HomeMy WebLinkAboutCOUNTRY CLUB RESERVE - PDP - PDP170008 - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTS (3)East Larimer County Water District 232 South Link Lane, P.O. Box 2044 • Fort Collins, Colorado 80522 Phone (970) 493-2044 • Fax (970) 493-1801 • www.elcowater.org S:\_Project_Files\Development\_Active Projects\Country Club Reserve\Docs\2107.03.15 PDP\PDP Review.doc 08 March 2017 Via Email: cmapes@fcgov.com Clark Mapes City of Ft. Collins Planning and Zoning P.O. Box 580 Ft. Collins, CO 80522-0580 RE: Project: Country Club Reserve Title: PDP 170008 Country Club Reserve – Type II Engineer Contact: Northern Engineering The East Larimer County Water District (District) staff has reviewed material delivered to the District for the proposed project referenced above and has provided initial, conceptual review redlines (attached) and has the following additional comments: 1. Preliminary Utility Plans: The water lines shown on Utility Sheet OU1 (Overall Utility Plan) are generally appropriate, see attached redlines for revisions. If the project progresses past this planning stage, District staff will review its master planning for this area and work with the developer’s engineer to finalize the location, easements (if required) and size of new waterlines. 2. Plat: Easements for waterlines that are not located within a public right-of-way will be required as redlined on the attached plat drawing. The property owner (or their representative) should contact the District regarding the easements and to obtain a copy of the standard District easement template. 3. Landscape Plans: Future landscape plans should show water services as they enter the lots. Trees proposed within the development must be placed a minimum 10-ft from any water service or waterline. 4. Water Rights: The District encourages the developer to contact the District General Manager to begin discussions on raw water dedication for the project. 5. Plan Review Fees: Plan review fees will be assessed upon receipt of the next level of design review drawings. Any written agreements required to complete water line connections to the property must be completed prior to final acceptance (signing) of the project construction drawings. The District administers design and construction standards for its water distribution system. The developer’s engineer should contact the District early in the project design process to obtain this information and coordinate the project design with the existing District facilities and standards. Country Club Reserve PDP 170008 March 8, 2017 S:\_Project_Files\Development\_Active Projects\Country Club Reserve\Docs\2107.03.15 PDP\PDP Review.doc Sincerely, Randy Siddens, P.E. District Engineer EC: Mike Scheid (ELCO) Jack Warner (ELCO) Attachments: Project Comment Sheet Utility Plans – Redlined Sheets Plat – Redlined Sheet LOCAL RESIDENTIAL (53' ROW) \A1;53' ROW 7' PARKING 7' PARKING 9' UTILITY ESMT. 9' UTILITY ESMT. 16' TRAVEL 2-LANE ARTERIAL STREET (78' ROW) \A1;78' ROW 15' UTILITY ESMT. \A1;48' \A1;EOP-16' EOP-{\Fsimplex|c186;} 12' CENTER EX 12' TRAVEL EX ~5' BIKE LN. 8' BIKE LN. STREET A EAST DOUGLAS ROAD STREET B STREET C STREET D STREET E 12' TRAVEL 2-LANE ARTERIAL STREET (72' ROW) \A1;72' ROW 15' UTILITY ESMT. \A1;50' EOP-\A1;{\24' Fsimplex|EOP-c186;} 12' TURN LANE 8' BIKE LN. TURNBERRY ROAD 12' TRAVEL 12' TRAVEL 6' BIKE LN. \A1;30' HALF ROW \A1;48' HALF ROW \A1;30' HALF ROW \A1;42' HALF ROW No. Revisions: By: Date: REVIEWED BY: B. Curtiss DESIGNED BY: DRAWN BY: SCALE: DATE: 12/14/16 PROJECT: 1324-001 Sheet of 39 COUNTRY CLUB RESERVE These drawings are instruments of service provided by Northern EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW Reviewed By:____________________________ __________ General Manager Date Review does not constitute “approval” of plans. Plan Engineer is responsible for accuracy and completeness of design. . No. Revisions: By: Date: REVIEWED BY: B. Curtiss DESIGNED BY: DRAWN BY: SCALE: DATE: 12/14/16 PROJECT: 1324-001 Sheet of 39 COUNTRY CLUB RESERVE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 12/14/16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com CS3 CONSTRUCTION NOTES GENERAL AND D. Weber D. Weber NTS 3 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W V.V.P. P. V.P. A.R.V. GAS GAS X X V.P. V.P. X X X X X X X G G G G G G G G G G G G G G G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E E E E E E E E E E E B M