Loading...
HomeMy WebLinkAboutTRAIL HEAD TRACTS F & G TOWNHOMES - PDP - PDP170035 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORT400 North Link Lane | Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 PRELIMINARY GEOTECHNICAL INVESTIGATION TRAIL HEAD SUBDIVISIION TRACTS F AND G FORT COLLINS, COLORADO Prepared For: TRITON COMMUNITIES 6500 East Hampden Avenue Suite 202 Denver, Colorado 80224 Attention: Mr. Ceri Jones Project No. FC06050.043-115 May 11, 2017 TABLE OF CONTENTS SCOPE ....................................................................................................................... 1 SUMMARY OF CONCLUSIONS ............................................................................... 1 SITE DESCRIPTION AND PROPOSED CONSTRUCTION .................................... 2 GEOLOGIC HAZARDS .............................................................................................. 2 SUBSURFACE CONDITIONS ................................................................................... 4 DEVELOPMENT RECOMMENDATIONS ................................................................. 4 Site Grading ............................................................................................................ 4 Utility Construction .................................................................................................. 5 Preliminary Pavement Thicknesses ....................................................................... 6 CONSIDERATIONS FOR STRUCTURES ................................................................ 7 Foundations ............................................................................................................ 7 Floor Systems and Slab-on-Grade Construction ................................................... 7 Surface Drainage ................................................................................................... 7 General Design Considerations ............................................................................. 8 RECOMMENDED FUTURE INVESTIGATIONS AND TESTING ............................. 9 LIMITATIONS ............................................................................................................. 9 FIGURE 1 – LOCATIONS OF EXPLORATORY BORINGS FIGURE 2 – SUMMARY LOGS OF EXPLORATORY BORINGS APPENDIX A – LABORATORY TEST RESULTS TABLE A-1 – SUMMARY OF LABORATORY TEST RESULTS APPENDIX B – GUIDELINE SITE GRADING SPECIFICATIONS 1 TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 SCOPE This report presents the results of our Preliminary Geotechnical Investigation for Trail Head Subdivision Tracts F and G in Fort Collins, Colorado. The purpose of our investigation was to identify geologic hazards that may exist at the site and to evaluate the subsurface conditions to assist in planning and budgeting for the proposed development. The report includes description of subsoil, bedrock, and groundwater conditions found in our exploratory borings, and discussions of site development as influenced by geotechnical considerations. This report was prepared based upon our understanding of the development plans. The recommendations are considered preliminary and can be used as guidelines for further planning of development and design of grading. We should review final development and grading plans to determine if additional investigation is merited, or if we need to revise our recommendations. Additional investigations will be required to design building foundations and pavements. A summary of our findings and recommendations is presented below. More detailed discussions of the data, analysis and recommendations are presented in the report. SUMMARY OF CONCLUSIONS 1. No geologic or geotechnical conditions were identified which would preclude development of this site. The primary geotechnical hazard at this site is the presence of swelling soils; the risks associated with swelling soils can be mitigated, but not eliminated, by appropriate design and construction practices. 2. Soils encountered in our borings generally consisted of sandy clay to the depths explored. Bedrock and groundwater were not encountered during our investigation. 