August 17, 2017
Ryan Sagar
LRK Consulting, LLC
1196 Grant St., Unit 313
Denver, CO 80203
RE: FTC CHIPPERS SC, PDP170027, Round Number 1
Comment Summary:
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
08/14/2017: Generally, an Ecological Characterization Study (ECS) is required by
Section 3.4.1 (D)(1) as the site is within 500 feet of a known natural habitats and
features (New Mercer Canal and associated habitat). However, as there is
intervening infrastructure between the feature and this property the ECS is waived
for this site.
Comment Number: 1 Comment Originated: 08/14/2017
08/14/2017: If landscape updates are required with this development: note City of
Fort Collins Land Use Code [Section 3.2.1 (E)(3)], requires that to the extent
reasonably feasible, all plans be designed to incorporate water conservation
materials and techniques. This includes use of low-water-use plants and grasses in
landscaping or re-landscaping and reducing bluegrass lawns as much as possible.
Native plants and wildlife-friendly (ex: pollinators, butterflies, songbirds) landscaping
and maintenance are also encouraged. Please refer to the Fort Collins Native Plants
document available online and published by the City of Fort Collins Natural Areas
Department for guidance on native plants is:
http://www.fcgov.com/naturalareas/pdf/nativeplants2013.pdf. Also see the City of
Fort Collins Plant List : https://www.fcgov.com/forestry/plant_list.pdf.
Comment Number: 2 Comment Originated: 08/14/2017
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Kai Kleer, at
970-416-4284 or kkleer@fcgov.com.
Page 1 of 6
08/14/2017: If lighting updates will be incorporated into this development: note that
especially for LED light fixtures, cooler color temperatures are harsher at night and
cause more disruption to circadian (biological) rhythms for both humans and wildlife.
Warmer color temperature (warm white, 3000K or less) for any LED light fixtures is
preferred. Please also consider fixtures with dimming capabilities so that light levels
can be adjusted as needed. Site light sources shall be fully shielded and
down-directional to minimize up-light, light spillage and glare [see LUC 3.2.4(D)(3)].
For further information regarding health effects please see:
http://darksky.org/ama-report-affirms-human-health-impacts-from-leds/
Comment Number: 3 Comment Originated: 08/14/2017
08/14/2017: If any trees are to be impacted during construction or as part of this
development: note LUC Section 3.2.1(C) requiring developments to submit a
landscape and tree protection plan, and if receiving water service from the City, an
irrigation plan, that: "...(4) protects significant trees, natural systems, and habitat,
and (5) enhances the pedestrian environment.” Note that a significant tree is defined
as a tree having DBH (Diameter at Breast Height) of six inches or more. If any of
the trees within this site have a DBH of greater than six inches, a review of the trees
shall be conducted with Tim Buchanan, City Forester (970-221-6361 or
tbuchanan@fcgov.com) to determine the status of the existing trees and any
mitigation requirements that could result from the proposed development.
Comment Number: 4 Comment Originated: 08/14/2017
Department: Internal Services
Contact: Sarah Carter, 970-416-2748, scarter@fcgov.com
Topic: Building Insp Plan Review
08/11/2017: Construction shall comply with adopted codes as amended. Current
adopted codes are:
2015 International Building Code (IBC)
2015 International Residential Code (IRC)
2015 International Energy Conservation Code (IECC)
2015 International Mechanical Code (IMC)
2015 International Fuel Gas Code (IFGC)
2015 International Plumbing Code (IPC) as amended by the State of Colorado
2017 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com/building web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2017.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 129vult or 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Comment Number: 1 Comment Originated: 08/11/2017
Department: Light And Power
Contact: Coy Althoff, 970-224-6150, CAlthoff@fcgov.com
Topic: General
08/15/2017: Light & Power has existing facilities in this area that could be utilized to
service this type of a commercial service. There is a 150 kVA pad-mount
transformer to the N.W. of the proposed location and there is also a 300 kVA
pad-mount transformer to the S.W. of the proposed location.