V.P. W W W W W W W W W W W W W W X X X X G G G G G G G G G G G G G E E E E E E E E E E E E WV WVWV WV WV WV X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD UD UD UD V.P. W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W V .P. V.P. A.R.V. GAS GAS V.P. V.P. X X X X X X G G G G G G G G G G G G G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E WV WVWV WV WV WV X X X X X V.P. WV H Y D WV WV X X X X X X X X X X X X X X X X X X G W X X M X X X X F E S M M F E S F E S M M X TELE F.O. TELE F E S F E S M GAS VAULT CABLE H Y D T T V.P. GAS V.P. M B F P X X F E S M F E S TELE X F E S M F E S X X X X X W S O X X V.P. VAULT CABLE BOX CABLE M M H2O X V.GAS P. GAS 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W W OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE B B B B B B B B ST PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT STORM DRAIN F STORM DRAIN C STORM DRAIN B STORM DRAIN A STORM DRAIN D SUBDRAIN LINE A SUBDRAIN LINE A CONNECT TO EXISTING 8" WATERLINE PROPOSED 15" OFFSITE SANITARY SEWER SEE SHEET SS1 BEGIN SINGLE TRENCH WITH SANITARY SEWER AND SUBDRAIN TURNBERRY ROAD STREET A STREET B STREET C STREET E E. DOUGLAS ROAD STREET A STREET D STREET E STREET B 8" SEWER 8" WATER 8" WATER 8" WATER 8" WATER 8" WATER 8" WATER 8" WATER 8" WATER 8" SEWER 8" SEWER 8" SEWER 8" SEWER 8" SEWER 8" SEWER 8" SEWER 8" SEWER 15" SEWER CONNECT TO EXISTING 10" WATERLINE CONNECT TO EXISTING 10" WATERLINE OUTLET STRUCTURE OUTLET STRUCTURE OUTLET STRUCTURE UNDERDRAIN FOR RAIN GARDEN OU1 UTILITY PLAN OVERALL D. Weber D. Weber 1"=120' 13 NORTH City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R MANAGER DATE: APPROVED: DATE: APPROVED: ELCO WATER DISTRICT UTILITY PLAN APPROVAL SYSTEMS ENGINEER MANAGER APPROVED: DATE: APPROVED: DATE: SYSTEMS ENGINEER BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL ( IN FEET ) 1 inch = ft. 120 0 120 Feet 120 240 360 No. Revisions: By: Date: REVIEWED BY: B. Curtiss DESIGNED BY: DRAWN BY: SCALE: DATE: 12/14/16 PROJECT: 1324-001 Sheet of 39 COUNTRY CLUB RESERVE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 12/14/16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com KEYMAP NTS DOUGLAS RD TURNBERRY RD EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING EDGE OF ASPHALT / / / / / / / / PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 5. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. PROPOSED STORM INLET PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE X X X X X X X X X X X X X X X X X X V.P. W S O W S O W S O W S O X X X X X X X X X X X M GAS F E S F E S TELE X X F E S M F E S X X X X X X X X X W S O X X X X X X X X X X X X X X X V.P. VAULT CABLE BOX CABLE H2O X V.GAS P. GAS 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W W W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W W OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE ST ST ST ST ST ST ST ST / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / PUMP HOUSE TO REMAIN GAS LINE TO REMAIN WATERLINE TO REMAIN ELECTRIC LINE TO REMAIN ELECTRIC TRANSFORMER BOX TO REMAIN PUMP HOUSE TO REMAIN VERTICAL PIPE TO REMAIN PUMP HOUSE TO REMAIN ± 345 L.F. OF FENCE TO BE REMOVED ± 1,962 L.F. OF OVERHEAD ELECTRIC LINE TO BE BURIED ± 1,322 L.F. OF FENCE TO BE REMOVED ± 565 L.F. OF FENCE TO BE REMOVED ± 783 L.F.OF FENCE TO BE REMOVED ± 690 L.F. OF FENCE TO BE REMOVED ± 925 S.F. OF WETLAND TO BE RELOCATED TO WETLAND TO THE WEST ± 42,003 S.F. OF WETLANDS TO REMAIN DROP BOX INLET INV. IN= 5062.84 (W) INV. OUT= 5058.62 (E) EXISTING 24" CMP FL = 5063.37 TELEPHONE PEDESTAL TO BE REMOVED OVERHEAD ELECTRIC POLE TO BE REMOVED ± 350 S.F. OF CONCRETE TO BE REMOVED TURNBERRY ROAD TURNBERRY ROAD E. DOUGLAS ROAD OPEN WATER POND TO BE REMOVED OUTFALL PIPE EXTENDS TO BOTTOM OF THE DITCH TO THE EAST BENCHMARK 92-14 N:150095.01 E:205460.88 CP "DAY" N:149746.84 E:204141.24 NE CORNER S30-T8N-R68W N:150052.51 E:205416.94 "STOP" SIGN TO BE RELOCATED "STOP" SIGN "RIGHT LANE BIKES ONLY" SIGN / / / / / / / / / / / / / EXISTING 18" CMP CULVERT TO BE REMOVED EXISTING 12" CMP CULVERT TO BE REMOVED / / / / / / / / / / / / / / FORT COLLINS CITY BOUNDARY EXISTING 60' ROW EXISTING 60' ROW EX2 AND DEMOLITION PLANS EXISTING CONDITIONS D. Weber D. Weber 1"=80' 5 NORTH City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 0 1 INCH = 80 FEET 80 80 160 240 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R MANAGER DATE: APPROVED: DATE: APPROVED: ELCO WATER DISTRICT