Loading...
HomeMy WebLinkAboutLOT 1, HARMONY COMMONS - FDP - FDP170028 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORTEROSION CONTROL REPORT/STORMWATER MANAGEMENT PLAN FOR Harmony Commons, SECOND FILING LOT 1111 Prepared by: Interwest Consulting Group 1218 West Ash, Suite A Windsor, Colorado 80550 Phone: 970.674.3300 Fax: 970.674.3303 Prepared for: Brinkman Partners 3528 Precision Drive, Suite 100 Fort Collins, CO 80528 (970) 667-0954 September 13, 2017 TABLE OF CONTENTS 1. INTRODUCTION .................................................................................................................... 1 2. SITE DESCRIPTION ............................................................................................................... 1 3. BMPS FOR STORMWATER POLLUTION PREVENTION ................................................ 5 3.1. Erosion and Sediment Controls ........................................................................................ 5 3.2 Materials Handling and Spill Prevention ......................................................................... 7 4. STORMWATER MANAGEMENT CONTROLS .................................................................. 9 4.1. SWMP Administrator ....................................................................................................... 9 4.2. Identification of Potential Pollution Sources ................................................................... 9 5. FINAL STABILIZATION AND LONG TERM STORMWATER MANAGEMENT ......... 11 6. INSPECTION AND MAINTENANCE ................................................................................. 12 6.1. City of Fort Collins Standard Erosion and Sediment Control Notes ............................. 12 6.2. City of Fort Collins Erosion Control Security Calculations ........................................... 13 7. SWMP IMPLEMENTATION................................................................................................ 15 APPENDIX A—BMP DETAILS ................................................................................................ A APPENDIX B—EROSION CONTROL PLAN ......................................................................... B APPENDIX C—CONSTRUCTION SEQUENCE .................................................................... C APPENDIX D—SOIL INFORMATION ................................................................................... D LIST OF FIGURES Figure 1—Vicinity Map…………………………………………………………………………..2 LIST OF TABLES Table 2.1—On-site Soil Characteristics…………………………………………………………..3 Table 6.1—Erosion Control Cost Estimate……………………………………………………...14 1 1. INTRODUCTION The primary purpose of preparing and maintaining a stormwater management plan is to improve the health and quality of the State's urban waterways. The preparation and maintenance of the plan will contribute to this objective by facilitating an approach to stormwater management, establishing a program of actions to be used during construction activities, and describing stormwater management controls and various Best Management Practices (BMPs) necessary to reduce erosion, sediment and pollutants in stormwater discharge. Information concerning the State of Colorado General Permit and Stormwater Management Plan are not included in the appendices of this report. The site is over one acre and will require a SWMP permit. This document can be used by the contractor as a part of the required documentation for the permit. 2. SITE DESCRIPTION The Harmony Common, Second Filing – Lot 1 development is located in the Northwest Quarter of Section 4, Township 6 North, Range 68 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. See Figure 1 for a vicinity map. The project site is located in the Harmony Commons Subdivision at the southwest corner of E. Harmony Road and Lady Moon Drive. Lot 7 bounds the property on the west, Lot 2 on the east, E. Harmony Road on the north, and Lot 6 on the south. The Harmony Commons Subdivision development consists of Lots 1 through 6 and is a replat of Lot One, Harmony Technology Park Second Filing. The property consists of about 1.6 acres of land and will consist of one new building and new parking and drive aisles. The total disturbed area will be about 1.6 acres. 