Comment Number: 1 Comment Originated: 08/15/2017
Page 2 of 6
08/15/2017: Please note that with regard to commercial services, Light & Power is
not responsible for the secondary electric system. If you haven't already, you will
need to engage an electrical engineering firm/ contractor to perform the design work
and then coordinate with Light & Power engineering and metering dept.
Comment Number: 2 Comment Originated: 08/15/2017
08/15/2017: Any changes to the existing electric capacity and or location will initiate
system modification charges. Please coordinate power requirements with Light and
Power Engineering at 221-6700.
Comment Number: 3 Comment Originated: 08/15/2017
08/15/2017: Please provide a one line diagram and a C-1 form to Light and Power
Engineering. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
Comment Number: 4 Comment Originated: 08/15/2017
08/15/2017: As your project begins to move forward please contact Light and
Power Engineering to coordinate the transformer and electric meter locations,
please show the locations on the utility plans.
Comment Number: 5 Comment Originated: 08/15/2017
08/15/2017: You may contact FCU Light & Power, project engineering if you have
questions. (970) 221-6700. You may reference Light & Power¿s Electric Service
Standards at
http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_F
INAL_18November2016_Amendment.pdf
You may reference our policies, development charge processes, and use our fee
estimator at http://www.fcgov.com/utilities/business/builders-and-developers.
Comment Number: 6 Comment Originated: 08/15/2017
Department: PFA
Contact: Cal Sheesley, 970-416-2599, csheesley@poudre-fire.org
Topic: General
08/15/2017: FIRE LANES
Fire access is required to within 150' of all exterior portions of any building or facility
as measured by an approved route around the perimeter. When measured from
McClelland, the proposed communications site meets access requirements.
Code language follows:
> IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building or
portion of a building hereafter constructed or moved into or within the jurisdiction.
The fire apparatus access road shall comply with the requirements of this section
and shall extend to within 150 feet of all portions of the facility and all portions of the
exterior walls of the first story of the building as measured by an approved route
around the exterior of the building or facility. When any portion of the facility or any
portion of an exterior wall of the first story of the building is located more than 150
feet from fire apparatus access, the fire code official is authorized to increase the
dimension if the building is equipped throughout with an approved, automatic
fire-sprinkler system.
Comment Number: 1 Comment Originated: 08/15/2017
Page 3 of 6
08/15/2017: WATER SUPPLY
Hydrant spacing and flow must meet minimum requirements based on type of
occupancy. A hydrant is required within 300' of any Commercial Building as
measured along an approved path of vehicle travel. The proposed communications
site appears to be located 500' from the nearest hydrant located at the northwest
Mason and Horsetooth. Due to the scope and nature of the development, water
supply requirements will not be enforced on this project.
Code language follows:
COMMERCIAL REQUIREMENTS
> IFC 507.5 and PFA Policy: Hydrants to provide 1,500 gpm at 20 psi residual
pressure, spaced not further than 300 feet to the building, on 600-foot centers
thereafter
Comment Number: 2 Comment Originated: 08/15/2017
08/15/2017: PREMISE IDENTIFICATION: ADDRESS POSTING & WAYFINDING
The address shall be posted on the proposed structure to aid in wayfinding. Per
Google Earth, it is unclear if signage requirements have been met an additional
signage may be deemed necessary at time of inspection.
Code language follows:
> IFC 505.1: New and existing buildings shall have approved address numbers,
building numbers or approved building identification placed in a position that is plainly
legible, visible from the street or road fronting the property, and posted with a
minimum of six-inch numerals on a contrasting background. Where access is by
means of a private road and the building cannot be viewed from the public way, a
monument, pole or other sign or means shall be used to identify the structure.
Comment Number: 3 Comment Originated: 08/15/2017
Department: Planning Services
Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com
Topic: Building Elevations
08/16/2017:
Several correctins need to be made on the Proposed South Elevation. See
corrections on plan set.
Comment Number: 4 Comment Originated: 08/16/2017
08/16/2017:
Fence cannot exceed six feet in height . Please reduce height. (3.8.13(C)(5).
Comment Number: 6 Comment Originated: 08/16/2017
Topic: General
08/16/2017:
Can the equipment be located in-ground? This would eliminate the need for a fence
and the majority of landscaping.
