HomeMy WebLinkAboutSPIRIT AT THE RIVER (FORMERLY LINCOLN CORRIDOR HOTEL) - PDP - PDP170026 - SUBMITTAL DOCUMENTS - ROUND 3 - UTILITY PLANSREVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
COVER SHEET R
FORT COLLINS, CO 2017
10/30/2017
017-0150
SPIRIT AT THE RIVER HOTEL
MM
C_TTL_0170150.dwg
MM
EM
C1.0
PRELIMINARY DESIGN PLANS
EM
VICINITY MAP
SCALE 1"=500'
UTILITY PLANS FOR
SPIRIT AT THE RIVER HOTEL
LOT 1, BALDWIN MINOR SUBDIVISION
LOCATED IN THE SOUTHEAST QUARTER OF SECTION 12, TOWNSHIP 7
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
GENERAL NOTES R
FORT COLLINS, CO 2017
10/30/2017
017-0150
SPIRIT AT THE RIVER HOTEL
MM
C_TTL_0170150.dwg
MM
EM
C1.1
PRELIMINARY DESIGN PLANS
EM
1. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS
ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR
BEFORE ANY CUTS ARE MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS. THE
FINISHED PATCH SHALL BLEND IN SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT
LAY-DOWN MACHINE. IN STREETS WHERE MORE THAN ONE CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE
PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY
MAJOR CONTOURS
MINOR CONTOURS
LEGEND
EXISTING PROPOSED
PROPERTY LINE
FLOWLINE
BACK OF CURB
EASEMENT
SETBACK LINE
STORM MANHOLE
STORM SEWER
INVERTED CROWN
WATER LINE
SANITARY SEWER
FIRE HYDRANT
SIGN
LIGHT POLE
WATER VALVE
BUILDING
FENCE
ASPHALT PAVEMENT
CONCRETE PAVEMENT
BENCHMARK
BASIS OF BEARING
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
LEGEND
EXISTING PROPOSED
PROPERTY LINE
FLOWLINE
BACK OF CURB
EASEMENT
SETBACK LINE
PARKING STALL COUNT PER ROW
OVERHEAD POWER
CONCRETE SIDEWALK
HEAVY DUTY CONCRETE
PAVEMENT
GRASS LANDSCAPING
BUILDING
FENCE
STANDARD DUTY CONCRETE
PAVEMENT
NATURAL HABITAT BUFFER ZONE
BENCHMARK
BASIS OF BEARING
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
LEGEND
EXISTING PROPOSED
PROPERTY LINE
FLOWLINE
BACK OF CURB
EASEMENT
SETBACK LINE
PARKING STALL COUNT PER ROW
OVERHEAD POWER
CONCRETE SIDEWALK
HEAVY DUTY CONCRETE
PAVEMENT
GRASS LANDSCAPING
BUILDING
FENCE
STANDARD DUTY CONCRETE
PAVEMENT
NATURAL HABITAT BUFFER ZONE
BENCHMARK
BASIS OF BEARING
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
LEGEND
EXISTING PROPOSED
PROPERTY LINE
FLOWLINE
BACK OF CURB
EASEMENT
SETBACK LINE
MAJOR CONTOURS
MINOR CONTOURS
STORM SEWER
SPOT ELEVATION
FLOW ARROW
FINISH FLOOR ELEVATION
HIGH POINT
LOW POINT
GRADE BREAK
FFE
HP
LP
ROADWAY CENTERLINE
SIDEWALK SW
FLOWLINE FL
STORM MANHOLE
GRATE INLET
WATER LINE
SANITARY SEWER
MATCH EXISTING GRADE MEG
BOTTOM OF WALL BOW
TOP OF POND TOP
BENCHMARK
BASIS OF BEARING
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
LEGEND
EXISTING PROPOSED
PROPERTY LINE
FLOWLINE
BACK OF CURB
EASEMENT
SETBACK LINE
MAJOR CONTOURS
MINOR CONTOURS
STORM SEWER
SPOT ELEVATION
FLOW ARROW
FINISH FLOOR ELEVATION
HIGH POINT
LOW POINT
GRADE BREAK
FFE
HP
LP
INVERTED CROWN
SIDEWALK SW
FLOWLINE FL
STORM MANHOLE
GRATE INLET
WATER LINE
SANITARY SEWER
MATCH EXISTING GRADE MEG
BOTTOM OF WALL BOW
TOP OF WALL TOW
BOTTOM OF POND BOP
TOP OF BERM TOB
BENCHMARK
BASIS OF BEARING
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
LEGEND
EXISTING PROPOSED
PROPERTY LINE
FLOWLINE
BACK OF CURB