UTILITY PLAN APPROVAL SYSTEMS ENGINEER MANAGER APPROVED: DATE: APPROVED: DATE: SYSTEMS ENGINEER BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL No. Revisions: By: Date: REVIEWED BY: B. Curtiss DESIGNED BY: DRAWN BY: SCALE: DATE: 12/14/16 PROJECT: 1324-001 Sheet of 39 COUNTRY CLUB RESERVE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 12/14/16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com KEYMAP NTS DOUGLAS RD TURNBERRY RD EXISTING ELECTRIC E LEGEND: G T EXISTING STORM SEWER ST EXISTING TELEPHONE EXISTING GAS EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING TREES (TO REMAIN) FIELD SURVEY BY: SUBSURFACE EXPLORATION BY: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3. CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. THE CITY OF FORT COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION THAT WILL ACCEPT CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD AND CAN BE REACHED AT (970) 482-1249. 4. ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5. CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 6. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. ORIGINAL FIELD SURVEY BY: NORTHERN ENGINEERING SERVICES, INC. PROJECT NUMBER: 103-005 DATE: JULY 11, 2006 EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROJECT BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 5015 5013 VAULT ELEC H Y D CONTROL IRR H2O G EXISTING TREES (TO BE REMOVED) EARTH ENGINEERING CONSULTANTS, INC. PRELIMINARY GEOTECHNICAL EXPLORATION - BOMA FARM DEVELOPMENT EEC PROJECT NUMBER: 1062013 DATE: FEBRUARY 22, 2006 APPROXIMATE LIMITS OF CONCRETE/ ASPHALT REMOVAL EX1 EX2 E E E E E E E E E E E E E E X X X X X X X X X X X X X X X X X X X X X WV TELE H Y D WV WV X X X X X X X X X X X X X X X X X X X X X X X X X X X X X F E S F E S M X X X X X X X F E S M M F E S F E S M M X X TELE F.O. TELE F E S X F E S F E S MM WV F E S F E S F E S F E S E E F E S M F E S F E S M M W S O W F E S F E S M M X GAS F E S X X E E F E S X X X F E S M 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING UNDERGROUND ELECTRIC LINE TO REMAIN UNDERGROUND WATER LINE TO REMAIN EXISTING 10" WATERLINE TO REMAIN ±1,067 L.F OF OVERHEAD ELECTRIC LINE TO BE BURIED GAS VALVE TO REMAIN ELEVATED PIPES (2) TO REMAIN EXISTING CATTLE GUARD TO REMAIN EXISTING FENCE TO REMAIN ELECTRICAL BOX W/ METAL 2 RAIL FENCE TO REMAIN ELECTRICAL BOX W/ METAL 2 RAIL FENCE TO REMAIN WATERLINE TO REMAIN GAS LINE TO REMAIN OIL RIG IN THE MIDDLE OF THE FENCE TO REMAIN ELECTRIC LINE TO REMAIN MSSU W/ METAL 2 RAIL FENCE TO REMAIN FENCE TO REMAIN MAILBOX TO REMAIN MAILBOX TO REMAIN TELEPHONE PEDESTAL TO REMAIN MAILBOXES TO REMAIN MAILBOX TO REMAIN MAILBOXES TO REMAIN EXISTING FIRE HYDRANT TO BE ADJUSTED TO FINAL GRADE TELEPHONE PEDESTAL TO BE REMOVED ± 905 L.F. OF FENCE TO BE REMOVED ± 1,157 L.F. OF FENCE TO BE REMOVED ± 42,003 S.F. OF WETLANDS TO REMAIN E. DOUGLAS ROAD N 1/4 S30-T8N-R68W N:150082.36 E:202773.42 CP "OIL" N:149442.70 E:202963.65 EXISTING 60' ROW EX1 AND DEMOLITION PLANS EXISTING CONDITIONS D. Weber D. Weber 1"=80' 4 NORTH City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 0 1 INCH = 80 FEET 80 80 160 240 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R MANAGER DATE: APPROVED: DATE: APPROVED: ELCO WATER DISTRICT UTILITY PLAN APPROVAL SYSTEMS ENGINEER MANAGER APPROVED: DATE: APPROVED: DATE: SYSTEMS ENGINEER BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL No. Revisions: By: Date: REVIEWED BY: B. Curtiss DESIGNED BY: DRAWN BY: SCALE: DATE: 12/14/16 PROJECT: 1324-001 Sheet of 39 COUNTRY CLUB RESERVE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 12/14/16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com KEYMAP NTS DOUGLAS RD TURNBERRY RD EXISTING ELECTRIC E LEGEND: G T EXISTING STORM SEWER ST EXISTING TELEPHONE EXISTING GAS EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING TREES (TO REMAIN) FIELD SURVEY BY: SUBSURFACE EXPLORATION BY: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3. CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. THE CITY OF FORT COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION THAT WILL ACCEPT CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD AND CAN BE REACHED AT (970) 482-1249. 4. ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5. CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 6. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. ORIGINAL FIELD SURVEY BY: NORTHERN ENGINEERING SERVICES, INC. PROJECT NUMBER: 103-005 DATE: JULY 11, 2006 EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROJECT BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 5015 5013 VAULT ELEC H Y D CONTROL IRR H2O G EXISTING TREES (TO BE REMOVED) EARTH ENGINEERING CONSULTANTS, INC. PRELIMINARY GEOTECHNICAL EXPLORATION - BOMA FARM DEVELOPMENT EEC PROJECT NUMBER: 1062013 DATE: FEBRUARY 22, 2006 APPROXIMATE LIMITS OF CONCRETE/ ASPHALT REMOVAL EX1 EX2 City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner MANAGER DATE: APPROVED: DATE: APPROVED: ELCO WATER DISTRICT UTILITY PLAN APPROVAL SYSTEMS ENGINEER MANAGER APPROVED: DATE: APPROVED: DATE: SYSTEMS ENGINEER BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL BOXELDER SANITATION DISTRICT CONSTRUCTION NOTES 1. Existing Utility Locates: It shall be the responsibility of the Contractor to coordinate field locates of all existing utilities prior to commencement of any construction. Contractor shall also notify all affected utility companies prior to commencing construction. In the event of damage to any existing utility, the contractor shall immediately notify the owner of the utility involved and unless authorized in writing by the owner of the subject utility, shall not attempt to make repairs. The cost of repairs shall be the responsibility of the Contractor. 2. District Owned Easement Pictures: Contractor to provide sequential digital pictures spaced at no more than 300 feet detailing conditions of the off-site Boxelder Owned Easement Conditions and any structures that could be affected, to the District and the property owner prior to the start of any off-site work. These pictures shall include all existing fence, ditches, ditch structures, out buildings, water troughs, trees and all other landscaping. Pictures are to be placed at no more than four (4) pictures on a 11x8 sheet of photo paper inserted into transparent sleeves and delivered with the drawings of record in a three (3) ring binder. 3. Protection of Property: Contractor shall continuously maintain adequate protection from damage of all public and private property through which the work is done. 4. Safety: All sewer main installation within the District shall be subject to current (Occupational Safety and Heath Association (OSHA) and the Colorado Safety Association, (CSA) safety requirements. Contractor shall also comply with any and all requirements and regulations as set forth by City, County, State and Federal agencies having applicable authority. 5. Start of Construction: No construction shall begin without prior design review of the District. The District shall be notified 48 hours in advance of starting construction or testing to allow for scheduling. 6. Road Excavation Permits: In event that State, County or City road excavation permit(s) are required, the Contractor is responsible for obtaining all road permits which may be required. 7. Other Permits: The Contractor shall be responsible for obtaining all permits required for construction. 8. Revisions: No verbal authorization for field revision shall be given. All requests for field revision shall be made in writing accompanied by proposed change indicated on copy of the approved design drawings. Any field revision approved and installed shall also be accurately documented on the Drawings of Record. 9. Materials: Plastic Pipe -All gravity sanitary sewer piping shall be Polyvinyl Chloride (PVC) unless otherwise noted on the approved drawings. Pipe 15" and smaller shall conform to ASTM D3034, Type PSM, and SDR 35. Pipe 18" and larger shall conform to ASTM F679. All fittings shall be (PVC) unless otherwise noted. 10. Pipe Cover: A minimum cover of 3-1/2 feet of cover shall be maintained throughout the sewer line and service line installation. 11. Bedding: All sewer main installation shall include bedding. Bedding shall be ¾" washed rock uniformly graded and compacted. Refer to force main desgin for force main bedding requirements. Trench shall be excavated to a depth below established grade equal to ¼ of pipe diameter (min. 4"). Bell depressions shall be provided for all joints. In event that unstable trench conditions are encountered at pipeline grade 1-1/2" uniformly graded washed rock shall be used for stabilization. Bedding material shall be placed and compacted under and around sides of the pipe. Place bedding in such a manner as to provide solid, uniform bearing surface for full length of barrel. Minimum 30" initial lift above pipe before other than hand compaction equipment is to be used. Note maximum trench width detail. 