Loading...
HomeMy WebLinkAboutFOSSIL CREEK APARTMENTS (FORMERLY WATERSTONE APARTMENTS) - PDP - PDP170010 - SUBMITTAL DOCUMENTS - ROUND 2 - TRAFFIC STUDY (4)T$- RIB Endineering, ac ..' Transportation Endineerimg Solutions Transportation Impact Study Vineyard-Goldelm Fort Collins, Colorado February 2016 Vineyard-Goldelm Transportation Impact Study Fort Collins, Colorado 22 February 2016 Prepared for: Mr. Hans H. Breuer Executive Pastor Vineyard Church 1201 Riverside Fort Collins, CO 80525 Prepared by: t •_• . • .(b,s • 4:=c•,-,7"•.1.< Eric L. Bracke, P.E., P.T.O.E. 5401 Taylor Lane Fort Collins, CO 80528 Office: 970-988-7551 ELBEngineeringlpbroadband.net This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization from ELB Engineering, LLC shall be without liability to ELB Engineering, LLC. TABLE OF CONTENTS Page 1 Introduction 1 2. Agency Discussions 1 3. Existing Conditions 3 4. Project Description 8 5. Traffic Projections/Analysis 12 6. Improvements 23 7. Multimodal Analysis 24 8. Conclusions 26 Table List of Tables Page 1. LOS Definitions 7 2. Existing Operation 7 3. Trip Generation 10 4. 2018 Background Capacity Analysis 15 5. 2020 Background Capacity Analysis 16 6. 2036 Background Capacity Analysis 16 7. Year 2018 Total Traffic Capacity Analysis 21 8. Year 2020 Total Traffic Capacity Analysis 22 9. Year 2036 Total Traffic Capacity Analysis 23 Figures List of Figures Page 1. Vicinity Map 2 2. Existing Peak Hour Traffic 6 3. Site Plan 9 4. Trip Distribution 10 5. Site Distributed Traffic 11 6. Year 2018 Background Traffic 12 7. Year 2020 Background Traffic 13 8. Year 2036 Background Traffic 14 9. Year 2018 Total Traffic 18 10. Year 2020 Total Traffic 19 11. Year 2036 Total Traffic 20 APPENDIX A. Base Assumptions/Scoping Form B. Traffic Counts C. HCM Capacity Analysis — Base Condition D. Signal Warrant Analysis — Existing Year E. Background Years — HCM Analysis F. 2018 Signal Warrant Analysis — Total Traffic G. HCM Capacity Analysis — Total Traffic 1 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 1.0 Introduction This transportation impact study addresses the Vineyard-Goldelm ODP/PDP located on the west side of College Avenue (US287) between Crestridge Road and Fossil Creek Boulevard in Fort Collins, Colorado. The site has sat vacant for years and numerous proposals have been submitted for this site. The site should be considered an infill development since it is surrounded by older county developments. The project will be constructed in phases and includes 250 apartments (non-student), a 42,000 square foot church, and either 18,000 square feet of car sales or specialty retail. For analysis purposes, the project will be built in three phases. Figure 1 on the following page is a vicinity map displaying the location of the project. 2.0 Agency Discussions Initial discussions with City staff indicated that a Full Transportation Impact Study as described in Chapter 4 of the Larimer County Urban Area Streets Standards (LCUASS) would be appropriate for this particular development. The project is considered infill and redevelopment and there are no recently approved projects in the area that need to be considered in the analysis. College Avenue recently has been repaved with minor improvements to the intersection of Skyway and College. College Avenue is a State Highway (US287) and has an Access Control Plan in place. The study will address the existing condition, a 2-year horizon, a 4-year horizon and a 20-year horizon for planning purposes. Traffic projections for College Avenue are from the Colorado Department of Transportation. Appendix A contains the form (Attachment A), which outlines the agreed to scope of work for the study. 2 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 Figure 1 - Vicinity Map  North 3 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 3.0 Existing Conditions 3.1. Current Traffic Peak hour turning movements for the College/Crestridge, College/Smokey, and the College/Skyway were obtained in January 2016. Counts at these three locations were taken in 2-hour blocks of time in 15-minute increments. The counts were taken in the AM between 7:00-9:00 and in the PM between 4:00-6:00. The data was collected in between the snowstorms of January when traffic was fairly normalized. The raw data regarding the turning movements is provided in Appendix B. 3.2 Current Street System The project is located in south Fort Collins on the west side of College Avenue between Crestridge and Fossil Creek Boulevard. The project intends to align Crestridge with Smokey on the east for full movement access with a potential traffic signal. Additional access is proposed on the north end of the project with a limited (RI/RO) movement. The land uses in the area are mixed with commercial and residential. All the developments in the south and to the east of the site were built under older County standards. To the north of the site is the Redtail Grove Natural Area owned by the City of Fort Collins. College Avenue is the main north- south thoroughfare in Fort Collins and is also US 287. The roadway is under the jurisdiction of the Colorado Department of Transportation (CDOT). College   4 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 Avenue is classified as an NRA Highway and currently has an Access Control Plan (ACP) in place that governs future access. College Avenue is a four-lane highway with a center left turn lane, shoulders and auxiliary lanes at intersections where needed. The speed limit is posted 55 mph and the pavement is in good condition. Crestridge is a collector roadway that will provide full-access to the proposed development. The roadway connects to Venus Street and provides access to the residential area to the south as well as the car dealership. The roadway appears to be used more for parking than access and is in poor condition. Smokey Street is a substandard roadway that provides access to an industrial area to the east of College Avenue. The roadway is in poor condition; no sidewalk, curb or gutter, and in a state of disrepair.    5 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 The intersection of College Ave and Skyway is controlled under a 6-phase traffic signal. Skyway traffic movements are relatively minor and the roadway provides access to the neighborhoods on both the east and west side of College Avenue. The radii on Skyway are non-existent and traffic operations for the turning movements is hindered by the poor geometry. 3.3 Current Traffic Conditions Capacity analyses were performed at the key intersections to determine if existing deficiencies exist on the roadway network. The analyses followed the procedures of the Highway Capacity Manual 2010. For the intersections of College/Crestridge and College/Smokey, it was observed that most folks making the left turn maneuver from the side street were using the TWLTL as a refuge. The intersections were model/analyzed as a two-stage left turn. Observation at the intersection also revealed that although there are no north or southbound left turn lanes at Crestridge or Smokey, the shoulders act as right turn lanes. Level of Service (LOS) is a qualitative term describing operating conditions and expressed in terms of delay. Table 1 below provides the definitions of LOS for both signalized and unsignalized intersections. Table 2 displays the results of the analyses. All key intersections operate at acceptable levels of service. The worksheets from the analyses can be found in Appendix C.  6 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 Smokey Figure 2 – Existing Peak Hour Turning Movements (AM/PM) 45/39 7/10 19/12 8/27 1359/1119 26/24 38/38 4/12 27/17 53/38 746/1560 32/37 18/28 6/10 16/73 14/47 1469/1171 36/59 847/1628 27/36 North South College 7/10 1470/1234 32/0 841/1618 Crestridge 7 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 Level of Service Signalized Intersection Average Total Delay (seconds/vehicle) Unsignalized Intersection Average Total Delay (seconds/vehicle) A < 10 < 10 B >10 and ≤ 20 >10 and ≤ 15 C >20 and ≤ 35 >15 and ≤ 25 D >35 and ≤ 55 >25 and ≤ 35 E >55 and ≤ 80 >35 and ≤ 50 F >80 >50 Table 1 Level of Service Definitions M  PM I M O D(/) O D(/) COLLEGE/SKYWAY EBL/T/R (APPROACH) D 51.8 D 52.2 Signal APPROACH D 51.8 D 52.2 WBL/T D 47.8 D 48.8 WBR D 49.0 D 52.2 WB APPROACH D 48.5 D 49.9 NBL A 3.6 A 5.9 NBT A 7.3 A 6.5 NBR A 3.9 A 4.0 NB APPROACH A 7.2 A 6.4 SBL A 5.2 A 4.9 SBT A 4.5 A 7.5 SBR A 3.4 A 3.5 SB APPROACH A 4.4 A 7.2 OVERALL A 8.8 A 8.7 COLLEGE/SMOKEY WBL/T D 28.7 E 38.4 STOP SIGN SBL A 0.4 B 12.1 OVERALL A 0.5 A 1.7 COLLEGE/CRESTRIDGE EBL/R C 21.3 F 50.3 STOP SIGN NBL A 9.9 C 15.4 OVERALL A 0.2 A 0.7 Table 2: Capacity Analysis - Existing Condition All of the key intersections are currently operating within the city standards from an overall standpoint. The intersections of College/Crestridge and College/Smokey are 8 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 experiencing delay – primarily the left turns onto College Avenue. This is a normal condition for an urban area. A Traffic Signal Warrant Analysis was conducted for the existing condition to determine if signalization was warranted at this time. The results indicate that the intersection of Crestridge/College/Smokey did not meet signal warrants under today’s trafficand the MUTCD requirements. Only the Peak Hour Warrant (#3) was analyzed. Results of this analysis is found in Appendix D. 4.0 Project Description 4.1 Project The project consists of developing the vacant parcel of land on the west side of College Avenue between Crestridge Road and Fossil Creek Boulevard. The property is situated just south of the Redtail Grove Natural Area. The project proposes to construct the project in three phases:  Phase I – 250 apartments (non-student)  Phase II – 18 thousand square feet of either specialty retail or auto sales  Phase III – 42 thousand square feet for the Vineyard church The project is surrounded by both commercial and residential developments. Access to the site will be from a right-in/right-out access on the north end of the project and on the south, at Crestridge Road. Crestridge Road is anticipated to be signalized in the future and realigned with Smokey Street on the east side of College Avenue. For analysis purposes, it will be assumed that the development will be completed in the following years:  Phase I by 2018  Phase II by 2020  Phase III is undetermined but will be considered in the long term analysis. The preliminary site plan is displayed in Figure 3. 9 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 Figure 3- Preliminary Site Plan 4.2 Trip Generation Trip generation rates for the proposed project are based on the ITE Trip Generation, 9 th Edition. The manual presents data from numerous trip generation studies for a variety of land uses from across the country. ITE Code 220, Apartments, was used for the residential and ITE Code 826 for the retail portion, and ITE Code 560 for the church use. No trip reductions were assumed as part of the project. Table 3 below summarizes the proposed trip generation for the project. For the entire project, during the morning peak hour, 294 trip ends can be expected and 298 trip ends can be expected from the project during the afternoon peak hours. North 10 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016   / ITE Code Land Use Size AWDTA AM Peak Hour PM Peak Hour Rate Trips Rate In Out Rate In Out Phase I 220 Apartments 250 6.65 1663 0.55 37 98 0.67 102 65 Phase II 826 Specialty Retail Center 18 44.32 798 6.84 59 64 5.02 51 40 Phase II 560 Church 42 9.11 383 0.87 20 16 0.94 21 19 Total 2843 116 178 174 124 Table 3 - Trip Generation 4.3 Trip Distribution Trip distribution is the process of determining where the trips are coming to and from the site. Since all trips into the site must come enter the site from College Avenue, the distribution is all north-south movements. The distribution for the project is displayed in Figure 4. Figure 4 – Trip Distribution 35% North South College 65% 11 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016   /   /   / 4.4 Site Distributed Traffic Based on the trip generation, the project trips were then assigned to the surrounding roadway network based on the estimated trip distribution. The numbers have been rounded to the nearest “5”. These estimated project trips will be utilized by adding them to the background traffic then analyzed to estimated roadway impact. Site distributed traffic is shown below in Figure 5.  