3. Spread footing foundations are likely appropriate for structures at this site. Mitigation for swelling soils will be recommended, and may include over-excavation to a depth of approximately 4 feet below residences. 2 TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 4. The risk of poor slab-on-grade performance may be high in some areas of the site; over-excavation can likely reduce this risk to low or moderate and allow slab-on-grade floors to be recommended for most or all of the lots included. 5. Pavement subgrade at this site will generally consist of sandy clay classifying as A-6 according to AASHTO criteria, with expected subgrade support of poor to good. Mitigation for swell will likely be recommended. Preliminary pavement thickness and construction recommendations are provided in this report. 6. Overall surface drainage should be designed to provide rapid run-off of surface water away from the proposed residences. Water should not be allowed to pond near the crest of slopes, on or adjacent to pavements, or adjacent to structures. All permanent slopes should be re-vegetated to reduce erosion. 7. Further investigations are required to make design recommendations for foundations, floors, and pavements. SITE DESCRIPTION AND PROPOSED CONSTRUCTION The project area lies on the north side of Vine Drive east of Timberline Road in Fort Collins, Colorado. The property was undeveloped at the time of our investigation. Residential communities have been constructed to the north, east and west, and the property to the south is in use for agriculture. The ground surface is relatively flat; ground cover consisted of natural grasses and weeds. A canal running west to east is located approximately 1,000 feet to the north. The site is planned for residential development including single-family homes, pavements, and utilities. GEOLOGIC HAZARDS Colorado is a challenging location to practice geotechnical engineering. The climate is relatively dry and the near-surface soils are typically dry and relatively stiff. These soils and related sedimentary bedrock formations tend to react to changes in moisture conditions. Some of the soils swell as they increase in moisture 3 TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 and are called expansive soils. Other soils can settle significantly upon wetting and are referred to as collapsing soils. Most of the land available for development east of the Front Range is underlain by expansive clay or claystone bedrock near the surface. Laboratory tests of samples from this site indicate variable swell potential. Higher swelling soils were generally encountered in the upper 10 to 15 feet. It is normal in the Front Range of Colorado and nearby eastern plains to measure radon gas in poorly ventilated spaces in contact with soil or bedrock. Radon 222 gas is considered a health hazard and is one of several radioactive products in the chain of the natural decay of uranium into stable lead. Radioactive nuclides are common in the soils and sedimentary rocks underlying the subject site. Because these sources exist, there is potential for radon gas accumulation in poorly ventilated spaces. The amount of soil gas that can accumulate is a function of many factors, including the radio-nuclide activity of the soil and bedrock, construction methods and materials, pathways for soil gas, and existence of poorly- ventilated accumulation areas. Typical mitigation methods consist of sealing soil gas entry areas and ventilation of below-grade spaces and perimeter drain systems (if any). Radon rarely accumulates to significant levels in above-grade spaces. The only reliable method to determine the concentration of radon is to perform testing after construction. FIELD AND LABORATORY INVESTIGATIONS Subsurface conditions were investigated by drilling four exploratory borings at the approximate locations shown on Figure 1. The borings were drilled using a truck-mounted drill rig with 4-inch diameter, continuous-flight augers. Our field representative observed drilling, logged the soils found in the borings and obtained samples. Summary logs of the subsurface conditions found in the borings and field penetration resistance values are presented on Figure 2. 