Loading...
HomeMy WebLinkAboutMOUNTAIN'S EDGE (FORMERLY 2430 OVERLAND TRAIL - RESIDENTIAL) - PDP - PDP160045 - SUBMITTAL DOCUMENTS - ROUND 3 - DRAINAGE REPORTPRELIMINARY DRAINAGE AND EROSION CONTROL REPORT October 9, 2017 Mountain’s Edge Fort Collins, Colorado Prepared for: Lorson South Land Corp Jeff Mark 212 N. Wahsatch Avenue, Suite 301 Colorado Springs, CO 80903 719-635-3200 Prepared by: 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 www.northernengineering.com Project Number: 911-007  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. RE: Preliminary Drainage and Erosion Control Report for Mountain’s Edge Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies Project Development Plan submittal for the proposed Mountain’s Edge development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Stephanie Thomas, PE Project Engineer Mountain’s Edge Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ....................................................................................................................................... 1 B. Description of Property ................................................................................................................ 1 C. Floodplain .................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4 A. Major Basin Description ............................................................................................................... 4 B. Sub-Basin Description .................................................................................................................. 4 III. DRAINAGE DESIGN CRITERIA ................................................................................... 5 A. Regulations .................................................................................................................................. 5 B. Four Step Process ........................................................................................................................ 5 C. Development Criteria Reference and Constraints ......................................................................... 6 D. Hydrological Criteria .................................................................................................................... 6 E. Hydraulic Criteria ......................................................................................................................... 6 F. Floodplain Regulations Compliance .............................................................................................. 7 G. Modifications of Criteria .............................................................................................................. 7 IV. DRAINAGE FACILITY DESIGN .................................................................................... 7 A. General Concept .......................................................................................................................... 7 B. Water Quality Treatment ........................................................................................................... 13 C. SWMM Modeling ....................................................................................................................... 13 D. Specific Details ........................................................................................................................... 14 V. CONCLUSIONS ...................................................................................................... 14 A. Compliance with Standards ........................................................................................................ 14 B. Drainage Concept ...................................................................................................................... 14 References ....................................................................................................................... 15 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations (NOT INCLUDED WITH PDP) B.1 – Detention Ponds and Water Quality B.2 – Storm Sewers (NOT INCLUDED WITH PDP) B.3 – Inlets (NOT INCLUDED WITH PDP) APPENDIX C – Erosion Control Report APPENDIX D – LID Exhibit APPENDIX E - SWMM Modeling APPENDIX F – References Mountain’s Edge Preliminary Drainage Report LIST OF FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2– Proposed Site Plan ................................................................................................ 3 Figure 3 – Existing Floodplains ............................................................................................. 4 LIST OF TABLES: Table 1 - Historic Rational Basin Summary ............................................................................ 8 Table 2 - Proposed Rational Basin Summary ........................................................................ 10 Table 3 - Detention Pond Summary ..................................................................................... 11 Table 4 - Historic Stormwater Release and Allowable Developed Release.................................. 12 Table 5 - Proposed Stormwater Release ............................................................................... 12 MAP POCKET: HDR1 – Historic Drainage Exhibit DR1 - Drainage Exhibit Mountain’s Edge Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. A tract located in the southwest quarter of Section 21, Township 7 North, Range 69 West of the 6th Prime Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. Bounded to the north by private property, to the west by Overland Trail, to the east by the Brown Farm Subdivision, and to the south by Drake Road. 4. Significant offsite flows are directed into the site through Dixon Creek. Dixon Creek traverses the Mountain’s Edge site within the southern half. Additionally, two existing culverts cross Overland Trail. These culverts convey stormwater runoff from the property to the west. These off-site flows will be conveyed safely to ultimate outfall locations within the Mountain’s Edge site. 5. The Mountain’s Edge property has not been studied with the previous proposals or drainage studies. B. Description of Property 1. The site is approximately 19.67 acres. This acreage includes a portion of the adjacent Overland Trail Right of Way. Mountain’s Edge Preliminary Drainage Report 2 Figure 1 – Aerial Photograph 2. The existing site is generally comprised of vacant land with natural grasses and vegetation. A house, gravel drive, and out-structures exist on the site. Off-site basins include portions of adjacent Overland Trail. 3. The north half of the site is within the Canal Importation Basin. The northern 1/3 of the site slopes to the northern property line. A portion of the center of the site slopes to the east and overland flows across the existing single-family lots. The southern half of the site is located within the Spring Creek Basin and slopes south to the Dixon Creek drainage channel. 4. A report by Soilogic dated June 11, 2015 lists the soils for the area as consisting of silty/clayey sand, gravel, cobble and sandy lean clay ranging from 9 to 15 feet below the ground surface. A Web Soil Survey by the Natural Resources Conservation Service indicates soils are classified as Hydrologic Soil Group B and have a moderate infiltration rate. For this study, the soils were modeled as a Soil Group C with a slow infiltration rate to account for the soil variations within the soil borings. 5. The proposed project site plan is composed of 12 townhome buildings, 17 single-family lots, public local streets, sidewalk, private asphalt drives, and detention ponds. 6. This site will employ water quality features and runoff reduction facilities including rain gardens, minimization of directed connected areas of imperviousness, bioswales, and extended detention basins. Mountain’s Edge Preliminary Drainage Report 3 Figure 2– Proposed Site Plan 7. No existing irrigation facilities are known at this time. 8. The project site has not been a part of any known previous drainage study. C. Floodplain The subject property is not located in a FEMA or City regulatory floodplain. Mountain’s Edge Preliminary Drainage Report 4 Figure 3 – Existing Floodplains II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The Mountain’s Edge project is located within two major drainage basins. The northern half of the site is located within the Canal Importation Basin. The southern half of the site is located within the Spring Creek Basin. B. Sub-Basin Description 1. Historically, the stormwater runoff and off-site flows within the northern half of the site generally flow in two directions. Stormwater runoff in the northern 1/3 of the site generally flows to the northern boundary and is collected within a swale along the access roadway on the adjacent property. Flows are conveyed to a channel in the Brown’s Farm 3rd Subdivision. Stormwater within the remainder of the northern half of the site overland flows across the existing single-family lots along the eastern boundary of the site. 2. Historically, stormwater runoff within the southern half of the site overland flows to the Dixon Creek channel. Once collected in the channel it is conveyed under Drake Road and ultimately outfalling to Spring Creek. 3. The proposed plan will generally detain developed flows and release to the Dixon Mountain’s Edge Preliminary Drainage Report 5 Creek (Spring Creek Basin) at the historical flow rates. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the Mountain’s Edge project. B. Four Step Process The overall stormwater management strategy employed with the Mountain’s Edge project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Preserving natural areas south of the Dixon Creek. Minimizing site disturbance. Proposed smaller private streets will allow for greater open space in the center of the site. This approach allows for a lower percent imperviousness. Providing vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through rain gardens to provide additional infiltration. Providing on-site detention to increase time of concentration, promote infiltration and reduce loads on existing storm infrastructure. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, this development will still generate stormwater runoff that will require additional BMPs and water quality. A majority of stormwater runoff from the site will ultimately be intercepted and treated in proposed rain gardens and extended detention basins. Water quality for areas not routed through the rain gardens will be provided within the extended detention basin volume. Step 3 – Stabilize Drainageways This property discharges detained stormwater to an existing drainage channel (Dixon Creek). The proposed release from this property is expected to require erosion control mats to stabilize the drainage way at the proposed pipe outfalls. Additionally, any proposed 4:1 grading will be required to be stabilized with erosion control blankets along the Dixon Creek. The majority of the Dixon Creek channel will remain undisturbed. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: Trash receptacles within home will allow for the disposal of solid waste. Rain Gardens and extended detention basins to provide for water treatment prior to flows being released to existing drainageways and storm infrastructure. Mountain’s Edge Preliminary Drainage Report 6 Standard Operating Procedures (SOPs) for BMP maintenance of Rain Gardens, Detention ponds, and associated drainage infrastructure to remove sediment accumulation regularly. C. Development Criteria Reference and Constraints 1. The proposed site is a part of the Spring Creek and Canal Importation Drainage Basins. This basin requires a 2-year historic stormwater release from the developed property. 2. This site is subject to the LID requirements per the City of Fort Collins. Please see the LID Exhibit located in the Appendix for calculations concerning LID treatment. The site must either have the following: 75% of total new impervious areas must be treated through an LID (Low Impact Development) treatment BMP, or 50% of total new impervious areas must be treated through an LID (Low Impact Development) treatment BMP and 25% of new pavement shall be pervious. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. Modified FAA Method calculations were utilized for detention storage calculations. 4. Three separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2- year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. The third storm computed, for comparison purposes only, is the 10-year event. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property historically drains to the north and south. 2. All drainage facilities proposed with the Mountain’s Edge project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated previously, the subject property is not located within a FEMA regulatory floodplain. 4. The Mountain’s Edge project does not propose to modify any natural drainageways. 5. The Mountain’s Edge project proposes to discharge developed stormwater runoff for the site to Dixon Creek at the historic 2-year rates. Mountain’s Edge Preliminary Drainage Report 7 F. Floodplain Regulations Compliance 1. As previously mentioned, all structures are located outside of any FEMA 100-year floodplain, and thus are not subject to any floodplain regulations. G. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the Mountain’s Edge drainage design are to maintain the allowable storm runoffs as outlined within the Spring Creek Basin master plans. This project will divert all developed runoff to the historic discharge location for the Spring Creek Basin. The historic discharge location for the Canal Importation Basin will not be utilized for on-site developed stormwater release from this project. 2. Per the development guidelines, half of any existing adjacent roadway is required to be detained and treated on-site, as is feasible and reasonable. With this development, half of Overland Trail (north of Bluegrass) is proposed to be detained and treated within the Mountain’s Edge project. Overland Trail (south of Bluegrass) and Drake Road are adjacent to the site, but are not adjacent to the planned development. As such, detention and treatment of these areas will be significantly challenging. In order to meet this guideline, extensive storm infrastructure and disturbance of existing vegetation would be required. With this in mind, these areas of Overland Trail (south of Bluegrass) and Drake Road are not proposed to be detained and treated on the Mountain’s Edge site. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. Historic runoff from the Mountain’s Edge project site was evaluated. This evaluation provided the historic 2-yr and 100-yr peak runoff rates for the existing site and historic discharge locations. Basin HA Basin HA is generally the southern half of the property. Stormwater within this portion of the existing property generally flows via overland to Dixon Creek, from there it is conveyed to Spring Creek through existing drainage infrastructure. Basin HA is within the Spring Creek Basin. Basin HA was subdivided into 3 sub-basins to further aid in design. Basin HA1 contains the area of the site that will remain mostly undisturbed and pervious. This area includes Dixon Creek. Basin HA2 contains area north of Dixon Creek that will be developed with this project. Basin HA3 contains existing Overland Trail Right of Way proposed to be detained and treated with this project. Mountain’s Edge Preliminary Drainage Report 8 Basin HB Basin HB is generally the northern half of the property. Stormwater within this portion of the existing property generally flows via overland the existing single-family development or to historic undefined swale adjacent the existing access road for the Holiday Twin Drive-In Theater, north of the property boundary. These stormwater flows are conveyed through existing drainage infrastructure to the detention ponds within the Brown’s Farm Subdivision. Basin HB is within the Canal Importation Basin. Basin HB was subdivided into 3 sub-basins to further aid in design. Basin HB1 contains the northern 1/3 of the property. This area generally drains to the northern property line and is collected in an undefined swale along the off-site access road to the Holiday Twin Drive-in Theater. From there, flows are conveyed to a City owned and maintained drainage easement through the Brown’s Farm Subdivision. Basin HB2 contains existing Overland Trail Right of Way proposed to be detained and treated with this project. Basin HB3 contains a portion of the property that generally flows via overland to the eastern boundary. Stormwater from this location historically flows through the adjacent single-family lots to Compass Court. Table 1 - Historic Rational Basin Summary DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 HA1 4.07 0.25 0.31 14.3 13.9 1.96 8.68 1 HA2 4.18 0.25 0.31 31.8 29.9 1.31 5.95 1 HA3 0.33 0.57 0.71 24.0 19.4 0.27 1.33 2 HB1 5.60 0.25 0.31 21.4 20.3 2.18 9.80 2 HB2 0.47 0.57 0.71 15.9 13.5 0.49 2.29 3 HB3 4.66 0.25 0.31 37.2 34.5 1.32 6.06 5. The Mountain’s Edge project divided the site into seven (7) major drainage basins, designated as Basins A, B, C, D, OS, HT and UD. The drainage patterns anticipated for each basin and sub-basin are further described below. Basin A Basin A consists of proposed single-family attached buildings, single-family lots, sidewalk, roadways, landscape areas and Detention Pond 1. Basin A is subdivided into 6 sub-basins (A1-A6). Runoff from Basins A1-A6 is detained in Detention Pond 1. Stormwater runoff within Basin A1 is treated for water quality and LID in Rain Garden 1. Stormwater runoff from Basins A2-A6 is treated for water quality within Detention Pond 1. The stormwater release from Detention Pond 1 will be routed south, through the site, to Dixon Creek. Mountain’s Edge Preliminary Drainage Report 9 Basin B Basin B consists of proposed single-family attached buildings, single-family lots, sidewalk, roadways, landscape areas and Detention Pond 2. Basin B is subdivided into 6 sub-basins (B1-B6). Runoff from Basins B1-B6 is detained in Detention Pond 2. Stormwater runoff for Basins B1-B6 will be treated for water quality within Detention Pond 2. The stormwater release for Detention Pond 2 will be conveyed south, through the site, to Dixon Creek. Off-site stormwater from Basin OS1 will be conveyed through the project to the historic discharge location for the Canal Importation Basin through a proposed pipe. Basin C Basin C consists of proposed single-family attached buildings, sidewalk, roadways, landscape areas and Detention Pond 3. Basin C is subdivided into 2 sub-basins (C1- C2). Runoff from Basins C1-C2 is detained in Detention Pond 3. Stormwater runoff for Basins C1-C2 will be treated for water quality within Detention Pond 3. The stormwater release for Detention Pond 3 will be conveyed south to Dixon Creek. Basin D Basin D consists of proposed single-family attached buildings, single-family lots, sidewalk, roadways, landscape areas and Detention Pond 4. Basin D is subdivided into 5 sub-basins (D1-D5). Runoff from Basins D1-D5 is detained in Detention Pond 4. Stormwater runoff for Basins D1-D5 will be treated for water quality and LID within Rain Garden 2. No additional water quality treatment is planned within Detention Pond 4. The stormwater release for Detention Pond 4 will be conveyed south to Dixon Creek. Basin UD Basin UD1 consists of proposed sidewalk and roadways. Runoff from Basin UD1 will not be detained. Stormwater runoff for Basin UD1 generally will be conveyed through existing roadways within the Brown’s Farm Subdivision. No LID treatment is planned for Basin UD1. Basin UD2 consists of open space and Dixon Creek. No detention is proposed for this basin as it is not being developed and generally will remain undisturbed. Minor grading is proposed within this basin. Basin HT1 Basin HT1 is an off-site basin that consists of the existing drive-in theater. Basin HT1 consists of mostly vegetated undeveloped land. HT1 generally gets conveyed in the small drainage swale on the northside of the Holiday Twin access road until it reaches the existing ticket booth. At the ticket booth, the flows overtop the existing access road into an undefined swale along the boundary of Holiday Twin and the Brown Farm Subdivision. Basin OS Basin OS1 is an off-site basin west of Overland Trail. This basin stretches to west to Horsetooth Reservoir. Based on existing topography, this basin was determined to be approximately 14.7 acres. During a 100-year event, stormwater from this basin will be conveyed to a culvert passing under Overland Trail within Basin B1. A SWMM model was utilized to determine the maximum flow that would pass through