EASEMENT
SETBACK LINE
STORM SEWER
WATER LINE
SANITARY SEWER
WATER METER
GAS LINE
UNDERGROUND ELECTRIC
STORM MANHOLE
GRATE INLET
WATER VALVE
SANITARY CLEANOUT
NATURAL HABITAT BUFFER ZONE
BENCHMARK
BASIS OF BEARING
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
UTILITY PLAN R
FORT COLLINS, CO 2017
10/30/2017
017-0150
SPIRIT AT THE RIVER HOTEL
MM
C_UTL_0170150.dwg
MM
EM
C8.0
PRELIMINARY DESIGN PLANS
EM
NOTES
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
ENVIRONMENTAL PLANNER
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
POND GRADING PLAN R
FORT COLLINS, CO 2017
10/30/2017
017-0150
SPIRIT AT THE RIVER HOTEL
MM
C_PONDGRD_0170150.dwg
MM
EM
C6.1
PRELIMINARY DESIGN PLANS
EM
NOTES
SECTION A-A AND B-B
TRAIL TYPICAL SECTION
NTS
SECTION NOTES
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
ENVIRONMENTAL PLANNER
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
GRADING AND DRAINAGE PLAN R
FORT COLLINS, CO 2017
10/30/2017
017-0150
SPIRIT AT THE RIVER HOTEL
MM
C_GRD_0170150.dwg
MM
EM
C6.0
PRELIMINARY DESIGN PLANS
EM
NOTES
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
ENVIRONMENTAL PLANNER
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
DIMENSION PLAN R
FORT COLLINS, CO 2017
10/30/2017
017-0150
SPIRIT AT THE RIVER HOTEL
MM
C_DIM_0170150.dwg
MM
EM
C3.1
PRELIMINARY DESIGN PLANS
EM
NOTES
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
ENVIRONMENTAL PLANNER
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
SITE PLAN R
FORT COLLINS, CO 2017
10/30/2017
017-0150
SPIRIT AT THE RIVER HOTEL
MM
C_STE_0170150.dwg
MM
EM
C3.0
PRELIMINARY DESIGN PLANS
EM
NOTES
KEYNOTE TABLE
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
EXISTING CONDITIONS AND DEMOLITION PLAN R
FORT COLLINS, CO 2017
10/30/2017
017-0150
SPIRIT AT THE RIVER HOTEL
MM
C_EXC_70150.dwg
MM
EM
C2.1
PRELIMINARY DESIGN PLANS
EM
NOTES
KEYNOTE TABLE
EASEMENT TABLE
ENGINEER AND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE CUTS ARE MADE.
2. UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN,
THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS.
3. STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL “T” INTERSECTIONS.
4. AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE
FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE.
5. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS, INCLUDING
STORM DRAINAGE STRUCTURES AND PIPES, FOR THE FOLLOWING PRIVATE STREETS: (N/A).
CITY OF FORT COLLINS GENERAL NOTE
1. THE EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO ANY CONSTRUCTION ON THIS
SITE.
2. THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED PLANS.
3. ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY
(STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE
APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS,
AND EROSION CONTROL REPORT.
4. AT ALL TIMES DURING CONSTRUCTION, THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION
INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO
BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN.
5. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING
VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST
PRACTICAL PERIOD OF TIME.
6. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.)
SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER
PERMANENT EROSION CONTROL BMPS ARE INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTSOF-WAY SHALL REMAIN
EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION
CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE LOCAL ENTITY.
7. IN ORDER TO MINIMIZE EROSION POTENTIAL, ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES SHALL:
a. BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) WEEKS AND AFTER EACH SIGNIFICANT STORM EVENT AND REPAIRED OR
RECONSTRUCTED AS NECESSARY IN ORDER TO ENSURE THE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION.
b. REMAIN IN PLACE UNTIL SUCH TIME AS ALL THE SURROUNDING DISTURBED AREAS ARE SUFFICIENTLY STABILIZED AS DETERMINED BY
THE EROSION CONTROL INSPECTOR.
c. BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR.
8. WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEAN UP AND
REMOVAL OF ALL SEDIMENT AND DEBRIS FROM ALL DRAINAGE INFRASTRUCTURE AND OTHER PUBLIC FACILITIES.
9. THE CONTRACTOR SHALL CLEAN UP ANY INADVERTENT DEPOSITED MATERIAL IMMEDIATELY AND MAKE SURE STREETS ARE FREE OF ALL
MATERIALS BY THE END OF EACH WORKING DAY.
10. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER
AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY WATERS OF THE UNITED STATES.
11. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT
BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (30) DAYS SHALL
BE SEEDED AND MULCHED.
12. THE STORMWATER VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM SEWER LINES WILL BE CLEANED UPON
COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE OVER TO THE LOCAL ENTITY OR HOMEOWNERS ASSOCIATION
(HOA).
13. CITY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (CDPS) REQUIREMENTS MAKE IT UNLAWFUL TO DISCHARGE OR ALLOW
THE DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER FROM CONSTRUCTION SITES. POLLUTANTS INCLUDE, BUT ARE NOT
LIMITED TO DISCARDED BUILDING MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, OIL AND GAS PRODUCTS, LITTER, AND SANITARY
WASTE. THE DEVELOPER SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND
DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
14. A DESIGNATED AREA SHALL BE PROVIDED ON SITE FOR CONCRETE TRUCK CHUTE WASHOUT. THE AREA SHALL BE CONSTRUCTED SO AS
TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST FIFTY (50) FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION. UPON
COMPLETION OF CONSTRUCTION ACTIVITIES THE CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND PROPERLY DISPOSED OF
PRIOR TO THE AREA BEING RESTORED.
15. TO ENSURE THAT SEDIMENT DOES NOT MOVE OFF OF INDIVIDUAL LOTS ONE OR MORE OF THE FOLLOWING SEDIMENT/EROSION CONTROL
BMPS SHALL BE INSTALLED AND MAINTAINED UNTIL THE LOTS ARE SUFFICIENTLY STABILIZED, AS DETERMINED BY THE EROSION CONTROL
INSPECTOR, (WITHIN LOVELAND GMA AND CITY LIMITS ONLY).
a. BELOW ALL GUTTER DOWNSPOUTS.
b. OUT TO DRAINAGE SWALES.
c. ALONG LOT PERIMETER.
d. OTHER LOCATIONS, IF NEEDED.
16. CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE
DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AS DIRECTED BY THE CITY/COUNTY.
17. A VEHICLE TRACKING CONTROL PAD SHALL BE INSTALLED WHEN NEEDED FOR CONSTRUCTION EQUIPMENT, INCLUDING BUT NOT LIMITED
TO PERSONAL VEHICLES EXITING EXISTING ROADWAYS. NO EARTHEN MATERIALS, I.E. STONE, DIRT, ETC. SHALL BE PLACED IN THE CURB &
GUTTER OR ROADWAY AS A RAMP TO ACCESS TEMPORARY STOCKPILES, STAGING AREAS, CONSTRUCTION MATERIALS, CONCRETE
WASHOUT AREAS, AND/OR BUILDING SITES.
