Loading...
HomeMy WebLinkAboutBOARDWALK OFFICE BUILDING - PDP - PDP170032 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTPRELIMINARY DRAINAGE REPORT Boardwalk Office Building Prepared for: r4 Architects 226 Remington Street, Unit #3 Fort Collins, CO 80528 (970) 224-0630 Prepared by: Interwest Consulting Group 1218 West Ash, Suite A Windsor, Colorado 80550 (970) 674-3300 October 17, 2017 Job Number 1326-069-00 iii TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................ iii 1. GENERAL LOCATION AND DESCRIPTION ................................................................ 1 1.1 Location ........................................................................................................................... 1 1.2 Description of Property ................................................................................................. 1 1.3 Floodplain Submittal Requirements ............................................................................. 1 2. DRAINAGE BASINS AND SUB-BASINS .......................................................................... 2 2.1 Major Basin Description ................................................................................................ 2 2.2 Sub-basin Description .................................................................................................... 2 3. DRAINAGE DESIGN CRITERIA ...................................................................................... 2 3.1 Regulations ...................................................................................................................... 2 3.2 Directly Connected Impervious Area (DCIA) Discussion .......................................... 2 3.3 Development Criteria Reference and Constraints ...................................................... 4 3.4 Hydrological Criteria ..................................................................................................... 4 3.5 Hydraulic Criteria .......................................................................................................... 4 3.6 Floodplain Regulations Compliance ............................................................................. 4 3.7 Modifications of Criteria ............................................................................................... 5 4. DRAINAGE FACILITY DESIGN ....................................................................................... 5 4.1 General Concept ............................................................................................................. 5 4.2 Specific Details ................................................................................................................ 6 5. CONCLUSIONS .................................................................................................................... 7 5.1 Compliance with Standards .......................................................................................... 7 5.2 Drainage Concept ........................................................................................................... 7 6. REFERENCES ...................................................................................................................... 8 APPENDIX VICINITY MAP AND DRAINAGE PLAN .............................................................................. A HYDROLOGIC COMPUTATIONS .......................................................................................... B HYDRAULIC COMPUTATIONS (PROVIDED AT FINAL) ................................................. C WATER QUALITY AND LID INFORMATION .................................................................... D SOILS INFO, FEMA INFO, AND REFERENCE MATERIAL .............................................. E STORMWATER ALTERNATIVE COMPLICANCE/VARIANCE APPLICATION ......... F 1 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location The Boardwalk Office Building development is located in Fort Collins. It is located in the Northwest