the existing culvert during a 100-year event. The maximum flow was determined to be Mountain’s Edge Preliminary Drainage Report 10 16.2 cfs with ponding west of Overland Trail. This flow will be safely passed through Basin B to the historic undefined swale along the boundary of Holiday Twin and the Brown Farm Subdivision. Basin OS2 is an off-site basin west of Overland Trail. This basin stretches to west to the Dixon Creek Reservoir. This off-site basin contributes to Dixon Creek. Based on the Fort Collins SWMM model for the Spring Creek Basin, this basin was determined to be approximately 72.2 acres minus 8.58 acres of historic on-site basin, for a total 63.62 acres. During a 100-year event, stormwater from this basin will be conveyed to an existing 18” culvert passing under Overland Trail within Basin UD2. The full 100-year flow is restricted by the 18” culvert and stormwater will pool west of Overland Trail. At a depth of approximately 6 feet above the culvert invert, the water will bypass the culvert and continue south down a roadside swale on the west side of Overland Trail. A SWMM model was utilized to determine the maximum flow that would pass through the existing culvert during a 100-year event. The maximum flow was determined to be 22.0 cfs with 18.83 cfs continuing south along Overland Trail. Table 2 - Proposed Rational Basin Summary DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) A1 A1 1.45 0.66 0.83 7.1 5.3 2.42 11.93 A2 A2 0.24 0.62 0.77 5.0 5.0 0.42 1.85 A3 A3 0.21 0.60 0.74 5.0 5.0 0.36 1.55 A4 A4 0.23 0.62 0.77 5.0 5.0 0.41 1.77 A5 A5 1.12 0.90 1.00 6.7 5.6 2.60 10.76 A6 A6 2.19 0.47 0.58 10.1 9.1 2.26 10.27 B1 B1 0.50 0.83 1.00 6.3 5.0 1.10 4.93 B2 B2 0.62 0.58 0.72 6.4 5.5 0.97 4.36 B3 B3 1.08 0.80 1.00 5.0 5.0 2.46 10.73 B4 B4 0.27 0.92 1.00 5.0 5.0 0.71 2.72 B5 B5 0.19 0.78 0.98 5.0 5.0 0.42 1.82 B6 B6 1.50 0.27 0.34 16.8 16.1 0.72 3.20 C1 C1 0.14 0.60 0.76 5.0 5.0 0.23 1.02 C2 C2 0.45 0.37 0.47 5.9 5.2 0.46 2.09 D1 D1 0.30 0.85 1.00 5.0 5.0 0.72 2.94 D2 D2 1.66 0.67 0.84 5.0 5.0 3.18 13.87 D3 D3 0.98 0.71 0.89 5.7 5.0 1.92 8.63 D4 D4 0.66 0.58 0.73 5.1 5.0 1.09 4.76 D5 D5 1.41 0.37 0.46 9.8 9.1 1.17 5.19 UD1 UD1 0.05 0.83 1.00 5.0 5.0 0.12 0.52 UD2 UD2 4.07 0.26 0.33 14.2 13.7 2.04 9.07 HT1 HT1 5.51 0.27 0.34 42.7 39.3 1.54 7.11 Mountain’s Edge Preliminary Drainage Report 11 Detention Pond 1 Detention Pond 1 detains developed runoff from Basin A. Detention Pond 1 has a total 3.65 feet of freeboard from the 100-yr WSEL to the lowest proposed top of foundation. Additionally, the emergency spill location is 2.01 feet below the lowest proposed top of foundation. Water Quality is proposed within the pond volume through an approved outlet structure. The pond release is routed to Dixon Creek. Detention Pond 2 Detention Pond 2 detains developed runoff from Basin B. All minimum opening elevations (MOEs) will need to be set at least 1 ft above the 100-yr WSEL with final design. Water Quality is proposed within the pond volume through an approved outlet structure. Additionally, Pond 2 will be designed to convey emergency overflow through the outlet structure. The pond release is routed to Dixon Creek. Detention Pond 3 Detention Pond 3 detains developed runoff from Basin C. Detention Pond 3 has a total 4.36 feet of freeboard from the 100-yr WSEL to the lowest proposed top of foundation. The emergency spill for Pond 3 will be directed through an emergency spill weir designed with final design. Water Quality is proposed within the pond volume through an approved outlet structure. The pond release is routed to Dixon Creek. Detention Pond 4 Detention Pond 4 detains developed runoff from Basin D. Detention Pond 4 has a total 2.25 feet of freeboard from the 100-yr WSEL to the lowest proposed top of foundation. The emergency spill for Pond 4 will be directed through an emergency spill weir designed with final design. Water Quality is provided upstream of the detention pond within Rain Garden 2. The pond release is routed to Dixon Creek. Table 3 - Detention Pond Summary Detention Pond Summary | Proposed Condition Pond 100-yr Volume (ac-ft) 100-yr WSEL WQCV (ft3) WQCV WSEL Max Release (cfs) 1 1.30 5145.90 3,129 5141.85 0.35 2 0.93 5139.59 3,115 5137.68 0.39 3 0.09 5144.65 268 5142.89 0.10 4 1.03 5142.24 n/a n/a 0.60 Mountain’s Edge Preliminary Drainage Report 12 Total Stormwater Release from Site The total allowable 100-yr release from the site was evaluated based on the historic Basins HA and HB. The allowable release for the Spring Creek Basin is a summation of the 100-yr historic runoff from Basin HA1 and the 2-yr historic runoff from Basins HA2 and HA3. The allowable release for the Canal Importation Basin is a summation of the 2-yr historic runoff from Basins HB1-HB3. Table 4 - Historic Stormwater Release and Allowable Developed Release Historic Stormwater Release Allowable Developed 100- yr Release (cfs) Pond/ Basin 2-yr Flow (cfs) 100-yr Flow (cfs) HA1 1.96 8.68 8.68 HA2 1.31 5.95 1.31 HA3 0.27 1.33 0.27 TOTAL BASIN HA 3.54 15.96 10.26 HB1 2.18 9.80 2.18 HB2 0.49 2.29 0.49 HB3 1.32 6.06 1.32 TOTAL BASIN HB 3.99 18.15 3.99 Based purely on a summation of detention pond releases and the basin runoff for Basin UD2, the total discharge from Mountain’s Edge to Dixon Creek would be 10.51 cfs. This is 0.25 cfs more than the allowable. Table 5 - Proposed Stormwater Release Proposed Stormwater Release Pond/ Basin 100-yr Flow (cfs) Basin HA Pond 1 0.35 Pond 2 0.39 Pond 3 0.10 Pond 4 0.60 Basin UD2 9.07 Total Basin HA 10.51 Basin HB UD1 0.52 Total Basin HB 0.52 Mountain’s Edge Preliminary Drainage Report 13 The pond volumes and pond releases were maximized based on a combination of available storage volume within of the ponds and total release durations based on the Colorado Revised Statute 37-92-602(8). Due to the 0.25 cfs discrepancy, a SWMM model was utilized to measure the flow in Dixon Creek from this site. The SWMM model accounts for the varying times to peak for the discharges from the ponds and Basin UD2. This SWMM model shows a 100- year peak flow from the site of 9.63 cfs contributing to Dixon Creek. This is sufficiently less than the allowable discharge of 10.26 cfs. The proposed site will generally detain all developed flows from the property to the 2- year historic release for the Spring Creek Basin. Additionally, any undetained runoff from the site will comply with the 2-year historic release for the Canal Importation Basin. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Water Quality Treatment 1. A combination of 12-hr Rain Gardens and 40-hr Extended Detention Basins will provide water quality for the site, including a portion of the Overland Trail right of way. 2. Water Quality within the Detention Ponds will be provided through approved outlet structures. C. SWMM Modeling 1. A SWMM model was created to model multiple drainage concepts that are challenging to model using standard hydraulic and rational calculations. These concepts include the following: • Peak flow from Basin OS2 through the existing pipe under Overland Trail during a 100-yr event. The total flow that spills to the south and bypasses the Dixon Creek during a 100-yr event. ▪ During a 100-year event, total flow in the existing culvert is 22.0 cfs and 18.83 cfs bypasses the Dixon Creek continuing south along Overland Trail roadside swale. • Peak flow from Basin OS1 routed through Basin B and discharged at the boundary of Holiday Twin Drive-in and Brown Farm Subdivision during a 100-year event. ▪ During a 100-year event, 16.20 cfs is conveyed through the Mountain’s Edge developing from Basin OS1. • Total emergency overflow rate for Basin B if the 100-yr orifice for Pond 2 is clogged. The outlet structure for Detention Pond 2 will be required to convey this flow to Dixon Creek prior to the pond overtopping. ▪ If the Detention Pond 2 100-year orifice were to become clogged during a 100-year event, the pond fill up and approximately 0.40 cfs would spill through the outlet structure and continue to Dixon Creek. Mountain’s Edge Preliminary Drainage Report 14 • Peak flow from the Mountain’s Edge site contributing to Dixon Creek based on differing peaking times for the undetained basin and detained basins during a100- year event. ▪ During a 100-year event, the peak flow from the Mountain’s Edge development to Dixon Creek is 9.63 cfs. This was determined by disallowing flows from Basin OS2 through the existing culvert. • Total flow in Dixon Creek based on the detained flows from Mountain’s Edge, undetained basins from Mountain’s Edge and upstream undetained off-site Basin OS2. ▪ During a 100-year event, the peak flow in Dixon Creek, along the Mountain’s Edge property, is 26.78 cfs. This flow accounts for the undetained basin UD2, the detention pond releases, and the flow from off-site basin OS2. D. Specific Details 1. Additional details to be provided with the FDP submittal. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the Mountain’s Edge project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with the Mountain’s Edge project complies with the City of Fort Collins’ Master Drainage Plan for the Spring Creek Basin and Canal Importation Basin. 3. There are no regulatory floodplains associated with the development. 4. The drainage plan and stormwater management measures proposed with the development are compliant with all applicable State and Federal regulations governing stormwater discharge. 5. The site achieves LID treatment for 49.8% of total impervious areas. This is 0.2% below the requirements set forth by the City of Fort Collins for Low Impact Development (LID). Please see LID Exhibit located in the Appendix. B. Drainage Concept 1. The drainage design proposed with this project will effectively comply with the Fort Collins Master Drainage Plan and will limit any potential damage or erosion associated with its stormwater runoff. All existing downstream drainage facilities are not expected to be impacted negatively by this development 2. The drainage design is anticipated to be very conservative. We have omitted any runoff reduction that will manifest due to infiltration within rain gardens. This is currently unable to be calculated with available soils data. Mountain’s Edge Preliminary Drainage Report 15 References 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 2. Preliminary Geotechnical Subsurface Exploration Report Proposed Single-Family Residential Development Herring Property – 2430 South Overland Trail, Fort Collins, Colorado, June 11, 2015, Soilogic, Inc. (Soilogic Project No. 15-1132). 