STANDARD GRADING AND EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES
1. ALL STREET CONSTRUCTION IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS AS WELL AS THE STREET
IMPROVEMENTS NOTES LISTED HERE.
2. A PAVING SECTION DESIGN, SIGNED AND STAMPED BY A COLORADO LICENSED ENGINEER, MUST BE SUBMITTED TO THE LOCAL ENTITY
ENGINEER FOR APPROVAL, PRIOR TO ANY STREET CONSTRUCTION ACTIVITY, (FULL DEPTH ASPHALT SECTIONS ARE NOT PERMITTED AT A
DEPTH GREATER THAN 8 INCHES OF ASPHALT). THE JOB MIX SHALL BE SUBMITTED FOR APPROVAL PRIOR TO PLACEMENT OF ANY
ASPHALT.
3. WHERE PROPOSED PAVING ADJOINS EXISTING ASPHALT, THE EXISTING ASPHALT SHALL BE SAW CUT, A MINIMUM DISTANCE OF 12 INCHES
FROM THE EXISTING EDGE, TO CREATE A CLEAN CONSTRUCTION JOINT. THE DEVELOPER SHALL BE REQUIRED TO REMOVE EXISTING
PAVEMENT TO A DISTANCE WHERE A CLEAN CONSTRUCTION JOINT CAN BE MADE. WHEEL CUTS SHALL NOT BE ALLOWED UNLESS
APPROVED BY THE LOCAL ENTITY ENGINEER IN LOVELAND.
4. STREET SUBGRADES SHALL BE SCARIFIED THE TOP 12 INCHES AND RE-COMPACTED PRIOR TO SUBBASE INSTALLATION. NO BASE
MATERIAL SHALL BE LAID UNTIL THE SUBGRADE HAS BEEN INSPECTED AND APPROVED BY THE LOCAL ENTITY ENGINEER.
5. FT. COLLINS ONLY. VALVE BOXES AND MANHOLES ARE TO BE BROUGHT UP TO GRADE AT THE TIME OF PAVEMENT PLACEMENT OR
OVERLAY. VALVE BOX ADJUSTING RINGS ARE NOT ALLOWED.
6. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS
ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE INSPECTOR BEFORE ANY CUTS ARE MADE.
CUTTING AND PATCHING SHALL BE DONE IN CONFORMANCE WITH CHAPTER 25, RECONSTRUCTION AND REPAIR. THE FINISHED PATCH
SHALL BLEND SMOOTHLY INTO THE EXISTING SURFACE. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY
THE LOCAL ENTITY ENGINEER. ALL OVERLAY WORK SHALL BE COORDINATED WITH ADJACENT LANDOWNERS SUCH THAT FUTURE
PROJECTS DO NOT CUT THE NEW ASPHALT OVERLAY WORK.
7. ALL TRAFFIC CONTROL DEVICES SHALL BE IN CONFORMANCE WITH THESE PLANS OR AS OTHERWISE SPECIFIED IN M.U.T.C.D. (INCLUDING
COLORADO SUPPLEMENT) AND AS PER THE RIGHT-OF-WAY WORK PERMIT TRAFFIC CONTROL PLAN.
8. THE DEVELOPER IS REQUIRED TO PERFORM A GUTTER WATER FLOW TEST IN THE PRESENCE OF THE LOCAL ENTITY INSPECTOR AND
PRIOR TO INSTALLATION OF ASPHALT. GUTTERS THAT HOLD MORE THAN ¼ INCH DEEP OR 5 FEET LONGITUDINALLY, OF WATER, SHALL BE
COMPLETELY REMOVED AND RECONSTRUCTED TO DRAIN PROPERLY.