Figure 5 – Site Distributed Traffic by Phase 20/10 North South College Phase I 65/45 20/10 15/35 15/35 25/20 South College Phase II 105/70 35/20 35/55 30/60 30/20 South College Phase III 115/80 40/25 15/35 35/80 30/35 50/40 12 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 Smokey Skyway 5.0 Traffic Projections/Background Analysis 5.1 Traffic Projections Background traffic for the horizon years was estimated by assuming that all traffic movements would increase by 1.0% per year, as agreed to in the initial scoping meeting with the Traffic Operations Department. The projections are based on the Colorado Department of Transportation estimates and the OTIS estimation for future traffic projections on the state highway system. Background traffic is displayed in Figure 6, 7 and 8. Figure 6 – Year 2018 Background Peak Hour Turning Movements (AM/PM) 45/40 10/10 20/10 10/30 1385/1140 30/25 40/40 5/15 30/20 55/40 760/1590 35/140 20/30 10/10 20/75 15/50 1500/1110 40/60 880/1695 30/40 North South College 10/10 1520/1195 35/5 860/1615 Crestridge 13 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 Smokey Skyway Figure 7 – Year 2020 Background Peak Hour Turning Movements (AM/PM) 50/40 10/10 20/10 10/30 1415/1165 30/25 45/40 5/15 30/20 55/40 775/1620 35/140 20/30 10/10 20/75 15/50 1530/1220 40/60 870/1705 30/40 North South College 10/10 1550/1280 35/5 875/1680 Crestridge 14 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 Smokey Skyway Figure 8 – Year 2036 Background Peak Hour Turning Movements (AM/PM) 55/50 10/15 25/15 45/45 5/15 35/20 10/35 1630/1345 35/30 45/45 5/15 35/20 65/45 895/2000 40//150 25/35 10/15 25/80 20/50 1760/1405 45/70 1015/1955 30/40 North South College 10/15 1765/1480 40/5 1010/1940 Crestridge 15 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 5.2 Capacity Analysis - Background Capacity analysis was performed for all the key intersections based on the techniques of the 2010 Highway Capacity Manual. The analysis revealed that the intersection get slightly worse in terms of delay as we moved through the horizon years. In particular, the minor street left turns from Crestridge and Smokey experience high levels of delay under stop sign control. The intersection of College/Skyway continues to operate at good levels of service without improvements through the year 2036. Tables 4-6 display the results of the analysis and capacity worksheets can be found in Appendix E. M  PM I M O D(/) O D(/) COLLEGE/SKYWAY EBL/T/R (APPROACH) D 51.7 D 52.1 Signal APPROACH D 51.7 D 52.1 WBL/T D 47.5 D 48.7 WBR D 48.4 D 50.4 WB APPROACH D 48.0 D 49.6 NBL A 3.8 A 6.5 NBT A 7.8 A 6.7 NBR A 4.1 A 4.1 NB APPROACH A 7.7 A 6.7 SBL A 5.7 A 5.3 SBT A 4.8 A 8.0 SBR A 3.6 A 3.7 SB APPROACH A 4.7 A 7.7 OVERALL A 9.2 A 9.2 COLLEGE/SMOKEY WBL/T D 25.2 E 38.1 STOP SIGN SBL A 14.8 B 11.7 OVERALL A 0.5 A 1.7 COLLEGE/CRESTRIDGE EBL/R C 14.9 F 51.5 STOP SIGN NBL A 10.0 C 15.4 OVERALL A 0.2 A 0.8 Table 4 - Year 2018 Background Traffic 16 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 M  PM I M O D(/) O D(/) COLLEGE/SKYWAY EBL/T/R (APPROACH) D 51.3 D 52.1 Signal APPROACH D 51.3 D 52.1 WBL/T D 46.9 D 848.7 WBR D 47.2 D 50.4 WB APPROACH D 47.0 D 49.6 NBL A 4.1 A 6.7 NBT A 8.4 A 6.8 NBR A 4.4 A 4.1 NB APPROACH A 8.3 A 6.8 SBL A 6.3 A 5.5 SBT A 5.1 A 8.2 SBR A 3.9 A 3.7 SB APPROACH A 5.1 A 7.9 OVERALL A 9.9 A 9.3 COLLEGE/SMOKEY WBL/T D 30.6 E 46.1 STOP SIGN SBL C 15.1 B 12.5 OVERALL A 0.6 A 2.0 COLLEGE/CRESTRIDGE EBL/R C 21.8 F 58.8 STOP SIGN NBL B 10.0 C 16.0 OVERALL A 0.3 A 0.8 Table 5 - Year 2020 Background Traffic M  PM I M O D(/) O D(/) COLLEGE/SKYWAY EBL/T/R (APPROACH) D 51.1 D 51.6 Signal APPROACH D 51.1 D 51.6 WBL/T D 46.1 D 47.1 WBR D 46.6 D 48.6 WB APPROACH D 46.4 D 47.9 NBL A 4.5 B 15.6 NBT B 10.6 A 8.4 NBR A 4.7 A 4.6 NB APPROACH A 10.4 A 8.5 SBL A 9.2 A 8.4 SBT A 5.8 B 13.5 SBR A 4.2 A 4.2 SB APPROACH A 5.8 B 13.0 OVERALL B 11.1 B 12.9 COLLEGE/SMOKEY WBL/T E 46.3 F 50.3 STOP SIGN SBL C 17.9 B 14.1 OVERALL A 0.9 A 2.0 COLLEGE/CRESTRIDGE EBL/R D 27.5 F 76.7 STOP SIGN NBL B 10.7 C 19.6 OVERALL A 0.4 A 1.2 Table 6 - Year 2036 Background Traffic 17 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 5.2 Total Traffic Projections and Analysis Site generated traffic was then added to the background traffic to derive the total traffic expected on the network for the horizons years. Figures 9-11 display the total traffic that is used in the analysis. While calculating the “Total Traffic Projections”, a Warrant Study was conducted at the intersections of College Ave/Crestridge/Smokey. It was determined that with the first phase of the project completed, the intersection would meet traffic signal warrants under the Manual on Uniform Traffic Control Devices, 2009. For analysis purposes, it was assumed that Crestridge and Smokey would be realigned sometime in between the construction of phase I and phase II. However, this does not prohibit the developer to construct the realignment during the phase I construction (which would be preferred on several levels). The Year 2018 “Total Traffic” diagram as shown in Figure 9 assumed that 65 EB left turn morning peak hour trips and 45 EB left turn morning trips went south through the neighborhood to make the EBLT at Skyway and College. The delays in making this movement at Crestridge would be severe and they would most likely cut through the neighborhood to make the left turn safely. From a daily trip perspective, ELB Engineering, LLC has estimated that the total project would generate over 2800 trips per day. Half of these trips ends are in and the other half are leaving the site. If the assumption is that 65% of these trips are heading north, there will probably be 900 extra trips going through the neighborhood to make the left turn at Skyway. From a traffic engineering perspective, going through the neighborhood is a safe and reasonable maneuver. From a neighborhood perspective, the increase in traffic will be unacceptable. If this project is to be successful, then the developer needs to find a way to reconstruct Crestridge Road and signalize the intersection in the early stages of the project. The Warrant Study can be found in Appendix F and the Capacity Worksheets in Appendix G. 18 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 Crestridge Smokey Skyway Figure 9 – Year 2018 Total Traffic – Phase I w/o realigned Crestridge 110/185 10/10 20/10 45/45 5/15 35/20 10/30 1400/1175 30/25 40/40 5/15 30/20 55/40 830/1630 35/140 20/30 30/20 20/75 15/50 1620/1190 40/60 860/1595 30/45 North South College 40/45 1600/1220 40/35 860/1615 Venus Rd 25/20 1670/1250 20/35 865/1645 19 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 Crestridge Smokey Skyway 50/40 10/10 20/10 45/45 5/15 35/20 10/30 1450/1230 30/25 45/40 5/15 30/20 55/40 840/1670 35/140 125/100 Negligible 45/30 20/75 Negligible 15/50 North South College 45/65 1530/1220 40/60 65/40 840/1635 30/40 Venus Rd 25/20 1675/1395 30/60 935/1715 20 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 Crestridge Smokey Skyway Figure 10 – Year 2020 Total Traffic – Phase II w/ realigned Crestridge Figure 11 – Year 2036 Total Traffic – Phase III 55/50 10/15 25/15 45/45 5/15 35/20 10/35 1645/1380 35/30 45/45 5/15 35/20 65/45 965/2045 40/150 135/110 Negligible 40/35 25/80 Negligible 20/50 North South College 50/85 1760/1405 45/70 85/45 955/1935 30/40 Venus Rd 30/20 1895/1595 35/80 1070/2020 21 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 Capacity analysis was performed on each of the key intersections for the years 2018, 2020 and for 2036. As stated earlier, it was assumed that in 2018, Crestridge and not yet been realigned. The intersection of College and Skyway functioned well with additional WB left turns added to the intersection. In the years 2020 and 2036, it was assumed that the key intersection had been realigned. For analysis purposes the following geometry was assumed:  The NB and SB approaches all had left turn lanes, two through lanes and an auxiliary right turn lane.  Crestridge approach assumed a left turn lane and a combination thru-right  The Smokey approach assumed the existing geometry with a combination left- thru-right.  The intersection operated under a 6-phase traffic signal with protected/permitted left turn phasing for the north and southbound left turns. The results of the analysis are shown in Tables 7-9 on the following pages. The key intersections operate under acceptable conditions in the short and long range future. M  PM I M O D(/) O D(/) COLLEGE/SKYWAY EBL/T/R (APPROACH) D 50.3 D 50.8 Signal APPROACH D 50.3 D 50.8 WBL/T D 42.6 D 44.3 WBR D 43.1 D 45.0 WB APPROACH D 42.9 D 44.7 NBL A 5.4 A 9.3 NBT B 10.5 A 9.0 NBR A 5.5 A 5.4 NB APPROACH B 10.4 A 8.9 SBL A 8.0 A 7.5 SBT A 6.8 B 11.0 SBR A 5.0 A 4.9 SB APPROACH A 6.7 B 10.6 OVERALL B 11.9 B 12.1 COLLEGE/SMOKEY WBL/T D 29.0 E 41.9 STOP SIGN SBL C 16.1 B 12.3 OVERALL A 0.6 A 1.9 COLLEGE/CRESTRIDGE EBL/R C 19.6 F 52.1 STOP SIGN NBL B 10.2 C 16.6 OVERALL A 0.5 A 1.1 COLLEGE/VENUS (access) EBR B 11.9 C 18.0 Table 7 – Year 2018 Total Traffic Analysis 22 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 M  PM I M O D(/) O D(/) COLLEGE/SKYWAY EBL/T/R (APPROACH) D 51.5 D 52.1 Signal APPROACH D 51.5 D 52.1 WBL/T D 47.0 D 4.7 WBR D 48.1 D 50.4 WB APPROACH D 47.6 D 49.6 NBL A 4.0 A 7.2 NBT A 8.4 A 7.1 NBR A 4.2 A 4.1 NB APPROACH A 8.3 A 7.0 SBL A 6.4 A 6.0 SBT A 5.2 B 8.5 SBR A 3.8 A 3.7 SB APPROACH A 5.1 A 8.2 OVERALL A 9.7 A 9.5 COLLEGE/CRESTRIDGE/SMOKEY EBL D 39.1 D 43.5 Signal EBT/T D 36.2 D 38.7 EB APPROACH D 38.3 D 42.3 WBL/T/R D 35.4 D 43.2 WB APPROACH D 35.4 D 43.2 NBL A 5.0 B 12.4 NBT A 9.9 A 9.5 NBR A 5.1 A 6.1 NB APPROACH A 9.7 A 9.5 SBL A 8.6 A 8.8 SBT A 7.1 B 1.3 SBR A 5.5 A 5.7 SB APPROACH A 7.0 B 11.9 OVERALL B 11.0 B 13.4 COLLEGE/VENUS (access) EBR B 12.4 C 19.4 Table 8 - Year 2020 Total Traffic Analysis 23 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 M  PM I M O D(/) O D(/) COLLEGE/SKYWAY EBL/T/R (APPROACH) D 51.2 D 51.6 Signal APPROACH D 51.2 D 51.6 WBL/T D 46.2 D 47.1 WBR D 46.7 D 48.6 WB APPROACH D 46.4 D 47.9 NBL A 4.6 B 17.3 NBT B 10.6 A 8.6 NBR A 4.7 A 4.6 NB APPROACH B 10.5 A 8.7 SBL A 9.4 A 9.0 SBT A 6.0 B 14.3 SBR A 4.2 A 4.2 SB APPROACH A 6.0 A 13.8 OVERALL B 11.1 B 13.4 COLLEGE/CRESTRIDGE/SMOKEY EBL D 43.5 D 44.7 Signal EBT/T D 39.4 D 39.2 EB APPROACH D 42.5 D 43.3 WBL/T/R D 39.3 D 43.5 WB APPROACH D 39.3 D 43.5 NBL A 5.4 C 25.7 NBT B 12.3 B 10.4 NBR A 5.2 A 5.9 NB APPROACH B 12.0 B 11.0 SBL B 12.1 A 8.5 SBT A 7.6 B 19.3 SBR A 5.6 A 6.2 SB APPROACH A 7.5 B 18.8 OVERALL B 12.6 B 17.5 COLLEGE/VENUS (access) EBR B 13.4 C 23.9 Table 9 Year 2036 Total Traffic Analysis 6.0 Improvements 6.1. Auxiliary Lanes: College Avenue is a State Highway under the “NRA” classification category with a speed limit of 55 mph. Based on the State Highway Access Code, the following improvements would be required:  Connection of Venus at College Ave.: o Southbound deceleration lane of 600’. This may be difficult to accomplish with the bridge in place over Fossil Creek o A southbound acceleration lane from Venus at a length of 960’ o Some form of median control to prevent the NB left turn and the and the EB left turn from the intersection 24 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016  College/Smokey/Crestridge Realignment o NB and SB right turn lanes should be provided at the new intersection with at least 600’ of deceleration and 60 ‘ of storage. o NB and SB right turn lanes are already present and should be brought up to the code in terms of deceleration. o NB and SB acceleration lanes would be required at the intersection that would accommodate “free right turns” 7.0. Multi-Modal Evaluation Section 4.5.3 (B) of the Larimer County Urban Area Street Standards requires that projects undergo a level of service analysis for alternative modes of transportation. The modes of transportation that must meet LOS standards are bicycles, and pedestrians. Transit service LOS must also be analyzed at the time of development review. 7.1 Pedestrian Level of Service The project area was evaluated for compliance with the pedestrian level of service standards. The project will construct pedestrian facilities an amenities to ensure that on- site pedestrian is safe and pleasant. Sidewalks, crosswalks, appropriate lighting will all be in place as the project develops. As stated previously, the site is surrounded by older county developments and there are no sidewalks in the immediate vicinity. It is physically impossible to connect to exist to surrounding neighborhoods via pedestrian facilities. There are sidewalks in the Redtail Ponds development to the north of the site but there isn’t an area considered a “pedestrian destination” in the development. On the northeast corner of the site, a pedestrian/trail connection could be made to the Mason Street Trail that would give additional access to other locations. The development will provide all pedestrian facilities and amenities in conformance with the City of Fort Collins standards. 