12. Backfill: Backfilling of trench shall be performed as soon as practical, subsequent to inspection and approval. Backfilling of acceptable material shall not be placed in lifts of greater than one (1) foot. Backfill shall be compacted to 95% of optimum density in roadway and residential areas and 90% in all off-site easement areas unless otherwise noted. Compaction testing of bedding and back fill shall be at least five tests per 1,000 feet and at varying depths and locations in accordance with the requirements of the applicable authority or as required in project specific specifications. 13. Concrete: All concrete construction shall be completed utilizing 3,000 psi at twenty-eight (28) days or equal concrete. 14. Pavement or Other Repairs: In event that asphalt or concrete pavement, sidewalks, storm sewers, waterline or any other public or privately owned property is damaged or requires reconstruction due to the work, repairs or replacement will be made in accordance with the requirements of the appropriate governing authority. Private property will be returned to its original condition or as close to original condition as reasonably possible, unless otherwise noted on the drawings. 15. Service Taps on Existing Lines: All taps made on existing lines shall be completed at developer's expense by District personnel or the District's authorized contractor with no exception. 16. Inspection: Construction shall conform to District Standards and Specifications or project specific specifications at all times. The District shall inspect the construction as necessary and shall observe all line testing. The District shall have the authority to ascertain that all construction of facilities is equal to or better than minimum construction requirements as set forth in 17. Testing: All lines shall be pressure tested and flushed by the Contractor in accordance with District Standards and Specifications and under the District's supervision. Upon passing, copies of all passing test results including soils compaction in the area of sewer main construction shall be provided to the District. 18. Acceptance: Upon completion of all utility construction (sewer and other) and fulfillment of all District requirements, preliminary acceptance of new sewer system improvements will occur in accordance with District's acceptance procedure. 19. Warranty: The Contractor shall warrant the materials, installation, workmanship and surface restoration for a period of two years from date of preliminary acceptance. During this warranty period the Developer shall promptly repair any defects in the work and maintain the work area. At the close of the two-year warranty period the District will make a field inspection. Upon satisfactory correction of any deficiencies noted the District would make final acceptance of the lines and work. The lines and the appurtenances shall then become the sole property and responsibility of Boxelder Sanitation District. 20. Drawings of Record and Total Costs: Within 90 days of preliminary acceptance of the new facilities, the District shall be provided with acceptable Drawings of Record of the complete system consisting of two sets of fill size reproduced prints, two sets of ½-size reproduced prints, one set of 6 mil double matted reproducible mylars and one complete digital file equivalent (software and version to be confirmed at time of delivery). Written confirmation of the total cost of all sewer system improvements shall also be submitted with the Drawings of Record. EAST LARIMER COUNTY WATER DISTRICT GENERAL NOTES FOR CONSTRUCTION 1. Locates: It shall be the responsibility of the Contractor to coordinate field locates of all existing utilities prior to commencement of any construction. Contractor shall also notify all affected utility companies prior to commencing construction. In event of damage to any existing utility Contractor shall immediately notify owner of the utility involved and, unless authorized in writing by the owner of the subject utility, shall not attempt to make repairs. Cost of repairs shall be the responsibility of the Contractor. 