9. PRIOR TO PLACEMENT OF H.B.P. OR CONCRETE WITHIN THE STREET AND AFTER MOISTURE/DENSITY TESTS HAVE BEEN TAKEN ON THE
SUBGRADE MATERIAL (WHEN A FULL DEPTH SECTION IS PROPOSED) OR ON THE SUBGRADE AND BASE MATERIAL (WHEN A COMPOSITE
SECTION IS PROPOSED), A MECHANICAL "PROOF ROLL" WILL BE REQUIRED. THE ENTIRE SUBGRADE AND/OR BASE MATERIAL SHALL BE
ROLLED WITH A HEAVILY LOADED VEHICLE HAVING A TOTAL GVW OF NOT LESS THAN 50,000 LBS. AND A SINGLE AXLE WEIGHT OF AT LEAST
18,000 LBS. WITH PNEUMATIC TIRES INFLATED TO NOT LESS THAN 90 P.S.I.G. “PROOF ROLL” VEHICLES SHALL NOT TRAVEL AT SPEEDS
GREATER THAN 3 M.P.H. ANY PORTION OF THE SUBGRADE OR BASE MATERIAL WHICH EXHIBITS EXCESSIVE PUMPING OR DEFORMATION,
AS DETERMINED BY THE LOCAL ENTITY ENGINEER, SHALL BE REWORKED, REPLACED OR OTHERWISE MODIFIED TO FORM A
SMOOTH, NON-YIELDING SURFACE. THE LOCAL ENTITY ENGINEER SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO THE “PROOF
ROLL.” ALL “PROOF ROLLS” SHALL BE PERFORMED IN THE PRESENCE OF AN INSPECTOR.
STREET IMPROVEMENT NOTES
1. ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC
SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE.
2. ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC.
3. ALL SIGNAGE SHALL BE PER LOCAL ENTITY STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD.
4. ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS.
5. ALL LANE LINES FOR CONCRETE PAVEMENT SHOULD BE EPOXY PAINT.
6. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE
DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE LOCAL ENTITY ENGINEER PRIOR
TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS.
7. PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS.
8. EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
9. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS.
10. ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS.
11. A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE LOCAL ENTITY ENGINEER. ALL
DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN.
12. THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES.
13. SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN.
14. SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE
WARRANTY PERIOD, THE LOCAL ENTITY ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE
LOCAL ENTITY ENGINEER DETERMINES THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR
THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD
FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS).
15. SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR
ADDITIONAL DETAIL.
TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES
1. THE CITY OF FORT COLLINS SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE
PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S).
2. ALL RECOMMENDATIONS OF THE FOOTHILLS REDEVELOPMENT FINAL DRAINAGE AND EROSION CONTROL STUDY PREPARED DECEMBER 5,
2013 BY R.A. SMITH NATIONAL, INC. SHALL BE FOLLOWED AND IMPLEMENTED. ALL RECOMMENDATIONS OF THE MAJOR AMENDMENT TO A
PORTION OF FOOTHILLS MALL REDEVELOPMENT PLANNING AREA 3 (LOTS 3, 4, 5, AND 6 OF FOOTHILLS MALL REDEVELOPMENT) FINAL
DRAINAGE AND EROSION CONTROL STUDY PREPARED FOR DECEMBER 18, 2015 BY OLSSON ASSOCIATES SHALL BE FOLLOWED AND
IMPLEMENTED.
3. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE CITY OF FORT COLLINS, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A
REGISTERED ENGINEER, MUST BY SUBMITTED TO AND APPROVED BY THE STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE
SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF
OCCUPANCY FOR SINGLE FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BY SUBMITTED TO THE STORMWATER
UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR
TO CERTIFICATION PER THE DEVELOPMENT AGREEMENT.
4. CERTIFYING ENGINEER SHALL BE PRESENT TO OBSERVE THE CONSTRUCTION OF THE STORM DRAINAGE IMPROVEMENTS. CONTRACTOR
TO COORDINATE WITH CERTIFYING ENGINEER.
5. CONTRACTOR SHALL COMPLETE DURING CONSTRUCTION INSPECTION CHECKLIST.
6. CERTIFYING ENGINEER SHALL COMPLETE THE THE OVERALL SITE AND DRAINAGE CERTIFICATION FORM AND CHECKLIST AND
CERTIFICATIONS OF LOT GRADING.