7.2 Bicycles Level of Service The project meets the standard of C for bicycle LOS. This LOS can be achieved if the project makes the connection to the Mason Street Trail to the north of the project. This trail provides access both to the north and to the east of the site. 25 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 At one time, there were bike lanes on College Avenue from Harmony Road to Carpenter Road. When CDOT repaved College Avenue in 2015, the bike lanes were removed and never replaced. The bike lanes were originally installed as an “experiment” by the City of Fort Collins under the permission of both CDOT and FHWA. The City was under the obligation to study the area and write a report on the results of the experiment. However, it is unknown if that report was ever written or why the bike lanes were removed. If the bike lanes had remained on College Avenue, then the LOS would be elevated to a B. C. Transit Level of Service The project is located to the south of the normal operations of the Transfort Bus Service. However, there are bus stops within walking distance to the north and to the south of the site that will allow people to access the bus system through the Flex routes. If a connection is made to the Mason Trail, then residents, employees, and customers will have full access to the site via transit. The City of Fort Collins South Transit is located north of the site with easy access via the trail. 26 | P a g e E L B E n g i n e e r i n g , L L C 5 4 0 1 T a y l o r L a n e F o r t C o l l i n s , C O 8 0 5 2 8 V i n e y a r d - G o l d e l m T I S 9 7 0 - 988- 7 5 5 1 bruary, 2016 8.0 Conclusion This TIS assessed the impacts associated with the Vineyard-Goldelm ODP/PDP located on the west side of College Avenue in South Fort Collins, CO. The project proposes to construct 250 apartments, 18 thousand square feet of retail/car sales and a 42 thousand square foot church. Based on the analyses, investigations, and findings documented in the various sections of this Transportation Impact Study, the following can be concluded. o Current operation is acceptable at all of the key intersections. Minor street left turns at Crestridge and Smokey are problematic in the peak hours. o Operation at the key intersections will be acceptable under full build-out of the project. o The realignment of Crestridge and Smokey should occur with the first phase of the project when signal warrants are satisfied. o For the entire project, during the morning peak hour, 294 trip ends can be expected and 298 trip ends can be expected from the project during the afternoon peak hours. o A new traffic signal will be warranted at Crestridge/College and is in conformance with the Access Control Plan. o The project will be required to provide auxiliary lanes in conformance with the State Highway Access Code as discussed in the report. o Multi-modal level of service can be satisfied for bikes and transit. LOS for pedestrians cannot be satisfied since there are no sidewalks in the immediate area. The project will construct the sidewalk system in conformance with the City Standards. Statement of Adequacy: The transportation facilities will be adequate and available to serve this development as contained in the Larimer County Urban Area Street Standards. All applicable LOS standards will be met since all transportation facilities are in place or will be in place upon issuance of a certificate of occupancy. APPNPIX A Vfretp-d- ocidelm frazsperiation Imprt otudy noengineering [LC Fat Cd/s. Cda-ado &May 20/6 Chapter 4 - Attachments Attachment A Transportation Impact Study Base Assumptions vdt 6,011 ollS - %DOS, fr Q(^‘?"4" f.,44, 1•\ hi 6-4-r Project Information Project Name via jayear_D ....ae ,i, rs,......,t Project Location ea an e eascirauge TIS Assumptions Type of Study Full: a---- i Intermediate: Study Area Boundaries North: ither.eatisnatc, South: screisigas East: ,c, %Vest: Study Years Sh Long Range: Future Traffic Tra Growth Rate s i / vivo 1.400,a _ Study Intersections r."-All-access - ' 5. 2. at * eeu-gosee 6. 3-2t7 1 entice— 7. 4. 8. Time Period for Study a- A..2:00-9:00 in) 4:00-6:00 Sat Noon: Trip Generation Rates an5, 4t-e? Trip Adjustment Factors Passby: essnis Captive Market: Overall Trip Distribution SEE ATTACHED SKETCH Cs 115 0K, Mode Split Assumptions Committed Roadway Roadway Improvements (.3 ONtysh Irtif I r•-• it , I treat, le"" AJOae \An IL:.‘ qt.? Other Traffic Studies isars a 01.4ii.55 pokerk „A li ngL V) .0 4t, ‘ Areas Requiring Special Study so -ea i e aa ...ar 5.Thiry y or a'? ay? fra6-7-atiCe-sot-Cier ••• Date: ZS Zres,fko.r...4, te. Traffic Engineer Local Entity Engineer j•LSILAt Page 4-34 Ladmor County Urban Area Street Standards — Ropoalod and Reenacted Apr111, 2007 Adopted by Latimer County, City of Loveland. City of Fort Collins lgs-1 I , APPNPIX E3 Vineyard- addelm fral5prrtaten Impart 5tudii no engineering, LLC Pat Collins, Cola-ado robruarti 2016 2 2 2 0 2 0 4 0 2 382 8 0 4 225 2 633 0 0 0 0 0 5 0 5 0 2 337 15 0 6 208 5 587 0 0 0 0 0 21 0 27 0 13 2,886 67 0 471,581 46 4,729 0 0 0 0 0 14 0 16 0 71,469 36 0 27 841 32 2,466 0 0 0 0 8 30 00 AM 0 4 0 0 9:4500 AM 0 4 D 0 Count Total 0 34 0 7 Peak Hour 0 18 0 6 4 Tic Data (303) 216-2439 www.alltrafficdatamet Location: 1 COLLEGE AVE & SMOKEY ST AM Date and Start Time: Tuesday, February 09, 2016 Peak Hour 07:30 AM - 08:30 AM Peak 15-Minutes: 07:30 AM - 07:45 AM Peak Hour-All Vehicles (1,674) 900 0.91 1,503 (2,947) 1 I 1 (591 o .Z .1 1 L. b I_ 16 n Imm N 4.... 10 ij 4.... 3 0.76 W 0.95 E 0 y r 14 24 yo 5 yp. 6 n (41) 1 i rc ° ..1 i 1 (48) 35 4.4.40 0 0 0 0.54 I E 63 :NG* I 117 (114) -1 4: 4"misr°. 1) ...*: 1 1 Peak Hour - Pedestrians/Bicycles in Crosswalk (1,609) 661 0.88 1.512 (2,966) Note: Total study counts contained in parentheses. Traffic Counts CRESTRIDGE DR Interval Eastbound Stall lime 4 00.00 PM 4 15 00 PM PM 0 0 4 0 0 0 Pi° 5 30 00 PM 0 5 0 5 45 00 PM 0 4 0 Count Total 0 41 0 Peak Hour 0 28 0 2 0 11 0 15 0 0 271 16 0 16 367 0 702 2,937 0 0 0 0 3 0 11 0 20 0 0 292 20 0 24 343 0 713 Z993 0 0 0 0 2 0 " 042 4 2 4 7. 2 4 2 0 11 0 M 0 0 289 19 0 10 383 0 730 0 0 2 0 8 0 21 0 0 295 18 0 19 360 0 727 0 0 19 0 88 0 140 0 0 2,318 132 0 105 3071 0 5,914 0 1 10 0 47 0 73 0 0 1,171 59 0 36 1,618 0 3,042 Location: 1 COLLEGE AVE & SMOKEY ST PM Date and Start Time: Monday, February 08, 2016 Peak Hour 04:30 PM - 05:30 PM Peak 15-Minutes: 04:45 PM - 05:00 PM a (303) 216-2439 www.alltrafficdata.net Peak Hour - All Vehicles (3,175) 1,651 055 1,272 (2,449) (228) 0 254 N —O 120 033 W 096 E 0.81 aa ..... s ...0. 95 (60) 10 —I C 0 : 1 I 41 0° !f: (237) n (3,178) 1,675 0.97 1,230 (2.493) Note: Total study counts contained In parentheses. Traffic Counts Peak Hour - Pedestrians/Bicycles in Crosswalk 4.440 1 ..*1 t I IN I t w4XectE 1 5 0 1 4.4.44.4.444 440 0 Location: 2 COLLEGE AVE St SKYWAY DR PM Date and Start Time: Monday, February 08, 2016 Peak Hour 04:45 PM - 05:45 PM Peak 15-Minutes: 05:15 PM - 05:30 PM (303) 216-2439 www.alltrafficdata.net (139) 77 0.90 61 •••.* (141) Peak Hour - All Vehicles (3,101) 1,1136 0.95 1,197 (2389) J ILL _ 9.9 39 _I N •••• 12 W Den E 10 r 17 12 11 -1 t fe I -1 -1'2 n (3,0251 1,590 0.95 1 171 (2,298) Peak Hour - Pedestrians/Bicycles In Crosswalk *MO 1 l MM. 2 (132) N I 67 0.93 *G*E " 71 S (139) ---1•••••••••••••• 0 .10 a soak Note: Total study cctunts contained In parentheses. Traffic Counts SKYWAY DR SKYWAY DR COLLEGE AVE COLLEGE AVE Start Time U-Turn Left Thru Right Interval Eastbound U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right Total Hour West East South North Westbound Northbound Southbound Rolling Pedestrain Crossings 0 7 0 5 0 4 248 4 0 15 343 0 11 2 12 0 4 264 8 0 7 331 0 4 3 7 0 4 267 5 0 10 366 4 00 00 PM 0 12 3 3 10 654 2,767 0 0 0 0 0 12 5 8 0 14 2 9 ID 694 2,846 709 2,920 0 0 0 0 0 0 0 5 45 00 PM Count Total Peak Hour 0 7 0 5 0 84 20 37 0 39 10 12 lc Data (303) 216-2439 www.alltrafficdata.net Location: 2 COLLEGE AVE & SKYWAY DR AM Date and Start Time: Monday, February 08,2016 Peak Hour 07:45 AM - 08:45 AM Peak 15-Minutes: 07:45 AM - 08:00 AM Peak Hour - All Vehicles (1,521) 621 091 1,442 (2,837) 1 1 t. .. (120) 0 z .1 1 L Is t_ 38 (132) 65 ii 643 45 j N 0.68 W 0.93 E are 7 .... r27 71 my, S sy 55 (145) 19 -I c ° 7 n ai ii tic* (g2) (1,486) 792 0.96 1,393 (2.727) Note: Total study cuunts contacted in parentheses. Traffic Counts Peak Hour - Pedestrians/Bicycles in Crosswalk _l 0 114,4tmermaserali 1 I N = WXjGVOE 0 I i -0 SKYWAY DR SKYWAY DR COLLEGE AVE COLLEGE AVE Interval Eastbound Westbound Northbound Southbound Rolling Pedestrain Crossings Start Time 1.1-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Lett Thru Right Total Floor West East South North 7.0000 AM 0 12 0 4 7:15,00 AM 0 11 1 7 730130 AM 0 15 2 8 0 6 0 1 0 3 288 0 1 6 118 6 445 2,207 0 0 0 0 0 11 0 5 0 4 340 3 3 1 143 8 537 2,328 0 0 1 0 0 1 1 10 0 1 363 1 0 3 181 8 594 2,353 0 0 0 0 8 45 00 AM 0 9 0 5 Count Total 0 92 10 43 Peak Hour 0 45 7 19 0 10 4 14 0 5 323 3 0 7 200 15 595 0 0 0 0 0 55 9 68 0 21 2,673 33 4 39 1,388 90 4,525 0 0 1 1 0 27 4 38 0 81,359 26 0 22 746 53 2,354 0 0 1 0 Appendix C Virgya-eb aoldelm fratffxrtatial Impxt sizeig eterripirenip, [IC Fat Ca' km Colorado February 206 4 5 14.5 6.7 8 5.5 5.5 5.5 20.5 58 67.5 8.6 2.1 9.8 0.5 0.0 33.4 HCM 2010 Signalized Intersection Summary 7: College Ave & Skyway 2/15/2016 C 4- sk" 4 \ t \' Initial 0 (0b), veh 0 0 0 0 0 0 0 0 0 0 0 0 Fed-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking &IS, Adj 1.00 1.00 1,00 100 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, vell/h/In 1900 1863 1900 1900 1863 1863 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veh/h 48 8 20 29 4 41 9 1461 28 34 802 57 Adj No. of Lanes 0 1 0 0 1 1 1 2 1 1 2 1 Peak Hour Factor 0.93 0.93 0.93 0.93 093 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, vell/h 110 22 28 163 19 130 524 2614 1169 313 2679 1199 Arrive On Green 0.08 0.08 0.08 0.08 0.08 0.08 0.01 0.74 0.74 0.03 0.76 0.76 Sat Flow, veh/b 688 263 340 1236 227 1583 1774 3539 1583 1774 3539 1583 Grp Volume(v), vehTh 76 0 0 33 0 41 9 1461 28 34 802 57 Grp Sat Flow(s),veh/h/In 1291 0 0 1463 0 1583 1774 1770 1583 1774 1770 1583 Q Serve(g_s), s 4.4 0.0 0.0 0.0 00 2.7 0.1 20.2 0.5 0.5 7.8 1.0 Cycle 0 Clear(g_c), s 6.6 0.0 0.0 2.3 0.0 2.7 0.1 20.2 08 0.5 7.8 1.0 Prop In Lane 0.63 0.26 0.88 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), vehlb 159 0 0 182 0 130 524 2614 1169 313 2679 1199 V/C Ralio(X) 0.48 0.00 0.00 0.18 0.00 0.32 0.02 0.56 0.02 0.11 0.30 005 Avail Cal)(c_a), veli/h 311 0 0 330 0 295 593 2614 1169 350 2679 1199 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 lipstrearn Ffiter(1) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1,00 1.00 Uniform Delay (d), s/veh 490 0.0 0.0 47.4 0.0 470 3.6 6.4 3.8 5.1 4.2 3.4 'nu Delay (d2), s/veh 2.2 00 0.0 0.5 00 1.4 0.0 0.9 0.0 0.2 0.3 01 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %lie Back0fQ(50%),vehiln 2.4 00 0.0 1.0 0.0 12 0.1 10.1 02 0.2 39 0.5 LnGrp Delay(d),s/veh 51.8 0.0 0.0 47.8 0.0 49.0 3.6 70 3.9 5.2 4.5 3.4 LnGrp LOS D D D A A A A A A Approach Vol, vehlh 76 74 1498 893 Approach Delay, s/veh 51.8 48,5 Approach LOS D D A A 7 Lane Configurations 4, r Volume (veh/h) 45 7 19 53 Number 14 16 4 '1 tt r tt 27 4 38 8 1359 26 32 746 3 8 18 5 2 12 1 6 7.2 4.4 Assigned Phs 1 2 Phs Duration (G+Y+Rc), s 8.7 86.7 Change Period (Y+Rc), s 5.5 85 Max Green Setting (Gmax), s 5.5 67,5 Max Q Clear Time (g_c+I1), s 25 22.2 Green Ext Time (p_c), s 0.0 29.0 HCM 2010 Cti1 Delay 8.8 HCM 2010 LOS A Vineyard-Goldelm ODP/PDP 2/15/2016 AM Existing - Synchro 9 Light Report HCM 2010 TWSC 5: College Ave & Smokey St. 2/15/2016 Intersecion- Int Delay, slveh 0.5 lttea Vol, veh/h 14 16 1469 36 27 847 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RI Channelized None - None - None Storage Length 0 - 0 0 - Veh in Median Storage, # 0 0 0 Grade, % 0 0 - 0 Peak Hour Factor 93 93 93 93 93 93 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 15 17 1580 39 29 911 Conflicting Flow All 2093 790 0 0 1580 0 Stage 1 1580 Stage 2 513 Critical Hdvry 6.84 6.94 4.14 Critical Hdwy Stg 1 5.84 Critical Hdvry Stg 2 5.84 Follow-up Hdvry 3.52 3.32 2.22 Pot Cap-1 Maneuver 45 333 412 Stage 1 155 Stage 2 566 Platoon blocked, % Mov Cap-1 Maneuver 42 333 412 Mov Cap-2 Maneuver 122 Stage 1 155 Stage 2 526 HCM Control Delay, s 28.7 0.4 HCM LOS Capacity (vehlh) - 184 412 HCM Lane V/C Ratio - 0.175 0.07 HCM Control Delay (s) - 28.7 14.4 HCM Lane LOS - D B HCM 95th %tile Q(veh) - 0.6 0.2 Vineyard-Goldelm ODP/PDP 2/15/2016 AM Existing - Synchro 9 Light Report ELB Page 1 748 0.01 9.9 A - 247 - 0,104 - 21.3 - 0.3 Capacity (veh/b) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95111 %tile Q(veh) HCM 2010 TVVSC 4: College Ave & Crestridge Drive 2115/2016 ar- 18 7 1470 0 0 Free Free - None 0 641 32 0 0 Free Free - None Vol, vetilb Conflicting Peds, #Thr Sign Control RI Channelized Storage Length Veh in Median Storage, # Grade % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 93 93 2 2 8 1581 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver 81 Mov Cap-2 Maneuver 208 Stage 1 355 Stage 2 396 HCM Control Delay, s 21.3 HCM LOS 1709 904 HCM 2010 Signalized Intersection Summary 7: College Ave & Skyway 2/20/2016 f Ak" 4 \ 11 ft r 24 137 1560 38 12 1 6 16 0 0 0 0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1863 1863 1863 1863 26 147 1677 41 1 1 2 1 0.93 0.93 0.93 0.93 2 2 2 2 1163 415 2664 1192 0.73 054 075 0.75 1583 1774 3539 1583 26 147 1677 41 1583 1774 1770 1583 0.5 2.2 24.5 0.7 0.5 22 24.5 0.7 1.00 1.00 1.00 1163 415 2664 1192 0.02 0.35 0.63 0.03 1163 431 2664 1192 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3.9 4A 6.4 3.4 0.0 0.5 1.1 0.1 0.0 05 0.0 0.0 02 1.1 12.1 03 4.0 4.9 7.5 3.5 A A A A 1865 7.2 A 4 17 12 38 3 8 18 0 0 0 0 0 0 1.00 1.00 100 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1900 1863 1900 1900 1863 1863 42 1111 18 13 41 0 1 0 0 1 1 0.93 0.93 0.93 0.93 0.93 0.93 2 2 2 2 2 2 106 25 16 109 65 112 0.07 0.07 057 0.07 0.07 0.07 738 354 227 812 922 1583 64 0 0 31 0 41 1319 0 1734 0 1583 3.7 0.0 0.0 05 0.0 2.7 5.5 0.0 0.0 11 ao 2,7 0.66 0.17 0.58 1.00 147 0 0 174 0 112 0.43 0.00 000 0.18 0.00 0.37 302 0 0 340 0 281 1.00 1.00 150 1.00 1.