March 27, 2017
David Lash
PWN Architects and Planners
9250 E. Costilla Ave, Ste 620
Greenwood Village, CO 80112
RE: Fossil Creek Apartments (formerly Waterstone Apartments), PDP170010,
Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Jason Holland, at 970-224-6126 or jholland@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 03/22/2017
03/22/2017: The street cross section for Crestridge Drive should be a
commercial local with a 72' ROW. This will accommodate bike lanes, parking
and a future left turn lane.
RESPONSE: Noted. The re-alignment of Crestridge will create a 72’ commercial local street R.O.W. See
attached Narrative for the proposed Crestridge Drive timing and phasing.
Comment Number: 3 Comment Originated: 03/22/2017
03/22/2017: The street cross section for Venus Drive should match the existing
pavement width of Venus Drive to the south. The existing pavement width is
about 40'. The closest street cross section is an industrial local with a 66' ROW.
RESPONSE: Venus drive shall be a private drive, which will have a 24 feet drive plus 6.5 feet of
landscaping, 4.5 feet of sidewalk and a 9 feet utility easement on each side to create an overall Utility and
Access Easement of 64’
2
Comment Number: 4 Comment Originated: 03/22/2017
03/22/2017: This development is only platting Lot 3. Based on this submittal,
there is numerous offsite work that needs to occur. Offsite easements by
separate documents will be needed. To the north, an access easement from
Fort Collins Natural Areas to the Developer is needed. Please be aware that
there is a separate dedication process by Natural Resources that requires
approval from City Council. Any public trails will need to be an alignment
dedicated from Natural Areas to the public. Temporary construction easements
will be needed in both scenarios for the construction of the trails. The SFCSD
Easement and the drainage easement will also be needed from Fort Collins
Natural Resources to the Developer. Drainage easements, Utility Easements,
Access Easements, Emergency Access Easements and Grading Easements
will be needed on Lot 2 and Lot 1 of the Vineyard Subdivision. All of these offsite
easements will need to be done by separate document. Please show the limits
of easements and label them as "Easement by Separate Document" on the
Utility Plans.
RESPONSE: Easements have been provided and will be recorded by Separate Document.
Comment Number: 5 Comment Originated: 03/22/2017
03/22/2017: The 24' private drive extending from Venus Drive and Crestridge
Drive will need to be treated as a driveway and be differentiated from a public
street. The driveway should follow LCUASS 707.1 with a minimum width of 28'.
RESPONSE: Acknowledged. The driveway has been designed with a private
drive approach including concrete apron and separation of flows.
Comment Number: 6 Comment Originated: 03/22/2017di
03/22/2017: Venus Drive will need to maintain a consistent cross section width.
Currently it shows it being tapered as it approaches the private drive.
RESPONSE: Venus drive has been aligned to match existing curb and gutter on East side heading south
towards Skyview Subdivision. The alignment maintains a consistent 44’ flowline to flowline distance until
widening out at the intersection with Crestridge per LCUASS 7-24.
Comment Number: 7 Comment Originated: 03/22/2017
03/22/2017: The private drive should be consistent with what is being shown on
the ODP. Currently the 59' cross section is being shown.
RESPONSE: ODP and PDP are now revised to match.
Cross section of private drive is 46 feet wide with 9 feet easement on both sides, which creates a total 64
feet easement.
Comment Number: 8 Comment Originated: 03/22/2017
03/22/2017: If Crestridge Drive is public right of way, the realignment of
Crestridge Drive will involve the vacation of ROW. This process will need to City
Council with 2 readings.
RESPONSE: Yes, Crestridge will be realigned and we understand that it will involve the vacation of ROW
and the process will need to City Council with 2 readings.
Comment Number: 9 Comment Originated: 03/22/2017
03/22/2017: Grading easements may be needed from the railroad to the west.
3
It looks like drainage may be flowing offsite in this location.
RESPONSE: There is a small basin primarily consisting of the 8’ Public trail
that will flow undetained south to the Vineyard property and to Fossil Creek.
Grading easement will be requested from the railroad along the western
boundary of the site.
Comment Number: 10 Comment Originated: 03/22/2017
03/22/2017: Currently Venus Drive is designed as a continuous road into the
private drive. The profile shows drainage into the private drive along the
southern flowline. Since the private drive will need to be designed as a
driveway, drainage across the driveway can't occur. A sidewalk chase will be
needed.
RESPONSE: Private Venus Drive has been realigned and re-graded to meet Private Driveway approach
standards.
Comment Number: 11 Comment Originated: 03/22/2017
03/22/2017: An additional 0.5' of ROW is needed on College Avenue to meet
the minimum
RESPONSE: Upon further discussion with Town staff it was determined that there is currently an adequate
½ ROW width on the developments side of College Avenue (as measured from the centerline of the
existing roadway alignment). It was also determined that an additional 0.5’ of Flowline width is required to
provide for the Ultimate cross-section. Additional roadway width has been provided.
Comment Number: 12 Comment Originated: 03/22/2017
03/22/2017: With the flowline profile, you will need to show that the minimum
cross pan grades are met. Not sure that this can occur with a crest vertical curve
across the pan in Venus Drive.
RESPONSE: Cross-pan has been removed with the redesigned intersection.
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/08/2017
03/08/2017: The clubhouse square footage was not indicated anywhere on the
plans that I could find. That information is needed to verify the TDR Fee
calculation.
RESPONSE: The Clubhouse square footage is 10,330 sq. ft. and shown on the updated site plan.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/21/2017
03/21/2017: Thank you for providing an Ecological Characterization Study
(ECS) and the Paleontological Report as required by Land Use Code (LUC)
Section 3.4.1 (D)(1), as the site is within five hundred feet (500 ft)) of known
natural features (wetlands; Fossil Creek; riparian habitat; geological and
paleontological features; Redtail Ponds Natural Area). Buffer standards range
from fifty to one hundred feet (50 to 100 ft) for these features [LUC 3.4.1(E)].
4
Additionally, Environmental Planning Staff received and reviewed both the
Geotechnical Engineering Report and Environmental Review documents
submitted with this PDP application. Highlights to note from these reports:
a. Overall site dominated by non-native vegetation (mostly grasses and forbes)
but the site does host some desirable native vegetation including yucca (Y.
glauca), prickly pear (O. polycantha), rabbitbrush (Chrysothamnus spp.), fringed
sage(A. frigida), purple threeawn (A. purpurea).
RESPONSE: Noted
b. The trees and other woody vegetation associated with Fossil Creek supports
soil stability and serves as cover and nutritional resources for a variety of urban
wildlife.
RESPONSE: Noted
c. Smooth brome (B. inermis) currently dominates the project site area and
there are other undesirable species including Colorado State noxious weed
species.
RESPONSE: Noted
d. The project area is situated within a context of natural features located
directly to the north and west in Redtail Ponds Natural Area, and directly to the
south in rock outcroppings, riparian forest, wetlands, wet meadows and aquatic
features.
RESPONSE: Noted. Site planning has been used to create proper setback and landscape transition areas.
e. If the project moves to approval and issuance of Development Construction
Permit, trees adjacent to Fossil Creek should be checked for nesting activity
prior to construction so that project complies with temporary 450 ft buffer for
active raptor nests (Feb 15 to July 15).
RESPONSE: Blue mountain company has been hired to prepare a nesting activity report and he
recommends the survey to be conducted within 7 days prior to the start of the construction. We will submit
for review as soon as the report is ready.
f. Seven borings (15 to 25 ft) were completed and subsurface consists mostly
of: lean clay with varying amounts of sand; sand with varying amounts of silt and
gravel; sandstone bedrock.
