Loading...
HomeMy WebLinkAboutPLATTE RIVER POWER AUTHORITY CAMPUS - PDP - PDP170040 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSPLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = N/A VERTICAL: 1" = N/A HORIZONTAL: PLATTE RIVER POWER AUTHORITY HQ 11/8/2017 4:28:03 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C0.00_COVER.DWG C0.00_COVER KRB NKS C0.00 26 COVER SHEET UTILITY PLANS FOR PLATTE RIVER POWER AUTHORITY HEADQUARTERS LOT 1 OF PLATTE RIVER POWER AUTHORITY HEADQUARTERS P.U.D. AND LOT 2 OF COLLINDALE INDUSTRIAL PARK, SITUATE IN THE SOUTHEAST QUARTER OF SECTION 30, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO NOVEMBER 2017 THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER MY DIRECT SUPERVISION, IN ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS AND STATE OF COLORADO STANDARDS AND STATUTES, RESPECTIVELY; AND THAT I AM FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS, AND RECORD CONDITIONS THAT I HAVE NOTED ON THESE PLANS. KEVIN BRAZELTON, PE #38837 DATE SCALE: 1"=400' CERTIFICATION STATEMENT DISCLAIMER STATEMENT VICINITY MAP OWNER / APPLICANT PLATTE RIVER POWER AUTHORITY 2000 EAST HORSETOOTH ROAD FORT COLLINS, CO 80525 PHONE: 970-229-4822 CONTACT: JEFFREY MENARD CIVIL ENGINEER UNITED CIVIL DESIGN GROUP, LLC 1501 ACADEMY CT., STE 203 FORT COLLINS, CO 80524 PHONE: 970-530-4044 CONTACT: KEVIN BRAZELTON DESIGN ARCHITECT ANDERSON MASON DALE ARCHITECTS 3198 SPEER BOULEVARD DENVER, CO 80211 PHONE: 303-294-9448 PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' VERTICAL: 1" = 30' HORIZONTAL: PLATTE RIVER POWER AUTHORITY HQ 11/8/2017 4:28:08 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C0.00_COVER.DWG C0.00_COVER KRB NKS C0.01 26 GENERAL & CONSTRUCTION NOTES TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES (CONTINUED) 12. The developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period, the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S standards. All signage and striping shall fall under the requirements of the two year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize windblown sediment. The developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (striping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPS are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the city/county. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: A. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. B. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. C. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the developer shall be responsible for the cleanup and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The storm water volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the city/county or Homeowners Association (HOA). 13. City ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The developer shall implement whatever measures are determined necessary, as directed by the city/county. PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 60' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:28:22 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C1.00_EXISTING CONDITIONS PLAN.DWG C1.00_EXISTING CONDITIONS PLAN ## ## C1.00 26 OVERALL EXISTING CONDITIONS PLAN 0 60' 120' SCALE: 1" = 60' 30' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC LEGEND NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. REFER TO SHEETS C1.01-C1.06 FOR DETAILED SURFACE AND UTILITY REMOVALS. 3. REFER TO SHEET C2.00 FOR PHASING PLAN. PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:28:38 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C1.01_SURFACE REMOVAL PLAN.DWG C1.01_SURFACE REMOVAL PLAN ## ## C1.01 26 SURFACE REMOVAL PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC EAST HORSETOOTH ROAD DANFIELD CT UNION PACIFIC RAILROAD TIMBERLINE ROAD HORSETOOTH ROAD KEYMAP LEGEND NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:28:42 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C1.01_SURFACE REMOVAL PLAN.DWG C1.01_SURFACE REMOVAL PLAN ## ## C1.02 26 SURFACE REMOVAL PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC EAST HORSETOOTH ROAD DANFIELD CT UNION PACIFIC RAILROAD TIMBERLINE ROAD HORSETOOTH ROAD KEYMAP LEGEND NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:28:46 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C1.01_SURFACE REMOVAL PLAN.DWG C1.01_SURFACE REMOVAL PLAN ## ## C1.03 26 SURFACE REMOVAL PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC EAST HORSETOOTH ROAD DANFIELD CT UNION PACIFIC RAILROAD TIMBERLINE ROAD HORSETOOTH ROAD KEYMAP LEGEND NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:29:00 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C1.04_UTILITY REMOVAL PLAN.DWG C1.04_UTILITY REMOVAL PLAN ## ## C1.04 26 UTILITY REMOVAL PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC EAST HORSETOOTH ROAD DANFIELD CT UNION PACIFIC RAILROAD TIMBERLINE ROAD HORSETOOTH ROAD KEYMAP LEGEND NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:29:04 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C1.04_UTILITY REMOVAL PLAN.DWG C1.04_UTILITY REMOVAL PLAN ## ## C1.05 26 UTILITY REMOVAL PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC EAST HORSETOOTH ROAD DANFIELD CT UNION PACIFIC RAILROAD TIMBERLINE ROAD HORSETOOTH ROAD KEYMAP LEGEND NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:29:08 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C1.04_UTILITY REMOVAL PLAN.DWG C1.04_UTILITY REMOVAL PLAN ## ## C1.06 26 UTILITY REMOVAL PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC EAST HORSETOOTH ROAD DANFIELD CT UNION PACIFIC RAILROAD TIMBERLINE ROAD HORSETOOTH ROAD KEYMAP LEGEND NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 60' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:29:24 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C2.00_PHASING PLAN.DWG C2.00_PHASING PLAN ## ## C2.00 26 OVERALL PHASING PLAN 0 60' 120' SCALE: 1" = 60' 30' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC LEGEND NOTES 1. THIS PRELIMINARY PHASING PLAN IS SCHEMATIC IN NATURE AND IS SHOWN FOR REFERENCE ONLY. MORE DETAILED PHASING INFORMATION FOR THE PROJECT WILL BE PROVIDED WITH FUTURE SUBMITTALS. 2. THE FOLLOWING FURTHER DESCRIBES THE INTENT OF THIS PRELIMINARY PHASING PLAN: PHASE 1 · MAINTAIN OPERATIONS OF THE EXISTING HEADQUARTERS BUILDING, THE EXISTING ENGINEERING/OPERATIONS (E/O) BUILDING AND THE EXISTING MICROWAVE TOWER AND SUPPORT BUILDING. THIS SHALL INCLUDE, BUT NOT LIMITED TO, ACCESS, UTILITIES AND DRAINAGE. · CONSTRUCT TEMPORARY ITEMS AS REQUIRED TO MAINTAIN EXISTING PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 60' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:29:41 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C3.00_HORIZONTAL CONTROL PLAN.DWG C3.00_HORIZONTAL CONTROL PLAN ## ## C3.00 26 OVERALL HORIZONTAL CONTROL PLAN 0 60' 120' SCALE: 1" = 60' 30' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC LEGEND NOTES 1. FOR BUILDING LAYOUT REFERENCE ARCHITECTURAL PLANS. LAYOUT AND DIMENSION INFORMATION SHOWN REPRESENTS OUTSIDE FACE OF WALL AND IS SHOWN FOR INFORMATION ONLY. 2. ALL DIMENSIONS AND LINE AND CURVE INFORMATION ARE MEASURED TO CURB FLOW LINE OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 3. CONTRACTOR SHALL REFER TO AND COORDINATE WITH THE APPROVED LANDSCAPE DRAWINGS FOR ALL LANDSCAPE AND SITE FEATURES SUCH AS LANDSCAPE WALLS, BIKE RACKS, TRASH RECEPTACLES, CONCRETE PLAZA DETAILS, PAVER DETAILS, LANDSCAPE ROCK AND MULCH, ETC. 4. ALL HANDICAP RAMPS (PRIVATE AND PUBLIC) SHALL BE INSTALLED WITH TRUNCATED DOME WARNING DETECTION SYSTEMS PER LARIMER COUNTY PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:29:46 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C3.00_HORIZONTAL CONTROL PLAN.DWG C3.00_HORIZONTAL CONTROL PLAN ## ## C3.01 26 DETAILED HORIZONTAL CONTROL & PAVEMENT PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC KEYMAP LEGEND NOTES 1. FOR BUILDING LAYOUT REFERENCE ARCHITECTURAL PLANS. LAYOUT AND DIMENSION INFORMATION SHOWN REPRESENTS OUTSIDE FACE OF WALL AND IS SHOWN FOR INFORMATION ONLY. 2. ALL DIMENSIONS AND LINE AND CURVE INFORMATION ARE MEASURED TO CURB FLOW LINE OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 3. CONTRACTOR SHALL REFER TO AND COORDINATE WITH THE APPROVED LANDSCAPE DRAWINGS FOR ALL LANDSCAPE AND SITE FEATURES SUCH AS LANDSCAPE WALLS, BIKE RACKS, TRASH RECEPTACLES, CONCRETE PLAZA DETAILS, PAVER DETAILS, LANDSCAPE ROCK AND MULCH, ETC. PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:29:50 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C3.00_HORIZONTAL CONTROL PLAN.DWG C3.00_HORIZONTAL CONTROL PLAN ## ## C3.02 26 DETAILED HORIZONTAL CONTROL & PAVEMENT PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC KEYMAP LEGEND NOTES 1. FOR BUILDING LAYOUT REFERENCE ARCHITECTURAL PLANS. LAYOUT AND DIMENSION INFORMATION SHOWN REPRESENTS OUTSIDE FACE OF WALL AND IS SHOWN FOR INFORMATION ONLY. 2. ALL DIMENSIONS AND LINE AND CURVE INFORMATION ARE MEASURED TO CURB FLOW LINE OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 3. CONTRACTOR SHALL REFER TO AND COORDINATE WITH THE APPROVED LANDSCAPE DRAWINGS FOR ALL LANDSCAPE AND SITE FEATURES SUCH AS LANDSCAPE WALLS, BIKE RACKS, TRASH RECEPTACLES, CONCRETE PLAZA DETAILS, PAVER DETAILS, LANDSCAPE ROCK AND MULCH, ETC. PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:29:54 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C3.00_HORIZONTAL CONTROL PLAN.DWG C3.00_HORIZONTAL CONTROL PLAN ## ## C3.03 26 DETAILED HORIZONTAL CONTROL & PAVEMENT PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC KEYMAP LEGEND NOTES 1. FOR BUILDING LAYOUT REFERENCE ARCHITECTURAL PLANS. LAYOUT AND DIMENSION INFORMATION SHOWN REPRESENTS OUTSIDE FACE OF WALL AND IS SHOWN FOR INFORMATION ONLY. 2. ALL DIMENSIONS AND LINE AND CURVE INFORMATION ARE MEASURED TO CURB FLOW LINE OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 3. CONTRACTOR SHALL REFER TO AND COORDINATE WITH THE APPROVED LANDSCAPE DRAWINGS FOR ALL LANDSCAPE AND SITE FEATURES SUCH AS LANDSCAPE WALLS, BIKE RACKS, TRASH RECEPTACLES, CONCRETE PLAZA DETAILS, PAVER DETAILS, LANDSCAPE ROCK AND MULCH, ETC. PROPERTY CORNER N:1439601.73 E:3127831.27 PROPERTY CORNER N:1439603.64 E:3128777.93 PROPERTY CORNER N:1439650.89 E:3128818.46 PROPERTY CORNER N:1440123.32 E:3128825.77 PROPERTY CORNER N:1440683.72 E:3127830.73 PROPERTY CORNER N:1440685.00 E:3128159.33 PROPERTY CORNER N:1440615.87 E:3128213.49 PROPERTY CORNER N:1440122.09 E:3128216.61 6' UTILITY EASEMENT 6' UTILITY EASEMENT 107.5' RIGHT-OF-WAY 50' RIGHT-OF-WAY R.O.W. WIDTH VARIES R.O.W. WIDTH VARIES ACCESS EASEMENT WIDTH VARIES EXISTING 6' UTILITY ESMT. EXISTING 6' UTILITY ESMT. 60' RIGHT-OF-WAY EXISTING 6' UTILITY ESMT. EXISTING 15' UTILITY ESMT. EXISTING 10' UTILITY ESMT. EXISTING 10' UTILITY ESMT. SOUTHEAST CORNER S30, T.7N., R68W PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT PROPERTY CORNER N:1440122.09 E:3128216.61 6' UTILITY EASEMENT 51.34 LF 36" RCP 78.24 LF 36" RCP 400.00 LF 36" RCP 49.26 LF 15" RCP 62.30 LF 24" RCP 11.00 LF 18" RCP G 10' ACCESS ESMT. (BY SEPARATE DOC.) 6' UTILITY EASEMENT R.O.W. WIDTH VARIES R.O.W. WIDTH VARIES ACCESS EASEMENT WIDTH VARIES EXISTING 10' UTILITY ESMT. SOUTHEAST CORNER S30, T.7N., R68W PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING 16" WATER CONNECT TO EXISTING 16" WATER MAIN PROPOSED OUTLET STRUCTURE EXISTING 16" SANITARY SEWER EXISTING 16" WATER MAIN EXISTING 4" GAS MAIN CONNECT TO EXISTING 6" WATER SERVICE PROPOSED 6" PRIVATE WATER CONNECT TO EXISTING SANITARY SERVICE PROPOSED POND OUTLET PROPOSED STORM SEWER PROPOSED STORM SEWER TEMPORARY STORM SEWER PROPOSED 8" METER AND BACKFLOW PREVENTION VAULT PROPOSED 6" METER AND BACKFLOW PREVENTION VAULT 50.00 LF 24" RCP 67.76 LF 10" HDPE TEMPORARY STORM SEWER EXISTING BUILDING TO REMAIN UNTIL PHASE 2 DEMOLITION (SEE NOTE 3) POTENTIAL FUTURE 10' ACCESS 6' UTILITY EASEMENT EASEMENT OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC PROPERTY CORNER N:1439601.73 E:3127831.27 PROPERTY CORNER N:1440122.09 E:3128216.61 49.26 LF 15" RCP 62.30 LF 24" RCP 108.28 LF 18" RCP 11.00 LF 18" RCP G 107.5' RIGHT-OF-WAY 50' RIGHT-OF-WAY EXISTING 10' UTILITY ESMT. PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING 16" WATER CONNECT TO EXISTING 16" WATER MAIN PROPOSED STORM SEWER PROPOSED 8" PRIVATE WATER PROPOSED STORM SEWER PROPOSED STORM SEWER PROPOSED FIRE HYDRANT TEMPORARY SEWER SERVICE PROPOSED 8" METER AND BACKFLOW PREVENTION VAULT FFE=4958.00 UNDERGROUND DETENTION AREA PROPOSED ROOF DRAIN PROPOSED TRANSFORMERS PROPOSED ROOF DRAIN MINOR STORM EVENT BYPASS STORM SEWER 163.05 LF 36" RCP 51.53 LF 30" RCP 116.47 LF 18" RCP 51.76 LF 18" RCP 24.96 LF 30" RCP 59.84 LF 30" RCP 80.51 LF 24" RCP 50.01 LF 30" RCP 150.23 LF 30" RCP 122.41 LF 30" RCP 44.56 LF 18" RCP 170.28 LF 18" RCP BIOSWALE (TYP.) PROPOSED WATER SERVICES PROPOSED YARD HYDRANT PROPERTY CORNER N:1440122.09 E:3128216.61 G G G EXISTING 6' UTILITY ESMT. EXISTING 6' UTILITY ESMT. 60' RIGHT-OF-WAY EXISTING 6' UTILITY ESMT. EXISTING 15' UTILITY ESMT. EXISTING 10' UTILITY ESMT. EXISTING 10' UTILITY ESMT. PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED 8" PRIVATE SANITARY SEWER MAIN POTENTIAL FUTURE PRIVATE WATER EXTENSION/LOOP CONNECT TO EXISTING MANHOLE EXISTING 24" SANITARY SEWER 116.47 LF 18" RCP 51.76 LF 18" RCP 24.96 LF 30" RCP 59.84 LF 30" RCP 80.51 LF 24" RCP 76.05 LF 18" RCP 54.73 LF 24" RCP 144.41 LF 24" RCP 44.36 LF 24" RCP EXISTING 6" WATER MAIN FIRE SERVICE WATER SERVICES WATER SERVICES SEWER SERVICE DOMESTIC SERVICE FROM WAREHOUSE TO SHOP SEWER SERVICE SEWER SERVICE DANFIELD COURT OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC MICROWAVE BUILDING MAINTENANCE SHOP / TRUCK WASH WAREHOUSE SUBSTATION GARAGE FLEET PARKING GARAGE A FLEET PARKING GARAGE B PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 60' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:30:56 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C5.00_OVERALL GRADING & EROSION CONTROL PLAN.DWG C5.00_OVERALL GRADING & EROSION CONTROL PLAN KRB NKS C5.00 26 OVERALL GRADING PLAN 0 60' 120' SCALE: 1" = 60' 30' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS (AND SUPPORTING UTILITIES) MAY BE PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:31:18 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C5.01_DETAILED GRADING PLANS.DWG C5.01_DETAILED GRADING PLANS ## ## C5.01 26 DETAILED GRADING PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC KEYMAP NOTES KEYMAP 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:31:24 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C5.01_DETAILED GRADING PLANS.DWG C5.01_DETAILED GRADING PLANS ## ## C5.02 26 DETAILED GRADING PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC KEYMAP NOTES KEYMAP 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:31:30 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C5.01_DETAILED GRADING PLANS.DWG C5.01_DETAILED GRADING PLANS ## ## C5.03 26 DETAILED GRADING PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC KEYMAP NOTES KEYMAP 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:31:52 PM P:\U16014 - PRPA CAMPUS\CADD\CP\CX.XX_DETAILED EC PLANS.DWG CX.XX_DETAILED EC PLANS ## ## C5.07 26 DETAILED EROSION CONTROL PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC KEYMAP 5124 5124 PROPOSED 1' CONTOUR EXISTING 1' CONTOUR STORM SEWER STORM INLET LEGEND EXISTING CURB & GUTTER PROPOSED CURB & GUTTER LIMITS OF DISTURBANCE EXISTING PROPERTY LINE EXISTING R.O.W LINE PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:31:57 PM P:\U16014 - PRPA CAMPUS\CADD\CP\CX.XX_DETAILED EC PLANS.DWG CX.XX_DETAILED EC PLANS ## ## C5.08 26 DETAILED EROSION CONTROL PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC KEYMAP 5124 5124 PROPOSED 1' CONTOUR EXISTING 1' CONTOUR STORM SEWER STORM INLET LEGEND EXISTING CURB & GUTTER PROPOSED CURB & GUTTER LIMITS OF DISTURBANCE EXISTING PROPERTY LINE EXISTING R.O.W LINE PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:32:03 PM P:\U16014 - PRPA CAMPUS\CADD\CP\CX.XX_DETAILED EC PLANS.DWG CX.XX_DETAILED EC PLANS ## ## C5.09 26 DETAILED EROSION CONTROL PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC KEYMAP 5124 5124 PROPOSED 1' CONTOUR EXISTING 1' CONTOUR STORM SEWER STORM INLET LEGEND EXISTING CURB & GUTTER PROPOSED CURB & GUTTER LIMITS OF DISTURBANCE EXISTING PROPERTY LINE EXISTING R.O.W LINE PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 60' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/8/2017 4:32:24 PM P:\U16014 - PRPA CAMPUS\CADD\CP\CX.XX_PROPOSED DRAINAGE PLAN.DWG CX.XX_PROPOSED DRAINAGE PLAN KRB NKS C6.00 26 DRAINAGE PLAN 0 60' 120' SCALE: 1" = 60' 30' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. 2. VEGETATIVE SWALES, BIOSWALES, UNDERGROUND DETENTION AND THE WATERQUALITY AND DETENTION POND SHALL BE MAINTAINED BY THE PROPERTY OWNER AND FOLLOW APPLICABLE STANDARD OPERATING PROCEDURES AS SHOWN IN DEVELOPMENT AGREEMENT. 5124 5124 PROPOSED 1' CONTOUR EXISTING 1' CONTOUR STORM SEWER STORM INLET LEGEND EXISTING CURB & GUTTER PROPOSED CURB & GUTTER PROPOSED FLOWLINE LIMITS OF DISTURBANCE EXISTING PROPERTY LINE EXISTING R.O.W LINE EXISTING EASEMENT BASIN BOUNDARY SWALE SECTION D-101 XXXX BASIN DESIGNATION BASIN AREA (ACRE) 2 - YR RUNOFF COEFF. 100 - YR RUNOFF COEFF. DESIGN POINT FLOW DIRECTION 5125 5125 PROPOSED 5' CONTOUR EXISTING 5' CONTOUR A A DRAINAGE SUMMARY POND SUMMARY LOW IMPACT DEVELOPMENT TREATMENT SUMMARY Basin Proposed Impervious Area LID Treatment Area Treated % of Site Treated (sf) (acres) (sf) (%) A-1 25,596 None 0 0% A-2 33,402 None 0 0% A-3 16,242 Underground Detention 16,242 6% A-4 23,562 Underground Detention 23,562 8% A-5 14,736 Underground Detention 14,736 5% A-6 9,600 Underground Detention 9,600 3% A-7 8,175 Underground Detention 8,175 3% A-8 3,539 Underground Detention 3,539 1% A-9 31,121 Underground Detention 31,121 11% A-10 29,725 Underground Detention 29,725 11% A-11 7,569 Underground Detention 7,569 3% A-12 (Future) 17,500 Future LID Treatment 17,500 6% A-13 11,517 None 0 0% B-1 10,651 Bioswale 10,651 4% B-2 28,612 Bioswale 28,612 10% C-1 5,726 Wet Pond 5,726 2% Total Site 277,273 206,758 75% Proposed Basins Basin Area %I C2 C100 Q2 Q100 (acre) (cfs) (cfs) A-1 3.46 18% 0.37 0.46 2.82 12.32 A-2 0.94 81% 0.82 1.00 1.85 7.85 A-3 0.37 90% 0.95 1.00 1.01 3.71 A-4 0.58 91% 0.90 1.00 1.16 4.48 A-5 0.40 85% 0.84 1.00 0.96 3.96 A-6 0.31 65% 0.75 0.94 0.58 2.54 A-7 0.32 53% 0.66 0.82 0.45 1.96 A-8 0.10 72% 0.81 1.00 0.22 0.95 A-9 0.71 90% 0.95 1.00 1.94 7.11 A-10 0.86 72% 0.80 1.00 1.48 6.39 A-11 0.65 26% 0.44 0.55 0.71 3.12 A-12 1.53 2% 0.25 0.31 1.02 4.45 A-13 0.26 90% 0.95 1.00 0.72 2.63 A-TOTAL 10.50 45% 0.58 0.72 11.00 47.85 B-1 0.46 51% 0.62 0.78 0.61 2.66 B-2 1.43 46% 0.57 0.71 1.88 8.21 B-TOTAL 1.90 48% 0.58 0.73 1.88 8.18 C-1 1.19 12% 0.33 0.41 1.04 4.52 C-TOTAL 1.19 12% 0.33 0.41 1.04 4.52 OS-1 0.68 2% 0.25 0.31 0.39 1.70 OS-2A 0.21 41% 0.54 0.68 0.30 1.29 OS-2B 0.97 77% 0.80 1.00 1.94 8.47 OS-3 0.41 45% 0.56 0.70 0.47 2.05 OS-4 1.26 75% 0.78 0.97 2.15 9.39 OS-5 0.54 2% 0.25 0.31 0.30 1.31 Pond A Pond C WQCV REQUIRED 0.26 AC-FT 0.02 AC-FT WQCV PROVIDED 0.30 AC-FT 0.02 AC-FT DETENTION VOLUME REQUIRED 2.77 AC-FT 0.32 AC-FT DETENTION VOLUME PROVIDED 2.88 AC-FT 0.35 AC-FT WQCV WATER SURFACE ELEVATION 4949.60 4955.05 100-YEAR WATER SURFACE ELEVATION 4,952.00 4,955.50 TOP OF POND ELEVATION 4,953.00 4,956.50 SOUTHEAST CORNER S30, T.7N., R68W 50' RIGHT-OF-WAY R.O.W. WIDTH VARIES 60' RIGHT-OF-WAY 107.5' RIGHT-OF-WAY 50' RIGHT-OF-WAY R.O.W. WIDTH VARIES A1 C1 OS1 OS2a OS3 OS4 OS2b A2 A3 A13 B1 B2 A5 A4 A6 A7 A9 A10 A11 A8 0.41 1.26 3.46 1.19 0.68 0.21 0.97 0.37 0.26 0.94 0.46 1.43 0.40 0.58 A12 1.53 0.31 0.86 0.71 0.32 0.65 0.10 0.54 OS5 DETENTION POND DETENTION POND POND OUTLET STRUCTURE POND OUTLET STRUCTURE EAST HORSETOOTH ROAD SOUTH TIMBERLINE ROAD DANFIELD COURT UNION PACIFIC RAILROAD OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC HQ BUILDING MICROWAVE BUILDING MAINTENANCE SHOP / TRUCK WASH POOL CAR WAREHOUSE SUBSTATION GARAGE FLEET PARKING GARAGE A PROPOSED POND EXISTING E&O BUILDING EXISTING HEADQUARTERS FLEET PARKING GARAGE B BIOSWALE W/ UNDERDRAIN POTENTIAL FUTURE PARKING AREA POTENTIAL FUTURE BIOSWALE UNDERGROUND DETENTION EXISTING STORM DRAINING BASIN OS3 EXISTING CHAIN LINK FENCE EXISTING FENCE EXISTING EASEMENT SILT FENCE VEHICLE TRACKING CONTROL PAD WATTLE DIKE CONCRETE WASHOUT AREA - FINAL LOCATION TO BE DETERMINED BY CONTRACTOR SURFACE ROUGHENING (SEE EROSION CONTROL NOTE 5) DROP INLET PROTECTION ROCK SOCK CONSTRUCTION FENCE NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. 3. REFER TO SHEETS C5.01-C5.03 FOR DETAILED GRADING PLANS. EXISTING CONCRETE PAVEMENT OR SIDEWALK PROPOSED CONCRETE PAVEMENT OR SIDEWALK PROPOSED BUILDING EROSION CONTROL NOTES 1. THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS. 2. REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES. 3. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4. CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED. 5. ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE WASHOUT, AND SEDIMENT TRAP. 6. SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132. 7. TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE SITE SHALL BE SEEDED WITH 100% SMOOTH BROME AT A MINIMUM APPLICATION RATE OF 30 PLS/LBS/ACRE. 8. A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED: INGREDIENT % AVAILABLE BY WEIGHT APPLICATION RATE IN LBS/ACRE EXISTING WATER EXISTING SANITARY EXISTING TELECOM EXISTING FIBER OPTIC EXISTING ELECTRIC EXISTING STORM SEWER EXISTING GAS PROJECT: PLATTE RIVER POWER AUTHORITY HQ BEST MANAGEMENT PRACTICE ITEM: PRESERVE EXISTING VEGETATION SILT FENCE VEHICLE TRACKING CONTROL STAGING AREAS CONCRETE WASHOUT AREA SWALE AND SLOPE PROTECTION SIDEWALK CHASE FILTER (RS) INLET PROTECTION 1. COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS. 2. CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMP'S. MOBILIZATION DEMOLITIONUTILITY INSTALLATION BUILDING CONSTRUCTION SITE GRADING & PAVING FINAL LANDSCAPING & STABILIZATION PHASE OF CONSTRUCTION EROSION CONTROL SEQUENCING 60' RIGHT-OF-WAY PROPOSED STORM SEWER DANFIELD COURT OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC MICROWAVE BUILDING MAINTENANCE SHOP / TRUCK WASH WAREHOUSE SUBSTATION GARAGE FLEET PARKING GARAGE A FLEET PARKING GARAGE B SWALE GRADE BREAK COORDINATE ALL EROSION CONTROL MEASURES TO PROTECT OFFSITE PROPERTY WITH OFFSITE PROPERTY OWNER EXISTING CHAIN LINK FENCE EXISTING FENCE EXISTING EASEMENT SILT FENCE VEHICLE TRACKING CONTROL PAD WATTLE DIKE CONCRETE WASHOUT AREA - FINAL LOCATION TO BE DETERMINED BY CONTRACTOR SURFACE ROUGHENING (SEE EROSION CONTROL NOTE 5) DROP INLET PROTECTION ROCK SOCK CONSTRUCTION FENCE NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. 3. REFER TO SHEETS C5.01-C5.03 FOR DETAILED GRADING PLANS. EXISTING CONCRETE PAVEMENT OR SIDEWALK PROPOSED CONCRETE PAVEMENT OR SIDEWALK PROPOSED BUILDING EROSION CONTROL NOTES 1. THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS. 2. REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES. 3. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4. CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED. 5. ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE WASHOUT, AND SEDIMENT TRAP. 6. SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132. 7. TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE SITE SHALL BE SEEDED WITH 100% SMOOTH BROME AT A MINIMUM APPLICATION RATE OF 30 PLS/LBS/ACRE. 8. A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED: INGREDIENT % AVAILABLE BY WEIGHT APPLICATION RATE IN LBS/ACRE EXISTING WATER EXISTING SANITARY EXISTING TELECOM EXISTING FIBER OPTIC EXISTING ELECTRIC EXISTING STORM SEWER EXISTING GAS PROJECT: PLATTE RIVER POWER AUTHORITY HQ BEST MANAGEMENT PRACTICE ITEM: PRESERVE EXISTING VEGETATION SILT FENCE VEHICLE TRACKING CONTROL STAGING AREAS CONCRETE WASHOUT AREA SWALE AND SLOPE PROTECTION SIDEWALK CHASE FILTER (RS) INLET PROTECTION 1. COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS. 2. CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMP'S. MOBILIZATION DEMOLITIONUTILITY INSTALLATION BUILDING CONSTRUCTION SITE GRADING & PAVING FINAL LANDSCAPING & STABILIZATION PHASE OF CONSTRUCTION EROSION CONTROL SEQUENCING 50' RIGHT-OF-WAY 107.5' RIGHT-OF-WAY PROPOSED ROOF DRAIN MINOR STORM EVENT BYPASS STORM SEWER EXISTING BUILDING TO REMAIN UNTIL PHASE 2 DEMOLITION PROPOSED STORM SEWER BIOSWALE (TYP.) PROPOSED STORM SEWER PROPOSED STORM SEWER PROPOSED ROOF DRAIN PROPOSED ROOF DRAIN PROPOSED ROOF DRAIN UNDERGROUND DETENTION AREA EAST HORSETOOTH ROAD HQ BUILDING MICROWAVE BUILDING POOL CAR WAREHOUSE EXISTING E&O BUILDING MONUMENT SIGN/ SCREEN WALL SCREEN WALL SCREEN WALL SWALE SILT FENCE TO PROTECT POND UNTIL COMPLETION OF LANDSCAPING END CONSTRUCTION FENCE AT EXISTING CHAIN LINK FENCE GRADE BREAK SILT FENCE TO PROTECT BIOSWALE UNTIL COMPLETION OF LANDSCAPING GRADE BREAK EXISTING CHAIN LINK FENCE EXISTING FENCE EXISTING EASEMENT SILT FENCE VEHICLE TRACKING CONTROL PAD WATTLE DIKE CONCRETE WASHOUT AREA - FINAL LOCATION TO BE DETERMINED BY CONTRACTOR SURFACE ROUGHENING (SEE EROSION CONTROL NOTE 5) DROP INLET PROTECTION ROCK SOCK CONSTRUCTION FENCE NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. 3. REFER TO SHEETS C5.01-C5.03 FOR DETAILED GRADING PLANS. EXISTING CONCRETE PAVEMENT OR SIDEWALK PROPOSED CONCRETE PAVEMENT OR SIDEWALK PROPOSED BUILDING EROSION CONTROL NOTES 1. THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS. 2. REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES. 3. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4. CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED. 5. ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE WASHOUT, AND SEDIMENT TRAP. 6. SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132. 7. TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE SITE SHALL BE SEEDED WITH 100% SMOOTH BROME AT A MINIMUM APPLICATION RATE OF 30 PLS/LBS/ACRE. 8. A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED: INGREDIENT % AVAILABLE BY WEIGHT APPLICATION RATE IN LBS/ACRE EXISTING WATER EXISTING SANITARY EXISTING TELECOM EXISTING FIBER OPTIC EXISTING ELECTRIC EXISTING STORM SEWER EXISTING GAS PROJECT: PLATTE RIVER POWER AUTHORITY HQ BEST MANAGEMENT PRACTICE ITEM: PRESERVE EXISTING VEGETATION SILT FENCE VEHICLE TRACKING CONTROL STAGING AREAS CONCRETE WASHOUT AREA SWALE AND SLOPE PROTECTION SIDEWALK CHASE FILTER (RS) INLET PROTECTION 1. COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS. 2. CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMP'S. MOBILIZATION DEMOLITIONUTILITY INSTALLATION BUILDING CONSTRUCTION SITE GRADING & PAVING FINAL LANDSCAPING & STABILIZATION PHASE OF CONSTRUCTION EROSION CONTROL SEQUENCING 107.5' RIGHT-OF-WAY R.O.W. WIDTH VARIES R.O.W. WIDTH VARIES PROPOSED OUTLET STRUCTURE PROPOSED LAKE OUTLET PROPOSED STORM PROPOSED STORM EXISTING BUILDING TO REMAIN UNTIL PHASE 2 DEMOLITION PROPOSED STORM SEWER POTENTIAL FUTURE EXPANSION UNDERGROUND DETENTION AREA PROPOSED ROOF DRAIN PROPOSED ROOF DRAIN PROPOSED ROOF DRAIN EMERGENCY OVERFLOW SPILLWAY ELEV = 4952.0 APPROXIMATE EXISTING IRRIGATION PIPE TOP OF POND ELEV = 4953.0 LAKE EMERGENCY OVERFLOW SPILLWAY ELEV = 4955.5 PROPOSED STORM SEWER EAST HORSETOOTH ROAD SOUTH TIMBERLINE ROAD HQ BUILDING MICROWAVE BUILDING PROPOSED POND EXISTING HEADQUARTERS LIMITS OF DISTURBANCE POTENTIAL FUTURE EXPANSION POTENTIAL FUTURE EXPANSION END CONSTRUCTION FENCE AT EXISTING CHAIN LINK FENCE SILT FENCE TO PROTECT POND UNTIL COMPLETION OF LANDSCAPING GRADE BREAK GRADE BREAK COORDINATE ALL EROSION CONTROL MEASURES TO PROTECT OFFSITE PROPERTY WITH OFFSITE PROPERTY OWNER TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS (AND SUPPORTING UTILITIES) MAY BE DEMOLISHED. 