(10 1.00 1171 59 0 0 Free Free - None 36 1628 0 0 Free Free - None 73 0 Stop None 1259 2.22 548 2212 1259 953 6.84 5.84 5.84 3.52 - 37 231 335 3.32 424 630 HCM Control Delay, s HCM LOS 0.3 Capacity (vehth) HCM Lane V/C Ratio HCM Control Delay (s) RCM Lane LOS HCM 95th %tile C(veh) -232548 - 0.556 0.071 - 38.4 12.1 3 0.2 HCM 2010 TWSC 5: College Ave & Smokey St. 2/15/2016 Int Delay, s/veh 1.7 Vol, vehili 47 Conflicting Peds, It/hr 0 Sign Control Stop RT Channelized Storage Length Veh in Median Storage, It 0 Grade, % 0 Peak Hour Factor Heavy Vehicles, % Mvmt Flow Conflicting Flow All Stage 1 HCM Control Delay, s HCM LOS 50.3 0.1 HCM 2010 TWSC 4: College Ave & Crestridge Drive 2/15/2016 Int Delay, s/veh 0.7 gre 870 1740 358 28 0 Stop 10 10 1234 0 0 Free Free - None 1618 0 0 Free Free - None Vol, veh/h Conflicting Peds, Sign Control RI Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Ozteril rat' Conflicting Flow All 2425 Stage 1 1740 Stage 2 685 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver - 27 Stage 1 127 Stage 2 462 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver 98 Stage 1 127 Stage 2 448 Appendix 17 Vheva-d- addelln franspertatal *art olvali Pat aim, Colorado el, gm/wean IX februn 206 ntersection Information Major Street Minor Street College Creshidge NB/ EB Street Name Direction Number of Lanei Approch Speed 55 Minor Approach Time Delay Condition Met? Minor Approach Volume Condition Met? Total Entering Intersection Volume Condition Met? Peak Hour Vehicular Volume Community Population Greater Than 10,000 and Major Street Approach Speed Below 40 mph — Wartant Curve • Warranted • Unwarranted 1 Majof, 1 Kona 1 M.;1 /4or, 2+ Knot 2+ Major, 1 Knot — 2+ Major, 2+ hirer ... ... - - - 700 BOO 930 1000 1163 1200 1300 1400 1500 1E00 1700 1800 Maim Suitt - Total of Both Ploproach (VP1-1) Major Street Total All Approaches (vph) Minor Street Highest Volume Approach (vph) 17:00 2,835 Federal 2003 Appendix r Vhetia-d- Cada; frampert3tIon Impxt study annlineentri, ICC Pat CdIns, Cabrado febrion/ 2016 Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Grnax), s Max Q Clear lime (g_c+I1), s Green Ext Time (p c), s 1 2 8.9 86.0 59 5.5 55 67.5 2.6 234 00 292 4 5 6 15.1 6.9 88.0 5.5 5.5 5.5 20 5 5,5 67.5 al 2.2 10.2 0.5 0 . 0 34.3 -tz'45;7^ HCM 2010 Cid Delay HCM 2010 LOS A HCM 2010 Signalized Intersection Summary 7: College Ave & Skyway 2/20/2016 At P \* 1 Sc 4 rf tt r 40 10 1385 30 35 760 55 18 5 2 12 1 6 16 0 Ped-Bike hij(A_pbT) 1.00 1.00 1.00 1.00 1.00 190 1.00 1.00 Paddrig Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/han 1900 1863 1900 1900 1863 1863 1863 1863 1863 1863 1863 1893 Adj Flosv Rate, vehth 48 11 22 32 5 43 11 1489 32 38 817 59 Lane Configurations Volume (veh/h) Number Initial Q (Cb), veh 4, 10 20 30 4 14 3 Adj No. of Lanes Peak Hour Factor Percent Heavy Veil, % Cap, vehth Arrive On Green Sat Flow, veli/h 1 0.93 0 . 93 0 . 93 0 . 93 0 . 93 0 , 93 0 . 93 0 . 93 0 . 93 0 . 93 0 . 93 0 . 93 2 2 2 2 2 2 2 2 2 2 2 2 107 27 30 163 21 138 514 2590 1159 304 2655 1188 099 0.09 009 0.09 0.09 0.09 091 0/3 0.73 093 0.75 0.75 630 307 350 1178 245 1583 1774 3539 1583 1774 3539 1583 1 1 2 1 1 2 1 81 0 0 37 0 43 11 1489 32 38 817 59 HCM 2010 TVVSC 5: College Ave & Smokey St. 2/20/2016 Int Delay, sheen 0.5 Vol, veh/h 15 20 1500 40 30 880 Conflicting Peds, Phr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - 0 0 - Vet) in Median Storage, # 0 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 93 93 93 93 93 93 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 16 22 1613 43 32 946 Conflicting Flow All 2151 806 1613 Stage 1 1613 Stage 2 538 Critical Hdvry 6.84 6.94 4.14 Critical Fidwy Sig 1 5.84 Crifical Hdwy Stg 2 5.84 Follow-uptidwy 3,52 3.32 222 - Pot Cap-1 Maneuver 41 325 400 Stpge 1 149 Stage 2 549 Platoon blocked, % Mov Cap-1 Maneuver 38 325 400 Mov Cap-2 Maneuver 149 Stage 1 149 Stage 2 505 HCM Control Delay, s 25.2 0 0.5 HCM LOS (00 -24t Capacity (veh/h) - 216 400 HCM Lane V/C_Ratio - 0.174 0.081 HCM Control Delay (s) - 25.2 14.8 HCM Lane LOS - D B HCM 95th %tile Cl(veh) - 0.6 0.3 Vineyard-Goldelm ODP/PDP 2/20/2016 AM -20211BACKGROUND Synchro 9 Light Report ELB 2ot F Page 1 Int Delay, s/veh 0.2 0 HCM 2010 TWSC 4: College Ave & Crestridge Drive 2/20/2016 Vol, vet* Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mint Flow 20 10 10 1520 860.35 0 0 0 0 0 0 Stop Stop Free Free Free Free None - None - None 0 - - 0 0 0 0 - 0 93 93 93 93 93 93 2 2 2 2 2 2 22 11 11 1634 925 38 Conflicting Row All 1764 462 925 Stage 1 925 Stage 2 839 Critical I-Idvry 6.84 6.94 4.14 Critkal Fldvry Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-pp I-Idwy 3.52 322 222 Pot Cap-1 Maneuver 75 547 734 Stage 1 347 Stage 2 384 Platoon blocked, % May Cap-1 Maneuver 74 547 734 Mov Cap-2 Maneuver 347 Stage 1 347 Stage 2 378 HCM Control Delay, s 14.9 0.1 HCM LOS Capacity (veh/h) 734 - 395 HCM Lane V/C Ratio 0.015 - 0,082 HCM Control Delay (s) 10 - 14.9 HCM Lane LOS A - B HCM 95th %tile 0(veli) 0 - 0.3 Vineyard-Goldelm ODP/PDP 2/20/2016 AM -2020 BACKGROUND Synchro 9 Light Report ELB W' Page 1 airerszante=t-?, Zer0 $74 Assigned Phs 1 2 Phs Duration (G+Y+Rc), s 185 85,9 Change Period (Y+Ro), $ 5.5 Max Green Setting (Gmax), s 10.5 ciao Max Clear Time (g_c+I1), s 43 17.7 Gietni ExtTime (p _ c) s 02 39.0 HCM 2010 CM Detay HCM 2010 LOS 4 5 6 137 8.6 877 55 55 5.5 186 5.0 70.5 7.8 25 28.0 04 0.0 _ 35.7 A HCM 2010 Signalized Intersection Summary 7: College Ave & Skyway 2/20/2016 Lane Configurations 4- k- \fr 1 44 ref Voluffie (vt3h/h) 40 10 10 20 15 40 30 1140 25 140 1590 40 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1M0 1.00 1.00 1.00 160 160 Parkirig Bus, Ar 1.00 160 1.00 1.00 1,00 1.00 1.00 160 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1900 1863 1900 1900 1863 1863 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veliffi 43 11 11 22 16 43 32 1226 27 151 1710 43 Adj No. of Lanes 0 1 0 0 1 1 1 2 1 1 2 1 Peak Hour Factor 0.93 0.93 063 0.93 0.93 033 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Caf), vehili 106 26 16 _111 67 117 255 2587 1157 405 2646 1184 Arrive On Green 0.07 0.07 0.07 0.07 0.07 0.07 0.03 0.73 0.73 0.05 0.75 0.75 Sat Flow, veh/h 702 352 215 805 908 1583 1774 3539 1M3 1774 3539 1583 Grp Vdume(v), veh/h 65 0 0 38 0 43 32 1226 27 151 1710 43 Grp Sat Flow(s),veli/hiln 1269 0 0 1713 0 1583 1774 1770 1583 1774 1770 1583 Q Serve(g_s), s 37 80 0.0 0.0 0.0 2.8 0.5 15.7 0.5 2.3 26.0 0.8 Cycle Q Clear(g_c), s 56 06 0.0 2.2 0.0 2.8 0.5 15.7 _ 0.5 23 26.0 0.8 Prop In Lane 0.66 0.17 858 1.00 1.00 1.00 IMO 160 Lane Grp Cap(c), vetuh 148 0 0 179 0 117 255 2587 1157 405 2646 1184 V/C Ratio()() 044 050 080 0.21 0.00 0.37 0.13 0.47 062 037 0.65 0.04 rt\vajl Cap(c_a), velt/h 278 0 0 318 0 259 286 2587 1157 494 2646 1184 HCM Platoon Ratio 160 1.00 160 1.00 1.00 1.00 1.00 180 1.00 1.00 160 1.00 Upstreani Filial') 1,00 0.00 0.00 1.00 0,00 1.00 160 1.00 160 1.00 1.00 160 Uniform Delay (d), sIveh 50.1 OM 0.0 48.1 80 48.5 6.2 6.1 4.1 4.7 6.8 3.6 Ina Delay (d2), s/Ireh 2.0 06 0.0 OM 0.0 1.9 0.2 0.6 0.0 OM 1.2 0.1 Initial Q Delay(d3) siveh 0.0 0.0 0.0 0.0 0.0 0.0 80 0.0 ao 0.0 0.0 0.0 %Ile Bad<OfQ(5056),vetdin LnGrp Delay(d),s/veh 2 . 0 52.1 0.0 0.0 0.0 0.0 418:17 0 0 ..0 HCM 2010 TVVSC 5: College Ave & Smokey St. 2/20/2016 1.7 Vol, veti/h Conflicting Peds, #ihr Sign Control RI Channeiized Storage Length Veh in Median Storage, Grade, 54 Peak Hour Factor Heavy Vehicles, % Mvmt Flow 1110 60 0 0 Free Free - None 40 1695 0 0 Free Free - None 2191 1194 997 6.84 5.84 5.84 3.52 - 39 250 318 597 3.32 446 1 -36 140 250 294 f"ar Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical fidvry Stg 1 Critical Hdvry Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon 13{o_dced, '34 Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 HCM Control Delay, s HCM LOS Capacity (vehlh) HCM Lane V/C Ratio 1737 332 2.22 296 358 HCM 2010 TWSC 4: College Ave & Crestridge Drive 2/20/2016 af Int Delay, sheet% 0.8 Vol, vehlh Conflicting Peds, (Or Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, 56 Peak Hour Factor Heavy Vehicles, 9:fi Mvmt Flow 0 Stop 10 0 Stop None 10 1195 0 0 Free Free - None 1615 0 0 Free Free - None 93 93 93 93 93 93 Conflicting Flow All 2401 Stage 1 1737 Stage 2 664 Critical Hdwy 6.84 Critical Hdwy Sig 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Ildwy 3.52 Pot Cap-1 Maneuver - 28 Stage 1 127 Stage 2 474 Platoon blocked, kitov Cap-1 Maneuver - 27 Mov Cap-2 Maneuver 99 4 r r "i 5 40 10 1415 30 35 8 18 5 2 12 1 ft r 775 55 6 16 0 10 4 20 35 14 3 8 A HCM 2010 Signalized Intersection Summary 7: College Ave & Skyway 2/20/2016 2.21 -5R01%- -zi Lane Configurations Volume (vehlt) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Paddrig Flus, Air4 Adj Sat Flow, vehthfi n ArM Flovi Rate, vehih Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive Oil Green Sat Flow, veh/ti Gm Volume(v), vehth Grp Sat Flow(s),vetilli/in Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp D(c), vehlh V/C Ralio(X) Avail Cap(c a), veli/li HCM Platoon Ratio IJpstream Alegi) Uniforrn Delay (d), s/veh lnbr Delay (d2), slveh Initial Q Delay(d3),s/veh %Ile Back0fQ(50%),vehtin LnGrp Delay(d),slveh LnGrp LOS Approach Vol, vehlh Approach Delay, siveli Approach LOS Assigned Phs Phs Duration (GFY+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Exi Tirrie (p c) s IMO 1.00 100 1.00 1.00 1.00 1.00 1.00 1900 1863 1900 1900 1863 54 11 22 38 5 HCM 2010 TVVSC 5: College Ave & Smokey St. 2/20/2016 Int Delay, sit/eh 0.6 vel;vewh Conflicting Peds, #/hr Sign Control RI Channelized Storage Length Veil in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 530 40 30 870 0 0 0 0 Stop Free Free Free Free None - None None 0 - 0 0 0 0 0 0 0 - 0 93 93 93 93 93 93 2 2 2 2 2 2 16 22 1645 43 32 935 15 0 Stop Conflicting Flow All zin 823 1645 Siegel 1645 Stage 2 532 Critical Hdwy 6.84 6.94 4.14 Critical Hdyry Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 3.32 2.22 Pot Cap-1 Maneuver 39 317 389 Stage 1 143 Stage 2 553 Platoon blocked, % May Cap-1 Maneuver 36 317 389 May Cap-2 Maneuver 112 Siegel 143 Stage 2 508 HCM Control Delay, s 30.6 0 0.5 HCM LOS SWITt . -14$11M1211.: Capacity (vetilh) -178389 HCM Lane V/C Ratio - 0.211 0.083 HCM Control Delay (s) - 30.6 15.1 HCM Lane LOS - D C HCM 95th %tile C(veh) - 0.8 0.3 Vineyard-Goldelm ODP/PDP 2/20/2016 AM - 2020 BACKGROUND Synchro 9 Light Report ELB Page 1 Int Delay, s/veh HCM 2010 TWSC 4: College Ave & Crestridge Drive 2/20/2016 *Ifa Vol, vehlh 20 Conflicting Peds, #/hr 0 Sign Control Stop RI Channelized Storage Length 0 Veh in Median Storage, # 0 Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 10 1550 0 0 Free Free - None 0 875 35 0 0 Free Free - None tEF Conflicting Flow All 1796 Stage 1 941 Stage 2 855 Critical lidwy 6.84 Critical Hdvry Sig 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdvry 3.52 Pot Cap-1 Maneuver 72 Stage 1 340 Stage 2 377 Platoon blocked, % May Cap-1 Maneuver 71 Mov Cap-2 Maneuver 194 Stage 1 340 Stage 2 371 470 1 HCM Control Delay, s 21.8 0.1 HCM LOS Capacity (vehlh) 724 247 HCM Laos V/C Ratio 0.015 - 0.131 HCM Control Delay (s) 10 - 21.8 HCM 2010 Signalized Intersection Summary 7: College Ave & Skyway 2/20/2016 Lane Configurations 4, 4 r ) ft r II ii-t r Volume (veh/h) 40 10 10 20 15 40 30 1165 25 140 1620 40 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veli 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 190 1.00 130 1.00 1.00 Parldng 1311S, AO 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ad Sat Flow, veh/htin 1960 1863 1900 1900 1863 1863 1863 1863 1863 1863 1863 1863 Ad) Flow Rate, veli/h 43 11 11 22 16 43 32 1253 27 151 1742 43 AO No. of Lanes 0 1 0 0 1 1 1 2 1 1 2 1 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Pe cent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, vent!" 106 26 16 111 67 117 249 2587 1157 396 2648 1184 Amve On Green 007 007. .07 007 0.07. .73 073 005.0.75 Sat Flow, yeti/II 702 352 215 805 908 1583 1774 3539 1503 1774 3539 1583 Grp Volume(v), veh/h 65 0 0 38 0 43 32 1253 27 151 1742 43 Grp Sat Flow(s),veh/hfin 1269 0 0 1713 0 1583 1774 1770 1583 1774 1770 1583 Q Serve(g_s), s 3.7 0.0 0.0 0.0 0.0 2.8 0.5 16.2 0.5 2.3 269 0.8 Cycle Q Clear(g_c), s 5.8 0 0 0 0 2.2 0 0 2 8 0.5 162 0.5 2.3 26.9 03 Prop In Lane 0.66 0.17 0.58 1.00 1.00 130 1.00 1.00 Lute Grp Cap(c), veh/11 148 0 0 179 0 117 249 2587 1157 396 2646 1184 V/C Ratio(X) 0.44 0.00 0.00 0.21 0.00 0.37 0 13 0.48 0.02 0.38 0.66 0.04 Avail Cap(c a), veh/h 278 0 0 318 0 259 279 2587 1157 486 2646 1184 HCM Platoon Ratio 1.00 1.00 190 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstrearri F4ter(I) 1.00 030 0.00 1.09 090 1.00 130 1.09 130 1.00 130 130 Uniform Delay (d), s/veh _50.1 0.0 0.0 48.1 a 0 48.5 6a 6.2 4.1 4.9 6.9 3.6 Ina Delay (d2), s/veh 2.0 