RESPONSE: Noted. Final soils report is underway per the revised site plan and can be provided later if
requested.
g. Geotechnical report took place in February 2015 and notes that: groundwater
fluctuations occur due to seasonal variations in rainfall amount, runoff and other
factors not evident at time borings were performed.
RESPONSE: Noted. Final soils report is underway per the revised site plan and can be provided later if
requested.
h. Hard to very hard sandstone bedrock was encountered in borings completed
at the site at depths of 0.5 to 19 ft below existing grades.
RESPONSE: Noted. Final soils report is underway per the revised site plan and can be provided later if
requested.
5
i. The most taxonomically diverse and best preserved fossils are currently
located in the center of the sandstone outcrop just outside and directly to south
of this Phase I project area and consist mostly of aquatic invertebrate species.
RESPONSE: Noted. Setbacks are created around the outcrop boundaries to preserve any existing fossils.
j. Vertebrate fossils are rare but scientifically important in Pierre Shale thus if
any subsurface bones or other potential fossils are unearthed during
construction, work in the immediate area (20 ft diameter of discovery site)
should be temporarily suspended and a qualified paleontologist should be
called to the site to evaluate.
RESPONSE: Noted. We will abide by the City requirement.
Comment Number: 2 Comment Originated: 03/21/2017
03/21/2017: Please provide the following in a table on the site plan:
1) The total acreage required by a standard 100 ft buffer zone for Fossil Creek
and associated wetlands.
RESPONSE: The project has two 100’ buffer zones, one located along the north property line and one
located along the south west property line. The acreage at Northern buffer zone is .228 Acres (9,950 SF)
and Southern buffer zone is .349 Acres (15,206 SF). Information regarding these areas is provided on
cover sheet.
2) The total acreage of the proposed natural habitat buffer zone.
RESPONSE: The total acreage of the proposed natural habitat buffer is 1.086 Acres (47,308 SF). The
NHBZ overlaps a portion of the 100 ft buffer zone from the wetlands.
Currently proposed plans seem to show encroachment into 100ft Fossil Creek
buffer on north side of project site area and on south site of project site area.
RESPONSE: All buildings have been moved out of the north and south side 100 ft buffer areas.
Comment Number: 3 Comment Originated: 03/21/2017
03/21/2017: Currently the proposed project site design does not meet the
standards outlined in LUC 3.4.1. If the proposed project is to continue in the
development review process, the design of the natural habitat buffer zone(s) for
this project site will need to be determined in collaboration with Environmental
Planning and will need to be addressed, including specific plantings and
delineations, before the project goes to a Public Hearing. Natural habitat buffer
zones (NHBZs) can be determined through application of standard buffers or
through the nine performance standards outlined in LUC 3.4.1(D)(1)(a-i).
Natural habitat buffer zones shall be delineated and labeled on site, grading,
utility and landscape plans. Please set up a separate meeting with myself and
project planner Jason Holland to address the specifics of the NHBZ
requirements and design as soon as possible.
RESPONSE: We set up a meeting to discuss the specifics of the NHBZ requirements and have adjusted
plans to show a natural habitat buffer area along the north side of the property. See plans for location and
extent. No buffer area was shown along the south side of the property as this is private land and is already
shown with the 100 ft wetlands setback and rock outcropping area and setback.
6
Comment Number: 4 Comment Originated: 03/21/2017
03/21/2017: Projects in the Vicinity of Fossil Creek must comply with Section
3.4.1(I)(1) of the Land Use Code, which states the following: Projects in the
vicinity of large natural habitats and/or natural habitat corridors, including, but
not limited to, the Poudre River Corridor and the Spring Creek Corridor, shall
be designed to complement the visual context of the natural habitat. Techniques
such as architectural design, site design, the use of native landscaping and
choice of colors and building materials shall be utilized in such manner that
scenic views across or through the site are protected, and manmade
facilities are screened from off-site observers and blend with the natural visual
character of the area. These requirements shall apply to all elements of a
project, including any above ground utility installations. Note: currently proposed
plans are not meeting this requirement, especially along the entire length of the
northern property boundary which is directly adjacent to Redtail Ponds Natural
Area.
RESPONSE: Buildings 1,2,3,4 and Clubhouse have been relocated further away from the property lines to
provide more landscape area. Building materials shall be stone, stucco and siding with selected earth tone
and paint colors that blend well with the natural environment. Color rendering will be provided at later day.
Landscape design has also been modified to show a natural habitat buffer area along the north side of the
property. See Architectural and Landscape Plans.
Comment Number: 5 Comment Originated: 03/21/2017
03/21/2017: This project must also comply with the following standard, as it is
adjacent to the Redtail Natural Area, Section3.4.1(L) Compatibility with Public
Natural Areas or Conserved Land. If the project contains or abuts a publicly
owned natural area or conserved land, the development plan shall be designed
so that it will be compatible with the management of such natural area or
conserved land. In order to achieve this, the development plan shall include
measures such as barriers or landscaping measures to minimize wildlife
conflicts, setbacks or open space tracts to provide a transition between the
development and the publicly owned natural area or conserved land, and
educational signage or printed information regarding the natural values,
management needs and potential conflicts associated with living in close
proximity to such natural area or conserved land.
RESPONSE: See comment # 4 above.
Easement arrangements will most likely need to be made if any impact will
occur to any portion of Redtail Ponds Natural Area. Please be advised that if
this is the case, then this project will need to be presented by Natural Areas
Department staff to the Land Conservation and Stewardship Board. Ultimately
any and all easements on natural area property will need to be approved by City
Council. This process from start to finish generally takes a minimum of 90 days.
This would need to occur prior to Hearing for the project. Contact Daylan Figgs,
Environmental Program Manager, City of Fort Collins Natural Areas
Department at 970-416-2814 or dfiggs@fcgov.com ; his department directly
handles easements and easement requests.
RESPONSE: Noted. We recognize that some area on Red tail pond shall be impacted and shall submit the
easement for approval by Land Conservation as well as City Council.
7
Comment Number: 6 Comment Originated: 03/21/2017
03/21/2017: Given the proximity to Redtail Ponds Natural Area, extra attention
should be paid to plant selections included in the landscape plans including any
and all seed mixes. Please revisit proposed shrubs and ornamental grass
selections as well as seed mix selections. Further recommendations can be
provided and to complement adjacent natural area ecology. Native plants and
wildlife-friendly (ex: pollinators; songbirds) landscaping and maintenance are
also encouraged. Please refer to the Fort Collins Native Plants document
available online and published by the City of Fort Collins Natural Areas
Department, especially for guidance on planting plans in Natural Habitat Buffer
Zone; the link is: http://www.fcgov.com/naturalareas/pdf/nativeplants2013.pdf.
Buffer zone plantings should include appropriate native vegetation, species
diversity and variety in vertical structure.
RESPONSE: The majority of plants shown are native and/or adaptive. Can provide additional native
plant species if desired.