Quarter of Section 36, Township 7 North, Range 69 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. Please refer to the vicinity map in Appendix A. The project site is located at the northeast corner of JFK Parkway and Boardwalk Drive. JFK Parkway bounds the property on the west, Boardwalk Drive on the south, Tract 9, Block 1 of Landings Office Park PUD on the east and Landings Bay FDP on the north. The development consists of Tracts 8 and 10, Block 2 of Landings Office Park PUD. 1.2 Description of Property The property consists of 0.55 acres of land. The project will include construction of a new building, sidewalks and new parking with drive aisles. The proposed development is very similar to the original approved 1995 design of the property. The site generally slopes in a southerly direction at approximately 5% to 7%. The land is currently vacant. There is no offsite flow contributing to the site. Soils on site consist of Tassel sandy loam, 3 to 25 percent slopes classified as Type D hydrologic soil group. According to FEMA Panel 08069C0987G (effective 05/02/2012) there are no mapped FEMA Floodways on this property. Please refer to Appendix E for hydrologic soil and FEMA information. 1.3 Floodplain Submittal Requirements Because the project is not within any FEMA or City of Fort Collins mapped floodway, a Floodplain Submittal is not required and a “City of Fort Collins Floodplain Review Checklist for 50% Submittals” has not been included with this report. 2 2. DRAINAGE BASINS AND SUB-BASINS 2.1 Major Basin Description The proposed development lies within the Mail Creek Master Drainage Plan. Outfall for this site is the Larimer County Canal No. 2. The site was previously studied in the “Final Drainage Report for Landings Office Park P.U.D.” by Northern Engineering Services, Inc., dated October 27, 1995. Please refer to Appendix E for reference material. 2.2 Sub-basin Description Today, the entire site sheet flows onto JFK Parkway and Boardwalk Drive where the curb and gutter conveys the flow to either the East Detention Pond of ShopKo or Detention Pond D1 of the Landings PUD located at the northwest corner of Boardwalk Drive and Landings Drive. 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations This report was prepared to meet or exceed the “City of Fort Collins Storm Drainage Design Criteria Manual” specifications. Where applicable, the criteria established in the “Urban Storm Drainage Criteria Manual” (UDFCD), developed by the Denver Regional Council of Governments, has been used. 3.2 Directly Connected Impervious Area (DCIA) Discussion Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainageways and implementing long-term source controls. The Four Step Process applies to the management of smaller, frequently occurring events. 3 Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). Runoff for the eastern portion of the site will be routed through vegetated areas through sheet flow thereby reducing runoff from impervious surfaces over permeable areas to slow runoff and increase the time of concentration and promote infiltration. Runoff from the parking lot and the eastern portion of the building shall drain directly into a porous pavement system thereby slowing runoff and also promoting infiltration. Runoff from the western portion of the building roof shall drain directly to a storm system that will release to a swale that will slow runoff and increase the time of concentration and promote infiltration. Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release Once runoff has been minimized, the remaining runoff shall be treated through the porous pavement system that allows for settlement of sediments. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate and volume of runoff during and following development. Because the site will drain to an existing detention pond, bank stabilization is unnecessary with this project. Step 4: Implement Site Specific and Other Source Control BMPs The proposed development will provide the porous pavement system feature which will eliminate pollution that had previously been exposed during weathering and runoff processes. The proposed project will proactively control pollutants at their source by preventing pollution rather than removing contaminants once they have entered the stormwater system as compared to historic conditions. 4 3.3 Development Criteria Reference and Constraints The runoff from this site has been routed to conform to the requirements of the City Stormwater Department. Because water quality capture volume from this site is not included in the development’s detention pond, water quality facilities are required for the new construction proposed on the site. The site’s water quality will be met through the use of a porous pavement system that includes 12” of storage in the voids below the pavers. A variance is requested for the portion of the site that does not reach the porous pavers for treatment. 3.4 Hydrologic Criteria Runoff computations were prepared for the 2-year and 10-year minor and 100-year major storm frequency utilizing the rational method. All hydrologic calculations associated with the basins are included in Appendix B of this report. Standard Form 8 (SF-8) provides time of concentration calculations for all sub- basins. Standard Form 9 (SF-9) provides a summary of the design flows for all Sub- basins and Design Points associated with this site. A variance to use the porous pavement system for the water quality capture volume is included in Appendix D. 3.5 Hydraulic Criteria All hydraulic calculations will be presented in the final drainage report and prepared in accordance with the City of Fort Collins Drainage Criteria. 3.6 Floodplain Regulations Compliance The project is not within any FEMA or City of Fort Collins mapped floodway; therefore, Floodplain Regulations Compliance is not required. 5 3.7 Modifications of Criteria The site has been designed to maximize water quality treatment but the handicap ramp area to Boardwalk and the west and south side of the site cannot drain to the porous pavement system. The entire site’s required water quality capture volume is 0.01 ac-ft and will be contained in the 12” of storage in the voids below the pavers. Please refer to Appendix D for supporting information regarding water quality. If the porous pavement system is completely saturated or overwhelmed, water will overtop into the Type R inlet then be conveyed east to the existing Detention Pond D1 of the Landings PUD. Runoff reduction practices (LID techniques) are also required. No less than fifty percent of any newly added impervious area must be treated using one or a combination of LID techniques. New impervious area is 16,449 sf. Basins A and B contain the porous paver system. Using this LID technique, 15,560 sf of new impervious area (95%) will be treated which exceeds the 50% requirement. No less than twenty five percent of any newly added pavement areas must be treated using a permeable pavement technology. The project adds 10,434 sf of new pavement area. This project will incorporate 3,790sf of porous pavers which is 36% of the newly added pavement which exceeds the required 25%. The porous pavement system is oversized and provides full water quality volume for the site. Please refer to Appendix D for LID calculations and information. 4. DRAINAGE FACILITY DESIGN 4.1 General Concept The majority of the proposed development will be collected and conveyed to the proposed storm drain system where it will be treated for water quality via a porous pavement system before being released into the proposed system that conveys water east to the existing Pond D1 of the Landings PUD. 6 4.2 Specific Details A summary of the drainage patterns within each basin is provided in the following paragraphs. Please refer to Appendix A for the drainage plan. Basin A is 0.09 acres and contains the north drive aisle and parking. This basin is calculated to have a 10-year discharge of 0.4 