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS Mountain's Edge CHARACTER OF SURFACE 1 : Runoff Coefficient Percentage Impervious Project: Mountain's Edge Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: S. Thomas Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 . 100% Date: December 20, 2016 Concrete …….......……………….….……….………………..….…………………………………………………….0.95 . 90% Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 . 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Pavers…………………………...………………..……………………………………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 . 0% Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 . 0% Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBasin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Pavers (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. HA1 4.07 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 4.075 0.25 0.25 0.31 0% Mountain's Edge Overland Flow, Time of Concentration: Mountain's Edge Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) 1 HA1 No 0.25 0.25 0.31 87 11.64% 6.5 6.5 6.1 681 0.94% 1.46 7.8 14.3 14.3 13.9 1 HA2 Yes 0.25 0.25 0.31 547 3.21% 25.2 25.2 23.4 583 0.96% 1.47 6.6 31.8 31.8 29.9 1 HA3 Yes 0.57 0.57 0.71 620 2.89% 17.4 17.4 12.8 583 0.96% 1.47 6.6 24.0 24.0 19.4 2 HB1 No 0.25 0.25 0.31 252 5.17% 14.6 14.6 13.5 590 0.94% 1.45 6.8 21.4 21.4 20.3 2 HB2 No 0.57 0.57 0.71 252 5.17% 9.1 9.1 6.7 590 0.94% 1.45 6.8 15.9 15.9 13.5 Mountain's Edge Rational Method Equation: Project: Mountain's Edge Calculations By: Date: Rainfall Intensity: 1 HA1 4.07 14 14 14 0.25 0.25 0.31 1.92 3.29 6.82 1.96 3.35 8.68 1 HA2 4.18 32 32 30 0.25 0.25 0.31 1.26 2.14 4.56 1.31 2.24 5.95 1 HA3 0.33 24 24 19 0.57 0.57 0.71 1.48 2.52 5.75 0.27 0.47 1.33 2 HB1 5.60 21 21 20 0.25 0.25 0.31 1.56 2.67 5.60 2.18 3.74 9.80 2 HB2 0.47 16 16 13 0.57 0.57 0.71 1.84 3.14 6.92 0.49 0.83 2.29 3 HB3 4.66 37 37 34 0.25 0.25 0.31 1.13 1.93 4.16 1.32 2.25 6.06 EXISTING RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) S. Thomas Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 December 20, 2016 Intensity, i10 (in/hr) C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) Q = C f ( C )( i )( A ) 12/20/2016 3:48 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Existing_Rational_Calcs.xlsx\Runoff Mountain's Edge CHARACTER OF SURFACE1: Runoff Coefficient Percentage Impervious Project: Mountain's Edge Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: S. Thomas Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 . 100% Date: September 14, 2017 Concrete …….......……………….….……….………………..….…………………………………………………….0.95 . 90% Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 . 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Single Family Lots 0.30 30% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 . 0% Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 . 0% Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBasin Area (ac) Area of Asphalt (ac) Area of Gravel (ac) Area of Concrete (ac) Area of Single-Family Lots (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite Mountain's Edge Overland Flow, Time of Concentration: Mountain's Edge Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) Mountain's Edge Rational Method Equation: Project: Mountain's Edge Calculations By: Date: Rainfall Intensity: A1 A1 1.45 7 7 5 0.66 0.66 0.83 2.52 4.31 9.95 2.42 4.14 11.93 A2 A2 0.24 5 5 5 0.62 0.62 0.77 2.85 4.87 9.95 0.42 0.73 1.85 A3 A3 0.21 5 5 5 0.60 0.60 0.74 2.85 4.87 9.95 0.36 0.61 1.55 A4 A4 0.23 5 5 5 0.62 0.62 0.77 2.85 4.87 9.95 0.41 0.69 1.77 A5 A5 1.12 7 7 6 0.90 0.90 1.00 2.60 4.44 9.63 2.60 4.45 10.76 A6 A6 2.19 10 10 9 0.47 0.47 0.58 2.21 3.78 8.03 2.26 3.87 10.27 A6 TOTAL BASIN A 5.44 9 9 7 0.63 0.63 0.78 2.35 4.02 8.80 8.00 13.66 37.42 B1 B1 0.50 6 6 5 0.83 0.83 1.00 2.67 4.56 9.95 1.10 1.87 4.93 B2 B2 0.62 6 6 6 0.58 0.58 0.72 2.67 4.56 9.63 0.97 1.65 4.36 B3 B3 1.08 5 5 5 0.80 0.80 1.00 2.85 4.87 9.95 2.46 4.20 10.73 B4 B4 0.27 5 5 5 0.92 0.92 1.00 2.85 4.87 9.95 0.71 1.22 2.72 B5 B5 0.19 5 5 5 0.78 0.78 0.98 2.85 4.87 9.95 0.42 0.71 1.82 B6 B6 1.50 17 17 16 0.27 0.27 0.34 1.78 3.04 6.30 0.72 1.23 3.20 B6 TOTAL BASIN B 4.16 14 14 12 0.59 0.59 0.73 1.95 3.34 7.16 4.76 8.14 21.83 C1 C1 0.14 5 5 5 0.60 0.60 0.76 2.85 4.87 9.95 0.23 0.40 1.02 C2 C2 0.45 6 6 5 0.37 0.37 0.47 2.76 4.72 9.95 0.46 0.79 2.09 C2 TOTAL BASIN C 0.58 6 6 5 0.43 0.43 0.54 2.76 4.72 9.95 0.69 1.18 3.11 D1 D1 0.30 5 5 5 0.85 0.85 1.00 2.85 4.87 9.95 0.72 1.22 2.94 D2 D2 1.66 5 5 5 0.67 0.67 0.84 2.85 4.87 9.95 3.18 5.43 13.87 D3 D3 0.98 6 6 5 0.71 0.71 0.89 2.76 4.72 9.95 1.92 3.27 8.63 D4 D4 0.66 5 5 5 0.58 0.58 0.73 2.85 4.87 9.95 1.09 1.86 4.76 D5 D5 1.41 10 10 9 0.37 0.37 0.46 2.26 3.86 8.03 1.17 1.99 5.19 D5 TOTAL BASIN D 5.00 8 8 7 0.59 0.59 0.74 2.40 4.10 9.06 7.10 12.14 33.51 UD1 UD1 0.05 5 5 5 0.83 0.83 1.00 2.85 4.87 9.95 0.12 0.21 0.52 UD2 UD2 4.07 14 14 14 0.26 0.26 0.33 1.92 3.29 6.82 2.04 3.50 9.07 HT1 HT1 5.51 43 43 39 0.27 0.27 0.34 1.03 1.76 3.80 1.54 2.63 7.11 OS1 OS1 14.72 24 24 23 0.33 0.33 0.41 1.48 2.52 5.20 7.06 12.06 31.10 September 14, 2017 Intensity, i10 (in/hr) C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) PROPOSED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc APPENDIX B HYDRAULIC COMPUTATIONS B.1 DETENTION POND SIZING B.2 STORM SEWER (NOT INCLUDED) B.3 INLET (NOT INCLUDED) APPENDIX B.1 DETENTION PONDS AND WATER QUALITY Mountain's Edge 911-007 Fort Collins, Colorado S. Thomas Date: 9/14/2017 Pond No.: 1 Pond 1 100-yr 0.78 WQCV 3129 ft3 Area (A)= 5.44 acres Quantity Detention 53694 ft3 Max Release Rate = 0.35 cfs Total Volume 56823 ft3 Total Volume 1.304 ac-ft Time Time Fort Collins 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft3) (ft3) (ft3) 5 300 9.95 42.2 12666 105 12561 10 600 7.72 32.8 19655 210 19445 15 900 6.52 27.7 24899 315 24584 20 1200 5.60 23.8 28514 420 28094 25 1500 4.98 21.1 31697 525 31172 30 1800 4.52 19.2 34523 630 33893 35 2100 4.08 17.3 36356 735 35621 40 2400 3.74 15.9 38087 840 37247 45 2700 3.46 14.7 39640 945 38695 50 3000 3.23 13.7 41117 1050 40067 55 3300 3.03 12.9 42428 1155 41273 60 3600 2.86 12.1 43688 1260 42428 65 3900 2.72 11.5 45012 1365 43647 70 4200 2.59 11.0 46158 1470 44688 75 4500 2.48 10.5 47354 1575 45779 80 4800 2.38 10.1 48474 1680 46794 85 5100 2.29 9.7 49556 1785 47771 90 5400 2.21 9.4 50638 1890 48748 95 5700 2.13 9.0 51517 1995 49522 100 6000 2.06 8.7 52446 2100 50346 105 6300 2.00 8.5 53464 2205 51259 110 6600 1.94 8.2 54330 2310 52020 115 6900 1.89 8.0 55336 2415 52921 120 7200 1.84 7.8 56214 2520 53694 Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = Detention Pond Calculation | FAA Method Project Number: Project Location: Calculations By: 9/14/2017 5:20 PM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 1.xlsm\FAA_LarmCnty idf Mountain's Edge 911-007 Fort Collins, CO S. Thomas Date: 9/14/2017 Pond No.: 1 Pond 1 WQCV 3129 ft3 5141.85 ft. Design Storm 100-yr Required Volume= 56823 ft3 5145.90 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft3 ft. ft3 ft3 ft3 ft3 5,140.20 68 0.00 0 0 0 0 5,140.40 270 0.20 34 34 32 32 5,140.60 586 0.20 86 119 84 115 5,140.80 985 0.20 157 277 155 271 5,141.00 1482 0.20 247 523 245 516 5,141.20 2098 0.20 358 881 356 872 5,141.40 2847 0.20 495 1376 493 1364 5,141.60 3751 0.20 660 2035 658 2022 5,141.80 4820 0.20 857 2893 855 2877 5,142.00 6006 0.20 1083 3975 1080 3957 5,142.20 7156 0.20 1316 5291 1315 5272 5,142.40 8243 0.20 1540 6831 1539 6811 5,142.60 8948 0.20 1719 8551 1719 8529 5,142.80 9337 0.20 1829 10379 1828 10358 5,143.00 9667 0.20 1900 12280 1900 12258 5,143.20 10003 0.20 1967 14247 1967 14225 5,143.40 10344 0.20 2035 16281 2035 16260 5,143.60 10692 0.20 2104 18385 2104 18363 5,143.80 11045 0.20 2174 20559 2174 20537 5,144.00 11403 0.20 2245 22803 2245 22781 5,144.20 11768 0.20 2317 25121 2317 25099 5,144.40 12,327 0.20 2410 27530 2409 27508 5,144.60 13,276 0.20 2560 30090 2560 30068 5,144.80 14,993 0.20 2827 32917 2825 32893 5,145.00 16,937 0.20 3193 36110 3191 36084 5,145.20 18,981 0.20 3592 39702 3590 39673 5,145.40 22,753 0.20 4173 43875 4168 43841 5,145.60 25,242 0.20 4800 48675 4797 48639 5,145.80 27,817 0.20 5306 53981 5304 53942 5,146.00 30,228 0.20 5805 59785 5803 59745 Design Point Design Storm Require Volume= Stage - Storage Calculation Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 66.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.660 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.21 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 63,123 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 1,086 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 833 sq ft D) Actual Flat Surface Area AActual = 933 sq ft E) Area at Design Depth (Top Surface Area) ATop = 1577 sq ft F) Rain Garden Total Volume VT= 1,255 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = N/A in Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering September 14, 2017 Mountain's Edge - Rain Garden 1 Drake and Overland, Fort Collins, CO UD-BMP (Version 3.06, November 2016) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO Rain Garden 1.xlsm, RG 9/14/2017, 2:31 PM POND 1 Project: Mountain's Edge By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 5.440 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 52.