2 The site generally slopes in an easterly direction at approximately 0.5% to 1.0%. The land is currently vacant. Offsite flow contributes to the site from the adjacent south half of Harmony Road. According to FEMA Panel 08069C0994F there are no mapped FEMA Floodways on this property. Figure 1--Vicinity Map 3 The existing soil type on-site consists of Nunn clay loam (100%) which is classified as Type C by the Natural Resources Conservation Service. Please refer to Table 2.1 for additional soil characteristics. Table 2.1: On-site Soil Characteristics Soil Type Percent of Site Hydrologic Soil Group K Factor1 Wind Group2 Nunn clay loam, 1 to 3 % slopes 100% C 0.28 6 1K factors range from 0.02 to 0.69. The higher value, the more susceptible the soil is to sheet and rill erosion by water. 2Soils assigned to wind group 1 are the most susceptible to wind erosion, soils assigned to wind group 8 are the least susceptible. Overall, the soils on site can be classified as moderately erodible. Please refer to Appendix D for the on-site soil information from the NRCS Soil Survey of Larimer County. 4 The anticipated sequence of construction shall progress as follows: 1) Site demolition and as quickly as possible the installation of perimeter erosion control measures (other measures as required for erosion control will be constructed throughout), aggregate bags along the south drive (both installed prior to demolition) and the concrete washout and vehicle tracking pad on the west access drive. 2) Clearing, stripping and grading 3) Utility installation 4) Sub-grade preparation for the drives and sidewalks 5) Building construction 6) Curb, gutter and sidewalks 7) Paving 8) Final grading and landscaping. All disturbed ground will be impervious (concrete, asphalt, or building), seeded and mulched, sodded or xeriscaped to permanently stabilize the site. 9) Building occupancy The weighted average 10-year runoff coefficient associated with this project is 0.71. No outside sources of pollution currently exist on this site. Potential pollutant sources brought onto the site during construction will be discussed (along with spill prevention) in Section 3.2 below. The anticipated non-stormwater components of discharge with this project are landscape irrigation return flows. Runoff from the site will flow through the porous pavers and also toward the proposed inlets and storm system. The project is within the City’s McClellands Master Basin. The area drains to the existing storm system in the Harmony Commons Subdivision and eventually reaches the Fossil Creek Reservoir Inlet Ditch (FCRID). 5 3. BMPS FOR STORMWATER POLLUTION PREVENTION 3.1. Erosion and Sediment Controls Structural Practices: Structural practices for the site will consist mainly of concrete washout structure, vehicle tracking pad, inlet protection, aggregate bags, erosion logs and erosion logs with construction fence which are described in detail in the following paragraphs. Detail drawings of these BMPs are also included in Appendix A. These BMPs are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMPs are in place and/or removed at the appropriate time in the construction sequence. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. All BMPs shall be inspected and repaired or replaced as indicated in Section 6 and as required to satisfy the conditions of the Permit. Concrete washout structure is intended to contain washout liquids and solids that result from the cleaning of concrete trucks and pumps. Washouts should be placed near the area where the concrete is being poured. Vehicle tracking pad is intended to trap mud and sediment within coarse grain material and provide clean access to public roadways. Wherever construction vehicle access routes intersect paved public roads a vehicle tracking control pad shall be installed to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Pads shall be maintained and refurbished when necessary to obtain their intended result. Inlet protection, aggregate bags, erosion logs and erosion logs with construction fence prevent sediment from entering storm drainage systems prior to permanent stabilization of the disturbed site area via ponding and settling of sediment. Inlet protection shall be placed at inlets on site and the existing inlets north of Lot 6 as inlet protection. Storm inlet protection must be inspected and maintained after every rainfall event that produces runoff. Sediment must be removed and rocks replaced. Erosion logs shall be used at proposed and existing area inlets, in the existing swale on the east and along the east, west and south sides of the building landscaping areas. Erosion logs with construction fence shall be used as flow line protection along back of curb and gutter along the drive aisle north of Lot 6 and also as perimeter protection along the west side of the disturbed area. Aggregate bags shall be used as protection along the upstream side of the pervious 6 pavement and along the drive aisle north of Lot 6. Non-Structural