3. SPOT ELEVATIONS SHOWN ARE TO FLOWLINE OR EDGE OF WALK UNLESS OTHERWISE NOTED. 4. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. 5. NOTE THAT THE FINISHED FLOOR ELEVATIONS AS SHOWN ON THIS DRAWING CORRESPONDS TO ELEVATION 100'-0" AS SHOWN ON THE ARCHITECTURAL PLANS. 6. THE FINISHED FLOOR ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 7. CONTRACTOR SHALL NOTE THAT OVEREXCAVATION IS REQUIRED UNDER BUILDING PADS. CONTRACTOR SHALL REFER TO THE GEOTECHNICAL REPORT PROVIDED BY TERRACON CONSULTANTS FOR MORE INFORMATION. 5124 5124 PROPOSED 1' CONTOUR EXISTING 1' CONTOUR STORM SEWER STORM INLET GRADE BREAK LEGEND PROPOSED SLOPE 90.30 PROPOSED SPOT ELEVATION FF=FINISHED FLOOR FG=FINISHED GRADE FW=FLOODWAY HP=HIGH POINT LP=LOW POINT TC=TOP OF CURB TOW=TOP OF WALL 90.30 EXISTING GRADE EXISTING CURB & GUTTER PROPOSED CURB & GUTTER PROPOSED FLOWLINE LIMITS OF DISTURBANCE EXISTING PROPERTY LINE EXISTING R.O.W LINE EXISTING STRIPING EXISTING CHAIN LINK FENCE EXISTING FENCE EXISTING EASEMENT 57.29 55.40 53.79 55.38 54.71 55.19 FFE=4954.50 (EXISTING) FFE=VARIES FFE=4956.50 FFE=4956.75 FFE=VARIES 54.39 55.21 56.80 EXISTING 6' UTILITY ESMT. EXISTING 6' UTILITY ESMT. 60' RIGHT-OF-WAY EXISTING 6' UTILITY ESMT. EXISTING 15' UTILITY ESMT. EXISTING 10' UTILITY ESMT. EXISTING 10' UTILITY ESMT. 54.07 55.14 55.64 56.00 56.50 57.00 56.70 56.70 57.86 56.70 56.50 2.0% 2.1% 2.6% 3.0% 2.5% 2.5% 1.7% 2.0% 2.7% 3.2% 4.5% 2.4% 3.1% 2.4% 2.0% 2.4% 3.4% 2.2% 1.9% 2.2% 2.1% 2.5% 3.3% 2.9% 54.24 2.4% 2.7% 2.2% PROPOSED STORM SEWER DANFIELD COURT OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC MICROWAVE BUILDING MAINTENANCE SHOP / TRUCK WASH WAREHOUSE SUBSTATION GARAGE FLEET PARKING GARAGE A FLEET PARKING GARAGE B SWALE (1.6%) (1.5%) (1.6%) (1.4%) EXISTING PARKING TO REMAIN EXISTING INLET EXISTING INLET EXISTING INLET FLOWLINE EXISTING CURB & GUTTER FLOWLINE 2.3% 2.2% 2.1% GRADE BREAK GRADE BREAK 57.12 57.12 57.48 6.9% 6.5% 8.6% 3.8% 4.1% 56.75 56.75 56.75 56.75 1.7% 1.7% GRADE BREAK TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS (AND SUPPORTING UTILITIES) MAY BE DEMOLISHED. 3. SPOT ELEVATIONS SHOWN ARE TO FLOWLINE OR EDGE OF WALK UNLESS OTHERWISE NOTED. 4. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. 5. NOTE THAT THE FINISHED FLOOR ELEVATIONS AS SHOWN ON THIS DRAWING CORRESPONDS TO ELEVATION 100'-0" AS SHOWN ON THE ARCHITECTURAL PLANS. 6. THE FINISHED FLOOR ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 7. CONTRACTOR SHALL NOTE THAT OVEREXCAVATION IS REQUIRED UNDER BUILDING PADS. CONTRACTOR SHALL REFER TO THE GEOTECHNICAL REPORT PROVIDED BY TERRACON CONSULTANTS FOR MORE INFORMATION. 5124 5124 PROPOSED 1' CONTOUR EXISTING 1' CONTOUR STORM SEWER STORM INLET GRADE BREAK LEGEND PROPOSED SLOPE 90.30 PROPOSED SPOT ELEVATION FF=FINISHED FLOOR FG=FINISHED GRADE FW=FLOODWAY HP=HIGH POINT LP=LOW POINT TC=TOP OF CURB TOW=TOP OF WALL 90.30 EXISTING GRADE EXISTING CURB & GUTTER PROPOSED CURB & GUTTER PROPOSED FLOWLINE LIMITS OF DISTURBANCE EXISTING PROPERTY LINE EXISTING R.O.W LINE EXISTING STRIPING EXISTING CHAIN LINK FENCE EXISTING FENCE EXISTING EASEMENT 6' UTILITY EASEMENT 55.27 54.84 55.85 56.25 56.13 55.44 56.10 55.09 54.60 55.49 56.84 56.27 55.88 54.36 55.21 55.75 55.82 56.10 58.52 58.17 57.40 57.19 57.03 56.30 56.64 56.58 56.87 58.31 56.92 57.55 57.26 57.90 57.49 56.61 55.62 55.12 57.88 57.55 56.15 56.45 55.72 54.43 53.89 54.31 53.79 55.38 56.37 56.28 55.97 55.36 56.10 55.74 56.47 56.82 56.70 57.05 FFE=4958.00 FFE=4957.90 FFE=4954.50 (EXISTING) FFE=4956.50 49.58 107.5' RIGHT-OF-WAY 50' RIGHT-OF-WAY EXISTING 10' UTILITY ESMT. 54.22 54.89 49.73 2.1% 2.1% 3.8% 2.2% 2.1% 2.2% 2.1% 2.9% 2.2% 2.0% 2.1% 2.1% 2.2% 2.0% 2.5% 1.8% 2.4% 2.0% 2.4% 3.4% 2.1% 2.5% 2.0% 2.1% 2.7% 2.4% 2.0% 2.1% 2.1% 2.0% 2.0% 3.9% 3.1% 4.1:1 4.2:1 2.0% 2.0% 2.0% 2.0% UNDERGROUND DETENTION AREA PROPOSED ROOF DRAIN PROPOSED ROOF DRAIN 2.5% 3.3% 2.9% EXISTING BUILDING TO REMAIN UNTIL PHASE 2 DEMOLITION (SEE NOTE 2) 2.3% 2.2% PROPOSED STORM SEWER BIOSWALE W/ UNDERDRAIN (TYP.) 52.00 54.24 PROPOSED STORM SEWER PROPOSED STORM SEWER PROPOSED ROOF DRAIN EAST HORSETOOTH ROAD UNION PACIFIC RAILROAD HQ BUILDING MICROWAVE BUILDING POOL CAR WAREHOUSE EXISTING E&O BUILDING SWALE 2.6% 2.7% 2' CONCRETE PAN 55.48 SWALE 10' ACCESS ESMT. (BY SEPARATE DOC.) GRADE BREAK 3.8% 4.1% PROPOSED ROOF DRAIN POTENTIAL FUTURE PARKING AREA POTENTIAL FUTURE BIOSWALE POTENTIAL FUTURE EXPANSION AREA PROPOSED POND PERMANENT WATER SURFACE = 4955.00 NORMAL TOP OF BANK = 4956.50 BOTTOM OF POND = 4943.00 GRADE BREAK TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS (AND SUPPORTING UTILITIES) MAY BE DEMOLISHED. 3. SPOT ELEVATIONS SHOWN ARE TO FLOWLINE OR EDGE OF WALK UNLESS OTHERWISE NOTED. 4. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. 5. NOTE THAT THE FINISHED FLOOR ELEVATIONS AS SHOWN ON THIS DRAWING CORRESPONDS TO ELEVATION 100'-0" AS SHOWN ON THE ARCHITECTURAL PLANS. 6. THE FINISHED FLOOR ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 7. CONTRACTOR SHALL NOTE THAT OVEREXCAVATION IS REQUIRED UNDER BUILDING PADS. CONTRACTOR SHALL REFER TO THE GEOTECHNICAL REPORT PROVIDED BY TERRACON CONSULTANTS FOR MORE INFORMATION. 5124 5124 PROPOSED 1' CONTOUR EXISTING 1' CONTOUR STORM SEWER STORM INLET GRADE BREAK LEGEND PROPOSED SLOPE 90.30 PROPOSED SPOT ELEVATION FF=FINISHED FLOOR FG=FINISHED GRADE FW=FLOODWAY HP=HIGH POINT LP=LOW POINT TC=TOP OF CURB TOW=TOP OF WALL 90.30 EXISTING GRADE EXISTING CURB & GUTTER PROPOSED CURB & GUTTER PROPOSED FLOWLINE LIMITS OF DISTURBANCE EXISTING PROPERTY LINE EXISTING R.O.W LINE EXISTING STRIPING EXISTING CHAIN LINK FENCE EXISTING FENCE EXISTING EASEMENT SOUTHEAST CORNER S30, T.7N., R68W 55.27 54.84 55.85 56.25 56.13 55.44 56.10 55.09 54.60 55.49 56.84 56.27 55.88 54.36 57.03 53.89 54.31 53.79 55.36 56.10 55.74 56.47 56.82 56.70 FFE=4958.00 FFE=4954.50 (EXISTING) 48.00 48.63 49.80 48.99 49.58 48.98 48.87 6' UTILITY EASEMENT 107.5' RIGHT-OF-WAY 50' RIGHT-OF-WAY R.O.W. WIDTH VARIES ACCESS EASEMENT WIDTH VARIES EXISTING 10' UTILITY ESMT. 54.89 49.73 2.1% 2.1% 2.1% 2.0% 2.2% 2.4% 2.1% 3.8% 3.3% 3.8% 2.1% 2.2% 2.1% 2.0% 2.1% 2.7% 2.4% 2.0% 2.1% 2.1% 3.9% 3.1% 4.0:1 3.0:1 3.0:1 4.0:1 4.0:1 4.0:1 4.0:1 4.3:1 4.0:1 4.0:1 4.8:1 5.1:1 7.7:1 6.3:1 2.0% 3.6% 2.0% 2.0% 2.0% 2.2% 2.0% 2.0% 10' ACCESS EASEMENT (BY SEPARATE DOC.) PROPOSED OUTLET STRUCTURE PROPOSED POND OUTLET TEMPORARY STORM SEWER PROPOSED STORM PROPOSED STORM TEMPORARY STORM SEWER EXISTING BUILDING TO REMAIN UNTIL PHASE 2 DEMOLITION (SEE NOTE 2) PROPOSED STORM SEWER POTENTIAL FUTURE EXPANSION POTENTIAL FUTURE EXPANSION PROPOSED ROOF DRAIN UNDERGROUND DETENTION AREA PROPOSED ROOF DRAIN PROPOSED ROOF DRAIN 7.7% 2.9% 2.5% 3.3% 2.9% 6.3% 3.3% 2.9% EMERGENCY OVERFLOW SPILLWAY ELEV = 4952.0 2.3% 2.2% APPROXIMATE EXISTING IRRIGATION PIPE TOP OF POND ELEV = 4953.0 POND EMERGENCY OVERFLOW SPILLWAY ELEV = 4955.5 PROPOSED STORM SEWER EXISTING POND LIMITS EAST HORSETOOTH ROAD SOUTH TIMBERLINE ROAD HQ BUILDING MICROWAVE BUILDING PROPOSED POND EXISTING HEADQUARTERS PROPOSED POND PERMANENT WATER SURFACE = 4955.00 NORMAL TOP OF BANK = 4956.50 BOTTOM OF POND = 4943.00 R.O.W. WIDTH VARIES 2' CONCRETE PAN EXISTING 12" STORM DRAIN SWALE SWALE 2.7% 3.6% 2.2% 4.2% 2.6% 2.7% EXISTING BIOSWALE 56.27 53.32 53.00 53.00 53.00 DRAINAGE EASEMENT (BY SEPARATE DOC.) 20' DRAINAGE ESMT. (BY SEPARATE DOC.) 2' CONCRETE PAN EXISTING INLET GRADE BREAK PROPOSED ROOF DRAIN GRADE BREAK EXISTING CURB CUT EXISTING CURB CUT DEMOLISHED. 3. SPOT ELEVATIONS SHOWN ARE TO FLOWLINE OR EDGE OF WALK UNLESS OTHERWISE NOTED. 4. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. 5. NOTE THAT THE FINISHED FLOOR ELEVATIONS AS SHOWN ON THIS DRAWING CORRESPONDS TO ELEVATION 100'-0" AS SHOWN ON THE ARCHITECTURAL PLANS. 6. THE FINISHED FLOOR ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 7. CONTRACTOR SHALL NOTE THAT OVEREXCAVATION IS REQUIRED UNDER BUILDING PADS. CONTRACTOR SHALL REFER TO THE GEOTECHNICAL REPORT PROVIDED BY TERRACON CONSULTANTS FOR MORE INFORMATION. 5124 5124 PROPOSED 1' CONTOUR EXISTING 1' CONTOUR STORM SEWER STORM INLET GRADE BREAK LEGEND PROPOSED SLOPE 90.30 PROPOSED SPOT ELEVATION FF=FINISHED FLOOR FG=FINISHED GRADE FW=FLOODWAY HP=HIGH POINT LP=LOW POINT TC=TOP OF CURB TOW=TOP OF WALL 90.30 EXISTING GRADE EXISTING CURB & GUTTER PROPOSED CURB & GUTTER PROPOSED FLOWLINE LIMITS OF DISTURBANCE EXISTING PROPERTY LINE EXISTING R.O.W LINE EXISTING STRIPING EXISTING CHAIN LINK FENCE EXISTING FENCE EXISTING EASEMENT SOUTHEAST CORNER S30, T.7N., R68W PROPERTY CORNER N:1439601.73 E:3127831.27 PROPERTY CORNER N:1439603.64 E:3128777.93 PROPERTY CORNER N:1439650.89 E:3128818.46 PROPERTY CORNER N:1440123.32 E:3128825.77 PROPERTY CORNER N:1440683.72 E:3127830.73 PROPERTY CORNER N:1440685.00 E:3128159.33 PROPERTY CORNER N:1440615.87 E:3128213.49 10' ACCESS EASEMENT 6' UTILITY EASEMENT 107.5' RIGHT-OF-WAY 50' RIGHT-OF-WAY R.O.W. WIDTH VARIES ACCESS EASEMENT WIDTH VARIES EXISTING 6' UTILITY ESMT. EXISTING 6' UTILITY ESMT. 60' RIGHT-OF-WAY EXISTING 6' UTILITY ESMT. EXISTING 15' UTILITY ESMT. EXISTING 10' UTILITY ESMT. EXISTING 10' UTILITY ESMT. 107.5' RIGHT-OF-WAY 50' RIGHT-OF-WAY R.O.W. WIDTH VARIES ACCESS EASEMENT WIDTH VARIES FFE=4958.00 FFE=4957.90 FFE=4956.50 FFE=VARIES FFE=4956.75 FFE=VARIES EAST HORSETOOTH ROAD SOUTH TIMBERLINE ROAD DANFIELD COURT UNION PACIFIC RAILROAD OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC HQ BUILDING MICROWAVE BUILDING MAINTENANCE SHOP / TRUCK WASH POOL CAR WAREHOUSE SUBSTATION GARAGE FLEET PARKING GARAGE A PROPOSED POND EXISTING E&O BUILDING EXISTING HEADQUARTERS FLEET PARKING GARAGE B PROPERTY CORNER N:1440122.09 E:3128216.61 EXISTING 30' UTILITY ESMT. DRAINAGE EASEMENT (BY SEPARATE DOC.) PROPOSED GAS SERVICE FFE=4956.50 FFE=4956.75 PROPOSED TRANSFORMER EXISTING PRIVATE OFFSITE WATER PROPOSED 2" GAS MAIN PROPOSED GAS SERVICE PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/9/2017 12:00:47 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C4.00_UTILITY PLAN.DWG C4.00_UTILITY PLAN ## ## C4.03 26 DETAILED UTILITY PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC KEYMAP LEGEND NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 3. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS (AND SUPPORTING UTILITIES) MAY BE DEMOLISHED. 4. THE PLUMBING CONTRACTOR SHALL TERMINATE UTILITY SERVICES 5' OUTSIDE OF BUILDING UNLESS NOTED OTHERWISE. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF ALL UTILITY CONNECTIONS INTO THE PROPOSED BUILDINGS SHALL BE COORDINATED WITH APPROVED ARCHITECTURAL DRAWINGS. 5. REFER TO SITE ELECTRICAL PLANS FOR ALL CONDUITS AND POWER LINE ROUTING FOR SITE LIGHTING. 6. WATER AND SEWER SERVICE PROVIDED BY THE CITY OF FORT COLLINS AND ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 7. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5'. MAXIMUM COVER SHALL BE 5.5'. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER & WATER MAINS & SERVICES. 9. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 10. SANITARY SEWER MAINS AND SERVICES SHALL BE SDR-35 PVC. 11. WATER MAINS AND FIRE SERVICES SHALL BE AWWA C-900 PVC. WATER SERVICES SMALLER THAN 1-1/2" SHALL BE TYPE K COPPER. WATER SERVICES 1-1/2" AND LARGER WATER SERVICES MAY BE EITHER TYPE K COPPER OR SDR 9 HDPE PIPE WITH A PRESSURE RATING OF 200 PSI. 12. THE LOCATION OF ANY PROPOSED DRY UTILITIES SHOWN ON THIS DRAWING ARE SHOWN FOR HORIZONTAL ALIGNMENTS ONLY AND ARE APPROXIMATE. FINAL DESIGNS OF DRY UTILITIES WILL BE PERFORMED BY THE APPROPRIATE UTILITY COMPANY. 13. ELECTRIC SERVICE TO BE PROVIDED BY THE CITY OF FORT COLLINS. THE CITY SHALL INSTALL THE TRANSFORMERS AND PRIMARY LINES FROM THE CONNECTION POINT AT THE EXISTING MAIN TO THE TRANSFORMER. THE COST OF THE PRIMARY LINE, TRANSFORMERS, AND INSTALLATION OF THE SECONDARY LINE FROM THE TRANSFORMER TO THE BUILDING SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. 14. ELECTRIC TRANSFORMER PAD SIZES ARE APPROXIMATE. COORDINATE FINAL LOCATION AND SIZE OF TRANSFORMER AND LOCATION OF SECONDARY LINE WITH APPROVED ARCHITECTURAL PLANS. 15. GAS SERVICE TO BE PROVIDED BY XCEL ENERGY. XCEL SHALL INSTALL ALL GAS SERVICES AND METERS. THE COST OF ALL THE MAIN AND SERVICE INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. 16. THE PROPOSED POND INCLUDES A GEOTHERMAL EXCHANGE SYSTEM. REFER TO THE MECHANICAL PLANS FOR ADDITIONAL INFORMATION. EXISTING WATER EXISTING SANITARY EXISTING TELECOM EXISTING FIBER OPTIC EXISTING ELECTRIC EXISTING STORM SEWER EXISTING GAS LIMITS OF DISTURBANCE EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING EASEMENT PROPOSED 6" WATER PROPOSED 8" SANITARY PROPOSED STORM SEWER PROPOSED 8" WATER PROPOSED WATER SERVICE PROPOSED FIRE SERVICE PROPOSED SANITARY SERVICE PROPOSED 8" PRIVATE WATER PROPOSED 6" PRIVATE WATER EAST HORSETOOTH ROAD UNION PACIFIC RAILROAD HQ BUILDING MICROWAVE BUILDING POOL CAR WAREHOUSE EXISTING E&O BUILDING PROPOSED OVERHEAD LIGHT (SEE NOTE 5) TEMPORARY GAS SERVICE MINOR STORM EVENT BYPASS STORM SEWER PROPOSED 8" PRIVATE WATER MAIN FFE=4957.90 FFE=4956.50 APPROXIMATE EXISTING IRRIGATION PIPE PROPOSED GENERATORS APPROXIMATE ELECTRICAL ROUTING (SEE ELEC. PLANS) PROPOSED POND (SEE NOTE 16) 138.17 LF 36" RCP PROPOSED ROOF DRAIN PROPOSED ROOF DRAIN PROPOSED 2" GAS MAIN TEMPORARY WATER SERVICE PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/9/2017 12:00:44 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C4.00_UTILITY PLAN.DWG C4.00_UTILITY PLAN ## ## C4.02 26 DETAILED UTILITY PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC KEYMAP LEGEND NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 3. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS (AND SUPPORTING UTILITIES) MAY BE DEMOLISHED. 4. THE PLUMBING CONTRACTOR SHALL TERMINATE UTILITY SERVICES 5' OUTSIDE OF BUILDING UNLESS NOTED OTHERWISE. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF ALL UTILITY CONNECTIONS INTO THE PROPOSED BUILDINGS SHALL BE COORDINATED WITH APPROVED ARCHITECTURAL DRAWINGS. 5. REFER TO SITE ELECTRICAL PLANS FOR ALL CONDUITS AND POWER LINE ROUTING FOR SITE LIGHTING. 6. WATER AND SEWER SERVICE PROVIDED BY THE CITY OF FORT COLLINS AND ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 7. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5'. MAXIMUM COVER SHALL BE 5.5'. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER & WATER MAINS & SERVICES. 9. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 10. SANITARY SEWER MAINS AND SERVICES SHALL BE SDR-35 PVC. 11. WATER MAINS AND FIRE SERVICES SHALL BE AWWA C-900 PVC. WATER SERVICES SMALLER THAN 1-1/2" SHALL BE TYPE K COPPER. WATER SERVICES 1-1/2" AND LARGER WATER SERVICES MAY BE EITHER TYPE K COPPER OR SDR 9 HDPE PIPE WITH A PRESSURE RATING OF 200 PSI. 12. THE LOCATION OF ANY PROPOSED DRY UTILITIES SHOWN ON THIS DRAWING ARE SHOWN FOR HORIZONTAL ALIGNMENTS ONLY AND ARE APPROXIMATE. FINAL DESIGNS OF DRY UTILITIES WILL BE PERFORMED BY THE APPROPRIATE UTILITY COMPANY. 13. ELECTRIC SERVICE TO BE PROVIDED BY THE CITY OF FORT COLLINS. THE CITY SHALL INSTALL THE TRANSFORMERS AND PRIMARY LINES FROM THE CONNECTION POINT AT THE EXISTING MAIN TO THE TRANSFORMER. THE COST OF THE PRIMARY LINE, TRANSFORMERS, AND INSTALLATION OF THE SECONDARY LINE FROM THE TRANSFORMER TO THE BUILDING SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. 14. ELECTRIC TRANSFORMER PAD SIZES ARE APPROXIMATE. COORDINATE FINAL LOCATION AND SIZE OF TRANSFORMER AND LOCATION OF SECONDARY LINE WITH APPROVED ARCHITECTURAL PLANS. 15. GAS SERVICE TO BE PROVIDED BY XCEL ENERGY. XCEL SHALL INSTALL ALL GAS SERVICES AND METERS. THE COST OF ALL THE MAIN AND SERVICE INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. 16. THE PROPOSED POND INCLUDES A GEOTHERMAL EXCHANGE SYSTEM. REFER TO THE MECHANICAL PLANS FOR ADDITIONAL INFORMATION. EXISTING WATER EXISTING SANITARY EXISTING TELECOM EXISTING FIBER OPTIC EXISTING ELECTRIC EXISTING STORM SEWER EXISTING GAS LIMITS OF DISTURBANCE EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING EASEMENT PROPOSED 6" WATER PROPOSED 8" SANITARY PROPOSED STORM SEWER PROPOSED 8" WATER PROPOSED WATER SERVICE PROPOSED FIRE SERVICE PROPOSED SANITARY SERVICE EXPANSION POTENTIAL FUTURE EXPANSION PROPOSED ROOF DRAIN FFE=4958.00 UNDERGROUND DETENTION AREA PROPOSED ROOF DRAIN PROPOSED TRANSFORMERS PROPOSED ROOF DRAIN 163.05 LF 36" RCP 50.01 LF 30" RCP 150.23 LF 30" RCP 122.41 LF 30" RCP APPROXIMATE EXISTING IRRIGATION PIPE PROPOSED WATER SERVICES EXISTING POND LIMITS EAST HORSETOOTH ROAD SOUTH TIMBERLINE ROAD HQ BUILDING MICROWAVE BUILDING PROPOSED POND EXISTING HEADQUARTERS PROPOSED GAS SERVICE PROPOSED GAS SERVICE PROPOSED OVERHEAD LIGHT (SEE NOTE 5) PROPOSED POND (SEE NOTE 16) PROPOSED 8" PRIVATE WATER MAIN PROPOSED DRAINAGE EASEMENT PROPOSED GENERATORS APPROXIMATE ELECTRICAL ROUTING (SEE ELEC. PLANS) 138.17 LF 36" RCP PROPOSED ROOF DRAIN PROPOSED 6" SANITARY SERVICE PROPOSED 2" GAS MAIN TEMPORARY SANITARY TO EXISTING HQ TEMPORARY GAS TO EXISTING HQ TEMPORARY WATER TO EXISTING HQ PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 30' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/9/2017 12:00:40 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C4.00_UTILITY PLAN.DWG C4.00_UTILITY PLAN ## ## C4.01 26 DETAILED UTILITY PLAN 0 30' 60' SCALE: 1" = 30' 15' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC KEYMAP LEGEND NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 3. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS (AND SUPPORTING UTILITIES) MAY BE DEMOLISHED. 4. THE PLUMBING CONTRACTOR SHALL TERMINATE UTILITY SERVICES 5' OUTSIDE OF BUILDING UNLESS NOTED OTHERWISE. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF ALL UTILITY CONNECTIONS INTO THE PROPOSED BUILDINGS SHALL BE COORDINATED WITH APPROVED ARCHITECTURAL DRAWINGS. 5. REFER TO SITE ELECTRICAL PLANS FOR ALL CONDUITS AND POWER LINE ROUTING FOR SITE LIGHTING. 6. WATER AND SEWER SERVICE PROVIDED BY THE CITY OF FORT COLLINS AND ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 7. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5'. MAXIMUM COVER SHALL BE 5.5'. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER & WATER MAINS & SERVICES. 9. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 10. SANITARY SEWER MAINS AND SERVICES SHALL BE SDR-35 PVC. 11. WATER MAINS AND FIRE SERVICES SHALL BE AWWA C-900 PVC. WATER SERVICES SMALLER THAN 1-1/2" SHALL BE TYPE K COPPER. WATER SERVICES 1-1/2" AND LARGER WATER SERVICES MAY BE EITHER TYPE K COPPER OR SDR 9 HDPE PIPE WITH A PRESSURE RATING OF 200 PSI. 12. THE LOCATION OF ANY PROPOSED DRY UTILITIES SHOWN ON THIS DRAWING ARE SHOWN FOR HORIZONTAL ALIGNMENTS ONLY AND ARE APPROXIMATE. FINAL DESIGNS OF DRY UTILITIES WILL BE PERFORMED BY THE APPROPRIATE UTILITY COMPANY. 13. ELECTRIC SERVICE TO BE PROVIDED BY THE CITY OF FORT COLLINS. THE CITY SHALL INSTALL THE TRANSFORMERS AND PRIMARY LINES FROM THE CONNECTION POINT AT THE EXISTING MAIN TO THE TRANSFORMER. THE COST OF THE PRIMARY LINE, TRANSFORMERS, AND INSTALLATION OF THE SECONDARY LINE FROM THE TRANSFORMER TO THE BUILDING SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. 14. ELECTRIC TRANSFORMER PAD SIZES ARE APPROXIMATE. COORDINATE FINAL LOCATION AND SIZE OF TRANSFORMER AND LOCATION OF SECONDARY LINE WITH APPROVED ARCHITECTURAL PLANS. 15. GAS SERVICE TO BE PROVIDED BY XCEL ENERGY. XCEL SHALL INSTALL ALL GAS SERVICES AND METERS. THE COST OF ALL THE MAIN AND SERVICE INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. 16. THE PROPOSED POND INCLUDES A GEOTHERMAL EXCHANGE SYSTEM. REFER TO THE MECHANICAL PLANS FOR ADDITIONAL INFORMATION. EXISTING WATER EXISTING SANITARY EXISTING TELECOM EXISTING FIBER OPTIC EXISTING ELECTRIC EXISTING STORM SEWER EXISTING GAS LIMITS OF DISTURBANCE EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING EASEMENT PROPOSED 6" WATER PROPOSED 8" SANITARY PROPOSED STORM SEWER PROPOSED 8" WATER PROPOSED WATER SERVICE PROPOSED FIRE SERVICE PROPOSED SANITARY SERVICE EXISTING FIRE HYDRANT PROPOSED OUTLET STRUCTURE EXISTING 16" SANITARY SEWER EXISTING 16" WATER MAIN EXISTING 4" GAS MAIN CONNECT TO EXISTING 6" WATER SERVICE PROPOSED 6" PRIVATE WATER PROPOSED 6" SANITARY SERVICE PROPOSED STORM SEWER PROPOSED 8" PRIVATE WATER PROPOSED STORM SEWER CONNECT TO EXISTING SANITARY SERVICE PROPOSED POND OUTLET PROPOSED FIRE HYDRANT PROPOSED 8" PRIVATE SANITARY SEWER MAIN POTENTIAL FUTURE PRIVATE WATER EXTENSION/LOOP CONNECT TO EXISTING MANHOLE EXISTING 24" SANITARY SEWER EAST HORSETOOTH ROAD SOUTH TIMBERLINE ROAD DANFIELD COURT UNION PACIFIC RAILROAD OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC HQ BUILDING MICROWAVE BUILDING MAINTENANCE SHOP / TRUCK WASH POOL CAR WAREHOUSE SUBSTATION GARAGE FLEET PARKING GARAGE A PROPOSED POND EXISTING E&O BUILDING EXISTING HEADQUARTERS FLEET PARKING GARAGE B PROPOSED POND (SEE NOTE 16) EXISTING POND LIMITS PROPOSED 2" GAS MAIN PLATTE RIVER POWER AUTHORITY 11/14/17 U16014 1" = 60' 1" = N/A PLATTE RIVER POWER AUTHORITY HQ NORTH 11/9/2017 12:00:37 PM P:\U16014 - PRPA CAMPUS\CADD\CP\C4.00_UTILITY PLAN.DWG C4.00_UTILITY PLAN ## ## C4.00 26 OVERALL UTILITY PLAN 0 60' 120' SCALE: 1" = 60' 30' PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC LEGEND NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 3. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS (AND SUPPORTING UTILITIES) MAY BE DEMOLISHED. 4. THE PLUMBING CONTRACTOR SHALL TERMINATE UTILITY SERVICES 5' OUTSIDE OF BUILDING UNLESS NOTED OTHERWISE. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF ALL UTILITY CONNECTIONS INTO THE PROPOSED BUILDINGS SHALL BE COORDINATED WITH APPROVED ARCHITECTURAL DRAWINGS. 5. REFER TO SITE ELECTRICAL PLANS FOR ALL CONDUITS AND POWER LINE ROUTING FOR SITE LIGHTING. 6. WATER AND SEWER SERVICE PROVIDED BY THE CITY OF FORT COLLINS AND ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 7. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5'. MAXIMUM COVER SHALL BE 5.5'. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER & WATER MAINS & SERVICES. 9. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 10. SANITARY SEWER MAINS AND SERVICES SHALL BE SDR-35 PVC. 11. WATER MAINS AND FIRE SERVICES SHALL BE AWWA C-900 PVC. WATER SERVICES SMALLER THAN 1-1/2" SHALL BE TYPE K COPPER. WATER SERVICES 1-1/2" AND LARGER WATER SERVICES MAY BE EITHER TYPE K COPPER OR SDR 9 HDPE PIPE WITH A PRESSURE RATING OF 200 PSI. 12. THE LOCATION OF ANY PROPOSED DRY UTILITIES SHOWN ON THIS DRAWING ARE SHOWN FOR HORIZONTAL ALIGNMENTS ONLY AND ARE APPROXIMATE. FINAL DESIGNS OF DRY UTILITIES WILL BE PERFORMED BY THE APPROPRIATE UTILITY COMPANY. 13. ELECTRIC SERVICE TO BE PROVIDED BY THE CITY OF FORT COLLINS. THE CITY SHALL INSTALL THE TRANSFORMERS AND PRIMARY LINES FROM THE CONNECTION POINT AT THE EXISTING MAIN TO THE TRANSFORMER. THE COST OF THE PRIMARY LINE, TRANSFORMERS, AND INSTALLATION OF THE SECONDARY LINE FROM THE TRANSFORMER TO THE BUILDING SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. 14. ELECTRIC TRANSFORMER PAD SIZES ARE APPROXIMATE. COORDINATE FINAL LOCATION AND SIZE OF TRANSFORMER AND LOCATION OF SECONDARY LINE WITH APPROVED ARCHITECTURAL PLANS. 15. GAS SERVICE TO BE PROVIDED BY XCEL ENERGY. XCEL SHALL INSTALL ALL GAS SERVICES AND METERS. THE COST OF ALL THE MAIN AND SERVICE INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. 16. THE PROPOSED POND INCLUDES A GEOTHERMAL EXCHANGE SYSTEM. REFER TO THE MECHANICAL PLANS FOR ADDITIONAL INFORMATION. EXISTING WATER EXISTING SANITARY EXISTING TELECOM EXISTING FIBER OPTIC EXISTING ELECTRIC EXISTING STORM SEWER EXISTING GAS LIMITS OF DISTURBANCE EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING EASEMENT PROPOSED 6" WATER PROPOSED 8" SANITARY PROPOSED STORM SEWER PROPOSED 8" WATER PROPOSED WATER SERVICE PROPOSED FIRE SERVICE PROPOSED SANITARY SERVICE 4. ALL HANDICAP RAMPS (PRIVATE AND PUBLIC) SHALL BE INSTALLED WITH TRUNCATED DOME WARNING DETECTION SYSTEMS PER LARIMER COUNTY URBAN AREA STREET STANDARD DETAILS. 5. PUBLIC CONCRETE SIDEWALKS SHALL BE 6-INCH MINIMUM THICKNESS. PRIVATE ONSITE SIDEWALKS SHALL BE 4-INCH MINIMUM THICKNESS UNLESS OTHERWISE NOTED. 6. ALL PAVING AREAS NOT DESIGNATED AS "MEDIUM DUTY" OR "HEAVY DUTY" SHALL CONSIST OF "LIGHT DUTY" PAVEMENT. SEE THE GEOTECHNICAL REPORT AND PAVEMENT SECTION DETAILS FOR MORE INFORMATION. 7. THE EXISTING ASPHALT PAVEMENT OF THE ACCESS FROM DANFIELD COURT SHALL BE RECONSTRUCTED TO MEET THE MINIMUM HEAVY DUTY PAVEMENT SECTION. 8. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS MAY BE DEMOLISHED. 9. LIMITS OF STREET CUT AS REQUIRED FOR UTILITY CONSTRUCTION OR THE PLACEMENT OF PROPOSED CURB AND GUTTER ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 10. THE PROPOSED POND SHALL BE LINED PER THE GEOTECHNICAL LINING DESIGN PROVIDED BY TERRACON CONSULTANTS. REFER TO THE LINING DESIGN DOCUMENTS FOR ADDITIONAL INFORMATION. 11. PROPOSED EASEMENTS AS SHOWN ON THIS DRAWING SHALL BE DEDICATED BY SEPARATE DOCUMENT. LIMITS OF DISTURBANCE EXISTING CURB & GUTTER EXISTING CONCRETE PAVEMENT OR SIDEWALK EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING FENCE EXISTING PAVEMENT STRIPING EXISTING EASEMENT PROPOSED CONCRETE PAVEMENT OR SIDEWALK PROPOSED CURB & GUTTER PROPOSED BUILDING PROPOSED PAVEMENT STRIPING MEDIUM DUTY PAVEMENT SECTION (SEE NOTE 6) INFLOW CURB & GUTTER T CURB & GUTTER TRANSITION PROPOSED ASPHALT PAVEMENT HEAVY DUTY PAVEMENT SECTION (SEE NOTE 6) PROPOSED EASEMENT RECONSTRUCT AND WIDEN EXISTING DRIVE APPROACH EXISTING 6' UTILITY ESMT. EXISTING 6' UTILITY ESMT. 60' RIGHT-OF-WAY EXISTING 6' UTILITY ESMT. EXISTING 15' UTILITY ESMT. EXISTING 10' UTILITY ESMT. PROPERTY CORNER N:1440683.72 E:3127830.73 PROPERTY CORNER N:1440615.87 E:3128213.49 PROPERTY CORNER N:1440122.09 E:3128216.61 EXISTING 10' UTILITY ESMT. S89° 53' 04"W 609.16' N01° 28' 57"W 119.57' N00° 45' 09"E 81.11' N00° 10' 46"W 123.29' N00° 12' 13"W 45.84' N00° 15' 07"W 124.01' L = 1 07 . 2 1 ' R = 5 0 . 0 0 ' ∆ = 1 2 2. 86 ° S89° 46' 35"W 328.61' S00° 01' 43"E 562.41' 8' SIDEWALK EDGE OF CONCRETE SECURITY FENCE 1.5' CURB & GUTTER (TYP.) 2.5' CURB & GUTTER (TYP.) EXISTING CURB & GUTTER (TYP.) PROPOSED FIRE HYDRANT 80' 80' 40' 40' POTENTIAL FUTURE DRIVE BUILDING CORNER N:1440133.84 E:3127954.11 BUILDING CORNER N:1440134.07 E:3128068.11 BUILDING CORNER N:1440229.20 E:3127994.11 BUILDING CORNER N:1440229.43 E:3128051.03 BUILDING CORNER N:1440450.12 E:3128046.74 BUILDING CORNER N:1440450.02 E:3127996.91 BUILDING CORNER N:1440455.77 E:3127888.49 BUILDING CORNER N:1440394.48 E:3128130.50 BUILDING CORNER N:1440189.56 E:3128130.92 BUILDING CORNER N:1440193.46 E:3127871.19 49.87' EXISTING PARKING TO REMAIN RECONSTRUCT EXISTING PAVEMENT TO HEAVY DUTY PAVEMENT SECTION (SEE NOTE 7) PROPERTY CORNER N:1440685.00 E:3128159.33 SWALE 2' CONCRETE PAN EXISTING 30' UTILITY ESMT. 42.81' 24.98' 55.33' 114' 56.92' 114.91' 30' 30.91' 1.5' CURB & GUTTER (TYP.) 30' EMERGENCY ACCESS ESMT. 30' EMERGENCY ACCESS ESMT. EXISTING CURB & GUTTER PROPERTY BOUNDARY 30'± PROPERTY LINE 10' UTILITY ESMT. 2.28' EXISTING CHAINLINK FENCE SECURITY FENCE DANFIELD COURT OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC MICROWAVE BUILDING MAINTENANCE SHOP / TRUCK WASH WAREHOUSE SUBSTATION GARAGE FLEET PARKING GARAGE A FLEET PARKING GARAGE B 4. ALL HANDICAP RAMPS (PRIVATE AND PUBLIC) SHALL BE INSTALLED WITH TRUNCATED DOME WARNING DETECTION SYSTEMS PER LARIMER COUNTY URBAN AREA STREET STANDARD DETAILS. 