2. Damage to Property: Contractor shall continuously maintain adequate protection from damage of all public and private property through which the work is done. 3. Safety: All water main installation within the ELCO Water District shall be subject to current OSHA and COSHA safety requirements. Contractor shall also comply with any and all requirements and regulations as set forth by City, County, State and Federal agencies having applicable authority. 4. Landscaping Adjacent to District Waterlines: No landscaping (bushes, shrubs, trees or other plantings) that has a mature height of over 3 feet (3-ft)shall be placed within ten feet (10-ft) of any District waterline (distribution main, service line, meter, etc.). The District shall have the right to remove any landscaping that violates this standard, at any time such landscaping is discovered, and shall not be required to replace the removed landscaping. 5. Design Approval and Notice of Construction Start: No construction shall begin without prior design approval from ELCO. District shall be notified 48 hours in advance of starting construction or testing to allow for scheduling. District shall inspect the construction as necessary and shall observe all line testing. Construction or testing shall conform to District Specifications at all times. In event that State or City road excavation permit(s) are required Contractor shall notify District of proposed construction schedule well in advance to allow time for District to obtain the required permit(s). 6. Permits: Contractor is responsible for obtaining all County road permits which may be required. 7. Changes During Construction: No verbal authorization for field revision shall be given. All requests for such field revision shall be made in writing accompanied by proposed change indicated on copy of the approved design drawings. Any field revision approved and installed shall also be accurately documented on As-Built drawings as detailed below in these Notes. 8. Materials of Construction: a. Pipe - All water piping shall be Polyvinyl Chloride (PVC). All PVC piping through 12-inch shall be manufactured in accordance with AWWA Standard C900, "Polyvinyl Chloride (PVC) Pressure Pipe, 4-inch through 12-inch, For Water Distribution", Class 150 (SDR 18). All PVC piping 14-inch through 24-inch shall be manufactured in accordance with AWWA Standard C905, "Polyvinyl Chloride (PVC) Water Transmission Pipe, Nominal Diameters 14-inch through 36", Class 200 (SDR 18). Pipe with a diameter greater than 24 inches shall be specified based on engineered design. Pipe size shall be as shown on the approved plans. All non-metal water piping shall be installed with a twelve (12) gauge braided copper wire, plastic coated, six hundred (600) volt taped to top of pipe and surfaced at each valve as a tracer wire. Pipe joints shall be made using an integral bell with an elastomeric gasket push-on type joint or using machined couplings of a sleeve type with rubber ring gaskets and machined pipe ends to form a push-on type joint. All materials installed shall be free of manufacturer defects. Any defective or damaged materials noted on the construction site shall be so marked and removed from the site. All fittings shall be mechanical joint, ductile iron, manufactured in accordance with AWWA Standard C153. Fittings shall be furnished with a cement-mortar lining of standard thickness class with a 250 psi pressure rating. Under no circumstances shall any PVC piping be installed utilizing mechanical equipment to seat the joints. b. Gate Valves - Gate valves shall conform to AWWA Standard C509-87 with mechanical joint, 2" open left operating nut and resilient seat. Valve shall be Mueller A-2380-20 or approved equal. c. Butterfly Valves - Butterfly valves shall conform to AWWA Standard C504-80 with mechanical joint, 2" open left operating nut, resilient seat and shall be equipped with sand bonnet. Valve shall be Mueller or approved equal. d. Fire Hydrant Assembly - Hydrant shall conform to AWWA Standard C502-85, 1" square open right operating nut, no American Darling units. Mueller Super Centurion with epoxy coated shoe or American Flo Control Waterous Pacer WB-67-250X with epoxy coated shoe. e. Fittings - All fittings shall be swing assemblies with anchor couplings. 9. Pipe Wrap: All fittings, valves, fire hydrant shoes and plugs shall be poly-wrapped with 8-mil thick polyethylene plastic wrap, double layered, and ends securely taped prior to backfill. 