it is assumed that the inlets are free of clogging debris and capturing the maximum amount of street runoff. Orifice rating curves will be utilized for the inlet capture capacities and route the captured runoff through the storm drain system. The program accounts for head losses within manholes and bends and head losses associated with pipe friction. Hydraflow will be used to compute the open channel hydraulics and check the capacities of the drainage swales throughout the site. Flow velocities within these swales will be reviewed and where flows are found to be supercritical, the swales will be protected with turf reinforcement mat. All swale and pipe outlets will be protected with riprap or suitable erosion protection methods. Storm sewer pipe outlets will be protected using the requirements set by the USDCM for the protection downstream of culverts. All supporting calculations for street sections are located in the Appendix. Page 5 DRAINAGE BASINS The Northfield – Filing 1 improvements proposed drainage basins were delineated by areas draining to major drainage elements (such as ponds and roadway sumps). The final drainage report will further detail the drainage basins. For the purposes of this preliminary drainage study, it is assumed that the project is 60% impervious for medium density residential sites, slightly higher than the 50% listed for LMN land use zone. Detailed percent imperviousness will be determined with the final drainage study. Historical drainage analysis was not completed since the Filing 1 proposed improvements are within basins that are restricted to 0.2 cfs/acre release rate. The conceptual future filing improvements and associated drainage basins are delineated for planning purposes. The basins are broken into 5 main drainage systems: Drainage System A: Drainage System A pertains to the improvements along the east side of the project site. Majority of this basin’s improvements are proposed for future phases. Sub-basin A1 consists of 10.63 acres of single-family attached residential lots, public roadways and private drives. The basin includes portion of Schlagel Street, Pioneer Trail Road, Snyder Drive, Harvest Sun Street and Landmark Way Road. Flows from this basin is mainly conveyed along said roadways and will be collected by a Type R inlets and a sidewalk culvert, ultimately to detention Pond A1. Future phases will construct much of Drainage System A storm infrastructure. During the interim condition, runoff will be conveyed south via open swales to detention Pond A1. The remaining undeveloped area of Filing 1 will continue to follow the historic drainage pattern southeasterly across the site. The swales will capture these flows coming from undeveloped areas to the northwest, and the rest of the undeveloped basin will continue the historic drainage pattern southeasterly across the site. Sub-basin A2 consists of 0.81 acres of future private drives and multifamily residential buildings. This basin will remain undeveloped with the Filing 1 and during the interim condition will continue to follow the historic drainage patterns southeasterly across the site. Most of the basin will be intercepted by the interim swale, conveying runoff to detention Pond A1. Sub-basin A3 consists of 2.13 acres and includes future multifamily residential buildings and private drives. This basin will remain undeveloped with Filing 1 and will continue to follow the historic drainage pattern southeasterly across the site. Sub-basin A4 consists of 3.42 acres of future single-family attached residential lots, multifamily residential buildings, public roadways and private drives. This basin will remain undeveloped with Filing 1 and will continue to follow the historic drainage patterns southerly Page 6 along N. Lemay Ave. A portion of N. Lemay Ave will be improved to accommodate the intersection with Suniga Rd. Runoff from these improvements will be collected by two Type R sump inlets and conveyed to the NECCO reinforced concrete box culvert storm drain without detention. Sub-basin A5 consists of 2.64 acres of future multifamily residential buildings, private drives and detention Pond A1. This basin will remain mainly undeveloped with Filing 1. The basin will continue to follow the historic drainage patterns southeasterly across the site, with the exception of the runoff captured by the interim detention pond. Drainage System B: Drainage System B mainly pertains to the improvements west of Drainage System A basins. This basin’s improvements are proposed with this current filing. Sub-basin B1 consists of 5.24 acres of single-family attached residential lots, public roadways and private drives. Runoff is mainly conveyed along Schlagel St and private drives, captured by a Type R sidewalk culvert and area inlets. Runoff is then conveyed to Pond B4 and ultimately to detention Pond B1 via storm drain pipes. Sub-basin B2 consists of 3.29 acres of single-family attached residential lots, the community clubhouse, public roadways and private drives. Runoff is conveyed along Schlagel St, Snyder Dr, and the private drives, is captured by Type R inlets and area inlets. Runoff is then conveyed to Pond B3 and ultimately to detention Pond B1 via storm drain pipes. Sub-basin B3 consists of 2.38 acres of multifamily residential buildings and private drives. Runoff is conveyed along the private drives and captured by area inlets. Runoff is then conveyed to detention Pond B1 via storm drain pipes. Sub-basin B4 consists of 4.30 acres of multifamily residential buildings, single-family attached residential lots, public roadways and private drives. Runoff is conveyed along Schlagel St and Harvest Sun Street to a sump Type R sidewalk culvert. Runoff is then conveyed to Pond B2 and ultimately to detention Pond B1 via storm drain pipes. There is a small portion of this basin that flows to a swale running southwesterly along the northwest property line of the site. These flows are conveyed to a culvert pipe that runs underneath Meadow Spring Drive and into the Sub-basin C of Drainage System C, where the swale continues southwesterly to Pond C. (This basin will be detailed futher in the final drainage report.) Sub-basin B5 consists of 0.73 acres of multifamily residential buildings and public roadways. Runoff is conveyed along Landmark Way Road and captured by Type R sump inlets before the street intersects with Suniga Road. Runoff is then conveyed detention Pond B1 via storm drain pipes. Page 7 Sub-basin B6 consists of 2.55 acres of multifamily residential buildings and detention Pond B1. Runoff is mainly conveyed by sheet flow to the detention pond. A concrete pan conveys all of the collected flow to the outlet structure, restricting flows to the allowed release rate, and ultimately to the existing NECCO reinforced concrete box culvert storm drain. Drainage System C: Drainage System C mainly consists of the area south of Meadow Spring Dr and a portion of Schlagel St north of Suniga Rd. This basin’s improvements are proposed with this current filing. Sub-basin C1 consists of 1.39 acres of single-family attached residential lots and public roadways. Runoff is conveyed along Meadow Spring Dr and Schlagel St to a Type R sump inlet. Runoff captured by this inlet is then conveyed to Pond C via storm drain pipes. Sub-basin C2 consists of 1.78 acres of single-family attached residential lots and detention Pond C. Flows drain to the swale, running southwesterly along the northwest property line of the site, then into pond C. A concrete pan conveys all of the collected flow to the outlet structure, restricting flows to the allowed release rate, and ultimately to the existing NECCO reinforced concrete box culvert storm drain. Drainage System D: Drainage System D consists of the area south of Suniga Rd. Sub-basin D1 consists of 