4 TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 Samples recovered from the borings were returned to our laboratory and visually classified by the geotechnical engineer for this project. Laboratory testing included moisture content, dry unit weight, swell-consolidation, Atterberg Limits, particle-size analyses, and water-soluble sulfate analyses. Swell-consolidation tests were wetted at a pressure that approximated the weight of the overlying soils (overburden pressure). Laboratory test results are presented in Appendix A. SUBSURFACE CONDITIONS Soils encountered in our borings generally consisted of sandy clay to the depths explored. Bedrock and groundwater were not encountered during our investigation. The soils classified as stiff to very stiff based on field penetration test results. Swell-consolidation tests were conducted on ten soil samples; results indicated 0.0 to 8.3 percent swell. Higher swells were generally in the upper 10 to 15 feet of soil. Free groundwater was not encountered in any of the borings during our investigation. Further description of the subsurface conditions is provided on our boring logs and in our laboratory test results. DEVELOPMENT RECOMMENDATIONS Site Grading The properties of fill will affect the performance of foundations, slabs-on- grade, utilities, and pavements. The ground surface in areas to be filled should be stripped of vegetation, scarified, moisture-conditioned, and densely compacted. The on-site soils can be used as site grading fill provided they are substantially free of organics and other deleterious materials. Permanent cut and fill slopes should be no steeper than 3:1 (horizontal to vertical) and be seeded or mulched to reduce erosion. Use of flatter (4:1) slopes is preferable. 5 TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 Our experience has shown clay fill moisture treated to optimum moisture content or above will exhibit lower swell than drier material. Clay fill should be moisture-conditioned to between optimum and 3 percent above optimum moisture content and compacted to at least 95 percent of standard Proctor maximum dry density (ASTM D 698). Sand fill should be moisture-conditioned to within 2 percent of optimum moisture content. The placement and compaction of site grading fill should be observed and density tested by our representative during construction. Guideline grading specifications are presented in Appendix B. Permanent slopes should be terraced and re-vegetated to reduce erosion. Utility Construction We believe excavations for utility installation can be performed with heavy- duty trenchers, excavators, or large backhoes. Groundwater was not encountered in our borings, but might be encountered in deeper trenches. Bracing and/or temporary dewatering may be required during utility construction. Dewatering may be accomplished by sloping excavations to occasional sumps where water can be removed by pumping. The sumps should be several feet below the bottom of the excavations so that water is pumped down through the soils rather than up through the bottom of the excavations to reduce potential that the support capacity of the subsoils will be compromised. Utility trenches should be sloped or shored to meet local, state, and federal safety regulations. Excavation slopes specified by OSHA are dependent upon soil types and groundwater conditions encountered. Seepage and groundwater conditions in trenches may downgrade the soil type. Initial trench excavations may be unstable and require flatter slopes than required by OSHA. Contractors should identify the soils encountered in the excavations and refer to OSHA standards to determine appropriate slopes. Excavations deeper than 20 feet should be designed by a professional engineer. 