7. AS-BUILT SURVEY OF GRADING, DRAINAGE IMPROVEMENTS, AND DRAINAGE FACILITIES SHALL BE COMPLETED. SURVEY TO COORDINATE
WITH CERTIFYING ENGINEER.
8. ALL STORMWATER AND UNDERDRAIN PIPE SHALL BE ADS N-12 ST IB OR EQUIVALENT. PIPE SHALL BE INSTALLED PER MANUFACTURES
RECOMMENDATIONS.
STORM DRAINAGE NOTES
1. THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS
AND APPROVED BY THE WATER UTILITY.
2. ALL WATER MAINS TO BE INSTALLED AND TESTED PER CITY OF FORT COLLINS SPECIFICATIONS.
3. ALL WATER SERVICES SHALL BE INSTALLED PER CITY OF FORT COLLINS WATER METER INSTALLATION PROCEDURES AND SPECIFICATION
2646 "SERVICE LINES, METERS, AND APPURTENANCES."
4. CONTRACTOR TO COORDINATE WET TAPS & ABANDOMENTS WITH CITY OF FORT COLLINS (970-416-2165).
5. ABANDON WATER SERVICES SHALL BE REMOVED TO THE MAIN. REMOVE CURB STOP BOXES FROM ABANDONED WATER SERVICES.
6. ALL WATER MAINS SHALL BE PVC C900 PRESSURE CLASS 150
7. ALL WATER MAINS SHALL BE INSTALLED WITH TRACER WIRE.
8. ALL WATER MAIN VALVES SHALL HAVE VALVE BLOCKING. SEE DETAILS.
9. ALL FIRE LINES SHALL BE PVC C900 PRESSURE CLASS 150.
10. ALL SERVICES SHALL BE TYPE K COPPER.
WATERLINE NOTES
1. MOISTURE DENSITY TESTS: TESTS SHALL BE CONDUCTED ON REPRESENTATIVE SAMPLES OF EACH TYPE OF MATERIAL ENCOUNTERED
OR UTILIZED.
2. COMPACTION CONTROL: FIELD TESTS SHALL BE CONDUCTED TO DETERMINE COMPLIANCE WITH PROJECT REQUIREMENTS AND
GEOTECHNICAL REPORT.
3. ALL MATERIAL TESTS SHALL BE MADE BY THE GEOTECHNICAL ENGINEER. QUANTITY AND LOCATIONS SHALL BE AT THE DIRECTION OF THE
GEOTECHNICAL ENGINEER.
4. DENSITY TESTS SHALL BE TAKEN IN COMPACTED MATERIAL BELOW THE DISTURBED SURFACE. WHEN DENSITY TESTS INDICATE THAT THE
DRY DENSITY OR MOISTURE CONTENT OF ANY LAYER OF FILL OR PORTION THEREOF IS BELOW THAT REQUIRED, THE PARTICULAR LAYER
OR PORTION SHALL BE REWORKED UNTIL THE REQUIRED DRY DENSITY OR MOISTURE CONTENT HAS BEEN ACHIEVED.
5. UNLESS OTHERWISE DIRECTED BY GEOTECHNICAL ENGINEER, COMPACTION SHALL BE MINIMUM OF 95% OF OPTIMUM DENSITY, IN
ACCORDANCE WITH ASTM D 698, AT A MOISTURE CONTENT OF NOT LESS THAN 2% BELOW AND NOT MORE THAN 2% ABOVE THE OPTIMUM
MOISTURE CONTENT.
6. PARKING SUBGRADE SHALL BE PROOF ROLLED TO DETECT ANY AREAS OF INSUFFICIENT COMPACTION. PROOF ROLLING SHALL BE
ACCOMPLISHED BY MAKING A MINIMUM OF TWO (2) COMPLETE PASSES WITH A FULLY LOADED TANDEM AXLE DUMP TRUCK, OR APPROVED
EQUIVALENT, IN EACH OF THE TWO PERPENDICULAR DIRECTIONS UNDER THE SUPERVISION AND DIRECTION OF THE GEOTECHNICAL
ENGINEER. AREAS OF FAILURE SHALL BE SCARIFIED, RECOMPACTED, AND RETESTED.