Practices: If there are any low sloped areas exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) they shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation or other permanent erosion control is installed. If there are any exposed steep sloped areas exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) they shall have slope protection. The contractor shall use a "tracked" vehicle, run perpendicular to slope so that the tracking runs on the contour to inhibit rill/gully erosion; the contractor may use other windrow-type methods as necessary. No soil shall remain exposed by land disturbing activity for more than thirty (30) days. At that time temporary or permanent erosion control seed/mulch, landscaping, etc. is required. Additional Non-Structural Practices are strongly encouraged such as minimizing the disturbance of soils and vegetation, providing educational materials on disposal /recycling, spill prevention / clean up, identification and elimination of illicit discharges, promotion of street sweeping and the development of public education programs. THE CONTRACTOR SHALL ADD ANY AND ALL BMP’S AND DETAILS NEEDED FOR SEDIMENT/EROSION CONTROL. 7 3.2 Materials Handling and Spill Prevention Potential impacts from significant materials and their handling are as follows: Chemicals, cleaning substances, and petroleum products related to the construction will be stored within the construction trailer or storage shed where it will not be in contact with precipitation. No storage of these materials will be allowed outside. Maintenance of equipment shall not take place on site. Fueling will be accomplished off- site. Absorbent (kitty litter) will be in the construction trailer and applied on any spill immediately and the dry material disposed of properly and legally. All construction waste shall be disposed of in the available dumpsters throughout the workday. Liquid wastes will be hauled off site and disposed of properly and legally. Any cleaning or maintenance of small equipment will be required to be done within a containment device (horse trough or small “kiddy pool”) and the liquid disposed of properly and legally. In the event of any spill, the SWMP Administrator shall be immediately notified. Spills can be broken into three categories. Their definitions and the procedures required to address the spills are as follow: Minor Spill – A spill generally of less than 5 gallons which is unlikely to reach adjacent waters (i.e. equipment leak). Procedure: a. Stop the source of the spill. b. Contain the spillage. c. Contact the SWMP Administrator. d. Clean up the spill with on-site absorbent material (kitty litter) e. Dispose of the dry material properly or legally. f. Document the spill and the response in the SWMP including dates and times – verify that the pollutants are completely cleaned up. g. Include incident in the following training meeting. h. Provide information to the City of Fort Collins at the next regular inspection. 8 Significant Spill – A spill of pollutants or oils of any size that will likely or has reached adjacent waters, may endanger health or the environment, or which may exceed a water quality standard. Procedure: a. Stop the source of the spill. b. Contain the spillage. c. Contact the SWMP Administrator. d. Clean up the spill with on-site absorbent material (kitty litter) e. Dispose of the dry material properly and legally. f. Document the spill and the response in the SWMP – verify that the pollutants are completely cleaned up. g. Notify the City of Fort Collins (970) 221-6700 and the Colorado Department of Public Health and Environment spill reporting line (877) 518-5608 of the spill. h. Notify the same two entities above with a written submission (outlined within the permit) within 5 calendar days. i. Include incident in the following training meeting. Hazardous Spill – A spill of a dangerous substance requiring expert cleanup. Procedure: a. Secure the area – do not approach the spill. b. Offer first aid to any injured parties. c. Call 911 and describe the nature of the spill and any injuries. d. If possible, isolate downstream areas from the spill (for example, cover an inlet that is downstream and a safe distance from the spill with plastic and soil). e. Contact the SWMP Administrator. f. Document the spill and the response in the SWMP g. Notify the City of Fort Collins (970) 221-6700 and the Colorado Department of Public Health and Environment spill reporting line (877) 518-5608 of the spill. h. Notify the same two entities above with a written submission (outlined within the permit) within 5 calendar days. i. Include incident in the following training meeting. 