9.21 acres of future multifamily residential buildings, a commercial lot, public roadway, and private drives. This basin will remain undeveloped with the Filing 1 and during the interim condition will continue to follow the historic drainage patterns easterly across the site. Sub-basin D2 consists of 0.91 acres of public roadway along N. Lemay Ave and Suniga Rd. Runoff is conveyed along Suniga Rd and N. Lemay Ave to two Type R sump inlets. Runoff captured by these inlets is conveyed to the existing NECCO reinforced concrete box culvert storm drain, undetained. Drainage System E: Sub-basins E1 & E2 consist of two basins, combining for a total of 7.19 acres of public roadways along Suniga Rd. Runoff is conveyed along Suniga Rd and collected by Type R sump inlets. The locations of these inlets were depicted in the conceptual design of the “East Vine Drive Relocation” utility plans. Runoff captured by these inlets is conveyed to the existing NECCO reinforced concrete box culvert storm drain, undetained. Page 8 DRAINAGE FACILITY DESIGN DRAINAGE CONVEYANCE DESIGN Storm infrastructure to convey runoff will include overland grass-lined swales, concrete trickle pans, inlets, storm sewer and culverts. Storm water detention and water quality enhancement will be achieved through the use of an extended detention basin. Storm inlets, storm sewers and the roadway culverts will be appropriately sized with the final drainage design DETENTION/WATER QUALITY POND DESIGN Multiple extended detention basins (EDB) with a dry bottom will be utilized as the detention and water quality facility for Northfield – Filing 1. The EDBs are designed to reduce the 100-yr developed runoff to the allow 0.2 cfs/acre. For the preliminary drainage study, the FAA method was used to determine the detention volume needed. EPA SWWM will be utilized for the final drainage design. UDFCD is referenced for the water quality capture volume (WQCV) with a 40- yr drain time. Due to the limited grades on the site, multiple ponds are proposed throughout the site with the main detention ponds being located along Suniga Rd. The pond bottoms have been graded to be 2 ft above the measured groundwater levels. The ultimate outfall will be the existing NECCO storm drain system. Not all of the storm infrastructure shown on the Grading & Drainage Plan will be constructed with this filing. Below is a description of the pond networks: Drainage System A: Drainage System A is not proposed to be fully constructed with Filing 1. For planning purposes, the ultimate and interim conditions were studied. This basin is 16.21 acres draining to the detention pond, which allows a release rate of 3.24 cfs. Under the ultimate condition, 3.59 acre- ft of detention storage is required with 0.383 acre-ft WQCV. To achieve the total detention volume, a network of two detention ponds, Pond A1 and Pond A2, will provide the total volume. At final design, SWMM will be utilized to maximize the detention volume in Pond A2 by determining the appropriate release rate, while only allowing the 0.2 cfs/acre from Pond A1. Under the interim condition, runoff from approximately 16.21 acres will be directed to the detention pond, 1.44 acre-ft of detention storage is required with 0.275 acre-ft WQCV. This volume will be achieved in a single pond north of Suniga Rd with a release rate of 3.24 cfs. Drainage System B: Drainage System B’s basin is 17.85 acres which allows a release rate of 3.57 cfs. This requires 3.96 acre-ft of detention storage volume with 0.422 acre-ft WQCV. To achieve the total detention volume, a network of four detention ponds, Pond B1, Pond B2, Pond B3, and Pond B4, Page 9 will provide the total volume. At final design, SWMM will be utilized to maximize the detention volume in upstream ponds by determining the appropriate release rate, while only allowing the 0.2 cfs/acre from Pond B1. Drainage System C: Drainage System C’s basin is 3.80 acres which allows a release rate of 0.76 cfs. This requires 0.84 acre-ft of detention storage volume with 0.090 acre-ft WQCV and is provided in Pond C1. Drainage System D: Drainage System D is not proposed to be constructed with Filing 1 with exception of the inlets and storm drain constructed within N. Lemay Ave. Based on discussions with staff and the existing impervious area associated with the existing N. Lemay Ave improvements, runoff from Lemay is not required to be detained. This basin is 10.11 acres which allows a release rate of 2.02 cfs, requiring 2.24 acre-ft of detention storage 0.239 acre-ft WQCV. It should be noted that the release rates and volumes above assume the 0.2 cfs/acre requirement. The area of the future detention pond and commercial area are within a NECCO basin that restricts runoff rates to the existing conditions. The release rate would likely increase and pond volumes reduced when this is accounted for. Page 10 LOW IMPACT DEVELOPMENT The City of Fort Collins updated the Low Impact Development ordinance in 2016 (Ordinance No. 007, 2016) to require: • Treat at least 75% of any newly developed or redeveloped area using one or a combination of LID techniques, or • Treat at least 50% of any newly developed or redeveloped area using one or a combination of LID techniques when 25% of private driveable surfaces are permeable. To satisfy the required implementation of Low Impact Development (LID) techniques, Northfield - Filing 1 will utilize below grade infiltration galleries. Other LID techniques were explored, but due to the limited grade available and the amount of detention volume required, shallow infiltration galleries assisted in maintaining storm drain grades and detention volumes. Pavers within the private drives did not treat enough contributing area to justify their use. Infiltration galleries will promote infiltration while capturing fine sediment that drains off of the impervious areas. Further soil investigation will occur to confirm the infiltration capacities within the sandy/gravel soil layers approximately 2’ to 5 ½’ below existing grades. It is anticipated that the infiltration gallery aggregates will extend to this sandy/gravel layer. Sumps will be implemented at the headworks to the infiltration galleries to allow larger sediment particle to settle prior to entering the infiltration gallery. The sumps will be accessible to remove sediments. Standard water quality is also provided within the detention ponds in addition to these LID infiltration galleries. A Standard Operations Procedure will be provided at final design to assist in ensuring that these BMPs will adequately perform over time. It was discussed with staff that there may be consideration on lowering the percent of area treated for single-family areas to 50%. Though the current design exceeds the 50% treatment, it is slightly under 75% treatment. For the purposes of the preliminary design, the area of treatment was calculated, rather than the area of impervious area. This approach assumes that the area of treatment has similar correlation to the impervious area treated. These area of treatment calculations will be further detailed in the final drainage design. Conceptual areas shown outside of the Filing 1 improvements are shown for planning purposes. Below is a description of the 4 step process for selecting structural BMPs: Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainageways and implementing long-term source controls. The Four Step Process applies to the management of smaller, frequently occurring events. Page 11 Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). Captured runoff from strategic areas are routed through below grade infiltration galleries. Infiltration galleries will slow runoff, promote infiltration, and filter runoff prior to being released into the adjacent storm drain system. Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release The infiltration galleries are designed to provide water quality capture volume per Urban Drainage’s recommendations and calculations. The captured runoff is design for a 12-hr drain time. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate and volume of runoff during and following development. Because the site will drain to an existing storm system, bank stabilization is unnecessary with this project. Step 4: Implement Site Specific and Other Source Control BMPs Proactively controlling pollutants at their source by preventing pollution rather than removing contaminants once they have entered the stormwater system or receiving waters is important when protecting storm systems and receiving waters. This can be accomplished through site specific needs such as construction site runoff control, post-construction runoff control and pollution prevention / good housekeeping. It will be the responsibility of the contractor to develop a procedural best management practice for the site. All calculations are attached for reference. Page 12 STORMWATER POLLUTION PREVENTION Erosion and sedimentation will be controlled on-site by use of sediment control logs, inlet protection, a gravel construction entrance, seeding, mulch, and turf. The measures are designed to limit the overall sediment yield increase due to construction as required by the City of Fort Collins. During overlot and final grading the soil will be roughened and furrowed perpendicular to the prevailing winds. During the performance of the work required by these specifications or any operations appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall furnish all labor, equipment, materials, and means required. The Contractor shall carry out proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance that has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings, or causing naissance to persons. The Contractor will be held liable for any damage resulting from dust originating from his operations under these specifications on right- of-way or elsewhere. It is unlawful to track or cause to be tracked mud or other debris onto city streets or rights-of- way. Wherever construction vehicles access routes or intersect paved public roads, previsions must be made to minimize the transport of sediment by runoff or vehicles tracking onto the paved surface. Stabilized construction entrances are required with base material consisting of 6” coarse aggregate. The contractor will be responsible for clearing mud tracked onto city streets on a daily basis. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Silt fence and sediment control logs will require periodic replacement. Maintenance is the responsibility of the contractor. All disturbed areas must be seeded and mulched within 30 days of project start. Vegetation shall not be considered established until a ground cover is achieved which is demonstrated to be mature enough to control soil erosion to the satisfaction of the City Inspector and to survive severe weather condition. Page 13 CONCLUSIONS This Preliminary Drainage Report for Northfield – Filing 1 has been prepared to comply with the storm water criteria set by the City of Fort Collins. The proposed preliminary drainage system presented in this report is designed to convey the developed peak storm water runoff through the site to the existing storm drain system and to the development’s LID features, detention and water quality facilities. Storm drains will be sized to provide the required roadway relief in both the 2-yr and 100-yr storm events, and to adequately convey the released runoff from the detention ponds disbursed throughout the site. Overland relief will be provided at all sump locations. The calculated 100-yr peak flows released from the Filing 1 will adhere to the allowed rates as established in the NECCO drainage studies. In this preliminary drainage report, we have shown the conceptual future improvements for planning purposes and confirm that the ultimate buildout of the Northfield future phases are appropriately anticipated. This preliminary drainage report anticipates the implementation of best management practices for erosion control, temporary and permanent, and on-site construction facilities that will be further designed and details in the Final Drainage Report. It can therefore be concluded that development of Northfield – Filing 1 will comply with the storm water jurisdictional criteria and will not adversely affect the adjacent properties, streets, storm drain system and/or detention/water quality facilities. Controlling the developed runoff from these improvements will actually improve the current situations currently existing on the site. Therefore, this preliminary report satisfies the burden of proof needed to proceed to a Final Drainage Report. Page 14 REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage and Flood Control District, June 2001, Revised November 2010. 2. Storm Drainage Criteria Manual and Construction Standards, City of Fort Collins Storm Water Utility, City of Fort Collins, Colorado, Updated January, 1997 with 2012 amendments. 3. Fort Collins Stormwater Criterial Manual (Draft for Council), Fort Collins Utilities, City of Fort Collins, Colorado, Dated November 2017 [Anticipated to be adopted by City Council in 2017] 4. “Hydrologic Group Rating for Larimer County Area, Colorado”, USDA-Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov. [12/06/2017] 5. “Preliminary Subsurface Exploration and Groundwater Report – Schlagel Property”, prepared by Earth Engineering Consultants, LLC, Dated August 16, 2017 6. “Public Improvement Plans, East Vine Drive Relocation”, prepared by Ayres Associates, Dated February 2009, obtained from City of Fort Collins. 7. “Utility Plans for NECCO Ponds and Backbone” – Record Drawings, prepared by Ayres Associates, Dated June 2017, obtained from the City of Fort Collins. 8. “Flood Insurance Rate Map, Larimer County, Colorado – Map Number 08069C0977G”, Federal Emergency Management Agency, Map Revised June 17, 2008. 9. “Flood Insurance Rate Map, Larimer County, Colorado – Map Number 08069C0981G”, Federal Emergency Management Agency, Map Revised June 17, 2008. Page 15 APPENDIX Appendix A – Site Descriptions, Characteristics, & References Appendix B – Rational Calculations Appendix C – Detention Pond Calculations Appendix D – Street Capacities Appendix E – Low Impact Development Calculations Appendix A APPENDIX A – SITE DESCRIPTIONS, CHARACTERISTICS, & REFERENCES SITE Vicinity Map PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK #43-97 ON THE SOUTH END OF THE WEST HEADWALL OF THE LAKE CANAL BRIDGE AT NORTH LEMAY AVENUE, 200 FEET SOUTH OF THE INTERSECTION OF LEMAY AVENUE. AND CONIFER STREET ELEV= 4960.11 CITY OF FORT COLLINS BENCHMARK #12-07 SOUTH SIDE OF VINE DRIVE ON THE SOUTH HEADWALL OF THE BRIDGE OVER DRY CREEK BASIN 0.4 MILES EAST OF NORTH LEMAY AVENUE ELEV= 4947.86 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. IF NGVD29 UNADJUSTED IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATIONS SHOULD BE USED: NGVD UNADJUSTED = 4960.11 (NAVD88) - 3.17 NGVD UNADJUSTED = 4947.81 (NAVD88) - 3.18 NTS Hydrologic Soil Group—Larimer County Area, Colorado (NorthField) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 1 of 4 4494130 4494220 4494310 4494400 4494490 4494580 4494670 4494130 4494220 4494310 4494400 4494490 4494580 4494670 494350 494440 494530 494620 494710 494800 494890 494980 495070 495160 494350 494440 494530 494620 494710 494800 494890 494980 495070 495160 40° 36' 11'' N 105° 4' 2'' W 40° 36' 11'' N 105° 3' 23'' W 40° 35' 52'' N 105° 4' 2'' W 40° 35' 52'' N 105° 3' 23'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 200 400 800 1200 Feet 0 50 100 200 300 Meters Map Scale: 1:4,140 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 64 Loveland clay loam, 0 to 1 percent slopes C 11.9 20.9% 73 Nunn clay loam, 0 to 1 percent slopes C 16.6 29.2% 76 Nunn clay loam, wet, 1 to 3 percent slopes C 28.3 49.9% Totals for Area of Interest 56.7 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—Larimer County Area, Colorado NorthField Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 3 of 4 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado NorthField Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 4 of 4 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 Intensity (in/hr) City of Fort Collins Rainfall Intensity-Duration-Frequency Curve 2-yr (FTC) 10-yr (FTC) 100-yr (FTC) 2-yr (UD) 10-yr (UD) 100-yr (UD) 100-yr 10-yr 0.0 1.0 2.0 3.0 4.