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.5200 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.212 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.096 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Rain Garden WQCV (ft 3 ) = 1086 <-- CALCULATED Adjusted WQCV (cu-ft) = 3096 <-- CALCULATED (minus Rain Garden) WQ Depth (ft) = 1.840 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.236 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 5/9 <-- INPUT from Figure 5 number of rows = 6 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE September 14, 2017 Mountain's Edge 911-007 Fort Collins, Colorado S. Thomas Date: 9/14/2017 Pond No.: Pond 2 Pond 2 100-yr 0.73 WQCV 3115 ft3 Area (A)= 4.16 acres Quantity Detention 37424 ft3 Max Release Rate = 0.39 cfs Total Volume 40539 ft3 Total Volume 0.931 ac-ft Time Time Fort Collins 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft3) (ft3) (ft3) 5 300 9.95 30.2 9065 117 8948 10 600 7.72 23.4 14066 234 13832 15 900 6.52 19.8 17820 351 17469 20 1200 5.60 17.0 20407 468 19939 25 1500 4.98 15.1 22685 585 22100 30 1800 4.52 13.7 24707 702 24005 35 2100 4.08 12.4 26019 819 25200 40 2400 3.74 11.4 27258 936 26322 45 2700 3.46 10.5 28370 1053 27317 50 3000 3.23 9.8 29427 1170 28257 55 3300 3.03 9.2 30365 1287 29078 60 3600 2.86 8.7 31267 1404 29863 65 3900 2.72 8.3 32214 1521 30693 70 4200 2.59 7.9 33034 1638 31396 75 4500 2.48 7.5 33891 1755 32136 80 4800 2.38 7.2 34692 1872 32820 85 5100 2.29 7.0 35467 1989 33478 90 5400 2.21 6.7 36241 2106 34135 95 5700 2.13 6.5 36870 2223 34647 100 6000 2.06 6.3 37535 2340 35195 105 6300 2.00 6.1 38264 2457 35807 110 6600 1.94 5.9 38883 2574 36309 115 6900 1.89 5.7 39603 2691 36912 120 7200 1.84 5.6 40232 2808 37424 Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = Detention Pond Calculation | FAA Method Project Number: Project Location: Calculations By: 9/14/2017 2:27 PM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 2.xlsm\FAA_LarmCnty idf Mountain's Edge 911-007 Fort Collins, CO S. Thomas Date: 9/14/2017 Pond No.: Pond 2 Pond 2 WQCV 3115 ft3 5137.68 ft. Design Storm 100-yr Required Volume= 40539 ft3 5139.59 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft3 ft. ft3 ft3 ft3 ft3 5,137.00 5 0.00 0 0 0 0 5,137.20 1874 0.20 188 188 132 132 5,137.40 5148 0.20 702 890 675 807 5,137.60 9268 0.20 1442 2332 1422 2228 5,137.80 13427 0.20 2269 4601 2257 4485 5,138.00 16787 0.20 3021 7623 3015 7500 5,138.20 18731 0.20 3552 11174 3550 11050 5,138.40 19560 0.20 3829 15004 3829 14879 5,138.60 20203 0.20 3976 18980 3976 18855 5,138.80 20851 0.20 4105 23085 4105 22961 5,139.00 21504 0.20 4235 27321 4235 27196 5,139.20 22162 0.20 4367 31687 4366 31562 5,139.40 22825 0.20 4499 36186 4499 36061 5,139.60 23502 0.20 4633 40819 4633 40693 5,139.80 24227 0.20 4773 45592 4773 45466 5,140.00 24986 0.20 4921 50513 4921 50387 Design Point Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 9/14/20172:19 PM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 2.xlsm\Stage_Storage POND 2 Project: Mountain's Edge By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 4.160 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 50.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.5000 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.206 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.072 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Rain Garden WQCV (ft 3 ) = 0 <-- CALCULATED Adjusted WQCV (cu-ft) = 3115 <-- CALCULATED (minus Rain Garden) WQ Depth (ft) = 1.120 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.279 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 3/5 <-- INPUT from Figure 5 number of rows = 3 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE September 14, 2017 Mountain's Edge 911-007 Fort Collins, Colorado S. Thomas Date: 9/14/2017 Pond No.: Pond 3 Pond 3 100-yr 0.54 WQCV 268 ft3 Area (A)= 0.58 acres Quantity Detention 3429 ft3 Max Release Rate = 0.10 cfs Total Volume 3697 ft3 Total Volume 0.085 ac-ft Time Time Larimer County Area II 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft3) (ft3) (ft3) 5 300 9.95 3.1 935 30 905 10 600 7.72 2.4 1451 60 1391 15 900 6.52 2.0 1838 90 1748 20 1200 5.60 1.8 2105 120 1985 25 1500 4.98 1.6 2340 150 2190 30 1800 4.52 1.4 2548 180 2368 35 2100 4.08 1.3 2683 210 2473 40 2400 3.74 1.2 2811 240 2571 45 2700 3.46 1.1 2926 270 2656 50 3000 3.23 1.0 3035 300 2735 55 3300 3.03 0.9 3132 330 2802 60 3600 2.86 0.9 3225 360 2865 65 3900 2.72 0.9 3322 390 2932 70 4200 2.59 0.8 3407 420 2987 75 4500 2.48 0.8 3495 450 3045 80 4800 2.38 0.7 3578 480 3098 85 5100 2.29 0.7 3658 510 3148 90 5400 2.21 0.7 3738 540 3198 95 5700 2.13 0.7 3803 570 3233 100 6000 2.06 0.6 3871 600 3271 105 6300 2.00 0.6 3946 630 3316 110 6600 1.94 0.6 4010 660 3350 115 6900 1.89 0.6 4084 690 3394 120 7200 1.84 0.6 4149 720 3429 Detention Pond Calculation | FAA Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = 9/14/2017 2:20 PM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 3.xlsm\FAA_LarmCnty idf Mountain's Edge 911-007 Fort Collins, CO S. Thomas Date: 9/14/2017 Pond No.: Pond 3 Pond 3 WQCV 268 ft3 5142.89 ft. Design Storm 100-yr Required Volume= 3697 ft3 5144.65 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft3 ft. ft3 ft3 ft3 ft3 5,142.00 9 0.00 0 0 0 0 5,142.20 73 0.20 8 8 7 7 5,142.40 200 0.20 27 36 26 33 5,142.60 389 0.20 59 94 58 91 5,142.80 641 0.20 103 197 102 193 5,143.00 956 0.20 160 357 159 352 5,143.20 1,337 0.20 229 586 228 580 5,143.40 1,748 0.20 308 895 308 888 5,143.60 1,905 0.20 365 1260 365 1253 5,143.80 2,062 0.20 397 1657 397 1650 5,144.00 2,224 0.20 429 2086 429 2078 5,144.20 2,391 0.20 461 2547 461 2539 5,144.40 2,563 0.20 495 3042 495 3035 5,144.60 2,742 0.20 531 3573 530 3565 5,144.80 2,928 0.20 567 4140 567 4132 5,145.00 3,120 0.20 605 4745 605 4737 5,145.20 3,319 0.20 644 5389 644 5381 5,145.40 3,525 0.20 684 6073 684 6065 5,145.60 3,737 0.20 726 6799 726 6791 5,145.80 3,956 0.20 769 7569 769 7560 Design Point Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 9/14/20172:20 PM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 3.xlsm\Stage_Storage POND 3 Project: Mountain's Edge By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 0.580 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 23.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.2300 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.128 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.006 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Rain Garden WQCV (ft 3 ) = 0 <-- CALCULATED Adjusted WQCV (cu-ft) = 268 <-- CALCULATED (minus Rain Garden) WQ Depth (ft) = 0.890 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.029 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 1/5 <-- INPUT from Figure 5 number of rows = 3 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE July 25, 2017 Mountain's Edge 911-007 Fort Collins, Colorado S. Thomas Date: 9/14/2017 Pond No.: 4 Pond 4 100-yr 0.74 WQCV 0 ft3 Area (A)= 5.00 acres Quantity Detention 44698 ft3 Max Release Rate = 0.6 cfs Total Volume 44698 ft3 Total Volume 1.026 ac-ft Time Time Fort Collins 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft3) (ft3) (ft3) 5 300 9.95 36.8 11045 180 10865 10 600 7.72 28.6 17138 360 16778 15 900 6.52 24.1 21712 540 21172 20 1200 5.60 20.7 24864 720 24144 25 1500 4.98 18.4 27639 900 26739 30 1800 4.52 16.7 30103 1080 29023 35 2100 4.08 15.1 31702 1260 30442 40 2400 3.74 13.8 33211 1440 31771 45 2700 3.46 12.8 34565 1620 32945 50 3000 3.23 12.0 35853 1800 34053 55 3300 3.03 11.2 36996 1980 35016 60 3600 2.86 10.6 38095 2160 35935 65 3900 2.72 10.1 39250 2340 36910 70 4200 2.59 9.6 40249 2520 37729 75 4500 2.48 9.2 41292 2700 38592 80 4800 2.38 8.8 42269 2880 39389 85 5100 2.29 8.5 43212 3060 40152 90 5400 2.21 8.2 44156 3240 40916 95 5700 2.13 7.9 44922 3420 41502 100 6000 2.06 7.6 45732 3600 42132 105 6300 2.00 7.4 46620 3780 42840 110 6600 1.94 7.2 47375 3960 43415 115 6900 1.89 7.0 48252 4140 44112 120 7200 1.84 6.8 49018 4320 44698 Detention Pond Calculation | FAA Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = 9/14/2017 2:21 PM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 4.xlsm\FAA_LarmCnty idf Mountain's Edge 911-007 Fort Collins, CO S. Thomas Date: 9/14/2017 Pond No.: 4 Pond 4 WQCV 0 ft3 5135.60 ft. Design Storm 100-yr Required Volume= 44698 ft3 5142.24 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft3 ft. ft3 ft3 ft3 ft3 5,135.60 138 0.00 0 0 0 0 5,135.80 452 0.20 59 59 56 56 5,136.00 875 0.20 133 192 130 186 5,136.20 1341 0.20 222 413 220 406 5,136.40 1778 0.20 312 725 311 717 5,136.60 2229 0.20 401 1126 400 1117 5,136.80 2714 0.20 494 1620 494 1611 5,137.00 3208 0.20 592 2213 592 2202 5,137.20 3417 0.20 662 2875 662 2865 5,137.40 3627 0.20 704 3579 704 3569 5,137.60 3841 0.20 747 4326 747 4316 5,137.80 4,061 0.20 790 5116 790 5106 5,138.00 4,287 0.20 835 5951 835 5940 5,138.20 4,518 0.20 880 6832 880 6821 5,138.40 4,754 0.20 927 7759 927 7748 5,138.60 4,996 0.20 975 8734 975 8723 5,138.80 5,243 0.20 1024 9758 1024 9747 5,139.00 5,495 0.20 1074 10832 1074 10820 5,139.20 5,753 0.20 1125 11957 1125 11945 5,139.40 6,017 0.20 1177 13134 1177 13122 5,139.60 6,286 0.20 1230 14364 1230 14352 5,139.80 6,560 0.20 1285 15648 1285 15637 5,140.00 6,841 0.20 1340 16989 1340 16977 5,140.20 7,126 0.20 1397 18385 1397 18373 5,140.40 7,417 0.20 1454 19840 1454 19827 5,140.60 7,713 0.20 1513 21352 1513 21340 5,140.80 12,298 0.20 2001 23354 1983 23324 5,141.00 12,974 0.20 2527 25881 2527 25850 5,141.20 13,659 0.20 2663 28544 2663 28514 5,141.40 14,360 0.20 2802 31346 2802 31315 5,141.60 15,076 0.20 2944 34289 2943 34258 5,141.80 15,806 0.20 3088 37378 3088 37346 5,142.00 16,553 0.20 3236 40614 3236 40582 5,142.20 17,346 0.20 3390 44004 3390 43972 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 51.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.510 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.17 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 217,840 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 3,035 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 2222 sq ft D) Actual Flat Surface Area AActual = 2334 sq ft E) Area at Design Depth (Top Surface Area) ATop = 3974 sq ft F) Rain Garden Total Volume VT= 3,154 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = N/A in Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering September 14, 2017 Mountain's Edge - Rain Garden 2 Drake and Overland, Fort Collins CO UD-BMP (Version 3.06, November 2016) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO Rain Garden 2.xlsm, RG 9/14/2017, 2:31 PM POND 4 Project: Mountain's Edge By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 5.000 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 51.