Comment Number: 7 Comment Originated: 03/21/2017
03/21/2017: Note that in approving the required Landscape Plan, the decision
maker shall have the authority to determine the optimum placement and
interrelationship of required landscape plan elements such as trees, vegetation,
turf, irrigation, screening, buffering and fencing, based on the following criteria
outlined in LUC Section 3.2.1(H):
1) protecting existing trees, natural areas and features;
2) enhancing visual continuity within and between neighborhoods;
3) providing tree canopy cover;
4) creating visual interest year round;
5) complementing the architecture of a development;
6) providing screening of areas of low visual interest or visually intrusive site
elements;
7) establishing an urban context within mixed-use developments;
8) providing privacy to residents and users;
9) conserving water;
10) avoiding reliance on excessive maintenance;
11) promoting compatibility and buffering between and among dissimilar land
uses;
12) establishing spatial definition.
RESPONSE: Noted. We would request that the Landscape Architect, Architect and Owner be consulted on
any changes to optimum placement, especially in relationship to trees and their proposed location(s). There
is a high amount of liability if tree roots effect site elements such as building foundation, sidewalks, ADA
site accessibility, retaining wall stability, etc. The site has been designed to make sure that the trees are
placed properly on site for life safety and to help lessen any complications or liability in the future.
Please also have the City Attorney review The State of Colorado DORA requirements, especially regarding
The Supervision of Landscape Architecture. Comment #7 above, as written, contradicts the requirements of
DORA. Language is shown below for your reference.
The Board shall interpret “supervision” of landscape architecture as follows:
“Supervision” of landscape architecture shall mean that degree of control a landscape
8
architect is required to maintain over landscape architectural decisions made personally
or by others over which the landscape architect exercises supervisory direction and
control authority.
(a) The degree of control necessary for a landscape architect to be in supervision shall
be such that the landscape architect:
(i) Personally makes landscape architectural decisions, or personally reviews and
approves proposed decisions prior to their implementation, including consideration of
alternatives whenever landscape architectural decisions that could affect the life, health,
property, and welfare of the public are made. In making said landscape architectural
decisions, the landscape architect shall be physically present or, through the use of
communication devices, be available in a reasonable period of time as appropriate.
(ii) Judges the validity and applicability of recommendations prior to their incorporation
into the work, including the qualifications of those making the recommendations.
(b) Landscape architectural decisions that are made by, and are the responsibility
of, the practicing landscape architect in supervision are those decisions concerning
permanent or temporary work that could create a danger to the life, health, property,
and welfare of the public, such as, but not limited to, the following:
(i) The selection of landscape architectural alternatives to be investigated and
comparison of alternatives for landscape architectural works.
(ii) The selection or development of design standards or methods, and materials to be
used.
(iii) The selection or development of techniques or methods of testing to be used in
evaluating materials or completed works, either new or existing.
More plantings need to be included in current plans, including more evergreen
species, especially along northern portion of the site, to aid in year-round
screening.
RESPONSE: Noted
Comment Number: 8 Comment Originated: 03/21/2017
03/21/2017: Within the Natural Habitat Buffer Zone, according to Article
3.4.1(E)(1)(g), the City has the ability to determine if the existing landscaping
within the buffer zone is incompatible with the purposes of the buffer zone.
Additionally, the currently proposed wall associated with the detention area is
an issue, especially as it appears this detention area is being proposed as
co-located within the required 100-ft natural habitat buffer zone required for
Fossil Creek and associated wetlands within Redtail Ponds Natural Area.
RESPONSE: By using Stormtech subsurface stormwater management system we will provide more of a
natural landscape setting and reduce the amount of walls by 50%. Walls have been limited to one side of
the detention areas. See revised plans for location and extend of walls.
Comment Number: 9 Comment Originated: 03/21/2017
03/21/2017: A softer transition and buffering is needed from the public natural
area to the development, especially along the northern parcel boundary where
site is directly adjacent to POL zone. The primary use of this particular POL
(Redtail Ponds Natural Area) is ecological conservation (as opposed to
recreation). This can be achieved through pulling buildings away from parcel
line and incorporating more natural-esque design into the building materials and
landscape including detention areas. Down the line it would be incredibly
9
beneficial prior to Hearing to have a rendering of proposed plans as viewed
from the proposed trail to be built within Redtail Ponds Natural Area near the
northern boundary of this project area.
RESPONSE: Rendering will be provided later. See comment # 4 above for more information on natural
landscape buffer. It was decided to have the natural grasses and tree gatherings extend into the site and
end at the beginning of the retaining walls to give the buffer a natural place to stop. Beyond the retaining
walls would be manicured landscape to relate to the apartment project. Slopes adjacent to the POL Zone
range from 2 to 25%. A split rail fence is proposed and will be located along the northern property line.
Comment Number: 10 Comment Originated: 03/21/2017
03/21/2017: Thank you for providing a photometric plan and luminaire
schedule. Current plans show spillage into off-site areas and within natural
feature areas on-site, however, light spillage is not allowed into natural feature
areas. With respect to lighting, the City of Fort Collins LUC Section 3.2.4(D)(6)
requires that "natural areas and natural features shall be protected from light
spillage from off-site sources." Lighting from parking areas or other site
amenities shall not spill over and into natural habitat buffer areas. This includes
areas directly to the north, west and south of the proposed project site area.
RESPONSE: All light spillage onto natural features has been eliminated, see Rev1 of photometric plan.
Comment Number: 11 Comment Originated: 03/21/2017
03/21/2017: Note that for outdoor lighting, cooler color temperatures (e.g. blue
and white light) are harsher at night and cause more disruption to circadian
(biological) rhythms for both humans and wildlife. Warmer color temperature
(warm white, 3000K or less) for any LED light fixtures is preferred in addition to
fixtures with dimming capabilities. Please change fixtures C and G to 3000K or
less.
RESPONSE: Change all fixtures to 3000K or less.
Site light sources shall be fully shielded and down-directional to minimize
up-light, light spillage and glare [see LUC 3.2.4(D)(3)]. In addition, LUC
3.2.4(D)(6), requires that "natural areas and natural features shall be protected
from light spillage from off-site sources." Thus, lighting from the parking areas or
other site amenities shall not spill over to the buffer areas or public natural
areas.
RESPONSE: The only fixtures that have an up component are at the decks and have deck or roof above to
contain that light. All spillage onto natural areas has been eliminated.
Several departments within the City of Fort Collins have been working together
to address light pollution; they are referred to as the City Night Sky team.
Results of the work can currently be viewed on the City Public Records website
in Resolution 2016-074, a summary of City of Fort Collins City Council Intent
and General Policy Regarding Night Sky Objectives. For further information
regarding health effects please see:
http://darksky.org/ama-report-affirms-human-health-impacts-from-leds/
RESPONSE: Light fixtures shall be dark sky compliant with the exception of lights located at the patios and
balconies which have a small up-light component. The lights are directly underneath solid balconies or
roofs which will minimize the upward directed light. Please advise if small patio up-light is acceptable.
10
Comment Number: 12 Comment Originated: 03/21/2017
03/21/2017: Need to verify and identify known raptor nests within 1/3 mile of
project area.
Response: Blue Mountain Company has been hired to prepare a nesting activity report and he
recommends the survey to be conducted within 7 days prior to the start of the construction. We will submit
for review as soon as the report is ready. Please advise if this is something that needs to be done sooner.
Comment Number: 13 Comment Originated: 03/21/2017
03/21/2017: Add Environmental Planner signature to all utility plans showing
the Natural Habitat Buffer Zone.
RESPONSE: The Environmental Planner is included on the Standard City of Fort Collins Utility Plan
Approval block and will be included on all plans showing the Natural Habitat Buffer Zone.
Comment Number: 14 Comment Originated: 03/21/2017
03/21/2017: Add the following statement to notes on all sheets showing the
Natural Habitat Buffer Zone: Please see Section 3.4.1 of the Land Use Code for
allowable uses within the buffer zone.