cfs and a 100-year discharge of 0.9 cfs. Flows from Basin A are captured by the porous paver system and will discharge to the 8- inch storm pipe around the north and east sides of the site. This system releases the treated water into the 5’ Type R inlet and 12-inch storm pipe located at design point B. Basin B is 0.26 acres, contains about 60 percent the roof (east portion) and the east drive aisle and parking. This basin is calculated to have a 10-year discharge of 1.0 cfs and a 100-year discharge of 2.5 cfs. Flows from Basin B are captured by the porous paver system. The treated water is released into the 5’ Type R inlet and 12-inch storm pipe located at design point B. Basin C is 0.04 acres and contains the remainder of the roof (about 40%). The basin is calculated to have a 10-year discharge of 0.2 cfs and a 100-year discharge of 0.4 cfs. Flows from this basin will be conveyed to the 6-inch perimeter drain that wraps around the west and south of the building. This drain will release flow to the sidewalk chase located on the southeast side of the building. This chase will direct the flow to Basin B’s porous paver system for treatment. The treated water is released into the same 5’ Type R inlet located at design point B and is then released to an outfall swale that conveys flow to the existing pond. 100 percent of the roof is treated in the porous paver system. Basin D is 0.13 acres and is calculated to have a 10-year discharge of 0.2 cfs and a 100- year discharge of 0.4 cfs. This basin consists of the west and south landscape area adjacent to the building. Flows from this basin will continue current conditions and sheet flow onto JFK Parkway and remains untreated. 7 Basin E is 0.03 acres and is calculated to have a 10-year discharge of 0.1 cfs and a 100- year discharge of 0.2 cfs. This basin consists of the handicap ramp adjacent to the north side of the building. Flows from this basin will drain to a sump inlet and the 8-inch storm pipe around the north and east sides of the site. This system releases the untreated water into the 5’ Type R inlet and 12-inch storm pipe located at design point B. The percent impervious weighted average of the entire site is 58% which is below the 70% imperviousness that was assumed in the previous Landings PUD study by Northern Engineering; therefore, detention is not required. Please refer to Appendix E for excerpts from this drainage report. 5. CONCLUSIONS 5.1 Compliance with Standards All computations that have been completed within this report are in compliance with the City of Fort Collins Storm Drainage Design Criteria Manual. A waiver to the Low Impact Development Criteria of the total WQCV treated has been requested. 5.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans adequately provides for stormwater quantity and quality treatment of proposed impervious areas. Conveyance elements have been designed to pass required flows and to minimize future maintenance. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit will be required. 8 6. REFERENCES 1. City of Fort Collins, “Fort Collins Stormwater Criteria Manual Amendments to the Urban Drainage and Flood Control District Criteria Manual”, adopted December 2011. 2. Urban Drainage and Flood Control District, “Urban Storm Drainage Criteria Manual”, Volumes 1 and 2, dated June 2001, and Volume 3 dated November 2010. 3. Northern Engineering Services, Inc., “Final Drainage Report for Landings Office Park P.U.D.”, dated October 27, 1995. A APPENDIX A VICINITY MAP AND DRAINAGE PLAN B APPENDIX B HYDROLOGIC COMPUTATIONS SUMMARY DRAINAGE SUMMARY TABLE Design Tributary Area C (10) C (100) tc (10) tc (100) Q(2)tot Q(10)tot Q(100)tot Sub-basin REMARKS Point (ac) (min) (min) (cfs) (cfs) (cfs) A A 0.09 0.81 1.00 5.0 5.0 0.2 0.4 0.9 PERVIOUS PAVER SYSTEM B B 0.26 0.77 0.96 5.0 5.0 0.6 1.0 2.5 PERVIOUS PAVER SYSTEM C C 0.04 0.83 1.00 5.0 5.0 0.1 0.2 0.4 TO 6" ROOF DRAIN SYSTEM TO PERVIOUS PAVER SYSTEM D D 0.13 0.26 0.32 5.0 5.0 0.1 0.2 0.4 