5. PUBLIC CONCRETE SIDEWALKS SHALL BE 6-INCH MINIMUM THICKNESS. PRIVATE ONSITE SIDEWALKS SHALL BE 4-INCH MINIMUM THICKNESS UNLESS OTHERWISE NOTED. 6. ALL PAVING AREAS NOT DESIGNATED AS "MEDIUM DUTY" OR "HEAVY DUTY" SHALL CONSIST OF "LIGHT DUTY" PAVEMENT. SEE THE GEOTECHNICAL REPORT AND PAVEMENT SECTION DETAILS FOR MORE INFORMATION. 7. THE EXISTING ASPHALT PAVEMENT OF THE ACCESS FROM DANFIELD COURT SHALL BE RECONSTRUCTED TO MEET THE MINIMUM HEAVY DUTY PAVEMENT SECTION. 8. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS MAY BE DEMOLISHED. 9. LIMITS OF STREET CUT AS REQUIRED FOR UTILITY CONSTRUCTION OR THE PLACEMENT OF PROPOSED CURB AND GUTTER ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 10. THE PROPOSED POND SHALL BE LINED PER THE GEOTECHNICAL LINING DESIGN PROVIDED BY TERRACON CONSULTANTS. REFER TO THE LINING DESIGN DOCUMENTS FOR ADDITIONAL INFORMATION. 11. PROPOSED EASEMENTS AS SHOWN ON THIS DRAWING SHALL BE DEDICATED BY SEPARATE DOCUMENT. LIMITS OF DISTURBANCE EXISTING CURB & GUTTER EXISTING CONCRETE PAVEMENT OR SIDEWALK EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING FENCE EXISTING PAVEMENT STRIPING EXISTING EASEMENT PROPOSED CONCRETE PAVEMENT OR SIDEWALK PROPOSED CURB & GUTTER PROPOSED BUILDING PROPOSED PAVEMENT STRIPING MEDIUM DUTY PAVEMENT SECTION (SEE NOTE 6) INFLOW CURB & GUTTER T CURB & GUTTER TRANSITION PROPOSED ASPHALT PAVEMENT HEAVY DUTY PAVEMENT SECTION (SEE NOTE 6) PROPOSED EASEMENT 107.5' RIGHT-OF-WAY 50' RIGHT-OF-WAY 6' UTILITY EASEMENT PROPERTY CORNER N:1439601.73 E:3127831.27 PROPERTY CORNER N:1440122.09 E:3128216.61 EXISTING 10' UTILITY ESMT. S89° 53' 04"W 609.16' N01° 28' 57"W 11 S00° 01' 43"E 519.58' N89° 53' 04"E 946.66' 19' (TYP.) HANDICAP PARKING SPACE 9' (TYP.) 1.5' CURB & GUTTER (TYP.) 1.5' CURB & GUTTER (TYP.) 1.5' OUTFALL CURB & GUTTER 1.5' CURB & GUTTER (TYP.) ROLL OFF DUMPSTER RECYCLABLES 19' (TYP.) 9' (TYP.) 38' (TYP.) 9' (TYP.) 17' (TYP.) 17' (TYP.) 9' (TYP.) 38' (TYP.) 17' (TYP.) 17' (TYP.) 17' (TYP.) 17' (TYP.) 17' 17' (TYP.) 17' (TYP.) 17' (TYP.) 19' (TYP.) 17' (TYP.) 9' (TYP.) BUILDING CORNER N:1439779.92 E:3128335.99 BUILDING CORNER N:1439711.74 E:3128375.24 BUILDING CORNER N:1439857.71 E:3128468.51 BUILDING CORNER N:1439909.72 E:3128441.52 2' CONCRETE PAN PROPOSED FIRE HYDRANT BUILDING CORNER N:1439827.29 E:3128189.40 BUILDING CORNER N:1439771.06 E:3128008.39 BUILDING CORNER N:1439771.31 E:3128130.89 GATE SECURITY FENCE 7' SIDEWALK 1.5' CURB & GUTTER (TYP.) HC RAMP EXISTING 7' SIDEWALK MONUMENT SIGN/ SCREEN WALL 1.5' OUTFALL CURB & GUTTER HANDICAP PARKING SPACE 1.5' OUTFALL CURB & GUTTER HANDICAP PARKING SPACE (TYP.) SCREEN WALL GATE GATE 8' SIDEWALK CONCRETE SIDEWALK CROSSING CONNECT TO EXISTING SIDEWALK CONNECT TO EXISTING SIDEWALK CONNECT TO EXISTING CURB & GUTTER SCREEN WALL PROPOSED FIRE HYDRANT 8' SIDEWALK BIOSWALE (TYP.) PROPOSED FIRE HYDRANT 2' CONCRETE PAN 1.5' CURB & GUTTER (TYP.) PROPOSED FIRE HYDRANT POTENTIAL FUTURE DRIVE EXISTING BUILDING TO REMAIN UNTIL PHASE 2 DEMOLITION (SEE NOTE 8) CONCRETE PAVERS CONCRETE PLAZA SWALE PROPOSED FIRE HYDRANT SWALE 12' 12' 15' 6' 45' 55.86' 128.67' 112.93' EMERGENCY ACCESS ESMT. (TYP) 27' 30' 27' DROP-OFF AREA 40' 14' EMERGENCY ACCESS ESMT. (TYP.) 10' ACCESS EASEMENT (BY SEPARATE DOC.) 30' 24' EMERGENCY ACCESS ESMT. (TYP.) 26' 30' 30' 24' 24' 26' 120' 23.28' PULL-OFF FOR TRUCK/ TRASH TRUCK MOVEMENTS GENERATORS ENCLOSURE (SEE ARCH. PLANS) PROPOSED POND (SEE NOTE 10) POTENTIAL FUTURE PARKING AREA POTENTIAL FUTURE DRIVE EXISTING CHAINLINK FENCE SECURITY FENCE POTENTIAL FUTURE EXPANSION AREA BUILDING CORNER N:1439771.45 E:3128197.97 EAST HORSETOOTH ROAD UNION PACIFIC RAILROAD HQ BUILDING MICROWAVE BUILDING POOL CAR WAREHOUSE EXISTING E&O BUILDING 4. ALL HANDICAP RAMPS (PRIVATE AND PUBLIC) SHALL BE INSTALLED WITH TRUNCATED DOME WARNING DETECTION SYSTEMS PER LARIMER COUNTY URBAN AREA STREET STANDARD DETAILS. 5. PUBLIC CONCRETE SIDEWALKS SHALL BE 6-INCH MINIMUM THICKNESS. PRIVATE ONSITE SIDEWALKS SHALL BE 4-INCH MINIMUM THICKNESS UNLESS OTHERWISE NOTED. 6. ALL PAVING AREAS NOT DESIGNATED AS "MEDIUM DUTY" OR "HEAVY DUTY" SHALL CONSIST OF "LIGHT DUTY" PAVEMENT. SEE THE GEOTECHNICAL REPORT AND PAVEMENT SECTION DETAILS FOR MORE INFORMATION. 7. THE EXISTING ASPHALT PAVEMENT OF THE ACCESS FROM DANFIELD COURT SHALL BE RECONSTRUCTED TO MEET THE MINIMUM HEAVY DUTY PAVEMENT SECTION. 8. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS MAY BE DEMOLISHED. 9. LIMITS OF STREET CUT AS REQUIRED FOR UTILITY CONSTRUCTION OR THE PLACEMENT OF PROPOSED CURB AND GUTTER ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 10. THE PROPOSED POND SHALL BE LINED PER THE GEOTECHNICAL LINING DESIGN PROVIDED BY TERRACON CONSULTANTS. REFER TO THE LINING DESIGN DOCUMENTS FOR ADDITIONAL INFORMATION. 11. PROPOSED EASEMENTS AS SHOWN ON THIS DRAWING SHALL BE DEDICATED BY SEPARATE DOCUMENT. LIMITS OF DISTURBANCE EXISTING CURB & GUTTER EXISTING CONCRETE PAVEMENT OR SIDEWALK EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING FENCE EXISTING PAVEMENT STRIPING EXISTING EASEMENT PROPOSED CONCRETE PAVEMENT OR SIDEWALK PROPOSED CURB & GUTTER PROPOSED BUILDING PROPOSED PAVEMENT STRIPING MEDIUM DUTY PAVEMENT SECTION (SEE NOTE 6) INFLOW CURB & GUTTER T CURB & GUTTER TRANSITION PROPOSED ASPHALT PAVEMENT HEAVY DUTY PAVEMENT SECTION (SEE NOTE 6) PROPOSED EASEMENT 10' ACCESS EASEMENT (BY SEPARATE DOC.) EXISTING 6' UTILITY ESMT. 107.5' RIGHT-OF-WAY 50' RIGHT-OF-WAY R.O.W. WIDTH VARIES R.O.W. WIDTH VARIES EXISTING ACCESS ESMT. (WIDTH VARIES) PROPERTY CORNER N:1439603.64 E:3128777.93 PROPERTY CORNER N:1439650.89 E:3128818.46 PROPERTY CORNER N:1440123.32 E:3128825.77 PROPERTY CORNER N:1440122.09 E:3128216.61 EXISTING 10' UTILITY ESMT. SOUTHEAST CORNER S30, T.7N., R68W N00° 16' 53"W 291.91' S89° 53' 04"W 609.16' N01° 28' 57"W 11 N40° 37' 30"E 62.25' N08° 23' 39"E 45.39' N00° 02' 40"W 49.64' N20° 55' 36"W 31.47' N13° 19' 41"E 58.14' 19' (TYP.) 2' CONCRETE PAN 2' CONCRETE PAN HANDICAP PARKING SPACE 9' (TYP.) CONCRETE PLAZA EXISTING 7' SIDEWALK 1.5' CURB & GUTTER (TYP.) 1.5' CURB & GUTTER (TYP.) 1.5' OUTFALL CURB & GUTTER 7' SIDEWALK BUILDING CORNER N:1439909.72 E:3128441.52 BUILDING CORNER N:1439857.71 E:3128468.51 BUILDING CORNER N:1439820.80 E:3128527.79 BUILDING CORNER N:1439772.28 E:3128519.76 BUILDING CORNER N:1439711.74 E:3128375.24 BUILDING CORNER N:1439779.92 E:3128335.99 MONUMENT SIGN/ SCREEN WALL HC RAMP 1.5' CURB & GUTTER (TYP.) R.O.W. R.O.W. ROLL OFF DUMPSTER RECYCLABLES 2' CONCRETE PAN PROPOSED SIDEWALK 19' (TYP.) 17' 17' (TYP.) 17' (TYP.) 17' (TYP.) 19' (TYP.) 17' (TYP.) 9' (TYP.) CONNECT TO EXISTING CURB & GUTTER CONNECT TO EXISTING SIDEWALK CONNECT TO EXISTING SIDEWALK SECURITY FENCE 2' CONCRETE PAN PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT 7' SIDEWALK GATE SECURITY FENCE 7' SIDEWALK 1.5' OUTFALL CURB & GUTTER HANDICAP PARKING SPACE 1.5' OUTFALL CURB & GUTTER PROPOSED FIRE HYDRANT 2' CONCRETE PAN PROPOSED FIRE HYDRANT EXISTING BUILDING TO REMAIN UNTIL PHASE 2 DEMOLITION (SEE NOTE 8) CONCRETE PAVERS POTENTIAL FUTURE EXPANSION POTENTIAL FUTURE EXPANSION 2' CONCRETE PAN SWALE SWALE EXISTING POND LIMITS 20' DRAINAGE ESMT. (BY SEPARATE DOC.) DRAINAGE EASEMENT (BY SEPARATE DOC.) PROPOSED CURB & GUTTER EXISTING BUS STOP PROPOSED CURB & GUTTER PROPOSED SIDEWALK 12' 12' 15' 6' 45' 55.86' 128.67' 112.93' EMERGENCY ACCESS ESMT. (TYP) 27' 30' 27' GENERATORS ENCLOSURE (SEE ARCH. PLANS) PROPOSED POND (SEE NOTE 10) CONCRETE PAVERS EAST HORSETOOTH ROAD SOUTH TIMBERLINE ROAD HQ BUILDING MICROWAVE BUILDING PROPOSED POND EXISTING HEADQUARTERS URBAN AREA STREET STANDARD DETAILS. 5. PUBLIC CONCRETE SIDEWALKS SHALL BE 6-INCH MINIMUM THICKNESS. PRIVATE ONSITE SIDEWALKS SHALL BE 4-INCH MINIMUM THICKNESS UNLESS OTHERWISE NOTED. 6. ALL PAVING AREAS NOT DESIGNATED AS "MEDIUM DUTY" OR "HEAVY DUTY" SHALL CONSIST OF "LIGHT DUTY" PAVEMENT. SEE THE GEOTECHNICAL REPORT AND PAVEMENT SECTION DETAILS FOR MORE INFORMATION. 7. THE EXISTING ASPHALT PAVEMENT OF THE ACCESS FROM DANFIELD COURT SHALL BE RECONSTRUCTED TO MEET THE MINIMUM HEAVY DUTY PAVEMENT SECTION. 8. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS MAY BE DEMOLISHED. 9. LIMITS OF STREET CUT AS REQUIRED FOR UTILITY CONSTRUCTION OR THE PLACEMENT OF PROPOSED CURB AND GUTTER ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 10. THE PROPOSED POND SHALL BE LINED PER THE GEOTECHNICAL LINING DESIGN PROVIDED BY TERRACON CONSULTANTS. REFER TO THE LINING DESIGN DOCUMENTS FOR ADDITIONAL INFORMATION. 11. PROPOSED EASEMENTS AS SHOWN ON THIS DRAWING SHALL BE DEDICATED BY SEPARATE DOCUMENT. LIMITS OF DISTURBANCE EXISTING CURB & GUTTER EXISTING CONCRETE PAVEMENT OR SIDEWALK EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING FENCE EXISTING PAVEMENT STRIPING EXISTING EASEMENT PROPOSED CONCRETE PAVEMENT OR SIDEWALK PROPOSED CURB & GUTTER PROPOSED BUILDING PROPOSED PAVEMENT STRIPING MEDIUM DUTY PAVEMENT SECTION (SEE NOTE 6) INFLOW CURB & GUTTER T CURB & GUTTER TRANSITION PROPOSED ASPHALT PAVEMENT HEAVY DUTY PAVEMENT SECTION (SEE NOTE 6) PROPOSED EASEMENT 10' ACCESS EASEMENT (BY SEPARATE DOC.) EXISTING 6' UTILITY ESMT. 107.5' RIGHT-OF-WAY 50' RIGHT-OF-WAY R.O.W. WIDTH VARIES R.O.W. WIDTH VARIES EXISTING ACCESS ESMT. (WIDTH VARIES) EXISTING 6' UTILITY ESMT. EXISTING 6' UTILITY ESMT. 60' RIGHT-OF-WAY EXISTING 6' UTILITY ESMT. EXISTING 15' UTILITY ESMT. EXISTING 10' UTILITY ESMT. PROPERTY CORNER N:1439601.73 E:3127831.27 PROPERTY CORNER N:1439603.64 E:3128777.93 PROPERTY CORNER N:1439650.89 E:3128818.46 PROPERTY CORNER N:1440123.32 E:3128825.77 PROPERTY CORNER N:1440683.72 E:3127830.73 PROPERTY CORNER N:1440615.87 E:3128213.49 PROPERTY CORNER N:1440122.09 E:3128216.61 EXISTING 10' UTILITY ESMT. N40° 37' 30"E 62.25' N00° 16' 53"W 291.91' N08° 23' 39"E 45.39' N13° 19' 41"E 58.14' N00° 02' 40"W 49.64' N20° 55' 36"W 31.47' S89° 53' 04"W 609.16' N01° 28' 57"W 119.57' N00° 45' 09"E 81.11' N00° 10' 46"W 123.29' N00° 12' 13"W 45.84' N00° 15' 07"W 124.01' L = 1 0 7 . 2 1 ' R = 5 0 . 0 0 ' ∆ = 1 2 2 . 8 6 ° S89° 46' 35"W 328.61' S00° 01' 43"E 519.58' S00° 01' 43"E 562.41' N89° 53' 04"E 946.66' CP-130 CP-128 CP-149 CP-132 CP-147 CP-124 CP-126 CP-142 CP-174 CP-168 CP-170 CP-161 CP-138 CP-159 CP-165 CP-163 CP-155 CP-153 CP-157 CP-106 CP-108 CP-136 CP-140 PROPERTY CORNER N:1440685.00 E:3128159.33 DRAINAGE EASEMENT (BY SEPARATE DOC.) EXISTING 30' UTILITY ESMT. EXISTING POND LIMITS EAST HORSETOOTH ROAD SOUTH TIMBERLINE ROAD DANFIELD COURT UNION PACIFIC RAILROAD OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC HQ BUILDING MICROWAVE BUILDING MAINTENANCE SHOP / TRUCK WASH POOL CAR WAREHOUSE SUBSTATION GARAGE FLEET PARKING GARAGE A PROPOSED POND EXISTING E&O BUILDING EXISTING HEADQUARTERS FLEET PARKING GARAGE B CONTROL POINT TABLE CONTROL POINT # CP-106 CP-108 CP-124 CP-126 CP-128 CP-130 CP-132 CP-136 CP-138 CP-140 CP-142 CP-147 CP-149 CP-153 CP-155 CP-157 CP-159 CP-161 CP-163 CP-165 CP-168 CP-170 CP-174 NORTHING 1440672.65 1440669.99 1440183.44 1439949.56 1439667.78 1439599.49 1439652.45 1439589.09 1439707.72 1440145.86 1440013.82 1439843.42 1439607.75 1440473.69 1440141.65 1440544.12 1439803.92 1439827.42 1440024.67 1439892.76 1439905.86 1439984.74 1439907.50 EASTING 3128209.23 3128557.60 3128834.15 3128820.82 3128823.46 3128712.44 3128329.57 3127807.62 3128190.21 3128417.44 3128707.01 3128732.28 3128521.77 3127939.00 3128181.56 3128087.25 3127923.77 3128173.02 3127885.15 3127980.22 3128480.55 3128195.41 3128329.11 ELEVATION 9909.48 4950.32 4951.27 4952.66 4954.99 4957.28 4958.00 4960.12 4957.25 4953.35 4953.39 4954.59 4957.39 4957.50 4954.74 4955.80 4956.99 4955.79 4955.92 4955.93 4954.93 4956.29 4955.35 BUILDINGS. THIS SHALL INCLUDE, BUT NOT LIMITED TO, TEMPORARY ROADS, PARKING, UTILITY SERVICES AND DRAINAGE INFRASTRUCTURE. · MAINTAIN THE SOUTHERN PORTION OF THE EXISTING POND UNTIL SUCH TIME THAT EXISTING DRAINAGE TO THE POND CAN BE REROUTED TO THE PROPOSED DETENTION AND WATER QUALITY POND. · CONSTRUCT THE RELOCATED WET POND. · CONSTRUCT THE PROPOSED HEADQUARTERS BUILDING, THE POOL CAR GARAGE, AND THE SUBSTATION AND FLEET MAINTENANCE BUILDINGS. · CONSTRUCT PROPOSED UTILITY SYSTEMS, INCLUDING WATER, SANITARY SEWER, STORM DRAINAGE INFRASTRUCTURE, AND DRY UTILITY SYSTEMS FOR THE CAMPUS THAT DOES NOT CONFLICT WITH THE EXISTING BUILDINGS TO REMAIN. PHASE 2 · DEMOLISH THE EXISTING HEADQUARTERS AND E/O BUILDINGS. THIS SHALL INCLUDE, BUT NOT LIMITED TO, BUILDINGS, ACCESSES, PARKING, UTILITIES AND DRAINAGE INFRASTRUCTURE. · DEMOLISH TEMPORARY ITEMS CONSTRUCTED WITH PHASE 1 AND THAT ARE NO LONGER REQUIRED. · COMPLETE THE CONSTRUCTION OF PROPOSED UTILITY SYSTEMS, INCLUDING WATER, SANITARY SEWER, STORM DRAINAGE INFRASTRUCTURE, AND DRY UTILITY SYSTEMS FOR THE CAMPUS. PHASE 2 EXISTING WATER EXISTING SANITARY EXISTING TELECOM EXISTING FIBER OPTIC EXISTING ELECTRIC EXISTING STORM SEWER EXISTING GAS PHASE 1 EXISTING CURB & GUTTER EXISTING CONCRETE PAVEMENT OR SIDEWALK EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING FENCE EXISTING PAVEMENT STRIPING EXISTING EASEMENT G G G G TEMPORARY STORM SEWER CONSTRUCTED WITH PHASE 1 TEMPORARY SANITARY SERVICE CONSTRUCTED WITH PHASE 1 EAST HORSETOOTH ROAD SOUTH TIMBERLINE ROAD DANFIELD COURT UNION PACIFIC RAILROAD OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC HQ BUILDING MICROWAVE BUILDING MAINTENANCE SHOP / TRUCK WASH POOL CAR WAREHOUSE SUBSTATION GARAGE FLEET PARKING GARAGE A PROPOSED POND EXISTING E&O BUILDING EXISTING HEADQUARTERS FLEET PARKING GARAGE B UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 3. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 4. COORDINATE REMOVALS OF ALL IRRIGATION EQUIPMENT (PIPING, HEADS, VALVES, ETC.) WITH THE LANDSCAPE PLANS. 5. THE EXISTING HEADQUARTERS AND ENGINEERING/OPERATIONS (E/O) BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS MAY BE DEMOLISHED. REFER TO SHEET C2.00 FOR ADDITIONAL PHASING REQUIREMENTS. 6. GAS SERVICES TO BE REMOVED DURING PHASE 1 OF DEMOLITION SHALL ONLY BE REMOVED AFTER TEMPORARY SERVICE TO THE EXISTING E/O BUILDING HAS BEEN INSTALLED AND IS OPERATIONAL. 7. THE EXISTING MICROWAVE BUILDING SHALL REMAIN FULLY OPERATIONAL FOR THE DURATION OF THE CONSTRUCTION. ALL UTILITIES SHOWN TO BE REMOVED THAT SERVICE THE EXISTING MICROWAVE BUILDING MAY ONLY BE REMOVED AFTER THE EXISTING UTILITIES HAVE BEEN REPLACED AND PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING UTILITIES MAY BE DEMOLISHED. 8. CONTRACTOR SHALL COORDINATE ALL UTILITY DEMOLITION AND/OR RELOCATION ITEMS WITH THE APPROPRIATE UTILITY PROVIDER PRIOR TO BEGINNING ANY ONSITE DEMOLITION. 9. CONTRACTOR SHALL COORDINATE WITH WATER UTILITIES (970-416-2165) ON THE ABANDONMENT/REMOVAL OF EXISTING WATER SERVICES. NOTE THAT THE WATER SERVICE SHALL BE ABANDONED AT THE MAIN PER CITY REQUIREMENTS. EXISTING WATER EXISTING SANITARY EXISTING TELECOM EXISTING FIBER OPTIC EXISTING ELECTRIC EXISTING STORM SEWER EXISTING GAS EXISTING CURB & GUTTER EXISTING CONCRETE PAVEMENT OR SIDEWALK EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING FENCE EXISTING PAVEMENT STRIPING EXISTING EASEMENT REMOVE EXISTING STORM REMOVE EXISTING WATER LIMITS OF DISTURBANCE GROUND LIGHTING OR LIGHT POLE REMOVAL REMOVE EXISTING SANITARY EXISTING BUILDING IRRIGATION BOX REMOVE EXISTING FIBER REMOVE EXISTING GAS REMOVE EXISTING TELEPHONE REMOVE EXISTING CCTV DANFIELD COURT OFFSITE PROPERTY OWNED BY: 15' UTILITY EASEMENT 6' UTILITY EASEMENT 10' UTILITY EASEMENT 10' UTILITY EASEMENT EXISTING MICROWAVE BUILDING REMOVE FIBER AND ELECTRIC LINES (SEE NOTES 5&7) REMOVE FIBER AND ELECTRIC BOXES (SEE NOTES 5&7) REMOVE IRRIGATION EQUIPMENT (SEE NOTE 4) REMOVE ELECTRIC BOX (SEE NOTE 7) REMOVE FIBER BOX (SEE NOTE 7) PHASING LINE OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC REMOVE DRAINAGE PIPE 30' UTILITY EASEMENT PROPERTY LINE PRIVATE OFFSITE WATER UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 3. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 4. COORDINATE REMOVALS OF ALL IRRIGATION EQUIPMENT (PIPING, HEADS, VALVES, ETC.) WITH THE LANDSCAPE PLANS. 5. THE EXISTING HEADQUARTERS AND ENGINEERING/OPERATIONS (E/O) BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS MAY BE DEMOLISHED. REFER TO SHEET C2.00 FOR ADDITIONAL PHASING REQUIREMENTS. 6. GAS SERVICES TO BE REMOVED DURING PHASE 1 OF DEMOLITION SHALL ONLY BE REMOVED AFTER TEMPORARY SERVICE TO THE EXISTING E/O BUILDING HAS BEEN INSTALLED AND IS OPERATIONAL. 7. THE EXISTING MICROWAVE BUILDING SHALL REMAIN FULLY OPERATIONAL FOR THE DURATION OF THE CONSTRUCTION. ALL UTILITIES SHOWN TO BE REMOVED THAT SERVICE THE EXISTING MICROWAVE BUILDING MAY ONLY BE REMOVED AFTER THE EXISTING UTILITIES HAVE BEEN REPLACED AND PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING UTILITIES MAY BE DEMOLISHED. 8. CONTRACTOR SHALL COORDINATE ALL UTILITY DEMOLITION AND/OR RELOCATION ITEMS WITH THE APPROPRIATE UTILITY PROVIDER PRIOR TO BEGINNING ANY ONSITE DEMOLITION. 9. CONTRACTOR SHALL COORDINATE WITH WATER UTILITIES (970-416-2165) ON THE ABANDONMENT/REMOVAL OF EXISTING WATER SERVICES. NOTE THAT THE WATER SERVICE SHALL BE ABANDONED AT THE MAIN PER CITY REQUIREMENTS. EXISTING WATER EXISTING SANITARY EXISTING TELECOM EXISTING FIBER OPTIC EXISTING ELECTRIC EXISTING STORM SEWER EXISTING GAS EXISTING CURB & GUTTER EXISTING CONCRETE PAVEMENT OR SIDEWALK EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING FENCE EXISTING PAVEMENT STRIPING EXISTING EASEMENT REMOVE EXISTING STORM REMOVE EXISTING WATER LIMITS OF DISTURBANCE GROUND LIGHTING OR LIGHT POLE REMOVAL REMOVE EXISTING SANITARY EXISTING BUILDING IRRIGATION BOX REMOVE EXISTING FIBER REMOVE EXISTING GAS REMOVE EXISTING TELEPHONE REMOVE EXISTING CCTV EAST HORSETOOTH ROAD UNION PACIFIC RAILROAD 40' PUBLIC ACCESS EASEMENT 10' UTILITY EASEMENT 6' UTILITY EASEMENT 107.5' R.O.W. 50' R.O.W. EXISTING E/O BUILDING EXISTING WORKOUT SPACE EXISTING MICROWAVE BUILDING EXISTING POOL CAR BUILDING EXISTING CARPENTER SHOP EXISTING POND REMOVE DRAINAGE PIPE REMOVE LIGHT POLE REMOVE CLEAN OUT REMOVE FIRE HYDRANT REMOVE FIBER AND ELECTRIC LINES (SEE NOTES 5&7) REMOVE GROUND LIGHT (TYP) REMOVE FIBER AND ELECTRIC BOXES (SEE NOTES 5&7) REMOVE WATER SERVICE, FIRE SERVICE AND WATER METER REMOVE DRAINAGE PIPE REMOVE ELECTRIC LINE (SEE NOTES 5&7) REMOVE FIBER LINE REMOVE FIBER BOX REMOVE FIBER BOXES REMOVE A/C UNIT REMOVE GROUND LIGHT (TYP) REMOVE LIGHT POLE (TYP) REMOVE SANITARY MANHOLES AND CLEANOUT REMOVE CLEAN OUT REMOVE CLEAN OUT REMOVE CLEAN OUT REMOVE FIRE HYDRANT REMOVE ELECTRIC BOXES REMOVE ELECTRIC BOXES REMOVE ELECTRIC BOX REMOVE ELECTRIC BOX REMOVE ELECTRIC BOXES REMOVE ELECTRIC BOX REMOVE FIBER BOX REMOVE ELECTRIC BOX REMOVE ELECTRIC BOXES REMOVE IRRIGATION EQUIPMENT (SEE NOTE 4) REMOVE ELECTRIC BOX (SEE NOTE 7) REMOVE FIBER BOX (SEE NOTE 7) REMOVE FIBER BOXES (SEE NOTE 7) REMOVE ELECTRIC REMOVE SANITARY MANHOLE BOX (SEE NOTE 7) REMOVE SANITARY MANHOLE REMOVE FIBER BOX REMOVE ELECTRIC LINE REMOVE WATER SERVICE LINES REMOVE ELECTRIC LINE REMOVE ELECTRIC LINE REMOVE ELECTRIC LINES REMOVE ELECTRIC LINE REMOVE FIBER LINE REMOVE FIBER LINE REMOVE SANITARY SERVICE LINE REMOVE GAS, FIBER, AND ELECTRIC LINES (SEE NOTES 5-7) REMOVE 6" WATER SERVICE LINE WITH PHASE 2 REMOVE IRRIGATION VALVE BOX REMOVE AND REPLACE RAW WATER WELL & INTAKE (SEE IRR. PLANS) REMOVE INLET PHASING LINE PHASING LINE OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC REMOVE A/C UNIT REMOVE GAS METER (SEE NOTES 5-6) REMOVE GAS METER REMOVE DRAINAGE PIPE REMOVE DRAINAGE PIPE APPROXIMATE EXISTING IRRIGATION PIPE APPROXIMATE PHASE 2 LIMITS (SEE NOTE 5) APPROXIMATE EXISTING IRRIGATION PIPE PROPERTY LINE PROPOSED 30' PORTION OF EXISTING PUBLIC ACCESS EASEMENT TO BE VACATED BY SEPARATE DOC. UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 3. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 4. COORDINATE REMOVALS OF ALL IRRIGATION EQUIPMENT (PIPING, HEADS, VALVES, ETC.) WITH THE LANDSCAPE PLANS. 5. THE EXISTING HEADQUARTERS AND ENGINEERING/OPERATIONS (E/O) BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS MAY BE DEMOLISHED. REFER TO SHEET C2.00 FOR ADDITIONAL PHASING REQUIREMENTS. 6. GAS SERVICES TO BE REMOVED DURING PHASE 1 OF DEMOLITION SHALL ONLY BE REMOVED AFTER TEMPORARY SERVICE TO THE EXISTING E/O BUILDING HAS BEEN INSTALLED AND IS OPERATIONAL. 7. THE EXISTING MICROWAVE BUILDING SHALL REMAIN FULLY OPERATIONAL FOR THE DURATION OF THE CONSTRUCTION. ALL UTILITIES SHOWN TO BE REMOVED THAT SERVICE THE EXISTING MICROWAVE BUILDING MAY ONLY BE REMOVED AFTER THE EXISTING UTILITIES HAVE BEEN REPLACED AND PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING UTILITIES MAY BE DEMOLISHED. 8. CONTRACTOR SHALL COORDINATE ALL UTILITY DEMOLITION AND/OR RELOCATION ITEMS WITH THE APPROPRIATE UTILITY PROVIDER PRIOR TO BEGINNING ANY ONSITE DEMOLITION. 9. CONTRACTOR SHALL COORDINATE WITH WATER UTILITIES (970-416-2165) ON THE ABANDONMENT/REMOVAL OF EXISTING WATER SERVICES. NOTE THAT THE WATER SERVICE SHALL BE ABANDONED AT THE MAIN PER CITY REQUIREMENTS. EXISTING WATER EXISTING SANITARY EXISTING TELECOM EXISTING FIBER OPTIC EXISTING ELECTRIC EXISTING STORM SEWER EXISTING GAS EXISTING CURB & GUTTER EXISTING CONCRETE PAVEMENT OR SIDEWALK EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING FENCE EXISTING PAVEMENT STRIPING EXISTING EASEMENT REMOVE EXISTING STORM REMOVE EXISTING WATER LIMITS OF DISTURBANCE GROUND LIGHTING OR LIGHT POLE REMOVAL REMOVE EXISTING SANITARY EXISTING BUILDING IRRIGATION BOX REMOVE EXISTING FIBER REMOVE EXISTING GAS REMOVE EXISTING TELEPHONE REMOVE EXISTING CCTV EAST HORSETOOTH ROAD SOUTH TIMBERLINE ROAD 6' UTILITY EASEMENT EXISTING HEADQUARTERS BUILDING EXISTING WORKOUT SPACE EXISTING MICROWAVE BUILDING EXISTING POOL CAR BUILDING EXISTING POND PUBLIC ACCESS EASEMENT (WIDTH VARIES) 107.5' R.O.W. 50' R.O.W. 40' PUBLIC ACCESS EASEMENT 6' UTILITY EASEMENT 120' R.O.W. 50' R.O.W. SECTION CORNER N:1439553.86 E:3128887.40 REMOVE HEADWALL REMOVE DRAINAGE PIPE REMOVE LIGHT POLE (TYP) REMOVE ELECTRIC LINE REMOVE A/C UNIT REMOVE GROUND LIGHT (TYP) REMOVE LIGHT POLE (TYP) REMOVE LIGHT POLE (TYP) REMOVE SANITARY MANHOLES AND CLEANOUT REMOVE CLEAN OUT REMOVE CLEAN OUT REMOVE CLEAN OUT REMOVE FIRE HYDRANT REMOVE FIRE HYDRANT REMOVE MAILBOX REMOVE ELECTRIC BOX REMOVE ELECTRIC BOX REMOVE ELECTRIC BOX REMOVE ELECTRIC BOXES REMOVE ELECTRIC BOX REMOVE ELECTRIC BOX REMOVE ELECTRIC BOX REMOVE ELECTRIC BOXES REMOVE ELECTRIC BOX REMOVE ELECTRIC BOXES REMOVE ELECTRIC BOX REMOVE FIBER BOX REMOVE ELECTRIC BOX REMOVE ELECTRIC BOX REMOVE FIBER BOXES REMOVE ELECTRIC BOX REMOVE ELECTRIC BOX REMOVE IRRIGATION EQUIPMENT (SEE NOTE 4) REMOVE ELECTRIC BOX (SEE NOTE 7) REMOVE FIBER BOX (SEE NOTE 7) REMOVE ELECTRIC BOX (SEE NOTE 7) REMOVE SANITARY MANHOLE REMOVE FIBER LINE REMOVE FIBER LINE REMOVE ELECTRIC LINE REMOVE WATER SERVICE LINES REMOVE FIBER LINE SSMH RIM=4953.4 INV S 8' PVC=4944.7 INV W 4" PVC=4945.1 INV N 8" PVC=4944.7 REMOVE EXISTING METER EQUIPMENT REMOVE IRRIGATION VALVE BOX REMOVE AND REPLACE RAW WATER WELL & INTAKE (SEE IRR. PLANS) REMOVE INLET PHASING LINE PHASING LINE REMOVE ELECTRIC BOX REMOVE A/C UNIT REMOVE GAS METER (SEE NOTES 5-6) REMOVE GAS METER REMOVE FIBER BOX OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC EXISTING GAS SERVICE REMOVE GAS SERVICE TO REMAIN (SEE NOTES 5-6) REMOVE DRAINAGE PIPE REMOVE DRAINAGE PIPE REMOVE DRAINAGE PIPE APPROXIMATE EXISTING IRRIGATION PIPE APPROXIMATE PHASE 2 LIMITS (SEE NOTE 5) PROPOSED 30' PORTION OF EXISTING PUBLIC ACCESS EASEMENT TO BE VACATED BY SEPARATE DOC. UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 3. LIMITS OF STREET CUT AS REQUIRED FOR UTILITY CONSTRUCTION OR THE PLACEMENT OF PROPOSED CURB AND GUTTER ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 4. CURB, GUTTER AND SIDEWALK SHALL BE REMOVED TO THE NEAREST JOINT. 5. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 6. COORDINATE THE REMOVAL AND/OR SALVAGING OF ALL EXISTING TREES AND OTHER PLANTINGS SHOWN ON THIS REMOVAL PLAN WITH THE LANDSCAPE DRAWINGS. 7. CONTRACTOR SHALL COORDINATE REMOVALS ASSOCIATED WITH THE EXISTING BUILDINGS WITH THE ARCHITECTURAL DRAWINGS. 8. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS MAY BE DEMOLISHED. REFER TO SHEET C2.00 FOR ADDITIONAL PHASING REQUIREMENTS. 9. THE EXISTING POND LINING AND EDGING SHALL BE REMOVED. THE MATERIAL MAY BE HAULED OFF SITE OR PROCESSED AND UTILIZED ONSITE PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 10. THE EXISTING POND SHALL BE FILLED USING MATERIAL APPROVED BY THE GEOTECHNICAL ENGINEER AND APPROPRIATE FOR THE PROPOSED BUILDING FOUNDATION DESIGN. 11. THE EXISTING ASPHALT PAVEMENT OF THE ACCESS FROM DANFIELD COURT SHALL BE REMOVED AND RECONSTRUCTED TO MEET THE MINIMUM HEAVY DUTY PAVEMENT SECTION. SAWCUT LINE REMOVE EXISTING CONCRETE PAVEMENT OR SIDEWALK REMOVE EXISTING ASPHALT EXISTING CURB & GUTTER EXISTING CONCRETE PAVEMENT OR SIDEWALK EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING FENCE EXISTING PAVEMENT STRIPING EXISTING EASEMENT REMOVE EXISTING CURB LIMITS OF DISTURBANCE TREE REMOVAL (SEE NOTE 6) REMOVE EXISTING FENCE REMOVE EXISTING BUILDING (SEE NOTE 7) 6' UTILITY EASEMENT OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC 15' UTILITY EASEMENT 10' UTILITY EASEMENT 10' UTILITY EASEMENT 30' UTILITY EASEMENT EXISTING MICROWAVE BUILDING REMOVE INLET REMOVE INLET REMOVE SHRUBS REMOVE BOLLARDS REMOVE CONCRETE VAULT/STRUCTURE REMOVE BOLLARDS REMOVE BOLLARDS REMOVE SIGNS REMOVE SIGN PHASING LINE PROPERTY BOUNDARY PROPERTY BOUNDARY REMOVE TREES AND LANDSCAPING FEATURES (SEE NOTE 6) PROPERTY LINE REMOVE RFENCING EXISTING PARKING LOT TO REMAIN REMOVE CONCRETE PAN REMOVE CONCRETE AND ANY UNDERGROUND STRUCTURES IF APPLICABLE EXISTING PAVEMENT TO BE RECONSTRUCTED TO HEAVY DUTY PAVEMENT SECTION (SEE NOTE 11) DANFIELD COURT OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 3. LIMITS OF STREET CUT AS REQUIRED FOR UTILITY CONSTRUCTION OR THE PLACEMENT OF PROPOSED CURB AND GUTTER ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 4. CURB, GUTTER AND SIDEWALK SHALL BE REMOVED TO THE NEAREST JOINT. 5. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 6. COORDINATE THE REMOVAL AND/OR SALVAGING OF ALL EXISTING TREES AND OTHER PLANTINGS SHOWN ON THIS REMOVAL PLAN WITH THE LANDSCAPE DRAWINGS. 7. CONTRACTOR SHALL COORDINATE REMOVALS ASSOCIATED WITH THE EXISTING BUILDINGS WITH THE ARCHITECTURAL DRAWINGS. 8. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS MAY BE DEMOLISHED. REFER TO SHEET C2.00 FOR ADDITIONAL PHASING REQUIREMENTS. 9. THE EXISTING POND LINING AND EDGING SHALL BE REMOVED. THE MATERIAL MAY BE HAULED OFF SITE OR PROCESSED AND UTILIZED ONSITE PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 10. THE EXISTING POND SHALL BE FILLED USING MATERIAL APPROVED BY THE GEOTECHNICAL ENGINEER AND APPROPRIATE FOR THE PROPOSED BUILDING FOUNDATION DESIGN. 