RESPONSE: The note has been added. See architectural site plan and civil/landscape cover sheets.
Comment Number: 15 Comment Originated: 03/21/2017
03/21/2017: Add the following note to the site, landscape, utility, grading, and
storm sewer plans that: the natural habitat buffer zone is meant to be maintained
in a native landscape. This will help preserve the intention behind the buffer
zones and the natural features into the future.
RESPONSE: The note has been added. See architectural site plan and civil/landscape cover sheets.
Comment Number: 16 Comment Originated: 03/22/2017
03/22/2017: Our city has an established identity as a forward-thinking
community that cares about the quality of life it offers its citizens now and into
the future. Programs include those listed below. Highly recommended to ensure
that waste and recycling management be adequately included in site design.
There also may be potential partnering with the Nature in the City program.
1) ClimateWise program: fcgov.com/climatewise/
2) Zero Waste Plan and the Waste Reduction and Recycling Assistance
Program (WRAP):
fcgov.com/recycling/pdf/_20120404_WRAP_ProgramOverview.pdf, contact
Caroline Mitchell at 970-221-6288 or cmitchell@fcgov.com
3) Green Building Program: fcgov.com/enviro/green-building.php, contact Tony
Raeker at 970-416-4238 or traeker@fcgov.com
4) Solar Energy: www.fcgov.com/solar
5) Integrated Design Assistance Program: fcgov.com/idap, contact Gary
Schroeder at 970-224-6003 or gschroeder@fcgov.com
6) Nature in the City Strategic Plan: http://www.fcgov.com/natureinthecity/,
11
contact Justin Scharton at 970-221-6213 or jscharton@fcgov.com
Please consider City sustainability goals and ways this development can
engage with these efforts. Let me know if I can help connect you to these
programs.
RESPONSE: This project will follow the Enterprise Green/Energy Star Program. This is the same program
that CHFA follows. Please see the link below for more information on Enterprise Green. In addition, we will
be providing trash and recycling bins at all of the outdoor trash areas.
https://www.enterprisecommunity.org/sites/default/files/media-library/solutions-and-innovation/green/ecp-20
15-criteria-manual-11-15.pdf
Department: Forestry
Contact: Molly Roche, , mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 03/24/2017
03/24/2017:
Please use the current City of Fort Collins Tree Protection Notes, which are
available through the City Forester.
RESPONSE: The Tree Protection Notes were omitted as per conversation on the site visit with Molly
Roche and Ralph Zentz on 2.1.2017 that the only tree that is to remain on site is in the
Rock outcrop buffer area which has fossilized footprints. The Tree protection notes
require driving posts around the tree. The nearest construction cannot take place within
approx. 80ft of the tree as it is in the protection of the rock outcrop buffer.
Will add to City of Fort Collins general notes #14 CONTRACTOR SHALL PREVENT
THE CLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE AND
DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT,
CONCRETE, MOTOR OIL OR ANY OTHER HARMFUL MATERIAL THAT IS UPHILL
OF WETLANDS AND THE ROCK OUTCROP. & note #15 NO WORK SHALL OCCUR
IN THE ROCK OUTCROP BUFFER AREA SUCH AS BUT NOT LIMITED TO THE
INSTALLATION OF PLANTS, UTILITIES, IRRIGATION LINES OR ANY
UNDERGROUND FIXTURE, GRADE WORK, EXCEPT MAINTENANCE OF
EXISTING TREES WITH WRITTEN APPROVAL FROM THE CITY OF FORT COLLINS
FORESTER AND AS PER THEIR DIRECTION.
Comment Number: 2 Comment Originated: 03/24/2017
03/24/2017:
Please show the City of Fort Collins Tree Permit Box on all landscape sheets.
This note is available through the City Forester.
RESPONSE: Will show. Note that is duplicating the exact text verbatim shown in the 'Street Tree
Notes' shown on the first sheet.
Comment Number: 3 Comment Originated: 03/24/2017
03/24/2017:
For the next submittal, please label all trees and landscape plants on the plans.
RESPONSE: Per direction from Jason Holland this is not required for this submittal as there are many
moving parts as the site keeps changing. I will keep in contact with Jason as to when
the landscape plan will need to be more detailed.
12
Comment Number: 4 Comment Originated: 03/24/2017
03/24/2017:
Please include Minimum Species Diversity percentages. See Land Use Code
3.2.1.
RESPONSE: The percentages are based on total qty of trees. Per direction from Jason Holland this is
not required for this submittal as there are many moving parts as the site keeps
changing. I will keep in contact with Jason as to when the landscape plan will need to be
more detailed.
Comment Number: 5 Comment Originated: 03/24/2017
03/24/2017:
Species Selection
- Please incorporate more ornamental trees on the plans to provide for
increased diversity.
RESPONSE: Will swap out large canopy trees for ornamental trees per your request.
- Please incorporate Colorado Blue Spruce and Austrian Pine on the plans to
provide for increased conifer diversity.
RESPONSE: These trees have too large of a diameter for the site. Austrian pine is not native.
- Sterling Silver Linden is not fully hardy in the Fort Collins area. Forestry
suggests using another species from the City Street Tree List.
RESPONSE: The City of Fort Collins '2011 approved plant list' pdf on page 4 refers to the 'Front
Range Tree Recommendation list' from which this tree was chosen from as it had an 'A'
rating. Will remove Sterling Silver Linden from plant legend.
Comment Number: 6 Comment Originated: 03/24/2017
03/24/2017:
City Street Trees
- Street Tree selection should be designated according to the City Street Tree
List.
RESPONSE: All trees will be City of Fort Collins compliant.
- Parkways should be irrigated turf on Venus Avenue.
RESPONSE: There is only a 5ft strip which cannot be 'efficiently irrigated' by pop-up sprays. Per
'Streetscape Standards Fort Collins Section 5.3.1 Irrigated Turfgrass. Parkways in
Standard Arterial: Streetscapes shall consist of irrigated turfgrass and street tree
plantings as described in Chapter 4" Venus Ave is not an Arterial. Per Section 6.1.1
"Two main approaches to landscaping parkways are permitted in collector and local
streets: turf-type grasses, and mulched planting beds." This will be a mulched planting
bed.
Comment Number: 7 Comment Originated: 03/24/2017
03/24/2017:
Private Property Tree Category Selection & Placement
- Explore increasing the number of evergreen trees with some distribution
throughout the site.
RESPONSE: Evergreen trees were carefully placed on the north side of sidewalks and roads so as
13
not to shade during the winter months which in turn would create icing conditions on
sidewalks & roads.
- Explore increasing the number of ornamental trees with some distribution
throughout the site.
RESPONSE: Per 3.2.1,D.2.(c) "Ornamental trees shall be planted in substitution for the canopy
shadetrees required in subsection (D)(2)(a) and (b) above where overhead lines and
fixtures prevent normal growth and maturity." This is not currently the case but if staff is
ok I will swap out large canopy trees per your request.
- Explore, where feasible, using some small ornamental and/or dwarf or
fastigiate confiers.
RESPONSE: Noted
Larger conifers, such as Pinyon Pine, Rocky Mountain
Juniper, and Ponderosa Pine could be planted on the slopes of the detention
ponds.
RESPONSE: Pinyon Pine, Rocky Mountain Juniper, and Ponderosa Pine need a very low amount of
water whereas the detention pond will create a high amount of moisture which will rot
out their roots.