9 4. STORMWATER MANAGEMENT CONTROLS 4.1. SWMP Administrator The Local Contact and SWMP Administrator is (INSERT CONTACT NAME, POSITION, COMPANY, AND PHONE NUMBER). (INSERT CONTACT) will be responsible for developing, implementing, maintaining, and revising the SWMP. (INSERT CONTACT) will also be responsible for required inspections and coordinating and documenting changes or repairs resulting from inspections. (INSERT CONTACT) will be responsible for the training and enforcement aspects of the SWMP and he is the first point of contact for any stormwater issues. 4.2. Identification of Potential Pollution Sources The permit identifies 13 potential sources that must be evaluated for their potential to contribute pollutants to stormwater discharge. These items have been evaluated below for this project: 1) Disturbed and stored soil – YES – The construction will require that areas be disturbed exposing soil including foundation construction, paving and repaving, slope construction, and demolition required as shown on the plans. BMPs will include the sediment trap, and erosion logs, aggregate bags or inlet protection on existing and proposed inlets, proposed flared end section, minimizing disturbance of existing vegetation and hard surfaces, and slope roughening and tracking of slopes after disturbance and prior to landscaping, paving, or building will be implemented. 2) Vehicle tracking of sediment – YES – The construction will require that subgrade be prepared for pavement and that vehicles drive on unpaved surfaces to the proposed buildings and utility improvement locations. BMPs will include a policy that vehicles be clean prior to entering the site and, if they become muddy during construction or earthwork activities, mud is removed by hand from the vehicle prior to departing the site in an area near the vehicle tracking pad. Any soil that is tracked from the site is to be disposed of in the trash dumpster by sweeping or scraping the material off the street. Any muddy vehicle will use the vehicle tracking pad prior to leaving the site. 3) Management of contaminated soil – NO – Soil borings do not indicate any existing contamination. If encountered, dispose of material properly and legally. 10 4) Loading and unloading operations – YES – Chemicals and petroleum products will be brought to the site. Anytime these are being transported, they will be in a sealed container. 5) Outdoor storage activities – YES – Inert materials such as wood and stone will be stored outside and will likely be covered with tarps or plastic, but are not pollutant sources and are not covered by the permit. Chemicals and petroleum products will be stored within the construction trailer or storage shed. Cement and mortar bags (if not contained in a vehicle or storage shed) will be completely covered with plastic to avoid contact with precipitation. 6) Vehicle and equipment maintenance and fueling – YES – Vehicle maintenance and fueling will take place. No fuel will be stored on site. 7) Significant dust or particulate generating processes – NO – The area of heavy construction is very limited; however, in order to control the dust or particulate generating process, a water truck or similar watering device will be available at all times. Please refer to the City of Fort Collins Fugitive Dust Ordinance (Ordinance No. 044, 2016) for more information. 8) Routine maintenance activities involving fertilizers, pesticides, detergents, fuels, solvents, oils, etc. – YES – Fertilizers and pesticides will not be used. Any cleaning or maintenance of small equipment will be required to be done within a containment device (horse trough or small “kiddy pool” and the liquid disposed of properly and legally. 9) On-site waste management – YES – The site construction will result in construction waste. A dumpster for trash and a dumpster for bulk recycling will be on the site. Waste will be hauled to the dumpsters by hand or in loaders. Dumpsters will be hauled off as needed. No construction waste will be left outside overnight without being located in a dumpster. No construction debris (including broken concrete) may be buried on the site. 10) Concrete truck/equipment washing – YES – One mobile concrete washout will be provided on site. This will be used for trucks and for any masonry/concrete tools. 11) Dedicated asphalt of concrete batch plants – NO – None on this project. 12) Non-structural waste sources such as worker trash and portable toilets – YES –Trash dumpster will be available for worker’s trash and will be located near the construction trailer and emptied weekly. Portable toilets will be staked on site near the construction trailer. 