0.0 0,0 0.6 0.0 13 0.2 0.7 0.0 0.6 1.3 al Initial 0 Delay(d3),s/veti 0.0 0.0 0.0 0.0 0 0 0.0 0.0 09 0.0 0.0 0.0 0.0 %tie Back0f0(50%),vehAn 2.0 0.0 0.0 1.1 0.0 1.3 0.3 8.1 0.2 1.2 133 0.4 LnGrp Delay(d),s/veh 521 0.0 0.0 487 0.0 504 61 6.8 4.1 55 8.2 37 LnGrp LOS D D D A A A A A A Approach Vol vehlh 65 81 1312 1936 Approach Delay, &vet) 52.1 49.6 68 7.9 Approach LOS D D A A Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Yi-Rc), s 10.5 85.9 13.7 8 6 871 137 Change Period (Y+Rc), s 5.5 5.5 55 5.5 55 55 Max Green Selling (Gmax), s 10.5 65.0 18.0 5.0 705 180 Max Q Clear Time (g_c+I1), s 4.3 182 7.8 2.5 28.9 48 Green EN:t Time (p_c), s 0.2 39.3 0.4 0.0 35.5 HCM 2010 Chi Delay 9.3 HCM 2010 LOS A Vineyard-Goidelm ODP/PDP 2/20/2016 PM - 2020 BACKGROUND Synchro 9 Light Report ELB Page 1 Vol, vehill Conflicting Peds, ifihr Sign Control RT Channelized Storage Length Veli in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 1220 60 0 0 Flee Free - None 40 1705 0 0 Free Free - None 0 Stop 0 75 0 Stop None 2315 1312 1003 6.84 5.84 5.84 3.52 332 -32 408 216 315 - 29 408 523 126 216 289 46.1 0.3 - 215 523 - 0.625 0.082 - 46.1 12.5 E B - 3.7 0.3 HCM 2010 TVVSC 5: College Ave & Smokey St. 2/20/2016 LIP Conflicting Flaw M Stage 1 Stage 2 Critical Hdwy Gritted Hdwy Stg 1 Critical Hdwy Sty 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Int Delay, s/veh Vol, vehth Conflicting Peds, #/hr Sign Control RT Channefized Storage Length Veh in Median Storage Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 30 10 10 12E0 1680 0 0 0 0 0 0 Stop Stop Free Free Free Free None - None - None 0 0 0 0 93 93 93 93 93 93 2 2 2 2 2 2 32 11 11 1376 1806 ConflctingFlowftll 2516 Stage 1 1806 Stage 2 710 Critical Hdwy 684 6.94 4.14 Critical 1-Idvry Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up I-Idvry 3.52 3.32 Pot Cap-1 Maneuver -23 280 Stage 1 116 Stage 2 448 Platoon blocked, % Mov Cap-1 Maneuver -22 Mov Cap-2 Maneuver 116 Stage 1 116 Stage 2 433 HCM Control Delay, s 43.3 0.1 HCM LOS 0.6 HCM 2010 TWSC 4: College Ave & Crestridge Drive 2/20/2016 Capacity (veh/b) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 337 136 0.032 0.316 16 - 43.3 0.1 - 1.3 414 4:41- -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined 1': All major volume in platoon Vineyard-Goldelm ODP/PDP 2/20/2016 PM - 2020 BACKGROUND Synchro 9 Light Report ELB Page 1 Vol, veh/h Conflicting Peds, Sign Cont ST Channelized Storage Length Veh in Median Storage, Glade, % Peak Hour Factor Heavy Vehicles, % Mvrnt Flow 0 Stop 0 0 Step None 10 1280 0 0 Free Free - None 1680 0 0 Rae Free - None 332 2.22 280 337 HCM 2010 TVVSC 4: College Ave & Crestrid9e Drive 2/2012016 fl Conflicting Flow All 2516_ Stage 1 1806 Stage 2 710 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdvry Stg 2 5.84 Follow-up litho 3.52 Pot Cap-1 Maneuver - 23 Stage 1 116 Stage 2 448 Platoon blocked, % May Cap-1 Maneuver Mov Cap-2 Maneuver 90 Stage 1 116 Stage 2 433 003 806 HCM Control Delay, s HCM LOS Capacity (veh/h) 4 r ill tt r il tt r 40 89: 65 1 16 0 4* 55 10 25 35 7 4 14 45 10 1630 35 18 5 2 12 5 HCM 2010 Signalized Intersection Summary 7: College Ave & Skyway 2/20/2016 t \* 1 1 4117C7.07:S-:--) Lane Configurations Volume (veh/h) Number Initial Q (Qb), veli Ped-Bike Adj(A_pbT) Parking Bus, Adj _ Adj Sat Flow, veh/h/ln Aclj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veil, % Cap, veli/ti 0 93 2 118 Arrive On Green 0.10 Sat Flan, veli/h 634 Grp Volume(v), vehlh 97 Grp Sat Flow(s),vehttiari 1241 Q Serve(g_s), s 5.6 CYdfl Q aeofifl_c4i 8 8.8 Prop In Lane 051 Lane Grp Cap(c), vell/ti 181 V/C Ratio(X) 0.54 Avail Cap(c_a), vehit 301 HCM Platoon Ratio 1.00 Upfdream Fitter(I) 1.00 Uniform Delay (d), s/veh 48.6 Ina Delay (d2), siveti 25 Initial Q Delay(d3),s/veh 0.0 Wile BacicOfQ(506/1),veliAn 3.0 1.00 1.00 1.013 1.00 1.00 IMO to 1.00 1.00 IMO 1.00 1.00 1.00 1.00 1.00 1.00 1863 1900 1900 1863 1863 1863 1863 1863 1863 1863 11 27 38 5 48 11 1753 38 43 962 1 0 0 1 1 1 2 1 1 2 0.93 0.93 0 93 0.93 0.93 0.93 0.93 0.93 0.93 053 2 2 2 2 2 2 2 2 2 2 27 36 181 29 164 434 2525 1129 238 2596 0.10 0.10 0.10 0.10 0.10 0.01 0.71 0.71 0.03 0.73 261 345 1156 195 1583 1774 3539 1583 1774 3539 0 0 43 0 48 11 1753 38 43 962 0 0 1351 0 1583 1774 1770 1583 1774 1770 0.0 OM 0.0 OM 3.1 02 30.9 0.8 0.7 10.9 0.0 00 3.2 0.0 31 0.2 30.9 0.8 0.7 10.9 HCM 2010 TVVSC 5: College Ave & Smokey St. 2/20/2016 30 1015 0 0 Free Free - None Vol veh/h Conflicting Peds, Sign _Control RT Channelized Storage Length Veh in Median Storage Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Conflicting Row Al 2502 Stage 1 1892 Stage 2 610 Critical Hdwy 6.84 Critical Hdwy Sig 1 5.84 Critical Hdvry Stg 2 5.84 Follow-up 1-idvry 3.52 Pot Cap-1 Maneuver 24 Stage 1 164 Stage 2 505 Platoon Necked, % May Cap-1 Maneuver Mov Cap-2 Maneuver 83 Stage 1 104 Stage 2 453 262 Capacity (veh/h) - 134 312 HCM Lane V/C Ratio - 0.361 0.103 HCM Control Delay (s) - 46.3 17.9 HCM Lane LOS E C HCM 95th %tile Q(veti) - 1.5 0.3 Vineyard-Goldelm ODP/PDP 2/20/2016 AM - 2036 BACKGROUND Synchro 9 Light Report ELB Page 1 0 HCM 2010 TWSC 4: College Ave & Crestridge Drive 2/20/2016 -10 1765 0 0 Free Free None Voi, veh/h Conflicting Peds, WM* Sign Control RI Channeled Storage Length Vett in Median Storage, # 0 Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 1010 40 0 0 Free Free - None Conflicting Flow All 2056 1086 Stage 1 1086 Stage 2 970 Critical Hdwy 6.84 Critical 1-1dvry Stg 1 584 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 48 Stage I 285 Stage 2 328 Platoon blocked, % Mov Cap-1 Maneuver 47 Alov Cap-2 Maneuver 159 Stage 1 285 Stage 2 322 322 2.22 484 638 HCM Control Delay, s 27.5 HCM LOS Capacity (vehth) 638 197 HCM Lane VIC Ratio 0.017 0.191 HCM Control Delay (s) 10.7 27.5 HCM Lane LOS HCM 95th %tile Ct(veh) 0.1 - 0.7 Vineyard-Goldelm ODP/PDP 2/20/2016 AM - 2036 BACKGROUND Synchro 9 Light Report ELB Page 1 0.1 HCM 2010 Signalized Intersection Summary 7: College Ave & Skyway 2/20/2016 te k- t P \* 1 1 TRIDEMS1P2i.Wij Lane Configurations 40 Voltinte (velifh) 50 15 15 Number 7 4 14 Initial Q (Qb), veh 4 tt 15 45 35 1345 30 150 8 18 5 2 12 1 tt ft 2000 45 6 16 0 Ped-Bike Adj(A_pbT) IMO 1.60 IMO IMO 1.00 1.00 1.00 1.00 Parking BUS, Ad( 1.00 1.-00 1.00 1.00 1.00 1.00 10 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1900 1863 1900 1900 1863 1863 1863 1863 1863 1863 1863 1863 Ac Flow Rate, vett/11 54 16 16 22 16 48 38 1446 32 161 2151 48 Acij No. of Lanes 0 1 0 0 1 1 1 2 1 1 2 1 Peak Flour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 093 0,93 0.93 0.93 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, vetilli 116 32 22 121 75 140 176 2535 1134 331 2584 1156 Anive On Green 009 009 0.09 0.09 009 0.09 003 0.72 0.72 005 073 073 Sat Flow, veh/h 706 360 244 784 844 1583 1774 3539 1583 1774 3539 1583 Grp Volume(v), veh/h 86 0 0 38 0 48 38 1446 32 161 2151 48 Grp Sat Flow(s),vehThfin 1310 0 0 1628 0 1583 1774 1770 1583 1774 1770 1583 Q Serve(g_s), $ 5.1 0.0 0.0 0.0 00 3.1 0.6 21.6 OM '2.6 460 OM Cyde Q Glearici_o), s 7.3 OM ao 22 0.0 3.1 0.6 216 0.6 26 46.0 0.9 Prop In Lane 0.63 0.19 0.58 1.00 100 1.00 IMO IMO Lane Grp Cap(c), vehih 0 196 0 140 176 2535 1134 331 2584 1156 V/C Ratio(X) 0.51 0.00 0.00 0.19 000 0.34 022 0.57 0.03 0.49 0.83 0.04 Avail Cap(c_a), vehfh 278 0 0 312 0 259 201 2"1.5 1134 420 2584 1156 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 IMO 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 IMO 1.00 1.00 1.00 Uniform Delay (d), &yen 493 00 0.0 467 0.0 47.1 15.0 75 45 7.3 102 4.1 !nor Delay (d2), sNeh 2.3 0.0 0.0 0.5 0.0 1A 0.6 0.9 ao 1.1 13 0.1 Initial Q Delay(d3),s/veh 0.0 OM 0.0 0.0 OM 0.0 0.0 0.0 00 0.0 00 0.0 %He BathOfQ(50%),vehlin 2,7 0.0 0,0 1.1 0.0 14 0.6 10.8 0.3 1.8 23.3 0.4 LnGrp Delay(d),slveti 516 0.0 0.0 47.1 0.0 486 156 84 4.6 8.4 133 4.2 LoGrp LOS o D 0 B A A A B A Approach Vol, veh/h 86 86 1516 2360 Approach Delay, s/veth 51.6 47.9 8,5 13.0 Approach LOS A 444'ff Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 10.5 84.3 15.2 8.9 858 15.2 Change Period (Y+Rc), s 5.5 5.5 5.5 5.5 5,5 5.5 Max Green Setting (Gmax), s 10.5 650 18.0 5.0 705 18.0 Max Q Clear Time (g_c+11), $ 4.6 23.6 9.3 2.6 480 5.1 Green Ext Time (p_c), s 0,2 39.1 0.5 _ 0.0 21.8 0.6 HCM 2010 CM Delay HCM 2010 LOS 12., E 9 3 Vineyard-Goldelm ODP/PDP 2/20/2016 PM -2036 BACKGROUND HCM 2010 TWSC 5: College Ave & Smokey St. 2/20/2016 Int Delay, s/veli Vol, vet* Conflicting Peds, #Thr Sign Control RI Channelized Storage Length Veh in Median Storage, Grade, % Peak Hour Factor Heavy Vehicles, % Mvint Flow 80 50 1405 70 40 1955 0 0 0 0 0 0 Stop Stop Free Free Free Free None - None - None 93 93 1511 75 —144,-?fraryi-- tazz-g. Conflicting Flow AM 2648 755 Stage 1 1511 Stage 2 1137 CrifiGal Hdvry 624 Critical Hdwy Stg 1 524 Critical Hdwy Stg 2 5.84 Foliow-up Hdvry 152 Pot Cap-1 Maneuver -19 Stage 1 169 Stage 2 268 Platoon blocked, % Mov Cap-1 Maneuver - 17 Mov Cap-2 Maneuver 169 Stage 1 169 242 HCM Control Delay, $ 50.3 HCM LOS 0.3 1511 Capacity (veh/h) HCM Lane VIC Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) - 211 439 0.662 0298 - 50.3 14.1 F B 4 0.3 -: Volume exceeds capacity $: Delay exceeds 300s : Computation Not Defined 1': All major volume in platoon Vineyard-Goldelm ODP/PDP 2/20/2016 PM -2036 BACKGROUND Synchro 9 Light Report ELB Page 1 HCM 2010 TVVSC 4: College Ave & Crestridge Drive 2/20/2016 Int Delay, s/veh 1.2 Vol, verith Conflicting Peds, Sign Control RI Channelized 0 Stop 15 0 Stop None 15 0 Free - 1480 0 Free None 1940 0 Free - 0 Free None Storage Length 0 0 - - 0 Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 93 93 93 93 93 93 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Fbw 16 16 1591 2086 ConfiicthgFlowAll 2914 1043 Stage 1 2086 _ Stage 2 828 Critical Hdwy 6.84 6.94 Crilical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 584 - Follow-up Fldvry 152 332 Pot Cap-1 Maneuver - 12 226 Stage 1 81 - Stage 2 389 Platoon blocked, % Mov Cap-1 Maneuver -11 226 Mov Cap-2 Maneuver 81 Stage 1 81 Stage 2 365 HCM Control Delay, s 76.7 HCM LOS Capacity (vehM) 262 - 100 HCM Lane V/G Ratio 0.062 - 0.538 HCM Control Delay (s) 19.6 - 76.7 HCM Lane LOS - F HCM 95th %the G(veti) 0.2 - 2.5 -: Volume exceeds capacity $: Delay exceeds 300s 2086 4.14 Appendix F Kreger& addelm frauffixrtation Imlat 544 ti1fnnj 1.1.6 rat Collm, Colorado retrial/ 2016 0 Hours met (1 required) Major Street Minor Sheet College Crestndge NB/SB ER Street Name Direction Number of Lanai Approch Speed 55 Minor Approach Time Delay Condition Met? Minor Approach Volume Condition Met? Total Entering Intersection Volume Condition Met? Peak Hour Vehicular Volume Community Population Greater Than 10,000 and Major Street Approach Speed Below 40 mph — Wartent Curve • Warranted • Urtwartartted 1 Major, 1 Moor 1 Major, 2+ Knot 2+ Major, 1 hcrnor — 2+ Major. 2+ Knot 2 Hours met (1 required) 700 600 900 1000 1100 1200 1300 1400 15130 1600 17130 1600 Major Street - Total of Both Approaches (VPH) - 4 500 Warrant 3: Peak Hour 4: CrestridgelCollege Hour Major Street Total Al Approaches (vph) Minor Street Highest Volume Approach NON 7:00 2,270 37 7:15 H 2,425:::::: 8:15 1,757 19 16:00 2,788 62 17:15 2,146 26 Federal 2009 2 2/21/2016 Appendix &ward- addelm fthnspatatiai Impact ..study ell 3 engineering, IL C Pat Calms, Cdenzio februry 2016 110 10 7 4 30 3 HCM 2010 Signalized Intersection Summary 7: College Ave & Skyway 2121/2016 t P \* 190 1.00 190 *IMO 1.00 1.00 'IMO 1900 1863 1900 1900 118 11 2 32 0 1 0 0 0.93 0.93 0.93 0.93 2 2 2 2 202 15 2 245 Arrive On Green 0.13 0.13 013 0.13 Sat flow, veti/li 1068 113 18 1404 Grp Volume(v), veh/h 131 0 0 37 Grp Sat Flow(s),vetuh/ln 1199 0 0 1664 Q Serve(a..$),s 100 00. .0 Cycle Q Clear(g_c), is 12.1 0.0 0.0 2.1 Prop In Lane 0.90 0.02 0.86 Lane Grp Cap(c), veti/h 220 0 0 279 V/C Ralio()t) 0.60 0.00 0.00 0.13 Avail Cap(c_a), veh/li 264 0 0 326 HCM Platoon Ratio IMO 1.00 1.00 190 Upstream Falai° 1.00 ODO 0.00 1.00 Uniform Delay (d), s/veh 47.7 09 0.0 424 Ina- Delay (d2), siveh 2.6 0.0 0.0 02 Initial Q Delay(d3),s/veh OM 0 0 0.0 0.0 %Ile Back0fQ(505(,),vehtin 4.1 0.0 0.0 1.0 LnGrp Delay(d),s/veh 50.3 0.0 OM 426 LriClip LOS D D Approach Vol, vehlh 131 Approach Delay, siveh 50.3 Approach LOS D 4 r i tt vi tat 5 40 10 1400 30 35 830 55 8 18 5 2 12 1 6 16 IMO 1.00 1.00 1.00 190 1.00 _ 1,00 _1.00 1.00 1.00 1.00 1.00 1.00 1863 1863 1863 1863 1863 1863 1863 1863 5 43 11 1505 32 38 892 59 1 1 1 2 1 1 2 1 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 2 2 2 2 2 2 2 2 34 208 445 2433 1088 274 2498 1117 0.13 0.13 0.01 0.69 069 003 071 0.71 260 1583 1774 3539 1583 1774 3539 1583 0 43 11 1505 32 38 892 59 0 1583 1774 1770 1583 1774 1770 1583 00 2.7. .4 07 0.7. . 0.0 2.7 0.2 25.4 0.7 0.7 10.9 1.3 IMO IMO 1.00 1.00 1.00 0 208 445 2433 1088 274 2498 1117 0.00 0.21 0.02 0.62 093 0.14 036 0.05 0 259 502 2433 1088 388 2498 1117 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 000 1.00 1.00 1.00 1.00 100 1.00 1.00 HCM 2010 TWSC 5: College Ave & Smokey St. 2/21/2016 Int Delay, s/veh 0.6 0 Stop None 30 0 Free - Vol, vetilh Conflicting Peds, Itihr Sign Control RI Channelized 15 0 Stop 1620 0 Free - 40 0 Free None 860 0 Free None Storage Length) 0 0 0 - Veh in Median Storage, # 0 0 - 0 Grade, % 0 0 - - 0 Peak Hour Factor 93 93 93 93 93 93 Heavy Vehicles, % 2 2 2 2 2 2 Want Fbw 16 22 1742 43 32 925 Conflicting Flow All 2269 871 1742 Stage 1 1742 Stage 2 527 Critical Hdwy 6.84 6.94 4.14 Cauca' Hdwy Stg 1 5,84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 3.32 2.22 Pot Cap-1 Maneuver 34 294 357 Stage 1 126 Stage? 