6 TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 Water and sewer lines are usually constructed beneath paved roads. Compaction of trench backfill can have a significant effect on the life and serviceability of pavements. Our experience indicates compacted trench backfill may settle 1 to 2 percent. More settlement may occur if wetting of the fill occurs. Trench backfill should be placed in thin loose lifts, moisture-conditioned and compacted as recommended in the Site Grading section of this report. The placement and compaction of backfill should be observed and tested by our firm during construction. Preliminary Pavement Thicknesses Pavement subgrade will generally consist of sandy clay classifying as A-6 material according to AASHTO criteria. Any fill material used is assumed to have equal or better properties than the on-site soil. Mitigation for swell will likely be recommended, and could consist of moisture treating the upper 12 to 24 inches of pavement subgrade or chemical stabilization with lime or fly ash. Preliminary pavement thickness alternatives are presented in Table A below. These thicknesses should be used for planning purposes only. We recommend a subgrade investigation and final pavement design after site grading is complete. TABLE A PRELIMINARY PAVEMENT THICKNESS ALTERNATIVES Classification HMA* + ABC* PCC* Local Standard Residential (EDLA = 10) 4"-5.5” HMA + 6”-8” ABC 6”- 7” PCC Residential Collector (EDLA = 50) 5.5”- 6.5" HMA + 6"-10” ABC 6”- 7" PCC *HMA = Hot Mix Asphalt; ABC = Aggregate Base Course; PCC = Portland Cement Concrete 7 TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 CONSIDERATIONS FOR STRUCTURES The following discussion is preliminary and not intended for design or construction. After grading is completed, a design level geotechnical investigation should be conducted which provides recommendations and design criteria for the planned construction. Foundations Subsurface conditions encountered in our borings were relatively consistent. We judge that spread footing foundations are likely appropriate for structures at this site. Expansive soils were encountered at depths where they are likely to affect foundation performance. Over-excavation to about 4 feet below foundation excavations may be recommended as a means to reduce the risk of swell-related movements. A design-level geotechnical investigation is necessary to provide more detailed foundation recommendations. Floor Systems and Slab-on-Grade Construction The risk of poor slab-on-grade performance due to swelling soils may be high in some areas of the site; over-excavation will likely reduce this risk to low or moderate for most or all of the lots. Slab-on-grade floors may still experience movements if constructed on over-excavated soil. Structurally supported floors can be considered in order to minimize movements and associated distress to floor systems. Surface Drainage The performance of improvements will be influenced by surface drainage. The ground surface around proposed structures should be shaped to provide runoff of surface water away from the structure and off of pavements. We generally 8 TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 recommend slopes of at least 12 inches in the first 10 feet where practical in the landscaping areas surrounding structures. There are practical limitations on achieving these slopes. Irrigation should be minimized to control wetting. Roof downspouts should discharge beyond the limits of backfill. Water should not be allowed to pond on or adjacent to pavements. Proper control of surface runoff is also important to limit the erosion of surface soils. Sheet flow should not be directed over unprotected slopes. Water should not be allowed to pond at the crest of slopes. Permanent slopes should be re-vegetated to reduce erosion. Water can follow poorly compacted fill behind curb and gutter and in utility trenches. This water can soften fill and undermine the performance of the roadways, flatwork, and foundations. We recommend compactive effort be used in placement of all fill. General Design Considerations Exterior sidewalks and pavements supported above the on-site soils are subject to post construction movement. Flat grades should be avoided to prevent possible ponding, particularly next to the building due to soil movement. Positive grades away from the buildings should be used for sidewalks and flatwork around the perimeter of the buildings in order to reduce the possibility of lifting of this flatwork, resulting in ponding next to the structures. Joints next to buildings should be thoroughly sealed to prevent the infiltration of surface water. Where concrete pavement is used, joints should also be sealed to reduce the infiltration of water. Since some post construction movement of pavement and flatwork may occur, joints around the buildings should be periodically observed and resealed where necessary. 