13) Other areas where potential spills can occur – NO – The above 12 items are adequate for the anticipated construction process. CONTRACTOR TO UPDATE THE ABOVE INFORMATION WITH EXACT LOCATIONS OF THE CONCRETE WASHOUT, DUMPSTERS, AND PORTABLE TOILETS PRIOR TO COMMENCEMENT OF CONSTRUCTION AND UPDATED AS NECESSARY THROUGHOUT THE CONSTRUCTION SEQUENCE. 11 5. FINAL STABILIZATION AND LONG TERM STORMWATER MANAGEMENT Long-term erosion control for this site will be the established vegetative cover, landscaping and xeriscaping along with the completed site improvements (pavement and buildings). All disturbed areas will be paved, sodded or mulched. The soil in such areas shall be thoroughly loosened to a depth of not less than eight (8) inches; and soil amendments shall be thoroughly incorporated into the soil of such areas to a depth of at least six (6) inches by tilling, discing or other suitable method, at a rate of at least three (3) cubic yards of soil amendment per one thousand (1,000) square feet of area to be planted, unless at least four (4) inches of loose top soil has been placed on the area after completion of construction activity on top of not less than four (4) inches of loosened subgrade soils. Final stabilization shall be considered achieved once the over-lot grading is complete and all vegetation is established. Vegetation shall not be considered established until a ground cover is achieved which is demonstrated to be mature enough to control soil erosion (70% of the original vegetative cover of 100%). 12 6. INSPECTION AND MAINTENANCE Site inspections will be performed to effectively address maintenance, repair, and adequacy of BMPs. The site inspections will be performed by the SWMP Administrator or his designee a minimum of once every fourteen (14) calendar days on active construction sites and within 24 hours after a significant storm event (event causing erosion). As part of the site inspections the inspector will keep documentation of all inspections and BMP maintenance, including updated Site Maps indicating new BMPs or the removal of BMPs since the previous inspection. Blank Site Maps will be utilized and will be redlined by the SWMP Administrator throughout construction to note all BMPs, pollutant sources, storage locations, etc. Any maintenance, repair, or necessary installation of BMPs that are noted during the inspection must begin immediately. The modifications shall be noted in the SWMP and the action taken as a result of the inspection shall be noted and certified on or attached to the original inspection report (date and time that the repair or change was started and finished and a certification that it was done properly). 6.1. City of Fort Collins Standard Erosion and Sediment Control Notes 1) The City Stormwater Department erosion control inspector must be notified at least 24 hours prior to any construction on this site. 2) All required BMPs shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc.). All of their required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 3) Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area required for immediate construction operations, and for the shortest practical period of time. 4) All soils exposed during land disturbing activity (stripping, grading, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control is 13 installed. No soils in areas outside project street rights of way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the Stormwater Department. 5) The project must be watered and maintained at all times during construction activities so as to prevent wind-caused erosion. All land disturbing activities shall be immediately discontinued when fugitive dust impacts adjacent properties, as determined by the City Engineering Department. 6) All temporary (structural) erosion control measures must be inspected and repaired or reconstructed as necessary after each runoff event and every 14 days in order to assure continued performance of their intended function. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any drainage way. 7) No stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after 30 days shall be seeded and mulched. 8) City Ordinance prohibits the tracking, dropping, or depositing of soils or any other material onto city streets by or from any vehicle. Any inadvertent deposited material shall be cleaned immediately by the contractor. 