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 E E 0.03 0.50 0.93 5.7 5.0 0.3 0.4 1.1 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 E A+E 0.12 0.74 0.93 5.0 5.0 0.3 0.4 1.1 TO 8" PERIMETER DRAIN B B+C 0.30 0.77 0.97 5.0 5.0 0.7 1.1 2.9 TO 18" PIPE AND TO POND Page 7 Interwest Consulting Group RUNOFF COEFFICIENTS & % IMPERVIOUS LOCATION: Boardwalk and JFK PROJECT NO: 1326-069-00 COMPUTATIONS BY: MO DATE: 10/17/2017 Recommended Runoff Coefficients from Table RO-11 of City of Fort Collins Stormwater Code, Volume I Recommended % Impervious from Table RO-3 Urban Storm Drainage Criteria Manual, Volume I Type B Soils Runoff % coefficient Impervious C Streets, parking lots (asphalt): 0.95 100 Sidewalks (concrete): 0.95 96 Roofs: 0.95 90 Gravel or Pavers: 0.50 40 Landscape Areas (Flat, heavy) : 0.20 0 Landscape Areas (Steep, heavy) : 0.35 0 SUBBASIN TOTAL TOTAL ROOF PAVED PAVERS SIDEWALK LANDSCAPE RUNOFF % DESIGNATION AREA AREA AREA AREA AREA AREA AREA COEFF. Impervious REMARKS (ac.) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (C) LANDINGS D5 0.45 19,602 7,492 7,013 0 0 5,097 0.76 70 LANDINGS D7 0.19 8,059 0 5,706 0 0 2,352 0.73 71 A 0.09 4,071 0 2,642 989 297 143 0.81 82 PERVIOUS PAVER SYSTEM B 0.26 11,369 2,375 4,003 2,801 1,094 1,097 0.77 73 PERVIOUS PAVER SYSTEM C 0.04 1,625 1,360 0 0 0 265 0.83 75 TO 6" ROOF DRAIN SYSTEM TO PERVIOUS PAVER SYSTEM D 0.13 5,556 0 0 0 408 5,148 0.26 7 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 E 0.03 1,198 0 0 0 481 717 0.50 39 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 A+E 0.12 5,269 0 2,642 989 778 861 0.74 72 TO 8" PERIMETER DRAIN B+C 0.30 12,994 3,734 4,003 2,801 1,094 1,363 0.77 73 TO 18" PIPE AND TO POND D+E 0.16 6,754 0 0 0 889 5,865 0.30 13 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 A+B+C+D+E 0.55 23,820 3,734 6,645 3,790 2,280 7,371 0.65 58 FOR ON SITE LID CALCULATIONS Equations - Calculated C coefficients & % Impervious are area weighted C = Σ (Ci Ai) / At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai's 10-18-17 Final FC Flow.xls Interwest Consulting Group STANDARD FORM SF-2 TIME OF CONCENTRATION - 2 and 10 YR LOCATION: Boardwalk and JFK PROJECT NO: 1326-069-00 COMPUTATIONS BY: MO DATE: 10/17/2017 2 and 10-yr storm Cf = 1.00 from Table RO-12 of City of Fort Collins Stormwater Code, Volume I SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASIN) tc DESIGN SUBBASIN(s) Area C Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10 PONIT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min) (1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14) A A 0.09 0.81 40 3.6 2.2 48 5.0 0.016 4.5 0.2 2.4 88 10.5 5.0 PERVIOUS PAVER SYSTEM B B 0.26 0.77 45 5.0 2.4 140 2.5 0.016 3.2 0.7 3.2 185 11.0 5.0 PERVIOUS PAVER SYSTEM C C 0.04 0.83 14 2.0 1.5 1 2.0 0.016 2.8 0.0 1.5 15 10.1 5.0 TO 6" ROOF DRAIN SYSTEM TO PERVIOUS PAVER SYSTEM D D 0.13 0.26 17 25.0 2.2 1 2.0 0.016 2.8 0.0 2.2 18 10.1 5.0 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 E E 0.03 0.50 36 2.0 5.3 1 2.0 1.016 0.0 0.4 5.7 37 10.2 5.7 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 E A+E 0.12 0.74 40 3.6 2.8 48 5.0 0.016 4.5 0.2 2.9 88 10.5 5.0 TO 8" PERIMETER DRAIN B B+C 0.30 0.77 45 5.0 2.4 140 2.5 0.016 3.2 0.7 3.1 185 11.0 5.0 TO 18" PIPE AND TO POND EQUATIONS: tc = ti + tt ti = [1.87 (1.1 - CCf ) L0.5 ] / S 1/3 tt = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of IDF curves 10-18-17 Final FC Flow.xls Interwest Consulting Group STANDARD FORM SF-2 TIME OF CONCENTRATION - 100 YR LOCATION: Boardwalk and JFK PROJECT NO: 1326-069-00 COMPUTATIONS BY: MO DATE: 10/17/2017 100-yr storm Cf = 1.25 from Table RO-12 of City of Fort Collins Stormwater Code, Volume I SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASIN) tc DESIGN SUBBASIN(s) Area C C*Cf Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10 PONIT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min) (1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14) A A 0.09 0.81 1.00 40 3.6 0.8 48 5.0 