Comment Number: 8 Comment Originated: 03/24/2017
03/24/2017:
Include locations of any water or sewer lines on the landscape plan.
RESPONSE: They are. See sheets 5-10.
Please adjust street tree locations to provide for proper tree/utility separation.
- 10’ between trees and public water, sanitary, and storm sewer main lines
- 6’ between trees and public water, sanitary, and storm sewer service lines
- 4’ between trees and gas lines
RESPONSE: Trees meet min tree separations. See sheets 5-10.
Show location of any stop signs and street lights. Identify these fixtures with a
distinct symbol.
RESPONSE: Providing stop sign & street lights is not in the Landscape Architect's scope of work or
professional field. Will show locations if Civil provides information on their backgrounds.
Space trees if needed as follows.
- Stop Signs: 20 feet from sign
- Street Light: 40 feet for canopy shade trees and 15 feet for ornamental trees
RESPONSE: Noted.
Comment Number: 9 Comment Originated: 03/24/2017
03/24/2017:
Is Goldelm Drive a private drive or a new public street?
RESPONSE: Goldelm Drive shall be a private drive.
Comment Number: 10 Comment Originated: 03/24/2017
03/24/2017:
14
The parkway areas on the private drive through the development are showing
shrubs with medium water use. Please talk with City Planner, Jason Holland,
about appropriateness and code requirements about using shrubs in these
private parkways.
RESPONSE: Had this specific discussion prior to submittal with Jason on 9.28.2016 and he was ok
with shrubs in the parkway areas. Part of the reasoning is with head-in parking there is a
2ft overhang which will prohibit Pop-up sprays, mowing under the vehicle and the bed
size is approx. 7ft which also makes inefficient for overhead sprays.
Per Section 3.2.1 (E) Landscape Standards "(a) Turf grass. High-use areas shall be
planted with irrigated turf grass. Non-irrigated shortgrass prairie grasses or other
adapted grasses that have been certified as Xeriscape landscaping may be established
in remote, low-use, low visibility areas."
Per General Landscape Note #2 "ALL TURF AREAS SHALL BE IRRIGATED WITH AN
AUTOMATIC POP-UP IRRIGATION SYSTEM".
Department: Internal Services
Contact: Clint Wood
Topic: General
Comment Number: 1 Comment Originated: 03/27/2017
03/27/2017: Please provide vertical, reflective delineators at all noses of the
right-in, right-out feature at Venus Ave and South College Ave. This is for
visibility of the noses for snow plow drivers. Also please construct the noses
with monolithic, tapered curbs as shown in this Google street view at Harmony
and Lemay:
https://www.google.com/maps/@40.5235317,-105.0579498,3a,15.1y,26.73h,7
8.18t/data=!3m6!1e1!3m4!1scRxZiXS46BYEK_gZWQFvxw!2e0!7i13312!8i66
56
Clint Wood
Civil Engineer
p. 970.416.2173 // m. 970.218.2472
e. cwood@fcgov.com // w. fcgov.com/streets
RESPONSE: Noted. Reflective delineators and monolithic, tapered curbs will be provided
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/21/2017
03/21/2017: Light and Power has electric facilities east and west of 5811 S
College Ave that can be extended into the site. Final coordination of primary
electric will be needed to ensure separation requirements are met with other
utility main lines.
RESPONSE: Coordination shall be done to ensure separation requirements are met.
Comment Number: 2 Comment Originated: 03/21/2017
03/21/2017: Electric capacity fees, development fees, building site charges
and any system modification charges necessary to feed the site will apply to this
15
development. Please contact me or visit the following website for an estimate
of charges and fees:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees
RESPONSE: Noted
Comment Number: 3 Comment Originated: 03/21/2017
03/21/2017: Transformer locations will need to be coordinated with Light &
Power. Transformers must be placed within 10 ft of a drivable surface for
installation and maintenance purposes. The transformer must also have a front
clearance of 10 ft and side/rear clearance of 3 ft minimum.
RESPONSE: Transformer locations are now shown on site plan. Clearance requirements will be provided.
Comment Number: 4 Comment Originated: 03/21/2017
03/21/2017: Multi-family buildings are treated as commercial services;
therefore commercial service forms (C-1 forms) and one line diagrams must be
submitted to Light & Power for each building. All secondary electric service
work is the responsibility of the developer to install and maintain from the
transformer to the meter bank.
RESPONSE: Noted
Comment Number: 5 Comment Originated: 03/21/2017
03/21/2017: Electric meter locations will need to be coordinated with Light and
Power Engineering and shown on the utility and site plans. Residential units will
need to be individually metered. If you wish to gang the meters on one side of
the building please place on the opposite side of the gas meters.
RESPONSE: Electric meters are shown on site plan, elevations and utility plans
Comment Number: 6 Comment Originated: 03/21/2017
03/21/2017: Is 3 phase power needed with this development?
RESPONSE: Only required at the clubhouse.
Comment Number: 7 Comment Originated: 03/21/2017
03/21/2017: Please contact Tyler Siegmund at Light & Power Engineering if
you have any questions at 970.416.2772. Please reference our policies,
construction practices, development charge processes, and use our fee
estimator at http://www.fcgov.com/utilities/business/builders-and-developers
RESPONSE: Noted
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 03/21/2017
03/21/2017: 2015 IFC CODE ADOPTION
The Poudre Fire Authority and the City of Fort Collins are in the process of
adopting the 2015 International Fire Code. Building plan reviews shall be
subject to the adopted version of the fire code in place at the time of plan review
submittal and permit application.
16
RESPONSE: Noted, the propose design shall be based on 2015 International Fire Code.
Comment Number: 2 Comment Originated: 03/21/2017
03/21/2017: WATER SUPPLY
Hydrant spacing and flow must meet minimum requirements based on type of
occupancy. A hydrant is required within 300' of any Commercial Building as
measured along an approved path of vehicle travel. An exception to this rule
pertains to buildings equipped with a standpipe system which require a hydrant
within 100' of any Fire Department Connection (FDC). Hydrants on the opposite
sides of major arterial roadways are not considered accessible.
The interior of the site meets minimum hydrant requirements at this time;
however, the developer is responsible for meeting hydrant spacing requirement
along College Ave. and Venus Ave. (Hydrants spaced @ 600'). A hydrant will
be needed at or near the intersection of Goldelm Dr. and College Ave. Another
hydrant will be needed along Venus Dr. Specific code language follows:
> IFC 507.5 and PFA Policy: COMMERCIAL REQUIREMENTS: Hydrants to
provide 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet
to the building, on 600-foot centers thereafter.
RESPONSE: Fire Hydrants have been added along Venus.
Comment Number: 3 Comment Originated: 03/21/2017
03/21/2017: GROUP R SPRINKLER SYSTEMS - LOCAL AMENDMENT
Garage Units 1,2,3,& 4 may be equipped with 13-R sprinkler systems provided
they meet local building department requirements for individual unit separation.
All other multi-family buildings will require a full NFPA 13 automatic sprinkler
system by local amendment. Code language provided below. Please contact
Assistant Fire Marshal, Joe Jaramillo with any fire sprinkler related questions at
970-416-2868.
> IFC 903.3.1.2: New multi-family buildings shall be provided with NFPA 13 (full
protection) fire suppression systems.
Exception 1: M-F units with six (6) or fewer dwelling units per building will be
allowed to install 13-R fire suppression systems provided the units are
separated by one-hour construction (walls & floors).