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 65.0 Duration (min) 2-yr 10-yr Duration (minutes) 2-yr Intensity (in/hr) 10-yr Intensity (in/hr) 100-yr Intensity (in/hr) Duration (minutes) 2-yr Intensity (in/hr) 10-yr Intensity (in/hr) 100-yr Intensity (in/hr) 5 2.85 4.87 9.95 33 1.22 2.08 4.24 6 2.67 4.56 9.31 34 1.19 2.04 4.16 7 2.52 4.31 8.80 35 1.17 2.00 4.08 8 2.40 4.10 8.38 36 1.15 1.96 4.01 9 2.30 3.93 8.03 37 1.13 1.93 3.93 10 2.21 3.78 7.72 38 1.11 1.89 3.87 11 2.13 3.63 7.42 39 1.09 1.86 3.80 12 2.05 3.50 7.16 40 1.07 1.83 3.74 13 1.98 3.39 6.92 41 1.05 1.80 3.68 14 1.92 3.29 6.71 42 1.04 1.77 3.62 15 1.87 3.19 6.52 43 1.02 1.74 3.56 16 1.81 3.08 6.30 44 1.01 1.72 3.51 17 1.75 2.99 6.10 45 0.99 1.69 3.46 18 1.70 2.90 5.92 46 0.98 1.67 3.41 19 1.65 2.82 5.75 47 0.96 1.64 3.36 20 1.61 2.74 5.60 48 0.95 1.62 3.31 21 1.56 2.67 5.46 49 0.94 1.60 3.27 22 1.53 2.61 5.32 50 0.92 1.58 3.23 23 1.49 2.55 5.20 51 0.91 1.56 3.18 24 1.46 2.49 5.09 52 0.90 1.54 3.14 25 1.43 2.44 4.98 53 0.89 1.52 3.10 26 1.40 2.39 4.87 54 0.88 1.50 3.07 27 1.37 2.34 4.78 55 0.87 1.48 3.03 28 1.34 2.29 4.69 56 0.86 1.47 2.99 29 1.32 2.25 4.60 57 0.85 1.45 2.96 30 1.30 2.21 4.52 58 0.84 1.43 2.92 31 1.27 2.16 4.42 59 0.83 1.42 2.89 32 1.24 2.12 4.33 60 0.82 1.40 2.86 Figure 3-1a City of Fort Collins Rainfall Intensity-Duration-Frequency Table for using the Rational Method Duration 2-yr 10-yr 100-yr 2-yr ∆∆∆∆ 10-yr ∆∆∆∆ 100-yr ∆∆∆∆ 5 2.85 4.87 9.95 2.78 -0.07 4.74 -0.13 9.68 -0.27 6 2.67 4.56 9.31 2.64 -0.03 4.51 -0.05 9.20 -0.11 7 2.52 4.31 8.80 2.52 0.00 4.30 -0.01 8.78 -0.02 8 2.40 4.10 8.38 2.41 0.01 4.11 0.01 8.39 0.01 9 2.30 3.93 8.03 2.31 0.01 3.94 0.01 8.04 0.01 10 2.21 3.78 7.72 2.21 0.00 3.78 0.00 7.72 0.00 11 2.13 3.63 7.42 2.13 0.00 3.64 0.01 7.43 0.01 2-yr 0.82 12 2.05 3.50 7.16 2.05 0.00 3.51 0.01 7.16 0.00 10-yr 1.40 13 1.98 3.39 6.92 1.98 0.00 3.39 0.00 6.92 0.00 100-yr 2.86 14 1.92 3.29 6.71 1.92 0.00 3.28 -0.01 6.69 -0.02 15 1.87 3.19 6.52 1.86 -0.01 3.17 -0.02 6.48 -0.04 16 1.81 3.08 6.30 1.80 -0.01 3.08 0.00 6.28 -0.02 C 1 28.5 17 1.75 2.99 6.10 1.75 0.00 2.99 0.00 6.10 0.00 C 2 10 18 1.70 2.90 5.92 1.70 0.00 2.90 0.00 5.93 0.01 C 3 0.786651 19 1.65 2.82 5.75 1.65 0.00 2.82 0.00 5.77 0.02 20 1.61 2.74 5.60 1.61 0.00 2.75 0.01 5.61 0.01 21 1.56 2.67 5.46 1.57 0.01 2.68 0.01 5.47 0.01 22 1.53 2.61 5.32 1.53 0.00 2.61 0.00 5.34 0.02 23 1.49 2.55 5.20 1.49 0.00 2.55 0.00 5.21 0.01 24 1.46 2.49 5.09 1.46 0.00 2.49 0.00 5.09 0.00 25 1.43 2.44 4.98 1.43 0.00 2.43 -0.01 4.97 -0.01 26 1.40 2.39 4.87 1.39 -0.01 2.38 -0.01 4.86 -0.01 27 1.37 2.34 4.78 1.36 -0.01 2.33 -0.01 4.76 -0.02 28 1.34 2.29 4.69 1.34 0.00 2.28 -0.01 4.66 -0.03 29 1.32 2.25 4.60 1.31 -0.01 2.24 -0.01 4.57 -0.03 30 1.30 2.21 4.52 1.28 -0.02 2.19 -0.02 4.48 -0.04 31 1.27 2.16 4.42 1.26 -0.01 2.15 -0.01 4.39 -0.03 32 1.24 2.12 4.33 1.24 0.00 2.11 -0.01 4.31 -0.02 33 1.22 2.08 4.24 1.21 -0.01 2.07 -0.01 4.23 -0.01 34 1.19 2.04 4.16 1.19 0.00 2.03 -0.01 4.15 -0.01 Coefficients Intensity (in/hr) Urban Drainage Intensity (in/hr) City of Fort Collins Urban Drainage Inputs Urban Drainage Intensity Equation 1-hr Rainfall Depths (P 1 ) City of Fort Collins Rainfall Intensity-Duration-Frequency Table Use of Urban Drainage Intensity Equation for CoFC IDF Values This cell was determined using Solver to best match intensities given from the Fort Collins IDF values. C 3 2 1 1 ( c ) C t C P I + = 34 1.19 2.04 4.16 1.19 0.00 2.03 -0.01 4.15 -0.01 35 1.17 2.00 4.08 1.17 0.00 2.00 0.00 4.08 0.00 36 1.15 1.96 4.01 1.15 0.00 1.96 0.00 4.01 0.00 37 1.13 1.93 3.93 1.13 0.00 1.93 0.00 3.94 0.01 2-year 5-yr 10-yr 25-yr 50-yr 100-yr 5 0.29 0.40 0.49 0.63 0.79 1.00 10 0.33 0.45 0.56 0.72 0.90 1.14 15 0.38 0.53 0.65 0.84 1.05 1.33 20 0.64 0.89 1.09 1.41 1.77 2.23 25 0.81 1.13 1.39 1.80 2.25 2.84 30 1.57 2.19 2.69 3.48 4.36 5.49 35 2.85 3.97 4.87 6.30 7.90 9.95 40 1.18 1.64 2.02 2.61 3.27 4.12 45 0.71 0.99 1.21 1.57 1.97 2.48 50 0.42 0.58 0.71 0.92 1.16 1.46 55 0.35 0.49 0.60 0.77 0.97 1.22 60 0.30 0.42 0.52 0.67 0.84 1.06 65 0.20 0.28 0.39 0.62 0.79 1.00 70 0.19 0.27 0.37 0.59 0.75 0.95 75 0.18 0.25 0.35 0.56 0.72 0.91 80 0.17 0.24 0.34 0.54 0.69 0.87 85 0.17 0.23 0.32 0.52 0.66 0.84 90 0.16 0.22 0.31 0.50 0.64 0.81 95 0.15 0.21 0.30 0.48 0.62 0.78 100 0.15 0.20 0.29 0.47 0.60 0.75 105 0.14 0.19 0.28 0.45 0.58 0.73 110 0.14 0.19 0.27 0.44 0.56 0.71 115 0.13 0.18 0.26 0.42 0.54 0.69 120 0.13 0.18 0.25 0.41 0.53 0.67 City of Fort Collins Design Storms for using SWMM Figure 3-1c Time (min) Intensity (in/hr) These are the 1-hour storm 2-year 5-yr 10-yr 25-yr 50-yr 100-yr 1-hr 0.82 1.14 1.40 1.81 2.27 2.86 2-hr 0.98 1.36 1.71 2.31 2.91 3.67 Storm Duration Rainfall Depth (in) Note: The City of Fort Collins SWWM input hyetopgrah is used to calculate the 1-hr and 2-hr storm rainfall depths for the different storm events. These are the 1-hour storm depths that are used in the Urban Drainage intensity equation, derived from the CoFC Hyetograph. LEGEND DRAINAGE BASIN BASIN NUMBER BASIN AREA (ACRES) EXHIBIT 4.2 FUTURE DETENTION AND WATER QUALITY REQUIREMENTS RESTRICT AMOUNT OF RUNOFF TO EXISTING CONDITIONS IF RE-DEVELOPED. WATER QUALITY PROVIDED IN REDWOOD POND REQUIRE FUTURE ON-SITE DETENTION & WATER QUALITY. RELEASE RATE @ 0.20 cfs/acre REQUIRE FUTURE ON-SITE DETENTION. WATER QUALITY PROVIDED IN REGIONAL POND. FUTURE RE-ALIGNED VINE DRIVE. WATER QUALITY PROVIDED WITH SNOUTS. DISCHARGE INTO REGIONAL POND WITHOUT FUTURE DETENTION OR WATER QUALITY. RESTRICT AMOUNT OF RUNOFF TO EXISTING CONDITIONS IF RE-DEVELOPED. FUTURE WATER QUALITY REQUIRED. RESTRICT AMOUNT OF RUNOFF TO EXISTING CONDITIONS IF RE-DEVELOPED. WATER QUALITY PROVIDED IN REGINAL POND. BASIN 103: NO DETENTION OR WATER QUALITY REQURED IF DISCHARGING INTO EVERGREEN WEST POND COLLEGE AVENUE RED CEDAR CIRCLE LEMAY AVENUE DRY CREEK BRISTLECONE DRIVE CONIFER STREET NOKOMIS COURT BLUE SPRUCE DRIVE CONIFER STREET LUPINE DRIVE REDWOOD POND REGIONAL POND REDWOOD STREET COLLEGE AVENUE JEROME STREET BONDELL STREET OSIANDER STREET EAST VINE DRIVE 70.0 ac 68.2 ac 13.2 ac 1 Jason Claeys From: Jaclyn Michaelsen <jmichaelsen@iconeng.com> Sent: Thursday, October 12, 2017 11:50 AM To: Jason Claeys Cc: Linsey Chalfant Subject: RE: Necco-Construction Plans The manhole on the northwest corner of Suniga and Lemay is MH Riser A-7. It is approximately 500-ft to the west of Lemay. The invert of the riser is at a 4943.68. The HGL is at a 4947.68 in the Master Plan condition. The Master Plan had the Schlagel property connecting into the system at this junction. I would check with the City, but I would assume tat you could connect into the storm sewer anywhere downstream of this location. Let me know if you need another elevation. Thanks Jaclyn Michaelsen 970.310.1547 From: Jason Claeys [mailto:jclaeys@interwestgrp.com] Sent: Wednesday, October 11, 2017 10:54 AM To: Jaclyn Michaelsen <jmichaelsen@iconeng.com> Cc: Linsey Chalfant <lchalfant@fcgov.com> Subject: RE: Necco-Construction Plans Hi Jackie, I hope that all is well. I am digging deeper into our stormwater design for the Schlagel property. I