557 Platoon blocked, % Mov Cap-1 Maneuver 31 294 357 Mov Cap-2 Maneuver 126 Stage 1 126 Stage 2 507 HCM Control Delay, s 29 0.5 HCM LOS kiirreigr Capacity (veh/h) - 187 357 HCM Lane V/C Ratio - 0.201 0.09 HCM Control Delay (s) - 29 16.1 HCM Lane LOS - D C HCM 95th %tile Q(veh) - 0.7 0.3 Vineyard-Goldelm ODP/PDP 2/21/2016 AM 2018 Total Traffic Synchro 9 Light Report 0.5 Vol, vehth Conflicting Peds, Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvrnt Flow 40 1600 0 0 Free Free - None 860 40 0 0 Free Free - None Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Sig 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage 2 Platoon blocked, 54, Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Capacity (veh/h) 734 300 HCM Lane VIC Ratio 0,059 0.179 HCM Control Delay (s) 10.2 - 19.6 HCM Lane LOS HCM 95th %tile Ci(veh) 0.2 - 0.6 547 734 1871 925 946 6.84 5.84 5.84 3.52 64 347 338 2.22 734 Vol, velti Conflicting Peds, #Ihr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Fbw 0 1670 0 0 Free Free - None 865 20 0 0 Free Free - None 1828 930 898 684 5.84 5.84 3.52 3.32 68 544 344 358 930 2.22 731 344 HCM 2010 TVVSC 11: College Ave & Venus (access) 2/21/2016 -tsterstria.1*-441. rs: Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Cnlical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Trat HCM Control Delay, s 11.9 HCM LOS Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS Lane Configurations Volume (veh/h) Number Initial Q (Qb), veh 4, 10 10 4 14 tt jV 'I 14 15 40 30 1175 25 140 8 18 5 2 12 1 1630 6 40 16 0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1863 1863 1863 1863 1863 1863 32 1263 27 151 1753 43 1 2 1 1 2 1 0.93 093 0.93 0.93 093 0.93 2 2 2 2 2 2 226 2444 1093 366 2503 1120 0.03. .69 0.05 071. 1774 3539 1583 1774 3539 1583 32 1263 27 151 1753 43 1774 1770 1583 1774 1770 1583 0.6 189 0.6 2.7 31.6 0.9 0,6 18,9 0.6 2.7 31.6 0.9 1.00 1.60 1.00 1.00 226 2444 1093 366 2503 1120 0.14 062 0.02 0.41 070 acvt 256 2444 1093 456 2503 1120 1.00 1.00 160 1.00 1.00 160 120 1.00 1.00 1.00 1.00 1.00 9.0 8.2 54 6.7 9.3 4.8 0.3 0.8 0.0 07 1.7 0.1 0.0 0.0 0.0 06 0.0 0.0 0.3 9.4 0.3 1.3 15.9 0,4 9.3 9.0 5 4 76 11.0 4.9 A A A A B A 1322 1947 8.9 10,6 A 5.5 18.0 4.7 07 HCM 2010 Signalized Intersection Summary 7: College Ave & Skyway 2/21/2016 t \*. 1 1 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parlcing B11S, A44 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, vehth/In 1900 1863 1900 1900 1863 1863 Adj Fins,/ Rate, velith 91 11 11 22 16 43 Adj No. of Lanes 0 1 0 0 1 1 Peak Hour Factor 023 0.93 0.93 0.93 023 _023 Percent Heavy Veh, % 2 2 2 2 2 2 C_ap, yeh/h 166 20 14 147 94 _ 181 HCM 2010 TWSC 5: College Ave & Smokey St. 2/21/2916 Int Delay, s/veh 1.9 Vol, veb/h 50 75 1190 60 44) 1595 Conflicting Peds, Phi 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RI Channelized None - None - None Storage Length - 0 0 - Veh in Median Storage, # 0 0 - 0 Grade, % 0 0 - 0 Peak Hour Factor 93 93 93 93 93 93 Heavy Vehicles, To 2 2 2 2 2 2 Minnt Row 54 81 1280 65 43 1715 Conflicting Flow All 2224 Stage 1 1280 Stage 2 944 Critical Hdvry 6.84 Critical Hdwy_Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdvry 3.52 Pot Cap-1 Maneuver -37 Stage 1 225 Stage 2 339 Platoon blocked, % Mov Cap-1 Maneuver -34 Mov Cap-2 Maneuver 134 Stage 1 225 Stage 2 312 HCM Control Delay, s HCM LOS Capacity (veh/h) HCM Lane VIC Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Cl(veh) 6.94 4.14 3.32 222 418 538 418 538 0 0.3 - 226 538 -0.595 0,08 - 41.9 12.3 - E B - 3.4 0.3 41.9 - -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined : All major volume in platoon Vineyard-Goklelm ODP/PDP 2/21/2016 PM 2018 Total Traffic Synchro 9 Light Report ELB Page 1 a:lkrat HCM 2010 TVVSC 4: College Ave & Crestridge Drive 2/21/2016 Int Delay, s/veh 1.1 Vol, Conflicting Peds, #thr Sign Garb] RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Conflicting Flaw All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Sth 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver May Cap-2Maneuver Stage 1 Stage 2 HCM Control Delay, s HCM LOS Capacity (vehlh) HCM Lane_V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 45 1220 1615 35 0 0 0 0 0 0 Sp Stop Free Free Free Free None None - None 0 0 0 93 2 32 93 2 22 Vol, vetuli Conflicting Peds, itlhr Sign Control RI Channelized Storage Length Veh in Median Storage, # Gradet% Peak Hour Factor Heavy Vehicles, % Mvmt Flow 10 0 1250 0 0 0 0 Stop Stop Free Free None - None 0 0 0 0 - 0 0 93 93 93 93 93 93 2 2 2 2 2 2 0 11 0 1344 1769 38 1645 35 0 0 Free Free - None HCM 2010 TVVSC 11: College Ave & Venus (access) 2/21/2016 Int Delay, s/veh 0.1 Conflicting Flow All 2441 1769 Stage 1 1769 Stage 2 672 Critical Hdwy 6.84 6.94 4.14 Critical tildwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 _ Fotiow-up Hdwy 3.52 332 222 Pot Cap-1 Maneuver 26 288 348 Stage 1 122 Stage 2 469 Platoon blocked, % Mov Cap-1 Maneuver 26 288 348 Mov Cap-2 Maneuver 96 - Stage 1 122 Stage 2 469 HCM Control Delay, s 18 HCM LOS Capacity (vehrh) 348 - 288 HCM Lane VIC Ratio - 0.037 HCM Control Delay (s) 0 - 18 HCM Lane LOS A - C HCM 95th %tile Q(veh) 0 - 0.1 Vineyard-Goldelm ODP/PDP 2/21/2016 PM 2018 Total Traffic Synchro 9 Light Report ELB Page 1 HCM 2010 Signalized Intersection Summary 7: College Ave & Skyway 2/21/2016 Lane Configurations Volume (veh/h) Number Irlitial Q (C1b), veh Ped-Bike Adj(A_pbT) Parkintj Bus, io4 Adj Sat Flow, veh/h/In Adj Flow Rate, veli/t) Adj No. of Lanes Peak Flour Factor Perc.ent Heavy Veh, % Cap, vehTh _ Arrive On Green Sat Flow, velifh Grp Volume(v), veh/h Grp Sat Flovt(s),veltilin CI Serve(g_s), s Cycle Q Clear(g_c), 8 Prop In Lane Lane Grp Cap(c), vehili V/C Ratio(X) Avail Cap(c_a), vehlh HCM Platoon Ratio Upslrearn Ffiter(i) Uniform Delay (d), slveh Ina Delay (d2), siveli Initial Q Delay(d3),s/vett Me BacirOfQ(51111‘),vehfin LnGrp Delay(d),s/veh LnGrp LOS Approach Vol, vehM Approach Delay, sheet' Approach LOS 'II tt r 50 10 20 30 5 45 10 1450 30 35 840 55 7 4 14 3 8 18 5 2 12 1 6 16 0 0 0 0 0 0 0 0 0 0 0 0 1.00 1.60 1.00 1.00 IMO IMO 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 190 -IMO IMO 1.00 1,00 1900 1863 1900 1900 1863 1863 1863 1863 1863 1863 1863 1863 54 11 22 32 5 48 11 1559 32 38 903 59 0 1 0 0 1 1 1 2 1 1 2 1 0.93 0.93 0.93 093 0.93 0.93 0.93 0.93 093 0.93 0.93 0.93 2 2 2 2 2 2 2 2 2 2 2 2 114 26 30 169 22 146 471 2572 1151 284 2637 1180 0.09 0.09 0,09 009 0.09 0.09 001 013 0.73 003 075 0.75 668 283 322 1173 241 1583 1774 3539 1583 1774 3539 1583 87 0 0 37 0 48 11 1559 32 38 903 59 1272 0 0 1414 0 1583 1774 1770 1583 1774 1770 1583 5.1 0.0 0.0 ao 0.0 3.1 02 23.7 OM 0.6 9.6 1.1 7.7 0.0 0.0 2.6 ao 31 0.2 231 0.6 0.6 9.6 1.1 0.62 0.25 0.86 1.00 1.00 1.00 1.00 IMO 170 0 0 191 0 146 471 2572 1151 284 2637 1180 0.51 aoo 0.00 0.19 000 0.33 0.02 0.61 0.03 0.13 0.34 005 281 0 0 299 0 266 537 2572 1151 318 2637 1180 1.00 IMO 1.00 1.00 1.00 100 1.00 1.00 1.00 100 100 IMO 1.00 0.00 0.00 1.00 aoo 1.00 1.00 1.00 'IMO 100 'IMO 1.00 HCM 2010 Signalized Intersection Summary 4: College Ave & Crestridge Drive/Smokey tt: -0' { 4- &" Lane Configurations TO 4.. Volume (vettAi) 125 5 20 Number 7 18 Q (Qb), vett 0 Pod-Bike Adj(A_pbT) 120 120 1.60 1.00 Padang Bus, Adj 1.00 1.00 1.00 1,00 120 1.00 Adj Sat Flow, vett/Win 1863 1863 1900 1900 1863 1900 Adj Flow Rate, vehlh 134 5 48 16 5 22 Adj No. of Lanes 1 1 0 0 1 0 Peak Hour Facbar 0.93 023 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 2 2 2 2 Cap, velt/h 253 18 171 103 44 94 Arrive On Green 0.12 0.12 0.12 0.12 0,12 012 Sat Flow, vehlh 1378 152 1455 395 371 803 Grp Volume(v), veh/h 134 0 53 43 0 0 Grp Sat Floiv(s),vetilltfin 1378 0 1606 1569 0 0 Q Serve(g_s), s 5.7 0.0 26 02 0.0 02 Cycle Q Clear(g_c), s 7/ 0.0 2.6 2.0 ao 0.0 Prop In Lane 1.00 0.91 0.37 0.51 Lane Grp Cap(c), vehili 253 0 189 241 0 0 V/C Ratio()9 053 020 028 0.18 020 020 Avail Cap(c_a), vell/h 412 0 375 416 0 I-1CM Platoon Rath) 1.00 120 1.00 1.00 120 1.00 Upslreani Ffiter(I) 1.00 0.00 1.00 1.00 0,00 0.00 Unifonn Delay (d), s/veh 374 0.0 35.4 35.1 0.0 OD iricr Delay (d2), siveh 17 0.0 as OA OM 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 ao oo 9li1el3ad(OfQ(505b),velifin 3.3 0.0 1.2 10 oo 0.0 LnGrp Delay(d),s/veh 39.1 0.0 362 35.4 0.0 0.0 LinGrp LOS D D D Approach Vol, vehlh 187 43 Approach Delay, &vett 38.3 354 Approach LOS Assigned Phs 1 2 4 5 6 Phs Duration (G+-Y+Rc), s 8.2 63.8 15.8 9.0 63,1 Change Period (Y+Rc), s 5.5 5.5 55 55 55 Max Green Setting (Gmax), s 5.1 67.9 205 5.1 67.9 Max Q Clear Time (g_c+11), s 2 5 27.7 9.7 2.7 12.4 Green Ext (p c), s 0.0 307 0.7 0.0 38.8 eat HCM 2010 Clrl Delay 11.0 HCM 2010 LOS 2/21/2016 4 \ t P i tt oft jV 45 1530 40 30 840 65 5 2 12 1 6 16 0 1.00 1.00 1.00 1.00 120 1.00 1.00 1.00 1.00 1.00 1863 1863 1863 1863 1863 1863 48 1645 43 32 903 70 1 2 1 1 2 1 023 023 0.93 0.93 0,93 0.93 2 2 2 2 2 2 461 2349 1051 245 2319 1038 HCM Control Delay, s MGM LOS RCM 2010 TVVSC 11: College Ave & Venus (access) 2/21/2016 0.1 Vol, venni Conflicting Peds, itihr Sign Control RI Channelized Storage Length Veh in Median Storage Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 25 0 1675 935 30 0 0 0 0 0 0 Stop Stop Free Free Free Free None - None - None ""c;W.5:-451 Conflicting Flow All 1906 Stage 1 1005 Stage 2 901 Critical Hdwy 6.84 Cdfical_ Hdwy Stg 1 , 5.84 Critical Hdwy Stg 2 5.84 Follow-up 3.52 Pot Cap-1 Maneuver 60 Stage 1 315 Stage 2 357 Platoon blocked, % Mov Cap-1 Maneuver 60 Mov Cap-2 Maneuver 315 Stage 1 315 Stage 2 357 503 1005 694 414 3,32 Z22 514 685 Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) HCM 2010 Signalized Intersection Summary 7: College Ave & Skyway 2/21/2016 Lane Configurations VA 4 f 'I t ft r ‘s. 4. tat r Volume (vehlh) 40 10 10 20 15 40 30 1230 25 140 1670 40 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial C1 (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Ac j 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/hrin 1900 1863 1900 1900 1863 1863 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veh/h 43 11 11 22 16 43 32 1323 27 151 1796 43 Adj No. of Lanes 0 1 0 0 1 1 1 2 1 1 2 1 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, velth 106 26 16 111 67 117 238 2587 1157 375 2646 1184 Arrive On Green 0.07 0.07 0.07 0.07 0.07 0.07 0.03 0.73 0.73 0.05 0.75 0.75 Sat Flow, veh/h 702 352 215 805 908 1583 1774 3539 1583 1774 3539 1583 Grp Volume(v), veh/h 65 0 0 38 0 43 32 1323 27 151 1796 43 Grp Sat Flow(s),veh/h/In 1269 0 0 1713 0 1583 1774 1770 1583 1774 1770 1583 Q Serve(g_s), s 3.7 0.0 0.0 0.0 0.0 2.8 0.5 17.7 0.5 2.3 28.6 0.8 Cycle 0 Clear(g_c), s 5.8 0.0 0.0 2.2 0.0 2.8 0.5 17.7 0.5 2.3 28.6 0.8 Prop In Lane 0.66 0.17 0.58 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 148 0 0 179 0 117 238 2587 1157 375 2646 1184 V/C Ratio(X) 0.44 0.00 0.00 0.21 0.00 0.37 0.13 0.51 0.02 0.40 0.68 0.04 Avail Cap(c_a), veh/h 278 0 0 318 0 259 273 2587 1157 461 2646 1184 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter@ 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 50.1 0.0 0.0 48.1 0.0 48.5 7.0 6.4 4.1 5.3 7.1 3.6 Ina Delay (d2), s/veh 2.0 0.0 0.0 0.6 0.0 1.9 0.3 0.7 " 0.0 0.7 1.4 0.1 Initial 0 Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %Ile Back0fQ(50%),vetritn 2.0 0.0 0.0 1.1 0.0 1.3 0.3 8.7 0.2 1.2 14.2 0.4 LnGrp Delay(d),s/veh 52.1 0.0 0.0 48.7 0.0 50.4 7.2 7.1 4.1 6.0 8.5 3.7 LnGrp LOS D D 0 A A'A A A A Approach Vol, veh/h 65 81 1382 1990 Approach Delay, s/veh 52.1 49.6 7.0 8.2 Approach LOS 0 0 A A Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), $ 10.5 85.9 13.7 8.6 87.7 13.7 Change Period (Y+Rc), s 5.5 5.5 5.5 5.5 5.5 5.5 Max Green Setting (Gmax), $ 103 65.2 18.0 5.3 70.2 18.0 Max 0 Clear Time (g_c+I1), s 4.3 19.7 7.8 2.5 30.6 4.8 Green Ext Time (p_c), s 0.2 39.5 0.4 0.0 34.9 0.5 HCM 2010 Cld Delay 9.5 HCM 2010 LOS A Vineyard-Goldelm ODP/PDP 2/21/2016 PM 2020 Total Traffic Synchro 9 Light Report ELB ENGINEERING, (SC Page 1 Lane Configurations Volume (vehth) Number Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Ad] 1.00 Adj Sat Flow, vehtlii/In 1863 Adj Flow Rate, velilh 108 Adj No. of Lanes 1 Peak Hour Factor 0.93 Percent Heavy Veh, % 2 Cap vehth 215 Arrive On Green 013 Sat Flow, vehth 1306 Grp Volume(v) vehlh 108 C7rp Sat Flow(s),velt/Win 1306 Q Serve(g_s), s 10 Cycle Q Clear(g__c), s 9.5 Prop In Lane IMO Lane Grp Cap(c), velvh 215 V/C Ratio(X) 050 Avail Caf)(c_a), vetr/h 298 HCM Platoon Ratio 1.00 Upstream Fittef(1) IMO Uniform Delay (d), siveh 41.7 Ina Delay (d2), /veti 1.8 Inibal QDelay(d3),s/veb 00 Yale Back0fQ(503(,),veh/In 30 LnGrp Delay(d),slveh 415 LnGrp LOS D Approach Vol, veh/h Appnoach Delay, shieli Approach LOS Assigned Phs 1 Phs Duration (G+Y+F(c), s 10.4 Change Period (Y+Rc), s 35 Max Green Setting (Gram), s 10.3 Max Q Clear Time (g_c+I1), s 4.7 0 0 100 1.00 1.00 1863 1900 5 32 1 0 0.93 0.93 2 2 27 175 0.13. 