Exception 2: M-F units with seven to twelve (7 - 12) units per building will be
allowed to install 13-R fire suppression systems provided the units are
separated by two-hour construction (walls & floors).
Contact the building department for further details.
RESPONSE: Noted, the proposed automatic sprinkler system shall be NFPA 13 except Garage units G1,
G2, G3 and G4 which will be NFPA 13R
Comment Number: 4 Comment Originated: 03/21/2017
03/21/2017: OTHER SPRINKLER SYSTEM REQUIREMENTS
> IFC 903.2.9 & 903.2.9.1: An automatic sprinkler system shall be provided
throughout buildings classified as enclosed parking garages (Group S-2
occupancy) in accordance with IBC 406.4 OR where located beneath other
17
groups.
RESPONSE: Noted and NFPA 13R being provided.
> IFC 903.3.1.2.1: Sprinkler protection shall be provided for exterior balconies,
decks, and ground floor patios of dwelling units where the building is of Type V
construction.
RESPONSE: Noted.
> IFC 912.2: Fire Department Connections shall be installed in accordance with
NFPA standards. Fire department connections shall be located on the street
side of buildings, fully visible and recognizable from the street or nearest point
of fire department vehicle access. The location of the FDC shall be shown on
final plan and be approved by the fire department.
RESPONSE: Noted, fire department connections are added to the site plan as well as Fire Exhibit A.
Comment Number: 5 Comment Originated: 03/21/2017
03/21/2017: FIRE LANES
Fire access is required to within 150' of all exterior portions of any building, or
facility as measured by an approved route around the perimeter. Any private
drive serving as a fire lane shall be dedicated as an Emergency Access
Easement (EAE) and be designed to standard fire lane specifications.
> A fire lane has been indicated on the plans; however, fire access to within
150' of all exterior portions of Buildings 1,2,3,4,& 11 have not been achieved
and further discussion is warranted.
RESPONSE: Site plan has been modified to show fire access to within 150’ of all exterior portions of
buildings 1, 2, 3 & 4. Fire Exhibit is provided showing the hose length.
> The dead-end fire lane to Building 11 exceeds 150' in length without a
turnaround.
RESPONSE: Building 11 is relocated to meet the dead-end fire lane requirement. The new proposed
distance is 148 feet. Dimension is shown on the site plan.
> The temporary EAE shall be dedicated with off-site easements.
RESPONSE: Noted
> A permanent fire lane plan to replace the temporary easements is required
before FDP approval.
RESPONSE: A Letter of Intent has been given by the Vinyard ownership which states that permanent
emergency access drives to Fossil Creek Apartments through the Vinyard property per the ODP shall be
provided upon development of their property. See attached letters of intent.
> The temporary EAE shall meet standard fire lane specifications. This includes
surface, grade, weight capacity and width. Compacted road base would require
approval of the fire marshal.
RESPONSE: Noted
Where project size and scope and/or site constraints conflict with fire code
compliance, the intent of the fire code may be met via alternative means and
methods, as approved by the fire marshal. As per IFC 104.8 & 104.9, the fire
18
marshal may allow this approach when perimeter access and/or aerial
apparatus access requirements cannot be met on the site plan. A written plan to
meet the intent of the code via alternative means and methods will need to be
submitted to Fire Marshal, Bob Poncelow for review and approval prior to final
plans approval.
RESPONSE: Noted, the emergency accesses have been increased to 26 foot.
Comment Number: 6 Comment Originated: 03/21/2017
03/21/2017: STRUCTURES EXCEEDING 30' IN HEIGHT
> IFC Appendix D; Poudre Fire Authority Administrative Policy 85-5: In order to
accommodate the access requirements for aerial fire apparatus (ladder trucks),
required fire lanes shall be 26 foot wide minimum on at least one long side of
the building. At least one of the required access routes meeting this condition
shall be located within a minimum of 15 feet and a maximum of 30 feet from the
building, and shall be positioned parallel to one entire side of the building.
RESPONSE: Increased fire lanes to 26 foot wide, dimensions are shown on the revised site plan.
Exterior elevations indicate the eave height at 30'0" however additional
information is required to verify the buildings do not exceed 30' in height as
defined by the 2015 IFC. Code language provided below.
RESPONSE: N/A, the emergency accesses has been increased to 26 feet.
WHERE REQUIRED
> IFC D105.1: Where the vertical distance between the grade plane and the
highest roof surface exceeds 30 feet, approved aerial fire apparatus access
roads shall be provided. For purposes of this section, the highest roof surface
shall be determined by measurement to the eave of a pitched roof, the
intersection of the roof to the exterior wall, or the top of parapet walls, whichever
is greater.
RESPONSE: Noted, site plan has been modified to show 26’ drive aisles along the long axis of the three
story buildings.
Comment Number: 7 Comment Originated: 03/21/2017
03/21/2017: FIRE LANE SPECIFICATIONS
A fire lane plan shall be submitted for approval prior to installation. In addition to
the design criteria already contained in relevant standards and policies, any
new fire lane must meet the following general requirements:
> Shall be designated on the plat as an Emergency Access Easement.
RESPONSE: Noted
> Maintain the required 20 foot minimum unobstructed width & 14 foot minimum
overhead clearance.
RESPONSE: Noted
> Be designed as a flat, hard, all-weather driving surface capable of supporting
40 tons.
RESPONSE: Noted
> Dead-end fire access roads in excess of 150 feet in length shall be provided
with an approved area for turning around fire apparatus.
19
RESPONSE: Noted, Dead-end fire access roads have been revised, new proposed distance at Building 11
is 148 feet. See site plan.
> The required turning radii of a fire apparatus access road shall be a minimum
of 25 feet inside and 50 feet outside. Turning radii shall be detailed on
submitted plans.
RESPONSE: Noted. See civil Auto Turn Exhibit.
> Additional access requirements exist for buildings greater than 30' in height.
Refer to Appendix D of the 2012 IFC or contact PFA for details.
RESPONSE: N/A
> Be visible by painting and/or signage, and maintained unobstructed at all
times. Sign locations or red curbing should be labeled and detailed on final
plans.
RESPONSE: Signs have been added to the site plan.
Comment Number: 8 Comment Originated: 03/21/2017
03/21/2017: SECONDARY ACCESS ROADS
Due to the total number of dwelling units within the development, along with
dead-end distances exceeding 660', two separate access roads will be
required and three have been provided. Distance separation requirements will
need approval of the fire marshal as they do not currently meet minimum code
requirements. Code language provided below.
> IFC D104.3: Where two fire apparatus access roads are required, they shall
be placed a distance apart equal to not less than one half of the length of the
maximum overall diagonal dimension of the lot or area to be served, measured
in a straight line between accesses
RESPONSE: 2 access road provided. Entrances are 493’ apart of Venus. 770’ apart at site entrance
Comment Number: 9 Comment Originated: 03/22/2017
03/22/2017: AUTOTURN EXHIBIT
Since turning radii are shown at less than 25' inside turning radius and to ensure
the width and turning radii can support emergency vehicles, an Autoturn exhibit
will be required for final approval.
RESPONSE: All emergency accesses are updated to 25’ inside turning radius. Please see the revised site
plan. Civil has also provided an AutoTurn Exhibit.
Comment Number: 10 Comment Originated: 03/22/2017
03/22/2017: FIRE LANE SIGNS
The limits of the fire lane shall be fully defined. Fire lane sign locations should be
indicated on future plan sets. Refer to LUCASS detail #1418 for sign type.