am anticipating tying to the NECCO line near the northwest corner of (Old) Lemay and Suniga. There were a few HGL’s in the report Lindsey sent but not near this intersection. Would you be able to send me appendixes to the report for reference and possibly the SWMM model? I want to review how the HGL’s in the NECCO pipe will affect our detention. Thanks! Jason T. Claeys, P.E., LEED AP Interwest Consulting Group | jclaeys@interwestgrp.com 1218 W Ash St, Suite A | Windsor, CO 80550 D 970.347.8917 | M 970.817.1712 | www.interwestgrp.com Appendix B APPENDIX B – RATIONAL CALCULATIONS ONLY ONLY ONLY ONLY ONLY ONLY ONLY lake canal dry creek lake canal POND A1 POND A2 N. LEMAY AVENUE SNYDER DRIVE HARVEST SUN STREET PIONEER TRAIL ROAD MEADOW SPRING DRIVE LANDMARK WAY ROAD SCHLAGEL STREET SCHLAGEL STREET N. LEMAY AVENUE SNYDER DRIVE POND B1 POND B2 POND B3 POND B4 POND C POND D 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME NORTHFIELD OVERALL DRAINAGE EXHIBIT 12/13/17 1"= 100' N/A LAJ JTC 1282-168-03 1 of 1 1170 West Ash Street, Suite 100 Windsor, Colorado 80550 Office: 970.460.0567 BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY Northfield DEVELOPED IMPERVIOUS AREA CALCULATION Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised January 2016) BASINS: % Impervious Runoff Coefficient C Return Period Frequency Adjustment Factor (Cf) 100% 0.95 2-year to 10-year 1.00 90% 0.95 100-year 1.25 90% 0.95 40% 0.50 0% 0.25 C2 to C10 C100 A1 463,045 10.630 60.0% 0.67 0.84 A2 35,384 0.812 60.0% 0.67 0.84 A3 92,687 2.128 60.0% 0.67 0.84 A4 148,850 3.417 60.0% 0.67 0.84 A5 115,077 2.642 60.0% 0.67 0.84 B1 228,242 5.240 60.0% 0.67 0.84 B2 143,112 3.285 60.0% 0.67 0.84 B3 103,867 2.384 60.0% 0.67 0.84 B4 187,106 4.295 60.0% 0.67 0.84 B5 31,832 0.731 60.0% 0.67 0.84 B6 110,921 2.546 60.0% 0.67 0.84 C1 60,327 1.385 60.0% 0.67 0.84 C2 77,729 1.784 60.0% 0.67 0.84 D1 401,014 9.206 60.0% 0.67 0.84 D2 39,433 0.905 60.0% 0.67 0.84 E1 49,549 1.137 60.0% 0.67 0.84 E2 263,309 6.045 60.0% 0.67 0.84 Overall 2,551,484 58.574 60.0% 0.67 0.84 A1 (interim) 463,045 10.630 16.2% 0.36 0.45 Interim Basins A to Pond A1 706,193 16.212 10.6% 0.32 0.41 L. Johnson Interwest Consulting Group 1282-168-03 December 13, 2017 % Impervious values from Table RO-3 in the Urban Storm Drainage Criteria Manual Runoff Coefficients and Frequency Adjustment Factors for City of Fort Collins - Storm Water Criteria Manual Land Use Paved Roof Walks Gravel/Pavers Northfield DEVELOPED TIME OF CONCENTRATION Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 6-2 -Equation 6-4 -Urbanized Check Equation 6-5 -Equation 6-3 CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins BASINS Type of Travel Surface Cv A1 A1 60.0% 0.67 10.630 300 0.0100 13.66 571 0.0061 Paved Areas 20 1.57 6.07 19.73 0.0075 15.36 15.36 A2 A2 60.0% 0.67 0.812 68 0.0201 5.14 186 0.0100 Paved Areas 20 2.00 1.55 6.69 0.0127 10.42 6.69 A3 A3 60.0% 0.67 2.128 227 0.0076 13.02 322 0.0050 Paved Areas 20 1.41 3.80 16.82 0.0061 13.45 13.45 A4 A4 60.0% 0.67 3.417 300 0.0100 13.66 1133 0.0035 Paved Areas 20 1.19 15.87 29.53 0.0049 21.94 21.94 A5 A5 60.0% 0.67 2.642 95 0.0630 4.16 330 0.0029 Paved Areas 20 1.07 5.14 9.31 0.0163 11.10 9.31 B1 B1 60.0% 0.67 5.240 133 0.0050 11.45 492 0.0058 Paved Areas 20 1.52 5.41 16.86 0.0056 14.28 14.28 B2 B2 60.0% 0.67 3.285 19 0.0265 2.45 362 0.0102 Paved Areas 20 2.02 2.98 5.43 0.0110 11.29 5.43 B3 B3 60.0% 0.67 2.384 300 0.0066 15.68 178 0.0066 Paved Areas 20 1.62 1.82 17.51 0.0066 12.71 12.71 B4 B4 60.0% 0.67 4.295 82 0.0329 4.79 373 0.0050 Paved Areas 20 1.41 4.42 9.21 0.0100 11.88 9.21 B5 B5 60.0% 0.67 0.731 60 0.0083 6.50 271 0.0169 Paved Areas 20 2.60 1.74 8.24 0.0154 10.69 8.24 B6 B6 60.0% 0.67 2.546 177 0.0343 6.95 688 0.0050 Paved Areas 20 1.41 8.10 15.06 0.0110 14.21 14.21 C1 C1 60.0% 0.67 1.385 24 0.0302 2.68 345 0.0090 Paved Areas 20 1.90 3.02 5.71 0.0104 11.28 5.71 C2 C2 60.0% 0.67 1.784 251 0.0214 9.69 561 0.0050 Paved Areas 20 1.41 6.62 16.31 0.0101 14.11 14.11 D1 D1 60.0% 0.67 9.206 300 0.0085 14.43 936 0.0058 Paved Areas 20 1.52 10.25 24.68 0.0064 18.72 18.72 D2 D2 60.0% 0.67 0.905 19 0.0274 2.43 384 0.0052 Paved Areas 20 1.44 4.45 6.89 0.0062 12.23 6.89 E1 E1 60.0% 0.67 1.137 43 0.0334 3.47 346 0.0062 Paved Areas 20 1.58 3.65 7.11 0.0093 11.55 7.11 E2 E2 60.0% 0.67 6.045 43 0.0331 3.47 1135 0.0073 Paved Areas 20 1.71 11.06 14.53 0.0083 17.18 14.53 A1 (interim) A1 (interim) 16.2% 0.36 10.630 300 0.0090 24.20 945 0.0064 Grassed Waterway 15 1.20 13.16 37.36 0.0070 31.18 31.18 SUB-BASIN DATA % Impervious Urban Check tc (min) OVERALL SLOPE (ft/ft) TRAVEL TIME (tt) SLOPE (ft/ft) VELOCITY (ft/s) tt (min) AREA (acres) LENGTH (ft) REMARKS Final Northfield DEVELOPED PEAK RUNOFF Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised August 2006) EQUATIONS: I = rainfall intensity (in/hr) Q n = n -yr peak discharge (cfs) P 1 = one-hour point rainfall depth (in) C n = n -yr runoff coefficient t c = time of concentration (min) I n = n -yr rainfall intensity (in/hr) P 1-2yr = 0.82 in A n = Basin drainage area (ac) P 1-10yr = 1.40 in P 1-100yr = 2.86 in BASIN SUMMARY: Runoff Coeff. (C2 ) C(A) (acres) Intensity (in/hr) Q (ft 3 /s) Runoff Coeff. (C10 ) C(A) (acres) Intensity (in/hr) Q (ft 3 /s) Runoff Coeff. (C100 ) C(A) (acres) Intensity (in/hr) Q (ft 3 /s) A1 A1 10.630 15.36 0.67 7.12 1.84 13.08 0.67 7.12 3.14 22.33 0.84 8.90 6.41 57.03 A2 A2 0.812 6.69 0.67 0.54 2.55 1.39 0.67 0.54 4.36 2.37 0.84 0.68 8.90 6.06 A3 A3 2.128 13.45 0.67 1.43 1.95 2.78 0.67 1.43 3.34 4.75 0.84 1.78 6.81 12.14 A4 A4 3.417 21.94 0.67 2.29 1.53 3.51 0.67 2.29 2.62 5.99 0.84 2.86 5.34 15.29 A5 A5 2.642 9.31 0.67 1.77 2.28 4.03 0.67 1.77 3.89 6.88 0.84 2.21 7.94 17.57 B1 B1 5.240 14.28 0.67 3.51 1.90 6.67 0.67 3.51 3.25 11.39 0.84 4.39 6.63 29.09 B2 B2 3.285 5.43 0.67 2.20 2.71 5.98 0.67 2.20 4.64 10.20 0.84 2.75 9.47 26.05 B3 B3 2.384 12.71 0.67 1.60 2.00 3.20 0.67 1.60 3.42 5.46 0.84 2.00 6.99 13.95 B4 B4 4.295 9.21 0.67 2.88 2.29 6.58 0.67 2.88 3.90 11.23 0.84 3.60 7.97 28.68 B5 B5 0.731 8.24 0.67 0.49 2.38 1.17 0.67 0.49 4.06 1.99 0.84 0.61 8.30 5.08 B6 B6 2.546 14.21 0.67 1.71 1.91 3.25 0.67 1.71 3.25 5.55 0.84 2.13 6.65 14.17 C1 C1 1.385 5.71 0.67 0.93 2.68 2.48 0.67 0.93 4.57 4.24 0.84 1.16 9.34 10.83 C2 C2 1.784 14.11 0.67 1.20 1.91 2.29 0.67 1.20 3.26 3.90 0.84 1.49 6.67 9.96 D1 D1 9.206 18.72 0.67 6.17 1.67 10.27 0.67 6.17 2.84 17.54 0.84 7.71 5.81 44.79 D2 D2 0.905 6.89 0.67 0.61 2.53 1.53 0.67 0.61 4.32 2.62 0.84 0.76 8.82 6.69 Appendix C APPENDIX C – DETENTION POND CALCULATIONS Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA 0.67 1.25 0.84 ft3 acre-ft 16.212 acres 156,530 3.59 3.24 cfs Time (min) 100-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.00 0.00 0 0 0 0.00 5 9.95 135.10 40,529 973 39,556 0.91 10 7.72 104.82 62,891 1,945 60,946 1.40 15 6.52 88.53 79,673 2,918 76,755 1.76 20 5.60 76.03 91,241 3,891 87,350 2.01 25 4.98 67.62 101,424 4,864 96,561 2.22 30 4.52 61.37 110,467 5,836 104,631 2.40 35 4.08 55.40 116,332 6,809 109,523 2.51 40 3.74 50.78 121,872 7,782 114,090 2.62 45 3.46 46.98 126,841 8,754 118,087 2.71 50 3.23 43.86 131,566 9,727 121,839 2.80 55 3.03 41.14 135,762 10,700 125,062 2.87 60 2.86 38.83 139,794 11,673 128,122 2.94 65 2.72 36.93 144,031 12,645 131,385 3.02 70 2.59 35.17 147,697 13,618 134,079 3.08 75 2.48 33.67 151,525 14,591 136,935 3.14 80 2.38 32.31 155,110 15,564 139,546 3.20 85 2.29 31.09 158,572 16,536 142,036 3.26 90 2.21 30.01 162,034 17,509 144,526 3.32 95 2.13 28.92 164,845 18,482 146,363 3.36 100 2.06 27.97 167,819 19,454 148,364 3.41 105 2.00 27.16 171,077 20,427 150,650 3.46 110 1.94 26.34 173,847 21,400 152,447 3.50 115 1.89 25.66 177,065 22,373 154,692 3.55 120 1.84 24.98 179,875 23,345 156,530 3.59 125 1.79 24.30 182,279 24,318 157,961 3.63 130 1.75 23.76 185,334 25,291 160,043 3.67 135 1.71 23.22 