218 1398 0 37 0 1616 0.0 2.0 00 2.0 086 0 203 0.00 0.18 0 305 1.00 1.00 0,00 1.00 00 383 Vol, veh/h Conflicting Peds, fl/hr 0 Sign Control Stop RT Channelized Storage Length Veh in Median Storage, Grade, % Peak Hour Factor 93 Heavy Vehicles, % 2 Mvmt Flow 0 1395 0 0 Free Free - None 0 Stop None 93 93 93 1715 60 0 0 Free Free - None 93 93 332 222 272 326 HCM 2010 TVVSC 11: College Ave & Venus (access) 2/21/2016 Int Delay, siveh 0.1 Conflicting FlowAll 2594 Stage 1 1844 Stage 2 750 Critical Hdvry 6.84 Critical Hdvor Stg 1 5.84 Critical Hdvry Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 20 Stage 1 111 Stage 2 427 Platoon Necked, % Mov Cap-1 Maneuver 20 May Cap-2 Maneuver 86 Stage 1 111 Stage 2 427 922 1844 f2A, Capacity (veti/h) 326 HCM 2010 Signalized Intersection Summary 7: College Ave & Skyway 2/21/2016 Lane Configuralions -st { 4 ak• r 4\ li 14 P 1' 'I it 141' .1 ig Volume (vetdt) 55 10 25 35 5 45 10 1645 35 40 965 65 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 IMO IMO Parking Bus, Agj 1.00 1.00 -IMO 1.00 1.00 1.00 1.00 1.00 IMO 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1900 1863 1900 1900 1863 1863 1863 1863 1863 1863 1863 1863 Al Flow Rate, vehth 59 11 27 38 5 48 11 1769 38 43 1038 70 Adj No. of Lanes 0 1 0 0 1 1 1 2 1 1 2 1 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0,93 0.93 093 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 2 2 2 2 Cap, vetifh 118 27 35 180 20 163 405 2527 1130 235 2599 1163 Arrive On Green 0.10 0.10 0.10 0.10 0.10 0.10 0.01 0.71 0.71 003 0.73 0.73 Sat Flow, velVb 632 260 344 1154 195 1583 1774 3539 1583 1774 3539 1583 Grp Vdume(v), vehlh 97 0 0 43 0 48 11 1769 38 43 1038 70 Grp Sat FIcrw(s),vell/h/In 1235 0 0 1349 0 1583 1774 1770 1583 1774 1770 1583 Q Serve(g_s), s 57 00 0.0 0.0 0.0 3.1 02 31.4 0.8 07 12.1 1.4 Cycle Q Clear(g_c), s 89 OM 0.0 3.2 ao 3.1 02 314 0.8 0,7 12.1 1.4 Prop In Lane 0.61 0.28 0.88 IMO 100 1.00 1.00 1.00 Lane Grp Car:i(c), vettlh 180 0 0 200 0 163 405 2527 1130 235 2599 1163 V/C Ratio(X) 054 0.00 000 021 0.00 0.30 003 0.70 0.03 0.18 0.40 0.06 Avail Gap(c_a), vetilh 268 0 0 286 0 259 462 2527 1130 268 2599 1163 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.09 1.00 1.00 1.00 Upstream Filter(I) 1.00 aoo 0.00 100 0.00 1.00 100 100 i.ao 1.00 i.00 1.00 Uniform Delay (d), s/veti 487 80 0.0 451 00 45/ 4.6 9.0 4.6 9.0 5.5 4.1 Ina Delay (d2), sNeti 2.5 0.0 ao 0.5 0.0 1.0 ao 1.6 0.1 OA 0.5 0.1 Initial Q Delay(d3),s/veti 00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 00 0.0 00 °41143 Back0fQ(5096),vellfin 3.0 0.0 0.0 1.2 OM 1A 0.1 15.6 0.4 0.5 6.1 0.6 LnGrp Delay(d),s/veh 51.2 00. .2 00 46.7. .6 47 94. 4.2 LnGip LOS D D D A B A A A A Approach Vol, vehlh 97 91 1818 1151 Approach Delay, s/vtah 51.2 46.4 10.5 6.0 Approach LOS D D B A 47k caici ata Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 9.2 840 168 6.9 863 168 Change Period (Y+Rc), s 5.5 5.5 5.5 5.5 55 55 Max Green Setting (Grim), $ 5.7 69.8 18.0 5.0 70.5 180 Max Q Clear Time (g_c+I1), s 2.7 33.4 109 2.2 14.1 52 Green Ext Time (p_c), s 0.0 30.6 0.5 0.0 43.6 0.7 HCM 2010 CIA Delay HCM 2010 LOS Vineyard-Goldelm ODP/PDP 2/21/2016 AM 2036 Total Traffic Synchro 9 Light Report ELB ENGINEERING, LLC HCM 2010 Signalized Intersection Summary 4: College Ave & Crestridge Drive/Smokey 2/21/2016 4- k \* 4 Lane Configurations 1 to 4* I 14 r 1 ft r Volume (vehlh) 135 5 40 20 5 25 50 1760 45 30 955 85 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial 0 (0b), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parldng Bus, Ar:Q 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, vehltilln 1863 1863 1900 1900 1863 1900 1863 1863 1863 1863 1863 1863 Adj Flow Rate, velith 145 5 43 22 5 27 54 1892 48 32 1027 91 Adj No. of Lanes 1 1 0 0 1 0 1 2 1 1 2 1 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 251 20 174 108 37 94 413 2407 1077 198 2372 1061 Arrive On Green 0.12 0.12 0.12 0.12 0.12 0.12 0.04 0.68 0.68 0.03 0.67 0.67 Sat Flow, vehlh 1372 168 1441 467 308 775 1774 3539 1583 1774 3539 1583 Grp Volume(v), veh/h 145 0 48 54 0 0 54 1892 48 32 1027 91 Grp Sat Flow(s),veh/h/In 1372 0 1608 1550 0 0 1774 1770 1583 1774 1770 1583 Q Serve(g_s), s 6.4 0.0 2.6 0.0 0.0 0.0 0.9 35.8 1.0 0.5 13.1 2.0 Cycle Q Clear(g_c), s 9.2 0.0 2.6 2.8 0.0 0.0 0.9 35.8 1.0 0.5 13.1 2.0 Prop In Lane 1.00 0.90 0.41 0.50 1.00 1.00 1.00 1.00 Lane Grp Cap(c), vet* 251 0 194 239 0 0 413 2407 1077 198 2372 1061 V/C Ratio(X) 0.58 0.00 0.25 0.23 0.60 0.00 0.13 0.79 0.04 0.16 0.43 0.09 Avail Cap(c_a), vehlh 346 0 306 343 0 0 436 2547 1139 236 2543 1138 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 41.4 0.0 38.8 38.8 0.0 0.0 5.2 10.7 5.1 11.7 7.5 5.6 !nor Delay (d2), stveh 2.1 0.0 0.7 0,5 0.0 0.0 0.1 1.6 0.0 0.4 0.1 0.0 Initial 0 Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %He Back0f0(50%),vehfin 3.9 0.0 1.2 1.4 0.0 0.0 0.4 17.6 0.4 0.4 6.3 0.8 LnGrp Delay(d),slveh 43.5 0.0 39.4 39.3 0.0 0.0 5.4 12.3 5.2 12.1 7.6 5.6 LnGrp LOS D D D A B AB A A Approach Vol, veh/h 193 54 1994 1150 Approach Delay, sAreh 42.5 39.3 12.0 7.5 Approach LOS D D B A Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 8.4 71.6 17.2 9.3 70.7 17.2 Change Period (Y+Rc), s 5.5 5.5 5.5 5.5 5.5 5.5 Max Green Setting (Gmax), s 5.0 70.0 18,5 5.1 69.9 18.5 Max 0 Clear Time (g_c+I1), s 2.5 37.8 11.2 2.9 15.1 4.8 Green Ext Time (p_c), s 0.0 28.4 0.6 0.0 44.6 0.8 r-_ - HCM 2010 CM Delay HCM 2010 LOS Vineyard-Goldelm ODP/PDP 2121/2016 AM 2036 Total Traffic Synchro 9 Light Report ELB ENGINEERING, LLC Page 1 12.6 0 Stop 0 Stop None 32 1070 0 0 Free Free - None 0 1151 86 0 1895 0 0 Free Free - None 0 2038 Vol, veh/ti Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 2170 1151 1019 6.84 5.84 5.84 3.52 40 263 40 148 263 309 575 1151 3.32 Z22 461 603 HCM 2010 TWSC 11: College Ave & Venus (access) 2/21/2016 Int Delay, s/veh 0.1 0;0 twt; E-5:111-* Conflict ng Flow NI Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdvry Stg 2 Follow-up Hthiry Pot Cap-1 Maneuver HCM 2010 Signalized Intersection Summary 7: College Ave & Skyway 2/21/2016 Lane Configurations Volume (veh/h) Number Q (Cti), veh Ped-Bike Adj(A_pbT) Parking Bus, AO Adj Sat Flow, veh/h/in Adj Flow Rate, ve4/11 Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cal), vehlti Arrive On Grecan Sat FloNv, velifh Grp Volume(v) vehlh Grp Sat Flow(s),ven/h/In Q Serve(g_s), s Cyde Cl Clear(g_c), s Prop In Lane Lane Grp Cap(c), vehlh V/C Ratio(X) Avail Cap(c_a), vehlti HCM Platoon Ratio Upstream Ftter(I) Uniform Delay (d), s/veh Irta Delay (d2), s/veh IniUal QDelay(d3),s/veh %Ile BacItOfQ(50%),vettilii LnGrp Delay(d),siveh LnGrp LOS Approach Vol, veh/h Approach Delay, siveh Approach LOS Assigned F'hs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Grnax), s Max Q Clear Time (g_c+11), s Green Ext Time (pA, s tt is tit 35 1380 30 150 2045 45 2 12 1 6 16 1.00 1.00 100 100 1.00 1.00 100 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1,00 1.00 1.00 1.00 IMO 100 1900 1863 1900 1900 1863 1863 1863 1863 1863 1863 1863 1863 54 16 16 22 16 48 38 1484 32 161 2199 48 0 1 0 0 1 1 1 2 1 1 2 1 0 93 0.93 0.93 0.93 0.93 0.93 0,93 0.93 0.93 0.93 0.93 0.93 2 2 2 2 2 2 2 2 2 2 2 2 116 32 fl 121 75 140 169 2935 1134 321 2584 1156 0.09 0.09 0.09 0.09 0.09 0.09 0.03 072 0.72 005 0.73 0.73 706 360 244 784 844 1583 1774 3539 1583 1774 3539 1583 86 0 0 38 0 48 38 1484 32 161 2199 48 1310 0 0 1628 0 1583 1774 1770 1583 1774 1770 1583 5.1 0.0 0.0 OM 0.0 3.1 0.6 225 0.6 2.6 48.7 0.9 7.3 0.0 00 22 ao 3.1 0,6 22.5 0,6 2.6 48.7 0.9 063 0.19 058 1.00 1.00 1.00 1.00 1.00 HCM 2010 Signalized Intersection Summary 4: College Ave & Crestridge Drive/Smokey 2/21/2016 t P Larte Configurations 'itt 4. r 1 tt r Volume (ueOral) 110 5 35 50 5 80 85 1405 70 40 1935 45 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial 0 (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 PS-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1863 1863 1900 1900 1863 1900 1863 1863 1863 1863 1863 1863 Adj Flow Rate, velith 118 5 38 54 5 86 91 1511 75 43 2081 48 Adj No. of Lanes 1 1 0 0 1 0 1 2 1 1 2 1 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 221 25 192 111 22 123 183 2360 1056 267 2321 1038 Arrive On Green 0.14 0.14 0.14 0.14 0.14 0.14 0.05 0.67 0.67 0.03 0.66 0.66 Sat Flow, veh/h 1300 187 1424 457 166 909 1774 3539 1583 1774 3539 1583 Grp Volume(v), veal 118 0 43 145 0 0 91 1511 75 43 2081 48 Grp Sat Flow(s),veh/h/In 1300 0 1611 1532 0 0 1774 1770 1583 1774 1770 1583 Q Serve(g_s), s 1.9 0.0 2.4 6.5 0.0 0.0 1.6 25.1 1.7 0.8 49.6 1.1 Cycle 0 Clear(g_c), $ 10.9 0.0 2.4 9.0 0.0 0.0 1.6 25.1 1.7 0.8 49.6 1.1 Prop In Lane 1.00 0.88 0.37 0.59 1.00 1.00 1.00 1.00 Lane Grp Cap(c), vehrb 221 0 218 256 0 0 183 2360 1056 267 2321 1038 V/C Ratio(X) 0.53 0.00 0.20 0.57 0.00 0.00 0.50 0.64 0.07 0.16 0.90 0.05 Avail Cap(c_a), veh/h 283 0 295 328 0 0 217 2360 1056 386 2401 1074 HCM Platoon Ratio 1.00 1.00 1.60 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(1) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 42.7 0.0 38.8 41.6 0.0 0.0 23.6 9.8 5.9 8.2 14.5 6.2 'nor Delay (d2), s/veh 2.0 0.0 0.4 2.0 0.0 0.0 2.1 0.6 0.0 0.3 4.8 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %fie Back0f0(50%),vehiln 3.3 0.0 1.1 4.0 0,0 0.0 1.8 12.4 0.7 0.4 25.5 0.5 InGrp Delay(d)s/veh 44.7 0.0 39.2 43.5 0.0 0.0 25.7 10.4 5.9 8.5 19.3 6.2 InGrp LOS D D CB A A B A Approach Vol, vehlh 161 145 1677 2172 Approach Delay, s/veh 43,3 43.5 11.0 18.8 Approach LOS Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 9.0 72.8 19.1 10.1 71.7 19.1 Change Period (Y+Rc), s 5.5 5.5 5.5 5.5 5.5 5.5 Max Green Setting (Gmax), s 10.3 64.7 18.5 6.5 68.5 18.5 Max Q Clear lime (g_c+11), s 2.8 27.1 12.9 3.6 51.6 11.0 Green Ext Time (p c), s 0.0 35.7 0.7 0.0 14.6 0.9 HCM 2010 arl Delay 17.5 HCM 2010 LOS Vineyard-Goldelm ODP/PDP 2/21/2016 PM 2036 Total Traffic Synchro 9 Light Report ELB ENGINEERING, LLC Page 1 Int Delay, s/veh 0.1 Vol, veh/h Conflicting Reds, lt/hr Sign Control RI Channelized StorPt3e Length Veil in Median Storage Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow o 20 0 1595 2020 80 0 0 0 0 0 0 Stop Stop Free Free Free Free None - None - None 93 93 93 93 0 1715 93 93 2 2 2172 86 Conflicting Fbvv Afl 3030 1086 Stage 1 2172 Stage 2 858 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 524 Follow-up lidwy 332 Pot Cap-1 Maneuver 10 Stage 1 Stage 2 Platoon blocked, % May Cap-1 Maneuver 10 Mov Cap-2 Maneuver 73 Stage 1 73 Stage 2 376 HCM 2010 TVVSC 11: College Ave & Venus (access) 2/21/2016 zzi>zirsvir HCM Control Delay, s 23.9 HCM LOS Capacity (veh/h) 242 212 HCM Law V/C Ratio 0.101 liCM Control Delay (s) - 23.9 HCM Lane LOS HCM 95th %tile Q(veh) - 0.3 Vineyard-Goldelm ODP/PDP 2/21/2016 PM 2036 Total Traffic Synchro 9 Light Report ELB ENGINEERING, LLC Page 1 169 0 0 196 0 140 169 2535 1134 321 2584 1156 0.51 0.00 000 019 000 0.34 0 22 0.59 003 0.50 0.85 0.04 278 0 0 312 0 259 199 2535 1134 407 2584 1156 1.00 1.00 1.00 1.00 100 1.00 1.00 1.00 1.00 1.00 100 1.00 IMO 0.00 000 1.00 0.00 1.00 100 1.00 100 1.00 1,00 1.00 49.3 00 ao 467 0.0 47.1 156 7.6 45 7.8 105 4.1 2.3 ao 0.0 0.5 0.0 1.4 0.7 10 0.0 1.2 3,8 01 0.0 00 0.0 0.0 0.0 00 0.0 00 0.0 00 0.0 0.0 2.7 00 0.0 1.1 0.0 14 0.7 112 0.3 1.9 24.6 OA 51.6 0.0 0.0 47.1 OM 48.6 17.3 85 4.6 9.0 14.3 4.2 D D D B A A A B A 86 86 1554 2408 51.6 47.9 81 13.8 D D A B 1 2 4 5 6 8 10.5 84.3 15.2 8.9 808 15.2 55 55 5.5 55 5.5 5.5 103 65.2 18.0 5.3 70.2 18.0 4.6 24.5 9.3 2.6 507 5.1 0.2 38.7 0.5 0.0 19.0 0.6 HCM 2010 Ctrl Delay 13.4 HCM 2010 LOS Vineyard-Goldelm ODPIPDP 2/21/2016 PM 2036 Total Traffic Synchro 9 Light Report ELB ENGINEERING, LLC Page 1 Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver May Cap-2 Maneuver Stage 1 Stage 2 HCM Control Delay, s HCM LOS Capacity (vehfh) 603 461 HCM Lane V/C Ratio 0.07 HCM Control Delay (s) - 134 HCM Lane LOS HCM 95th %the Q(veh) - 0.2 Vineyard-Goldelm ODP/PDP 2/21/2016 AM 2036 Total Traffic Synchro 9 Light Report ELB ENGINEERING, LLC Page 1 Page 1 - 272 HCM Lane V/C Ratio - 0 079 HCM Control Delay (s) - 19.4 HCM Lane LOS HCM 95th %tile Q(veh) - 0.3 Vineyard-Goldelm ODP/PDP 2/21/2016 PM 2020 Total Traffic Synchro 9 Light Report ELB ENGINEERING, LC Page 1 0.0 0.4 00 0.0 0.0 0.9 0.0 38.7 D 145 42.3 0 2 69.7 5.5 64.7 21.9 Green Ext Time (p_c), $ 0,2 37.2 HCM 2010 Signalized Intersection Summary 4: College Ave & Crestridge Drive/Smokey 2/21/2016 4. 