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.5100 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 0.8 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.167 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.070 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Rain Garden WQCV (ft 3 ) = 3035 <-- CALCULATED Adjusted WQCV (cu-ft) = 0 <-- CALCULATED (minus Rain Garden) WQ Depth (ft) = 1.000 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.000 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 0 <-- INPUT from Figure 5 number of rows = 3 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE September 14, 2017 APPENDIX B.2 STORM SEWERS APPENDIX B.3 INLETS APPENDIX C EROSION CONTROL REPORT Mountain’s Edge Preliminary Erosion Control Report A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Utility Plans at final design will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. APPENDIX D LID EXHIBIT Project: Mountain's Edge Calculations By: S. Thomas Date: September 14, 2017 LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) LID Treatment L1 A1 63,123 66% 41,387 Total L1 63,123 66% 41,387 L2 D1 12,853 86% 10,992 D2 72,150 62% 44,522 D3 42,668 63% 26,699 D4 28,680 60% 17,110 D5 61,489 20% 12,463 Total L2 217,840 51% 111,785 Total Treated 280,963 55% 153,172 LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) A2 10,529 47% 4,964 A3 9,133 44% 4,060 A4 10,041 47% 4,757 A5 48,678 85% 41,408 A6 95,400 28% 26,656 B1 21,602 82% 17,654 B2 27,198 42% 11,537 B3 47,051 74% 34,707 B4 11,903 88% 10,433 B5 8,132 74% 6,013 B6 65,127 14% 9,441 C1 5,930 46% 2,705 C2 19,542 16% 3,130 UD1 2,263 80% 1,810 Total Proposed Untreated 382,529 47% 179,275 B1 21,602 66% 14,163 D1 12,853 86% 10,992 Total Overland Trail ROW 34,455 73% 25,155 PROPOSED LID COMPUTATIONS PROPOSED LID UNTREATED AREA PROPOSED LID TREATED AREA Rain Garden 2 Rain Garden 1 AREA NOT REQUIRED TO BE TREATED WITH LID Project: Mountain's Edge Calculations By: S. Thomas Date: September 14, 2017 PROPOSED LID COMPUTATIONS 663,492 25,155 332,447 307,291 153,646 153,172 49.8% Rain Garden 1 Rain Garden 2 Total Contributing Area (sf) 63,123 217,840 Percent Impervious 66% 51% Total Volume Required (cf) 1,086 3,035 Total Volume Provided (cf) 1,255 3,154 LID TREATMENT SUMMARY Total Site Area (sf) Total Net Proposed Impervious Area (sf) RAIN GARDEN SUMMARY Total Overland ROW Impervious Area (sf) (Basins B1, D1) Total Proposed Impervious Area (sf) Total Treated Impervious Area (sf) Percent Impervious Treated by LID measures 50% Required Minimum Area to be Treated by LID measures (sf) APPENDIX E SWMM Modeling SUB-A SUB-B SUB-C SUB-D HT OS1 OS2 SUB-UD2 1 2 3 8 9 10 11 BYPASS OVERFLOWWEIR OUT1 OUT2 OUT3 OUT4 OUTOS1 OUTOS2 J1 J2 J3 J4 J5 J6 J7 O1 O2 O3 POND1 POND2 POND3 POND4 PONDOS1 PONDOS2 FORTCOLLINS 03/15/2016 00:05:00 SWMM 5.1 Page 1 SWMM Output - All pipes Open.rpt EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.010) -------------------------------------------------------------- ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ MAR-15-2016 00:00:00 Ending Date .............. MAR-20-2016 06:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:05:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 15.00 sec ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 31.524 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 17.008 1.980 Surface Runoff ........... 14.472 1.684 Final Storage ............ 0.131 0.015 Continuity Error (%) ..... -0.274 Page 1 SWMM Output - All pipes Open.rpt ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 14.472 4.716 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 14.674 4.782 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.204 0.066 Final Stored Volume ...... 0.000 0.000 Continuity Error (%) ..... 0.009 ******************************** Highest Flow Instability Indexes ******************************** Link OUTOS2 (2) ************************* Routing Time Step Summary ************************* Minimum Time Step : 15.00 sec Average Time Step : 15.00 sec Maximum Time Step : 15.00 sec Percent in Steady State : 0.00 Average Iterations per Step : 1.00 Percent Not Converging : 0.00 *************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------------------------- Total Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Coeff Page 2 SWMM Output - All pipes Open.rpt Subcatchment in in in in in 10^6 gal CFS -------------------------------------------------------------------------------------------------------- SUB-A 3.67 0.00 0.00 0.74 2.89 0.43 37.08 0.789 SUB-B 3.67 0.00 0.00 0.85 2.78 0.31 23.92 0.759 SUB-C 3.67 0.00 0.00 1.11 2.56 0.04 4.01 0.699 SUB-D 3.67 0.00 0.00 0.77 2.87 0.39 32.77 0.783 HT 3.67 0.00 0.00 2.10 1.58 0.24 11.01 0.430 OS1 3.67 0.00 0.00 2.10 1.57 0.63 26.35 0.427 OS2 3.67 0.00 0.00 2.22 1.45 2.51 99.12 0.395 SUB-UD2 3.67 0.00 0.00 2.10 1.59 0.18 8.73 0.432 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- J1 JUNCTION 0.07 1.31 42.01 0 02:09 1.31 J2 JUNCTION 0.09 1.31 40.41 0 02:20 1.31 J3 JUNCTION 0.23 1.38 35.58 0 00:52 1.38 J4 JUNCTION 0.03 1.11 39.33 0 00:50 1.11 J5 JUNCTION 0.01 0.61 46.21 0 01:02 0.61 J6 JUNCTION 0.15 0.33 36.83 0 02:26 0.33 J7 JUNCTION 0.15 0.33 35.33 0 02:29 0.33 O1 OUTFALL 0.02 1.11 36.61 0 00:50 1.11 O2 OUTFALL 0.23 1.38 34.98 0 00:53 1.38 O3 OUTFALL 0.00 0.00 48.00 0 00:00 0.00 POND1 STORAGE 2.31 5.77 45.77 0 02:22 5.77 POND2 STORAGE 0.69 2.67 39.67 0 02:28 2.67 POND3 STORAGE 0.43 3.18 45.18 0 02:09 3.17 POND4 STORAGE 1.29 6.87 43.47 0 02:18 6.87 PONDOS1 STORAGE 0.01 0.96 47.96 0 01:02 0.95 PONDOS2 STORAGE 0.15 6.15 50.15 0 01:37 6.15 ******************* Node Inflow Summary ******************* Page 3 SWMM Output - All pipes Open.rpt ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- J1 JUNCTION 0.00 22.10 0 02:09 0 2.27 0.000 J2 JUNCTION 8.73 25.75 0 00:51 0.175 2.44 0.000 J3 JUNCTION 0.00 26.78 0 00:52 0 3.64 0.000 J4 JUNCTION 11.01 25.49 0 00:50 0.236 0.861 0.000 J5 JUNCTION 0.00 16.20 0 01:02 0 0.625 0.000 J6 JUNCTION 0.00 0.74 0 02:26 0 0.799 0.000 J7 JUNCTION 0.00 1.34 0 02:25 0 1.19 0.000 O1 OUTFALL 0.00 25.47 0 00:50 0 0.861 0.000 O2 OUTFALL 0.00 26.78 0 00:53 0 3.64 0.000 O3 OUTFALL 0.00 18.83 0 01:37 0 0.281 0.000 POND1 STORAGE 37.08 37.08 0 00:40 0.428 0.46 0.003 POND2 STORAGE 23.92 23.92 0 00:40 0.314 0.34 0.003 POND3 STORAGE 4.01 4.01 0 00:40 0.0404 0.0441 0.009 POND4 STORAGE 32.77 32.77 0 00:40 0.39 0.396 0.007 PONDOS1 STORAGE 26.35 26.35 0 00:40 0.626 0.626 0.067 PONDOS2 STORAGE 99.12 99.12 0 00:40 2.51 2.51 0.018 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- J1 JUNCTION 126.00 1.312 3.688 J2 JUNCTION 126.00 1.312 3.688 J3 JUNCTION 126.00 1.379 3.621 J4 JUNCTION 126.00 1.107 1.893 J5 JUNCTION 126.00 0.609 2.391 J6 JUNCTION 126.00 0.333 1.667 J7 JUNCTION 126.00 0.333 1.667 POND1 STORAGE 126.00 5.771 0.029 POND2 STORAGE 126.00 2.673 0.327 Page 4 SWMM Output - All pipes Open.rpt POND3 STORAGE 126.00 3.175 0.625 POND4 STORAGE 126.00 6.871 0.529 PONDOS1 STORAGE 126.00 0.956 6.044 PONDOS2 STORAGE 126.00 6.147 0.853 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** Storage Volume Summary ********************** -------------------------------------------------------------------------------------------------- Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------------------- POND1 14.995 25 0 0 58.923 99 0 02:22 0.35 POND2 7.931 16 0 0 42.552 84 0 02:28 0.39 POND3 0.483 6 0 0 5.307 70 0 02:08 0.10 POND4 6.111 10 0 0 48.858 82 0 02:18 0.60 PONDOS1 0.102 0 0 0 11.701 3 0 01:01 16.20 PONDOS2 3.081 2 0 0 148.527 81 0 01:37 40.83 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- O1 2.93 8.66 25.47 0.861 O2 71.75 1.49 26.78 3.639 O3 0.71 11.64 18.83 0.281 ----------------------------------------------------------- Page 5 SWMM Output - All pipes Open.rpt System 25.13 21.80 61.44 4.781 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- 1 CONDUIT 22.10 0 02:20 3.21 0.03 0.26 2 CONDUIT 25.75 0 00:52 5.08 0.02 0.23 3 CONDUIT 26.78 0 00:53 3.52 0.03 0.28 8 CONDUIT 16.20 0 01:03 3.65 0.27 0.61 9 CONDUIT 25.47 0 00:50 5.20 0.07 0.37 10 CONDUIT 0.74 0 02:29 2.16 0.06 0.17 11 CONDUIT 1.34 0 02:25 6.79 0.03 0.11 BYPASS WEIR 18.83 0 01:37 0.00 OVERFLOWWEIR WEIR 0.00 0 00:00 0.00 OUT1 DUMMY 0.35 0 02:22 OUT2 DUMMY 0.39 0 02:28 OUT3 DUMMY 0.10 0 02:09 OUT4 DUMMY 0.60 0 02:18 OUTOS1 DUMMY 16.20 0 01:02 OUTOS2 DUMMY 22.00 0 01:26 ************************* Conduit Surcharge Summary ************************* No conduits were surcharged. Analysis begun on: Mon Oct 09 12:14:38 2017 Analysis ended on: Mon Oct 09 12:14:38 2017 Total elapsed time: < 1 sec Page 6 SWMM Output - OS2 closed.rpt EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.010) -------------------------------------------------------------- ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ MAR-15-2016 00:00:00 Ending Date .............. MAR-20-2016 06:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:05:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 15.00 sec ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 31.524 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 17.008 1.980 Surface Runoff ........... 14.472 1.684 Final Storage ............ 0.131 0.015 Continuity Error (%) ..... -0.274 ************************** Volume Volume Page 1 SWMM Output - OS2 closed.rpt Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 14.472 4.716 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 11.403 3.716 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.204 0.066 Final Stored Volume ...... 3.268 1.065 Continuity Error (%) ..... 