188,063 26,263 161,799 3.71 140 1.67 22.67 190,466 27,236 163,230 3.75 145 1.63 22.13 192,543 28,209 164,334 3.77 150 1.60 21.72 195,517 29,182 166,335 3.82 Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA 0.32 1.25 0.40 ft3 acre-ft 16.212 acres 62,565 1.44 3.24 cfs Time (min) 100-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.00 0.00 0 0 0 0.00 5 9.95 64.52 19,357 973 18,384 0.42 10 7.72 50.06 30,038 1,945 28,092 0.64 15 6.52 42.28 38,053 2,918 35,135 0.81 20 5.60 36.31 43,578 3,891 39,687 0.91 25 4.98 32.29 48,441 4,864 43,578 1.00 30 4.52 29.31 52,760 5,836 46,924 1.08 35 4.08 26.46 55,562 6,809 48,753 1.12 40 3.74 24.25 58,208 7,782 50,426 1.16 45 3.46 22.44 60,581 8,754 51,827 1.19 50 3.23 20.95 62,838 9,727 53,111 1.22 55 3.03 19.65 64,842 10,700 54,142 1.24 60 2.86 18.55 66,768 11,673 55,095 1.26 65 2.72 17.64 68,791 12,645 56,145 1.29 70 2.59 16.80 70,542 13,618 56,924 1.31 75 2.48 16.08 72,370 14,591 57,780 1.33 80 2.38 15.43 74,082 15,564 58,519 1.34 85 2.29 14.85 75,736 16,536 59,200 1.36 90 2.21 14.33 77,390 17,509 59,881 1.37 95 2.13 13.81 78,732 18,482 60,250 1.38 100 2.06 13.36 80,152 19,454 60,698 1.39 105 2.00 12.97 81,708 20,427 61,281 1.41 110 1.94 12.58 83,031 21,400 61,632 1.41 115 1.89 12.26 84,568 22,373 62,196 1.43 120 1.84 11.93 85,911 23,345 62,565 1.44 125 1.79 11.61 87,058 24,318 62,740 1.44 130 1.75 11.35 88,518 25,291 63,227 1.45 135 1.71 11.09 89,821 26,263 63,558 1.46 140 1.67 10.83 90,969 27,236 63,733 1.46 145 1.63 10.57 91,961 28,209 63,752 1.46 150 1.60 10.38 93,381 29,182 64,200 1.47 Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA 0.67 1.25 0.84 ft3 acre-ft 17.853 acres 172,374 3.96 3.57 cfs Time (min) 100-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.00 0.00 0 0 0 0.00 5 9.95 148.77 44,631 1,071 43,560 1.00 10 7.72 115.43 69,257 2,142 67,115 1.54 15 6.52 97.49 87,738 3,214 84,524 1.94 20 5.60 83.73 100,477 4,285 96,192 2.21 25 4.98 74.46 111,691 5,356 106,335 2.44 30 4.52 67.58 121,649 6,427 115,221 2.65 35 4.08 61.00 128,108 7,498 120,610 2.77 40 3.74 55.92 134,208 8,569 125,639 2.88 45 3.46 51.73 139,681 9,641 130,040 2.99 50 3.23 48.29 144,884 10,712 134,172 3.08 55 3.03 45.30 149,504 11,783 137,721 3.16 60 2.86 42.76 153,945 12,854 141,090 3.24 65 2.72 40.67 158,610 13,925 144,684 3.32 70 2.59 38.73 162,647 14,997 147,650 3.39 75 2.48 37.08 166,863 16,068 150,795 3.46 80 2.38 35.59 170,810 17,139 153,671 3.53 85 2.29 34.24 174,623 18,210 156,413 3.59 90 2.21 33.04 178,436 19,281 159,155 3.65 95 2.13 31.85 181,531 20,352 161,178 3.70 100 2.06 30.80 184,805 21,424 163,382 3.75 105 2.00 29.90 188,394 22,495 165,899 3.81 110 1.94 29.01 191,444 23,566 167,878 3.85 115 1.89 28.26 194,988 24,637 170,350 3.91 120 1.84 27.51 198,083 25,708 172,374 3.96 125 1.79 26.76 200,729 26,780 173,950 3.99 130 1.75 26.17 204,093 27,851 176,243 4.05 135 1.71 25.57 207,099 28,922 178,177 4.09 140 1.67 24.97 209,745 29,993 179,752 4.13 145 1.63 24.37 212,033 31,064 180,968 4.15 150 1.60 23.92 215,307 32,135 183,172 4.21 Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Detention Volume Calculation - C Basins 0.67 1.25 0.84 ft3 acre-ft 3.797 acres 36,661 0.84 0.76 cfs Time (min) 100-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.00 0.00 0 0 0 0.00 5 9.95 31.64 9,492 228 9,264 0.21 10 7.72 24.55 14,730 456 14,274 0.33 15 6.52 20.73 18,660 683 17,977 0.41 20 5.60 17.81 21,370 911 20,458 0.47 25 4.98 15.84 23,755 1,139 22,615 0.52 30 4.52 14.37 25,872 1,367 24,505 0.56 35 4.08 12.97 27,246 1,595 25,651 0.59 40 3.74 11.89 28,544 1,823 26,721 0.61 45 3.46 11.00 29,707 2,050 27,657 0.63 50 3.23 10.27 30,814 2,278 28,536 0.66 55 3.03 9.64 31,797 2,506 29,291 0.67 60 2.86 9.09 32,741 2,734 30,007 0.69 65 2.72 8.65 33,733 2,962 30,772 0.71 70 2.59 8.24 34,592 3,189 31,402 0.72 75 2.48 7.89 35,489 3,417 32,071 0.74 80 2.38 7.57 36,328 3,645 32,683 0.75 85 2.29 7.28 37,139 3,873 33,266 0.76 90 2.21 7.03 37,950 4,101 33,849 0.78 95 2.13 6.77 38,608 4,329 34,280 0.79 100 2.06 6.55 39,305 4,556 34,748 0.80 105 2.00 6.36 40,068 4,784 35,284 0.81 110 1.94 6.17 40,717 5,012 35,705 0.82 115 1.89 6.01 41,470 5,240 36,230 0.83 120 1.84 5.85 42,128 5,468 36,661 0.84 125 1.79 5.69 42,691 5,696 36,996 0.85 130 1.75 5.56 43,407 5,923 37,484 0.86 135 1.71 5.44 44,046 6,151 37,895 0.87 140 1.67 5.31 44,609 6,379 38,230 0.88 145 1.63 5.18 45,095 6,607 38,489 0.88 Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA 0.67 1.25 0.84 ft3 acre-ft 10.111 acres 97,624 2.24 2.02 cfs Time (min) 100-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.00 0.00 0 0 0 0.00 5 9.95 84.26 25,277 607 24,670 0.57 10 7.72 65.37 39,224 1,213 38,010 0.87 15 6.52 55.21 49,690 1,820 47,870 1.10 20 5.60 47.42 56,905 2,427 54,478 1.25 25 4.98 42.17 63,256 3,033 60,222 1.38 30 4.52 38.28 68,895 3,640 65,255 1.50 35 4.08 34.55 72,554 4,247 68,307 1.57 40 3.74 31.67 76,008 4,853 71,155 1.63 45 3.46 29.30 79,108 5,460 73,648 1.69 50 3.23 27.35 82,055 6,067 75,988 1.74 55 3.03 25.66 84,671 6,673 77,998 1.79 60 2.86 24.22 87,186 7,280 79,906 1.83 65 2.72 23.03 89,828 7,887 81,942 1.88 70 2.59 21.93 92,114 8,493 83,621 1.92 75 2.48 21.00 94,502 9,100 85,403 1.96 80 2.38 20.15 96,738 9,707 87,031 2.00 85 2.29 19.39 98,897 10,313 88,584 2.03 90 2.21 18.71 101,057 10,920 90,137 2.07 95 2.13 18.04 102,810 11,527 91,283 2.10 100 2.06 17.44 104,664 12,133 92,531 2.12 105 2.00 16.94 106,696 12,740 93,956 2.16 110 1.94 16.43 108,424 13,347 95,077 2.18 115 1.89 16.00 110,431 13,953 96,478 2.21 120 1.84 15.58 112,184 14,560 97,624 2.24 125 1.79 15.16 113,682 15,167 98,516 2.26 130 1.75 14.82 115,588 15,773 99,815 2.29 135 1.71 14.48 117,290 16,380 100,910 2.32 140 1.67 14.14 118,789 16,986 101,802 2.34 145 1.63 13.80 120,084 17,593 102,491 2.35 150 1.60 13.55 121,939 18,200 103,739 2.38 Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A 16.212 acres Imperviousness, I 60.0% WQCV (watershed inches) 0.236 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.383 acre-feet Including 20% for Sedimentation Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond A1 CONTOUR (FT) AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4948.00 0 0.00 0.00 0.00 0.00 4949.0 22111 0.51 0.17 1.00 0.17 4950.0 53203 1.22 0.84 2.00 1.01 4951.0 59483 1.37 1.29 3.00 2.30 4952.0 63661 1.46 1.41 4.00 3.71 Pond A2 CONTOUR (FT) AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4950.21 0 0.00 0.00 0.00 0.00 4951.0 6205 0.14 0.04 0.79 0.04 4952.0 15932 0.37 0.25 1.79 0.28 4953.0 19106 0.44 0.40 2.79 0.68 3.59 ac-ft 4.40 ac-ft Critical Pond Elevations - A Basins J.Claeys Interwest Consulting Group 1282-163-03 December 13, 2017 Volume Required: Combined Volume Provided: Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised November 2010) ( ) 3 AAAADepth 1 2 1 2 V + + = * * 1 . 2 12 Area WQCV Volume      Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A 16.212 acres Imperviousness, I 36.3% WQCV (watershed inches) 0.170 inches 40-Hour Drain Time (Table 3-2) Required WQCV 0.275 acre-feet Including 20% for Sedimentation Stage Storage Volume (pond volume calculated using the prismoidal formula): CONTOUR (FT) AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4948.00 0 0.00 0.00 0.00 0.00 4949.0 16146 0.37 0.12 1.00 0.12 4950.0 38428 0.88 0.61 2.00 0.73 4951.0 54071 1.24 1.06 3.00 1.79 4951.5 60342 1.39 0.66 3.50 2.44 1.44 ac-ft 2.44 ac-ft Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised November 2010) Pond A1 Interim Volume Required: Combined Volume Provided: Critical Pond Elevations - A Basins (Interim) J.Claeys Interwest Consulting Group 1282-163-03 December 13, 2017 ( ) 3 AAAADepth 1 2 1 2 V + + = * * 1 . 