Comment Number: 7 Comment Originated: 08/16/2017
Page 4 of 6
08/16/2017:
This proposal does not employ "stealth" technology. It will be required to locate the
antenna inside the light pole. If unable to do on existing pole, a new one may be
erected on the same location of the existing pole. The antenna should be
seamlessly integrated with the pole and maintain the previous height of the existing
structure. If replacement of the light pole is required please ensure that the light
fixture meets all requirements outlined in code section 3.2.4.
Comment Number: 8 Comment Originated: 08/16/2017
08/16/2017:
With respect to a wireless telecommunication facility that is a tower or a monopole,
the setback of the facility from the property lines shall be one (1) foot for every foot of
height. However, to the extent that it can be demonstrated that the structure will
collapse rather than topple, this requirement can be waived by the Director. In
addition, the setbacks for ground-mounted wireless telecommunication equipment
shall be governed by the setback criteria established in Articles 3 and/or 4.
Comment Number: 9 Comment Originated: 08/16/2017
Topic: Landscape Plans
08/16/2017:
Please include a complete landscape plan. There are existing plants missing from
this view (shrubs). Landscape screening is required; see comments to follow.
Comment Number: 1 Comment Originated: 08/16/2017
08/16/2017:
Coniferous landscaping needed around the base of fence. (3.8.13(C)(4)
Comment Number: 5 Comment Originated: 08/16/2017
Topic: Site Plan
08/16/2017:
Fence needs to be setback from the concrete curb so that car doors can swing
open when using the space.
After the Staff Review Meeting it was discussed that the equipment could potentially
be moved to the center of the landscape island so that the fence may only obstruct
where the nose of the vehicle would be located.
Comment Number: 2 Comment Originated: 08/16/2017
08/16/2017:
Because we are asking for coniferous plants around the base of the fence, will it be
possible to reduce the size of the enclosure? If not, please provide explanation.
Comment Number: 3 Comment Originated: 08/16/2017
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
08/02/2017: The proposed site changes shown in this submittal are not substantial
enough to trigger Stormwater requirements; therefore, no requirements apply at this
time. If future submittals include site or grading changes that are not shown on
these plans, please contact Dan Mogen in Water Utilities Engineering at
(970)224-6192 or dmogen@fcgov.com to coordinate and determine what
requirements, if any, will apply.
Comment Number: 1 Comment Originated: 08/02/2017
Department: Technical Services
Page 5 of 6
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
08/15/2017: All plan sheets must be 24"x36".
Comment Number: 1 Comment Originated: 08/15/2017
08/15/2017: A legal description of the property where this equipment is located will
need to be added to sheet T1.
Comment Number: 2 Comment Originated: 08/15/2017
08/15/2017: Some of the sheet titles in the sheet index do not match the sheet titles
on the noted sheets. See redlines.
Comment Number: 3 Comment Originated: 08/15/2017
08/15/2017: There are line over text issues. See redlines.
Comment Number: 4 Comment Originated: 08/15/2017
08/15/2017: There is text that needs to be rotated 180°. See redlines.
Comment Number: 5 Comment Originated: 08/15/2017
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com
Topic: General
08/16/2017: Transfort is interested in obtaining a pedestrian easement through this
property to allow access to the transit facility to the west of this proposal. Please
contact Seth Lorson to follow up. Email- slorson@fcgov.com Phone- 970-416-4320
Comment Number: 1 Comment Originated: 08/16/2017
08/16/2017: The anticipated change in traffic volume is not expected to rise to the
threshold of needing a TIS. Based on section 4.2.3.D of LCUASS, the Traffic Impact
Study requirement can be waived.
Comment Number: 2 Comment Originated: 08/16/2017
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
08/15/2017: The antenna mounted on the outside of the existing pole is not stealth.
The antenna needs to be mounted inside a pole so it is concealed.
Comment Number: 1 Comment Originated: 08/15/2017
08/15/2017: Where is the landscape plan?
Comment Number: 2 Comment Originated: 08/15/2017
Page 6 of 6