0.016 4.5 0.2 1.0 88 10.5 5.0 PERVIOUS PAVER SYSTEM B B 0.26 0.77 0.96 45 5.0 1.0 140 2.5 0.016 3.2 0.7 1.8 185 11.0 5.0 PERVIOUS PAVER SYSTEM C C 0.04 0.83 1.00 14 2.0 0.6 1 2.0 0.016 2.8 0.0 0.6 15 10.1 5.0 TO 6" ROOF DRAIN SYSTEM TO PERVIOUS PAVER SYSTEM D D 0.13 0.26 0.32 17 25.0 2.1 1 2.0 0.016 2.8 0.0 2.1 18 10.1 5.0 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 E E 0.03 0.50 0.63 36 2.0 4.2 1 2.0 1.016 0.0 0.4 4.6 37 10.2 5.0 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 E A+E 0.12 0.74 0.93 40 3.6 1.3 48 5.0 0.016 4.5 0.2 1.5 88 10.5 5.0 TO 8" PERIMETER DRAIN B B+C 0.30 0.77 0.97 45 5.0 1.0 140 2.5 0.016 3.2 0.7 1.7 185 11.0 5.0 TO 18" PIPE AND TO POND EQUATIONS: tc = ti + tt ti = [1.87 (1.1 - CCf ) L 0.5 ] / S 1/3 tt = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of IDF curves 10-18-17 Final FC Flow.xls Interwest Consulting Group RATIONAL METHOD PEAK RUNOFF (City of Fort Collins, 2-Yr Storm) LOCATION: Boardwalk and JFK PROJECT NO: 1326-069-00 COMPUTATIONS BY: MO DATE: 10/17/2017 2 yr storm, Cf = 1.00 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Tributary A C Cf tc i Q (2) from Q (2) Q(2)tot Sub-basin Design Point (ac) (min) (in/hr) (cfs) Point (cfs) (cfs) A A 0.09 0.81 5.0 2.85 0.2 0.2 PERVIOUS PAVER SYSTEM B B 0.26 0.77 5.0 2.85 0.6 0.6 PERVIOUS PAVER SYSTEM C C 0.04 0.83 5.0 2.85 0.1 0.1 TO 6" ROOF DRAIN SYSTEM TO PERVIOUS PAVER SYSTEM D D 0.13 0.26 5.0 2.85 0.1 0.1 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 E A+E 0.12 0.74 5.0 2.85 0.3 0.3 TO 8" PERIMETER DRAIN B B+C 0.30 0.77 5.0 2.85 0.7 0.7 TO 18" PIPE AND TO POND Q = Cf C iA Q = peak discharge (cfs) C = runoff coefficient Cf = frequency adjustment factor i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99) A = drainage area (acres) i = 24.221 / (10+ tc)0.7968 10-18-17 Final FC Flow.xls Interwest Consulting Group RATIONAL METHOD PEAK RUNOFF (City of Fort Collins, 10-Yr Storm) LOCATION: Boardwalk and JFK PROJECT NO: 1326-069-00 COMPUTATIONS BY: MO DATE: 10/17/2017 10 yr storm, Cf = 1.00 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Tributary A C Cf tc i Q (10) from Q (10) Q(10)tot Sub-basin Design Point (ac) (min) (in/hr) (cfs) Point (cfs) (cfs) A A 0.09 0.81 5.0 4.87 0.4 0.4 PERVIOUS PAVER SYSTEM B B 0.26 0.77 5.0 4.87 1.0 1.0 PERVIOUS PAVER SYSTEM C C 0.04 0.83 5.0 4.87 0.2 0.2 TO 6" ROOF DRAIN SYSTEM TO PERVIOUS PAVER SYSTEM D D 0.13 0.26 5.0 4.87 0.2 0.2 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 E A+E 0.12 0.74 5.0 4.87 0.4 0.4 TO 8" PERIMETER DRAIN B B+C 0.30 0.77 5.0 4.87 1.1 1.1 TO 18" PIPE AND TO POND Q = Cf C iA Q = peak discharge (cfs) C = runoff coefficient Cf = frequency adjustment factor i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99) A = drainage area (acres) i = 41.44 / (10+ tc)0.7974 10-18-17 Final FC Flow.xls Interwest Consulting Group RATIONAL METHOD PEAK RUNOFF (City of Fort Collins, 100-Yr Storm) LOCATION: Boardwalk and JFK PROJECT NO: 1326-069-00 COMPUTATIONS BY: MO DATE: 10/17/2017 100 yr storm, Cf = 1.25 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Des. Area A C Cf tc i Q (100) from Q (100) Q(100)tot Design Point Design. (ac) (min) (in/hr) (cfs) Point (cfs) (cfs) A A 0.09 1.00 5.0 9.95 0.9 0.9 PERVIOUS PAVER SYSTEM B B 0.26 0.96 5.0 9.95 2.5 2.5 PERVIOUS PAVER SYSTEM C C 0.04 1.00 5.0 9.95 0.4 0.4 TO 6" ROOF DRAIN SYSTEM TO PERVIOUS PAVER SYSTEM D D 0.13 0.32 5.0 9.95 0.4 0.4 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 FLOWS TO JFK AND BOARDWALK - PART OF LANDINGS D3 E A+E 0.12 0.93 5.0 9.95 1.1 1.1 TO 8" PERIMETER DRAIN B B+C 0.30 0.97 5.0 9.95 2.9 2.9 TO 18" PIPE AND TO POND Q = C iA Q = peak discharge (cfs) C = runoff coefficient i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99) A = drainage area (acres) i = 84.682 / (10+ tc) 0.7975 10-18-17 Final FC Flow.xls C APPENDIX C HYDRAULIC CALCULATIONS (PROVIDED AT FINAL) D APPENDIX D WATER QUALITY AND LID INFORMATION Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Project Name: Boardwalk Office