9 TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 Roof drains should be discharged well away from the structures, preferably by closed pipe systems. Where roof drains are allowed to discharge on concrete flatwork or pavement areas next to the structures, care should be taken to insure the area is as water tight as practical to eliminate the infiltration of this water next to structures. RECOMMENDED FUTURE INVESTIGATIONS AND TESTING Based on the results of this investigation and the proposed development, we recommend our firm perform the following investigations: 1. Review of site grading plans once the plans are available; 2. Subgrade Investigation and Pavement Design after grading; 3. Design-level Soils and Foundation Investigation after grading; and 4. Construction testing and observation during site development, and building construction, including compaction testing of grading fill, utility trench backfill and pavements, and foundation installation observations. LIMITATIONS This report has been prepared for the exclusive use of Triton Communities for the purpose of providing geotechnical design and construction criteria for the proposed project. The information and conclusions presented herein are based upon consideration of many factors including, but not limited to, the type of development proposed, the geologic setting, and the subsurface conditions encountered. The information contained in the report are not valid for use by others. Standards of practice evolve in the area of geotechnical engineering. The information provided is appropriate for about five years. If the development of the site does not occur within five years, we should be contacted to determine if we should update this report. TH-1 TBM TH-2 TH-3 TH-4 Vine Drive Wagon Trail Greenfields Drive Campfire Drive VINE DR. MULBERRY ST. CR 50 I - 25 CR 9E SITE LEGEND: INDICATES APPROXIMATE LOCATION OF EXPLORATORY BORING INDICATES APPROXIMATE LOCATION OF TEMPORARY BENCHMARK (PAVEMENT SURFACE AT NORTHWEST CORNER OF INTERSECTION, ASSUMED ELEVATION 100 FEET) TH-1 TBM TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL I T PROJECT NO. FC06050.043-115 FIGURE 1 Locations of Exploratory Borings VICINITY MAP (FORT COLLINS, COLORADO) NOT TO SCALE 200' APPROXIMATE SCALE: 1" = 200' 60 65 70 75 80 85 90 95 100 105 60 65 70 75 80 85 90 95 100 105 21/12 18/12 19/12 22/12 14/12 SW=5.5 SS=0.020 WC=8.2 DD=120 SW=1.2 SW=5.5 SS=0.020 WC=8.2 DD=120 SW=1.2 TH-1 El. 100.5 20/12 30/12 26/12 19/12 11/12 WC=6.5 DD=118 SW=4.8 WC=8.2 DD=123 SW=3.3 WC=9.0 DD=124 SW=2.8 WC=13.0 DD=121 SW=0.8 WC=18.2 DD=112 SW=0.0 WC=6.5 DD=118 SW=4.8 APPENDIX A RESULTS OF LABORATORY TESTING Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT= PCF From TH - 1 AT 2 FEET MOISTURE CONTENT= % Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT= 120 PCF From TH - 1 AT 14 FEET MOISTURE CONTENT= 8.2 % TRITON COMMUNITIES TRAILHEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 APPLIED PRESSURE - KSF APPLIED PRESSURE - KSF COMPRESSION % EXPANSION Swell Consolidation FIGURE A-1 COMPRESSION % EXPANSION -1 0 1 2 3 4 5 6 7 EXPANSION UNDER CONSTANT PRESSURE DUE TO WETTING -4 -3 -2 -1 0 1 2 3 EXPANSION UNDER CONSTANT PRESSURE DUE TO WETTING 0.1 1.0 10 100 0.1 1.0 10 100 Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT= 118 PCF From TH - 2 AT 4 FEET MOISTURE CONTENT= 6.5 % TRITON COMMUNITIES TRAILHEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 APPLIED PRESSURE - KSF COMPRESSION % EXPANSION Swell Consolidation Test Results FIGURE A-2 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 EXPANSION UNDER CONSTANT PRESSURE DUE TO WETTING 0.1 1.0 10 100 Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT= 123 PCF From TH - 2 AT 9 FEET MOISTURE CONTENT= 8.2 % TRITON COMMUNITIES TRAILHEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 APPLIED PRESSURE - KSF COMPRESSION % EXPANSION Swell Consolidation Test Results FIGURE A-3 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 EXPANSION UNDER CONSTANT PRESSURE DUE TO WETTING 0.1 1.0 10 100 Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT= 124 PCF From TH - 2 AT 14 FEET MOISTURE CONTENT= 9.0 % Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT= 121 PCF From TH - 2 AT 19 FEET MOISTURE CONTENT= 13.0 % TRITON COMMUNITIES TRAILHEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 APPLIED PRESSURE - KSF APPLIED PRESSURE - KSF COMPRESSION % EXPANSION Swell Consolidation FIGURE A-4 COMPRESSION % EXPANSION -3 -2 -1 0 1 2 3 4 EXPANSION UNDER CONSTANT PRESSURE DUE TO WETTING -4 -3 -2 -1 0 1 2 3 EXPANSION UNDER CONSTANT PRESSURE DUE TO WETTING 0.1 1.0 10 100 0.1 1.0 10 100 Sample of SAND, CLAYEY (SC) DRY UNIT WEIGHT= 112 PCF From TH - 2 AT 24 FEET MOISTURE CONTENT= 18.2 % TRITON COMMUNITIES TRAILHEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 APPLIED PRESSURE - KSF COMPRESSION % EXPANSION Swell Consolidation Test Results FIGURE A-5 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 NO MOVEMENT DUE TO WETTING 0.1 1.0 10 100 Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT= 121 PCF From TH - 3 AT 9 FEET MOISTURE CONTENT= 7.4 % TRITON COMMUNITIES TRAILHEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 APPLIED PRESSURE - KSF COMPRESSION % EXPANSION Swell Consolidation Test Results FIGURE A-6 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 EXPANSION UNDER CONSTANT PRESSURE DUE TO WETTING 0.1 1.0 10 100 Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT= 116 PCF From TH - 4 AT 2 FEET MOISTURE CONTENT= 8.2 % TRITON COMMUNITIES TRAILHEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 APPLIED PRESSURE - KSF COMPRESSION % EXPANSION Swell Consolidation Test Results FIGURE A-7 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 EXPANSION UNDER CONSTANT PRESSURE DUE TO WETTING 0.1 1.0 10 100 Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT= 122 PCF From TH - 4 AT 14 FEET MOISTURE CONTENT= 12.9 % TRITON COMMUNITIES TRAILHEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 APPLIED PRESSURE - KSF COMPRESSION % EXPANSION Swell Consolidation Test Results FIGURE A-8 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 EXPANSION UNDER CONSTANT PRESSURE DUE TO WETTING 0.1 1.0 10 100 PASSING WATER- MOISTURE DRY LIQUID PLASTICITY APPLIED SWELL NO. 200 SOLUBLE DEPTH CONTENT DENSITY LIMIT INDEX SWELL* PRESSURE PRESSURE SIEVE SULFATES BORING (FEET) (%) (PCF) (%) (PSF) (PSF) (%) (%) DESCRIPTION TH-1 2 5.5 200 0.02 CLAY, SANDY (CL) TH-1 14 8.2 120 1.2 1,800 CLAY, SANDY (CL) TH-2 4 6.5 118 4.8 500 CLAY, SANDY (CL) TH-2 9 8.2 123 3.3 1,100 7,600 CLAY, SANDY (CL) TH-2 14 9.0 124 2.8 1,800 13,000 CLAY, SANDY (CL) TH-2 19 13.0 121 0.8 2,400 8,400 CLAY, SANDY (CL) TH-2 24 18.2 112 0.0 3,000 SAND, CLAYEY (SC) TH-3 4 7.9 123 34 21 69 CLAY, SANDY (CL) TH-3 9 7.4 121 3.9 1,100 <0.01 CLAY, SANDY (CL) TH-4 2 8.2 116 8.3 200 CLAY, SANDY (CL) TH-4 14 12.9 122 0.7 1,800 CLAY, SANDY (CL) SWELL TEST RESULTS* TABLE A-I SUMMARY OF LABORATORY TESTING ATTERBERG LIMITS Page 1 of 1 * NEGATIVE VALUE INDICATES COMPRESSION. TRITON COMMUNITIES TRAILHEAD TRACTS F AND G CTL|T PROJECT NO. FC06050.043-115 APPENDIX B GUIDELINE SITE GRADING SPECIFICATIONS TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 B-1 GUIDELINE SITE GRADING SPECIFICATIONS 1. DESCRIPTION This item shall consist of the excavation, transportation, placement, and compaction of materials from locations indicated on the plans, or staked by the Engineer, as necessary to achieve preliminary street and overlot elevations. These specifications shall also apply to compaction of excess cut materials that may be placed outside of the development boundaries. 2. GENERAL The Soils Engineer shall be the Owner's representative. The Soils Engineer shall approve fill materials, method of placement, moisture contents and percent compaction, and shall give written approval of the completed fill. 3. CLEARING JOB SITE The Contractor shall remove all vegetation and debris before excavation or fill placement is begun. The Contractor shall dispose of the cleared material to provide the Owner with a clean, neat appearing job site. Cleared material shall not be placed in areas to receive fill or where the material will support structures of any kind. 4. SCARIFYING AREA TO BE FILLED All topsoil and vegetable matter shall be removed from the ground surface upon which fill is to be placed. The surface shall then be plowed or scarified until the surface is free from ruts, hummocks or other uneven features, which would prevent uniform compaction. 