111 ft 100 5 30 50 5 75 65 1220 60 140 1635 40 7 4 14 3 8 18 5 2 12 1 6 16 0 0 0 0 0 0 0 0 0 1.00 1.00 1.00 1.00 1.00 100 150 1.00 1.00 1.00 1.00 1.00 1.00 150 1.00 1900 1863 1900 1863 1863 1863 1863 1863 1863 54 5 81 70 1312 65 151 1758 43 0 1 0 1 2 1 1 2 1 093 093 0.93 0.93 0 93 093 0.93 0.93 0.93 2 2 2 2 2 2 2 2 2 111 21 111 236 2320 1038 340 2344 1049 , 013 0.13 004 0.66 0.66 005 0.66 0.66 479 167 886 1774 3539 1583 1774 3539 1583 140 0 0 70 1312 65 151 1758 43 1532 0 0 1774 1770 1583 1774 _ 1770 1583 6.4 00 00 1.2 199 1.4 27 32.6 0.9 8.5 0.0 OM 1.2 19.9 14 2.7 32.6 0.9 039 0.58 1.00 1.00 1.00 100 243 0 0 236 2320 1038 340 2344 1049 038 0.00 aoo 0.30 057 0.06 0.44 0.75 004 338 0 0 277 2339 1047 438 2477 1108 1.00 100 1.00 IMO IMO 1.00 1.00 1.00 IMO 1.00 0.00 0.00 150 1.00 1.00 1.00 1.00 1.00 41.1 0.0 ao 11.7 9.2 6.1 7.9 11.1 5.7 2.1 0.0 0,0 0,7 0.3 00 0.9 1.2 9.0 0.0 00 00 00 0.0 0.0 0.0 0.0 OM 3.8 0.0 0.0 0.9 9.8 06 14 16.0 43.2 OM 0.0 12.4 9.5 6.1 8.8 12.3 5.7 D B A A A B A 140 1447 1952 43.2 9.5 119 D A 4 5 6 8 17.8 9.8 70.3 17.8 5.5 53 53 53 18.5 6.5 685 18.5 11.5 12 34.6 10.5 0.8 0.0 30.2 03 ri rr cwsearaz. Mc:Le HCM 2010 Girl Delay 13.4 HCM 2010 LOS Vineyard-Goldelm ODP/PDP 2/21/2016 PM 2020 Total Traffic Synchro 9 Light Report ELB ENGINEERING, LLC Page 1 685 - 514 • 0 052 - 124 - 0.2 Vineyard-Goldelm ODP/PDP 2/21/2016 AM 2020 Total Traffic Synchro 9 Light Report ELB ENGINEERING, [IC Page 1 0.04 ass ass 023 0.66 026 1774 3539 1583 1774 3539 1583 48 1645 43 32 903 70 1774 1770 15R3 1774 1770 1583 0.7 25.7 0.8 0.5 10.4 1.4 07 25/ as 0.5 104 1A 1.00 1.00 1.00 1.00 461 2349 1051 245 2319 1038 010 0.70 0.04 0.13 039 0.07 494 2735 1224 293 2735 1224 1.00 1.00 1.00 120 1.00 120 1.00 120 120 1.00 1.00 1.00 4.9 93 51 84 72 5.5 0.1 0.7 0.0 0.2 0.1 0.0 oo oo ao oo oo oo 04 12.6 04 03 51 a6 5.0 9.9 5.1 8.6 7.1 5.5 A A A A A A 1736 1005 91 7.0 A A aws Vineyard-Goldelm ODP/PDP 2/21/2016 AM 2020 Total Traffic Synchro 9 Light Report ELB ENGINEERING, LLC Page 1 49.2 ao OM 46.5 0.0 46.8 4.0 7.3 4/ 6.2 4.8 17 2.4 0.0 0.0 0.5 0.0 13 0.0 1.1 0.0 0.2. . 00 0.0 0.0 00 0.0 00 0.0 00 0.0 0.0 0.0 ao 2.7 0.0 0.0 1.1 0,0 14 al 11.9 0.3 0.3 4.8 0.5 51.5 0.0 00 470 0.0 48.1 4.0 84 4.2 6.4 5.2 30 D D D A A A A A A 87 85 1602 1000 51.5 47.6 8,3 5.1 D A A voiiiimmir-rtaieSfltilts Assigned Phs Phs Duration (G-EY+Rc), s Change Period (Y+Rc), s Max Green Setting (Grnax), s Max Q Clear Time (g_c+11), s Green Ext Tune (p_c), s 1 2 8.9 85.4 55 5.5 5,5 69.5 2.6 25.7 0.0 31.3 4 5 6 15.6 6 . 9 875 5.5 5.5 5.5 18.5 5 . 5 69 . 5 9.7 22 11.6 05 00 373 8 15.6 5.5 185 5.1 0.6 HCM 2010 LOS A Vineyard-Goldelm ODPIPDP 2/21/2016 AM 2020 Total Traffic Synchro 9 Light Report ELB ENGINEERING, LLC Page 1 0 0 0 93 93 2 2 48 1312 0 0 93 2 1737 0 93 2 38 2490 1737 0 1737 753 6.84 6.94 4.14 5.84 5.84 - 3.52 3.32 2.22 - 24 296 358 127 426 -21 296 358 93 - 127 369 52.1 0.6 0 358 - 128 0,135 - 0.42 16.6 - 52.1 C - F 0.5 - 1.8 -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined : All major volume in platoon Vineyard-Goldelm ODP/PDP 2/21/2916 PM 2018 Total Traffic Synchro 9 Light Report ELB Page 1 Anive On Gnaen all 0.11 011 011 0.11 011 Sat Flow, ve11/11 938 173 120 836 822 1583 Grp Volume(v), vehlh 113 0 0 38 0 43 Grp Sat Flow(s),vehhin 1230 0 0 1658 0 1583 Q Serve(g_s), s 81 0.0 0.0 0.0 00 27 Cycle Q Clear(g_c), s 10.2 DO 0.0 2.1 0.0 2.7 Prop in Lane 0.81 0.10 0.58 1.00 Lane Grp Cap(c), vetUb 200 0 0 242 0 181 V/C Ratio(X) 0.57 0.00 0.00 0.16 0.00 0/4 Avail Cap(c a), veh/ti 269 0 0 318 0 259 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Rtrar(I) 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), sfveh 48.3 0.0 06 44.0 DO 44.3 lila Delay (d2), s/veh 2.5 0.0 0.0 0.3 0.0 0.7 Initial Q Delay(d3),s/veh 0. . 0.0 0.0 0.0 %lie Sack°r(45°Ig'v ehlln 3.5 06 0,0 1.1 ao 1.2 LnGrp Delay(d),s/veh 50 .8 0.0 06 44302 45.0 LnGrp LOS D D D Approach Vol, veh/h 113 81 Approach Delay, sivell 50.8 44.7 Approach LOS Assigned Phs 1 2 4 5 6 Nis Duration (G+Y+Rc), $ 105 81.5 18.1 8.6 83.3 Change Period (Y+Rc), s 56 5.5 5.5 5.5 5.5 Max Green Setting (Grriax), s 10.5 65.0 18,0 5.0 706 Max Ci Clear Time (g_c+I1), s 4.7 202 12.2 2.6 316 Green Ext Time (p_c), s 0.2 37.6 0.4 0.0 32.2 HCM 2010 Ctrt Delay 12. HCM 2010 LOS Vineyard-Goldelm ODP/PDP 2/21/2016 PM 2018 Total Traffic Synchro 9 Light Report ELB Page 1 HCM 95th %tile Cl(veh) 731 - 544 1104 - 11.9 - 0.1 Vineyard-Goldelm ODP/PDP 2/21/2016 AM 2018 Total Traffic Synchro 9 Light Report ELB Page 1 332 547 HCM 2010 TVVSC 4: College Ave & Crestridge Drive 2/21/2016 Vineyard-Goldelm ODP/PDP 2/21/2016 AM 2018 Total Traffic Synchro 9 Light Report ELB Page 1 ELB Page 1 09 42.7 E3 9.3 5.5 7.8 6.4 4.9 0.0 0.5 00 1.2 0.1 0.2 0.4 0.1 0 0 0.0 0.0 0.0 0.0 0.0 09 0.0 0.0 1.2 0.1 127 0.3 0.3 5.3 0.6 0.0 43.1 5.4 10.5 E5 80 6.8 59 D A B A A A A 80 1548 989 42.9 10.4 67 A Lane Configurations Volume (vehh) Number lniliaIQ(),veh Pod-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/In Adj Row Rate, veliTh Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, velith Assigned Phs 1 2 Plis Duration (G+Y+Rc), s 8.9 81.1 Change Period (Y+Rc), s 5.5 5.5 Max Green Setting (Gmax), s 10.5 65.0 Max Q Clear Time (g_c+I1), $ 2.7 274 Green Ext Time (p_c), s 0.0 27.2 4 5 6 83 19.9 6 . 9 . 1 5.5 5.5 5.5 18.0 5.0 70.5 14.1 2.2 12.9 0.3 0.0 36.2 199 55 18.0 4.7 0.8 RCM 2910 Clrl Delay 11,9 HCM 2010 LOS Vineyard-Goldelm ODP/PDP 2/21/2016 AM 2018 Total Traffic Syncbro 9 Light Report ELB Page 1 - 2.22 262 262 0.2 : Computation Not Defined t: All major volume in platoon Vineyard-Goldelm ODPIPDP 2/20/2016 PM - 2036 BACKGROUND Synchro 9 Light Report ELB Page 1 Synchro 9 Light Report ELB Page 1 0.28 088 IMO 1.00 1.00 1.00 0 0 201 0 164 434 2525 1129 238 2596 OMO 0.00 0.21 0.00 0.29 053 0.69 0.03 0.18 0.37 0 0 318 0 295 499 2525 1129 268 2596 150 150 1.00 1.00 IMO 1.00 IMO 1.09 150 1.00 0.00 000 1.00 0.00 1.00 1.00 1.09 1.00 1.00 100 ao 0.0 45.6 ao 456 4.5 9.0 45 8.8 5.4 0.0 110 0.5 OM 1.0 0.0 1.6 al 0.4 0.4 0.0 OM OM 0.0 0.0 0.0 0.0 0.0 OM OM 0.0 0.0 1.2 0.0 1.4 0.1 15.4 0.4 0.5 as 0.0 0.0 46.1 0.0 46.6 4.5 10.6 4.7 9.2 5.8 D D A B A A A 97 91 1802 1075 51,1 464 104 55 D B A -sear Wat:c 2 4 5 6 8 84.0 16.9 6.9 86.2 169 55 55 55 5.5 5.5 67.5 20.5 5.5 67.5 20,5 32.9 108 2.2 12.9 5.2 28.6 0.6 0.0 41 2 0,8 1900 59 0 LnGrp Delay(d),s/veti 51.1 LnGrpLOS D Approach Vol, vehlh Approach Delay, siveh Approach LOS Assigned Phs 1 Phs Duration (G+Y+fic), s 9.2 Change Period (Y+Rc) s 55 Max Green Selling (Gmax), $ 5.5 Max Q Clear Time (g_c+11), s 2.7 Green Ext Time (p_c), s 0.0 1.00 1.00 1863 70 1 0.93 2 1162 073 1583 70 1583 14 14 1.00 1162 0.116 1162 1.00 1.00 4.1 01 0.0 0.6 4.2 A HCM 2010 Ctrl Delay HCM 2010 LOS B Vineyard-Goldelm ODP/PDP 2/20/2016 AM - 2036 BACKGROUND Synchro 9 Light Report ELB Page 1 337 - 108 HCM Lane V/C Ratio 0.032 0.398 I-1CM Control Delay (s) 16 - 58.8 HCM Lane LOS HCM 95th %tile G(veh) 0.1 - 17 -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Vineyard-Goldelm ODP/PDP 2120/2016 PM - 2020 BACKGROUND Synchro 9 Light Report ELB Page 1 Stage 2 Platoon bladed, % Mov Cap-1 Maneuver May Cap-2 Maneuver Stage 1 Stage 2 HCM Control Delay, s RCM LOS Capacity (veh/h) HCM Lane VIC Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Cf(veh) -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Vineyard-Goldelm ODP/PDP 2/20/2016 PM -2020 BACKGROUND Synchro 9 Light Report ELB Page 1 HCM Lane LOS HCM 95th %lite Q(veh) - 0.4 Vineyard-Goldelm ODP/PDP 2/29/2016 AM - 2020 BACKGROUND Synchro 9 Light Report ELB Page 1 0 1 1 0.93 033 0.93 0.93 0.93 2 2 2 2 2 114 27 30 175 19 0.10 0.10 0.10 0.10 010 635 283 311 1185 202 87 0 0 43 0 1229 0 0 1388 0 4.9 0.0 0.0 0.0 0.0 8.1 0.0 0.0 3.1 0.0 0.62 025 0.88 171 0 0 195 0 0.51 000 000 0.22 0.00 303 0 0 323 0 1.00 1.00IMO 1.00 1.60 IMO 0.00 0.00 1.00 0.00 49.0 00 0.0 46.3 00 2.3 0.0 0.0 0.6 0.0 0.0 0.0 ao 0.0 0.0 2.7 ao ao 1.2 0.0 51.3 0.0 0.0 409 OM CI D 87 86 51.3 47.0 D D 1 2 4 5 8.9 85.0 16.1 6.9 5.5 55 5.5 5.5 5.5 67.5 20.5 5.5 26 25.0 10.1 2.2 0.9 29.2 0.5 0.0 1.00 IMO 1.00 IMO 1.00 1,00 1.00 1.00 1.00 1.00 1.00 IMO 1863 1863 1863 1863 1863 1863 1863 43 111522 32 38 833 59 1 1 2 1 1 2 1 0.93 0.93 0.93 0.93 0.93 0.93 0.93 2 2 2 2 2 2 2 152 499 2558 1144 291 2623 1173 010 0.01 0.72 0.72 0.03 0.74 0.74 1583 1774 3539 1583 1774 3539 1583 43 11 1522 32 38 833 59 1583 1774 1770 1583 1774 1770 1583 2.8 0.2 23.0 OM OM 83 1.1 2.8 02 23M 0.6 0.6 8.8 1.1 1.00 1.00 1.00 1.00 1.00 152 499 2558 1144 291 2623 1173 0.28 0.02 000 003 013 0.32 0.05 295 565 2558 1144 324 2623 1173 1.00 1 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 'IMO 100 1.00 1.00 1.60 462 4.1 7.4 4.3 6.1 4.8 3.8 1.0 0.0 10 0.0 az 0.3 al OM 0.0 00 0.0 0.0 0.0 0.0 1.3 0.1 114 0.3 0.3 4.3 0.5 47.2 4.1 8.4 4.4 6.3 5 .1 3 .8 D A A A A A A 1565 930 8 3 5 1 A A 6 87.0 5.5 67.5 10.8 35.2 HCM 2010 Ctrl Delay HCM 2010 LOS Vineyard-Gokielm ODP/PDP 2/20/2016 AM -2020 BACKGROUND Synchro 9 Light Report ELB Page 1 Stage 1 127 Stage 2 459 HCM Control Delay, s 51.5 HCM LOS 0.1 -zt-c7 Capacity (veh/h) HCM Lane V/C Rao HCM Control Delay (s) HCM Lane LOS HCM 95th %file 0(veh) 358 - 119 0.03 0.361 15.4 - 51,5 0.1 - 15 -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Vineyard-Goldelm ODP/PDP 2/20/2016 PM -2018 BACKGROUND Synchro 9 Light Report ELB Page 1 HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 38.1 0.3 - 238 580 0.565 0.074 - 38.1 11.7 E B - 3.1 0.2 -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Vineyard-Goldelm ODP/PDP 2/20/2016 PM -2018 BACKGROUND Synchro 9 Light Report ELB Page 1 0 5 1 0 3 4 6 0.3 5 7 6 .7 7 4 0..2 1 5 1. 3 2 1.2 8 .8 0 3 0.4 7 LnGrp LOS D c.; D A A A A A A Approach Vol, veh/h 65 81 1285 1904 Approach Delay, slveh 52.1 49.6 6.7 7.7 Approach LOS D D A A Vineyard-Goldelm ODPIPDP 2/20/2016 PM -2018 BACKGROUND Synchro 9 Light Report ELB Page 1 Grp Sa_t Flow(s),veltiAn 1287 0 0 1424 0 1583 1774 1770 1583 1774 1770 1583 Q Serve(g_s), s 4.5 0.0 09 0.0 ao 2.8 0.2 21.4 as 0.6 8.2 1.1 Cycle Q DP.ar(g_c), s 7.1 0.0 0.0 2.6 0.0 2.8 0.2 214 0.6 0.6 82 16. 0 1 Prop In Lane 0.59 027 0 1 .86 1.00 1.00 1.00 1.00 . Lane Grp Cap(c), vehin 164 0 0 185 0 138 514 2590 1159 304 2655 1188 VIC Ratio(X) 0.49 0.00 0.00 0.20 090 0.31 0 02 0.57 0.03 0.12 0.31 0.05 Avail Capin a), vet* 310 0 0 326 _ 0 295 580 2590 1159 338 2655 1188 HCM Platoon Ratio 190 1.00 190 1.00 1.00 1.00 1.09 1.00 1.00 1.00 1.00 1.00 Upstream Fated') 1.00 000 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 494 09 0.0 47.0 0.0 47.1 3.8 98 49 95 4.5 39 Inc: Delay (d2), stveh - 2.3 0.0. 0.5 0,0 1.3 0.0 0.9 0.0 0.2 0.3 0.1 Initial Q Delay(d3),s/veh 0.0 09 0.0 0.0 0.0 0.0 00 0.0 09 ao oa ao 'bile BaclsOf_2(50{14),welUln 2.5 0.0 0.0 1.1 00 1.3 0.1 10/ 0.3 03 4.1 05 LnGrp Delay(d),s/veh 51/ 0.0 0.0 47.5 09 48.4 3.8 7.8 4.1 5.7 4.8 3.6 LuGrp LOS D D D A A A A A A Approach Vol, veh/h 81 80 1532 914 Approach Delay, a/vell 51.7 480 7.7 4.7 Approach LOS D Vineyard-Goldelm ODWPDP 2129/2016 AM 4928'BACKGROUND Synchro 9 Light Report ELB Page 1 A A Capacity (veh/h) 358 - 119 HCM Lane V/C Ratio 0.03 - 0.343 HCM Control Delay (s) 15.4 - 50.3 HCM Lane LOS HCM 95th %tile Q(veh) 0.1 - 1.4 -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Vineyard-Goldelm ODP/PDP 2/15/2016 PM Existing - Synctiro 9 Light Report ELB Page 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Ildwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver -34 Mov Cap-2 Maneuver 136 Stage 1 231 Stage 2 311 44. -: Volume exceeds capadty $: Delay exceeds 300s +: Computation Not Defined t: All major volume in platoon Vineyard-Goldelm ODP/PDP 2/15/2016 PM Existing - Synchro 9 Light Report ELB Page 1 1.00 0.00 0.00 1.00 0.00 1.00 . . . . . 48.8 2.0 0.0 0.0 05 0.0 2.0 05 0.0 0.0 0.0 50 0.0 2.0 0.0 0.0 0.9 0.0 12 52.2 0.0 0.0 48.8 05 50.8 D D 1) 64 72 52.2 49.9 D D 1 2 4 5 6 104 863 132 8 4 883 5.5 5.5 5.5 55 55 5.9 68.1 19.5 5.5 68.5 4.2 17.0 7.5 Z4 26.5 0.1 40.8 0.4 0.0 34.8 tt 27 1119 5 2 0 0 1.00 1.00 1.00 1863 1863 29 1203 1 2 0.93 0.93 2 2 263 2600 0.03 0.73 1774 3539 29 1203 1774 1770 OA 15.0 OA 15.0 1.00 263 2600 0.11 0.46 304 2600 1.00 1.00 1.00 1,00 5.7 5.9 02 06 05 0.0 0,2 7.4 5.9 05 A A_ 1258 6.4 A 8 13.2 5.5 19.5 4.7 Lane Configurations Voturne (veh/h) Number Initial Q (0b), veh Ped-Bike Adj(A_pbT) Paridng Bus, Adj Adj Sat Flow, vett/h/In Acq flow Raba, itettfn Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, vehrn Arrive On Green Sat Flow, veh/h Grp Volume(v), velt/h Grp Sat Flow(s),veh/hiln 0 Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cal3(c_a), veb/h HCM Platoon Ratio Upstream Filtac(1) Uniform Delay (d), s/veti 1ncr Delay (d2), slveli Initial Q Delay(d3),s/velt %Ile Bacit010(50%),vetVin LnGrp Delay(d),s/veh Lit-Grp LOS Approach Vol, vehth Approach Delay, sive!). Approach LOS Assigned Phs Phs Duration (G+Y+Ftc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+11), s Green Ext Time (p_c), s HCM 2010 Chi Delay HCM 2010 LOS A Vineyard-Goldelm ODP/PDP 2/15/2016 PM Existing - Synchro 9 Light Report ELB Page 1 805 6.84 5.84 5.84 3.52 82 355 400 452 3.32 2.22 555 748 Vineyard-Goldelm ODP/PDP 2/15/2016 AM Existing - Synchro 9 Light Report ELB Page 1 ELB Page 1 1 0 3 0 11 0 3 293 3 0 6 345 13 689 0 0 0 0 0 42 17 73 1 42 2,211 44 1 762,945 80 5672 0 2 0 2 0 17 12 38 1 27 1,119 24 1 37 1,560 38 2 935 0 0 1 0 Interral Start Time CRESTRIDGE DR SMOKEY ST COLLEGE AVE COLLEGE AVE Eastbound Westbound Northbound Southbound Roiling Pedestrain Crossals U-Turn Left Thru Right U Turn Left Thru Right U-Turn Lett Thru Right U-Turn Left Thru Right Total Hour West East South North U-Turn Left That Right 700 00 AM 0 6 0 0 7.15:00 AM 0 2 0 1 SMOKEY ST COLLEGE AVE COLLEGE AVE Westbound Northbound Southbound Rotting Pedestrdin Crossings U-Turn Left Thru Right U-Turn Left Thai Right U-Turn Left Thru Right Total Haw West East South North 0 0 0 1 0 0 329 3 0 3 129 4 475 2,327 0 0 0 0 0 0 0 1 0 2 369 5 0 7 178 3 568 2,456 0 0 U0