August 31, 2017
Ken Merritt
JR Engineering, LLC
2900 S. College Ave, Ste 3D
Fort Collins, CO 80525
RE: Newton Subdivision, BDR170011, Round Number 1
Comment Summary:
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
08/24/2017: A development agreement will be required to bind the property as
notice for obligations that will be further deferred until the second BDR and/or
building permit. In the development agreement, the local street obligation for Vine
Drive will be required for the Vine Drive frontage on Lot 1 and the 20 feet of frontage
east of Lot 1, and will be required prior to a building permit for Lot 1. Should it be
demonstrated with a future BDR for Lot 1 that the 20 feet east of Lot 1 is truly
developable, then this requirement may then be amended through an amended
development agreement (or repeal and replacement with a new development
agreement at that time.)
Comment Number: 2 Comment Originated: 08/24/2017
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
06/30/2017: 06/09/2017: the project owes an additional $100 more for the BDR
TDRF. So between the annexation and the project $150 is owed.
Comment Number: 1 Comment Originated: 06/30/2017
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: General
08/16/2017: No comments on the subdivision. Additional review and comments will
apply at the time the second BDR is submitted.
Comment Number: 1 Comment Originated: 08/16/2017
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Kai Kleer, at
970-416-4284 or kkleer@fcgov.com.
Page 1 of 3
Department: Light And Power
Contact: Janet McTague, 970-224-6154, jmctague@fcgov.com
Topic: General
08/23/2017:
Light and Power currently has existing facilities in Vine Drive at Lyons and Lancer
Drives. The applicant may be required to provide easements to reach the property
from one of these locations.
Comment Number: 1 Comment Originated: 08/23/2017
08/23/2017: We will need to coordinate a transformer location that is accessible to
a line truck.
Comment Number: 2 Comment Originated: 08/23/2017
08/23/2017: Normal capacity fees will apply. In addition, the applicant may be
responsible for the extension of primary lines to reach the site.
Comment Number: 3 Comment Originated: 08/23/2017
Department: PFA
Contact: Cal Sheesley, 970-416-2599, csheesley@poudre-fire.org
Topic: General
08/23/2017: PFA has no comment for the BDR of the Newton Subdivision;
however, comments provided in June, 2017 for Newton subdivision PDP170019 will
be observed and enforced at time of property development.
Comment Number: 1 Comment Originated: 08/23/2017
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
08/21/2017: Repeat comments from PDP: The site disturbs more than 10,000 sq.
ft., therefore Erosion and Sediment Control Materials need to be submitted for FDP.
The erosion control requirements are in the Stormwater Design Criteria under the
Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control
Materials Submitted do not meet requirements. Please submit; an Erosion Control
Plan, an Erosion Control Report, and an Escrow / Security Calculation. Also, based
upon the area of disturbance State permits for stormwater will be required since the
site is over an acre. If you need clarification concerning the erosion control section,
or if there are any questions please contact Jesse Schlam 970-218-2932 or email
@ jschlam@fcgov.com
Comment Number: 1 Comment Originated: 08/21/2017
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
08/25/2017: A detailed lot grading plan can be done at time of BDR.
Comment Number: 3 Comment Originated: 08/25/2017
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Plat
Page 2 of 3
08/22/2017: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections were
not made. Please provide any responses on redlined sheets and/or in response
letter.
Comment Number: 1 Comment Originated: 08/22/2017
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
08/25/2017: An Utility Plan can be done at time of BDR.
Comment Number: 1 Comment Originated: 08/25/2017
Department: Zoning
Contact: Ryan Boehle, 970-416-2401, rboehle@fcgov.com
Topic: General
08/22/2017: The property would be considered U-E. Setbacks for a single family
dwelling in the UE shall be at a minimum 30ft. for the front, 25ft. for the rear, and
20ft. for the side.
Comment Number: 1 Comment Originated: 08/22/2017
Page 3 of 3