5. COMPACTING AREA TO BE FILLED After the foundation for the fill has been cleared and scarified, it shall be disked or bladed until it is free from large clods, brought to the proper moisture content (0 to 3 percent above optimum moisture content for clays and within 2 percent of optimum moisture content for sands) and compacted to not less than 95 percent of maximum dry density as determined in accordance with ASTM D 698. 6. FILL MATERIALS Fill soils shall be free from organics, debris or other deleterious substances, and shall not contain rocks or lumps having a diameter greater than six (6) TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 B-2 inches. Fill materials shall be obtained from cut areas shown on the plans or staked in the field by the Engineer. On-site materials classifying as CL, CH, SC, SM, SW, SP, GP, GC, and GM are acceptable. Concrete, asphalt, organic matter and other deleterious materials or debris shall not be used as fill. 7. MOISTURE CONTENT AND DENSITY Fill material shall be moisture conditioned and compacted to the criteria in the table, below. Maximum density and optimum moisture content shall be determined from the appropriate Proctor compaction tests. Sufficient laboratory compaction tests shall be made to determine the optimum moisture content for the various soils encountered in borrow areas. FILL COMPACTION AND MOISTURE REQUIREMENTS Soil Type Depth from Final Grade (feet) Moisture Requirement (% from optimum) Density Requirement Clay 0 to 15 feet 0 to +3 95% of ASTM D 698 Sand -2 to +2 95% of ASTM D 698 Clay Greater than 15 feet -2 to +1 98% of ASTM D 698 Sand -2 to +1 95% of ASTM D 1557 The Contractor may be required to add moisture to the excavation materials in the borrow area if, in the opinion of the Soils Engineer, it is not possible to obtain uniform moisture content by adding water on the fill surface. The Contractor may be required to rake or disk the fill soils to provide uniform moisture content through the soils. The application of water to embankment materials shall be made with any type of watering equipment approved by the Soils Engineer, which will give the desired results. Water jets from the spreader shall not be directed at the embankment with such force that fill materials are washed out. Should too much water be added to any part of the fill, such that the material is too wet to permit the desired compaction from being obtained, rolling and all work on that section of the fill shall be delayed until the material has been TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 B-3 allowed to dry to the required moisture content. The Contractor will be permitted to rework wet material in an approved manner to hasten its drying. 8. COMPACTION OF FILL AREAS Selected fill material shall be placed and mixed in evenly spread layers. After each fill layer has been placed, it shall be uniformly compacted to not less than the specified percentage of maximum density. Fill shall be compacted to the criteria above. At the option of the Soils Engineer, soils classifying as SW, GP, GC, or GM may be compacted to 95 percent of maximum density as determined in accordance with ASTM D 1557 or 70 percent relative density for cohesionless sand soils. Fill materials shall be placed such that the thickness of loose materials does not exceed 12 inches and the compacted lift thickness does not exceed 6 inches. Compaction as specified above shall be obtained by the use of sheepsfoot rollers, multiple-wheel pneumatic-tired rollers, or other equipment approved by the Engineer for soils classifying as CL, CH, or SC. Granular fill shall be compacted using vibratory equipment or other equipment approved by the Soils Engineer. Compaction shall be accomplished while the fill material is at the specified moisture content. Compaction of each layer shall be continuous over the entire area. Compaction equipment shall make sufficient trips to ensure that the required density is obtained. 