Appropriate directional arrows required on all signs. Posting of additional fire
lane signage may be determined at time of fire inspection. Code language
provided below.
RESPONSE: Noted, fire lane signs are shown on the revised site plan.
> IFC D103.6: Where required by the fire code official, fire apparatus access
20
roads shall be marked with permanent NO PARKING - FIRE LANE signs
complying with Figure D103.6. Signs shall have a minimum dimension of 12
inches wide by 18 inches high and have red letters on a white reflective
background. Signs shall be posted on one or both sides of the fire apparatus
road as required by Section D103.6.1 or D103.6.2.
RESPONSE:Noted, please see the revised site plan
Comment Number: 11 Comment Originated: 03/22/2017
03/22/2017: LANDSCAPE PLAN
The proposed Landscape Plan indicates that tree canopy diameters may
encroach on the fire lane over time. PFA would like to ensure the integrity of the
EAE remains as the trees mature and a canopy develops. The EAE shall be
maintained to 14' in height. This is mostly relevant through the parking areas,
where the EAE diminishes in width. This comment is aimed to preserve the
trees and the fire apparatus.
RESPONSE: Note added
Comment Number: 12 Comment Originated: 03/22/2017
03/22/2017: HAZMAT STORAGE/USE
The storage and use of chemicals related to the swimming pool will require a
separate permit for final approval. Please contact Assistant Fire Marshal Ron
Gonzales at 970.416.2864 or rgonzales@poudre-fire.org with further questions.
RESPONSE: Noted, the use of chemicals for the swimming pool will be stored in a lockable closet within
the pool equipment building. The chemical storage closet will also have ventilation, specifically for the
closet.
Comment Number: 13 Comment Originated: 03/22/2017
03/22/2017: PUBLIC-SAFETY RADIO AMPLIFICATION SYSTEM TEST
> IFC 510: New buildings require a fire department, emergency communication
system evaluation after the core/shell but prior to final build out. For the
purposes of this section, fire walls shall not be used to define separate
buildings. Where adequate radio coverage cannot be established within a
building, public-safety radio amplification systems shall be designed and
installed in accordance with criteria established by the Poudre Fire Authority.
RESPONSE: Noted
LOCAL EXCEPTION: PFA will waive the testing requirement and system
installation in all buildings less than 10,000 sq. ft. and any Type V construction
building less than 15,000 sq. ft. PFA policy P15-510.1
RESPONSE: Noted
Comment Number: 14 Comment Originated: 03/22/2017
03/22/2017: PREMISE IDENTIFICATION & WAYFINDING
Where possible, the naming of private drives is usually recommended to aid in
wayfinding. Addresses shall be posted on each structure and where otherwise
needed to aid in wayfinding. Unless otherwise approved by city GIA
department, street names are required to change when they change in direction
(eg. north-south street changing to an east-west orientation). With that in mind,
Goldelm Dr. would be in conflict with the city standard as it would loop back onto
itself. Further discussion with city planning staff is advised.
21
RESPONSE: Additional names for private drives are provided to meet county standard. Our current names
have not been used in the county yet. If that changes during the process we will adjust names as needed.
Comment Number: 15 Comment Originated: 03/22/2017
03/22/2017: ADDRESS POSTING - M-F - LOCAL AMENDMENT
> IFC 505.1.7: Buildings, either individually or part of a multi-building complex,
that have fire lanes on sides other than the addressed street side, shall have the
address numbers and street name on each side that fronts the fire lane.
RESPONSE: Address/number are shown on elevations.
Department: Planning Services
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/22/2017
03/22/2017: The trail connection routing has been discussed with the
development group for quite some time and with multiple departments and
planning staff. The trail connection route proposed does not meet City code and
staff cannot recommend approval of the projects with the proposed
configuration. The connectivity standards outline ped./bike connectivity routing
requirements to the adjacent Skyview neighborhood to the south. As explained
in several meetings and follow-up conversations, the trail spur route must
accommodate bike and ped flow without vehicle conflicts to the maximum extent
feasible.
RESPONSE: Per city recommendation, bike path has been rerouted to west and will be adjacent to railroad
tract. The path will be located in a 30’ easement which runs along the west property line.
Comment Number: 2 Comment Originated: 03/22/2017
03/22/2017: Add the site density to the Land Use Table.
RESPONSE: Noted, please see revised land use table. See site plan.
Comment Number: 3 Comment Originated: 03/27/2017
03/27/2017: Please look at options along the north and northeast portion of the
site to provide a more gradual natural transition along the Redtail Natural Area.
The building 11 location/design and sidewalk area is to abrupt and no transition
is provided in this area.
RESPONSE: Building 11 has been relocated to achieve compatibility with transitions between new
development and the adjacent natural area. We will integrate building and site elements into the detention
design to create aesthetically pleasing landscape that will be suitable with the Redtail Natural Area. We will
select stone masonry, colors and textures which are earth toned to create natural screen that lessen the
visual impact of building and blend well with the natural area.
Department: Stormwater Engineering
Contact: Mark Taylor, 970-416-2494, mtaylor@fcgov.com
Topic: Floodplain
Comment Number: 6 Comment Originated: 03/22/2017
03/22/2017: On the Plat, please label and show the Fossil Creek 100-year
22
floodplain/floodway limits.
RESPONSE: Added Fossil Creek 100-year Floodplain/Floodway limits on the revised Plat.
Comment Number: 7 Comment Originated: 03/22/2017
03/22/2017: On the Site Plan, please label and show the Fossil Creek
100-year Floodplain/Floodway limits, and the Erosion Buffer Zone.
RESPONSE: Added Fossil Creek 100-year Floodplain/Floodway limits, and the Erosion Buffer Zone on the
revised site plan
Comment Number: 8 Comment Originated: 03/22/2017
03/22/2017: On Sheets OG1, G1, G2, G3, G4, and DR1 of the PDP Drawings,
add a note regarding storing materials & equipment in the Floodway and
Erosion Buffer Zone.
RESPONSE: Note added.
Comment Number: 9 Comment Originated: 03/22/2017
03/22/2017: On Sheets OG1, G1, G2, G3, G4, and DR1 of the PDP Drawings,
add a note that fencing will not be allowed in the Floodway or the Erosion Buffer
Zone.
RESPONSE: Note added.
Comment Number: 10 Comment Originated: 03/22/2017
03/22/2017: On Sheets OG1, G1, G2, G3, G4, and DR1 of the PDP Drawings,
label the Floodplain/Floodway boundary and the Erosion Buffer Zone.
RESPONSE: Labels Added.
Comment Number: 11 Comment Originated: 03/22/2017
03/22/2017: On Sheets OG1, G1, G2, G3, G4, and DR1 of the PDP Drawings,
show and label the cross-sections, including Stationing and the BFE at each.
RESPONSE: Labels Added.
Comment Number: 12 Comment Originated: 03/22/2017
03/22/2017: On Sheets OG1, G1, G2, G3, G4, and DR1 of the PDP Drawings,
add notes regarding the need for an approved Floodplain Use Permit and
No-Rise Certification for sanitary sewer main and storm sewer pipes in the
Floodway and the Erosion Buffer Zone.
RESPONSE: Notes Added.
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 03/22/2017
03/21/2017:
This proposed site development disturbs more than 1 acre and will be subject
to State discharge permits as well as City Erosion Control requirements. The
proposed development activities as currently reflected on the plans have
several areas with steep slopes, is adjacent to a Natural Area and has 2 outfalls
into adjacent creeks. The outfalls crossing natural areas should provide
23
adequate permanent erosion control at the point of outfall. Any infrastructure
that is proposed on Natural Areas needs to be well protected during
construction, and re-seeded with a seed mix acceptable to Natural Areas.