10. Bedding: All water main installation shall include bedding. Bedding shall be 3/4" washed rock uniformly graded and compacted. Trench shall be excavated to a depth below established grade equal to 1/4 of pipe diameter (min. 4"). Bell depressions shall be provided for all joints. In event that unstable trench conditions are encountered at pipeline grade 1-1/2" uniformly graded washed rock shall be used for stabilization. Bedding material shall be placed and compacted under and around sides of the pipe. Place bedding in such a manner as to provide solid, uniform bearing surface for full length of barrel. Minimum 30" backfill above pipe before other than hand compaction equipment is to be used. Note maximum trench width detail. 11. Backfill: Backfilling of trench shall be performed as soon as practical, subsequent to inspection and approval. Backfilling of acceptable material shall be placed in lifts not greater than one (1) foot. Backfill shall be compacted to 95% of optimum density in roadway areas and 90% in all other locations. Compaction testing of bedding and backfill shall be at least five tests per 1,000 feet and at varying depths and locations in accordance with the requirements of the applicable authority. 12. Thrust Blocks: All fittings, tees, plugs and fire hydrants shall be provided with anchor couplings and concrete thrust blocks in accordance with ELCO Specifications. 13. Concrete: All concrete construction, including thrust blocks, shall be completed utilizing Type 5 or equal cement only. 14. Asphalt Replacement: In event that asphalt pavement is involved that has been in place less than two years (according to City or County Engineer's record) and is cut, the cut shall be a minimum of 20 feet in width and will be replaced to the specified depth by a paving machine. 15. Pipe Cover: A minimum cover of 4-1/2 feet shall be maintained throughout the waterline and service line installation, particularly in areas of new grading and drainage swales. Extra bury depth may be required to maintain minimum cover at drainage culvert crossings and/or fire hydrant runs. Maximum allowable cover shall be 6 feet, unless specifically approved by the District. 16. Connection to Existing System: All connections to existing waterlines shall be completed at developer's expense by ELCO personnel or the District's authorized contractor with no exception. 17. Inspection: ELCO shall have the authority to ascertain that all construction of facilities is equal to or better than minimum construction requirements as set forth in the District's Specifications. The District shall also have the authority to assign an inspector to check any and all work, including all materials to be incorporated in the work, excavation, bedding, backfill, testing and all construction methods and practices. 18. Testing and Acceptance: All lines shall be pressure tested, chlorinated and flushed by the Contractor in accordance with District Specifications and under the District's supervision. Upon passing chlorination testing, bacteriological testing will be completed by an accredited water quality control laboratory. Copies of all passing test results, including soils compaction in the area of water main construction, shall be provided to the District. 19. Project As-Built and Record Drawing Requirements: a. As-built drawings are prepared by the contractor. They confirm, in red ink, on-site changes to the original construction documents. The As-built drawings shall be forwarded to project's design engineer for conversion to Record Drawings. b. Record Drawings are prepared by the project's design engineer and reflect on-site changes the contractor noted in the as-built drawings. The Record Drawings shall be approved by ELCO prior to Preliminary Acceptance of the project. Record Drawings are to be delivered to the District in hard copy (11 x 17 format) and electronic format. Hard copy drawing text font size shall be large enough to be legible with font size approved by the District. Electronic format shall be delivered in Adobe .pdf, AutoCAD and ArcView shape files (release version to be confirmed with District at time of submittal). These documents shall accurately reflect any change made in the field which varies from the approved construction plan and including, at a minimum, field dimensions and elevations, horizontal and vertical locations of underground utilities and appurtenances. Include with the Record Drawings a complete copy of the recorded Filing Plat and a written confirmation of total costs of all water system improvements involved. 