Building Project Number: 1326-069-00 Company: INTERWEST CONSULTING GROUP Designer: ES Date: 10/17/2017 1. Basin Storage Volume A) Tributary Area's Imperviousness Ratio (i=Ia/100) Ia = 58 % i = 0.58 B) Contributing Watershed Area (Area) A = 0.55 acres C) Water Quality Capture Volume (WQCV) WQCV = 0.229636 watershed inches (WQCV = 1.0 * (0.91 * i3 - 1.19 * i2 + 0.78i) ) D) Design Volume: Vol = WQCV/12 * Area * 1.2 Vol. = 0.013 ac-ft New Impervious Area 16,449 sf Required Minimum Impervious Area to be Treated 8,225 sf Treatment #1 - Pervious Pavers (Basin A) 989 sf Treatment #1 - Impervious Area Treated (Basin A) 3,928 sf Treatment #1 - Run-on Ratio (3:1 Max) 3.0 Treatment #2 - Pervious Pavers (Basin B) 2,801 sf Treatment #2 - Impervious Area Treated (Basin B & C) 11,632 sf Treatment #2 - Run-on Ratio (3:1 Max) 3.2 Total Area Treated 15,560 sf Actual % of Impervious Area On-Site Treated by LID 95 % New Pavement Area 10,434 sf Required Minimum Area of Pervious Pavement 2,609 sf Area of Pervious Pavers Provided 3,790 sf Actual % of Pervious Pavement Provided 36 % 50% On-Site Treatment by LID Requirement LID Table 25% Porous Pavement Requirement E APPENDIX E EXCERPTS FROM REFERENCE REPORTS Page 1 of 1 https://utility.arcgisonline.com/arcgis/rest/directories/arcgisoutput/Utilities/PrintingTools_... 8/17/2017 This unofficial copy was downloaded on Jul-18-2017 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA F APPENDIX F STORMWATER ALTERNATIVE COMPLIANCE/VARIANCE APPLICATION Stormwater Alternative Compliance/Variance Application City of Fort Collins Water Utilities Engineering Section A: Engineer/Owner Information Engineer Name____________________________________________Phone___________________________ Street Address_____________________________________________________________________________ City__________________________________________State________________________Zip_____________ Owner Name______________________________________________Phone___________________________ Street Address_____________________________________________________________________________ City__________________________________________State________________________Zip_____________ Section C: Alternative Compliance/Variance Information Section B: Proposed Project Information Legal description and/or address of property____________________________________________________ Project Name______________________________________________________________________________ Project/Application Number from Development Review (i.e. FDP123456)__________________________ Description of Project_______________________________________________________________________ __________________________________________________________________________________________ Existing Use (check one): ☐ residential ☐ non-residential ☐ mixed-use ☐ vacant ground Proposed Use (check one): ☐ residential ☐ non-residential ☐ mixed-use ☐ other____________________ If non-residential or mixed use, describe in detail_______________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ State the requirement from which alternative compliance/variance is sought. (Please include applicable Drainage Criteria Manual volume, chapter and section.) __________________________________________________________________________________________ What hardship prevents this site from meeting the requirement? __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ What alternative is proposed for the site? Attach separate sheet if necessary Attach separate sheet if necessary ● ✚ ✛ ✁ ✜ ✂ ✄ ✢ ☎ ✣ ✆ ✤ ✜ ✝ ✢ ✞ ✣ ✟ ✤ ✢ ✁ ✠ ✥ ✡ ☛ ✦ ✧ ✁ ★ ✂ ✂ ☞ ✜ ✌ ✍ ✤ ✛ ✎ ✜ ☎ ✢ ✆ ✤ ✌ ✩ ✏ ✜ ☎ ✜ ✤ ✆ ✥ ✌ ✡ ✪ ✑ ✫ ✒ ✓ ✣ ✤ ✒ ✓ ✣ ✢ ✒ ✔ ✬ ✕ ✛ ✆ ✭ ✢ ✡ ✁ ● ✣ ✮ ✡ ✖ ✥ ✂ ✯ ✗ ✯ ✭ ✘ ✣ ✰ ☛ ✬ ✧ ☎ ✢ ✢ ✄ ✍ ✣ ✦ ✡ ✯ ✙ ✜ ✆ ✤ ✡ ✧ ✠ ✆ ✫ ✖ ✡ ✩ ✆ ✥ ✏ ✣ ✪ ✒ ✤ ✛ ✣ ✢ ✢ ✱ ✦ ✲ ✦ ✥ ✢ ✣ ✪ ✤ ✧ ✥ ✤ ✩ ✜ ✥ ✤ ✰ ✜ ✪ ✤ ✥ ✩ ✜ ✥ ✳ ✴ ✵ ✶ ✷ ✷ ✸ ✹ ✺ ✹ ✻ ✷ ✶ ✼ ✵ ✻ ✷ ✻ ✽ ✾ ✻ ✿ ✷ ✹ ❀ ❀ ✼ ❁ ✽ ✻ ✼ ✼ ❀ ❂ ❃ ❄ ✹ ❀ ✻ ❅ ❅ ❀ ❁ ❃ ❀ ❂ ✹ ✿ ❃ ✵ ❀ ✷ ❃ ❆ ❀ ❀ ❃ ✻ ✼ ❂ ❂ ❀ ❃ ✻ ✶ ✼ ❀ ❂ ❄ ❇ ❇ ✺ ✷ ✶ ❃ ❀ ❂ ❄ ✾ ✼ ✷ ❃ ❆ ❀ ✻ ❈ ❉