0.034 ******************************** Highest Flow Instability Indexes ******************************** All links are stable. ************************* Routing Time Step Summary ************************* Minimum Time Step : 15.00 sec Average Time Step : 15.00 sec Maximum Time Step : 15.00 sec Percent in Steady State : 0.00 Average Iterations per Step : 1.00 Percent Not Converging : 0.00 *************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------------------------- Total Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Coeff Subcatchment in in in in in 10^6 gal CFS -------------------------------------------------------------------------------------------------------- SUB-A 3.67 0.00 0.00 0.74 2.89 0.43 37.08 0.789 SUB-B 3.67 0.00 0.00 0.85 2.78 0.31 23.92 0.759 SUB-C 3.67 0.00 0.00 1.11 2.56 0.04 4.01 0.699 SUB-D 3.67 0.00 0.00 0.77 2.87 0.39 32.77 0.783 Page 2 SWMM Output - OS2 closed.rpt HT 3.67 0.00 0.00 2.10 1.58 0.24 11.01 0.430 OS1 3.67 0.00 0.00 2.10 1.57 0.63 26.35 0.427 OS2 3.67 0.00 0.00 2.22 1.45 2.51 99.12 0.395 SUB-UD2 3.67 0.00 0.00 2.10 1.59 0.18 8.73 0.432 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- J1 JUNCTION 0.03 0.17 40.87 0 02:09 0.17 J2 JUNCTION 0.06 0.75 39.85 0 00:45 0.75 J3 JUNCTION 0.20 0.94 35.14 0 00:46 0.93 J4 JUNCTION 0.03 1.11 39.33 0 00:50 1.11 J5 JUNCTION 0.01 0.61 46.21 0 01:02 0.61 J6 JUNCTION 0.15 0.33 36.83 0 02:26 0.33 J7 JUNCTION 0.15 0.33 35.33 0 02:29 0.33 O1 OUTFALL 0.02 1.11 36.61 0 00:50 1.11 O2 OUTFALL 0.20 0.94 34.54 0 00:47 0.93 O3 OUTFALL 0.00 0.00 48.00 0 00:00 0.00 POND1 STORAGE 2.31 5.77 45.77 0 02:22 5.77 POND2 STORAGE 0.69 2.67 39.67 0 02:28 2.67 POND3 STORAGE 0.43 3.18 45.18 0 02:09 3.17 POND4 STORAGE 1.29 6.87 43.47 0 02:18 6.87 PONDOS1 STORAGE 0.01 0.96 47.96 0 01:02 0.95 PONDOS2 STORAGE 5.97 6.29 50.29 0 01:15 6.29 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- J1 JUNCTION 0.00 0.10 0 02:09 0 0.0441 0.000 J2 JUNCTION 8.73 8.78 0 00:45 0.175 0.219 0.000 J3 JUNCTION 0.00 9.63 0 00:46 0 1.41 0.000 Page 3 SWMM Output - OS2 closed.rpt J4 JUNCTION 11.01 25.49 0 00:50 0.236 0.861 0.000 J5 JUNCTION 0.00 16.20 0 01:02 0 0.625 0.000 J6 JUNCTION 0.00 0.74 0 02:26 0 0.799 0.000 J7 JUNCTION 0.00 1.34 0 02:25 0 1.19 0.000 O1 OUTFALL 0.00 25.47 0 00:50 0 0.861 0.000 O2 OUTFALL 0.00 9.63 0 00:47 0 1.41 0.000 O3 OUTFALL 0.00 50.82 0 01:15 0 1.44 0.000 POND1 STORAGE 37.08 37.08 0 00:40 0.428 0.46 0.003 POND2 STORAGE 23.92 23.92 0 00:40 0.314 0.34 0.003 POND3 STORAGE 4.01 4.01 0 00:40 0.0404 0.0441 0.009 POND4 STORAGE 32.77 32.77 0 00:40 0.39 0.396 0.007 PONDOS1 STORAGE 26.35 26.35 0 00:40 0.626 0.626 0.067 PONDOS2 STORAGE 99.12 99.12 0 00:40 2.51 2.51 0.061 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- J1 JUNCTION 126.00 0.173 4.827 J2 JUNCTION 126.00 0.752 4.248 J3 JUNCTION 126.00 0.940 4.060 J4 JUNCTION 126.00 1.107 1.893 J5 JUNCTION 126.00 0.609 2.391 J6 JUNCTION 126.00 0.333 1.667 J7 JUNCTION 126.00 0.333 1.667 POND1 STORAGE 126.00 5.771 0.029 POND2 STORAGE 126.00 2.673 0.327 POND3 STORAGE 126.00 3.175 0.625 POND4 STORAGE 126.00 6.871 0.529 PONDOS1 STORAGE 126.00 0.956 6.044 PONDOS2 STORAGE 126.00 6.286 0.714 ********************* Node Flooding Summary ********************* No nodes were flooded. Page 4 SWMM Output - OS2 closed.rpt ********************** Storage Volume Summary ********************** -------------------------------------------------------------------------------------------------- Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------------------- POND1 14.995 25 0 0 58.923 99 0 02:22 0.35 POND2 7.931 16 0 0 42.552 84 0 02:28 0.39 POND3 0.483 6 0 0 5.307 70 0 02:08 0.10 POND4 6.111 10 0 0 48.858 82 0 02:18 0.60 PONDOS1 0.102 0 0 0 11.701 3 0 01:01 16.20 PONDOS2 141.600 77 0 0 154.329 84 0 01:15 50.82 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- O1 2.93 8.66 25.47 0.861 O2 71.75 0.58 9.63 1.414 O3 5.62 7.55 50.82 1.440 ----------------------------------------------------------- System 26.77 16.79 77.25 3.715 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- 1 CONDUIT 0.10 0 02:13 0.83 0.00 0.03 2 CONDUIT 8.72 0 00:46 3.88 0.01 0.15 3 CONDUIT 9.63 0 00:47 2.73 0.01 0.19 Page 5 SWMM Output - OS2 closed.rpt 8 CONDUIT 16.20 0 01:03 3.65 0.27 0.61 9 CONDUIT 25.47 0 00:50 5.20 0.07 0.37 10 CONDUIT 0.74 0 02:29 2.16 0.06 0.17 11 CONDUIT 1.34 0 02:25 6.79 0.03 0.11 BYPASS WEIR 50.82 0 01:15 0.00 OVERFLOWWEIR WEIR 0.00 0 00:00 0.00 OUT1 DUMMY 0.35 0 02:22 OUT2 DUMMY 0.39 0 02:28 OUT3 DUMMY 0.10 0 02:09 OUT4 DUMMY 0.60 0 02:18 OUTOS1 DUMMY 16.20 0 01:02 OUTOS2 DUMMY 0.00 0 00:00 ************************* Conduit Surcharge Summary ************************* No conduits were surcharged. Analysis begun on: Mon Oct 09 12:12:24 2017 Analysis ended on: Mon Oct 09 12:12:24 2017 Total elapsed time: < 1 sec Page 6 SWMM Output - Outlet 2 Orifice Clogged.rpt EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.010) -------------------------------------------------------------- ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ MAR-15-2016 00:00:00 Ending Date .............. MAR-20-2016 06:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:05:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 15.00 sec ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 31.524 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 17.008 1.980 Surface Runoff ........... 14.472 1.684 Final Storage ............ 0.131 0.015 Continuity Error (%) ..... -0.274 Page 1 SWMM Output - Outlet 2 Orifice Clogged.rpt ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 14.472 4.716 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 13.682 4.459 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.204 0.066 Final Stored Volume ...... 0.991 0.323 Continuity Error (%) ..... 0.011 ******************************** Highest Flow Instability Indexes ******************************** Link OUTOS2 (2) ************************* Routing Time Step Summary ************************* Minimum Time Step : 15.00 sec Average Time Step : 15.00 sec Maximum Time Step : 15.00 sec Percent in Steady State : 0.00 Average Iterations per Step : 1.00 Percent Not Converging : 0.00 *************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------------------------- Total Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Coeff Page 2 SWMM Output - Outlet 2 Orifice Clogged.rpt Subcatchment in in in in in 10^6 gal CFS -------------------------------------------------------------------------------------------------------- SUB-A 3.67 0.00 0.00 0.74 2.89 0.43 37.08 0.789 SUB-B 3.67 0.00 0.00 0.85 2.78 0.31 23.92 0.759 SUB-C 3.67 0.00 0.00 1.11 2.56 0.04 4.01 0.699 SUB-D 3.67 0.00 0.00 0.77 2.87 0.39 32.77 0.783 HT 3.67 0.00 0.00 2.10 1.58 0.24 11.01 0.430 OS1 3.67 0.00 0.00 2.10 1.57 0.63 26.35 0.427 OS2 3.67 0.00 0.00 2.22 1.45 2.51 99.12 0.395 SUB-UD2 3.67 0.00 0.00 2.10 1.59 0.18 8.73 0.432 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- J1 JUNCTION 0.07 1.31 42.01 0 02:09 1.31 J2 JUNCTION 0.09 1.31 40.41 0 02:20 1.31 J3 JUNCTION 0.21 1.37 35.57 0 00:52 1.37 J4 JUNCTION 0.03 1.11 39.33 0 00:50 1.11 J5 JUNCTION 0.01 0.61 46.21 0 01:02 0.61 J6 JUNCTION 0.12 0.33 36.83 0 02:28 0.33 J7 JUNCTION 0.12 0.33 35.33 0 02:31 0.33 O1 OUTFALL 0.02 1.11 36.61 0 00:50 1.11 O2 OUTFALL 0.21 1.37 34.97 0 00:52 1.37 O3 OUTFALL 0.00 0.00 48.00 0 00:00 0.00 POND1 STORAGE 2.31 5.77 45.77 0 02:22 5.77 POND2 STORAGE 2.69 2.76 39.76 0 02:28 2.76 POND3 STORAGE 0.43 3.18 45.18 0 02:09 3.17 POND4 STORAGE 1.29 6.87 43.47 0 02:18 6.87 PONDOS1 STORAGE 0.01 0.96 47.96 0 01:02 0.95 PONDOS2 STORAGE 0.15 6.15 50.15 0 01:37 6.15 ******************* Node Inflow Summary ******************* Page 3 SWMM Output - Outlet 2 Orifice Clogged.rpt ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- J1 JUNCTION 0.00 22.10 0 02:09 0 2.27 0.000 J2 JUNCTION 8.73 25.75 0 00:51 0.175 2.44 0.000 J3 JUNCTION 0.00 26.51 0 00:52 0 3.32 0.000 J4 JUNCTION 11.01 25.49 0 00:50 0.236 0.861 0.000 J5 JUNCTION 0.00 16.20 0 01:02 0 0.625 0.000 J6 JUNCTION 0.00 0.74 0 02:28 0 0.476 0.000 J7 JUNCTION 0.00 1.34 0 02:31 0 0.872 0.000 O1 OUTFALL 0.00 25.47 0 00:50 0 0.861 0.000 O2 OUTFALL 0.00 26.51 0 00:52 0 3.32 0.000 O3 OUTFALL 0.00 18.83 0 01:37 0 0.281 0.000 POND1 STORAGE 37.08 37.08 0 00:40 0.428 0.46 0.003 POND2 STORAGE 23.92 23.92 0 00:40 0.314 0.34 0.000 POND3 STORAGE 4.01 4.01 0 00:40 0.0404 0.0441 0.009 POND4 STORAGE 32.77 32.77 0 00:40 0.39 0.396 0.007 PONDOS1 STORAGE 26.35 26.35 0 00:40 0.626 0.626 0.067 PONDOS2 STORAGE 99.12 99.12 0 00:40 2.51 2.51 0.018 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- J1 JUNCTION 126.00 1.312 3.688 J2 JUNCTION 126.00 1.312 3.688 J3 JUNCTION 126.00 1.374 3.626 J4 JUNCTION 126.00 1.107 1.893 J5 JUNCTION 126.00 0.609 2.391 J6 JUNCTION 126.00 0.334 1.666 J7 JUNCTION 126.00 0.333 1.667 POND1 STORAGE 126.00 5.771 0.029 POND2 STORAGE 126.00 2.760 0.240 Page 4 SWMM Output - Outlet 2 Orifice Clogged.rpt POND3 STORAGE 126.00 3.175 0.625 POND4 STORAGE 126.00 6.871 0.529 PONDOS1 STORAGE 126.00 0.956 6.044 PONDOS2 STORAGE 126.00 6.147 0.853 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** Storage Volume Summary ********************** -------------------------------------------------------------------------------------------------- Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------------------- POND1 14.995 25 0 0 58.923 99 0 02:22 0.35 POND2 42.913 85 0 0 44.637 88 0 02:27 0.40 POND3 0.483 6 0 0 5.307 70 0 02:08 0.10 POND4 6.111 10 0 0 48.858 82 0 02:18 0.60 PONDOS1 0.102 0 0 0 11.701 3 0 01:01 16.20 PONDOS2 3.081 2 0 0 148.527 81 0 01:37 40.83 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- O1 2.93 8.66 25.47 0.861 O2 71.75 1.36 26.51 3.316 O3 0.71 11.64 18.83 0.281 ----------------------------------------------------------- Page 5 SWMM Output - Outlet 2 Orifice Clogged.rpt System 25.13 21.66 61.08 4.458 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- 1 CONDUIT 22.10 0 02:20 3.21 0.03 0.26 2 CONDUIT 25.75 0 00:52 5.08 0.02 0.23 3 CONDUIT 26.51 0 00:52 3.51 0.03 0.27 8 CONDUIT 16.20 0 01:03 3.65 0.27 0.61 9 CONDUIT 25.47 0 00:50 5.20 0.07 0.37 10 CONDUIT 0.74 0 02:31 2.16 0.06 0.17 11 CONDUIT 1.34 0 02:31 6.79 0.03 0.11 BYPASS WEIR 18.83 0 01:37 0.00 OVERFLOWWEIR WEIR 0.40 0 02:28 0.00 OUT1 DUMMY 0.35 0 02:22 OUT2 DUMMY 0.00 0 00:00 OUT3 DUMMY 0.10 0 02:09 OUT4 DUMMY 0.60 0 02:18 OUTOS1 DUMMY 16.20 0 01:02 OUTOS2 DUMMY 22.00 0 01:26 ************************* Conduit Surcharge Summary ************************* No conduits were surcharged. Analysis begun on: Mon Oct 09 12:15:17 2017 Analysis ended on: Mon Oct 09 12:15:18 2017 Total elapsed time: 00:00:01 Page 6 APPENDIX F REFERENCES Hydrologic Soil Group—Larimer County Area, Colorado (Mountain's Edge) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2016 Page 1 of 4 4489080 4489140 4489200 4489260 4489320 4489380 4489440 4489500 4489560 4489080 4489140 4489200 4489260 4489320 4489380 4489440 4489500 4489560 488580 488640 488700 488760 488820 488880 488940 488580 488640 488700 488760 488820 488880 488940 40° 33' 24'' N 105° 8' 5'' W 40° 33' 24'' N 105° 7' 50'' W 40° 33' 8'' N 105° 8' 5'' W 40° 33' 8'' N 105° 7' 50'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 100 200 400 600 Feet 0 35 70 140 210 Meters Map Scale: 1:2,410 if printed on A portrait (8.5" x 11") sheet. Warning: Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 3 Altvan-Satanta loams, 0 to 3 percent slopes B 8.7 42.7% 4 Altvan-Satanta loams, 3 to 9 percent slopes B 11.6 57.3% Totals for Area of Interest 20.3 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—Larimer County Area, Colorado Mountain's Edge Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2016 Page 3 of 4 Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Mountain's