7. REFERENCE GEOTECHNICAL REPORT PREPARED BY XX, DATED XX XX, XXXX.
QUALITY CONTROL NOTES
1. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR.
2. ALL REPAIRS AND REPLACEMENT OF SIDEWALK, CURB, GUTTER AND ASPHALT SHALL BE IN ACCORDANCE WITH CITY STREET REPAIR
STANDARDS.
3. FOR LOCATIONS WHERE SERVICES ARE SHOWN UNDER SIDEWALK, SIDEWALK SHALL BE REMOVED AND REPLACED.
4. PERMIT(S) FOR ALL WORK SHOWN ON THESE PLANS SHALL BE OBTAINED PRIOR TO THE START OF ANY WORK SHOWN ON THESE PLANS.
5. CLEANOUTS LOCATED WITHIN SIDEWALK OR DRIVEWAY SHALL HAVE A TRAFFIC RATED LID.
6. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND
GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY
OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR
PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.
GENERAL UTILITY NOTES
1. ALL SEWER MAINS AND SERVICES TO BE INSTALLED PER CITY OF FORT COLLINS SPECIFICATIONS.
2. CONTRACTOR TO COORDINATE WET TAPS & ABANDOMENTS WITH CITY OF FORT COLLINS (970-416-2165).
3. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE PVC SDR 35.
SANITARY SEWER NOTES
NORTH, RANGE 69 WEST OF THE 6TH P.M. CITY OF FORT COLLINS,
COUNTY OF LARIMER, STATE OF COLORADO
PROJECT TEAM CONTACTS
ARCHITECT
PBA STUDIO
1575 GILPIN STREET
DENVER, CO 80218
CONTACT: EDWIN MOCKE
PHONE: (720) 376-6853
CIVIL ENGINEER
OLSSON ASSOCIATES
1880 FALL RIVER DRIVE, SUITE 200
LOVELAND, CO 80538
CONTACT: MIKE MAURER
PHONE: (970) 461-7733
SURVEYOR
OLSSON ASSOCIATES
4690 TABLE MOUNTAIN DRIVE, SUITE 200
GOLDEN, CO 80403
CONTACT: JUSTIN SCHEITLER
PHONE: (303) 237-2072
OLSSON ASSOCIATES GENERAL NOTES:
LANDSCAPE ARCHITECT
RUSSELL + MILLS STUDIOS
141 SOUTH COLLEGE AVE, SUITE 104
FORT COLLINS, CO 80524
CONTACT: SHELLEY LA MASTRA
PHONE: (970) 484-8855
BEARINGS ARE BASED ON THE NORTH LINE OF THE
SOUTHWEST PORTION OF SUBJECT PROPERTY BEING
MONUMENTED AT THE WEST END BY A FOUND NUMBER 4
REBAR WITH AN ILLEGIBLE YELLOW PLASTIC CAP, FROM
WHICH THE EAST END OF SAID LINE BEARS S89°57'00"E, A
DISTANCE OF 170.00 FEET, BEING MONUMENTED BY A FOUND
BENT NUMBER 4 REBAR.
SITE BENCHMARK: A CHISELED "X" (POINT #100) SET AT THE
NORTH EDGE OF WALK LOCATED NEAR THE NORTHEASTERLY
CORNER OF PROJECT ALONGSIDE AND SOUTH OF EAST
LINCOLN AVENUE EL=4950.07' (NAVD88)
PROPOSED SITE
BASIS OF BEARING
BENCHMARKS
SITE MAP
SCALE 1"=100'
“ ”
“ ”
CITY OF FORT COLLINS GENERAL NOTES
E LINCOLN AVE.
E LINCOLN AVE.
RIVERSIDE AVE.
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
ENVIRONMENTAL PLANNER
Sheet List Table