9. COMPACTION OF SLOPES Fill slopes shall be compacted by means of sheepsfoot rollers or other suitable equipment. Compaction operations shall be continued until slopes are stable, but not too dense for planting, and there is not appreciable amount of loose soils on the slopes. Compaction of slopes may be done progressively in increments of three to five feet (3' to 5') in height or after the fill is brought to its total height. Permanent fill slopes shall not exceed 3:1 (horizontal to vertical). 10. PLACEMENT OF FILL ON NATURAL SLOPES Where natural slopes are steeper than 20 percent in grade and the placement of fill is required, benches shall be cut at the rate of one bench for each 5 feet in height (minimum of two benches). Benches shall be at least 10 feet in width. Larger bench widths may be required by the Engineer. Fill shall be placed on completed benches as outlined within this specification. 11. DENSITY TESTS Field density tests shall be made by the Soils Engineer at locations and depths of his choosing. Where sheepsfoot rollers are used, the soil may be TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115 B-4 disturbed to a depth of several inches. Density tests shall be taken in compacted material below the disturbed surface. When density tests indicate that the density or moisture content of any layer of fill or portion thereof is not within specification, the particular layer or portion shall be reworked until the required density or moisture content has been achieved. 12. SEASONAL LIMITS No fill material shall be placed, spread or rolled while it is frozen, thawing, or during unfavorable weather conditions. When work is interrupted by heavy precipitation, fill operations shall not be resumed until the Soils Engineer indicates that the moisture content and density of previously placed materials are as specified. 13. NOTICE REGARDING START OF GRADING The Contractor shall submit notification to the Soils Engineer and Owner advising them of the start of grading operations at least three (3) days in advance of the starting date. Notification shall also be submitted at least 3 days in advance of any resumption dates when grading operations have been stopped for any reason other than adverse weather conditions. 14. REPORTING OF FIELD DENSITY TESTS Density tests made by the Soils Engineer, as specified under "Density Tests" above, shall be submitted progressively to the Owner. Dry density, moisture content, and percentage compaction shall be reported for each test taken. 15. DECLARATION REGARDING COMPLETED FILL The Soils Engineer shall provide a written declaration stating that the site was filled with acceptable materials, and was placed in general accordance with the specifications. WC=8.2 DD=123 SW=3.3 WC=9.0 DD=124 SW=2.8 WC=13.0 DD=121 SW=0.8 WC=18.2 DD=112 SW=0.0 TH-2 El. 98.0 26/12 27/12 31/12 23/12 14/12 WC=7.9 DD=123 LL=34 PI=21 -200=69 WC=7.4 DD=121 SW=3.9 SS=<0.01 WC=7.9 DD=123 LL=34 PI=21 -200=69 WC=7.4 DD=121 SW=3.9 SS=<0.01 TH-3 El. 99.5 11/12 26/12 18/12 11/12 26/12 WC=8.2 DD=116 SW=8.3 WC=12.9 DD=122 SW=0.7 WC=8.2 DD=116 SW=8.3 WC=12.9 DD=122 SW=0.7 TH-4 El. 96.0 ELEVATION - FEET FIGURE 2 DRIVE SAMPLE. THE SYMBOL 21/12 INDICATES 21 BLOWS OF A 140-POUND HAMMER FALLING 30 INCHES WERE REQUIRED TO DRIVE A 2.5-INCH O.D. SAMPLER 12 INCHES. ELEVATION - FEET SAND, CLAYEY, MOIST, MEDIUM DENSE, BROWN, GRAY, RUST (SC) 2. 3. CLAY, SANDY, MOIST, STIFF TO VERY STIFF, BROWN (CL) THE BORINGS WERE DRILLED ON APRIL 12, 2017, USING 4-INCH DIAMETER CONTINUOUS-FLIGHT AUGERS AND A TRUCK-MOUNTED DRILL RIG. 1. LEGEND: NOTES: BORING ELEVATIONS WERE SURVEYED BY A REPRESENTATIVE OF OUR FIRM REFERENCING THE TEMPORARY BENCHMARK SHOWN ON FIGURE 1. THESE LOGS ARE SUBJECT TO THE EXPLANATIONS, LIMITATIONS AND CONCLUSIONS IN THIS REPORT. 4. Summary Logs of Exploratory Borings WC DD SW -200 LL PI UC SS - - - - - - - - INDICATES MOISTURE CONTENT (%). INDICATES DRY DENSITY (PCF). INDICATES SWELL WHEN WETTED UNDER OVERBURDEN PRESSURE (%). INDICATES PASSING NO. 200 SIEVE (%). INDICATES LIQUID LIMIT. INDICATES PLASTICITY INDEX. INDICATES UNCONFINED COMPRESSIVE STRENGTH (PSF). INDICATES SOLUBLE SULFATE CONTENT (%). TRITON COMMUNITIES TRAIL HEAD TRACTS F AND G CTL | T PROJECT NO. FC06050.043-115