Disturbed areas that are being graded with this development for future
development will need to be protected and stabilized. Any steep slopes will
need to have adequate protection, the use of wattle dikes in swales as currently
proposed in some instances is usually not effective. Any offsite grading as
shown currently on the plans will need to have the appropriate easement or
approvals from adjacent property owners. Please refer to redlines for detailed
comments. At final a detailed Erosion and Sediment Control Report will be
required in accordance to Volume 3 Chapter 7 of the Stormwater Criteria
Manual. Please contact Basil Hamdan at 224-6035 (bhamdan@fcgov.com)
with any questions.
RESPONSE: Offsite grading and drainage approvals have been given in the form of Letters of Intent from
the Vinyard ownership as well as the Tynans property. Natural Areas Easement protection notes have
been added to the Erosion control plan. We will work with Natural areas moving forward to ensure their
requirements for erosion control, re-seeding, stabilizing, etc, will be met.
Topic: General
Comment Number: 2 Comment Originated: 03/22/2017
03/22/2017: Detention Pond 1 along the north boundary is currently proposed
to have retaining walls around the entire perimeter. The City's Detention Pond
Landscape Standards do not allow detention ponds to be completely enclosed
by a retaining wall due to maintenance, safety and aesthetic concerns. The City
recommendation is no more than 50% of the perimeter enclosed by a retaining
wall.
RESPONSE: Noted, the detention pond 1 has been redesigned with Stormtech subsurface stormwater
management system and eliminated the amount of retaining wall by 50%. Our goals are to integrate
retaining walls into natural contours to reinforce the natural transition connection between architecture and
landscape to create natural transitions and minimize disturbance to the site. We plan to use stone that
appears to be local to the site, gabion and will be constructed with traditional dry-stack method. The current
design meets the City’s Detention Pond Landscape Standards.
Comment Number: 3 Comment Originated: 03/22/2017
03/22/2017: Drainage easements and/or alignments will be required for the
outfalls into Fossil Creek. This can be a lengthy process due to the land being
owned by the Natural Resources Department.
RESPONSE: Noted. The process has already begun with the completion of an Easement Alternative
Analysis for the Fossil Creek Outfall.
Comment Number: 4 Comment Originated: 03/22/2017
03/22/2017: Maintenance agreements will be required for the off-site detention
basins that will detain for the apartment site.
RESPONSE: Noted.
Comment Number: 5 Comment Originated: 03/22/2017
03/22/2017: Coordination will need to take place between Natural Resources
and Water Utilities regarding the outfall into Fossil Creek. This will include the
24
type of erosion protection and outfall elevation into the creek.
RESPONSE: Noted. Final details will be coordinated with the final submittal.
Comment Number: 13 Comment Originated: 03/24/2017
03/24/2017: Please add text in the Drainage Report documenting that Basin
10 will need to be detained with the Development of Phase 2.
RESPONSE: a note has been added to the drainage report.
Comment Number: 14 Comment Originated: 03/24/2017
03/24/2017: Drainage easements are required for all storm water
improvements off-site including detention ponds and conveyance elements.
RESPONSE: drainage easements have been provided and will be dedicated by separate document.
Comment Number: 15 Comment Originated: 03/24/2017
03/24/2017: Pleae revise the LID calculations. Some of the basin areas do not
match. A LID exhibit is recommended in the Drainage Report.
RESPONSE: LID calculations have been revised.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 9 Comment Originated: 03/24/2017
03/24/2017: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
RESPONSE: Mask has been added for ease of reading text. Please advise if you see other graphic issues
with the drawings.
Topic: Construction Drawings
Comment Number: 11 Comment Originated: 03/24/2017
03/24/2017: Please revise the Benchmark Statement as marked. See redlines.
RESPONSE: the benchmark statements have been revised.
Comment Number: 12 Comment Originated: 03/24/2017
03/24/2017: Some of the sheet titles in the sheet index do not match the sheet
titles on the noted sheets. See redlines.
RESPONSE: noted.
Comment Number: 13 Comment Originated: 03/24/2017
03/24/2017: All benchmark statements must match on all sheets.
RESPONSE: the benchmark statements have been revised.
Comment Number: 14 Comment Originated: 03/24/2017
03/24/2017: Please change the railroad name to match the revised plat.
RESPONSE: The Railroad is now referenced as BNSF Railway
Comment Number: 15 Comment Originated: 03/24/2017
03/24/2017: There are line over text issues. See redlines.
25
RESPONSE: Revised.
Topic: Landscape Plans
Comment Number: 7 Comment Originated: 03/24/2017
03/24/2017: There are line over text issues. See redlines.
RESPONSE: Corrected
Comment Number: 8 Comment Originated: 03/24/2017
03/24/2017: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
RESPONSE: Corrected
Topic: Lighting Plan
Comment Number: 10 Comment Originated: 03/24/2017
03/24/2017: There are line over text issues. See redlines.
RESPONSE: Fixed on updated drawings.
Topic: Plat
Comment Number: 1 Comment Originated: 03/23/2017
03/23/2017: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections
were not made. Please provide any responses on redlined sheets and/or in
response letter.
RESPONSE: Revised.
Topic: Site Plan
Comment Number: 2 Comment Originated: 03/24/2017
03/24/2017: Please revise the title to match the revised title on the Subdivision
Plat.
RESPONSE: Revised
Comment Number: 3 Comment Originated: 03/24/2017
03/24/2017: Some of the sheet titles in the sheet index do not match the sheet
titles on the noted sheets. See redlines.
RESPONSE: Revised
Comment Number: 4 Comment Originated: 03/24/2017
03/24/2017: There are line over text issues. See redlines.
RESPONSE: Revised
Comment Number: 5 Comment Originated: 03/24/2017
03/24/2017: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
RESPONSE: Revised
Comment Number: 6 Comment Originated: 03/24/2017
03/24/2017: The property boundary bearings & distances should all be either
measured or record, not a mix of both. If they aren't needed, they should be
26
removed.
RESPONSE: Noted. We removed them from the Architectural Site Plan
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/21/2017
03/21/2017: We will need to work with you on timing of the relocation of
Crestridge and the installation of a signal at this intersection.
RESPONSE: Noted. We will begin meeting as the apartment project or car dealership project moves closer
to the construction document phase and permit acquisitions.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/21/2017
03/21/2017: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
RESPONSE: Noted.
Department: Zoning
Contact: Ryan Boehle, 970-416-2401, rboehle@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/22/2017
03/22/2017: Please move or add one handicap space closer to clubhouse
area for better accessibility.
RESPONSE: 2 Handicap spaces are provided near Clubhouse and Pool house.
Comment Number: 2 Comment Originated: 03/22/2017
03/22/2017: Need light levels to be shown on north end of lot past the 20'
provided cutoff.
RESPONSE: Illustrated on new set of drawings.
Comment Number: 3 Comment Originated: 03/22/2017
03/22/2017: Please provide details for all bike storage areas ( bike barns,
clubhouse , and patio hook locations). How will the tenants access the
clubhouse bike parking area ?
RESPONSE: Cut sheets and bike storage layout are provided. See Bike Storage Exhibit. The clubhouse
bike parking is accessed on the walkout level of the clubhouse. That access point also gives the tenants
access to the dog wash and bicycle repair room.