6.2. City of Fort Collins Erosion Control Security Calculations The cost of erosion control for the site was compared to the cost to reseed the entire site and the greater cost was used to establish the erosion control escrow amount. The cost to reseed the site is estimated at $2,400.00. Using a multiplier of 1.5 the erosion control escrow amount would be $3,600.00. The site erosion control cost is estimated at $7,020.00. Using a multiplier of 1.5 the erosion control escrow amount would be $10,530.00. The larger sum of the Erosion Control cost and the Reseeding cost shall be used for the escrow account. Therefore, the Erosion Control Escrow amount is $10,530. See Table 6.1 for a break-down of the costs associated with seeding and erosion control. 14 Table 6.1: Erosion Control Cost Estimate ITEM QUANTITY UNIT COST/UNIT TOTAL COST Inlet Protection (IP-1, IP-2 and EL-IP) 7 EA $ 150.00 $ 1,050.00 Erosion Log (El and EL-D) 300 LF $ 2.00 $ 600.00 Aggregate Bag Protection (AB) 460 LF $ 2.00 $ 920.00 Erosion Log w/ Construction Fence (EL, CF) 430 LF $ 5.00 $ 2,150.00 Concrete Washout (CW) 1 EA $ 800.00 $ 800.00 Vehicle Tracking Pad (VTP) 1 EA $ 1,500.00 $ 1,500.00 Subtotal $ 7,020.00 Contingency (50%) $ 3,510.00 Total $ 10,530.00 CITY RESEEDING COST Reseed/Mulch 1.6 ACRE $ 1,500.00 $ 2,400.00 Subtotal $ 2,400.00 Contingency (50%) $ 1,200.00 Total $ 3,600.00 CALCULATED EROSION CONTROL ESCROW AMOUNT $10,530 Note: Minimum Escrow Amount is $3,000. 15 7. SWMP IMPLEMENTATION It is the responsibility of the contractor to operate and maintain all facilities and systems of treatment and control which are installed to achieve compliance with the conditions of the permit. This includes effective performance, adequate funding, adequate staffing and training, etc. (see permit). All personnel on the construction site who will be in a position to affect or be affected by the SWMP shall be trained prior to beginning work. These individuals will be given general orientation information regarding the project and SWMP, shown where the SWMP is physically located, the SWMP will be explained to them and available for their review, and the enforcement policy will be reviewed. After this training, a certification that the employee or subcontractor’s employee is familiar with the document and its procedures will be signed. Copies of these certifications are included in the Appendix. Throughout the construction, as a part of a weekly safety meeting, the SWMP will be reviewed with all attendees and any incidents discussed. All attendees shall be logged. APPENDIX A—BMP DETAILS B APPENDIX B—EROSION CONTROL PLAN C APPENDIX C—CONSTRUCTION SEQUENCE Mobilization Demolition Grading Utilities Installation Flat work Installation Vertical Installation Landscape Demobilization Best Management Practices (BMPs) Structural "Installation" Contour Furrows (Ripping / Disking) Concrete Washout Structure* Vehicle Tracking Pad* Erosion Logs* Any prior inlets that could use protecting Inlet Filter Bags* Any prior inlets that could use protecting Aggregate Bags* Any prior inlets that could use protecting Terracing Collecting Asphalt / Concrete Saw Cutting Waste *All BMPs to be Removed once Construction is Complete. Vegetative Temporary Seeding Planting Any time the site will sit dorment longer than 30 Days. Mulching/Sealant Any time the site will sit dorment longer than 30 Days. Permanent Seeding Planting Sod Installation Other: CONSTRUCTION SEQUENCE CHART D APPENDIX D—SOIL INFORMATION Hydrologic Soil Group—Larimer County Area, Colorado (Harmony Commons, Second Filing - Lot 1) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/22/2017 Page 1 of 4 4485770 4485780 4485790 4485800 4485810 4485820 4485830 4485840 4485770 4485780 4485790 4485800 4485810 4485820 4485830 4485840 498790 498800 498810 498820 498830 498840 498790 498800 498810 498820 498830 498840 40° 31' 23'' N 105° 0' 51'' W 40° 31' 23'' N 105° 0' 49'' W 40° 31' 21'' N 105° 0' 51'' W 40° 31' 21'' N 105° 0' 49'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 15 30 60 90 Feet 0 5 10 20 30 Meters Map Scale: 1:406 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 74 Nunn clay loam, 1 to 3 percent slopes C 0.9 100.0% Totals for Area of Interest 0.9 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Hydrologic Soil Group—Larimer County Area, Colorado Harmony Commons, Second Filing - Lot 1 Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/22/2017 Page 3 of 4 Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Harmony Commons, Second Filing - Lot 1 Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/22/2017 Page 4 of 4 K Factor, Whole Soil—Larimer County Area, Colorado (Harmony Commons, Second Filing - Lot 1) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/22/2017 Page 1 of 3 4485770 4485780 