11. THE EXISTING ASPHALT PAVEMENT OF THE ACCESS FROM DANFIELD COURT SHALL BE REMOVED AND RECONSTRUCTED TO MEET THE MINIMUM HEAVY DUTY PAVEMENT SECTION. SAWCUT LINE REMOVE EXISTING CONCRETE PAVEMENT OR SIDEWALK REMOVE EXISTING ASPHALT EXISTING CURB & GUTTER EXISTING CONCRETE PAVEMENT OR SIDEWALK EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING FENCE EXISTING PAVEMENT STRIPING EXISTING EASEMENT REMOVE EXISTING CURB LIMITS OF DISTURBANCE TREE REMOVAL (SEE NOTE 6) REMOVE EXISTING FENCE REMOVE EXISTING BUILDING (SEE NOTE 7) OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC 40' PUBLIC ACCESS EASEMENT 10' UTILITY EASEMENT 6' UTILITY EASEMENT 107.5' R.O.W. 50' R.O.W. REMOVE DRAINAGE STRUCTURE EXISTING E/O BUILDING EXISTING WORKOUT SPACE EXISTING MICROWAVE BUILDING EXISTING POOL CAR BUILDING EXISTING CARPENTER SHOP EXISTING POND PROPOSED 30' PORTION OF EXISTING PUBLIC ACCESS EASEMENT TO BE VACATED BY SEPARATE DOC. REMOVE BUILDING AND CURB IN PHASE 1 OF CONSTRUCTION REMOVE PORTION OF BUILDING IN PHASE 1 OF CONSTRUCTION REMOVE BUILDING IN PHASE 1 OF CONSTRUCTION FILL IN EXISTING POND WITH PHASE 1 CONSTRUCTION (SEE NOTE 10) REMOVE INLET REMOVE INLET REMOVE GUTTER REMOVE SHRUBS REMOVE BOLLARDS AT FRONT OF BUILDING REMOVE TREES AND LANDSCAPING FEATURES (SEE NOTE 6) REMOVE BIKE RACK REMOVE DRAINAGE STRUCTURE REMOVE PAN REMOVE CONCRETE SPLASH PAD REMOVE BOLLARDS AT FRONT OF BUILDING REMOVE STOP SIGN REMOVE BOLLARD REMOVE STOP SIGN REMOVE AND REPLACE WATER WELL AND INTAKE (SEE IRRIGATION PLANS) REMOVE STORAGE UNITS (TYP.) REMOVE ASPHALT REMOVE ASPHALT REMOVE ASPHALT REMOVE LANDSCAPING FEATURES (SEE NOTE 6) REMOVE LANDSCAPING FEATURES REMOVE AND RESET SIGN REMOVE CONCRETE VAULT/STRUCTURE REMOVE BOLLARDS REMOVE CONCRETE OUTLET STRUCTURE REMOVE AND RESET HANDICAP SIGN REMOVE SIDEWALK CHASE REMOVE SOLAR PANEL ARRAY REMOVE SOLAR PANELS REMOVE EXISTING BUILDING REMOVE EXISTING BUILDING PHASING LINE PHASING LINE REMOVE BUILDING IN PHASE 2 OF CONSTRUCTION PROPERTY BOUNDARY REMOVE CURB WALL APPROXIMATE PHASE 2 LIMITS (SEE NOTE 8) PROPERTY LINE REMOVE RFENCING REMOVE FENCING REMOVE FENCING RESET EXISTING STOP SIGN AT PROPOSED ACCESS SAWCUT & REMOVE EXISTING ASPHALT SAWCUT & REMOVE EXISTING ASPHALT EAST HORSETOOTH ROAD UNION PACIFIC RAILROAD UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 3. LIMITS OF STREET CUT AS REQUIRED FOR UTILITY CONSTRUCTION OR THE PLACEMENT OF PROPOSED CURB AND GUTTER ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 4. CURB, GUTTER AND SIDEWALK SHALL BE REMOVED TO THE NEAREST JOINT. 5. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 6. COORDINATE THE REMOVAL AND/OR SALVAGING OF ALL EXISTING TREES AND OTHER PLANTINGS SHOWN ON THIS REMOVAL PLAN WITH THE LANDSCAPE DRAWINGS. 7. CONTRACTOR SHALL COORDINATE REMOVALS ASSOCIATED WITH THE EXISTING BUILDINGS WITH THE ARCHITECTURAL DRAWINGS. 8. THE EXISTING HEADQUARTERS, ENGINEERING/OPERATIONS (E/O), AND MICROWAVE BUILDINGS SHALL REMAIN FULLY OPERATIONAL UNTIL SUCH TIME THAT PLATTE RIVER POWER AUTHORITY NOTIFIES THE CONTRACTOR THAT THE EXISTING BUILDINGS MAY BE DEMOLISHED. REFER TO SHEET C2.00 FOR ADDITIONAL PHASING REQUIREMENTS. 9. THE EXISTING POND LINING AND EDGING SHALL BE REMOVED. THE MATERIAL MAY BE HAULED OFF SITE OR PROCESSED AND UTILIZED ONSITE PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 10. THE EXISTING POND SHALL BE FILLED USING MATERIAL APPROVED BY THE GEOTECHNICAL ENGINEER AND APPROPRIATE FOR THE PROPOSED BUILDING FOUNDATION DESIGN. 11. THE EXISTING ASPHALT PAVEMENT OF THE ACCESS FROM DANFIELD COURT SHALL BE REMOVED AND RECONSTRUCTED TO MEET THE MINIMUM HEAVY DUTY PAVEMENT SECTION. SAWCUT LINE REMOVE EXISTING CONCRETE PAVEMENT OR SIDEWALK REMOVE EXISTING ASPHALT EXISTING CURB & GUTTER EXISTING CONCRETE PAVEMENT OR SIDEWALK EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING FENCE EXISTING PAVEMENT STRIPING EXISTING EASEMENT REMOVE EXISTING CURB LIMITS OF DISTURBANCE TREE REMOVAL (SEE NOTE 6) REMOVE EXISTING FENCE REMOVE EXISTING BUILDING (SEE NOTE 7) SECTION CORNER N:1439553.86 E:3128887.40 OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC PUBLIC ACCESS EASEMENT (WIDTH VARIES) 6' UTILITY EASEMENT REMOVE BUILDING IN PHASE 1 OF CONSTRUCTION REMOVE CONCRETE POND LINING/EDGING (SEE NOTE 9) REMOVE LANDSCAPE WALL 107.5' R.O.W. 50' R.O.W. 40' PUBLIC ACCESS EASEMENT 6' UTILITY EASEMENT 120' R.O.W. 50' R.O.W. EXISTING HEADQUARTERS BUILDING EXISTING WORKOUT SPACE EXISTING MICROWAVE BUILDING EXISTING POOL CAR BUILDING EXISTING POND PROPOSED 30' PORTION OF EXISTING PUBLIC ACCESS EASEMENT TO BE VACATED BY SEPARATE DOC. REMOVE SIGN REMOVE HEADWALL REMOVE FENCE REMOVE BUILDING IN PHASE 2 OF CONSTRUCTION REMOVE PORTION OF BUILDING IN PHASE 1 OF CONSTRUCTION REMOVE BUILDING IN PHASE 1 OF CONSTRUCTION FILL IN EXISTING POND WITH PHASE 1 CONSTRUCTION (SEE NOTE 10) REMOVE CURB, GUTTER AND PAN AT EXISTING ACCESS REMOVE INLET REMOVE INLET REMOVE CURB, GUTTER, AND PAN AT ACCESS SAWCUT & REMOVE EXISTING ASPHALT REMOVE BOLLARDS AT FRONT OF BUILDING REMOVE STOP SIGN REMOVE BOLLARD REMOVE STOP SIGN REMOVE STOP SIGN REMOVE AND REPLACE WATER WELL AND INTAKE (SEE IRRIGATION PLANS) REMOVE CURB AND SIDEWALK REMOVE PAN REMOVE STORAGE UNITS (TYP.) REMOVE ASPHALT REMOVE ASPHALT REMOVE ASPHALT REMOVE ASPHALT REMOVE STOP SIGN REMOVE BOLLARD REMOVE BOLLARDS AND SIGNS REMOVE AND RESET HANDICAP SIGN REMOVE AND RESET HANDICAP SIGN REMOVE LANDSCAPING FEATURES REMOVE LANDSCAPING FEATURES (SEE NOTE 6) REMOVE BOLLARDS REMOVE AND RESET HANDICAP SIGN REMOVE LANDSCAPE WALL REMOVE LANDSCAPE WALL REMOVE CURB WALL REMOVE CURB WALL REMOVE FLAG POLES REMOVE SIGN REMOVE SIGN PROPERTY BOUNDARY REMOVE EXISTING BUILDING REMOVE EXISTING BUILDING PHASING LINE PHASING LINE REMOVE CURB WALL APPROXIMATE PHASE 2 LIMITS (SEE NOTE 8) SAWCUT & REMOVE EXISTING ASPHALT RESET EXISTING STOP SIGN AT PROPOSED ACCESS SAWCUT & REMOVE EXISTING ASPHALT EAST HORSETOOTH ROAD SOUTH TIMBERLINE ROAD EXISTING WATER EXISTING SANITARY EXISTING TELECOM EXISTING FIBER OPTIC EXISTING ELECTRIC EXISTING STORM SEWER EXISTING GAS LIMITS OF DISTURBANCE EXISTING CURB & GUTTER EXISTING CONCRETE PAVEMENT OR SIDEWALK EXISTING RIGHT-OF-WAY LINE EXISTING LOT LINE EXISTING FENCE EXISTING PAVEMENT STRIPING EXISTING EASEMENT SSMH RIM=4951.6 INV W 24" RCP=4943.6 INV E 24" RCP=4943.5 SSMH RIM=4957.0 INV W 24" RCP=4945.6 INV N 4" PVC=4947.6 INV W 24" RCP=4945.6 SSMH RIM=4958.0 INV W 24" RCP=4946.4 INV E 24" RCP=4946.3 SSMH RIM=4956.2 SEPARATOR SSMH RIM=4955.5 OIL SEPERATOR SSMH RIM=4955.5 OIL SEPERATOR SSMH RIM=4955.8 INV W 6" STEEL PIPE=4950.4 INV E 6" STEEL PIPE=4950.3 SSMH RIM=4956.0 INV S 4" PVC=4953.4 TOP VERTICAL 4" PVC=4953.8 INLET GRATE=4954.3 INV NW 8" CMP=4953.0 INLET GRATE=4956.34 INV NE 12" CMP=4951.99 INLET RIM=4952.5 INV NW 12" RCP=4948.5 INV E 12" RCP=4948.5 INLET GRATE=4953.0 INV NW 12" RCP=4950.3 INLET GRATE=4952.4 INV E 12" RCP=4949.6 INLET GRATE=4952.0 INV W 12" RCP=4949.0 INV N 12" RCP=4948.9 INV E 12" RCP=4948.9 INLET GRATE=4953.2 INV E 12" RCP=4949.5 INV SE 12" RCP=4949.5 INLET GRATE=4951.1 INV E 18" RCP=4948.1 INV W 18" RCP=4948.0 INLET GRATE=4950.5 INV W 18" RCP=4948.0 INV N 18" RCP=4947.7 INLET GRATE=4954.3 INV SE 12" RCP=4950.2 INV N 12" RCP=4950.2 INLET GRATE=4953.6 INV S 12" RCP=4949.7 INV SE 12" RCP=4949.7 STORM MH RIM=4951.0 INV SE 4" PVC=4948.0 INV SW 10" CMP=4947.8 INV N 12" RCP=4947.5 6' UTILITY EASEMENT 6" SANITARY SEWER SERVICE EXISTING FIRE HYDRANTS EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT 10" CMP OUTLET INV. OUT = 4948.14 POND STM INV 12" CMP=4949.7 EXISTING 6" WATER SERVICE 6" SANITARY SEWER SERVICE EXISTING FIRE HYDRANT SSMH RIM=4953.4 INV S 8' PVC=4944.7 INV W 6" PVC=4945.1 INV N 8" PVC=4944.7 PROPERTY LINE EXISTING PARKING LOT 40' PUBLIC ACCESS EASEMENT 15' UTILITY EASEMENT 10' UTILITY EASEMENT 10' UTILITY EASEMENT 6' UTILITY EASEMENT PUBLIC ACCESS EASEMENT (WIDTH VARIES) 6' UTILITY EASEMENT 107.5' R.O.W. 50' R.O.W. 30' UTILITY EASEMENT PROPOSED 30' PORTION OF EXISTING PUBLIC ACCESS EASEMENT TO BE VACATED BY SEPARATE DOC. EAST HORSETOOTH ROAD SOUTH TIMBERLINE ROAD DANFIELD COURT UNION PACIFIC RAILROAD OFFSITE PROPERTY OWNED BY: 2001 DANFIELD LLC EXISTING E/O BUILDING EXISTING HQ EXISTING WORKOUT SPACE EXISTING MICROWAVE BUILDING EXISTING POOL CAR GARAGE EXISTING CARPENTER SHOP EXISTING POND PRIVATE OFFSITE WATER 16. A vehicle tracking control pad shall be installed when needed for construction equipment, including but not limited to personal vehicles exiting existing roadways. No earthen materials, i.e. stone, dirt, etc. shall be placed in the curb & gutter or roadway as a ramp to access temporary stockpiles, staging areas, construction materials, concrete washout areas, and/or building sites. CITY OF FORT COLLINS WATERLINE NOTES 1. Water mains shall be DIP with polywrap or PVC with tracer wire. 2. Water mains shall be installed with 4.5 to 5.5 feet of cover unless otherwise approved. 3. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal box and tracer wire test lid per City Water Detail 25. CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: APPROVED: LARIMER COUNTY URBAN AREA STREET STANDARDS - REPEALED AND REENACTED OCTOBER 1, 2002 GENERAL NOTES 1. All materials, workmanship, and construction of public improvements shall meet or exceed the Standards and Specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the local entity. 2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the local entity engineer. Use of these plans after the expiration date will require a new review and approval process by the local entity prior to commencement of any work shown in these plans. 4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the local entity, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the local entity engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the local entity, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5. All sanitary sewer, storm sewer, and water line construction, as well as power and other "dry" utility installations, shall conform to the local entity standards and specifications current at the date of approval of the plans by the local entity engineer. 6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The developer shall be responsible for unknown underground utilities. 7. The developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8. The developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the local entity prior to beginning construction. 10. The developer shall coordinate and cooperate with the local entity, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11. No work may commence within any public storm water, sanitary sewer or potable water system until the developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12. The developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13. The minimum cover over water lines is4.5 feet and the maximum is 5.5 fee unless otherwise noted in the plans and approved by the Water Utility. 14. A state construction dewatering wastewater discharge permit is required if dewatering is required in order to install utilities or water is discharged into a storm sewer, channel, irrigation ditch or any waters of the united states. 15. The developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the storm water management plan, and the erosion control plan. 16. The local entity shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17. Prior to final inspection and acceptance by the local entity, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the storm water utility department. Certification shall be submitted to the storm water utility department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Storm Water Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the development agreement. 18. The local entity including but not limited to City of Fort Collins, South Fort Collins Sanitation District and Fort Collins-Loveland Water District shall not be responsible for any damages or injuries sustained in this development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the local entity failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19. All recommendations of the preliminary drainage and erosion control study entitled "Platte River Power Authority Headquarters" prepared by United Civil Design Group LLC, and dated November 14, 2017, shall be followed and implemented. 20. Temporary erosion control during construction shall be provided as shown on the erosion control plan. All erosion control measures shall be maintained in good repair by the developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21. The developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the local entity street inspector. 22. No work may commence within any improved or unimproved public right-of-way until a right-of-way permit or development construction permit is obtained, if applicable. 23. The developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The developer shall notify the local entity engineering inspector (Fort Collins - 221-6605) and the local entity erosion control inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the local entity engineer is not available after proper notice of construction activity has been provided, the developer may commence work in the engineers absence. However, the local entity reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24. The developer shall be responsible for obtaining soils tests within the public right-of-way after right-of-way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the developer shall be responsible for a re-design of the subject pavement section or, the developer may use the local entity's default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed professional engineer. The final report shall be submitted to the inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the local entity engineer approves the final report. 