Edge Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2016 Page 4 of 4 MAP POCKET DR1 – OVERALL DRAINAGE EXHIBIT X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com DR1 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 0 1 INCH = 60 FEET 60 60 120 180 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE"Preliminary Drainage Report for Mountains Edge " BY NORTHERN ENGINEERING, DATED October 9, 2017 FOR ADDITIONAL INFORMATION. NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) A1 A1 1.45 0.66 0.83 7.1 5.3 2.42 11.93 A2 A2 0.24 0.62 0.77 5.0 5.0 0.42 1.85 A3 A3 0.21 0.60 0.74 5.0 5.0 0.36 1.55 A4 A4 0.23 0.62 0.77 5.0 5.0 0.41 1.77 A5 A5 1.12 0.90 1.00 6.7 5.6 2.60 10.76 A6 A6 2.19 0.47 0.58 10.1 9.1 2.26 10.27 B1 B1 0.50 0.83 1.00 6.3 5.0 1.10 4.93 B2 B2 0.62 0.58 0.72 6.4 5.5 0.97 4.36 B3 B3 1.08 0.80 1.00 5.0 5.0 2.46 10.73 B4 B4 0.27 0.92 1.00 5.0 5.0 0.71 2.72 B5 B5 0.19 0.78 0.98 5.0 5.0 0.42 1.82 B6 B6 1.50 0.27 0.34 16.8 16.1 0.72 3.20 C1 C1 0.14 0.60 0.76 5.0 5.0 0.23 1.02 C2 C2 0.45 0.37 0.47 5.9 5.2 0.46 2.09 D1 D1 0.30 0.85 1.00 5.0 5.0 0.72 2.94 D2 D2 1.66 0.67 0.84 5.0 5.0 3.18 13.87 D3 D3 0.98 0.71 0.89 5.7 5.0 1.92 8.63 D4 D4 0.66 0.58 0.73 5.1 5.0 1.09 4.76 D5 D5 1.41 0.37 0.46 9.8 9.1 1.17 5.19 UD1 UD1 0.05 0.83 1.00 5.0 5.0 0.12 0.52 UD2 UD2 4.07 0.26 0.33 14.2 13.7 2.04 9.07 HT1 HT1 5.51 0.27 0.34 42.7 39.3 1.54 7.11 OS1 OS1 14.72 0.33 0.41 23.7 23.2 7.06 31.10 Detention Pond Summary | Proposed Condition Pond 100-yr Volume (ac-ft) 100-yr WSEL WQCV (ft3) WQCV WSEL Max Release (cfs) 1 1.30 5145.90 3,129 5141.85 0.35 2 0.93 5139.59 3,115 5137.68 0.39 3 0.09 5144.65 268 5142.89 0.10 4 1.03 5142.24 n/a n/a 0.60 X X X X / / / / / / / / / / / / / / / / X X X X X X X X X X X X X X X X OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / GAS MM T W VAULT F.O. B M D T C F E S C ONTROL IRR S H2O H2O H2O 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W HA1 HA2 HB1 HB2 HA3 1 2 HB3 3 8" SS 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 6" W 6" W S 6" W S S OVERLAND TRAIL BLUEGRASS DRIVE DRAKE ROAD Sheet MOUNTAIN'S EDGE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com of 23 HDR1 HISTORIC DRAINAGE EXHIBIT CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R ( IN FEET ) 0 1 INCH = 60 FEET 60 60 120 180 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE "PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR MOUNTAIN'S EDGE" BY NORTHERN ENGINEERING, DATED DECEMBER 20TH, 2016 FOR ADDITIONAL INFORMATION. NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 HA1 4.07 0.25 0.31 14.3 13.9 1.96 8.68 1 HA2 4.18 0.25 0.31 31.8 29.9 1.31 5.95 1 HA3 0.33 0.57 0.71 24.0 19.4 0.27 1.33 2 HB1 5.60 0.25 0.31 21.4 20.3 2.18 9.80 2 HB2 0.47 0.57 0.71 15.9 13.5 0.49 2.29 3 HB3 4.66 0.25 0.31 37.2 34.5 1.32 6.06 Survey Area Data: Version 11, Sep 23, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (Mountain's Edge) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2016 Page 2 of 4 5,142.40 18,224 0.20 3557 47561 3557 47528 5,142.60 19,191 0.20 3741 51302 3741 51269 5,142.80 20,245 0.20 3944 55246 3943 55212 5,143.00 22,280 0.20 4252 59498 4251 59463 Design Point Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 9/14/20172:21 PM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 4.xlsm\Stage_Storage Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 9/14/20175:19 PM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 1.xlsm\Stage_Storage (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) S. Thomas Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 Q = C f ( C )( i )( A ) 9/14/2017 2:05 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Proposed_Rational_Calcs.xlsx\Runoff 10-yr Tc (min) 100-yr Tc (min) A1 A1 No 0.66 0.66 0.83 61 2.34% 4.8 4.8 3.0 N/A N/A N/A 227 0.70% 1.67 2.3 7.1 7.1 5.3 A2 A2 No 0.62 0.62 0.77 33 8.30% 2.6 2.6 1.7 N/A N/A N/A 159 1.39% 2.36 1.1 5.0 5.0 5.0 A3 A3 No 0.60 0.60 0.74 32 16.91% 2.1 2.1 1.5 N/A N/A N/A 124 1.06% 2.06 1.0 5.0 5.0 5.0 A4 A4 No 0.62 0.62 0.77 32 16.91% 2.0 2.0 1.3 N/A N/A N/A 141 1.64% 2.56 0.9 5.0 5.0 5.0 A5 A5 No 0.90 0.90 1.00 65 3.35% 2.0 2.0 1.0 N/A N/A N/A 512 0.85% 1.84 4.6 6.7 6.7 5.6 A6 A6 No 0.47 0.47 0.58 61 4.41% 5.6 5.6 4.6 191 1.72% 1.97 1.6 239 0.47% 1.38 2.9 10.1 10.1 9.1 A6 TOTAL BASIN A No 0.63 0.63 0.78 61 4.41% 4.2 4.2 2.8 191 1.72% 1.97 1.6 239 0.47% 1.38 2.9 8.7 8.7 7.3 B1 B1 No 0.83 0.83 1.00 46 2.91% 2.4 2.4 0.9 N/A N/A N/A 358 0.60% 1.55 3.8 6.3 6.3 5.0 B2 B2 No 0.58 0.58 0.72 47 10.04% 3.1 3.1 2.2 389 1.74% 1.98 3.3 N/A N/A N/A 6.4 6.4 5.5 B3 B3 No 0.80 0.80 1.00 N/A N/A N/A N/A 91 0.86% 1.39 1.1 223 1.79% 2.68 1.4 5.0 5.0 5.0 B4 B4 No 0.92 0.92 1.00 37 3.70% 1.3 1.3 0.7 N/A N/A N/A 175 1.21% 2.20 1.3 5.0 5.0 5.0 B5 B5 No 0.78 0.78 0.98 59 2.42% 3.4 3.4 1.3 N/A N/A N/A 250 1.76% 2.65 1.6 5.0 5.0 5.0 B6 B6 No 0.27 0.27 0.34 35 1.43% 8.1 8.1 7.5 653 0.91% 1.43 7.6 148 1.32% 2.30 1.1 16.8 16.8 16.1 B6 TOTAL BASIN B No 0.59 0.59 0.73 35 1.43% 5.0 5.0 3.6 653 0.91% 1.43 7.6 148 1.32% 2.30 1.1 13.7 13.7 12.3 C1 C1 No 0.60 0.60 0.76 33 8.30% 2.6 2.6 1.8 N/A N/A N/A 71 3.86% 3.93 0.3 5.0 5.0 5.0 C2 C2 No 0.37 0.37 0.47 51 6.61% 5.2 5.2 4.5 115 3.03% 2.61 0.7 N/A N/A N/A 5.9 5.9 5.2 C2 TOTAL BASIN C No 0.43 0.43 0.54 51 6.61% 4.8 4.8 4.0 115 3.03% 2.61 0.7 N/A N/A N/A 5.5 5.5 5.0 D1 D1 No 0.85 0.85 1.00 43 2.79% 2.2 2.2 0.9 N/A N/A N/A 255 1.52% 2.47 1.7 5.0 5.0 5.0 D2 D2 No 0.67 0.67 0.84 N/A N/A N/A N/A N/A N/A N/A 368 2.43% 3.12 2.0 5.0 5.0 5.0 D3 D3 No 0.71 0.71 0.89 68 4.37% 3.7 3.7 2.0 217 1.43% 1.79 2.0 N/A N/A N/A 5.7 5.7 5.0 D4 D4 No 0.58 0.58 0.73 18 2.94% 2.9 2.9 2.1 N/A N/A N/A 266 1.00% 2.00 2.2 5.1 5.1 5.0 D5 D5 No 0.37 0.37 0.46 57 6.11% 5.7 5.7 5.0 487 1.71% 1.96 4.1 N/A N/A N/A 9.8 9.8 9.1 D5 TOTAL BASIN D No 0.59 0.59 0.74 57 6.11% 3.9 3.9 2.8 487 1.71% 1.96 4.1 N/A N/A N/A 8.1 8.1 6.9 UD1 UD1 No 0.83 0.83 1.00 165 3.33% 4.4 4.4 1.6 N/A N/A N/A N/A N/A N/A 5.0 5.0 5.0 UD2 UD2 No 0.26 0.26 0.33 87 11.64% 6.5 6.5 6.0 681 0.94% 1.46 7.8 N/A N/A N/A 14.2 14.2 13.7 HT1 HT1 Yes 0.27 0.27 0.34 500 0.60% 41.1 41.1 37.7 302 4.30% 3.11 1.6 N/A N/A N/A 42.7 42.7 39.3 OS1 OS1 No 0.33 0.33 0.41 20 2.00% 5.1 5.1 4.6 2420 2.10% 2.17 18.6 N/A N/A N/A 23.7 23.7 23.2 * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. PROPOSED TIME OF CONCENTRATION COMPUTATIONS S. Thomas Design Point Sub-Basin Overland Flow Swale Flow Gutter/Pipe Flow Time of Concentration September 14, 2017 (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = 9/14/2017 2:05 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Proposed_Rational_Calcs.xlsx\Tc % Imperv. A1 1.45 0.39 0.23 0.43 0.20 Clayey | Average 2% to 7% 0.200 0.66 0.66 0.83 66% A2 0.24 0.00 0.06 0.00 0.07 Clayey | Average 2% to 7% 0.115 0.62 0.62 0.77 47% A3 0.21 0.00 0.05 0.00 0.05 Clayey | Average 2% to 7% 0.106 0.60 0.60 0.74 44% A4 0.23 0.00 0.06 0.00 0.06 Clayey | Average 2% to 7% 0.109 0.62 0.62 0.77 47% A5 1.12 0.21 0.35 0.00 0.48 Clayey | Average 2% to 7% 0.084 0.90 0.90 1.00 85% A6 2.19 0.00 0.21 0.00 0.47 Clayey | Average 2% to 7% 1.510 0.47 0.47 0.58 28% TOTAL BASIN A 5.44 0.60 0.95 0.43 1.34 Clayey | Average 2% to 7% 2.124 0.63 0.63 0.78 52% B1 0.50 0.37 0.04 0.00 0.00 Clayey | Average 2% to 7% 0.087 0.83 0.83 1.00 82% B2 0.62 0.00 0.08 0.00 0.22 Clayey | Average 2% to 7% 0.330 0.58 0.58 0.72 42% B3 1.08 0.35 0.23 0.00 0.27 Clayey | Average 2% to 7% 0.233 0.80 0.80 1.00 74% B4 0.27 0.05 0.07 0.00 0.13 Clayey | Average 2% to 7% 0.013 0.92 0.92 1.00 88% B5 0.19 0.10 0.04 0.00 0.00 Clayey | Average 2% to 7% 0.044 0.78 0.78 0.98 74% B6 1.50 0.00 0.01 0.52 0.00 Clayey | Average 2% to 7% 0.965 0.27 0.27 0.34 14% TOTAL BASIN B 4.16 0.87 0.47 0.52 0.62 Clayey | Average 2% to 7% 1.673 0.59 0.59 0.73 50% C1 0.14 0.00 0.03 0.00 0.04 Clayey | Average 2% to 7% 0.067 0.60 0.60 0.76 46% C2 0.45 0.00 0.05 0.00 0.03 Clayey | Average 2% to 7% 0.369 0.37 0.37 0.47 16% TOTAL BASIN C 0.58 0.00 0.08 0.00 0.07 Clayey | Average 2% to 7% 0.436 0.43 0.43 0.54 23% D1 0.30 0.24 0.01 0.00 0.00 Clayey | Average 2% to 7% 0.041 0.85 0.85 1.00 86% D2 1.66 0.45 0.31 0.22 0.22 Clayey | Average 2% to 7% 0.446 0.67 0.67 0.84 62% D3 0.98 0.35 0.15 0.00 0.14 Clayey | Average 2% to 7% 0.338 0.71 0.71 0.89 63% D4 0.66 0.12 0.11 0.30 0.06 Clayey | Average 2% to 7% 0.069 0.58 0.58 0.73 60% D5 1.41 0.00 0.06 0.22 0.16 Clayey | Average 2% to 7% 0.969 0.37 0.37 0.46 20% TOTAL BASIN D 5.00 1.17 0.64 0.75 0.58 Clayey | Average 2% to 7% 1.864 0.59 0.59 0.74 51% UD1 0.05 0.03 0.01 0.00 0.00 Clayey | Average 2% to 7% 0.009 0.83 0.83 1.00 80% UD2 4.07 0.00 0.07 0.00 0.00 Clayey | Average 2% to 7% 4.010 0.26 0.26 0.33 1% TOTAL SITE 19.31 2.66 2.22 1.69 2.62 Clayey | Average 2% to 7% 10.116 0.53 0.53 0.66 40% HT1 5.51 0.17 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 5.345 0.27 0.27 0.34 3% OS1 14.72 1.47 0.15 0.00 0.00 0.00 Clayey | Average 2% to 7% 13.248 0.33 0.33 0.41 10% Composite Runoff Coefficient with Adjustment PROPOSED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 9/14/2017 2:05 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Proposed_Rational_Calcs.xlsx\Composite C 3 HB3 Yes 0.25 0.25 0.31 541 0.98% 37.2 37.2 34.5 0 N/A N/A N/A 37.2 37.2 34.5 EXISTING TIME OF CONCENTRATION COMPUTATIONS S. Thomas December 20, 2016 Design Point Sub-Basin Overland Flow Swale Flow Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = 12/20/2016 3:48 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Existing_Rational_Calcs.xlsx\Tc HA2 4.18 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 4.178 0.25 0.25 0.31 0% HA3 0.33 0.15 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.178 0.57 0.57 0.71 45% HB1 5.60 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 5.602 0.25 0.25 0.31 0% HB2 0.47 0.21 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.254 0.57 0.57 0.71 45% HB3 4.66 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 4.661 0.25 0.25 0.31 0% 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis Composite Runoff Coefficient with Adjustment EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 12/20/2016 3:47 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Existing_Rational_Calcs.xlsx\Composite C OS1 OS1 14.72 0.33 0.41 23.7 23.2 7.06 31.10 6. Four (4) detention ponds are proposed with the Mountain’s Edge development. These ponds will restrict all runoff from the developed site to historic 2-yr flowrate based on the master drainage plan for the Spring Creek Basin.