2 12 Area WQCV Volume       = 1282-168-03 PondCalcs.xls - Pond Stage (Prelim A Interim) Page 2 of 5 Interwest Consulting Group Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A 17.853 acres Imperviousness, I 60.0% WQCV (watershed inches) 0.236 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.422 acre-feet Including 20% for Sedimentation Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond B1 CONTOUR (FT) AREA (FT 2 ) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4949.00 0 0.00 0.00 0.00 0.00 4950.0 8530 0.20 0.07 1.00 0.07 4951.0 21199 0.49 0.33 2.00 0.40 4952.0 34540 0.79 0.63 3.00 1.03 4953.0 47409 1.09 0.94 4.00 1.97 Pond B2 CONTOUR (FT) AREA (FT 2 ) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4954.15 0 0.00 0.00 0.00 0.00 4955.0 7126 0.16 0.05 0.85 0.05 4956.0 23453 0.54 0.33 1.85 0.38 4957.0 31454 0.72 0.63 2.85 1.01 Pond B3 CONTOUR (FT) AREA (FT 2 ) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4953.46 0 0.00 0.00 0.00 0.00 4954.0 2872 0.07 0.01 0.54 0.01 4955.0 17409 0.40 0.21 1.54 0.22 Pond B4 CONTOUR (FT) AREA (FT 2 ) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A 3.797 acres Imperviousness, I 60.0% WQCV (watershed inches) 0.236 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.090 acre-feet Including 20% for Sedimentation Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond C CONTOUR (FT) AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4953.17 0 0.00 0.00 0.00 0.00 4954.0 1168 0.03 0.01 0.83 0.01 4955.0 13987 0.32 0.15 1.83 0.15 4956.0 28723 0.66 0.48 2.83 0.63 4957.0 36143 0.83 0.74 3.83 1.38 Volume Required: 0.84 ac-ft Volume Provided: 1.38 ac-ft Critical Pond Elevations - C Basins J.Claeys Interwest Consulting Group 1282-163-03 December 13, 2017 Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised January 2016) ( ) 3 AAAADepth 1 2 1 2 V + + = * * 1 . 2 12 Area WQCV Volume       = 1282-168-03 PondCalcs.xls - Pond Stage (Prelim C) Page 4 of 5 Interwest Consulting Group Northfield Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A 10.111 acres Imperviousness, I 60.0% WQCV (watershed inches) 0.236 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.239 acre-feet Including 20% for Sedimentation Stage Storage Volume (pond volume calculated using the prismoidal formula): Pond D CONTOUR (FT) AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4948.00 0 0.00 0.00 0.00 0.00 4949.0 18908 0.43 0.14 1.00 0.14 4950.0 43159 0.99 0.69 2.00 0.84 4951.0 63984 1.47 1.22 3.00 2.06 4951.5 77038 1.77 0.81 3.50 2.87 Volume Required: 2.24 ac-ft Volume Provided: 2.87 ac-ft Critical Pond Elevations - D Basins J.Claeys Interwest Consulting Group 1282-163-03 December 13, 2017 Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised January 2016) ( ) 3 AAAADepth 1 2 1 2 V + + = * * 1 . 2 12 Area WQCV Volume       = 1282-168-03 PondCalcs.xls - Pond Stage (Prelim D) Page 5 of 5 Interwest Consulting Group Appendix D APPENDIX D – STREET CAPACITIES CONNECTOR LOCAL NTS MAJOR ARTERIAL NTS 1218 W. Ash, Suite A Windsor , Colorado 80550 Phone: (970) 674-3300 Fax: (970) 674-3303 I N T E R W E S T C O N S U L T I N G G R O U P PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME NORTHFIELD - FILING 1 STREET CAPACITY EXHIBIT 12/13/17 1"=10' 1"=1' LAJ JTC 1282-168-03 1 of 1 1170 ASH STREET, SUITE 100 WINDSOR, CO 80550 OFFICE: 970.460.0567 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 20.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.005 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 16.8 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 10.8 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 8.0 66.8 cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield Connector Local Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' 1282-168-03 Inlet Calcs_Connector Local.xlsm, Inlet 1 12/12/2017, 12:09 PM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 16.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 32.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.005 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 16.8 32.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 10.8 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 8.0 78.6 cfs Version 4.05 Released March 2017 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Northfield Major Arterial Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' 1282-168-03 Inlet Calcs_Major Arterial.xlsm, Inlet 1 12/12/2017, 12:10 PM Appendix E APPENDIX E – LOW IMPACT DEVELOPMENT CALCULATIONS Northfield Low Impact Development Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Low Impact Development Summary Sq-Ft Acres 960,287 22.05 920,610 21.13 56,625 1.30 245,118 5.63 224,315 5.15 2,406,955 55.26 Infiltrator Depth & Area (ft2) % Area (ft2) % of Total Req'd % Area (ft2) % of Total Req'd 2 ft B1 & B2 371,354 60% Infiltration Gallery 99% 366,784 38% 0% 0 0% 0.19 0.43 5,847 2,923 A1, A2, & A3 591,116 60% Infiltration Gallery 57% 335,371 35% 49% 289,489 31% 0.19 0.43 9,307 4,653 B3 103,867 60% Infiltration Gallery 0% 0 0% 133% 138,032 15% 0.19 0.43 1,635 818 D1 286,887 60% Rain Garden 0% 0 0% 100% 286,887 31% 0.19 0.43 4,517 - Total Treatment 702,155 73% Total Treatment 714,407 78% Basin (s) Area Treated by LID (ft2) % Impervious Req'd WQCV (12 hr Release Rate) (cu-ft) WQCV (watershed inches) Depth of Average Runoff Producing Storm (watershed inches) Single Family (Fee Simple) Multi-Family (Condos) Development Area Breakdown City of Fort Collins - Ordinance No. 007, 2016 - Treat at least 75% of any newly developed or redeveloped area using one or a combination of LID techniques, or - Treat at least 50% of any newly developed or redeveloped area using one or a combination of LID techniques when 25% of private driveable surfaces are permeable. J.Claeys Interwest Consulting Group 1282-168-03 December 13, 2017 Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised January 2016) Total Description Treatment Method Single Family Area Multifamily Area Commercial Area (future treatment) Suniga (no treatment) Detention Areas (no treatment) (ACRE-FT) 4953.41 0 0.00 0.00 0.00 0.00 4954.0 3459 0.08 0.02 0.59 0.02 4955.0 11947 0.27 0.17 1.59 0.18 4956.0 14331 0.33 0.30 2.59 0.48 4957.0 16316 0.37 0.35 3.59 0.84 Volume Required: 3.96 ac-ft Combined Volume Provided: 4.03 ac-ft Critical Pond Elevations - B Basins J.Claeys Interwest Consulting Group 1282-163-03 December 13, 2017 Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised January 2016) ( ) 3 AAAADepth 1 2 1 2 V + + = * * 1 . 2 12 Area WQCV Volume       = 1282-168-03 PondCalcs.xls - Pond Stage (Prelim B) Page 3 of 5 Interwest Consulting Group  = 1282-168-03 PondCalcs.xls - Pond Stage (Prelim A) Page 1 of 5 Interwest Consulting Group 155 1.57 13.29 123,641 18,806 104,834 2.41 160 1.54 13.04 125,190 19,413 105,777 2.43 165 1.51 12.79 126,588 20,020 106,568 2.45 170 1.48 12.53 127,832 20,626 107,206 2.46 175 1.45 12.28 128,925 21,233 107,692 2.47 180 1.42 12.02 129,865 21,840 108,025 2.48 185 1.40 11.86 131,592 22,446 109,146 2.51 190 1.38 11.69 133,218 23,053 110,165 2.53 195 1.36 11.52 134,742 23,660 111,082 2.55 200 1.34 11.35 136,165 24,266 111,898 2.57 205 1.32 11.18 137,486 24,873 112,613 2.59 210 1.30 11.01 138,705 25,480 113,226 2.60 215 1.28 10.84 139,823 26,086 113,737 2.61 220 1.26 10.67 140,839 26,693 114,146 2.62 225 1.24 10.50 141,754 27,300 114,454 2.63 230 1.22 10.33 142,567 27,906 114,660 2.63 235 1.21 10.25 144,472 28,513 115,959 2.66 240 1.20 10.16 146,326 29,120 117,207 2.69 December 13, 2017 Runoff Coefficient (C ) Frequency Factor (C f ) 100-yr Detention Volume - FAA Method Northfield J.Claeys Interwest Consulting 1282-168-03 Adjusted Runoff Coefficient (CC f ) Area (A ) Allowed Release Rate Required Detention Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised April 2008) City of Fort Collins - Storm Water Criteria Manual Detention Volume Calculation - Future D Basins 150 1.60 5.09 45,792 6,835 38,957 0.89 155 1.57 4.99 46,431 7,062 39,369 0.90 160 1.54 4.90 47,013 7,290 39,723 0.91 165 1.51 4.80 47,538 