25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the local entity inspector. The engineer or surveyor must certify in a letter to the local entity that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the local entity before installation of base course or asphalt will be allowed on the streets. 26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27. Portions of Larimer County are within overlay districts. The Larimer County floodplain resolution should be referred to for additional criteria for roads within these districts. 28. All road construction in areas designated as wild fire hazard areas shall be done in accordance with the construction criteria as established in the wild fire hazard area mitigation regulations in force at the time of final plat approval. 29. Prior to the commencement of any construction, the contractor shall contact the local entity forester to schedule a site inspection for any tree removal requiring a permit. 30. The developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31. The developer shall submit a construction traffic control plan, in accordance with MUTCD, to the appropriate right-of-way authority. (local entity, county or state), for approval, prior to any construction activities within, or affecting, the right-of-way. The developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities. 32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact local entity traffic operations department, who will temporarily remove or relocate the sign at no cost to the contractor; however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33. The developer is responsible for all costs for the initial installation of traffic signing and striping for the development related to the development's local street operations. In addition, the developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the development. 34. There shall be no site construction activities on Saturdays, unless specifically approved by the local entity engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by the local entity. 35. The developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the designer for clarification, and annotate the dimension on the as-built record drawings. 37. The developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the developer shall contact the designer and the local entity engineer immediately. 39. The developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the local entity's inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the local entity engineer. GENERAL NOTES (CONTINUED) 40. The designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: PROJECT DATUM: NAVD 88. BENCHMARK #1: CITY OF FORT COLLINS 17-92 300 FEET SOUTH OF THE SOUTHWEST CORNER OF EAST DRAKE ROAD AND TIMBERLINE ROAD, IN THE TOP OF AN IRRIGATION STRUCTURE ELEVATION=4938.70 BENCHMARK #2: CITY OF FORT COLLINS 43-01 EAST SIDE OF TIMBERLINE ROAD, AT THE SOUTH ENTRANCE TO C.S.U. RIGDEN FARM, ON THE NORTH END OF THE HEADWALL OF A STORM DITCH. ELEVATION=4937.02 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.19'. BASIS OF BEARINGS: ASSUMING THE SOUTH LINE OF THE SOUTHEAST QUARTER OF SECTION 30, T.7N., R.68W., AS BEARING SOUTH 89°53'04" WEST BEING A GRID BEARING OF THE COLORADO STATE PLANE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICAN DATUM 1983/2011, A DISTANCE OF 2653.20 FEET WITH ALL OTHER BEARINGS CONTAINED HEREIN RELATIVE THERETO. NOTE: FOR LOTS 1 AND 2, ALL PLAT BEARINGS WERE ROTATED 0°28'56" COUNTERCLOCKWISE TO COINCIDE WITH THE STATED BASIS OF BEARING. 41. All stationing is based on centerline of roadways unless otherwise noted. 42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first certificate of occupancy. 43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the local entity construction inspector before any cuts are made. Patching shall be done in accordance with the local entity street repair standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the local entity engineer and/or the local entity inspector at the time the cuts are made. 44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. Standard handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46. After acceptance by the local entity, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47. The local entity shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: none. 48. Approved variances are listed as follows: -None. STREET IMPROVEMENTS NOTES 1. All street construction is subject to the General Notes on the Cover Sheet of these plans as well as the street improvements notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed engineer, must be submitted to the local entity engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the local entity engineer in Fort Collins. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the local entity engineer. 5. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, reconstruction and repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the local entity engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in MUTCD (including Colorado supplement) and as per the right-of-way work permit traffic control plan. 8. The developer is required to perform a gutter water flow test in the presence of the local entity inspector and prior to installation of asphalt. Gutters that hold more than inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. And a single axle weight of at least 18,000 lbs. With pneumatic tires inflated to not less than 90 P.S.I.G. "proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the local entity engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The local entity engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be performed in the presence of an inspector. STORM DRAINAGE NOTES 1. All street, sanitary sewer, storm sewer and water construction shall conform to City Standards and Specifications current at date of execution of the Development Agreement pertaining to this development. Any construction occurring three years after the execution of the development agreement shall require re-examination of the plans by the Director who may require that they be made to conform to standards and specifications current at that time. 2. The type, size, location, and number of all known underground utilities are approximate as shown on the drawings. It shall be the responsibility of the contractor to verify the existence and location of all underground utilities along the route of the work. Before commencing new construction, the contractor shall be responsible for locating unknown underground utilities. 3. These plans have been reviewed by the City for concept only. The review does not imply responsibility by the reviewing department, the City Engineer, or the City for accuracy or correctness of the calculations. Furthermore, the review does not imply that the quantities of the items on the plans are the final quantities required. The review shall not be construed in any reason as acceptance of financial responsibility by the City for additional quantities of items shown that may be required during the construction phase. 4. Prior to the commencement of any construction, the contractor must give the City Engineering Department (970-221-6605) and the Erosion Control Inspector (970-221-6700) twenty-four (24) hours advance. Initial erosion control measures must be installed and a site inspection by the Erosion Control Inspector is required before commencing construction activities. 5. Maintenance of onsite drainage facilities shall be the responsibility of the property owners. 6. All recommendations of the preliminary drainage and erosion control study entitled "Platte River Power Authority Headquarters" prepared by United Civil Design Group LLC, and dated November 14, 2017, shall be followed and implemented. 7. Prior to final inspection and acceptance by the City, certification of the drainage facilities by a Colorado registered professional engineer must be submitted to and approved by the City Stormwater Department. (including the applicable note as set forth below) For commercial and multi-family developments, certification of all drainage facilities shall be submitted to the City Stormwater Department at least two weeks prior to the release of a certificate of occupancy. Individual lot certification, elevation certification, or floodproofing certification, as specified in the development agreement, must be submitted to the City Stormwater Department at least two weeks prior to the release of a certificate of occupancy for such lot. For single family developments, certification of all drainage facilities must be submitted to the City Stormwater Department in accordance with all conditions as prescribed by the development agreement associated with this development. Individual lot certification, elevation certification, or floodproofing certification, as specified in the development agreement, must be submitted to the City Stormwater Department at least one week prior to the release of a certificate of occupancy for such lot. 8. If dewatering is used to install utilities, and discharge will be into the street, gutter, storm sewer, channel, irrigation ditch, or any waters of the State a State Construction Dewatering Industrial Wastewater Discharge Permit is required. 9. All land disturbing activities greater than or equal to one acre must comply with the State of Colorado permitting process for Stormwater Discharges Associated with Construction Activity. For more information contact the Colorado Department of Public Health and Environment, Water Quality Control Division, at 303-692-3500 or refer to the web site at http://www.cdphe.state.co.us/wq/PermitsUnit/. 10. Benchmark: See General Note Number 40. 11. If fill or dredged material is discharged into waters of the United States, a USACE 404 permit is required. 12. If construction affects any Colorado Highway, a Colorado Department of Transportation right-of-way permit is required. PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC CONTACT: KRISTINA WINN ARCHITECT OF RECORD BELFORD WATKINS GROUP 425 WEST MULBERRY, SUITE 207 FORT COLLINS, CO 80521 PHONE: 970-212-1243 CONTACT: DON WATKINS SURVEYOR KING SURVEYORS 650 EAST GARDEN DRIVE WINDSOR, CO 80550 PHONE: 970-686-5011 CONTACT: STEVEN PARKS PROJECT TEAM UTILITY PROVIDER CONTACT PHONE Water/Wastewater City of Fort Collins Utilities Shane Boyle (970) 221-6339 Stormwater City of Fort Collins Utilities Shane Boyle (970) 221-6339 Power City of Fort Collins Light & Power Luke Unruh (970) 416-2724 Natural Gas Xcel Energy Stephanie Rich (970) 225-7828 Telecom Centurylink Robert Rulli (970) 490-7503 Cable Comcast Don Kapperman (970) 567-0245 Note: All utility providers listed hereon is provided as a courtesy. It is the responsibility of the recipient to verify the accuracy and completeness of the information shown. UTILITY PROVIDERS C0.00 COVER SHEET C0.01 GENERAL & CONSTRUCTION NOTES C1.00 OVERALL EXISTING CONDITIONS PLAN C1.01-C1.03 SURFACE REMOVAL PLANS C1.04-C1.06 UTILITY REMOVAL PLANS C2.00 OVERALL PHASING PLAN C3.00 OVERALL HORIZONTAL CONTROL PLAN C3.01-C3.03 DETAILED HORIZONTAL CONTROL & PAVEMENT PLANS C4.00 OVERALL UTILITY PLAN C4.01-C4.03 DETAILED UTILITY PLANS C4.04-C4.0X UTILITY PROFILES (RESERVED FOR FUTURE SUBMITTAL) C5.00 OVERALL GRADING PLAN C5.01-C5.03 DETAILED GRADING PLANS C5.04-C5.06 GRADING DETAILS (RESERVED FOR FUTURE SUBMITTAL) C5.07-C5.09 EROSION CONTROL PLANS C6.00 DRAINAGE PLAN C7.00-C7.XX CONSTRUCTION DETAILS (RESERVED FOR FUTURE SUBMITTAL) SHEET INDEX CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: APPROVED: CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC PROJECT COORDINATES PROJECT DATUM: NAVD 88. BENCHMARK #1: CITY OF FORT COLLINS 17-92 300 FEET SOUTH OF THE SOUTHWEST CORNER OF EAST DRAKE ROAD AND TIMBERLINE ROAD, IN THE TOP OF AN IRRIGATION STRUCTURE ELEVATION=4938.70 BENCHMARK #2: CITY OF FORT COLLINS 43-01 EAST SIDE OF TIMBERLINE ROAD, AT THE SOUTH ENTRANCE TO C.S.U. RIGDEN FARM, ON THE NORTH END OF THE HEADWALL OF A STORM DITCH. ELEVATION=4937.02 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.19'. BASIS OF BEARINGS: ASSUMING THE SOUTH LINE OF THE SOUTHEAST QUARTER OF SECTION 30, T.7N., R.68W., AS BEARING SOUTH 89°53'04" WEST BEING A GRID BEARING OF THE COLORADO STATE PLANE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICAN DATUM 1983/2011, A DISTANCE OF 2653.20 FEET WITH ALL OTHER BEARINGS CONTAINED HEREIN RELATIVE THERETO. NOTE: FOR LOTS 1 AND 2, ALL PLAT BEARINGS WERE ROTATED 0°28'56" COUNTERCLOCKWISE TO COINCIDE WITH THE STATED BASIS OF BEARING. NOTE: 1. ALL PROJECT CONTROL LISTED HEREON IS PROVIDED AS A COURTESY. IT IS THE RESPONSIBILITY OF THE RECIPIENT TO VERIFY THE ACCURACY OF THE COORDINATES AND ELEVATIONS SHOWN PRIOR TO USING THEM FOR ANY PURPOSES. PLANNER/LANDSCAPE ARCHITECT BHA DESIGN INC. 1603 OAKRIDGE DRIVE, SUITE 100 FORT COLLINS, CO 80525 PHONE: 970-223-7577 CONTACT: ANGELA MILEWSKI GEOTECHNICAL ENGINEER TERRACON CONSULTANTS, INC. 1901 SHARP POINT DRIVE, SUITE C FORT COLLINS, CO 80525 PHONE: 970-484-0359 CONTACT: ERIC BERNHARDT PROJECT SITE HORSETOOTH ROAD TIMBERLINE ROAD DANFIELD COURT UNION PACIFIC RAILROAD AUTOMATION WAY EASTBROOK DR VERMONT DR CARLTON AVE