20. Warranty: The Contractor shall warrant all work associated with the waterline installation including, but not limited to the materials, installation workmanship and surface restoration for a period of two years from date of Preliminary Acceptance. During this warranty period the Contractor shall repair any defects in the work and maintain the work area. At the close of the two year warranty period and upon satisfactory correction of any deficiencies noted, the District shall accept the constructed lines and appurtenances as the sole property and responsibility of the ELCO. Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 12/14/16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com CS1 COVER SHEET D. Weber D. Weber NTS 1 CONTACT INFORMATION PROJECT TEAM: GAS----------------- Xcel Energy---------------------------------------------------------(970) 225-7828 ELECTRIC-------- City of Fort Collins Light & Power-----------------------------(970) 224-6152 CABLE------------- Comcast-------------------------------------------------------------(970) 567-0245 TELECOM.--------CenturyLink---------------------------------------------------------(970) 490-7501 WATER------------ ELCO Water Distric-----------------------------------------------(970) 221-6700 WASTEWATER--Boxelder Sanitation District-------------------------------------(970) 221-6700 STORMWATER- City of Fort Collins Utilities--------------------------------------(970) 221-6700 FIBER OPTICS-- Colorado State University---------------------------------------(970) 491-0187 UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. DECEMBER 2016 SHEET INDEX PRELIMINARY UTILITY PLANS FOR A TRACT OF LAND LOCATED IN THE NORTHEAST QUARTER OF SECTION 30, TOWNSHIP 8 NORTH, RANGE 68 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO COUNTRY CLUB RESERVE PHONE NUMBER Bud Curtiss, PE Northern Engineering Services, Inc. 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 Erik Smith, PLS Northern Engineering Services, Inc. 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 *The underground utility locates provided by SiteWise, LLC are based upon the best available information at the time of locating. Contractor acknowledges that it is common for underground facility owner maps to have errors and omissions of data shown. Consequently, it is the Contractor's sole responsibility to field verify the location of all utilities prior to construction, and notify the Engineer of any discrepancies found. VICINITY MAP NORTH 1"=2,000' I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: PROJECT DATUM: NAVD88 BENCHMARK 92-14 AT THE NORTHEAST CORNER OF DOUGLAS ROAD AND TURNBERRY ROAD, ON THE SOUTHWEST CORNER OF A BRIDGE OVER LARIMER CANAL DITCH. ELEVATION: 5075.10 BENCHMARK 92-15 AT DOUGLAS ROAD AND COUNTY ROAD 13, ON A LARIMER COUNTY BRASS CAP, ON THE SOUTHWEST CORNER OF A BRIDGE OVER LARIMER CANAL DITCH. ELEVATION: 5123.89 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.17' Northern Engineering Services, Inc. Project No. 103-005 Date: July 11, 2006 ORIGINAL FIELD SURVEY BY: Earth Engineering Consultants, Inc. Preliminary Geotechnical Exploration - Boma Farm Development Fort Collins, Colorado EEC Project No. 1062013 Date: February 22, 2006 PROJECT BENCHMARKS: E N G I N E E R I N G N O R T H E RN E N G I N E E R I N G N O R T H E RN CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner SITE ENGINEER SURVEYOR CS1 COVER SHEET CS2-CS3 GENERAL AND CONSTRUCTION NOTES EX1-EX2 EXISTING CONDITIONS AND DEMOLITION PLAN OG1 OVERALL GRADING PLAN G1-G6 GRADING PLAN OU1 OVERALL UTILITY PLAN U1-U6 UTILITY PLAN SS1 OFFSITE SANITARY SEWER R1-R2 STREET A PLAN AND PROFILE R3-R4 STREET B PLAN AND PROFILE R5 STREET C PLAN AND PROFILE R6 STREET D PLAN AND PROFILE R7-R8 STREET E PLAN AND PROFILE R9-R11 EAST DOUGLAS ROAD PLAN AND PROFILE R12-R13 TURNBERRY ROAD PLAN AND PROFILE XS1-XS3 EAST DOUGLAS ROAD ROADWAY CROSS SECTIONS XS4-XS5 TURNBERRY ROAD ROADWAY CROSS SECTIONS DR1 DRAINAGE EXHIBIT PROJECT LOCATION MANAGER DATE: APPROVED: DATE: APPROVED: ELCO WATER DISTRICT UTILITY PLAN APPROVAL SYSTEMS ENGINEER MANAGER APPROVED: DATE: APPROVED: DATE: SYSTEMS ENGINEER BOXELDER SANITATION DISTRICT UTILITY PLAN APPROVAL The Birdsall Group, LLC 444 Mountain Avenue Berthoud, CO 80513 (970) 532-5891 PLANNER/ LANDSCAPE ARCHITECT DEVELOPER/APPLICANT Crystal Cove Development, LLC 8020 S County Road 5, Unit 200 Fort Collins, CO 80528 (970) 204-9393