4485790 4485800 4485810 4485820 4485830 4485840 4485770 4485780 4485790 4485800 4485810 4485820 4485830 4485840 498790 498800 498810 498820 498830 498840 498790 498800 498810 498820 498830 498840 40° 31' 23'' N 105° 0' 51'' W 40° 31' 23'' N 105° 0' 49'' W 40° 31' 21'' N 105° 0' 51'' W 40° 31' 21'' N 105° 0' 49'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 15 30 60 90 Feet 0 5 10 20 30 Meters Map Scale: 1:406 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons .02 .05 .10 .15 .17 .20 .24 .28 .32 .37 .43 .49 .55 .64 Not rated or not available Soil Rating Lines .02 .05 .10 .15 .17 .20 .24 .28 .32 .37 .43 .49 .55 .64 Not rated or not available Soil Rating Points .02 .05 .10 .15 .17 .20 .24 .28 .32 .37 .43 .49 .55 .64 Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads K Factor, Whole Soil K Factor, Whole Soil— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 74 Nunn clay loam, 1 to 3 percent slopes .28 0.9 100.0% Totals for Area of Interest 0.9 100.0% Description Erosion factor K indicates the susceptibility of a soil to sheet and rill erosion by water. Factor K is one of six factors used in the Universal Soil Loss Equation (USLE) and the Revised Universal Soil Loss Equation (RUSLE) to predict the average annual rate of soil loss by sheet and rill erosion in tons per acre per year. The estimates are based primarily on percentage of silt, sand, and organic matter and on soil structure and saturated hydraulic conductivity (Ksat). Values of K range from 0.02 to 0.69. Other factors being equal, the higher the value, the more susceptible the soil is to sheet and rill erosion by water. "Erosion factor Kw (whole soil)" indicates the erodibility of the whole soil. The estimates are modified by the presence of rock fragments. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Layer Options (Horizon Aggregation Method): Surface Layer (Not applicable) K Factor, Whole Soil—Larimer County Area, Colorado Harmony Commons, Second Filing - Lot 1 Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/22/2017 Page 3 of 3 Wind Erodibility Group—Larimer County Area, Colorado (Harmony Commons, Second Filing - Lot 1) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/22/2017 Page 1 of 3 4485770 4485780 4485790 4485800 4485810 4485820 4485830 4485840 4485770 4485780 4485790 4485800 4485810 4485820 4485830 4485840 498790 498800 498810 498820 498830 498840 498790 498800 498810 498820 498830 498840 40° 31' 23'' N 105° 0' 51'' W 40° 31' 23'' N 105° 0' 49'' W 40° 31' 21'' N 105° 0' 51'' W 40° 31' 21'' N 105° 0' 49'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 15 30 60 90 Feet 0 5 10 20 30 Meters Map Scale: 1:406 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons 1 2 3 4 4L 5 6 7 8 Not rated or not available Soil Rating Lines 1 2 3 4 4L 5 6 7 8 Not rated or not available Soil Rating Points 1 2 3 4 4L 5 6 7 8 Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Wind Erodibility Group Wind Erodibility Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 74 Nunn clay loam, 1 to 3 percent slopes 6 0.9 100.0% Totals for Area of Interest 0.9 100.0% Description A wind erodibility group (WEG) consists of soils that have similar properties affecting their susceptibility to wind erosion in cultivated areas. The soils assigned to group 1 are the most susceptible to wind erosion, and those assigned to group 8 are the least susceptible. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Lower Wind Erodibility Group—Larimer County Area, Colorado Harmony Commons, Second Filing - Lot 1 Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/22/2017 Page 3 of 3 Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 11, Sep 23, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 20, 2015—Oct 15, 2016 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Wind Erodibility Group—Larimer County Area, Colorado (Harmony Commons, Second Filing - Lot 1) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/22/2017 Page 2 of 3 Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 11, Sep 23, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 20, 2015—Oct 15, 2016 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. K Factor, Whole Soil—Larimer County Area, Colorado (Harmony Commons, Second Filing - Lot 1) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/22/2017 Page 2 of 3 of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 11, Sep 23, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 20, 2015—Oct 15, 2016 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (Harmony Commons, Second Filing - Lot 1) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/22/2017 Page 2 of 4