7,518 40,020 0.92 170 1.48 4.71 48,005 7,746 40,259 0.92 175 1.45 4.61 48,415 7,974 40,442 0.93 180 1.42 4.52 48,768 8,202 40,567 0.93 185 1.40 4.45 49,417 8,429 40,988 0.94 190 1.38 4.39 50,028 8,657 41,370 0.95 195 1.36 4.32 50,600 8,885 41,715 0.96 200 1.34 4.26 51,134 9,113 42,021 0.96 205 1.32 4.20 51,630 9,341 42,290 0.97 210 1.30 4.13 52,088 9,568 42,520 0.98 215 1.28 4.07 52,508 9,796 42,712 0.98 220 1.26 4.01 52,890 10,024 42,865 0.98 225 1.24 3.94 53,233 10,252 42,981 0.99 230 1.22 3.88 53,538 10,480 43,059 0.99 235 1.21 3.85 54,254 10,708 43,546 1.00 240 1.20 3.82 54,950 10,935 44,015 1.01 December 13, 2017 Northfield 100-yr Detention Volume - FAA Method J.Claeys Interwest Consulting 1282-168-03 Area (A ) Allowed Release Rate Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised April 2008) City of Fort Collins - Storm Water Criteria Manual Runoff Coefficient (C ) Frequency Factor (C f ) Required Detention Adjusted Runoff Coefficient (CC f ) 155 1.57 23.47 218,313 33,207 185,106 4.25 160 1.54 23.03 221,049 34,278 186,771 4.29 165 1.51 22.58 223,516 35,349 188,167 4.32 170 1.48 22.13 225,714 36,420 189,294 4.35 175 1.45 21.68 227,642 37,491 190,151 4.37 180 1.42 21.23 229,302 38,562 190,740 4.38 185 1.40 20.93 232,352 39,634 192,719 4.42 190 1.38 20.63 235,223 40,705 194,518 4.47 195 1.36 20.33 237,914 41,776 196,138 4.50 200 1.34 20.04 240,426 42,847 197,579 4.54 205 1.32 19.74 242,759 43,918 198,840 4.56 210 1.30 19.44 244,912 44,990 199,922 4.59 215 1.28 19.14 246,886 46,061 200,825 4.61 220 1.26 18.84 248,680 47,132 201,548 4.63 225 1.24 18.54 250,295 48,203 202,091 4.64 230 1.22 18.24 251,730 49,274 202,456 4.65 235 1.21 18.09 255,094 50,345 204,749 4.70 240 1.20 17.94 258,369 51,417 206,952 4.75 December 13, 2017 Northfield 100-yr Detention Volume - FAA Method J.Claeys Interwest Consulting 1282-168-03 Area (A ) Allowed Release Rate Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised April 2008) City of Fort Collins - Storm Water Criteria Manual Runoff Coefficient (C ) Frequency Factor (C f ) Required Detention Adjusted Runoff Coefficient (CC f ) Detention Volume Calculation - B Basins 155 1.57 10.18 94,685 30,154 64,530 1.48 160 1.54 9.99 95,871 31,127 64,744 1.49 165 1.51 9.79 96,941 32,100 64,842 1.49 170 1.48 9.60 97,895 33,072 64,822 1.49 175 1.45 9.40 98,731 34,045 64,686 1.48 180 1.42 9.21 99,451 35,018 64,433 1.48 185 1.40 9.08 100,774 35,991 64,783 1.49 190 1.38 8.95 102,019 36,963 65,056 1.49 195 1.36 8.82 103,186 37,936 65,250 1.50 200 1.34 8.69 104,276 38,909 65,367 1.50 205 1.32 8.56 105,287 39,882 65,406 1.50 210 1.30 8.43 106,221 40,854 65,367 1.50 215 1.28 8.30 107,077 41,827 65,250 1.50 220 1.26 8.17 107,855 42,800 65,056 1.49 225 1.24 8.04 108,556 43,772 64,783 1.49 230 1.22 7.91 109,178 44,745 64,433 1.48 235 1.21 7.85 110,637 45,718 64,919 1.49 240 1.20 7.78 112,057 46,691 65,367 1.50 December 13, 2017 Northfield 100-yr Detention Volume - FAA Method J.Claeys Interwest Consulting 1282-168-03 Adjusted Runoff Coefficient (CC f ) Area (A ) Allowed Release Rate Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised April 2008) City of Fort Collins - Storm Water Criteria Manual Detention Volume Calculation - A Basins (Interim) Runoff Coefficient (C ) Frequency Factor (C f ) Required Detention 155 1.57 21.32 198,246 30,154 168,091 3.86 160 1.54 20.91 200,730 31,127 169,603 3.89 165 1.51 20.50 202,971 32,100 170,871 3.92 170 1.48 20.09 204,967 33,072 171,894 3.95 175 1.45 19.69 206,718 34,045 172,673 3.96 180 1.42 19.28 208,225 35,018 173,207 3.98 185 1.40 19.01 210,995 35,991 175,004 4.02 190 1.38 18.74 213,602 36,963 176,639 4.06 195 1.36 18.47 216,046 37,936 178,110 4.09 200 1.34 18.19 218,327 38,909 179,418 4.12 205 1.32 17.92 220,445 39,882 180,564 4.15 210 1.30 17.65 222,400 40,854 181,546 4.17 215 1.28 17.38 224,193 41,827 182,366 4.19 220 1.26 17.11 225,822 42,800 183,022 4.20 225 1.24 16.84 227,288 43,772 183,516 4.21 230 1.22 16.56 228,592 44,745 183,847 4.22 235 1.21 16.43 231,647 45,718 185,929 4.27 240 1.20 16.29 234,620 46,691 187,930 4.31 December 13, 2017 Northfield 100-yr Detention Volume - FAA Method J.Claeys Interwest Consulting 1282-168-03 Area (A ) Allowed Release Rate Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised April 2008) City of Fort Collins - Storm Water Criteria Manual Runoff Coefficient (C ) Frequency Factor (C f ) Required Detention Adjusted Runoff Coefficient (CC f ) Detention Volume Calculation - Future A Basins E1 E1 1.137 7.11 0.67 0.76 2.50 1.91 0.67 0.76 4.27 3.26 0.84 0.95 8.73 8.32 E2 E2 6.045 14.53 0.67 4.05 1.89 7.64 0.67 4.05 3.22 13.04 0.84 5.06 6.58 33.29 A1 (interim) A1 (interim) 10.630 31.18 0.36 3.86 1.25 4.84 0.36 3.86 2.14 8.27 0.45 4.83 4.38 21.12 Design Point Sub-basin Area (acres) tc (min) 2-yr Peak Runoff 100-yr Peak Runoff L. Johnson Interwest Consulting Group 1282-168-03 December 13, 2017 10-yr Peak Runoff Q n = C n I n A n 0.786651) 1 ( 10 ) 28 . 5 t c P I + = tc (min) tc=ti+tt (min) L. Johnson Interwest Consulting Group 1282-168-03 December 13, 2017 SLOPE (ft/ft) Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised January 2016) ti (min) LENGTH Table RO-2 (ft) INITIAL/OVERLAND TIME (ti) DESIGN POINT Sub-basin C5 ( ) 0 .33 0 . 395 1 . 1 5 S C L ti − = t c = t i + t t 0 . 5 V = C v S w V L tt 60 = �� = 18 − 15� + � 60 24� + 12 � Lawns (Heavy, 2-7% Slope) Sub-basin Designation Atotal (sq feet) Atotal (acres) Weighted % Impervious COMPOSITE DRAINAGE BASIN FLOW PATH LEGEND EX MAJOR CONTOUR SPILL GUTTER EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR BFE (FEMA) CROSS-SECTION (FEMA) 100-YR FLOODPLAIN (FEMA) 0 100' 100 50 100 200 SCALE: 1" = AH 18.5 ac 8.7 ac 29.3 ac 11.4 ac 9.8 ac 11.4 ac 4.8 ac 16.4 ac 3.3 ac 1.3 ac 31.6 ac 52.7 ac 21.3 ac 7.4 ac 18.1 ac 17.0 ac 2.5 ac 2.7 ac 2.0 ac 4.6 ac 2.5 ac 13.1 ac 3.9 ac 13.7 ac 1.8 ac 0.2 ac 7.2 ac 6.0 ac 3.8 ac 0.6 ac 2.4 ac 5.2 ac 1.6 ac 2.6 ac 35.7 ac 2.6 ac 1.8 ac 1.8 ac 1.6 ac 1.2 ac 0.7 ac 4.2 ac 2.6 ac 13.6 ac 13.0 ac 8.6 ac 7.1 ac 5.1 ac 4.5 ac 4.2 ac 10.9 ac 8.2 ac 19.2 ac 16.0 ac 32.4 ac 17.5 ac 9.8 ac 16.6 ac 29.3 ac 6.0 ac 10.3 ac 5.9 ac 1.5 ac 1.3 ac 21.2 ac 1.ac5 ac 1.2 1.1 ac 1.1 ac 8.2 ac 1.0 ac 8.6 ac 5.2 ac 14.8 ac 2.0 ac 1.6 ac 3.3 ac 1.4 ac 5.3 ac 1.2 ac 1.0 ac 2.7 ac 2.2 ac 3.9 ac 3.3 ac 3.4 ac 4.4 ac 7.9 ac 0.2 ac 4.2 ac 1.1 ac 1.7 ac 2.4 ac 2.0 ac 1.0 ac 36.2 ac 5.5 ac 49.1 ac APPROX NORTHFIELD PROPRETY LINE 38 1.11 1.89 3.87 1.11 0.00 1.90 0.01 3.88 0.01 39 1.09 1.86 3.80 1.09 0.00 1.87 0.01 3.82 0.02 40 1.07 1.83 3.74 1.08 0.01 1.84 0.01 3.76 0.02 41 1.05 1.80 3.68 1.06 0.01 1.81 0.01 3.70 0.02 42 1.04 1.77 3.62 1.04 0.00 1.78 0.01 3.64 0.02 43 1.02 1.74 3.56 1.03 0.01 1.76 0.02 3.59 0.03 44 1.01 1.72 3.51 1.01 0.00 1.73 0.01 3.54 0.03 45 0.99 1.69 3.46 1.00 0.01 1.71 0.02 3.48 0.02 46 0.98 1.67 3.41 0.99 0.01 1.68 0.01 3.44 0.03 47 0.96 1.64 3.36 0.97 0.01 1.66 0.02 3.39 0.03 48 0.95 1.62 3.31 0.96 0.01 1.64 0.02 3.34 0.03 49 0.94 1.60 3.27 0.95 0.01 1.61 0.01 3.30 0.03 50 0.92 1.58 3.23 0.93 0.01 1.59 0.01 3.25 0.02 51 0.91 1.56 3.18 0.92 0.01 1.57 0.01 3.21 0.03 52 0.90 1.54 3.14 0.91 0.01 1.55 0.01 3.17 0.03 53 0.89 1.52 3.10 0.90 0.01 1.53 0.01 3.13 0.03 54 0.88 1.50 3.07 0.89 0.01 1.51 0.01 3.09 0.02 55 0.87 1.48 3.03 0.88 0.01 1.50 0.02 3.06 0.03 56 0.86 1.47 2.99 0.87 0.01 1.48 0.01 3.02 0.03 57 0.85 1.45 2.96 0.86 0.01 1.46 0.01 2.98 0.02 58 0.84 1.43 2.92 0.85 0.01 1.44 0.01 2.95 0.03 59 0.83 1.42 2.89 0.84 0.01 1.43 0.01 2.92 0.03 60 0.82 1.40 2.86 0.83 0.01 1.41 0.01 2.88 0.02 0.00 -0.02 0.00 C 3 2 1 1 ( c ) C t C P I + = of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 12, Oct 10, 2017 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 20, 2015—Oct 15, 2016 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (NorthField) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/6/2017 Page 2 of 4